HomeMy WebLinkAbout79-19 MM 2021 Town of Sunset BeachPENDER
BRUNSWICK
ONG BAY V CAPE
FEAR
PROJECT AREA
LENOIR
JONES
PAMLICO
00
01 ?�
Pp
C S
ONSLOW
CARTERET
V
� �P
BEAUFORT
BOGLE INLET CAPE
INLET LOOKOUT
NEW RIVER
41
INLET
O
" G
0� O
G
A4.�
P
�v
P
VICINITY MAP
PROJECT 777LE. TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DA7UM.' WIN
PREPARED BY., MOFFATT & HICHOL
0 10 20
m
5 15 25
SCALE IN MILES
PREPARED FOR.. TOWN OF SUNSET BEACH
NORTH CAROLINA
DA 7F.' SEPTEMBER 9, 2020
ATLANTIC OCEAN
LOCATION MAP
SHEET 77TLE.•
VICINITY AND LOCATION MAPS
.OW BAY
0 2 a
m
1 3 5
SCALE IN MILES
SHEET
1
OF
7
PROJECT 777LE.• TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DATUM.• MLW
PREPARED BY MOFFATT & NICHOL
PREPARED FOR.• TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE SEPTEMBER 9, 2020
N
NOTES: (NORTHSHORE PLACEMENT)
• THE HYDRAULIC PIPELINE USED TO TRANSFER THE
DREDGE MATERIAL SHALL BE POSITIONED WITHIN 20—FT
OF THE DUNE TOE ADJACENT TO THE VEGETATION LINE
WHILE TRAVERSING THE BEACH. THE PIPELINE SHALL
HAVE A MINIMUM OF ONE SAND RAMP CROSSING
POSITIONED TO FACILITATE PEDESTRIAN ACCESS WHERE
THE PIPELINE CROSSES THE SANDY BEACH TO ENTER THE
ATLANTIC OCEAN.
• THE CONTRACTOR SHALL INSPECT THE PIPELINE A
MINIMUM OF ONCE EVERY 4 HOURS OF OPERATION FOR
LEAKS OR MATERIAL SPILLS. WHEN A LEAK IS
DISCOVERED ALL OPERATIONS SHALL CEASE UNTIL
REPAIRS ARE COMPLETED TO STOP THE MATERIAL
SPILLAGE.
• ALONG NAVIGABLE WATERWAYS, OR BAY SIDE OF SUNSET
BEACH, THE PIPELINE SHALL BE POSITIONED ABOVE MHW
AND AS LANDWARD AS POSSIBLE WITHOUT TRAVERSING
OVER VEGETATION OR THE DUNE FEATURE.
• IF THE PIPELINE CANNOT BE POSITIONED ABOVE MHW DUE
TO DOCKS OR OTHER STRUCTURES, THE PIPELINE SHALL
BE MARKED WITH BUOYS AND LIGHTS A MINIMUM OF
EVERY 500—FT, OR AS RECOMMENDED BY THE USCG.
• THE PIPELINE WILL CROSS ALL NAVIGABLE WATERWAYS
PERPENDICULAR TO THE DIRECTIONS OF TRAVEL TO
MINIMIZE THE PIPELINE LENGTH WITHIN THE NAVIGATION
CHANNEL. THE PIPELINE WILL BE ANCHORED IN THE
DEEPEST DEPTH AVAILABLE TO NOT BLOCK NAVIGATION
AND WILL HAVE BUOYS ATTACHED APPROXIMATELY
EVERY 25—FEET ALONG EACH CROSSING TO IDENTIFY ITS
PRESENCE. THE PIPELINE SHALL NOT BE ALLOWED TO
CROSS NAVIGABLE WATERS WITH LESS THAN FOUR (4)
FEET OF DRAFT REMAINING OVER THE SUBMERGED LINE.
• SIGNAGE SHALL ALSO BE PROVIDED AND VISIBLE FROM
BOTH DIRECTIONS OF TRAVEL TO MARK ALL NAVIGATION
CROSSINGS.
LEGEND
MEAN HIGH WATER
APPROXIMATE PIPELINE CORRIDOR
— — — — — — — DREDGE FOOTPRINT
NEARSHORE PLACEMENT SITE
SHEET 777LE.-
SITE & KEY PLAN
soo' o' soo• i000•
ma
SCALE: 1"=1000'
SHEET
2
OF
7
PROJECT 777LE.. TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DATUM: MLW
PREPARED BY., MOFFATT & NICHOL
SOUTH JINKS CREEK
5:1 SIDE SLOPES ;
BOTTOM EL —5.0 ;
s�dp `r DREISGE
•ems � � i—_�'-- �_
BEACH PLACEM
PIPELINE, TYP -
E MAIN ST
PREPARED FOR: TOWN OF SUNSET BEACH
NORTH CAROLINA
DA7E• SEPTEMBER 9, 2020
N LEGEND
— —OO — — MAJOR CONTOUR
------- MINOR CONTOUR
NOTES:
1. MAJOR CONTOURS PROVIDED
ARE ON A 5' INTERVAL.
2. MINOR CONTOURS PROVIDED
ARE ON A 1' INTERVAL.
3. CONTOURS ARE BASED ON 2016
CONDITIONS.
u
SHEET 777LE.-
DREDGE AREA WORK PLAN - SHEET 1 OF 4
50' 0' 50' 100'
SCALE: 1"=100'
SHEET
3
OF
7
PROJECT 7I7LE.' TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DATUM.' MLW
PREPARED BY.' MOFFATT & NICHOL
PREPARED FOR: TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE: SEPTEMBER 9, 2020
'IPELINE
LENT WILL BE
NATED WITH
& USFWS
SHEET 777LE.-
LEGEND
— —CD— — MAJOR CONTOUR
- - - - - - - MINOR CONTOUR
NOTES:
1. MAJOR CONTOURS PROVIDED
ARE ON A 5' INTERVAL.
2. MINOR CONTOURS PROVIDED
ARE ON A 1' INTERVAL.
3. CONTOURS ARE BASED ON 2016
CONDITIONS.
DREDGE AREA WORK PLAN - SHEET 2 OF 4
too' 0' 100' 200'
SCALE: 1"=200'
SHEET
4
OF
7
~I
W
W
�IW
Z
J
S
U
a
W3�
PROJECT 777LE.' TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DATUM: MLW
PREPARED BY.' MOFFATT & NICHOL
N
o-,
LEGEND
- - O- - MAJOR CONTOUR
- - - - - - - MINOR CONTOUR
NOTES:
1. MAJOR CONTOURS PROVIDED
ARE ON A 5'INTERVAL.
2. MINOR CONTOURS PROVIDED
ARE ON A 1' INTERVAL.
3. CONTOURS ARE BASED ON 2016
CONDITIONS.
y
PROPOSED Iw
CORRIDOR LIMITS
LLi
FINAL PIPELINE
- PLACEMENT WILL BE ~
COORDINATED WITH
NCWRC & USFWSWj�W�—v o
i
PREPARED FOR.' TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE' SEPTEMBER 9, 2020
ATLANTIC OCEAN
SHEET 777LE.'
DREDGE AREA WORK PLAN - SHEET 3 OF 4
100• a' 1oa' zoo'
SCALE: 1'=200'
SHEET
5
of-
7
N LEGEND
- -OO - - MAJOR CONTOUR
____---- _ - - - - - - - MINOR CONTOUR
-
--------- FILL AREA
_ _ _-:�`�
- -_--- - -- `-' 1. MAJOR CONTOURS PROVIDED
I----------- --------- 1 --- T — —,---
_._ _� i % . ARE ON A 5 INTERVAL.
�------ =��=+r-was_'�'---_-
_ ---------- -- _-______-_-__--- =�------------------ �- 2. MINOR CONTOURS PROVIDED
r=====----------T'� --- - -- - _ - - - - ------
=_ - 15 `L _ _=ec= _____ ______ -----------
ARE _-�_;__: ARE ON A 1' INTERVAL.
-----_ - _=-_____+ \• `-_�___=��=y�-_<<��_s--10-- - - -=------------- --- -
-+_-
3=--% o __-- -''--------- ____ --'-------------- -- 3. CONTOURS ARE BASED ON 2016
-� ----- --- --' -----
_
- - - -
- -�'------- _------'--------- - - - CONDITIONS.
-------------- ---------------------- - -y---
----------------'------------`------------ ----- ----- -
-�-----'--- - _ -
------- 5 — —
_ —
_ � l- --'__________________________________ r- ____________
5_____________________� -_____
____�__- ___-__-----
_____ ___ ___
_--.-���11-----------------------
-- --
- =t�� ------ _--------- ---•- -----
Ld
----
------------ f APPROX E-MTTFlC` o , -
r MHW-LINE------_-_-_-_--------_--- ----- - 11-------------------�"-" I =
-------------------- -- ----- {vIFW _�---------
_------------------- MtW----_ ---SAL
_------ - ---_ _ ATLANTIC OCEAN PROPOSED PIPELINE I a
____-- ---_�_ � --'- CORRIDOR LIMITS
--- --
-----4k4K-�__
-- --� ?--- FIi+YAL 13tA INE _
_�TvIL�-�=___- � �--- ��-_�SC�€"��F-- --- -------------------------- PLACEMEbT WILL BE
=_MEW----- --- -%---------------------------- - - - - �90RB{NA�€O WfFH — - -
---- - - - ---------
--------------------.---------- - - - - - - - --- �- - - -------NCWRC: &.11SF�AlS----- --
--------------- -- —----------------------- -
----------
- - D- - _ -------------------
-------------------------------
----------------------------3:-1-SLOPE, TYP _---------------- -
__--------------- n -----
-----------------------------------------
------------------------------ --- - — --------IOP_�F-�E-F�PA--C-�=�0,-_fYP-------------- ---
---------------- - --D p o =
--1N�2354 _ _ „- - - - - - - - - - - - - -
-Wd o o----
-10 - � 2T508 9 - - - - - - o
- - - ----------------A -----
- --- - ------ ---
------------------------ - - - -
- - - - - - - ------ -----
------- - - -
N 42833
-----------fit 42L1I-----_----------------------------------- ------
E 2150856 .'--------------------------------------------._-
----------------------------------
2016 AERIALS BY NC ONEMAP
PROJECT 777LE.• TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DAMP: MLW
PREPARED BY; MOFFATT & NICHOL
PREPAREDFOR.- TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE.' SEPTEMBER 9, 2020
SHEET 777LE.-
DREDGE AREA WORK PLAN - SHEET 4 OF 4
20V 0' 10tl 200'
SCALE: 1 "-200'
SHEET
6
OF
7
SECTION H
30
30
..
20
20
3
J
g
Z
10
10
0
F
>
0
0
w
J
W
-10
-10
-20
-20
-1+00
0+00
1+00 2+00 3+00
4+00 5+00
DISTANCE (FEET)
BEACH
FILL
150
00'
APPROX.
EXIST. G
ADE
NAVD 2.94
_ -
A
EL -6.0
PROJECT TTT[E.• TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DATUM., MLW
PREPARED BY: MOFFATT & NICHOL
PREPARED FOR: TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE' SEPTEMBER 9, 2020
SHEET TTTLE.
NEARSHORE PLACEMENT TYPICAL SECTION
50' 0' SO' 100'
SCALE: 1"=100'
SHEET
7
OF
7