Loading...
HomeMy WebLinkAbout64-19 MOD LLC....................... _.. _... - Permit Class Permit Number NEW i 64-19 STATE OP NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission , Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to MOD LLC., 4505 Dalton Rd., Chevv Chase, MD 20015 Authorizing development in Chowan County at adi to the Yeopim River, at 620 Flagship Ct., in the Farms at R.iversound S/D, near Edenton , as requested in the permittee's application dated 6/8/19, incl att workplan drawings (8), Sheet 2 of 4 dated "Rev 8/19/09", Sheets 1-3 of 7 dated "Rev 6/10/19", Sheets 4-6 of 7 dated "Rev 6/5/19", Sheet 7 of 7 dated 6/8/19. This permit, issued on August 7, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation )f these terms may be subject to Imes, imprisonment or civii acuon; or may causc urc periui< w uc uuu auu vuiu. NOTE: This permit is issued in accordance with conditions within Permit No. 126-09 as amended to Yeopim Partners LLC. issued on 5/8/15 and the Minor Modification issued on 1117/18. Shoreline Stabilization - Bulkhead 1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 2) No vegetated wetlands shall be excavated or filled, even temporarily. 3) No open water shall be excavated or filled, even temporarily, outside the approved bulkhead alignment. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the secretary or uhy ana me Unau of the Coastal Resources Commission. z�, �� a� Braif on C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee MOD LLC. ADDITIONAL CONDITIONS Permit No. 64-19 Page 2 of 3 4) The alignment of the authorized bulkhead shall be staked by the Oermittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. 5) The bulkhead shall be constructed prior to any backfilling activities. 6) The bulkhead shall be structurally tight so as to prevent seepage of backfrli materials through the structure. 7) The fill material shall be clean and free of any pollutants except in trace quantities. 8) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. Sedimentation and Erosion Control 9) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. Docking Facility 10) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 11) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 12) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 13) This permit authorizes a maximum of 1 formalized boat slip. 14) The boathouse shall not be completely enclosed or have side coverage more than one half the height of the side, from the roof waterward. The footprint of the boathouse shall not exceed the dimensions on the authorized workplans. MOD LLC. ADDITIONAL CONDITIONS Permit No. 64-19 Page 3 of 3 15) The authorized boathouse shall be single story, and shall riot be designed to allow for second story use. 16) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 17) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's areas of riparian access. General 18) In order to reduce the potential for negative effects on the spawning migration of anadromous fish, no in -water work shall be permitted between February 15 and June 30 of any year without the prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies. 19) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 20) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third party. 21) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2019-01213) issued 8/2/19. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2019 issued 8/6/19. OOS1 NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: An application processing fee of $250 was received by DCM for this project. y ' r � DIVISION OF COASTAL MANAGEMENT Application Processing Notes Applicant:: G' "10 L Type: (Check all that apply) New S Major Mod Permit# Permit Coordinator: Field.Representative: L�_� r, n Minor Mod Renewal Transfer Date Time Message bKl(GIKAd # �ir;r. ROY COOPER Governor MICHAEL §.'BEGAN Secretary BRAXTON C. DAVIS Director NORTH CAROLINA Environmental Quality File Note: FROM: Gregg Bodnar, DCM Assistant Major Permit Coordinator SUBJECT: YeopimPartners #126-09 DATE: 7/18/19 MOD LLC is located within the Riversound Subdivision located off Drummond's Point Rd., in Chowan County. The subdivision was authorized under permit no. 126-09. The NEW permit was issued on 9/1/09. Condition No.18 restricted all lots within Phase II to be restricted to a one slip docking facility. Condition No. 19 dedicated lots 243-257 shoreline for the marina Condition No. 20 restricted all waterfront lots from requesting shoreline stabilization Major Modification issued 2/16/15 modified Condition No. 19 to lots 42-51 which is located in proximity to the marina. Amended permit issued 5/8/15 modified Condition No. 19 to a section of shoreline noted on Sheet 1 of 7 dated "Revised 9/30/14". The location was designated an area along Simon Creek between markers A and B. Minor Modification issued 11/7/18 modified Condition No. 20 to allow for each property listed below to allow for each property to apply for shoreline stabilization though the Major Permit process only. All other lots not designated under the Minor Modification will have the shoreline stabilization restriction remain in effect. These lots are available on Sheet 1 of 1 dated "Revised 10/8/18". Plantation Circle (Lots 42-34) Windsong Point (Lots 20-15) Mayfaire Drive (Lots 51-49) Flagship Dr. and Flagship Ct.(Lots 48-42) D Q� North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400Commerce Avenue I Morehead City, North Carolina 28557 252.8082808 Pernut Class NEW Permit Number 64-19 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ermtt for QA, X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to MOD LLC 4505 Dalton Rd., Chevy Chase MD 20015 Authorizing development in Chowan County at adi to the Yeopim River, at 620 Flagship Ct., in the Farms at Riversound S/D, near Edenton , as requested in the permittee's application dated 6/8/19, incl att workplan drawings (8), Sheet 2 of 4 dated "Rev 8/19/09", Sheets 1-3 of 7 dated "Rev 6/10/19", Sheets 4-6 of 7 dated "Rev 6/5/19", Sheet 7 of 7 dated 6/8/19. This permit, issued on August 7, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation If these terms may be subject to fines, imprisonment or civil action; or may cause me permit to De null ana vora. NOTE: This permit is issued in accordance with conditions within Permit No. 126-09 as amended to Yeopim Partners LLC. issued on 5/8/15 and the Minor Modification issued on 11/7/18. Shoreline Stabilization - Bulkhead 1) The bulkhead shall be constructed in accordance with the alignment depicted on t1B rkplan drawings. SEP 18 2019 2) No vegetated wetlands shall be excavated or filled, even temporarily. DCM-MHD CITY 3) No open water shall be excavated or filled, even temporarily, outside the approved bulkhead alignment. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary or urxl ana me Lnau of the Coastal Resources Commission. l� Bra -AM C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. /hopL__C„ �tJ G AW Signature ofPermittee MOD LLC. ADDITIONAL CONDITIONS Permit No. 64-19 Page 2 of 3 4) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. 5) The bulkhead shall be constructed prior to any backfilling activities. 6) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 7) The fill material shall be clean and free of any pollutants except in trace quantities. 8) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. Sedimentation and Erosion Control 9) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. Dockine Facility 10) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of strictures shall be conducted on, in or over Public Trust waters without permit modification. 11) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 12) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. RECEIVED 13) This permit authorizes a maximum of 1 formalized boat slip. S E P 18 2019 14) The boathouse shall not be completely enclosed or have side coverage more tj�tl�eeight of the side, from the roof waterward. The footprint of the boathouse shall not exce a on the authorized workplans. M16D LLC. Permit No. 64-19 Page 3 of 3 ADDITIONAL CONDITIONS 15) The authorized boathouse shall be single story, and shall not be designed to allow for second story use. 16) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 17) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's areas of riparian access. General 18) In order to reduce the potential for negative effects on the spawning migration of anadromous fish, no in -water work shall be permitted between February 15 and June 30 of any year without the prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies. 19) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 20) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third party. 21) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2019-01213) issued 8/2/19. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2019-6881 issued 8/6/19. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: An application processing fee of $250 was received by DCM for this project. RECEIVED SEP 18 2019 DCM-MHD CITY Bodnar, Gregg From: Scarbraugh, Anthony Sent: Thursday, August 08, 2019 9:17 AM To: Bodnar, Gregg Subject: FW: CAMA Major Permit: MOD LLC/ Permit #64-19 Attachments: Mod LLC Permit.pdf Gregg, The project references the wrong DWR project number. The correct project number is 2019-0881 and not 2019-6881. Thanks, D_E Anthony Scarbraugh Environmental Specialist H,, L a.W Resources North Carolina Department of Environmental•Quality 252.9483924 (Office) Anthony.Scarbraugh@pcdear.gov CnxI4 cx0s a 7C7&= to fM &ort7 IMs acida= is sutl6ct 0 M Mwgh GTCC.`.`m Fubfc Abcerds Law and rIV1W di J 10 th7d padres From: Day, Susan Sent: Wednesday, August 7, 2019 3:03 PM To: tedsr@sampsoncontracting.com; Renaldi, Ronald <ronald.renaldi@ncdenr.gov>; Godfrey, Ella M <EIIa.Godfrey@ncdenr.gov>; Raleigh Bland <Raleigh.W.Bland@usace.army.mil>; DCR - Environmental —Review <Environmental.Review@ncdcr.gov>; Whitfield, Clif <clif.whitfield@ncdenr.gov>; Staples, Shane <shane.staples@ncdenr.gov>; Harris, David B <davidharris@ncdot.gov>; Jenkins, Shannon <shannon.jenkins@ncdenr.gov>; Gupton, Sharon <sharon.gupton@ncdenr.gov>; Walton, Tim <tim.walton@doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Sullivan, Shelton <shelton.sullivan@ncdenr.gov>; Scarbraugh, Anthony<anthony.scarbraugh@ncdenr.gov>; Thorpe, Roger <roger.thorpe@ncdenr.gov>; Dunn, Maria T., <maria.dunn@ncwildlife.org>; Butler, Rodney A <Rodney.Butler@ncdcr.gov>; brandon.shoof@chowan.nc.gov Subject: CAMA Major Permit: MOD LLC/ Permit #64-19 For your records, please find attached a copy of the new Major Permit #64-19 that was issued to MOD LLC. The original has been sent to the permitee via USPS. Thanks and have a great day. Swan S. Dactp Office Manager Division of Coastal Management Department of Environmental Quality 400 Commerce Ave Morehead City, NC 28557 252 808 2808 Ext. 206 office Permit Class Permit Number NEW,®;_ ® 64-19 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vertnt"t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to MOD LLC 4505 Dalton Rd Chevy Chase MD 20015 Authorizing development in Chowan County at adi to the Yeopim River, at 620 Flagship Ct., in the Farms at Riversound S/D, near Edenton , as requested in the permittee's application dated 6/8/19, incl att workplan drawings (8), Sheet 2 of 4 dated "Rev 8/19/09", Sheets 1-3 of 7 dated "Rev 6/10/19", Sheets 4-6 of 7 dated "Rev 6/5/19", Sheet 7 of 7 dated 6/8/19. This permit, issued on August 7, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation )f these terms may be subject to fines, imprisonment or civil action; or may cause the pertntt to oe nutt ana vora. NOTE: This permit is issued in accordance with conditions within Permit No. 126-09 as amended to Yeopim Partners LLC. issued on 5/8/15 and the Minor Modification issued on 11/7/18. Shoreline Stabilization - Bulkhead 1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 2) No vegetated wetlands shall be excavated or filled, even temporarily. 3) No open water shall be excavated or filled, even temporarily, outside the approved bulkhead alignment. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. bigneO cy me autnOrny oI me Jecrel'dry ul uny uiu um �uau of the Coastal Resources Commission. ✓ f7i�' Brax on C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee MOD LLC. Permit No. 64-19 Page 2 of 3 ADDITIONAL CONDITIONS 4) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. 5) The bulkhead shall be constructed prior to any backfilag activities. 6) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 7) The fill material shall be clean and free of any pollutants except in trace quantities. 8) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. Sedimentation and Erosion Control 9) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. Docking Facility 10) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 11) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 12) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 13) This permit authorizes a maximum of 1 formalized boat slip. 14) The boathouse shall not be completely enclosed or have side coverage more than one half the height of the side, from the roof waterward. The footprint of the boathouse shall not exceed the dimensions on the authorized workplans. . MOD LLC. Permit No. 64-19 .. Page 3 of 3 ADDITIONAL CONDITIONS 15) The authorized boathouse shall be single story, and shall not be designed to allow for second story use. 16) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 17) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's areas of riparian access. General 18) In order to reduce the potential for negative effects on the spawning migration of anadromous fish, no in -water work shall be permitted between February 15 and June 30 of any year without the prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies. 19) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 20) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third party. 21) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2019-01213) issued 8/2/19. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2019-FAST issued 8/6/19. 0�381 NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: An application processing fee of $250 was received by DCM for this project. r- DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Mod LLC COUNTY: Chowan PROJECT NAME: Shoreline Protection and Pier Development LOCATION OF PROJECT: 620 Flagship Court, Lot 47 off Drummonds Point Road DATE APPLICATION RECEIVED COMPLETE BY FIELD: 6-14-19 FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: No FIELD REPRESENTATIVE: Mathis J� DISTRICT OFFICE: ELIZABETH CITY DISTRICT MANAGER REVIEW Date G1a� dol9 B) DATE RECEIVED BY MAJOR PERMITS UNIT_::' FEE REC'D: $250 # III(A) Private w1D&F up to I acre APPLICATION ASSIGNED TO: Bodnar �&Wtl PUBLIC NOTICE REC'D: 73-19 END OF NOTICE DATE: 7-23-19 ADJ. RIP. PROP NOTICES REC'D: DEED RECD: Yes C) 75 DAY DEADLINE: 8-28-19 150 DAY DEADLINE: HOLDS: EMAIL OUT DATE: 6-28-19 STATE DUE DATE: 7-19-19 PERMIT FINAL ACTION: ISSUE DENY AGENCY DATE NOTES COMMENTS OBJECTIONS: RETURNED YES NO DCM - Field Rep 6 Zy �� >'f �w fa • ,, DCM - LUP Consistency Determination 7/((]o Gny' i- Local Permit Officer Corps of Engineers - Regulatory Branch ! ZO(9 — O( 2.15 DWR - 401 Section (�(� 20l9 -OsAg DWR-Public Water Supply DEMLR - Stormwater & Sed/Erosion DOA - State Property Office 7/1 yc Wildlife Resources Commission 1�%V t 5{t DMF - Shellfish Section �f 9 DMF - Habitat & Enhancement ��(p >r- DNCR - Archives & History I16 DNCR - Natural Heritage Program NCDOT Rural Development Division 1Z JUN 2 8 2019 DCM-MHD CITY ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Dfrector NORTH CAROLINA Environmental Quality MEMORANDUM TO: Gregg Bodnar, Assistant Major Permits Coordinator THROUGH: Ronald Renaldi, District Manager FROM: Lynn Mathis, Environmental Specialist II DATE: June 24, 2019 SUBJECT: MOD, LLC CAMA Major Permit Application The applicant, MOD, LLC, is requesting a permit to construct 151' of bulkhead 4' above normal water level (NWL), a high ground ramp and stairs to access a 273' x 6' pier that will extend out into the Yeopim River 250' and be elevated 4' above NWL, a lower 8' x 16' kayak launch 8' from the proposed bulkhead, a 13' x 30.5' boathouse at the end of the pier with a 10' x 25' lift, and 4' wide walkway around the boathouse. SECTION .0200 - THE ESTUARINE AND OCEAN SYSTEMS 15A NCAC 07H .0203 MANAGEMENT OBJECTIVE OF THE ESTUARINE AND OCEAN SYSTEM It is the objective of the Coastal Resources Commission to conserve and manage estuarine waters, coastal wetlands, public trust areas, and estuarine and public trust shorelines, as an interrelated group of AECs, so as to safeguard and perpetuate their biological, social, economic, and aesthetic values and to ensure that development occurring within these AECs is compatible with natural characteristics so as to minimize the likelihood of significant loss of private property and public resources. Furthermore, it is the objective of the Coastal Resources Commission to protect present common law and statutory public rights of access to the lands and waters of the coastal area. The proposed length serves no additional need for water access and should be limited to only that which is necessary to obtain the 5.2' depth show at both -130' And 250'. This area has the potential of becoming congested in the future should the marina reach buildout 71' from the applicant's pier and the adjacent lot wish to build a pier between the applicant's property and the marina. 15A NCAC 07H .0208 USE STANDARDS (a) General Use Standards (1) Uses which are not water dependent shall not be permitted in coastal wetlands, estuarine waters, and public trust areas. Restaurants, residences, apartments, motels, hotels, trailer parks, private roads, factories, and parking lots are examples of uses that are not water dependent. UseMM r JUN 2 8 2019 "'"°" ' DCM-MHD CITY North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 Recommendations MOD, LLC June 24, 2019 Page 2 dependent include: utility crossings, wind energy facilities, docks, wharves, boat ramps, dredging, bridges and bridge approaches, revetments, bulkheads, culverts, groins, navigational aids, mooring pilings, navigational channels, access channels and drainage ditches; Consistent: Water dependent use. (2) Before being granted a permit, the CRC or local permitting authority shall find that the applicant has complied with the following standards: (A) The location, design, and need for development, as well as the construction activities involved shall be consistent with the management objective of the Estuarine and Ocean System AEC (Rule .0203 of this subchapter) and shall be sited and designed to avoid significant adverse impacts upon the productivity and biologic integrity of coastal wetlands, shellfish beds, submerged aquatic vegetation as defined by the Marine Fisheries Commission, and spawning and nursery areas; Inconsistent: The proposed pier length of 250' is unnecessary and inconsistent with this standard. The water depth at 250' offshore is the same as the water depth found at -130' offshore. The additional length is not consistent with the Division's Management Objective (07H .0203). (B) Development shall comply with state and federal water and air quality; Consistent: Not an issue. (C) Development shall not cause irreversible damage to documented archaeological or historic resource's as identified by the N.C. Department of Cultural resources; Consistent: No known sites. (D) Developrent shall not increase siltation; Consistent: As designed siltation should not be an issue. (E) Development shall not create stagnant water bodies; Consistent: Open design (F) Development shall be timed to avoid significant adverse impacts on life cycles of estuarine and ocean resources; and Consistent: This standard can be met by permit condition. (G) Development shall not jeopardize the use of the waters for navigation or for other public trust rights in public trust areas including estuarine waters. Consistent: The length of the pier will be close to that of the adjacent approve marina docking facility. (3) When the proposed development is in conflict with the general or specific use standards set forth in this Rule, the CRC may approve the development if the applicant can demonstrate that the activity associated with the proposed project will have public benefits as identified in the findings and goals of the Coastal Area Management Act, that the public benefits outweigh the long range adverse effects of the project, that there is no reasonable alternate site available for the project, and that all reasonable means and measures to mitigate adverse impacts of the project have been incorporated into the project design and shall be implemented at the applicant's expense. Measures taken to mitigate or minimize adverse impacts shall include actions that: Consistent: No conflict. RECEIVED JUN 2 8 ,19 il�_D_EQ� DCM-MHD CITY North Carolina Department of Environmental Quality I Division of Coastal Management ,Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 252.264.3901 Recommendations MOD, LLC June 24, 2019 Page 3 15 NCAC 07H .0208 Use Standards (b)Special Use Standards (6) Piers and Docking Facilities. (A) Piers shall not exceed six feet in width. Piers greater than six feet in width shall be permitted only if the greater width is necessary for safe use, to improve public access, or to support a water dependent use that cannot otherwise occur; Consistent: Proposed piers are 6' in width. (B) The total square footage of shaded impact for docks and mooring facilities (excluding the pier) allowed shall be eight square feet per linear foot of shoreline with a maximum of 2,000 square feet. In calculating the shaded impact, uncovered open water slips shall not be counted in the total. Projects requiring dimensions greater than those stated in this Rule shall be permitted only if the greater dimensions are necessary for safe use, to improve public access, or to support a water dependent use that cannot otherwise occur. Size restrictions shall not apply to marinas; Consistent: One pier is proposed with 151 linear feet of shoreline: 589sf is consistent with the 2,000sf maximum. (C) Piers and docking facilities over coastal wetlands shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland substrate as measured from the bottom of the decking; Consistent: None proposed. (D) A boathouse shall not exceed 400 square feet except to accommodate a documented need for a larger boathouse and shall have sides extending no farther than one-half the height of the walls and covering only the top half of the walls. Measurements of square footage shall be taken of the greatest exterior dimensions. Boathouses shall not be allowed on lots with less than 75 linear feet of shoreline. Size restrictions do not apply to marinas; Consi§tent: Boathouse < 400sf. (E) The total area enclosed by an individual boatlift shall not exceed 400 square feet except to accommodate a documented need for a larger boat lift; Consistent: The area enclosed by a boatlift will be inside the boathouse and < 400sf. (F) Piers and docking facilities shall be single story. They may be roofed but shall not be designed to allow second story use; Consistent: Single story proposed. (G) Pier and docking facility length shall be limited by: (1) not extending beyond the established pier or docking facility length along the same shoreline for similar use; (This restriction does not apply to piers 100 feet or less in length unless necessary to avoid unreasonable interference with navigation or other uses of the waters by the public); Applicants pier will be longer than the nearest residential pier 400' east of the applicants proposed alignment. RECEIVED (ii) not extending into the channel portion of the water body; and C nsistent: Does not appears to encroach into a navigation channel. JUN 2 S 2019 D E W CITY North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 252.264.3901 Recommendations MOD, LLC June 24, 2019 Page 4 (III) not extending more than one-fourth the width of a natural water body, or human -made canal or basin. Measurements to determine widths of the water body, canals or basins shall be made from the waterward edge of any coastal wetland vegetation that borders the water body. The one-fourth length limitation does not apply in areas where the U.S. Army Corps of Engineers, or a local government in consultation with the Corps of Engineers, has established an official pier -head line. The one-fourth length limitation shall not apply when the proposed pier is located between longer piers or docking facilities within 200 feet of the applicant's property. However, the proposed pier or docking facility shall not be longer than the pier head line established by the adjacent piers or docking facilities, nor longer than one-third the width of the water body. Consistent: No USACE channel and less than % the width of the Yeopim River. (H) Piers or docking facilities longer than 400 feet shall be permitted only if the proposed length gives access to deeper water at a rate of at least 1 foot each 100 foot increment of length longerlthan 400 feet, or, if the additional length is necessary to span some obstruction to navigation. Consistent: The maximum length proposed from NWL is 250'. (1) Piers and docking facilities shall not interfere with the access to any riparian property and shall have a minimum setback of 15 feet between any part of the pier or docking facility and the adjacent property owner's areas of riparian access. Consistent: The proposed will maintain a minimum of 15' from the riparian line to the east. ' (J) Applicants for authorization to construct a pier or docking facility shall provide notice of the permit application to the owner of any part of a shellfish franchise or lease over which the proposed dock or pier would extend. The applicant shall allow the lease holder the opportunity to mark a navigation route from the pier to the edge of the lease. Consistent: The piers do not involve any shellfishing franchise. (7) Bulkheads (A) Bulkhead alignment, for the purpose of shoreline stabilization, shall approximate the location of normal high water or normal water level; Consistent: The proposed bulkhead will be an average of 1.3', and a maximum of 5', waterward of NWL. The alignment is based on the presence of a scalloped shoreline, the presence of wetlands and a high bluff. (B) Bulkheads shall be constructed landward of coastal wetlands in order to avoid significant adverse impacts to the resources; Consistent: Proposed bulkhead will be landward of wetlands. (C) Bulkhead backfill material shall be obtained from an upland source approved by the Division of Coastal Management pursuant to this Section, or if the bulkhead is a part of a permitted 12 project involving excavation from a non -upland source, the material so obtained may be contained behind the bulkhead; Consistent: Upland fill shall be obtained on site and a commercial source if nesdle%VED DE Q� JUN 2 8 2119 North Carolina Department of Environmental Quality I Division of Coastal Management 00*4VHf) CITY Elizabeth City office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 252.264.3901 Recommendations MOD, LLC June 24, 2019 Page 5 (D) Bulkheads shall be permitted below normal high water or normal water level only when the following standards are met: (i) the property to be bulkheaded has an identifiable erosion problem, whether it results from natural causes or adjacent bulkheads, or it has unusual geographic or geologic features, e.g. steep grade bank, which will cause the applicant unreasonable hardship under the other provisions of this Rule; Consistent: The elevation of the bank along the applicant's property is failing in numerous places and is resulting in sediment entering the river during storm events. (ii) the'bulkhead alignment extends no further below normal high water or normal water level than necessary to allow recovery of the area eroded in the year prior to the date of application, to align with adjacent bulkheads, or to mitigate the unreasonable hardship resulting from the unusual geographic or geologic features; Consistent: The alignment being requested is reasonable alignment given the shoreline configuration. (iii) the bulkhead alignment will not adversely impact public trust rights or the property of adjacent riparian owners; Consistent: The proposed piers will not adversely impact public trust rights. (iv) the need for a bulkhead below normal high water or normal water level is documented by the Division of Coastal Management; Consistent: Based on the configuration of the shoreline and the height of the bank, a 1.3' average alignment is reasonable. (v) the property to be bulkheaded is in a non -oceanfront area. Consistent: Estuarine Shoreline in Joint waters. (E) Where possible, sloping rip -rap, gabions, or vegetation shall be used rather than bulkheads. Consistent: The use of gabions and vegetation along this shoreline would not be a successful method of erosion control. Recommendation: Based on a review of the rules and the application, I recommend that the request be approved subject to a pier limitation of 160'. The reduced length allows sufficient clear access to a depth of 5.2' from the landward side of the boathouse to the waterward side of the boathouse and reduces unnecessary impacts to open water habitat. The increased length does not provide greater depths or access to the Yeopim River, and is more congruent with the management goals of the Division. RECEIVED JUN 2 8 19 DCNr- �/ HD CITY D_EQ�� North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 252.264.3901 w„ ROY COOPER aoremar MICHAEL S. REGAIN Seaefarr BRAXTON C. DAVIS almdar June 28, 2019 NORTH CAROLINA 6nlronmantatQuallry FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEO - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier04.10-3$) greme bodnar(Mncdenr oov SUBJECT: CANIA/Dredge & Fill Application Review Applicant: MOD, LLC Project Location: 620 Flagship Court, Lot 47 off Drummonds Point Road In chowan County Proposed Project: Shoreline protection and pier development Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greer Bodnar at the address above by July 19, 2018. If you have any questions regarding the proposed project, contact Lynn Mathis (252454-3901, ext. 234) when appropriate, in-depth comments with supporting data is requested. REPLY: V This agency has no objection to the project as proposed. "Additional comments may be attached*" _ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated, See attached. _ This agency objects to the project for reasons described in the attached comments. PRINT NAME'�t� AGENCY SIGNATURE DATE 7✓`<� RECEIVED JUL 3 2019 MP SECTION MHD P16V coop.ER anvEmbr MICHAEI S REGAN 5e[reforY 8RAXT.QN:C:-DAVIS DrfECW June 28; 2019 MEMORANDUM: FROW Gregg.Bodner, Asslstant Major Permits Coordinator NCDEQ -Division of Coastal Management. 400 CommarceAva., Morehead City, NC 28557 Fax: 252-247-. * (Cour1er04.7643) grecb bodharfalncdenrboy SUBJECT: LAMA /Dredge & Fill Application Review Applicant: MOD; LLC Project Location: 026 Flagship Court, Lot 47 off Drummonds Point Road In Chowan County Propoeed Project: Shoreline protection and pier development Please indicate below your agency's. position or Viewpoint on the proposed; project and return thls form to Greub Bodhe at the address above by July 19, 2t10.f 9. If you have any questions regarding -the proposed project; contact Lynn Mathis (252-2,04-3g01, ext; 234) when appropriate, in=depth comments with supporting data is requested. REPLY; This agency has no objection to tne project as proposea.. `"Additional comments may be attached" This agency has no comment on, the proposed project. _ This agency approves of the project only If the recommended. changes are incorporated; See attached, , _Thiiss.aagencyyoobj/ectcts to the project for.reasons described in the attached PRINT NAME C, Ij+f Vrp/� AGENCY )�ublk VAr J�(d7��y SIGNATURE _1 q�1------ DATE RECEIVED JUL 3 2019 MP SECTION MH I ROY, COOPER; covern;i -- MlChAELS '. IkEGA - N seam BRAX,TON'C.lDAVIS Diredor. June'28i 2919 _MEMORANDUM.' FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management; 400.CoMmarcePao.Ave., Moreh - City NC28557 , Fax; 252-247-3330,(Pourier,04-16-33), qreLqQ.bodnar(5)ncdenr.gov r I — SUBJECT: CAA4A,1DTqdge: & Fill Application Review APPIIcant: MODj,LLC-• , t4' Project Location: 00 Flagship Court, Lot 47 off Drummonds PoInt,Road In Chdwan:Countyr Proposed Project Shoreline protection and pier development. Please indicate below your,ajencyls•posifionor.Viewpoint,on.the%proposqd project and return thit'forM to Gr6cia I Bodnaratthe address above by July-l§,' 2019. If you have any.. questions regaMing the proposed project, corltacMynn'Mathis (252464 - -3401,,ext. 254) when ,approp appropriate,; I iatqj in-depth comments with supporting data is requested. REPLY.' This agency has no, objection to the project as proposed —AZ— this agency has no comment ontheproposed project. This agency'japproves of theprojectonly if the recommended changes ,are. incorporated. See atta - ched. This agency Objects to the project for,realsons.described in the attached: PRINTAAME Ipffrey RhPilbattam fnrc;h;innnn Jebki S AGENCY NrnMF Sht-lifigh q;int;;tmnn EIVED ,SIGNATURE, CL'g�.�A' REC DATE 07-OP-201P 0 2019 MP SECTION MHD --NortlaCarolina D rtment of Environmental Quality I Division of Coastal Management. �6'�tffz.Ge—tgCftiN6rWdm—rni-27909 CAMA Major - MOD,LLC - Shoreline protection and pier development, Chowan County Thorpe, Roger Mon 7/8/2019 11:28 AM To: Bodnar, Gregg <gregg.bodnar®ncdenr.gov> Gregg The subject project will not require a State stormwater permit. Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office rogecthorpe@ncdenr.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 W: -�>-Nothing Compares-,— Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to thin! parties. ROY COOPER, covernm MICHAEL S: REGAN Seaefttry BRAXTON C. DAMS Director June28, 2019 MEMORANDUM: NORTH CAROLINA ER91ronmentalQua4ty FROM: Gregg Bodnar, Assistant Major,P.ermits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City; NC 28557 Fax: 252-24773330 (Courier04-16-33) greog bodnariRncdenryoy SUBJECT: CAMA/Dredge &.Fill Application'Review Applicant: MOD, LLC Project Location: 620 Flagship Court, Lot 47 off Drummonds Point Road In Chowan County Proposed Project: Shoreline protection and.pler development Please indicate below your agency's position or viewpoint on the proposed project and return this form to Grego Bodnar at the address above by.July 19, 2019. If.you have any questions regarding the proposed, project, contact•Lynn Mathis (252-264-3901, ext. 234) when appropriate,19-depth comments with supporting, data is requested. KCVLY: This agency.has no:objection,to the project as proposed. "Additional comments may be attached" , ' This agency, has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. _ This agency objects.to the project for reasons described in the attached comments. PRINTNAME LS°e rad�icl� 1 AGENCY NC C P RECEIVED SIGNATURE DATE JUL 1 2 2019 MP SECTION MHD ;qQQ North Carolina Department ofr yil ental Quality:I Division of Coastal Management .Elizabeth City Office 1401 South Crif6 Strei6 to 300 i fllzatieth City, North Carolina 27909 " 2522643901 R- ROY COOPER. Govemor MICHAEL S. REGAN Seaetary BRAXTON C. DAVIS Director June 28, 2019 MEMORANDUM: NORTH CAROLINA Envfmnmmra1Qu4nty FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEO - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16.33) greQg. bodnar(a7ncdenr.Qov SUBJECT: LAMA /Dredge & Fill Application Review Applicant: MOD, LLC Project Location: 620 Flagship Court, Lot 47 off Drummonds Point Road in Chowan County Proposed Project: Shoreline protection and pier development Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by July 19, 2019. If you have any questions regarding the proposed project, contact Lynn Mathis (252-264-3901, ext. 234) when appropriate, In-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINTNAME Ckarlar OW"S AGENCY WC-0 t2 — acm RECEIVED SIGNATURE DATE _I'(G-zo19 JUL 1 6 2019 gG D_E� MP SECTION MH® _North Carollm Department ofrnvtronmentai Quail I DIvislon of Coastal Manaement 4 Elizabeth City OfnEet 46i South Grain Street sultesd fElizabeth City, North caroMa 27909 2522643901 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director MEMORANDUM NORTH CAROLINA fnvlronmentar Quality TO: Gregg Bodnar, Major Permits Processing Coordinator Division of Co?I, Management FROM: Charlan OwenCP, NE District Planner Division of CoManagement SUBJECT: Major Permit Request by MOD, LLC to install 151 linear feet of bulkhead with 15 foot long return walls, a 6 foot wide by 58 foot long walkway/ramp and stairs, a 6 foot wide by 273 foot long pier, an 8 foot by 16 foot kayak launch, a 13 foot by 30.5 foot wide boathouse with a 10 foot by 25 foot boatlift, and a 4 foot wide by 44 foot long walkway/finger pier on the Yeopim River; at 620 Flagship Court, in Chowan County. DATE: July 16, 2019 Consistency Determination: The request is consistent with/not in conflict with the Chowan County & Town of Edenton Joint Land Use Plan certified by the CRC on November 15, 2018. Overview: The 11.44 acre subject property has approximately 151 linear feet of shoreline along the Yeopim River which connects to the Albemarle Sound. Water depths in the Yeopim River in this area range from 0 inches to -5.2 feet extending out to a distance of approximately 130 feet offshore. The -5.2 foot depth is maintained out to a distance of 250 feet waterward of Normal Water Level (NWL). The property is bisected by the right-of-way of Flagship Court, with 4.44 acres on the north side of the road. The centerline of Flagship Drive runs along the property line for a distance of approximately 1,930 feet, then turns onto the property at a 90 degree angle and ends in a gravel cul-de-sac approximately 225 feet from the shoreline. Average elevation of the property is approximately 8 feet above Normal Water Level (NWL). A high bluff slopes down to approximately 1 feet above NWL at the northwest corner of the site along the shoreline at the bottom of the bluff. A 350 sq. ft. area of wetlands are located along the shoreline. The property is located in the AE Flood Zone. Existing site improvements consist of a single-family house, shed, livestock shed, fencing and associated infrastructure. The shoreline is unimproved. The subject property is located within the Riversound subdivision. The subdivision's developer was granted a CAMA Permit (Major Permit #126-09) in 2009 for a 130 slip floating marina to be located on a commorLar ,tg,�ly d�ff6s ��yy (2) lots west of the subject property. At that time the developer offered restrictiEIVE® m D _EQ� JUL 1 6 2019 s...� a,w�rorr North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1401 South Griffin Street, Suite 300 i Ekabeth City, North Carolina 27VP SECTION M H D 252.2643901 i11 North Carolina Department of Environmental Quality Division of Coastal Management Page 2 of 6 shoreline stabilization and limiting waterfront lots to no more than one (1) mooring facility/boat slip per lot. This limitation was modified in November 2018 to allow certain lots to obtain permits for shoreline stabilization, with shoreline stabilization only being permitted through a CAMA Major Permit. Installation of 151 linear feet of bulkhead with 15 foot long return walls, a 6 foot wide by, 58 foot long walkway/ramp and stairs, a 6 foot wide by 273 foot long pier, an 8 foot by 16 foot kayak launch, a 13 foot by 30.5 foot wide boathouse with a 10 foot by 25 foot boatlift, and a 4 foot wide by 44 foot long walkway/finger pier is proposed. The bulkhead will be installed an average of 1.3 feet and a maximum of 5 feet waterward of NWL. The bulkhead will be located landward of the wetland vegetation. The top of the bulkhead will be 4 feet above NWL. The bank along the project area will be sloped 8 feet landward of the bulkhead alignment to the top of the bulkhead. The pier will extend 250 feet into the Yeopim River., The 4 foot wide by 44 foot long walkway/finger pier will wrap around the boathouse on three (3) sides. The waters of the Yeopim River are classified as SC waters and closed to shellfishing. The Yeopim River is designated as an Anadromous Fish Spawning Area and is within the NC Division of Marine Fisheries Striped Bass Management Area. No Submerged Aquatic Vegetation (SAV) is located within the project area. A review of historic and archaeological resources was not included in the Field Investigation Report. Anticipated Impacts resulting from this project are expected to include: the filling of 200 sq. ft. of Public Trust Area/Estuarine Waters Areas of Environmental Concern (AEC); the disturbance of 3,275 sq. ft. of High Ground within the. Estuarine Shoreline AEC, and; the shading of 2,247 sq. ft. of Public Trust Area/Estuarine Waters AEC. The pier and boathouse will be located 71 feet from the approved marina. Basis for Determination: The subject property is designated as "Low Density Residential" on the Chowan County Future Land Use Map. The shoreline is depicted as "Proposed Greenway Trail" on the 2003 Edenton/Chowan Greenway and Open Space Plan map. "As indicated on Page 2-10 "...coastal wetlands, estuarine waters, estuarine shoreline, public trust areas, and 'Section 404' wetlands..." are part of the "Conservation" classification. "Also included in the Conservation classification are the future greenway corridors located throughout the County along creeks and rivers as depicted in the 2003 Edenton/Chowan Greenway and Open Space Plan and reproduced in Appendix 10..." of the Chowan County & Town of Edenton Joint Land Use Plan. For Conservation areas, "...passive recreation would be appropriate in this classification, provided environmentally sensitive areas are not negatively impacted." Specific.to the "Proposed Greenway Trail", according to the Planning Director, the County does not have any easements for a trail on the subject property and the most recent greenway plan indicates "recommended" for a multi -use path. RECEIVED JUL 1 6 2019 MP SECTION MHD North Carolina Department of Environmental Quality Division of Coastal Management The following LUP policies may be applicable to this request. Provide Recreation and Oven Space: Policy C-8, Page 2-7. "The County promotes construction of bicycle and walking trails, with an emphasis on trails that are along waterfronts, connect to waterfront areas, or connect pedestrians and cyclists to commercial areas." Policy C-9, Page 2-7. "The County will encourage residential subdivision developers to provide bicycle and walking trails, fees -in -lieu, dedication of land, or a combination of these to fulfill open space and recreation requirements." Policy C-10, Page 2-7. "As funding and land resources allow, the County will explore opportunities to install bicycle and walking trails within County -owned easements, on County owned properties, and in existing parks." Public Access to Public Trust Waters: Policy PA-6, Page 2-41. "The Town of Edenton and Chowan County will continue to provide for the diverse recreational needs of the permanent and seasonal populations by supporting the design and construction of the extensive waterfront area in a manner that balances water access need with the protection of fragile natural resources." Land Use Compatibility: Policy LU-2, Page 2-42. "The Town of Edenton and Chowan County support growth and development in keeping with the Future Land Use Maps in this Plan ° MEMORANDUM Page 3 of 6 JUL 1 6.2019 MP SECTION.MHD North Carolina Department of Environmental Quality Division of Coastal Management Policy LU-9, Page 2-42. MEMORANDUM Page 4 of 6 "The Town of Edenton and Chowan County will encourage land use proposals which will have no negative impact on historic, cultural and/or archaeological resources. These proposals shall be reviewed through the Section 106 review process as well as through the Historic Preservation Commission and the State Historic Preservation Office." Policy LU-10, Page 2-42. "The Town of Edenton and Chowan County shall adhere to the state's mitigation requirements, criteria, and concepts to minimize conflicts with natural resources and fragile areas. The Town and County shall also maintain local development standards (such as distance/separation requirements, buffering/screening requirements, etc.) for special and/or conditional uses in order to assist with mitigating potential negative impacts." Natural Hazard Areas: Policy NH-1, Page 2-46. "The Town of Edenton and Chowan County will conserve the natural resources and fragile environments that provide protection from such natural hazards as floods and storm surges." Policy NH-2, Page 2-46. "The Town of Edenton and Chowan County will minimize the threat to life, property, and natural resources that may result from land use and development within or adjacent to identified natural hazard areas." Policy NH-3, Page 2-46. "The Town of Edenton and Chowan County will continue to coordinate all development within the special flood hazard area with the NC Division of Coastal Management, FEMA, and the US Corps of Engineers. The Town of Edenton and Chowan County recognize and will continue to work with NC Emergency Management as the cognizant agency for risk management and hazard mitigation, including administration of the National Flood Insurance Program." JUL 1 6 2019 M' SECTION MH® North Carolina Department of Environmental Quality Division of Coastal Management Policy NH-8, Page 2-47. "The Town of Edenton and Chowan County shall maintain flood damage prevention requirements that (1) Restrict or prohibit uses which are dangerous to health, safety, and property due to water or erosion hazards, or which result in damaging increases in erosion, flood heights or flood water velocities; (2) Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction; (3) Control the alteration of natural floodplains, stream channels, and natural protective barriers which are involved in the accommodation of floodwaters; (4) Control filling, grading, dredging, and other development which may increase erosion or flood damage; and (5) Prevent or regulate the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards to other lands." Policy NH-9, Page 247. "Chowan County supports the CAMA development permit process for estuarine shoreline areas and the requisite development standards which encourage both shoreline stabilization and facilitation of proper drainage." Water Quality: Policy WQ-2, Page 2-48. "Chowan County and the Town of Edenton shall require that all development adhere to State requirements concerning stormwater runoff limitations and standards." Policy WQ-3, Page 2-48. "It is the policy of Chowan County and the Town of Edenton to coordinate the approval of local land development projects with applicable state agencies to ensure compliance with regulations to prevent or control nonpoint source discharges." Policy WQ-5, Page 2-48. MEMORANDUM Page 5 of 6 "Chowan County and the Town of Edenton shall maintain requirements that, to the extent practicable, require all development to conform to the natural contours of the land and ensure that pre-existing man-made drainage waysRECEIVED remain undisturbed. All developments shall be provided with a drainage JUL 1 6 2019 MP SECTION MHn- North Carolina Department of Environmental Quality Division of Coastal Management system that is adequate to prevent the undue retention of surface water on the development site. No surface water may be channeled or directed into a sanitary sewer. Whenever practicable, the drainage system of a development shall coordinate with and connect to the drainage systems or drainage ways on surrounding properties or roads. All developments shall be constructed and maintained so that adjacent properties are not unreasonably burdened with surface waters as a result of such developments." Policy WQ-8, Page 2-48. "Chowan County and the Town of Edenton support state efforts to reduce nutrient loading in the surrounding surface waters." Policy WQ-9, Page 248. "Chowan County and the Town of Edenton shall require that development adhere to the state's buffer requirements for developments abutting water bodies and/orAECs." Policy WQ-10, Page 2-49. "In order to minimize sedimentation and erosion, Chowan County and the Town Edenton shall require that all developments maintain a vegetated buffer along each side of a stream or natural drainageway in accordance with State requirements." MEMORANDUM Page 6 of 6 JUL 1 6 2019 MP SECTION MHD I ROY COOPER eovanar MICHAEL S. REGAN seadary BRAXTON C. DAVIS Director June 28, 2019 MEMORANDUM: NORTH CAROUNA Envtrenmental QUOEty JUL 01 2019 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28667 Fax: 252-247-3330 (Courier 04-16.33) grgcc.bodnarCk?ncdenroov SUBJECT: CAMA/Dredge $ Fill Application Review tit Applicant: MOD, LLC Project Location: 620 Flagship Court, Lot 47 off Drummonds Point Road In Chowan County Proposed Project: Shoreline protection and pier development Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by July 19, 2019, If you have any questions regarding the proposed. project, contact Lynn Mathis (252-264-3901, ext 234) when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the projectas proposed. "Additional comments may be attached" >/ This agency has no comment on the proposed project. _ This agency approves of the project only if the recommended changes are incorporated. See attached. _ This agency objects to the project for reasons described in the attached PRINT AGENC SIGNA' DATE La JUL 1 6 2019 MP SECTION MW® North Carolina Department oMvWomentel _I Division ofcogst Ma�ement _. .._.__. --- 0iii6eth City oftke f 4U(South Griffin Street Rraffia city.Nort1)Caroba2r909 _ 2522643901 ROY COOPER Gownw MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director June 28, 2019 NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) oregg.bodhaKg.ncdenr.gov SUBJECT: CAMA/Dredge & Fill Application Review Applicant: _MOD, LLC Project Location: G20 Flagship Court, Lot 47 off Drummonds Point Road in Chowan County Proposed Project: Shoreline protection and pier development Please Indicate below your agency's position or viewpoint on the proposed project and retum this form to Gremrr Bodnar at the address above by July 19, 2019. If you have any questions regarding the proposed project, contact Lynn Mathis (252-264-3901, ext. 234) when appropriate, in-depth comments with supporting data Is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" ✓ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME WOe/IZ� O-A �� e e AGENCY `fin Y,` 11�.� u6t SIGNATURE W t}�ttiOl0.l.l� e � i l RECEIVED JUL 1 8 2019 MEN SECTION Mho® _ North Carolina DepmtmentofEnvlronmental Quallty_I DlvlslonofCoast4Mana9emmt Eliia6eth Qry Office 1 461 South dririin Strce�, oe 300 (•Efiea6efh Gty. North Carolina 27909 252164.3901 Hfkofic Ptesery a-tion. Offi , ce ER 1917'2101 ROY* COOPER' Covnnor nC T!�EL S; REGAN, ]BRAXTON QIDAVIS;l .4und'28,2019 ,,M RAfvbUm. �EM_6 . Gregd.,B.od4,� t,s§,isto.nt-Major.Permits CoordinaidT, . . . 'NCDEQ -Division ofi-�-oagtafManagement 4d0'com,mer ,loom4ead City.. NC -2,45,57.' -FAf2 -24-7 333"(gmilar.6446.43) 6-hn'bodnarncden.go .S'lbcoymReview,- U lDredde &F81,App PjECT;; Applicant: MOD,.,LLC. 0,rOjqci Locatlo n. '610 Flagrhi'PlCouq, Low, off br6mffiondi Polat 1100 lwr-howani,dounty 'Pioo,osed Otoj^jct:• Shbedilfi,,eotot.ed.tion,ifi6,plerddv"ol6p"m6nt- P.lease.lndl6aWb-eio,6q youra6encypbsitionior viewpoint on peo'Pose&project and ket—ym--fh—l—sform to the address abo4dbVJuly l9',2019. If you -hav-e'ab,yI questi ons; '264-380,1;ext. 234)wh nap-opate. cornrbent§*tWsupporti g dat4ls requested. ;,.Addiflo . naPcomments may be I attached'". 10 This agency has noi,comment on the,proposed pfojecL This agen6yr bpprmei of the.orpledonly ifIthe redqrpme.pdedCchangps are incorporated: See -attached:' This agency �-,objects tothe ,ptojectfbr',reasonsddsdri66din,theattachid comments., pkjNT kAjkE Renee:GledhiULEarle3L t ftc AGENCY .State Historic Preservation Offire �4W SIGNAiUkE 40� 'IbATE- E.`Q� - �jy idy'CoOft - TIMT, �15- RAXTO V -I*,P.VAVES meta - I -- J - une;fg-, 2019 MEMORANDUM: FROM; SUBJECT;" 0rqjqqf Location: Proposed Pfojgdt* Mo%-L I LC 1620 Flagship �EPLYY:- This agency "Additional his e�agency agen6 aremcorpm This ageriicy PRINT -NAM AGENCY N f A -A SIGNATURE DATE & P(1mm1!CaA0.,("Re,v?qYv A 47 off Virummonds P'dinf Road In Pbbwan'County and pier development. I of ViieWg.ointopffie pCoopsedLofolect"poo Posabove bvJuly 14.2010. if you have any questions prqjw,+ . reasons de6cri4edIn%the attached RECEIVED JUL 2 9 2019 MP SECTION MHD ® North Carolina Myers, Resources Commission 9 MEMORANDUM TO: Gregg Bodnar l RECEIVED Division of Coastal Management North.CarolinaDepartment;ofEnvironmental Quality JUL 2 9 2019 FROM: Maria.T. Dunn, Coastal Coordinator MP SECTION MND Habitat Conservation Division DATE: _July 26,'2019 i SUBJECT: CAMA Dredge/Fill Pernut Application for MOD, LLC, Chowan County, North Carolina. i Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed the permit application with regard to impacts on fish and �wildlifaxesources. Theproject site is located 6t:620 Flagship Court,, Lot 47 of the RiverSound Subdivision adjacent,the Yeopim River" off Drummonds Point. Our comments'are provided in accordance with provisions of the Coastal,Area,Management Act;(G.& 113A-100 through 113A-128), as arnerided, Sections 401 and 404 of the Clean Water Act, as amended, and the Fish and Wildlife Coordination Act (48 Stat.40.1, as amended; 16 U.S.C.. 661 et seq.). The_appRpant proposes to install 15 F of bulkhead four feet above normal water level,; construct a high ground ramp and stairs to access. a.6' by 273',pier that extends into the Yeopim River 250' in length four feet above NWL, insta111 an 8' by:16' kayak launch eight feet from the proposed bulkhead, and construct'a 13' by30.5' boathouse with a 10' by 215' lift and a 4' wide walkway around the boathouse. Tlus.proposal would provide the one slip allowed per, waterfront lot within the subdivision and, shoreline stabilization for certain lots as determined through several meetings with state agencies and the developer. The structure would be:71' from.the footprint of the yet to be.completed marina for'the subdivisionL The Yeopim River at this location is classified SC by the Environmental Management Coiiimission, is designated an anadromous fish spawning area (AFSA) by the,NCWRC and NC:Divzsion of Marine Fisheries (NCDMF), and is withimthe NCDMF Striped Bass Management Area. The NCWRC has reviewed and.commented on the development of this area since 2006, During these reviews, comments.were submitted stating concerns for a variety of impacts including treatment of onsite wastewater,. road and infrastructure establishment, general wetland fill, shoreline stabilization; marina lighting pollution,.and overall shoreline.development:that contributes to the disconnect and loss'of abitat Conservation . 1721'Mail Service Center • Raleigh, NC Telephone: 1(919) 707-0220 Fax: (919) 707-01)28 anadromous fish spawning habitat along the shoreline. These concerns were stated due to the importance the extensive amounts of riparian wetlands and natural shorelines have for wildlife and aquatic communities in the Yeopim and Middleton Creek systems. These wetlands and natural shorelines provide valuable habitat areas for numerous species of small mammals, reptiles, amphibians, and neo-tropical birds. Flood plain areas of these wetlands also provide spawning habitat for anadromous fish such as blueback herring (Alosa aestivalis) and nesting habitat for a variety of duck species. The development of individual lots would significantly impact these habitats and functions unless done so with a minimal footprint. Permit conditions were included that took these concerns into consideration thereby limiting shoreline development allowances. In 2018 our agency and several other state agencies met with the developer and discussed allowing shoreline stabilization on certain lots with bluffs that exhibited erosion Several lots have elevation changes from normal water level and are relatively stable with the establishment of cypress and other vegetation along the shoreline. The majority of lots upstream the boat ramp has extensive riparian wetlands and is not threatened by erosion. However, some lots near the marina could benefit from shoreline protection and upland terracing or grading. Lot 47 was one such lot. Therefore, the NCWRC does not object to application proposal as long as the following permit conditions are included: — This area of the Yeopim River and Middleton Creek are designated AFSA and are highly regarded by the NCWRC due to their value for several anadromous species. To protect aquatic resources, the February 15 — June 30 AFSA moratorium is requested for all in -water construction- - To reduce the opportunity for sedimentation from bluff grading during biologically sensitive times of year, the AFSA moratorium would be appreciated, but is not required during upland grading. However, appropriate sedimentation and erosion control measures should be installed and inspected to insure sediment does not leave the upland area and enter the water. We would like to note, as we did during on site meetings, that lot development and placement of structures on the lot can greatly influence how shorelines can be stabilized. Lots with bluffs could be terraced or have a more gentle slope if residential structures are placed farther from the shoreline. This should be taken into consideration for any future lot developments. The NCWRC appreciates the opportunity to review and comment on this permit application. The proposal took many recommendations, including minimal shallow water habitat fill, from earlier meetings into consideration. If you need further assistance or additional information, please contact me at (252) 948- 3916 or at maria dtuu��ancwildlifc.ose RECEIVED JUL 2 9 2019 &'7P SECTION MHD Bodnar, Gregg From: Bland, Raleigh W CIV CESAW CESAD (US)<Raleigh.W.Bland@usace.army.miI> Sent: Friday, August 02, 2019 8:02 AM To: Bodnar, Gregg Subject: RE: [External] RE: MOD LLC CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to repo rt.spam@nc.gov<mai Ito: repo rt.spam@nc.gov> MOD LLC SAW 2019-01213 Chowan PGP 198000291 2Aug19 Gerathy SAW 2019-01211 Perquimans PGP 298000291 2Aug19 Hope this helps! Thanks! -----Original Message ----- From: Bodnar, Gregg [mailto:gregg.bodnar@ncdenr.gov] Sent: Monday, July 29, 2019 11:56 AM To: Bland, Raleigh W CIV CESAW CESAD (US)<Raleigh.W.Bland@usace.army.mil> Subject: [Non-DoD Source] RE: [External] RE: MOD LLC You're the best. Maria and Shane both came back, comments attached. Gregg -----Original Message ----- From: Bland, Raleigh W CIV CESAW CESAD (US) <Raleigh.W.Bland@usace.army.mil> Sent: Monday, July 29, 2019 11:11 AM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: [External] RE: MOD LLC CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Been on vacation. Get you some responses this week. Thanks! -----Original Message ----- From: Bodnar, Gregg [mailto:gregg.bodnar@ncdenr.gov] Sent: Monday, July 22, 2019 4:30 PM To: Bland, Raleigh W CIV CESAW CESAD (US) <Raleigh.W.Bland@usace.army.mil> Subject: [Non-DoD Source] MOD LLC Hey Raleigh, NORTH CAROLINA Environmental Quality ROY COOPER Govenmr MICHAELS.REGAN Seei'elary LINDA CULPEPPER Director August 06, 2019 DWR Project # 2019-0881 v1 Chowan County MOD, LLC ATTN: Mr. Richard Dent, Managing Member 4505 Dalton Road Chevy Chase, Maryland 20015 Subject: NO WRITTEN CONCURRENCE REQUIRED 620 Flagship Court (Lot 47, Drummond's Point, Farms at RiverSound s/d) —Shoreline protection and pier development Dear Mr. Dent: The Division of Water Resources (DWR) has received a copy of your CAMA Major application modification request. DWR issues approval in the form of a Water Quality Certification (WQC) in conjunction with the CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. In accordance with the attached General Certification #4175 (GC4175), the impacts described in your application do not require written authorization to utilize GC 4175. However, you are required to follow the conditions listed in the attached certification. You should get or otherwise comply with any other federal, state and local requirements before you go ahead with your project including (but not limited to) erosion and sediment control regulations. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at htto://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:OOpm excludin official state holidays).����® �.E�J' \�e AUG 7 2019 North Carolina Depurvnent orEtnironmental Quality [Division of Water Resources - Washington Regional Office 943 ti'ashutgton Square Mall, Washington. North Carolina 27889 a S ® N The petition maybe faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee.is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact Chris Pullinger'at 252-948-3922 or chris.ouliinger@ncdenr.gov if you have any questions or concerns. Sincerely, ROW T.cl.k+lnd Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosures: GC 4175 Certification of Completion cc: Josh Pelletier, USACE Washington Regulatory Field Office (via e-mail) Gregg Bodnar, DCM Morehead City (via e-mail) Lynn Mathis, DCM Elizabeth City (via e-mail) Samir Dumpor, DEMLR WaRO Sampson Contracting, Inc. —ATTN: Theodore J. Sampson Laserfiche AUG 7 2019 MP SECTION MH® North Carolina Depaumient ofEnvinnunenlal Quality IMision of WatutResources - Washington Regional Office 943 Washington Square Niall. Washington. North Carolinct 27889 252-946-6481 Coastal Management ENVIRONMENTAL QUALITY Mod LLC c/o Richard Dent 4505 Dalton Road Chevy Chase, MD 20015 Dear Mr. Dent: August 7, 2019 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure -Sincerely, Douglas V. Huggett Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 2528082808 DCM Coordinator: Permit#: G7 79 5p DCM Field Offices AFlizabeth City "TAorehead City Washington Wilmington US ACOE Offices: Washington: MAILING DISTRIBUTION SHEET N �' °�a' (with revised work plan drawings) Raleigh Bland (Beaufok Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Nknee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) pswshane Staples David Harris - Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser avo s6H, SAva.-. Clif Whitfield (WARO) Curt Weychert Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater, Garcy Ward- (NCDOT—fort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Wildlife Resources: Natural Heritage Progr* Robb Mairs — 401 (Carteret, Onslow, Pender) Chad Coburn — 401 (Brunswick, New Hanover) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Maria Dunn (WARO) IF Rodney Butler It LPO: "1 If0jmn SPCA— G6&'U t �. Fax Distribution: Permittee #: Aeent# (NCDOT) Travis Wilson Received 1eH N14 APPLICATION for DMEC malor Development Permit (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Bustness Name Mod, LLC Project Name (if applicable) Shoreline Protection 8 Pier Development Applicant 1: First Name Richard MI Lest Name Dent (Managing Mernber) Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) m1h names listed. Mailing Address 4505 Dalton Road PO Bolt City Chevy Chase Stale MD ZIP 20015 Country USA Phew No. 301-652-8958 ext. FAX No. - - SUeet Address (if different from above) City State ZIP Email N FORMTEXT 2. Agent/ContractorInformation Business Name Sampson Contracting, Inc. Agent/ Contractor 1: First Name Theodore MI J Last Name Sampson Agent/ Contractor 2: First Name MI Last Name Mailing Address 125 Hunters Trail West PO Box Gly Elizabeth City State NC ZIP 27909 Phone No. 1 252 - 548-4292 ext. Phone No. 2 252-331-2447 ext. FAX No. 866 793 4261 Contractor # Street Address (if different from above) City State ZIP Email <Form continues on bado JUN 2 8 2019 ; a 8-4 R o o 1:. VJWW,, ; DiGM-MHD CITY 'Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) street Address State Rd. fl Chowain 620 Flagship Court SubdIvIsW Name city Slate Zip Farms at Riversound Edenton NC - Phone No, Lot Nixie) (if many, attach additional page with list) - - ext. 47, 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank Yeopim River c. Is the water body identified in (b) above, natural or manmade? d. Name the cimest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Albemarle Sound e. Is proposed work within city limits or planning junsdiction? r. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. Chowan County 4. Site Description a. Total length of shoreline on the tract (R) b. Size of entire tract (sq.ft. ) 151 498,326.4 C. Size of lifick dual Id(s) d. Approximate elevation of tract above NHW (normal high water) or 498,326.4, 1 1 NWL (normal wafer level) (If many lot sizes, please attach additional page with a list) 8-ft ❑NHW or ®NWL e. Vegetation an tract Meadow grasses (Various), Loblolly pine (Pinus taeda), Sweet gum (Liquidambar styraci8ua), Bald cypress (Taxodium dislichum), Wax myrtle (Myrica cerifera), Soft rush (Juncus effusus), and Cattail (Typha spp.). I. Man-made features and uses now on tract Gravel roadways, residential utilities, power transformer, concrete driveway, residential structure, concrete -stone pateo, horse corral fence, bam, and livestock shelter. g. Identity and describe the existing land uses adiacua to the proposed project site. 10.33 acre undeveloped residential lot to west; 11.77 undeveloped residential lot to east. h. How roes local government zone the tract? i. Is the proposed project consistent with the applicable zoning? CU-R25 (Attach zoning compliance certificate, if applicable) ®Yes ❑No DNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes No k Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No DNA If yes, by whom? I. Is the proposed project located in a National Registered Mahone District or does a involve a ❑Yes ®No DNA RECEIVE National Register listed or eligible property? <Form continues on next page> JUN 2 S 2019 DCM-MHD CITY 252-808.2808 ,. 1.88a-4RCOAST .. www.necoastalmanagement.net r Form DCM MP-t (Page 3 of 4) APPLICATION for Major Development Permit an. (1) Are there wetlands on the site? ®Yes ❑No (if) Are there coastal wetlands on the sae? ®Yes ❑No (Ili) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes NNo (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Septic tank, pump and leach field. o. Describe existing drinking water supply source. Private onsite well. p. Describe existing storm water management or treatment systems. N/A 5. Acdvides and Impacts e. Will the project be for commercial, pudic, or private use? ❑Commercial ❑Publia/Government ®PrivatelCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. Project will protect lot's exposure to Yeopim River from ongoing erosion, and provide a private, non-commercial, boat docking and kayak launch capacity in support of traditional waterfront residential uses. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where It is to be stored. Protect wetlands and shoreline waterward of bulkhead with silt fence and/or turbidity curtain; grade/excavate uplands with excavator to facilitate bulkhead construction; set bulkhead piles and sheet piles with excavator equipped vibratory hammer, and or water jet; set pier, boat house and kayak platform piles with barge mouted vibratory hammer and/or water jet; construct stairs, boat house, boat lift and deck pier/platfomJwalkways; finish grade and seed disturbed areas; store equipment on uplands when not in use. d. List all development activities you propose. Construct shoreline protection bulkhead with return walls; grade uplands to height of bulkhead; construct ramp/stairs from uplands downt to top of bulkhead; construct pier with walkways at boat house; construct boat house; construct boat lift; construct kayak-lauch platform with stairs to pier height. e. Are the proposed activities maintenance of an existing project, new work, or both? New work. I. What is the approximate total disturbed land area resulting from the proposed project? 3,725 NSq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessw ay or other area NYes []No ❑NA ry that the public has established use of? RECEIVE h. Describe location and type of existing and proposed discharges to waters of the state. No existing discharges; no proposed discharges . ` P Y D i. Will wastewater or stormwater be discharged into a wetland? ❑Yes NNo ❑NA If yes, wiN this discharged water be of the same salinity as the receiving water? ❑Yes ❑No NNA j. Is there any mitigation proposed? []Yes NNo ❑NA If yes, attach a mitigation proposal. parlievorl <Form continues on bacii I: - I I. [i ` 252-808.2800 :: 1.888-4aGOAST :: www.necoastalmaaagement. iM-EC J A u■ Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. AdditionallnforTnation In addition to this completed application lam, (MP-1) the following dams below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (g are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional dravAngs) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, dearly Indicate on maps, plats, dravwngs to distinguish between work completed and proposed. c. A eke or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site, d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. L A flat of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed Mum receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Mohamed Eiiwa Shalaby Phone No. Address 552 E Carson St., Ste 104, Carson, CA 90745 Name William Edward Hartsough Phone No. Address 691 W. Azure Lane; Litchfield Park AZ 85340-5089 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pemwttee, and issuing dates. 126-09 Amended 0510815 to Yeopim Partners, LLC 126-09 Modified 11/07118 to Yeopim Partners, LLC h. Signed consultant or agent authorization form, If applicable. I. Weiland delineation, If necessary. J. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). If necessary. If the project Involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Ad. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge Date Revised: Print Name Theodore Sampson June 8, 2019 Signature Please indicate application attachments pertaining to your proposed project. RECEIVED ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development ®DCM MP4 Structures Information JUN 2 8 2019 DCM-MHD CITY Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlandsimarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? 1f any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ ❑WL ❑None (ii) Describe the purpose of the excavation in these areas 2. DISPOSAL OF EXCAVATED MATERIAL a area c. (i) Do you claim title to disposal area? []Yes []NO ❑NA (ii) It no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW ), submerged aquatic vegetation (SAV), shell bosom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL []None (n) Describe the purpose of disposal in these areas: d. High -ground excavation in cubic yards. ®This section not applicable b. Dimensions of disposal area. d. (I) Will a d"al area be available for future maintenance? ❑Yea ❑No ❑NA (Ill If yes, where? f. (i) Does the disposal Include any area in the water? ❑Yes ❑No []NA (it) If yes, how much water area is affected? RECEIVED Received JUN282019 1'"j'.p DCM-MHD CITY DCM-EC 252-808.2808 n 1.888.4RCOAST :: www.me astaimmp!gemen!.net revised: 120W06 Form DCM MP-2 (Excavation and Fill, Parle, 2 of 2) 3. SHORELINE STABIUZATION ❑This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: 151 it ®Bulkhead ❑Riprap ❑Breakwater/SiM ❑Other Width_ J.$.Itl c. Average distance waterward of NHW or NWL: -4.7 ft (Landward); along d. Maximum distance waterward of NHW or NWL ♦5 ft the 49 of BM watenvard (wAv) of shoreline the avg. distance wtw is 2.4' e. Type of stabilization material: Vinyl Sheetpile or Treated Wood Lap g. Number of square feet of fill to be placed belowwater level. Bulkhead back@I; 00 Riprap_ Breakwater/Sill Other I. Source of fill material. From grading of uplands. f. (1) Has there been shoreline erosion during preceding 12 months? ®Yes ONO ❑NA (if) It yes, state amount of erosion and source of erosion amount information. By comparison with platted lot line of 6/1812014: 770 eq it of uplands (162 sq ft/yr), 228 cu yds o1 uplarW (48 our ydNyr); erosion escarpment retreated by 7.3-a (IS ft/yr). In Type of fill material. Upland sand/soil 4. OTHER FILL ACTIVITIES ®This section not applicable (ExcNding Shoreline Stabilization) a. (i) Will fill material be brought to the ske? ❑Yes ❑No ❑NA b. (i) Will fill material be Placed in coastal wetlands/marsh (CW). If yes, submerged aquatic vegetation (SAV), shell bottom SIB), or (if) Amount of material to be placed in the water other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. fill) Dimensions of fill area ❑CW ❑SAV _ ❑SB fly) Purpose of fill OWL ❑None (ii) Describe the purpose of the fill In these areas: 8. GENERAL a. Flow will excavated or fill material be kept on age and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Fill material will be placed behind constructed bulkhead; final slope Excavator, vibratory hammer, water pump and jetting wand, (not steeper than 3:1) will be seeded. barge. c. (1) Will navigational aids be required as a result of the project? d. (I) Will wetlands be crossed in transporting equipment to project ❑Yes DgNo ❑NA site? ❑Yes ONo ❑NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid environmental impacts. C 19 oelpwl- Revised June 8, 2019 Ciry Date MOD, LLC. Shoreline Protection 8 Pier Development Applicant Name Project Name e-- - /(Theorldre Applicant Slgnatumre Sampson -Agent) 252-808-2608 :: 1.808.4111COAST :: www.nccoastzilnfanarLement.net evlsed: 12126/06 Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. 1 N/A --- c. Density (give the number of residential units and the units par aae). N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must recelve an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (it If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes []No NNA hi) If yes, list the date submitted: g. Give the percentage or the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. NIA i. Give the percentage of the entire tract to be covered by impervious ant/or buih-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. Impervious: 8.38%tolal(Existing); Built-Upon:8.38% Total: 8.38% j. Describe proposed method of sewage disposal. Septic tank, pump and leach field. I. Describe location and type of proposed discharges to waters of the state (a g., surface runoff, sanitary wastewater, industrial/ commercial effluent, 'wash down' and residential discharges). None d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 3,725 sq. ft. f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. NIA h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a she development plan been submitted to the Division of Water quality for review? ❑Yes ❑No ®NA (ii) If yes, list the date submitted. k. Have the facilities described in Item (i) received state or local approval? []Yes [-]No ®NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ❑Yes ❑No ®NA It yes, attach REoCatplpoFtap@ntation Received JUN28?!'l DCM-MHD CITY Ita 7 .: ;- DCM-EC [07 bo9 a110412:: 1-808.4RCOAST nwww.nccoastapmanal...�,.a.r,. revised: 1226106 Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. 1 N/A c. Denelty (give the number of residential units and the units per acre). NIA e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begin,. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes ONO ®NA (u) II yes, list the date submitted: g. Give the percentage of the tract Wthin the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftop, or to be used for vehicular driveways or parking. NIA i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. Impervious: 8.38% total(Exisling); Built -Upon: 8.38% Total: 8.38% j. Describe proposed method of sewage disposal. Septic tank, pump and leach field. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, induslnalf commercial effluent, 'wash down' and residential discharges). None d. Size of area to be graded, filled, or disturbed Including roads, ditches, etc. 3,725 sq. ft. f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. N/A h. Projects that require a CAMA Major Development Permit may also require a Storm,water Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes ONO ®NA (ii) If yes, list the dale submitted. k. Have the facilities described in Item (1) received state or local approval? ❑Yes ONO ®NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ❑Yes ONO ®NA If yes. attach appropriate documentation. ed Receiv RECEIVED Received JUN 2 8 2019 DCM-EC DCM-MHD cin 252.608-28082 :: 1.688.4111COAST It www.nccoastalm inagement.ne[ revised: 1226106 Form DCM MP-3 (upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Private onsile well. o. When was the lolls) platted and recorded? 06/18/2014 Revised June 8, 2019 Date Shoreline Protection & Pier Development Project Name MOD, LLC. Applicant Signature (Theodore Sampson - Agent) n. (i) Will water be impounded? ❑Yes ®No ❑NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? []Yes []No ®NA RECEIVED JUN 2 8 2efq DCM-MNp CITY 252-808-2808 :: 1-888-41RCOAST :: www.nccoastalmanngement.net revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project- Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: []Commercial ❑Public/Government ®Private/Community c. (I) Dock(s) ardor piers) (it) Number 1 (fit) Length 273-fl (N) Width 6-ft (v) Floating []Yes ®No e. (i) Are Platforms included? ®Yes ❑No If yes: (ii) Number 1 (#I) Length 16-f1 (iv) Width 8_ft (v) Floating ❑Yes ®No Note. Roared areas are calculated from dnpline dimensions. g. (I) Number of slips proposed I (11) Number of slips existing Q I. Check the proposed type of siting. ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water, no dredging required ❑Other, please descrbe: k. Typical boat length: 30-ft m. (i) Will the facility have tie pilings? ®Yes ❑No fill If yes number of tie pilings? 3 [I This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Are Finger Piers included? ®Yes []No If yes: (I!) Number (in) Length (iv) Width-/ (v) Floating ❑Yes HNb t (0 Are Boatfift included? ®YM []NO If yes: (ii) Number 1 (NI) Length 25-ft (iv) Width 10-ft h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ('wet slips') only, number of slips: ❑ Dry storage; number of boats: _ ❑ Boat tempts); number of boat ramps. ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). RECEIVED mixed types JUN 2 8 2C?9 DCM-MHD CITY I. (i) Will the facily be open to the general public? ❑ Received C'Yes No 1 ,, V^ 4 DCM-EC Z52-80111 2bur} ;: I -Brio 4RCOAEI r. wwW.nccoa@ta6nafna_gemErnt.net revised: 12/27106 Fof'ffl DCM MP-4 (Structures, Pape 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. b. Check each of the following sanitary facilities that will be Included In the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location. ❑ Showers ❑ Boatholding tank pumpod; Give type and location Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (1) Give the location and number of 'No Sewage Discharge' signs proposed. (if) Give the location and number of'Pumpout Available' signs proposed. I. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? In i. Give the number of channel markers and 'No Wake' signs proposed. Give the location of fuel -handling facilities, and describe the safely measures planned to protect area water quality. J. What vAll be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? RECEIVED I. If this project is an expansion of an existing marina, what types of services are currently provided? JUN 2 8 2019 DCRN_lldun ..... m. Is the marinaldocking facility proposed within a primary or secondary nursery area? ❑Yes ❑No 2.".ZJ;N1F1 2t1Utc :: 'I -Unit .i MC OAST .: WWw,a I.-,:. ')'I al+n.+uagprnent.nei rovlsed: 121271013, Fornt DCM MP-4 (Structures, Page 3 of 4) n. Is the marmaldocking facility proposed within or adjacent to any shellfish harvesting area? []Yes ❑No o. is the marinalclocking facility proposed within or adjacent to coastal wetlandstmarah (CW ), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL []None p. Is the proposed madnaldocking facility located within or within close proximity to any shellfish leases? []Yes []No If yes, give the name and address ofthe leasehokler(s), and give the proximity to the lease. 3. BOATHOUSE (including covered tuts) ❑This section not applicable a. (g Is the boathouse structure(s): ❑Commercial ❑PuGIIHGovernment OPdvatelCommunily, (ii) Number 1 (iii) Length J -ft (N) Width 13-11 Note: Rooted areas are calculated from dnpsne dimensions. 4. GROIN (e.g., wood, sheetplle, etc. If a rock groin, use MP-2, Excavation and Fill) ®This section not applcable a. (1) Number _ (11) Length (III) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length _ b. Average distance from NFW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands B. MOORING PILINGS and BUOYS ®This section not applicable a. Is the strudure(s): []Commercial ❑Public/Government ❑PrivatelCommunty a Distance to be placed beyond shoreline Note: This should be measured from marsh edge, If present. e. Arc of the swing _ T. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) at-„ElVEO 'UN 2 8 2019 Received 'UN CIry ila l t :� _� `:� D MIC 252 609-2000:: 1-1100-411Ge7AST www.fpcc.oa.it,rtrnarrt57emont.nct revis.•d: 12'Z710ti POrin nGPA Mix-4 (Strnctnres, Pays 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines 15-ft Note: For buoy or mooring piling, use arc of swing including fength ofvesset c. Width of Hater body 0.35-mile e. (I) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (11) If yes, explain what type and how they will be Implemented. b. Proximity of structuie(s) to adjacent docking facilities. 268-f1(W End B/H to Marina); 164-ft (NW edge Bt/Hs to Marina); 983-ft (NE End Pier to E) d. Water depth at waterward end of structure at NLW or NWL 5.2-ft N WL 18. OTHER ®This section not appikable a. Give complete description: Revised June 8, 2019 Date Shoreline Protection & Pier Development Project Name MOD, LLC. Applicant Name Applicant Signature (Theodore Sampson -Agent) RECEIVED JUN 2 8 2019 DCM-MHD CITY 252•n0f -2800 t: 11,861)-4nGOAST :: www.ncr:o;15LalnnmapemenLnrt revised: 12027/06 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director File Note: NORTH CAROLINA Environmenta/Quality FROM: Gregg Bodnar, DCM Assistant Major Permit Coordinator a SUBJECT: MOD LLC application and Yeopim Partners #126-09 DATE: 7/18/19 MOD LLC is located within the Riversound Subdivision located off Drummond's Point Rd., in Chowan County. The subdivision was authorized under permit no. 126-09. The NEW permit was issued on 9/1/09. Condition No.18 restricted all lots within Phase II to be restricted to a one slip docking facility. Condition No. 19 dedicated lots 243-257 shoreline for the marina Condition No. 20 restricted all waterfront lots from requesting shoreline stabilization Major Modification issued 2/16/15 modified Condition No. 19 to lots 42-51 which is located in proximity to the marina. Amended permit issued 5/8/15 modified Condition No. 19 to a section of shoreline noted on Sheet 1 of 7 dated "Revised 9/30/14". The location was designated an area along Simon Creek between markers A and B. Minor Modification issued 11/7/18 modified Condition No. 20 to allow for each property listed below to allow for each. property to apply for shoreline stabilization though the Major Permit process only. All other lots not designated under the Minor Modification will have the shoreline stabilization restriction remain in effect. These lots are available on Sheet 1 of 1 dated "Revised 10/8/18". Plantation Circle (Lots 42-34) Windsong Point (Lots 20-15) Mayfaire Drive (Lots 51-49) Flagship Dr. and Flagship Ct. (Lots 48-42) MOD LLC. application is located on 620 Flagship Court (Lot 47) within Phase II of the subdivision. Condition 18 is the only condition that applies. DEQ North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252.8082808 Permit Class MODIFICATION/MINOR Permit Number 126-09 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vie,rklnnt"t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Yoepim Partners, LLC., c/o.Joseph Stevens,19421-A Liverpool Parkway, Cornelius, NC 29301 Authorizing development in Chowan County adi. to the Yoepim River. off Drummond's Point Rd, Riversound Subdivision as requested in the permittee's letter dated 11%7/18, including the attached workplan drawings (1), dated "Revised 10/8/19". This permit, issued on November 7, 2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically altered herein, this Minor Modification authorizes the modification of Condition No. 20 of the original Permit No. 126-09, which was issued as amended on 5/8/15, all as expressly and specifically set forth in the attached letter and workplan drawings. Any additional development activities may require a modification of this permit. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2019 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Brae on C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature ofPermittee Partners LLC. c/o Joseph Stevens Permit No.126-09 Page 2 of 2 ADDITIONAL CONDITIONS In order to satisfy concerns of the resource agencies and in accordance with commitments made by the permittee, waterfront lots to the east of the community area boat ramp access, along Plantation Circle (lots 42-34), Windsong Point (lots 20-15), Mayfaire Drive (lots 5149), and Flagship Drive and Flagship Court (lots 48-42), shall have the existing deed restriction modified to allow for the ability to apply for shoreline stabilization by way of the Division of Coastal Management's Major Permit application process only. Furthermore, the deed restrictions shall prohibit the ability for the lots to apply for shoreline stabilization by way of the Division's General Permit process. Condition No. 20 of the original permit, which issued was amended on 5/8/15, remains in force for all remaining waterfront lots not detailed in Condition No. 2 of this Minor Modification. This Minor Modification shall be attached to the original Permit No. 126-09, which was issued as amended on 5/8/15, as well as all subsequent modifications, refinements, and renewals, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. All conditions and stipulations of the active permit remain in force unless specifically altered herein. The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW- 2009-01119. The Division of Water Resources assigned the proposed project DWR Project No. 06-1245 V4. A minor modification application processing fee of $100 was received by DCM for this project. Permit Class AMENDED Permit Number 126-09 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Yeopim Partners LLC. c/o Joseph Stevens 19421-A Liverpool Parkway, Cornelius, NC 28031 Authorizing development in Chowan County at adi to the Yeonim River, off of Drummond's Point Rd. Riversound Subdivision as requested in the permittee's application dated revised 12/4/14, including the attached drawings(4) 1 dated revised 11/12/14 and 3 dated revised 12/5/14 This permit, issued on May 8, 2015 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may )e subject to tines, imprisonment or civil action; or may cause me permir to De nun ana voia. Marina 1) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility shall be installed in an easily accessible location. The pumpout facility shall be operable and maintained for the life of the marina. 2) Prior to the occupancy of any slips authorized by this permit, the permittee shall meet on -site with a representative of the Division of Coastal Management to ensure that the required pumpout facility is in place and operable. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit shall be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. = Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. - Signature of Permittee Yeopim Partners, LLC Permit # 126-09 Page 2 of 5 ADDITIONAL CONDITIONS 3) The marina shall display a sign showing the location of the on -site pumpout facility, including other appropriate waste disposal information, at the entrance and exit from the main piers. 4) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 5) Unless specifically altered herein, this permit authorizes only the reconfiguration of the previously authorized manna facility and the installation of the two No Wake Buoys and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 6) The No Wake Buoys shall conform with any and all appropriate regulations governing such structures, including but not limited to marking and lighting requirements of the N.C. Wildlife Resources Commission and/or the U.S. Coast Guard. 7) All portions of the access pier/walkway located over Coastal Wetlands shall not exceed a width of 6 ft. and shall be elevated a minimum of 3 feet above the marsh substrate as measured from the bottom of the decking. 8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 9) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 10) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury that may be caused from existing or future operations undertaken by the United States in the public interest. 11) This permit authorizes a maximum of 130 formalized docking spaces. 12) Should lots 47 and 48 be sold prior to the initiation of construction, the permittee shall be required to obtain a signed riparian corridor waiver from the owner of lot 47 and an encroachment agreement from the owner of lot 48. Ydopim Partners, LLC ADDITIONAL CONDITIONS Easement Permit # 126-09 Page 3 of 5 13) The permittee may be required to apply for a submerged land lease from the Department of Administration's State Property Office. Contact the Department of Administration's State Property Office directly at (919) 807-4650 for this determination. Should it be determined that an Easement is required, the permittee shall supply a copy of the easement to the Division within 30 days of issuance of the Easement. Upland Development 14) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the dock masters station, pumpout structure, walkway, and parking area, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 264-3901 for this determination. Sedimentation and Erosion Control 15) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfrlling activities. 16) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. NOTE: A modified Erosion and Sedimentation Control Plan shall be required for this project. This plan shall be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Land Quality Section, 943 Washington Square Mall, Washington, NC 27889. Stormwater Management 17) The NC DEMLR Stormwater Section approval of this project under stormwater management rules of the Environmental Management Commission is covered by way of Stormwater Permit No. SW7080105 MOD. Any violation of the permit approved by the DWQ will be considered a violation of this CAMA permit. Yeopim Partners, LLC ADDITIONAL CONDITIONS Permit # 126-09 Page 4 of 5 Deed Restrictions 18) In accordance with the commitments made by the permittee in the narrative dated 4/18/09, deed restriction shall be placed on all waterfront lots of Phase II restricting the ability of each lot to apply for only one boat slip to the Division of Coastal Management. These deed restrictions shall be recorded with the Chowan County Register of Deeds, and copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of construction of the marina facility. 19) 15A NCAC 07H .0208(b)(D) of the Rules of the Coastal Resources Commission require that marinas to be developed in waters subject to public trust rights for the purpose of providing docking for residential developments shall be allowed no more than 27 square feet of public trust areas for every one linear foot of shoreline. In order to ensure consistency with this requirement, deed restriction shall be placed on lots referenced between Point A and Point B as shown on plat titled `Exhibit" Riversound Sewer Treatment Plant dated 5/30/14. The deed restriction shall further state that no "T"s, finger piers, platforms, or decks shall be allowed off of lots referenced between Point A and Point B as shown on plat titled `Exhibit' Riversound Sewer Treatment Plant dated 5/30/14 in the future as long as the permitted marina facility is in place. This deed restriction shall be recorded with the Chowan County Register of Deeds, and copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of construction of the marina facility. 20) In accordance with the commitments made by the permittee in the narrative dated 4/18/09, deed restrictions shall be place on waterfront lots within the Riversound Subdivision prohibiting shoreline stabilization. This deed restriction shall be recorded with the Chowan County Register of Deeds, and copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of any development activities authorized by this permit. General 21) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense claim shall be made against the United State removal or alteration. s 22) No Coastal Wetlands shall be excavated or filled, even temporarily. 23) Any mitigative measures or environmental commitments specifically made by the applicant in the Environmental Assessment for this project should be implemented, regardless of whether or not such commitments are addressed by individual conditions of this permit. 24) The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. Yeopim Partners, LLC Permit # 126-09 Page 5 of 5 ADDIITIONAL CONDITIONS 25) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 26) This. major modification shall be attached to the original Permit No. 126-09, which was issued on 9/l/09 and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. 27) All conditions and stipulations of the active permit remain in force under this major modification unless specifically altered herein. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3642 (DWQ Project No. 06-1245 Ver. 4). NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-200901119. Pemut Class Permit Number MODIFICATION/MAJOR 126-09 STATE OF NORTH CAROLING Department of Environment and Natural Resources and X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Yeouim Partners, LLC.,_ c/o Joseph Stevens,19421-A Liverpool Parkway, Cornelius, NC 28031 Authorizing development in Chowan County at adi to the Yeouim River, off of Drummond's _ Point Rd. Riversnnnd Subdivision as requested in the permittee's application dated revised 12L4114,.including the attached drawings 4 1 dated revised 11/12/14 and 3 dated revised 12/5/14 This permit, issued on February 16 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may _.-.:, «: . ,....,a„ the nermit to he null and void. lG JLLV�VHL LV LLLLL.J, uaaraauv.uuv... .. Marina 1) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility shall be installed in an easily accessible location. The pumpout facility shall be operable and maintained for the life of the marina. 2) Prior to the occupancy of any slips authorized by this permit, the permittee shall meet on -site with a representative of the Division of Coastal Management to ensure that the required pumpout facility is in place and operable. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit shall be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program, ..F nvxm and fha 31&UCU Uy 'UG UULLLVLIL� — u.... ..------� -- Chairman of the Coastal Resources Commission. Braxton C. Davis, Director a�Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Pennittee Yeopim Partners, LLC Permit # 126-09 Page 2 of 5 ADDITIONAL CONDITIONS 3) The marina shall display a sign showing the location of the on -site pumpout facility, including other appropriate waste disposal information, at the entrance and exit from the main piers. 4) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 5) Unless specifically altered herein, this permit authorizes only the reconfiguration of the previously authorized marina facility and the installation of the two No Wake Buoys and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 6) The No Wake Buoys shall conform with any and all appropriate regulations governing such structures, including but not limited to marking and lighting requirements of the N.C. Wildlife Resources Commission and/or the U.S. Coast Guard. 7) All portions of the access pier/walkway located over Coastal Wetlands shall not exceed a width of 6 ft. and shall be elevated a minimum of 3 feet above the marsh substrate as measured from the bottom of the decking. 8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable . waters at or adjacent to the authorized work. 9) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 10) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury that may be caused from existing or future operations undertaken by the United States in the public interest. 11) This permit authorizes a maximum of 130 formalized docking spaces. 12) Should lots 47 and 48 be sold prior to the initiation of construction, the permittee shall be required to obtain a signed riparian corridor waiver from the owner of lot 47 and an encroachment agreement from the owner of lot 48. X6opim Partners, LLC Permit # 126-09 Page 3 of 5 ADDITIONAL CONDITIONS Easement 13) The permittee may be required to apply for a submerged land lease from the Department of Administration's State Property Office. Contact the Department of Administration's State Property Office directly at (919) 807-4650 for this determination. Should it be determined that an Easement is required, the permittee shall supply a copy of the easement to the Division within 30 days of issuance of the Easement. Upland Development 14) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the dock masters station, pumpout structure, walkway, and parking area, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 264-3901 for this determination. Sedimentation and Erosion Control 15) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. 16) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. NOTE: A modified Erosion and Sedimentation Control Plan shall be required for this project. This plan shall be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Land Quality Section, 943 Washington Square Mall, Washington, NC 27889. Stormwater Management 17) The NC DEMLR Stormwater Section approval of this project under stormwater management rules of the Environmental Management Commission is covered by way of Stormwater Permit No. SW7080105 MOD. Any violation of the permit approved by the DWQ will be considered a violation of this CAMA permit. Yeopim Partners, LLC Permit # 126-09 Page 4 of 5 ADDITIONAL CONDITIONS Deed Restrictions 18) In accordance with the commitments made by the permittee in the narrative dated 4/18/09, deed restriction shall be placed on all waterfront lots of Phase II restricting the ability of each lot to apply for only one boat slip to the Division of Coastal Management. These deed restrictions shall be recorded with the Chowan County Register of Deeds, and copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of construction of the marina facility. 19) 15A NCAC 07H .0208(b)(D) of the Rules of the Coastal Resources Commission require that marinas to be developed in waters subject to public trust rights for the purpose of providing docking for residential developments shall be allowed no more than 27 square feet of public trust areas for every one linear foot of shoreline. In order to ensure consistency with this requirement, deed restriction shall be placed on lots between 42 through 51 dedicating the entire shoreline of these lots to the proposed community access facility. The deed restriction shall further state that no "T"s, finger piers, platforms, or decks shall be allowed off of lots between 42 and 51 in the future as long as the permitted marina facility is in place. This deed restrictions shall be recorded with the Chowan County Register of Deeds, and copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of construction of the marina facility. 20) In accordance with the commitments made by the permittee in the narrative dated 4/18/09, deed restrictions shall be place on waterfront lots within the Riversound Subdivision prohibiting shoreline stabilization. This deed restrictions shall be recorded with the Chowan County Register of Deeds, and copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of any development activities authorized by this permit. General 21) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 22) No Coastal Wetlands shall be excavated or filled, even temporarily. 23) Any mitigative measures or environmental commitments specifically made by the applicant in the Environmental Assessment for this project should be implemented, regardless of whether or not such commitments are addressed by individual conditions of this permit. 24) The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. Yeopim Partners, LLC Permit # 126-09 Page 5 of 5 ADDITIONAL CONDITIONS 25) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 26) This major modification shall be attached to the original Permit No. 126-09, which was issued on 9/l/09 and copies of both documents shall be readily available on site when Division personnel inspect .the project for compliance. 27) All conditions and stipulations of the active permit remain in force under this major modification unless specifically altered herein. NOTE:. This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3642 (DWQ Project No. 06-1245 Ver. 4). NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-200901119. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1, APPLICANT'S NAME: MOD, LLC 2. LOCATION OF PROJECT SITE: Site is located off of Drummonds Point Road (SR 1100), on lot 47, 620 Flagship Court, Farms at Riversound subdivision, adjacent to the Yeopim River and in Chowan County. Photo Index: 2006: 155-6755; K22 State Plane Coordinates: Lat.: 36*05'11,56"N Long: 76' 28'29.42"W 3. INVESTIGATION TYPE: CAMA & D/F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit: 06/20/2019 Was Applicant Present: No 5. PROCESSING PROCEDURE: Application Received Complete: June 14, 2019 Office: Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan: Chowan County LUP Land Classification: Rural Conservation R-25 (B) AEC(s) Involved: EW, ES and PTA (C) Water Dependent: Yes (D) Intended Use: Residential (E) Wastewater Treatment: Existing: Septic Planned: N/A (F) Type of Structures: Existing: Residence, a storage shed, a livestock shelter and fencing Planned: Stairs, pier, platform, boathouse, kayak launch, and bulkhead (G) Estimated Annual Rate of Erosion: 1.5' per year 7. HABITAT DESCRIPTION: [AREA] DISTURBANCE FILLED SHADED (A) Shallow Bottom: EW & PTA 200sf 2,247sf (B) Open Water: EW & PTA (C) High Ground: ES 3,725sf r� (D) Total Area Disturbed: = .1416 Acres or 6,172sf (E) Primary Nursery Area: No JUN 2 8 2019 (F) Water Classification: SC Open: No MMHHO� 8. PROJECT SUMMARY: The applicant, MOD, LLC, is requesting a permit to construct 15t1'' of bulk7i�2fd4C)rY above normal water level (NWL), a high ground ramp and stairs to access a 273' x 6' pier that will extend out into the Yeopim River 250' and be elevated 4' above NWL, a lower 8' x 16' kayak launch 8' from the proposed bulkhead, a 13' x 30.5' boathouse at the end of the pier with a 10' x 25' lift, and 4' wide walkway around the boathouse. MOD, LLC Field Investigation Report Page 2 Project Setting The applicant's properly is located at the Farms at RiverSound subdivision, more specifically 620 Flagship Court, adjacent to the Yeopim River in Chowan County. RiverSound is a private gated residential community located off of Drummond's Point Road (SR 1100). The property consists of approximately 11.44 acres bisected by Flagship Court. Approximately 7 acres of pine forest is situated on the south side of Flagship Court with the remaining 4.44 acres (on the north side of the road) fronting on 151' of shoreline along the Yeopim River. Development of the property includes a gravel cul- de-sac, a residence, shed, livestock shed, fencing, and associated infrastructure. All lots surrounding the applicant's property are designated for similar use within the gated community, but are currently undeveloped. Two lots northwest of the property is a common area that received a CAMA Major Permit to construct a 130 slip floating marina. To date only 20 slips and twelve finger piers have been constructed off of the main pier. The CAMA Major Permit issued to Yeopim Partners is still active with a December 31, 2019 expiration date. Pines and hardwoods can be found in varying growth stages with typical undergrowth on the property. Vegetation includes, but not limited to, Loblolly Pine (Pinus taeda), Sweet Gum (Liquidambar styraciflua), Bald Cypress (Taxodium distichum), Wax myrtle (Myrica cerifera), Cat brier (Smilax rotundifolia), Poison ivy (Toxicodendron radicans), and Carolina jasmine (Gelsemium sempervirens). Located along the shoreline is a small area of Soft rush (Juncus effuses) and Cattail (Typha, spp.) that form a small area of wetlands approximately 350sf along the shoreline at the bottom of a bluff. Average elevation of the property is approximately 8' above normal water level (NWL). A high bluff extends along the rear of the residence from the eastern corner and slopes down to approximately V above NWL at the northwest corner along the river. The flood designation for most of the property is AE, and the entire tract is located within the 100-year floodplain. Soil in the area of proposed development along the Yeopim River is classified as Dellwood Gravely Fine Sandy Loam (DgB) soil. Water depths on the Yeopim River within the project area vary from 0' to -5.2' extending out to a distance of approximately 130' offshore. The -5.2' depth is maintained out to a distance of 250' waterward of NWL. No submerged aquatic vegetation was found within the project area. On April 16, 2019, the applicant's consultant Ted Sampson raked along the approximate oentedine of the proposed pier and platform alignment, from the shoreline to a'distance of 250' offshore. According to the consultant a single detached strand of Southern Naiad (Najas guadalupensis) was found approximately 80' waterward of the shoreline, at a depth of 31. Yeopim River is located in the Pasquotank River Basin, is classified as SC waters and closed to shellfishing. Yeopim River is designated as an Anadromous Fish Spawning area and is within the NC Division of Marine Fisheries Striped Bass Management Area. The nearest major water body to the applicant's property is the Albemarle Sound, which is 4 miles by waterHECEIVED There is one marina in operation the area, approximately 4.2 miles from the applicant's property, on Yeopi Creek at Albemarle Plantation, Albemarle Plantation's marina is a 158 slip docking facility exclusively forth N 2 $ 2019 residents of the Plantation, but fuel and pump -out facilities are available to the public for a fee. DCM -MHD C►T� When the developer, Yeopim Partners, received their CAMA Major Permit (#126-09) for the marina in Phase it of RiverSound, they offered restrictions prohibiting shoreline stabilization and limit waterfront lots to no more than one mooring facility (boat slip) per lot. This limitation was modified on November 7, 2018 to allow for the ability for certain lots to obtain permit(s) for shoreline stabilization. The permit modification further limited permitting for shoreline stabilization through the CAMA Major Permit process only (Permit enclosed). MOD, LLC Field Investigation Report Page 3 Development Proposal Bulkhead, Walkway/Ramp and Stairs: The applicant proposes to construct a bulkhead along 151' of shoreline landward if small area of coastal and noncoastal wetland vegetation (350sf). The bank along the project area will be sloped beginning at a distance of approximately 8' landward of the proposed bulkhead alignment to the top of said proposed bulkhead. Anticipated disturbance will extend approximately 24.6'to 25' landward of the proposed bulkhead. The top of the bulkhead will be 4' above NWL. Per the application the bulkhead will be constructed an average of 1.3', and a maximum of 5', waterward of NWL and have 15' return walls along both side of the property. Approximately 200sf of shallow bottom fill is anticipated and a maximum of 3 725sf of upland disturbance is anticipated in association with the sloping of the bank and the construction of a 6' x 58' walkway/ramp and stairs to access a proposed pier, kayak launch and boathouse. Pier: The proposed pier will be 6' x 273' long, extend a total of 250' into the Yeopim River and shade 1,638sf of open water. The pier and docking facility will be elevated 4' above NWL and constructed with a 45° turn southeast and run along the 15' riparian line to a distance of 250' waterward of NWL. The proposed alignment of the pier and boathouse will be 71' from the approved footprint of the 130 slip RiverSound Marina, and approximately 900' northwest of the nearest residential pier. Water depth at the end of the pier is -5.2'. The water depth shown on the plan submitted also notes that the water depth is -5.2 just 130' waterward of NWL and is continuous out to 250' offshore. Kayak Launch: An 8' x 16' kayak launch "step down" is proposed on the northwest side of the pier approximately 8' waterward of the proposed bulkhead, and will shade128sf of open water. Water depth at the kayak launch is approximately -1.9'. Boathouse and Lift: A 13' x 30.5' boathouse is proposed with a 10' x 25' boatlift. The boathouse roof will over hang the pier (1.5' x 30.5') for a total of 45.75sf. Open water shading from the boathouse will be: 396.5sf - 45.75sf = 350.75sf of open water shading. As noted with the pier the depth of the River at the boat house is -5.2' and will be 71' from the footprint of an approved marina (Partially constructed with an active CAMA Major Permit). Walkway/Finger Pier: A 4' x 44' walkway/finger pier is proposed round the boathouse. The boathouse roof calculated above will overhang (1.5' x 30.5') for a total of 45.75sf. Additional shading from the walkway/ finger pier will be: 4' x 44' =176sf - 45.75sf=130.25sf of open water shading. Totals: Shallow Bottom Fill: 200sf Open Water Shading: 2,247sf High Ground Disturbance: 3,725sf Total: 6,172sf RECEIVED JUN 2 8 2019 Anticipated Impacts From the Requested Modification DCM-MHD CITY 1. Loss of 200sf of Shallow Bottom. 2. Shading of 2,247sf of Open Water. MOD, LLC Field Investigation Report Page 4 3. Approximately 3,275sf High Ground Disturbance. 4. The proposed development will temporarily disrupt animal populations within adjacent waters and the project area. 5. Installation of the proposed bulkhead may result in temporally suspending sediments in the water. 6. Installation of the bulkhead and backfill will not result in a significant increase in elevation of the subject property. 7. During the project construction it is anticipated that noise levels may periodically increase above surrounding background (ambient) levels from heavy equipment. & Treated wood leaches over time in surrounding waters and sediment. The amount of leaching is dependent on the type of organic material present in the water bottom substrate, oxygen levels and water movement; however, it is estimated that 90% of the leaching will occur within the first 90 days, Submitted by: Lynn W. Mathis Date: June 24, 2019 RECEIVED JUN 2 8 2019 DCM-MHD CITY SAMPSON CONTRACTING, INC. Marine Construction And Environmental Consulting Services 125 Hunters Trail West, Elisabeth City, North Carolina, 27209 USA Tel: 252 548 4292 - Fax: 866 793 4261 tedsresampsoncontrscting.com www.sampsoncontracting.com PROJECT NARRATIVE Received IN SUPPORT OF REQUEST FOR MAJOR PERMIT AMENDED 06/05/2019 I APPLICANT: MOD, LLC D M-EC PROJECT: Shoreline Protection and Pier Development LOCATION: Chowan County, North Carolina; Lot 47, 620 Flagship Court, Farms at Riversound subdivision, off of Drummonds Point Road Directions: From Edenton's Highway 17 and Highway 32 intersection, proceed northeast on Highway 17 for 4.2 miles to State Road 1101 (Thick Neck Road), and turn right. Proceed 1.7 miles to intersection of State Road 1102 (Yeopim Road), and turn right. Proceed south for 0.5 miles to intersection of State Road 1100 (Drmnmonds Point Road), and turn left. Proceed east-southeast for 2.5 miles, and turn left onto Batts Island Road. Proceed 1.2 miles to north and turn right onto Flagship Drive. Proceed 0.2 miles to east to intersection of Flagship Drive with Trailwood Court. This is the southwest corner of MOD, LLC.'s Lot #47. Turn left following Flagship Drive to the north for 0.3 miles. Development site is ahead on the right. SITE: Description: The project area consists of an 11.44 acre tract of land, bisected by the Flagship Court road, and bordered along most of its western boundary by Flagship Drive. This tract is owned by MOD, LLC., and identified on Chowan County Records as 620 Flagship Court, Lot 47-Farms at Riversound, and by PIN as 784500692478. The shoreline of the tract along the Yeopim River is 151 feet. This number is measured between the lot boundaries near the erosion escarpment, and does not take into account minor shoreline fluctuations along this property boundary observed on a site visit on 3/13/2019. Approximately 7 acres of the tract (the area to the south of Flagship Court) is currently a pine forest, managed in the past as part of active sylviculture. Approximately 2.25 acres of the tract (the area to the north of Flagship Court and south of the graveled cul-de-sac) is being utilized for agricultural purposes related to livestock. This area is regarded as Uplands, despite there being a small area (approximately 0.02 acres) along the eastern boundary of this area that lies within the AE Flood Hazard Area. The approximatel)RECaErRM13he JUN 2 8 2019 DCM-MHD CITY Lot that lies to the north of the graveled cul-de-sac is under development for residential purposes Adioining Development: All lots surrounding this MOD, LLC. tract are zoned for similar uses, are currently undeveloped, and are forested with managed sylviculture. Outside of the Riversound subdivision, six lots to the east, there exists residential development with a pier and boathouse. Along the Yeopim River to the northwest, to the point where the river bends decidedly to the southwest, no lots have any residential or waterfront development, with the exception of the common -area marina location. This 130-slip permitted marina location lies on the second parcel to the northwest, and currently has been developed with a pier and 12 finger piers. The waterward extent of this pier lies 250-ft off of the shoreline. Erosion: Erosion is readily discernable along the shoreline of the Lot, where an erosion escarpment that is approximately 8-11 above Normal Water Level (NWL) has been breaking off and falling down to the elevation of the Yeopim River. Since the Lot was platted, 770 sq ft of uplands have been lost to erosion (162 sq ftlyr); 228 cu yds of upland soil have been lost (48 on ydslyr); and the escarpment has receded 7.3-ft at its maximum extent (1.5-ft/yr). This shoreline along the Yeopim River is a high energy shoreline where winds cross an open fetch of water ranging from approximately 0.9 miles when blowing from the east-northeast, 0.7 miles when blowing from the northwest, and a minimum of approximately 0.3 miles when blowing from the north. This shoreline is sheltered by land when winds range from the northwest, counter- clockwise, to the east-northeast. Soils: Information available from the USDA indicates one hydric soil type exists: Roanoke Silt Loam (Ro). This soil type comprises approximately 86% of the Lot and extends from the southern boundary to within approximately 75-ft of the gravel road cul-de-sac near the development area on the north portion of the property. Approximately 10% of the Lot consists of Wahee Fine Sandy Loam (WaA), which is not a hydric soil type. This band of soil extends from the northern boundary of the Roanoke Silt Loam to a line approximately 90-ft north of the gravel road cul-de-sac. Approximately 4% of the Lot consists of Dellwood Gravelly Fine Sandy Loam (DgB), which is not a hydric soil type. The soil in the area of proposed development along the Yeopim River is classified in its entirety as Dellwood Gravely Fine Sandy Loam (DgB) soil. Hydrology: The hydrology of the project area varies significantly. The area of Roanoke Silt Loam soil is 0 to 12 inches above the water table under normO The area having Wahee Fine Sandy Loam is normally 6 to 18 inches above the JUN 2 8 2019 DCM-MHD CITY water table, and the area with Dellwood Gravelly Fine Sandy Loam soil is normally 18 to 36 inches above the water table. The Dellwood Gravelly Fine Sandy Loam soil in the area of proposed development is considered to be moderately well -drained, having a capacity of its most limiting layer to transmit water (Ksat) listed as moderately high (0.20 to 0.57 in/hr), and a depth to restrictive features of more than 80 inches. It is listed as having a high water capacity of about 9.3 inches. A typical profile is listed as: Fine Sandy Loam 0 - 8 inches; Clay Loam 8 - 66 inches; Sandy Loam 66 - 80 inches. The Wahee Fine Sandy Loam soil is considered to be somewhat poorly - drained, having a capacity of its most limiting layer to transmit water (Ksat) listed as moderately low to moderately high (0.06 to 0.20 in/hr), and a depth to restrictive features of more than 80 inches. It is listed as having a moderate water capacity of about 8.8 inches. A typical profile is listed as: Fine Sandy Loam 0 - 6 inches; Sandy Clay 6 - 44 inches; Sand 44 - 80 inches. The Roanoke Silt Loam soil is considered to be poorly -drained, having a capacity of its most limiting layer to transmit water (Ksat) listed as very low to moderately high (0.00 to 0.20 in/hr), and a depth to restrictive features of more than 80 inches. It is listed as having a high water capacity of about 9.2 inches. A typical profile is listed as: Silt Loam 0 - 8 inches; Clay Loam 8 - 13 inches; Clay 13 - 58 inches; Fine Sandy Loam 58 - 80 inches. Some of the drainage from this tract is conveyed to the low lands bordering the Yeopim River through sheet Flow to the lower AE Flood Hazard Area that extends inland from the River on the Lot to the east, running near the Lot boundary, and extending nearly 20-ft onto the MOD, LLC Lot about 200-ft north of the point where the Flagship Court road crosses the MOD, LLC Lot's eastern boundary. The Normal Water Level of the Yeopim River appears, from vegetative growth visible on tree buttresses and root mats, to vary by 12 to 16 inches in response to seasonal wind direction. Strong, sustained, seasonal winds likely cause temporary excursions of the water level two to three feet above and below the Normal Water Level. Section 404 Wetlands: A 404 wetland delineation has not been conducted for this tract. However, an assessment has been made for the presence of any such wetlands within the area where the shoreline protection development is proposed. A small area (approx. 225 sq ft) of 404 wetlands exists along the western shoreline and consists primarily of Juncus effusus. The proposed Bulkhead alignment lies 3 to 7 feet landward of this wetland area. The proposed pier development lies approximately 32-ft to the east of this wetland area -RECEIVED Received Coastal Wetlands: JUN 2 8 2019 DCM-MHD CITY DCM-EC A small area of coastal wetlands has been identified along the shoreline of the property. These wetlands consist of a single species: cat -tail, (Typha, spp.) in an area of approximately 100 sq ft. This area is situated almost in the middle of the eastern half of the property shoreline. The proposed Bulkhead alignment lies 4 to 6 feet landward of this wetland area. The proposed pier development lies approximately 3-ft to the west of this area. Uplands: Upland vegetation in areas under sylviculture consist predominantly of Loblolly pine (Pinus taeda). Other areas not under cultivation include meadow grasses (Various), Loblolly pine (Pins taeda), Sweet gum (Liquidambar styraciflua), Bald cypress (Taxodium distichum), and Wax myrtle (Myrica cerifera). Waters: The waters, from the source of the Yeopim River to the Albemarle Sound, are classified by NC Division of Water Quality as SC waters. This includes the waters along the project site. These waters are outside any primary or secondary nursery areas. The waters along the project site adjoining the Yeopim River are Inland Waters subject to the jurisdiction of the Wildlife Resources Commission. While the waters adjoining this tract lie outside any Primary or Secondary Nursery Areas, they are designated as an inland Anadromous Fish Spawning area. The waters adjoining the project site are also included within the Striped Bass Management Area. The waters adjoining the project site lie approximately 0.5 miles upstream and outside of the River Herring Management Area. These waters have been designated by the NC Shellfish Sanitation Commission to be prohibited areas for shellfish harvesting. Submerged Aquatic Vegetation (SAV): In that this Permit seeks only limited in -water development no specific effort was made to assess the entire nearshore areas for SAY. However, on 4/16/2019, the centerline of the proposed pier and platform was raked continuously from shoreline to 250-ft offshore to detect the presence of any SAY. The results were the detection of a single, detached, non -rooted strand of Southern Naiad (Najas guadalupensis) at a point 80-11 waterward of the shoreline, at a depth of approximately 3.7-ft. The Secchi depth for the entire area examined was 0.5 meters (1.9-ft). There were no beds of SAV detected, nor any rooted SAV plants associated with the proposed docking structures. Historical -Archaeological: No Historical/Archaeological sites within the development area are indicated on the location maps retained by the NC Division of Coastal Management. There is one site, C038, located approximately 0.5 miles to the east of the development area near the Yeopim River, and anothR MI) located JUN 2 8 2019 DCM-MHD CITY approximately 0.8 miles to the west, on the west side of Middleton Creek near its confluence with Burnt Mill Creek. Species of Concern: In Chowan County, five vertebrate species of concern are listed by the US Fish and Wildlife Service and the National Marine Fisheries Service, and one vascular plant. Three of the vertebrate species are listed as Endangered. These are the Atlantic Sturgeon (Acipenser oxyrinchus), the Shortnose Sturgeon (Acipenser brevirostrum) and the West Indian manatee (Trichechus manarus). These species could be present in this area, but no reports of any sightings have been found. One of the vertebrate species is listed as Threatened. This is the Red Knot (Calidris canuius rufa). This species could be present in this area, but no reports of any sightings have been found. One of the vertebrate species listed is the Bald eagle (Haliaeetus leucocephalus), and it is a protected species under the Bald and Golden Eagle Protection Act. This species is known to be present in the area, and has been reported to be seen flying in the vicinity, with a nest sighted within approximately '/2 mile of the development site. There was no nesting habitat for this specie observed in the immediate area of proposed development. The vascular plant listed is Raven's seedbox (Ludwigia ravenh), and is classified as an At Risk Specie. This plant was not observed during the site evaluation and its typical habitat of peat soils and bogs make it unlikely that it exists within the area of proposed development. It is unlikely that the proposed development will have any impacts on the identified species of concern. DEVELOPMENT: Proposed New as Part of this Permit Application: This project, in addition to the proposed erosion control bulkhead, includes proposed development of a pier, a boat house, with supporting finger piers and boatlift, all for a single boat slip, and a kayak launch platform within waters of the State of North Carolina, including attachment to State bottom beneath the waters. The project as proposed is in compliance with the N. C. environmental Policy Act (N.C.G.S. 113A 1-10). Bulkhead: A 151-ft long wooden lap or sheet -pile bulkhead of 12 to 18 inch width, with return walls on eadh end of the bulkhead, each of approximately 16-ft length. Pier: A pier of 273-ft in length and 6-ft wide, extending from the bulkhead to no farther offshore than 250-ft. Boat House: A boat house is to be constructed at the water -ward end of the pier. Not greater than 400 sq ft, it will be of approximate dimensions 13-ft x 30.5-ft, enclosing a boat lift, and accommodated by 4-ft wide walkways, totaling 49-ft, along its southern and western dip►t:tlsi D Fttt,;tty RpC21V@d JUN 2 S H19 DCM-MHD CITY DJM-EC Boat Lift: A mechanical boat lift is to be constructed of approximate dimensions of 10-ft by 25-ft within the confines of the Boat House. This boat lift will be supported by three piles on each side of the slip. The three piles on the water -ward side of the slip will function as tie piles for the single boat slip until such time as the boat lift is constructed. Kayak Launch Platform: A kayak launch platform is to be constructed of approximate dimension of 8-ft by 16-ft. This platform will be located on the western side of the pier/walkway, approximately 3-ft water -ward of the proposed bulkhead. Additional Development: Additional development includes the construction of a stairs/ramp and short walkway to connect to the pier at its intersection with the bulkhead, and grading of the uplands (approx. 3,725sq. ft.) landward of the proposed bulkhead alignment. Existing: Prior development includes one residential structure, with associated driveway and patio, a small storage shed and smaller livestock shelter. Additional existing development includes graveled roadway surfaces along most of the Lot's western boundary, across the width of the lot, and into the driveway entrance, all constructed by the developer of the subdivision. UTILITIES Wastewater: Wastewater is handled by an onsite septic tank, pump and leach field. Potable Water: Potable water is provided through a private, onsite well. Power: Power is provided through connection to buried subdivision utilities. Telephone: No telephone utilities are currently available. Telephone is through cellular service. IMPACTS Project development under this Permit application seeks no new impervious surface. Overall project development involves the following impacts: Pier. Stairs/Ramo. Walkways. Platform and Boathouse: Built -upon area within the Coastal Shoreline AEC will result in an increase of 96 sq ft as a result of the stairstramp and walkway to connect to the pier at the bulkhead. Shaded area over the Yeopim River will increase by 1846 sq ft. Driving of pilings will result in minor, temporary acoustic shocks within the water column. Driving or jetting of pilings will result in minor, temporary turbidity in the water column. No shading of SAV beds is anticipated from the Pier, Platform and Boathouse. RECEIVED JUiN 2 8 2019 'OCM-MHD CITY Bulkhead: Bulkhead backfill will fill 200 sq ft of the Yeopim River. Driving of pilings and sheet -piles will result in minor, temporary acoustic shocks within the water column. Driving or jetting of pilings and sheet-piles/boards will result in minor, temporary turbidity in the water column. Placement of bulkhead tiebacks and grading of uplands to slope to the top of the bulkhead will result in soil disturbance of approximately 3,725sq ft. Access: Access for equipment and materials is available through the tract to the Areas of Environmental Concern in the vicinity of the proposed development without crossing any Section 404 wetlands or coastal wetlands. AVOIDANCE AND MIMIMIZATION Applicant seeks to provide boat use and mooring capacity on this lot with a pier, boat house and kayak launch platform. Location and alignment of these structures has been selected based on no observed presence of SAV beds, but both location and alignment can be shifted to avoid SAV beds if present at the time of structure construction. Shading impacts are minimized by keeping pier width, and boathouse and platform areas to not exceed that allowed under the Rules of the Coastal Resources Commission under General Permits. Applicant seeks to provide erosion protection along the unprotected shoreline adjoining the Yeopim River through the construction of pile -supported wooden, and/or vinyl sheet -pile bulkheads. Sedimentation and erosion control during construction will be provided by construction sequence, with bulkhead construction being completed, where possible, prior to disturbance of adjoining uplands to provide backfill. In addition, construction of bulkheads will include the placement of filter cloth along the landward side of the bulkhead strictures, extending landward a minimum of 6 feet from the exposed bottom of the bulkhead. If jetting of bulkhead components is utilized, additional erosion protection will be provided in the form of silt fence and/or turbidity curtain as may be appropriate. If disturbance of uplands landward of the bulkhead alignment is necessary before the bulkhead is in place, temporary silt fence will be placed as needed. Stabilization of adjoining uplands will be addressed by providing seeding of the disturbed areas at the completion of the land disturbance. i Ted Sampson Environmental Consultant RECEIVED JUN 2 8 2019 DCM-MHD CITY Received DCM-EC From Edenton's Highway 17 and Highway 32 intersection, proceed northeast on Highway 17 for 4.2 miles to State Road 1101 (Thick Neck Road), and turn righL Proceed 1.7 miles to intersection of State Road 1102 (Yeopim Road), and turn right. Proceed south for 0.5 miles to intersection of State Road 1100 (Dmmmonds Point Road), and turn left. Proceed east-southeast for 2.5 miles, and turn left onto Batts Island Road. Proceed 1.2 miles to north and turn right onto Flagship Drive. Proceed 0.2 miles to east to intersection of Flagship Drive with Trailwood Court. This is the southwest comer of MOD, LLC.'s Lot # 47. Turn left following Flagship Drive to the north for 0.3 miles. Development site is ahead on the right. received 37 ;ACM -EC -51 1.71 - `r}: 11' ' i• ► i009Y1f _ t iJ it 1117 1102 NH EDEI/UON Pop.4.7T6 som z t -- 31=1 llli 1 r ifivas \ 32 i 94 — 37 t slJwlnc I "re, }Northeastern RGNL (+, Airport 1.13 t, B1.._' _ 9�. /\4Y .u, SCALE ]a N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM Date: March 13 2019 Name of Property Owner Applying for Permit: Richard Dent, Managing Member MOD LLC Mailing Address: 4505 Dalton Road Chevy Chase MD 20815 1 certify that I have authorized (agent) Theodore Sampson & Sampson Contracting Inc to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) shoreline erosion protection landscaping Pier, boathouse boatlift and walkway. at (my property located at) Lot 47, Farms at Riversound Subdivision 620 Flagship CourtChowan County, adjacent to Yeopim River. This certification is valid thru (date): March 13, 2020. RECEIVED Property Owner Signature Date JUN 2 8 2019 By: Richard Dent, Managing Member DCM-MHD CITY Received 1.1, uMEC Aeency Form For Permit Applications 1, Richard Dent. Managing Member of MOD. LLC, the owner of the property located: (property owner) Adjacent to Yeopim River: off of Drummonds Point Road Lot 47 Farms at Riversound Subdivision 620 Flagship Court, Chowan County, North Carolina. (property location/address) do hereby authorize: SAMPSON CONTRACTING, INC., and its agents (Theodore Sampson, or others) to act as our agent for the purpose of obtaining any environmental Permits, including, but not limited to NC Coastal Area Management Act permits, NC Dredge and Fill Act permits, NC DEQ permits, US Army Corps of Engineers permits, and/or any local, or county building and environmental permits, that may be associated with the development at the above -indicated property, which entails: shoreline erosion protection, landscaping_ pier, boathouse, boadift and walkway. (describe the proposed development for which permits are being sought) This agency authorization is limited to the specific activities described above, and will expire on: 13 March 2020, unless withdrawn in writing prior to that time. (date on which agency authorization expires) (Agent Information:) Sampson Contracting, Inc. 125 Hunters Trail West received Elizabeth City, NC 27909 Tel.: (252) 5484292 ,,, , (Property Owner Information:) DCM_EC 0a'Llk"-17- (signature) Richard Dent for MOD. LLC 4505 Dalton Road RECEIVED (printed name of owner) (Mailing Address) JUN 2 8 20!9 Managing Member, MOD, LLC Chevy Chase, MD 20015 DCM-tIIAHD CITY (Title: officer of core. owner or trustee) (City, Stale, Zip Code) 13 March 2019 301-652-8958 (date) (Telephone Number) SAMPSON CONTRACTING, INC. Marine Construction And Environmental Consulting Services 125 Hunters Trall West, Elizabeth City, North Carolina, 27909 USA Tel: 252 548 4292 - Fax: 888 793 4261 tedsr@sampsoncontraeting.com www.sampsoncontracting.com CERTIFIED MAIL— RETURN RECEIPT REQUESTED April 24, 2019 William Edward Hartsough 691 W. Azure Lane Litchfield Park, AZ 85340-5089 Re: MOD, LLC's waterfront development, 620 Flagship Court, Famns at Riversound subdivision, Chowan County, North Carolina Dear Mr. Hartsough: Our company has been retained by MOD, LLC, owners of Lot 47, Farms at Riversound (PIN 784500692478) in Chowan County, located at 620 Flagship Court, which is adjacent to your Lot 46, at 221 Flagship Court. MOD, LLC seeks to undertake development on their property, which abuts the Yeopim River. MOD, LLC has asked us to make application for the needed permits for their proposed development on their property. The proposed development can be summarized as follows: • Provide shoreline erosion protection along the property fronting on the Yeopim River by construction of a bulkhead structure, and • Provide a water access pier with boathouse, and boat lift, and a kayak launch platform along the Yeopim River. The overall development activities are depicted on the enclosed site drawings. As an adjacent riparian neighbor to the development location, the CAMA Permit process requires that we notify you by Certified Mail of the proposed project. This provides you with the opportunity to advise the NC Division of Coastal Management of whether you have any comments relating to the proposed work. Landowners have 30 days from the date of notification in which to comment. Such comments will be considered by the Department in reaching a final decision on the application. MOD, LLC is seeking this Permit to preserve the existing shoreline of this property along the Yeopim River, and to facilitate access to and from the Perquimans River. If you have comments, you can provide those to: NC Division of Coastal Management 1367 U.S. 17 South RECEIVED Elizabeth City, NC 27909 JUN 2 8 2019 Received ,, DCM-MHD CITY DCM-EC If you do have comments, or any other questions, we request that you contact us, before sending your comments to the State so that we may have the opportunity to further clarify the project and/or alleviate any of your concerns. Thank you for your kind attention to this matter. Please feel free to contact me if you have any questions. Sincerely, Ted Sampson Environmental Consultant Encl: (1) NC Division of Coastal Management Application for Major Development, MP-1, MP-2, MP-3, and MP-4 (2) SAMPSON CONTRACTING Drawings No. 02-012218-001, Sheet 1, titled Site Overview, Sheet 2, titled Development Site Overview, Sheet 3, titled Proposed Pier/Walkways, Boatlift, Boat House & Kayak Launch Platfornt, Sheet 4, titled Pier Details, Sheet 5, titled Kayak Launch Platform & Bulkhead Details, and Sheet G, titled Boat House Details. Received DCM-EC RECEIVED JUN 2 8 2C!9 DCM-MHD CITY UNITED STATEF08li RI!'"VICE Final -Class Mail /A Z .}ice Postage & Fees Paid USPS 01, MAY a19 Permit No. G-10 Sender: Please print your name, address, and ZIP+4e in this box• ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mallplece, or on the front If space permits. 1. A.rw. A.U..a. M- William Edward Hartsourgil 691 1N, Azure Lane Litch ieid Park, A7 85340-fi089 SAMPSON CONTRACTING, INC. 125 Hunters Trail West Elizabeth City, NC 27909 A. S eturg Agent !� ❑ Add re B. Received 4y lPrinfgd Name) C. Da4of Del Is del" address dleemof from Item 1? U Yee If YES, enter delivery address below: p No II I'IIIII IIII I'I I I I I I III III I II I II III I IIII I III Adult t(2gal MWt in" PetdtaDelNwy oRMi Od M0 R ie 9590 9403 0492 5173 7244 74 ❑ Craffie Ma Resufd d Delivery ❑ Re urn Fv elpt (m ❑ C91l%t W D9May Meg hMe,'a 2. Araole Number (R srer from serv109 Own In r ai..., __ Wv1 Beselct9d DelN y O Signature C9nfi,.Wt — 7014 3490 0001 4367 5600 1i R�WtW Del,,e,y OReso Woell"gt _ ORn , Apri12015 PSN 7C>30-02-000-9053 Domestb Return Rwelpt Received D M-EC,' RECEIVED JUN 8 8 22:9 Of:Y�M4D Cf�Y' ■ Completo Items 1, 2, and 3.- " " �1Vp- ■ Print your name and address on the reverse X l�- 0 Agent Adds so that we can return the card to you. ■ Attach this card to the back of the mallplece, a. Roa lved Name) C. Da or or on the front It apace permits. rr'9 - (i 1. A.W. Add .d en: D. Is do" address differeaffmM Item 14 ❑ Yes William Edviard Hartsouflil If YES, enter delivery address below: 0 No 691 W. Azure Lane Litch ieid Park, AZ 85340-5089 IIIIII�II IIII I�II'II III�IIII IIII II III IIIIIIICI3. ❑Adol$C"W. Rmldcled Demory ❑ReNO%s Mee' nestrlictod 9590 9403 0492 5173 7244 74 ❑ CMMed MW10 ❑ ne11ea1 Mall Hmtrinied Delwry Dee�rWW ❑ netum Ry *g for O CWleet on neUwry Mor ,te nr u '— Delivery ReWded Dellvay OalenetUMCy#fmterlOn- 2. Article Number(i/amfer float SWIOO ralwll _ 0001 4367 7014 349❑l oi 5600 uR.Wkd Demur 0 slq.We Donp.vlm amMWml lku.-,y �.—r--w'mvj — Domestlo Roturn Receipt Received D M-EC RECEIVED JUN 2 8 2019 OCM-MHD CITY SAMPSON CONTRACTING, INC. Marine Construction And Environmental Consulting Services r:,,1, 125 Hunters Trail West, Elizabeth City, North Carolina, 27909 USA Tel: 252 548 4292 - Fax: 866 793 4261 ni,61 tedsr@sampsoncontracting.com www.sampsoncontracting.com CERTIFIED MAIL- RETURN RECEIPT REQUESTED April 24, 2019 Mohamed Eliwa Shalaby 347 Suttons Landing Road Hertford, NC 27944 Re: MOD, LLC's waterfront development, 620 Flagship Court, Fauns at Riversound subdivision, Chowan County, North Carolina Dear Mr. Shalaby: Our company has been retained by MOD, LLC, owners of Lot 47, Fauns at Riversound (PIN 784500692478) in Chowan County, located at 620 Flagship Court, which is adjacent to your Lot 48, at 621 Flagship Drive, MOD, LLC seeks to undertake development on their property, which abuts the Yeopim River. MOD, LLC has asked us to make application for the needed permits for their proposed development on their property. The proposed development can be summarized as follows: Provide shoreline erosion protection along the property fronting on the Yeopim River by construction of a bulkhead s0'ucture, and Provide a water access pier with boathouse, and boat lift, and a kayak launch platform along the Yeopim River. The overall development activities are depicted on the enclosed site drawings. As an adjacent riparian neighbor to the development location, the CAMA Permit process requires that we notify you by Certified Mail of the proposed project. This provides you with the opportunity to advise the NC Division of Coastal Management of whether you have any comments relating to the proposed work. Landowners have 30 days from the date of notification in which to comment. Such comments will be considered by the Department in reaching a final decision on the application. MOD, LLC is seeking this Permit to preserve the existing shoreline of this property along the Yeopim River, and to facilitate access to and from the Perquimans River. If you have comments, you can provide those to: NC Division of Coastal Management 1367 U.S. 17 South Elizabeth City, NC 27909 Received RECEIVED l,,,y <, JUN 2 8 2019 DCM-EC DCM-MHD CITY rn' ,ry /dry J /� 1n Ni 1 i A N ` ns , f M 0 N tb N l4 14 W W- 4K& x u tom '0`_ Q tuQ N.� U Fr0� ZQw in Q2 T ►" a complete Items 1. 2, and 3. i! Pont your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mallplece, or on the front If space permUs. i.Adtcle Addreued to; Mohamed Biwa Shalaby 347 Sullons Landing road F1Rrtford. NC 27944 IIIIIIIII IIII IIIII II1111 III 11111 II111111lll111 9590 9403 0492 5173 7244 81 n eww. ee.N.er mm�.iw /mm earvin+Nbrdl 7014 3490 0001 4367 5594 P8 Ftxm 3811. April 2015 FISH 7t.10-02.000'M �� W. Agent X ❑ Addre o—nwelved by (Prtnted M vn4 a.Date of Dal D. N delivery addax' dtfttenIlran IMm 19J-Ile,--1--9 O Yea R YES enter delivery address bebv.< ❑ No 3. Service Typo ❑pla*MW Er (] Aevs ak}Klue ❑Adun elpnewre Rntrbted GIMry O Re9dleatpwoW MO`Reaatdsd M ❑ Glided MNId O Gnabd Mell Rsetrbtetl DeAVery ❑Rahn Rxe�Mrar Mwhar ea o GNeGt on DeeYer'/ ❑ C.W m nefivn R.W," Ckrh-ry 06yesnss Cadenulbn^' r] SYdnuNn Gnertredm a MM d Mil RaeMctW edhory Re,b W DaWary Oomoetic Rohn Receipt ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse X so that we can return the card to you. & ■ Attach this card to the back of the mallplece, or on the front It space pemdts. 1. Artlol0 Addressed to: D. MOHAMED ELIWA SHALABY 552 E CARSON ST STE 104 CARSON, CA 90745 ❑ Agent ❑ Addressee C. Dale of Oel"ry h d*my addreae dlffwant from Rem 19 ❑Yee N YES, enter delivery address hebw, ❑ No .. a oemM cuw rypu Ll Pdonly Mau EpacvJ q III'III�I ��II �'ll II� I II' II (IIII III IIIIIII'll rlN Wtaed 0 Addl lYenaase nmtdded Nis" 0 Hoo6lerad Mail 11 s , cted 9590 9402 3392 7227 0497 27 o ai fMiae�aeslnaledfwrvary ❑ RDDrNu =t ❑ODWWD*A7 sWn:naMlse _ 2. Articb Number (rwwla front service IaoeU o Co%d an D*"Heatdaad aeivery o eignelure U,rfvm evn�" nk I me" 0sg ,.Co an .a ❑InewM MNfWslcbd OeiWary H WaM au , war PS Form 3811, JUly 2015 PSN 7630-02-000-S 3 UgMstia Return Neoe" ; U.S. Postal Service" CERTIFIED MAILO RECEIPT llomestie Afali Only For dellvery Inttrmallon, visit our wehslle at eww.usps.com'. M1 M1 M M s 7 ra ri O O RNum HWa Fee - Pod,mk O O tt.Z.nwnneeuva� Ibr„ O O IMeVkLrd nclrvary rea O O ffi vOR1 A Rv A no O^ ar 7 S Total Pantaeo R Fume �' m m a :r MOHAMED ELIWA SHALABY C3 0-0 552 E CARSON ST STE 104 M1 M1 p PO6aR NG iaix sis s: Y*w- CARSON, CA 90745 ....... Received .. r., I t ,. DC'%M-EC RECEIVED JUN 2 8 2019 DCM-MHD CITY �IttL F— Fdad 04113120161009.7gkt A Lynn C G11"Alod. Reyhlw Of Deeds Chewrrn County NC Revenue Tax S34000 Land Transfer iax $169900 ,.! at@C@IVCC� 84 Hook 4IIIIIIIPAGE 3r64 r(3) n ��I�ryllp DCM-EC NORTH CAROLINA GENERAI, WARRANTY DEED Parcel Identifier No. 7t450069247t BV __ yenfied by MuV90A to: Ilunh L Frankl_ riAttorney_a Law. 194 County on she This Insuament was prepared by: Iluah 1 F -k1' Au my t 14421-A Li 1 P . kwly Brief desanpaoo forthe Index: LOT 47 % rSnutd Phase I I —C THIS DEW made 1Nr _, 1211day of AmJ . 2016 by and letween VWPM Partners. LLC I UKAM1 19421 Liverpod parkway MOD' LLC Coraehw, NC 2t031 4505 When Road ChevY Chase. Mn 208 15 Ewer in appropriate block for each Grantor and Gramee: name. moiling address. an L if appropriate, character of entity, e.g. M"tinn or pan"hip. The designation Grano, and Grantee mused herein shall iwhde said panics. their hrirs, steces"%, and assigns, and shall iwlude singular. Plural . masculiw. femimm or ncuer as required by context. WITNFS.SLI'H. that the Grantor. for a valuable cn idcatioapaid by the Grantee, the receiptofwhich ish ebyacknowledged. Msand by these Presents dun gram. bargain, sell and convey unto the Grainier In bee simpk. all that certain Inn parcel of land or Comontnium unit situated in the City of __ ___ Edtnton TowmhiP .---County. North Carolina and mere particularly described oa follows: See E+hibit A aautad hereto and incorporated herein by rekrewe The property heteinahow described was acquired by Grantor by instrument recorded in Back ___ 463-_- page __. 66I__ .. All of a portion of the properly herein conveyed includes or .K . does not include the primary residence of a Grantor. A sup showing the above described Property is Mottled in Plat Book _ 2 page __7411 Pep 1d7 NCOe Aswamwform\o l01976.knucJ01917.Mn 7011 Thai ..Mud 1. NIVeen aAvu+ea by h... N by Apemen at de IC aar A..eu..-1%1 Nmb Cr 4d. ev A,..iuw-NC nor faem Nol / 6 0 hi - /i.'i 7 RECEIVED JUN 2 S 2019 DCM-MHD CITY ( 4Y mu/ ^B JY- eo k twmM�uW ,^Im 91oZ' 11,YU alyeY q! YI ! aY YBMYyI ai.Wi) leyl pogpalMwiae P. eW 41"'We" aialg ,al_un.lgnlYr J,d- f0id �!ll4{uY'W°NVodbo•U,uq/mp A ny! ruppl" JOW, _�a�Pm'Yo,'�_!-._ �tr,_ . �la'4l_�`-YN Pad W/w_d,,.i�rw "1'1•�11�,Jo 4111 �p��M•�lNo14aVl tl ay. D1OaW top °mlar IrinlY JO alrlg du P�a9�11Wa W.awon ! Sgag P"'4'r .(l'a )'A% l4„aldra Yl,rMdtd oour`nyoroJput N a AvrhOdJnda 1PpOvad �'P!o --n4lH F+r_+om ao p, ��-1O�IIJ eo,fwno fbMnOt°18op1 to d,•ceeroN \tOt/ua� J9��l0NPwl ro0pu",.a 000popq.f�4vluPgO `__ n'aPon,y lJo� p!eglo alotaq YTw Rapp AttaJf � � W J0'd1J� u�J19 nd\�Pv1�p���q „•'Pd a i nrYle luJm Yid � 1i'ayrV .44 d 'OJo%ar°le8°�aPPo�aa O4l YOYTlrp aY N, eO:yl�i ^` B r Ul anusaw NJapl Ye! Tgfs,"UeW •ke 4 BU/Waxy,yryln,y ( tip �' gYeN �W 'O'nbb �nV•�dw�/Ra ,q aupoJvw ra'(iYp'1V dnll oa > !eW�ago, °jt of eh Dito 41:,awR� floe �:p! MlV4V aW A Paiq�rM'�Nroalp p1hp(V�,aa!/m g'4d.V1/M Ml �/111i/to �tJ i/!✓'�°Y/9gal°%,q' Af tf laygda^ MegM 971MNNY{�W,1t11� NJp n�#ab0 k Or t Page 365 TO HAVE AND TO HOLD the 0mrsaid lot or purcel of local am rt pnvueges and uppurtewnces thereto belonging w the Grantee In fee simple And the Chanlor covwanu With the Grandee. that Granmr is seined of the premises in fee simple. has the right to convey the tone In fee simi mat title is marketable and free and dear of all encumbrances. and that Granmr will warrant and defend the tide against the lawful claims of all persons Whomsoever, other than the following exceptions: Fasements, Redfictionr and Rights of Way of Rmord; 2015 Chowan County Tax; matter shown on the referentced Plat, IN WITNESS WIIBREOF. the Grantor ha, duly executed the huegoing err of the day and year fiat ahlrve i nnen Ya ion P LLC -LUAU 5 —__ (En ty 1 77� Pria/7MM Name: B li rc .a 5 PriaVlype Name R Title: Dianna S. Moore. Maltager -__ PrioVlype Nana' By: PrfaVlype Name B Title.. Dirty S. Moore p iftgypa By:_ ISvar y PAoVhTe Natm d Title: PrioNfype Natrr: _- State of __ - County or City of _ 1. she ladraigaed Notary Public of INC County or City of _ eed State aforesaid. certify that Pete UY WRred before me this day arad rimowledgedthedue execution oftheforegoing instrument for the purposes themoexpressed. Witness my hand and Noaral Romp or seal this ___ dayof My Comolrioo Expires: (Affix Sal) Notary Public MUD's Pmrcd m Typcd Hare Sum of -County or City of 1.lie undersigned Notary Public of the County or City of and Sum aforesaid. certify that Penw^dlyappexed before me this day and acknowledged thedue executimofthe(=Ong Instrument for the purposes tlertioexpmsed. Witness my hand and Notarial stamp or cal (his --day or 20_. MYCommissioo Expires: ___Koury Public fAffu Sal) won,. & Printed or'Iypod No,. Stateof_Noq CgVline _ -county" City of_[.(gf(Isfihwk 1. the undersigned Notary Public of the County or City of MreJhftdm a and Store aforesaid. certify that pennnelly came beforeme this day and rklnwledged that he a the _. Mas}ge(of ^_Ysop� PargerSLLC , • NoM Caroline or __ corponiimJlimiled liability company/general purne rshlpAimlmd partnership formic through the iooppitcable). and thu by audmrity duly given and as the act of ouch entity. _he signed the foregoing instrument in Ion norm on in behalf r in so and deed. Witness my hard and Notarial &temp orsed. this 12th day of _ A I 2016 , MYConlmissloa Exp"oes: lghf}9. 2°I7° aNN A'y�"v d'i • Wilton N Mre Otry Public (Affix Seel) ,` ;r'b Notion*a Primed or Typed Norm 2 . tp NC au Aawnuamlam Na. 301916. R<viwd019yir,'.g11f20D ihir .., AmMgAp<emve vM N<SC Bu Aaaa:atitn-IPoI"' 'l!:" imam lam hex soesatPmet q. NUN Cmiinr gar Mvicia iia-NC Bar Jose W.3 RECEIVED ceived Ndy n D M-EC D0Yi_ +Hu Ci ry Book 484 Page 366 Snuels in Yeopim Township, Chowan County, North Carolina, and being Lot 47 in Phase II of RrverSound Subdivision, as the same is shown on and more particularly described by Plat recorded in Plat Cabinet 2 Slides 74H through 75E of the Chowan County Registry entitled "The Forms at RivefSDund". by Tennessee Land Surveying Co. TOGETHER WITH ANO SUBJECT TO the terms, conditions, easements and obligations shown on the referenced Mat. or contained in that certain Amended Declaration of Covenants, Conditions, Restrictions and Limilalbns gel forth in Deed Book 360 at Page 932 of the Chowan County Registry, as the same has been amended and supplemented according to its terms, and specifically inducing that certain Supplementary Declaration recorded in Book 476 al Page 481 of the Chowan County Registry TOGETHER WITH a non escluslve and perpetual right of access over, and subject to the rights of others in the roadways shown on the referenced plats for ingress egress and regress to and from Drummonds Point Road and within Rivereound Subdivision. in accordance with the use and maintenance provisions set out in the above referenced Declarations. Received 110 1 > D M-EC (MOD LLC 47 MORAOD LLC 04) RECEIVED JUN Q 8 2019 t)(,'M-►UHD CITY ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S. REGAN .feadwy BRAXTON C. DAVIS Director June 27,2019 Mod, LLC Richard Dent 4505 Dalton Road Chevy Chase, MD 20015 Dear Mr. Dent: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of property located at 620 Flagship Court, Lot 47 off Drummonds Point Road, in Chowan County. It was received complete on June 14, 2019 and appears to be adequate for processing at this time. The projected deadline for making a decision is August 28, 2019. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from June 14, 2019, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. RECEIVED JUN 2 S 2019 D Q'�d} DCM-MHD CITY North Carolina Department of Emironmental Quality I DNision of Coastal Management Elizabeth City Office 1 401 South Griffin Street. State 300 1 Elizabeth City. North Carolina 2790q 252.2643901 Mod, LLC June 27, 2019 Page 2 of 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact Lynn Mathis, Field Representative, if you have any questions and or if you wish to receive a copy of her field report. Sincerely, Ron Renaldi District Manager, Northeastern District NC Division of Coastal Management f77[�7 Enclosure cc: Doug Huggett, Major Permits Coordinator, DCM, Morehead City, NC Lynn Mathis, Field Representative, DCM, Elizabeth City, NC Ted Sampson, Sampson Contracting, Inc. RECEIVED JUN282019 DCM-MHD CITY N0T 1(40'**.17dA RECEIVED JUN 2 8 2019 DCM-MHD CITY C MA PERMIT APPLIED FOR PROJECT: Construct 151' of bulkhead, high ground ramp & stairs to access a 2731x6' pier into the Yeopim River 250' & 4' above NWL, 81x16' kayak launch, 131x30.5' boathouse with a 101x25' lift & 4' wide walkway around the boathouse COMMENTS -ACCEPTED THROUGH . July23, 20-19 APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW. MOD, LLC Lynn Mathis Richard Dent (Managing Member) 401 S. Griffin Street, Suite 300 4505 Dalton Road Chevy Chase, MD 20015 Elizabeth City, NC 27909 301-652-8958 252-264-3901, ext. 234 ��F Coastal Management ENV,DONNENTal oval EMAIL MEMORANDUM TO: The Chowan Herald Edenton, NC 27932 C/o edalegals@dailyadvance.com FROM. Ella Godfrey DATE: June 27. 2019 SUBJECT: Major Public Notice: MOD, LLC ROY COOPER G,n,,, .n MICHAEL S. REGAN 1,v •ew'r BRAXTON C. DAVIS llnu ,r Please publish the attached Notice in the Wednesday, July 3, 2019 issue of THE CHOWAN HERALD. Please note that this is for a one -day publication only. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Melissa Sebastian, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557, (Telephone 252-808-2808). Thank you for your assistance in this matter. If you should have any questions, please contact me at our Elizabeth City office (252) 264-3901. Attachment cc: Doug Huggett, Major Permits Coordinator, DCM, Morehead City Tricia Smith, PIO, DMF/DCM, Morehead City Melissa Sebastian, Accounts Payable, DCM, Morehead City File RECEIVED JUN 2 8 201� DCM-MHD CITY Nothing Compares . .Suh, of North C.H.I tnvirnnm vial Quality I Coagal Mawgvnknl 401 S. Griffin Sr. Ste 1001 Elizabeth City. NC 2/909 252 264 1901 232-111-2951 Ifaal NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The NC Department of Environmental Quality hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an AEC as designated under the CAMA was received on 06/14/19. MOD, LLC proposes to construct 151' of bulkhead, 4' above normal water level, a high ground ramp & stairs to access a 273'x6' pier that will extend into the Yeopim River; a lower 8'x16' kayak launch, a 13'x30.5' boathouse with a 10x25' life and a 4' wide walkway around the boathouse at 620 Flagship Court, Lot 7, off Drummonds Point Road in Chowan County. A copy of the entire application may be reviewed at the office of the Division of Coastal Management, located at 401 S Griffin St, Ste 300, Elizabeth City, NC, 252-264- 3901 during normal business hours. Comments mailed to Braxton Davis, Director, DCM, 400 Commerce Avenue, Morehead City, NC 28557, prior to 07/23/19, will be considered in making the permit decision. Later comments will be considered up to the time of permit decision. Project modification may occur based on review & comment by the public, state & federal agencies. Notice of the permit decision in this matter will be provided upon written request. PLEASE PUBLISH ON: DATE Wednesday, July 3, 2019 RECEIVED JUN 2 8 2019 DCM-MHD CITY NC Division of Coastal Management Major Permit Application Computer Sheet (f U0112012) Applicant MOD, LLC - Dete: OB242019 Project Site County: Chowan Staff: Lynn Mathis District: OElizabeth City U Washington ❑Morehead City ❑Wilmington Pmject Name: WA Rover File: WA Let: 36'05'11.56' N Long.: 76' 2829.42' W Date of initial application submittal (EX.• 1/82007): M4i2019 (preliminary review) Date application 'received as complele' M the Field office (EX 1B12007): OW141f9 Pemef Aulhonzabon OCAM4 Dredge a Fill OBofh SITE DESCRIPTIOMPERMIT INFORMATION PNA: Yes NNo Photos Taken: YesO NoO Setback Required (riparian): Yes PgAki Cri" Habifah Yes LJNo Not Sure 15 foot waiver obtained. 0 Yes ONo Hazard Notification Retumed: []Yes ❑No NWA SAV: U Yes DgAlo ONO Sure She/Bottom: []Yes ONo Not Temporary Impacts: OYes No Sum Sandbags Yes ONO ONotSure Did the land use cassfficalkm come from Mitigation Required (op(ronso: county LUP: ®Yes ❑No ❑Yes ONO Morabdum Conditions: ❑ Yes NNo Environmental Assessment Done: ❑NA ❑Yes ❑No NNA SECONDARY WATER CLASSIFICATION— OPTIONAL (choose MAX of 4) Future Water Supply (FWS) Nutrient Sensitive Waters (NSW) Swamp Waters (SW) High Quality Waters (HQM ❑ Outstanding Resource Waters (ORW) WETLANDS IMPACTED ❑ (404) Corp. of Engineers (Jurisdictional (LS) Sea lavender (Limonium sp.) El (SS) Glassworl (Salkomis sp.) wetlands) (CJ) Saw grass (Clarkum jamaicense) (SA) Salt marsh coidgrass (Sparana D (SY) Salt reed grass (Spardna altemi6ora) cynosuto des) (DS) Salt or spike grass (Distkhlis 0 (SC) Bullmsh or three square (Scrpus El (TY) Cattail (Typha sp.) ,%oksta) ap.) ❑ (JR) Black needlenish (Juncus (SP) Salthneadow grass (Spaihna roemerianus) patens) APPLICATION FEE No fee required - $0.00 0 III(A) Private W D&F up to 1 acre; 0 III(D) Pnvpublic orcomm W D&F to 1 3490 can be applied - $250 acre; 3490 cant be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major ❑ IV Any development involving D&F of pemit - $100 permit - $250 more than 1 acre - $475 Permit Transfer-$100 III(B)Public orcornmercalWD&Fto1 Express Pe ZOQO-ED acre; 3490 can be applied - $400 t V Major development extension request - ❑ ll. Public or commercial/no dredge $100 androrfill -$400 JUN 2 8 2019 ❑ 1. Private no dredge and/or fill - $250 ❑ 111(C) Priv. public orcomm wrD&F to 1 acre; 3490 can be applied; DCM needs DCM-MHO CITY DWQ agreement - $400 Applicant MOD, LLC Date: June 24, 2019 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found In your Activities code sheet. Activity TYPE REPLACE Dimension 1 Dimension 2 Dimension 3 Dimension 4 Number Choose Choose One One Shallow Bottom 1 New work Replace 151, 1.3' Fill —Below Maint ❑ ❑ Y ON NWL Open Water I New � ace 273' 6' Pier Maint ❑ ❑ Y ON Open Water I New 6lbr* R°plBCB 16' 8' Ka k Launch Meier ❑ ❑ Y O N Open Water I New Yvmk Sao' 30.5' 13' Boathouse Maint ❑ ❑ Y ® N Open Water I NewWbrk 0 mace 44' 2.5' Finger Pier Maint ❑ ❑ Y O N High Ground I NewWak Replete /51' 24.6' Grading, for Maint ❑ ❑ Y IN N walkway and stairs New Work Replace Main(❑ ❑ Y ❑ N New Work 0 Replace McW0 ❑Y []N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Worn Replace Maint ❑ ❑ Y ❑ N New work El Replace Maint ❑ ❑ Y ❑ N New Wbrk Replace Maint❑ ❑Y❑N New Wak RrpMoe Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N t New Work RepAme Maint ❑ ❑ Y ❑ N New Wmk Replace Maint❑ ❑Y❑N New Work ❑ Rep ws Maint ❑ ❑ Y ❑ N New Work U Replace Maint❑ ❑Y❑N I —RECEIVED JUN 2 8 2019 DCM-MHD CITY Describe below the HABITAT disturbances for the application. All values should thatch the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. FL TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One tncludes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp Impact tamp impacts) ct amoun) tam ire is arrwun Shallow Bottom Dredge ❑ Fig ® Both ❑ OUW ❑ 200sf 200sf High Ground Dredge ❑ Fig ❑ Both ❑ Other ® A 725V 3, 725sf Open Water Dredge ❑ FB ❑ Both ❑ Other ® 2,2473f 2,247sf Shoreline Dredge ❑ FRO Bofb ❑ Other ® 151' 1511, Dredge ❑ Fa ❑ Both ❑ Other ❑ Dredge Fa Both❑ Offer Dredge ❑ Fig ❑ Both ❑ Other ❑ Dredge ❑ FM ❑ Both ❑ Other ❑ Dredge ❑ FB ❑ Both ❑ Other ❑ Dredge ❑ FN O Both ❑ Other ❑ Dredge ❑ FY ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ FRO Both ❑ Other ❑ Dredge ❑ FN ❑ Both ❑ Other ❑ Dredge ❑ FI/❑ Both ❑ Otber ❑ RECEIVED JUN 2 S 2019 DCM-MHD CITY ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director June 28, 2019 MEMORANDUM NORTH CAROLINA Environmental Qualify FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEO - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregg. bodnar(a)ncdenr.gov SUBJECTS CAMA /Dredge & Fill Application Review Applicant: MOD, LLC Project Location: 620 Flagship Court, Lot 47 off Drummonds Point Road in Chowan County Proposed Project: Shoreline protection and pier development Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by July 19, 2019. If you have any questions regarding the proposed project, contact Lynn Mathis (252-264-3901, ext. 234) when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME AGENCY SIGNATURE DATE RECEIVED JUN 2 S 2019 "D �� DCM-MHD CITY North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Slreet. Suite 3001 Ellzabeth City, North Carolina 27909 252.264.3901 DCM Coordinator: Greg Bodnar Distributed Yes® No ❑ Applicant: MOD. LLC Distribution Date: 6/28/2019 AGENCY ECRO Community Development/LPO Brandon Shoaf DCM Planner Charlan Owens Eliz City US COE: Raleigh Bland (Beaufort Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Peletier — (Berrie, Currituck, Dare, Gates, Pamlico, Posquotank, Washington) Community Assistance Lee Padrick (Beaufort, Carteret, Craven, Eliz City, Pamlico, Washington) Cultural Resources Renee Gledhill -Earley Div. of Water Infrastructure (No longer public Water Supply) Clif Whitfield Marine Fisheries Shane Staples WARO/ECRO NC DOT David Harris Shannon Jenkins Shellfish Sanitation Sharon Gupton Tim Walton State Property Mike Moser Wanda Hillard DEMLR/DWR: Sheri Montalvo DEMLR Sediment & Erosion- Samir Dumpor Storm water- Roger Thorpe DWR401- Anthony Scarbraugh WRC Maria Dunn (WARD) RE National Heritage Program Rodney Butler CEIVED JUN 2 8 2019 DCM-MHD CITY https://nccon nect-my.sharepoint.com/personal/eIIa_godfrey_ncden r_gov/Documents/Documents/Major Permits/Bill Belter/Maj Comment Distribution Sheet Bill Belter.docx Revised: 6/29/2018 MAJOR P`ERM_rIT FEE MATRIX Applicant Selection Development Type Fee DCM % (14300 1601 435100093 1625 6253) DWO % (24300 1602 435100095 2341) I. Private, non-commercial development that does not $250 100% ($250) 0% ($0) Involve the filling or excavation of any wetlands open water areas: ic or commercial ment that does not $400 100% ($400) 0%� ($0) rTexcavation the filling or of any wetlands water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Major a .. III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B. C, or D below applies: III(A). Private, non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 4097 (See attached) can be applied: II(B). Public or commercial development, if General $400 100% ($400) 0% ($0) r: Water Quality Certification No. 4097 (See attached) can be a lied: lll(C). If General Water Quality Certification No. $400 60%($240) 40%=60)- KEUEIVED 4097 (see attached) could be applied, but DCM staff determined that additional JUN 2 8 201 review and written DWQ concurrence is needed DCM-MHD CI because of concerns related to water quality or aquatic life: III(D). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) cannot be a lied: IV. For development that involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or o en water areas: I, . C " ,.: I Permit Class MODIFICATION/MINOR Received Permit Number 126-09 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit DCM-EC for -A— Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 — Excavation and/or tilling pursuant to NCGS 113-229 Issued to Yoepim Partners, LLC., c/o Joseph Stevens,19421-A Liverpool Parkway, Cornelius, NC 28301 Authorizing development in Chowan County adi to the Yoepim River. off Drummond's Point Rd, Riversound Subdivision , as requested in the permittee's letter dated 11/7/18, including the attached workplan drawings (1) dated "Revised 10/8/18". This permit, issued on November 7, 2(118 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may oe subject to tines, tmpnsonmem or civu action; or may cause me permit ro ue nun anu vmo. 1) Unless specifically altered herein, this Minor Modification authorizes the modification of Condition No. 20 of the original Permit No. 126-09, which was issued as amended on 5/8/15, all as expressly and specifically set forth in the attached letter and workplan drawings. Any additional development activities may require a modification of this permit. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2019 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. B on C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. SigndhileiofIl WIttee Voepim Partners LLC. c/o Joseph Stevens Permit No. 126-09 Page 2 of 2 ADDITIONAL CONDMONS 2) In order to satisfy concerns of the resource agencies and in accordance with commitments made by the permittee, waterfront lots to the east of the community area boat ramp access, along Plantation Circle (lots 42-34), Windsong Point (lots 20-15), Mayfaire Drive (lots 51-49), and Flagship Drive and Flagship Court (lots 48-42), shall have the existing deed restriction modified to allow for the ability to apply for shoreline stabilization by way of the Division of Coastal Management's Major Permit application process only. Furthermore, the deed restrictions shall prohibit the ability for the lots to apply for shoreline stabilization by way of the Division's General Permit process. 3) Condition No. 20 of the original permit, which issued was amended on 5/8/15, remains in force for all remaining waterfront lots not detailed in Condition No. 2 of this Minor Modification. 4) This Minor Modification shall be attached to the original Permit No. 126-09, which was issued as amended on 518115, as well as all subsequent modifications, refinements, and renewals, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 5) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: The U.S. Army Corps of Engineers assigned the proposed project COB Action 1d. No. SAW- 2009-01119. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 06-1245 V4. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. RECEIVED JUN 2 S Z019 DCM-MHD lass Fermit Number NEW 126-09 STATE OF NORTH CAROLINA s 1f Department of Environment and Natural Resources r g and Coastal Resources Commission Vrrmft for c ft5; ju r 08 1G'G, X Major Development in an Area of Environmental C nSWi4 pursuant to NCGS 113A-118 II _ Excavation and/or filling pursuant to NCGS 113-229 Issued to The Waterfront Group, N.C., LLC., 17505 West Catawba Avenue, Cornelius, NC 28031 Authorizing development in Chowan County at adi. to the Yeopim River, off of Dmmmond's Point Rd. Riversound Subdivision as requested in the permittee's application dated revised 4/18/09. including - I the attached drawinss (4). 1 dated 4/29/09 and 2 dated revised 2/23/09. and 1 dated revised 515109 This permit, issued on September 1, 2009 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may oe sunlect to times, imprisonment or ctvu action; or may cause me permit to oe nutt ano vora. 1) In accordance with commitments made by the authorized agent in an email dated 8/25/09 the no wake buoys are hereby removed from this project. Any references to the no wake buoys in the attached permit application are hereby null and void. Marina 2) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility shall be installed in an easily accessible location. The pumpout facility shall be operable and maintained for the life of the marina. 3) Prior to the occupancy of any slips authorized by this permit, the permittee shall meet on -site with a representative of the Division of Coastal Management to ensure that the required pumpout facility is in place and operable. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work shall cease when the permitexpires on December 31, 2012 Ex t. r o Qyf T t In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Mahagement Program. RECEI Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources CommissidbJN 2 8 2010 DCM-MHD Division of Coastal Management This permit and its conditions are hereby accepted. o M . , J,d 6I S. C. 2c/0-/77. Signature of Permittee r.wl;..r�»o-re..+-...�..aw-we>ro..+...a.. .. +.,w..-v...«.»......,>. ..... m... .-+.-s....+s..a...,�o... The Waterfront Group, N.C., LLC. Page 2 of 5 ADDITIONAL CONDITIONS 4) The marina shall display a sign showing the location of the on -site pumpout facility, including other appropriate waste disposal information, at the entrance and exit from the main piers. 5) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 6) Unless specifically altered herein, this permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 7) All portions of the access pier/walkway located over Coastal Wetlands shall not exceed a width of 6 ft. and shall be elevated a minimum of 3 feet above the marsh substrate as measured from the bottom of the decking. 8) No attempt shall be made by the pentuttee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 9) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the Permitted activity without having it transferred to a third party. 10) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work; or injury that may be caused from existing or future operations undertaken by the United States in the public interest. 11) This permit authorizes a maximum of 130 formalized docking spaces. 12) Should lots 439, 440, 464, or 465 be sold to the initation of construction, the permittee shall be required to obtain a signed riparian corridor waiver from the new property owners prior to the placement of any structure within the 15 foot riparian corridor. RECEIVED JUN28C7 DCM-MHD CITY Group, N.C., LLC. ADDITIONAL CONDITIONS Easement Permit # 126-09 Page 3 of 5 0) The permittee may be required to apply for a submerged land lease from the Department of Administration's State Property Office. Contact the Department of Administration's State Property Office directly at (919) 807-4650 for this determination. Should it be determined that an Easement is required, the permittee shall supply a copy of the easement to the Division within 30 days of issuance of the Easement. Upland Development 14) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the dock masters station, pumpout structure, walkway, and parking area, all as expressll and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 264-3901 for this determination. Sedimentation and Erosion Control 15) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. 16) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. NOTE: A modified Erosion and Sedimentation Control Plan shall be required for this project This plan shall be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Land Quality Section, 943 Washington Square Mall, Washington, NC 27889. Stormwater Manaeement I 17) The Division of Water Quality approval of this project under stormwater management rules of the Environmental Management Commission is covered by way of Stormwater Permit No. SW7080105 MOD. Any violation of the permit approved by the DWQ will be considered a violation of this CAMA permit. RECEIVED JUN 2 8 DCM-MHD CITY •wNie„v.M...gw'.p(w..4nw+M/�.ayYra.-..se•'. •wwr The Waterfront Group, N.C., LLC. ADDITIONAL CONDITIONS Deed Restrictions Permit # V Page 4of5 13) In accordance with the commitments made by the permittee in the narrative dated 4/18/09, deed restriction shall be placed on all waterfront lots of Phase II restricting the ability of each lot to apply for only one boat slip to the Division of Coastal Management. These deed restrictions shall be recorded with the Chowan County Register of Deeds, and copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of construction of the marina facility. 19) 15A NCAC 07H .0208(b)(D) of the Rules of the Coastal Resources Commission require that marinas to be developed in waters subject to public trust rights for the purpose of providing docking for residential developmens shall be allowed no more than 27 square feet of public trust areas for every one linear foot of shoreline. In order to ensure consistency with this requirement, deed restriction shall be placed on lots between 243 and 257 dedicating the entire shoreline of thgse lots to the proposed community access facility. The deed restriction shall further state that no T"s, finger piers, platforms, or decks shall be allowed off of lots between 243 and 257 in the future as long as the permitted marina facility is in place. This deed restrictions shall be recorded with the Chowan County Register of Deeds, and copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of construction of the marina facility. 20) In accordance with the commitments made by the permittee in the narrative dated 4/18/09, deed restrictions shall be place on waterfront lots within the Riversound Subdivision prohibiting shoreline stabilization. This deed restrictions shall be recorded with the Chowan County Register of Deeds, and copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of any development activities authorized by this permit. General 21) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 22) No Coastal Wetlands shall be excavated or filled, even temporarily. 23) Any mitigative measures or environmental commitments specifically made by the applicant in the Environmental Assessment for this project should be implemented, regardless of whether or not such commitments are addressed by individual conditions of this permit. 24) The permittee and/or his contractor shall meet with a representative of the Di6fta"M) project initiation in order to discuss the conditions set forth in this permit. JUN 2 8 ', DCM-MHD CITY PpEerfront Group, N.C., LLC. Permit# 126.09 Page 5 of 5 ADDITIONAL CONDITIONS 25) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3642 (DWQ Project No. 06-1245 Ver. 4), which was issued on 8/4/09. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-200901119. RECEIVED JUN 2 8 `'19 DCM-MHD CITY ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Dtreclor May 23, 2019 Theodore Sampson Sampson Contracting, Inc. 125 Hunters Trail West Elizabeth City North Carolina 27909 Re: CAMA Major Permit Application for MOD, LLC. Dear Mr. Sampson: The NC Division of Coastal Management hereby acknowledges receipt of a preliminary application for Casey Cameron on May 14, 2019. My review has revealed certain deficiencies, which must be corrected before an application package can be accepted as complete. To assist you in expediting the permitting process as much as possible, I am notifying you of these deficiencies immediately so that they can be quickly corrected to facilitate my detailed review. I am retaining the original application package so that I may continue reviewing the project. Please understand that the subsequent detailed review may reveal additional areas where further information or documentation is required to demonstrate compliance with the rules directly applicable to the proposed development. If this occurs, you will be notified of such issues separately. My initial screening has identified the following deficiencies: 1. Application Forms Form DCM-MP-1: #1 Please give the name of the owner or legal representative for MOD, LLC. #4 The length of the property is listed as 150' (not including fluctuations in the shoreline). The bulkhead length is noted in the MP-2 form a 151'. #5 f. The area of disturbance of 2,700sf does not appear to include the area around the proposed walk and stairs. The line noting grading goes around this structure and would add an addition 336sf of disturbance to the total. Typically for such projects I recommend using a standard distance of 30' for incidental disturbance, and it keeps it simple. #6 f. The address for Mohamed Eliwa Shalaby listed on his deed as 5166 Dixons Mill Road, Marshall, Virginia 20115. Re -notification to that address will be required. Form DCM-MP-2: Excavation & Fill #3 b. The length of the applicant's shoreline is listed as 150'. The bulkhead cannot exceed that length. c. Please note the average distance "waterward" of NWL that the proposed bulkhead will be constructed, along the 40' section that will be constructed waterward of NWL. I would also leave the -4.7 to demonstrate the overall average of the structure. RECEIVED DEQ1 JUN 10 2019 �..e ��✓ DCM-MHD CITY North Carolina Deparbnent of Environmental Quaihy I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street. Suite 300 1 Elizabeth City, North Carolina 27909 252.264.3901 Theodore Sampson May 23, 2019 Page 2 Form DCM- MP-3: Upland Development g. If the stairs are wooden the answer here is N/A d. Please check area as noted in #5 f. of the MP-1 Form comments. i. As noted in g., because the stairs are wooden the answer is N/A. Form DCM MP4: Structures #7 b. Please check the distance to the existing pier on the west side. I come up with a much lower distance. Note the distance (-984') to the nearest pier to the east that is for a similar use. 2. Drawinns: a.) The riparian line along the west side of the property does not appear to be accurate. Please recheck and correct as need. I have enclosed a drawing noting the approximate location of riparian line. While this will not change the location of the pier, it should accurately reflect the alignment. b.) Clarify NWLlshoreline. The line changes from outside of the property to within the property. Just for ease of identification and reading. c.) The grading line goes around the landward side of the proposed ramp and stairs. Is this area to be sloped back an additional 30' as shown? d.) A scaled cross section drawing through the bulkhead and bank is required. If grading back an additional 30' at the location of the stairs, I recommend that the cross section show how that area will be sloped. 3. Comments: a.) I am sure that you are aware that the marina to the west has not been completed and is still under an active CAMA Major Permit. Please show the distance that the proposed pier will be from the approved marina. I have enclosed an aerial showing the alignment based on the approved plan. I have also enclosed a copy of the approved plan for your convenience. b.) For clarity could you label each drawing on sheets 4 through 6: Top View, Cross Section and Elevation as appropriate. Once your application has been accepted as complete, you will be notified by letter. Please do not hesitate to contact me at (252) 264-3901 if you have any questions regarding this letter, the permitting process or if you would like to meet and review the application packet for completeness. Sincerely, d1`�-.)--' +�� Lynn W. Mathis Environmental Specialist II Enclosures CC: Doug Huggett, Major Permit Coordinator, DCM Jonathan Howell, District Manager, DCM MOD, LLC., Owner DEQ� North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Offlot 1 401 South Crlffln Street. Suite 300 1 Elizabeth City, North Carolina 27909 2522643W RECEIVED JUL 1 6 2019 MP SECTION MHD REEK BANKlf` 46 TPIS EASEMENT i.0 FSE1 Of TIRE LOCATION OF TIRE MTER LINE. THE ACTI.IAL LOCATION OF TIRE MIER LINE NEEDS TO BE FIELD VERIFIED LOB i BEFORE ANY CONSTRUCTION BEGINS HrRMOUND PRAM 1 P.B. 2 PG. 42A-43E 201) - I 60A C.I.Iutgth ot __ Imaiii TWO% 11wis­ U.1 1.hard go-ou ov IMM ELL, N 30'13'49- W CIL 160.00 09.72. 130.52 49'bl TV I26AC N WE 0 32- f. CIL 125.00, 43.0V 82.01, 30-OU 1V 81 40 1 25-bo 6V E C4 125 � Go, 43.05' 82AI 38-00 IV a, I) A 63-61 13- E cl 126,00, 97 50 - il"Ima3i 76-00 38. 153'.S N 44'5I 04- IN CO 100.00. 73.44- 128.80- 72-35 CI - 118.38, 8 4VOWIV E C? C9 100.00 7373 91 53 9 W. 9C 07,06 2M.11- IV W W7775 1-49 '00 .. .... 64.35 -56-.20-' .... n0o. N 511711' S 64'06'29- N 67-17 02- It' IN 010 CTI _T12 5308.58 W7 41 317.41 77,55- 166.10, mov 26- 64� 33,80 _67 3W 1-40 2V 6-P1,30- , . 12-09-2FV _165.09' 29.67 67,23- wewciv_4�ow . S , . 2 _ I _ 38 . 5 . V _. 5 12-51-2PIN W I IM 16 ."30 CAM 40 SINILHACK LINE 2o L25 LET &3 Qj LOT 15 10 107 At-', A, In Ln 202. Ina I A& A. 45JF 7' 46 (IN UHL TEA MOD p A4 Swidi 6 uml I. Fri LOT A6 c ps G4 CREILK 13INK W 0 L41 ------ R -A LOLr a 'IE W 16.836 AC. 1107, 6 iiitiiv�, 050 AC. 10.LOT 14 (I 10.050 AC Ap A6 I, RIF MISAIIIT j MAW 47 (SEE -*-NOTE) )_.. 46 LOT 5 oil -witiv �LTYT - �_­j 0 N IS '\\,/C0NffRaL CORIE 10955 AC� Row S"S"6i - ------------ Vow- LOT 24 REMAINDER OF TRACrU' 11 N:'wi ------ RIVER SOUND SEWAGE TREATMENTFACILITY 46 C12 �CIII 4& WINDEJOINT IL 1U58DIVIIIEPIALYFORTHE G"m I RK _R` c ..... t 4 C 2 h . 0 1 9- E BENEFIT OF LOTS 1Z RESAR SET ,:,,H 117L I- OFU%WiUAy La t.09 2�1 7-SE. 13. 1311140FILY. 0 25.40 50.82. 50 75' 1 7. E I - WqDfFCH KM: ?r. - TO; to -0'"'23 c. Lit, z '31 13' N 23-0 to- E t wiVe -()I Lur 12 sob 10,051 AC iMAOE C arse Bea my DI renc9 REMAINDER OF 7RACT U' Jt' L 1 s29- 93 29 " W T; RIVERSOUND SEWAGE TREATMENTFACILI 47.87 Ak L2 N 67-25-22- _1315.W 205791E MSL Ah �6 L3 S 2W�04-38._w LOT 1pL 3 L4 N as I, 13V. IN, MAO! 4W_SE_T9AC­KFR0A4E;;4TIvT9 --(Lao YELAII IS NOVIWOL IF 90.2,3, PEUUIL PLON) lq.bo-1 AC. 90 OF WASTEWATER TREATMENT A W NDE JOINT EII N 26-35-07- 11 'USSIORNENILAYFORTHE PER NCAC STATUTE I Z ... U A 20-2453- IN 127.30. BENEFIT OF LOTS 3 A 4 ONLY, Am T. I LB IF i4-3V_0VE Ir _016 _V 14 54 53h _60, 61 N 44- Vb3�_W_ 7, 85 OT 4 AM 112 1 N 44-54 53- W _. . , 12,27. 1.000 AC. pse L13 S 17-20 01IN :io.ii ".v-IS 1 M A 714_N 37-2463W 124.74- LOT 3 E us 1 020'�53N_- n M036 AC��L ,_ A6 110W I 164. WILLACK LINK oo -a ... 1.g T- Lit Lij 3 U*11, 24' ii, 106, ?B CHEEK BANK HIS -------- IN MEET" SET, _118 V '04VE_ - - - - - - - -- 119 N 31 I8.92. E 126,02 Tom^ >O IPBa 108-90 46 N 14-50 44- F 98.5a, C) L22 N 22'18'00' k 88AW 23 It �!-43. IV, E 18 22, N 41-43-16- F 69.21 LOT 10 LOT 11 - 3v N 45-16-02- E 104.ig�_ L25 N T7 �Bvw T 1w. n L20 '11 . '41- F .. .. .. .. .... 91.6 _ 0 ... ....... . I;0 , W8 Iplu 10.048 AC, M552 AC L27 N 48 21 at BILL? 21.92 LOT 2 1-14AM. w WIDE JOINT 01-06 35- 102.60 p . : tl`� z 10.334 AC.. USE THE . ..... 1 U14 1 WDFr01yL"0T3 9. 15-09 43' E * WILE SO WIDE JOINT in 10 A I I ONLY. BT ie. 4 v �sr ketl BB............ ......... ... ..................... ........ ORLINEWAY FOR THE 133 S 85*22-23- E 08.55, PIT OF LOTS I A 2 ONLY. 14WW 465,01" .... ...... _1 ----- I ----- -- - NOW11 L34 N 83-24 0V E 103.221 40LI S,, L35 ... ....... 9 00-25 17- E as'. L36 8 urii - w w '37-- ws--w I i�­­F- -I i-9-gs LEGEND CHECK BANK 3, L38 8 41 53 40- E 1411.22 L39 , 43W32`7_ 1 66.73- C) - REN PIN RAR L40 N W-46-11- E SF 1 1, 2" RE LOT 9 L41 B­37,42 - S? .-w 01HER015t N01t0) 10,273 AG, -3 �Um 155 12.11 . . . . . . . . . . . �.71 Li I98,BV 0 - CONCHtfk MONW&NI fOUNO 1,01 1 1 42 21-4: 3V E 1.6 .67� 10.548 C. .0,72. -CAINO 1/' NEHAH _160_ � �_ _ IP 144 N OV4 11- E III, IRON PIN i - (UNLESS OTHERWISE 6 POINT NEITHER SET AVEN FOUND 'U, A,, CONTROL CWISLB W RANDS (06) T_ DRU A N 852129 43' AMA 5� 18A CK I /Nj_ AfmORj-)§ PO E 2742WFi,';/' NOTE 41PROX 7 00 YkAN fLOOD PJA/,V) S.R.110ONT CAD 0.9999701, WITti OIL WFILANONS SWELL) IN POW # 126-N , NC DNINONI OF COASTAL WNLAGEMULT, ON INS WAIEN5 Of I SO LOW AS ffi�. HNILRSOUND MARINA LOCATED TI&I"AFER 6 N PLACE. 11 IL INPRE WN�tUla, T 200 0 400 0 SLNn BETWEEN I-ON1 WjAhl) POINI [p MARINA FACILOY AS RIOUSLED W IsA Nc� DIN n2m(q)(n) OF _�IS DWICARED TO THE FHL RVMS OF THE COASTAL RESOLARCEIi aFPW,IW Otoi �­ 'i CONSTRUCTION Of My IS, HNCFR PILPS PLATFORMS, OR DECKS GRAPHIC SCALE! l'-200' rmp UK ZUA Ir. RICKWONS; JViIKAI` 412 5/71114 'A 4,QO1 4 AAWD 9 IRAON PA fA M Z Off 4 J-5 'ME FA RNS A T TENNESSEE LAND SURVEYING CO. (AFF"SEV) 2 LIT �. VIE jb�l 4 AT�.p ior 49 & F ?1141'2014 �y 1; 7, aw ly NOE .. .. . ...... 0 . ......... RIVERSOMD TISICr. 560 W. BROAD STREET PHONE: 615-597-4085 I- - 00' �VJA�IqIII At -- - -- - FOR YEOPINPARMAMS SMITHVILLE, TN 37166 FAX: 615-597-4091 $Hit r .108 No. ___ ..... - YEOPIM row-velf, 1 Ov 7 0,50011 AL' _A)/Zt 14 A"YO APH?A MTe INF CAZM2!NT W 1015 /. 14 & .14 mVdn; .0t1Nr), NORLH CAA10ZINA LICENSE NO. C-3091 i z e 161 SUBDIVISION BOUNDARY LINE W CAMA PUBLIC TRUST SHORELINE AEC SUBDIVISION LOTS AFFECTED BY REMOVAL OF SHORELINE PROTECTION RESTRICTION (S LOTS, 3 25 SHORELINE MILES) I�1 Bulkhead maybe M needed due bupland u e adw Shoreline Stabllization not needed now due to low elevation of upland Shoreline Stabilization not needed now, but bamimcn from how elevation o substantial elevation of upland nub could change over time -� Shoreline Stabilization not needed now, but elevation of ndioining upland could be subject b future erosbn Riprap could be utilized M significant erosion —� devebps on 12-m bklF M significant active eroswn noted al present Existing bulkheaded of — Shoreline Stabilization rut needed now Shoreline Stabil¢abon not needed due to exler a width ofwellan le — SMxeline Stabilization not needed due W wetlands Shoreline Stabilization not needed due to attentive width of wedards n from of uplands • • • • • • — BOUNDARY BETWEEN PHASE 1 AND PHASE II PHASE II - THE FARMS AT RIVERSOUND SA BUFFER AREA G COMMON AREA M DEVELOPER EASEMENT Sl SEWAGE PUMP STATION VS VACUUM STATION 1) Drawings derived from information available from the Chowan County GIS, and from Google Earth imagery. 2) Drawing is for planning & permitting purposes only and not construction. 3) Copyright ® 2018 SAMPSON CONTRACTING, INC. All rights reserved. This material is the property of SAMPSON CONTRACTING, INC., and is protected by the copyright laws of the United States and other countries. It may not be reproduced, distributed, or altered in any fashion by any entity without the express written consent of SAMPSON CONTRACTING, INC. Written consent is hereby granted to Yeopim Partners, LLC, and Miles Stockbridge, P.C. Written consent is herby granted to NC DCM, NC DEC, and the US ACOE for Permit processing purposes. NO I REI DATE 1 lincorporateonsiterneetirgoomments 1 10M3818 PE STAMP SAMPSON CONTRACTING, INC. I YEOPIM PARTNERS, LLC MINOR MODIFICATION SHORELINE STABILIZATION RESTRICTION M7.=_ J Ts 02-011818-001 SHEET 1 OF 1 03107/18 10-:02-011818 SUBDIVISION BOUNDARY LINE — 31r CAMA PUBLIC TRUST SHORELINE AEC w 11 lul OF SHORELINE OF SHORENLOTSAFFECT®BYRFICTION RESTRICTION m 5 � � (90 LOTS; 325 SHORELINE MILES) SHORELINE Bulkhea l maybe Or needed due to upland na u elevation 4a4 a E Shoreline StaNknobon nol needed now due to x° low elevation of upland 3 Shffelim il¢ae deeded now, but om le ati transition room Ivv elevation to whs V elevation ndub could ch n of uplanarge r time oveove R elbaton m could be wbisol emsi Riprap court be utilmed it sig ific erosion a-ft blult s9nifx�nt spine y/ enotedl tm Fx.fing Wlkheaded tit Shoreline Stabilization not roeded now Shoreline Stabll¢ahm not oeeded due to edensive width of wetlaMs - Stw elin s Stahlvallon not needed due to wetlands Shoreline Stabilization not needed d,e ro exlersive wdh of wetlands m hart of uplaMs • • — • • — • • — BOUNDARY BETWEEN PHASE I AND PRASE II PHASE II- THE FARMS AT RNERSOUND BA BUFFERAREA CA COMMON AREA DE DEVELOPER EASEMENT sPs SEWAGE PUMP STATION VS VACUUM STATION 1) Drawings denved from information available from the Chowan County GIS, and from Google Earth imagery. 2) Drawing is for planning & permitting purposes only and not construction. 3) Copyright ® 2018 SAMPSON CONTRACTING, INC. All rights reserved. This material is the property of SAMPSON CONTRACTING, INC., and is protected by the copyright laws of the United States and other Countries. It may not be reproduced, distributed, or altered in any fashion by any entity without the express written consent of SAMPSON CONTRACTING, INC. Written consent is hereby granted to Yeopim Partners, LLC, and Miles Stockbridge, P.C. Written consent is herby granted to NC DCM, NC DIED, and the US ACOE for Permit processing purposes. NO 1 125 Hunters Triad West Elizabeth City. NC 2790 YEOPIM PARTNERS, LLC MINOR MODIFICATION SHORELINE STABILIZATION RESTRICTION As Yl6celad DRAWING NO.: TS 02 /� VL-01181S- tM1 SHEET 1 OF 1 O 07/18 0.:02-011818 \ �&�t•d v AUG 2 0 ZOOS =. LOT 436 MOr8head City/ QQJ / \ \LOT 437 LOT 434 LOT 439 \ L \ LOT 440\ \ PROPOSED PU P OUf \ ANO RE5IROOId BU z —S.i' 2 G ' \ / ' \ 104• LOT 441 LOT442 / LOT 463 r 4ffi /. �r LOT 464 \ \ ,d LOT 465 \\ / LOT466 F Z YEOPINI RIVER l \ [a\\ U \ 80' PRDPOS,ED T—HEAD (9' x 6) el r 1/4=1$ L= of 7B0PN RrW z —&7' z —a t.' z —a.7' 9 fuy TYPICAL PIER CROSS SECTION N.T.S. e0a• PIERS (a2) z LI_ Cam. z -aa' PR POSED N) x 6= 41 —sa' z EXISTING WATER DEPTHS Pntwcs _ —58' iSO PROPOSED SLIP NUMBERS z —6.a' z �•0•—•-•-•- EXISTING 404 WETLAND LINE EXISTING W DCM BUFFER LINE z —66' — • • — 75' AEG LINE EXISTING SHORELINE SHEET 2 OF 4 RIVERSOUND MARINA WATERFRONT GROUP NC RIVERSOUND SUBDIVISION So' o too' 2oo'CHOWA aoo'COUNTY — NORTH CAROLINA ATLANTIC £NIIROWNTAL CONSULTANTS, LLC GRAPHIC SCALE 1•-100' P.O. 90A'3166, KITTY HAWK, N.C. 2790 8/19/Os (252)261-7707, a ma// rardormanpao%com ATE: 2/14108 REVISED: 9/17/08 ,5/5 09 FILE: 06-015 DRAWN BY: DAD LEGEND/KEY --.--- .--- .--- ._._ SHORELINE IMWM)- OBSERVEDS'ISMIS PROPOSED BULKHEAD ® GRADING a SLOPE) To TOP OF BM LOTIBOUNDARY UNE EASTING UNPAVEDROADWAYIORIVEWAY E%IsnNGCONCRETE f - — — — — — — X CMM PUBLIC TRUST SHORELINE AEC ,-—..—..—.. —... AS FLOODFNZARD AREA BOUNICARY 0 ?, 3 p -p ...: .r':' — — — — — — TOP OF ESCARPMENT•. m {.:' N ................... e111 WETLANDS NC COASTAL WETLANDS W y W = TRANSFORMER PAD Property Of: W Fs � CYPRESS TREE Mohamed Eliwa Shalaby 61 �+ RECEIVE ch -0$ 4eceived JU Flagship m 8 Z�� i Flaggnlp Df1va �- CM MH N2 g,. C D Cf]C&I-EC r r_ Property Of. to MOD LLC �} ' o F' GENERAL NO'fES �Q, Drawings derhad from a survey of Nicholas M. Rackley, D) ) M L 5062, signed on May 21, 2018, and from mformation available from the Chowan County GIS, N and from Measurements taken of escarpment and Of the shoreline collected on 3fI312019. 2)Drawl Is for permitting Property Of: '� —... j W conduction. purposasoMyandnot William Edward Hartsough"•,.;;_ ''� '.\ '� y l!h 3) Copyright ® 2019 SAMPSON CONTRACTING,Ine. All light reserved. This material Is the property of SAMPSON .I N CONTRACTING, Inc., and is protected by the copyright laws ~' rn of the United Stales and other countries. It may not be Ley reproduced, distributed, or altered In any fashion by any ' U) entity without the express written consent of SAMPSON CONTRACTING, Inc. Written consent is hereby T granted to MOD, LLC. Written consent As herby granted to rx NC DCM, NC DEO, and the US ACOE for Permit Processing N. 1 UI OaeA. y m NO REVISION DATE ro is Q 0 9)N 1 AdJ MAdearwdaros, elarifi_•Nwl."ne &5;19 fn .0 O ro 4 2 Modify Weill Ri Live 6/10/19 0 <_', j v0 $ W. o m 3 PE STAMP SA41PWNCONIUCTM,INC to n 0 ' a C, m re o go CD 8 LD FD � ° d, lU a F 1251 Tr=a WNt A 9. f Ellzar»1n Cr rrC an" A PROJECT TITLE: MOD, LLC 9 SHORELINE PROTECTION & PIER 3 � DEVELOPMENT J'g,Ti DRAwwomlE: y 6 A SITE OVERVIEW SCALE, -100 0 180 360 540 720 900 1080 1260 1440 1620 1800 A W1IN.=180F7. No.: mtawlNG �� TS 09 CHECKED: 02 - 012218 - 001 SCALE:1 IN =180 FT SHEET 1 OF 7 DATE: 0320119 PROJECT NO.: 02-012218 CuJ A� MCOjy y m � c 4 C A Om 3 $ y or Ed D m P &. M c an 2 m to c1 R o � 3 m N \ Si3 io y Ss 44. O_ / m m / F m / O / / m 91 i m a m It 3 m °w I m n m m m � N � v < a � 3 a �I c n , t m m I m T m p \ �C l 0 50 100 200 300 400 500 SCALE: 1 IN - 80 FT ..------ ._._._. SHORELINE {NIL) -OBSERVED 31132019 PROPOSEOBULIGEAD GRADING 0.1 SLOPE) TO TOP OF BM LOTABOLINDARY LINE EXISTING UNPAVED ROADWAYMOVE WAY EXISTING CONCRETE o a a EXISTING STONE PATEO PROPOSED PIERANALKWAY 317 CANA PUBLIC TRUST SHORELINE AEC _..— .—..—..- AE FLOOD HV.ARD AREA BOUNDARY =------ TOP OF ESCARPMENT a m■■• a a r 404 WETLANDS .... .....:. NO COASTAL WETLANDS ® TRANSFORMER PAD CYPRESS TREE RECER✓W ived JUN 2 8'2019' DCM-MH6eMYE(; 1) Drawings derived from a survey of Nicholas M. Rackley, L-5062, signed on May 21, 2018, and from information available from the Chowan County GIS, and from Measurements taken of escarment and of the shoreline ociecled On 3113/2019. 2) Drawing is for permitting purposes only and not construction. 3) Copyright ® 2019 SAMPSON CONTRACTING,Inc. A0 right reserved. This material is the property of SAMPSON CONTRACTING, Inc., and is protected by the copyright laws of the United Stales and other countries. It may not be reproduced, distributed, or altered In any fashion by any entity without the express wdnen consent of SAMPSON CONTRACTING, Inc. Written consent is hereby Wanted to MOD, L-C. Written consent is herby granted to NC DCM, NC DEO, and the US ACOE for Permit processing sea. NO REVISION I DATE S.011'WNCO N"FRAMNG,MC. true, MOD, LLC SHORELINE PROTECTION & PIER DEVELOPMENT SITE OVERVIEW 1 IN. = 80 FT. IDRAWING NO.: TS e 02-012218-Q01 SHEET 2 OF 7 03/29/19 0:02—012218 10� �"A'g,� %'tz4'O! W9llarm Ed1�ya d NaRSGu of. ! x 0 50 too 200 300 SCALE: 1 IN. 40 FT -- - - ---- - - SHORELkIE (NVIL) - OBSERVED 9I312019 PROPOSED BULKHEAD GRADING (9:1 SLOPE) TO TOP OF BM LOTMOUNDARY LINE EwSTINGCONCRETE E)1STING STONE PATEO PROPOSED RERIWAL KWAY — — — — — 30 CAMA PUBLIC TRUST SILORELNE AEC — — — AE FLOOD HAZARD AREA BOUNDARY — — — — — TOPOFESCARPWNT X X )F `* 4D4 WETLANDS NO COASTAL WETLANDS ® TRANSFORMER PAD CYPRESS TREE prmv D Received JUN282019 CITY®CM-EC 1) Drawings derived from a survey of Nicholas W Rackley, L-5062, signed on May 21, 2018, and from Information available from the Chowan County GIS, and from Measurements taken of escarpment and of the shoreline collected on 311312019. 2) Drawing Is for permitting purposes only and not construction. 3) Copyright ® 2019 SAMPSON CONTRACTING,Inc. All rights reserved. This material is the Property of SAMPSON CONTRACTING, Inc., and is protected by the copyright laws of the United States and other countries. it may not be reproduced, distributed. or ahered in any fashion by any Batty without One express written consent of SAMPSON CONTRACTING, Inc. Written consent is hereby / granted to MOD, LLC. Written consent is herby granted to NC DCM, NC DEC, and the US ACOE for Pam* processing PIRPOSMS. NO REVISION DATE / 1 dd Marina SaucWres, change NWL Line 08AW9 2 Add Escarpment Cross-section locetians 08/08/18 3 1 Modified West Riparian Line 08/10/19 PE STAMP SAMPSON CONTRACTING, INC. 0 rlcweCl 1111.: MOD, LLC SHORELINE PROTECTION & PIER DEVELOPMENT DRAWING TITLE: PROPOSED PIER/WALKWAYS, BOATLIFT, BOAT HOUSE & KAYAK LAUNCH PLATFORM SCALE: 1 IN. = 40 FT. DRAWINO NO.. - DRAWN: TS CNECrE6 02 - 012218 - 001 SHEET 3 OF 7 DATE: 03229119 z r 12 k� 52 Zugaa :i W m0 00 �OE 88 a a "tl o NF W eA m i c m Z Z pW cis cm8— Ot- W = .t { T H o`g3£�° zz . P ny ��w! 3 oNi U e..r Z zag&�75N O .W Thai W C OOWOk�yI o '`Fj eZ•, g' ,"j c J�GG QU'S g 4' ,p$aj W tit W o L mro-y90 JCJ W b N2y00.NficIL � -� 0 s 2b=.0.�° < a Y Typical Pier Sections TOP VIEW 2" x 10" Girders 6'-0" 2" x 8" Blocking 2" x 8" Joists 2" x 2" Uplift Ties 1 Tie at each joist and girder intersection 2" x 8" Decking Fasten with 3" Stainless Steel D Screws CROSS SECTION Seven 2" z 8" z 16's with Outboard Joists Sistered ELEVATION 1! i itJEach 12" x 2" Us (`i1 Tie at Estand Girder Iction ;'3'MinimumDistance Above1 Water & Wetland;r Substrate 2"x10" iBoth Sidile ( rPiles: 8" Butt Piles cut flush with 1; j j 5/8" Galvaolts 1;top of girders. 7 t ! with Washach j2.5CCA t(' Side and in ; tEach '-0"v-0 MAIN PIER DETAILS NTS TOP VIEW 2" x 10" Girders 4'-0" 2" x 8" Blocking i 2' x 8" Joists Jl 2" x 2" Uplift Ties 1 Tie at each joist and girder intersection 2" x 8" Decking Fasten with 3" Stainless Five CROSS SECTION Steel Deck Screws with Outboard Joists Sistered r x x 16's ELEVATION 1' fi !t , — — — — —hill — 2" x 2" UpliftTies : ' 1 Tie at Each Joist and Girder Intersection 3Minimum (� ' 1' ' ff Distance Above ('r Water& Wetland ?( (( (t i Substrate 2" x 10" Girders f l f 1 Both Sides of Pile + t Piles: 8" Butt Piles cut flush with j ; 1 ;` 5/8" Galvanized Bolts top of girders. i ; with Washer on Each 2.5 CCA Side and Nut (2 in Each Girder) --v -0" - FINGER PIER DETAILS NITS 6 Piles, 8" Dia. Cut Flush With Top of Joist 2" x 10" Double Girders 2" x 8" Blocking 518" Galvanized Bolts 2" x 2" Uplift Ties 6 Nails each Tie 2" x 8" Decking W SS Screw Fasteners 2" x 8" Joisis on 24" cents. Typical Platform Sections Platform Area 128 SF TOP VIEW PLATFORM DETAILS NTS ELEVATION 6" x 6" — 2" x 5/8" x 16 Hot Dipped Galvanized Tieback RodS Deadmen: 6"x6"xIT 2.5 CCA Level of Adjoi Existing G Normal Wat Level NW Typical Bulkhead Sections TOP VIEW V x 6" TREX Cap Boards Orthogonal to Line of Bulkhead ESP 4.1 -1, ILA- iLiju:l� 15 ' Vinyl Sheetpile CROSS SECTION �I tr�rrrar(r�J�'r■t�larrarr■■g�■ i Filter Cloth 2'Below Ground Level & 11'Below Bulkhead End of Rod Not Representative of Sheet -Pile Depths Below Bottom: To Be Determined By Assessment of Soil Conditions BULKHEAD DETAILS NTS RECEIVED JUN 2 8 2019 DCM-MHD CITY Received UC M—E ki construction. 2) Copyright 0 2019 SAMPSON CONTRACTING,Inc, All rightE 2" x 6„ reserved. This matedal is the property of SAMPSON CONTRACTING, Inc., and is protected by the copyright laws of the United States and otter countdos, it may not be reproduced, distributed, or altered in any fashion by any " x 6° catty without the express written consent of SAMPSON CONTRACTING, Inc. Written consent is hereby granted to MOD, LLC. Written consent is herby granted to NC DCM, NC DEQ, and the US ACOE for Permit processing purposes. i I Addedyiew labels I owmllg PE STAMP SAMPSOVC0h7RACTING,I\C. rxgrra l mU' MOD, LLC SHORELINE PROTECTION & PIER DEVELOPMENT DRAWING TITLE: —� KAYAK LAUNCH PLATFORM & BULKHEAD DETAILS TS 02 - 012218 - 001 SHEET 5 OF 7 04110/19 0.: 02 _W7219 LEGEND/KF.YOD 0 m » T T O A w I N Z 9� 1 y 6 H N �i6 mR N In ou x x x m a 4m met $„mJ30C� 4 $ m RECEIVED JUN 2 8 2011 i _ = -- DCM MHD CITY I I 3 A 8 �Reeeived in y m I z 0 = pc� E CIOm GENERAL NOTES 41 i�1.yi o o 1) Drawing construis f PemNR&Ig Purposes only and not V v N 2) Copyright ® 2019 SAMPSON CONTRACTING,Inc. All righ to N N reserved. This material Is the property, of SAMPSON CONTRACTING, Inc., and is protected by the copyright laws "3 1 of the United States and other countries. It may net be $ ro K reproduced, distributed, or altered In any fashion by any 8 x m n, s' " "' �' K ``' N "'- �'- "' r`'- "'- entity without the express written consent of SAMPSON CONTRACTING, Inc. Written consent is hereby granted to MOD, LLC. Written consent is herby granted to g I It it a NC DCM, NC DEQ, and the US ACOE for Permit processing g ;o Purposes. rn r i r NO REVISION DATE in 1 Added view abets 0898l19 < PF. STAMP SAMFMCONTRACn,%G,INC o r Z m N A 1 P { Elizabeth Cl HC 1T90a 4 PROJEC I I FILE: MOD, LLC SHORELINE PROTECTION & PIER { DEVELOPMENT DRAWRJG TDIE: { § BOAT HOUSE DETAILS SCALE: AS INDICATED INtAWMO NO.: ryr DRAWN: TS__- d CHECKED 02. 012218.001 SHEET 8 OF 7 DATE: 04/10119 PROJECT NO.:02 - 012218 50' 45' 40' 35' Proposed Slope at B 1:12 30' 25' 20' Proposed Slope at A, C, D, & E 1:3 Bulkhead i A -- -- 51 —I-- ------ ---- ------------- I F -- -- -t--------------- - ---- ------ I I I 1 I I II II I I-t NWL 15' 10' 5' 0' 5' 10' 1 I 1 NWL at Sections: B & D Top of Slope NWL at Section: C NWL at Section: A / NWL at Section. F NWL at Section: E 5' Proposed Slope at F 1:24 1100 RECEIVED JUN 2 � 19 ')CM-MHD Cm Receive JI.:!'Iv?'. DCM-EC Drawing Is for permitting purposes only and not construction. Copyright ® 2019 SAMPSON CONTRACTING,Inc. All righ reserved. This material Is the property of SAMPSON CONTRACTING, Inc., and is protected by the copyright laws of the United States and other countries. It may not be reproduced, distributed, or altered in any fashion by any entity without the express written consent of SAMPSON CONTRACTING, Inc. Written consent Is hereby granted to MOD, I.I.C. Written consent is herby granted to NC DCM, NC DEC, and the US ACOE for Permit processing Purposes. NO REVISION DATE PE STAMP I SAMPSON CONTRACIING,INC. 125 Hunter Lall Wsst EllzaboN CI , NC 27901. mLE: MOD, LLC ------ SHORELINE PROTECTION & PIER ESCARPMENT CROSS -SECTIONS 1"=5' DRAWING NO TS 02.012218-001 SHEET 7 OF 7 RECEIVED JUL 1 6 2019 LIP SECTION MHD THIS EASEWNI IS 7 6 FEE T ON EITHER SIM OF I HE C, LOCATION OF THE WATERLINE. THE ACTUAL LOCATION eEK BANK- AF OF THE WATER LINE NEEDS TO BE MELD VERIFIED BEFORE ANY CONSMUCTION BEGINS ("00) RIVERSOUND .6 PHASE 1 P.B. 2 PG. 42A-43E I ci 125,00 1. "'m 126.0W I S"t" 196,35. Lach�l 90-60 Do- 178.7W d U... N W1349- W C2 I b 0-00 SIT _72 OD.52 49-511 IV 128. 44 - -I qO f _11 7 - 3 Z � I - C3 1- 26 00 i3_ 05' 82.91 30-00 19- IL, 42�_ -5a'55' E S 15 9 5 04 5 DO 43 05 82.91 38 -00 1W a .a IS C5 125.00 97,66- 76 5, _83' 76-00 Ja' 153.93. N 44-51 04- If CO OW 73, 44 128,68 72-35 01 - 118.30, 8 43-08'18- C ? __1000. AW 33 PC 88.24 60.7V -W-11 _1 W 26-29-40- 4C 3V 66.20' WIF - - i�, - - 3 0 R, US 1313 91 117.08- 22W, 11 _V�49POW ni.Wa­ , IT 2. W NZ-111'. 6p CIO cl 1. C12 5308.58 3iTiT. 77.55- 33 OW 155.10. 67,30 1-40 12.09421 28 ­6v 89. 1.4 21 30'56' IT 1 7 LOT 16 604 ) - W -- I _jp (2�2 5 SECIK LINE ELY: LOT 1.5 LOT 23 C 10,107 JA�C. Nagy 5 1p., l 46 .6T SON 7' ME L (in TEAR 7. FLOOD p LOT ti 46 11. 10.167 AC. I HECK BANK 19 L41 1V"OF4 LOT 8 I 1 C. 13 LOT 6 10,050 AC. (Ilk LO1' 14 10.050 AC. • CENTS Um IRS CIO Se lv� UNE BrOI A6 LOT 5 oil (SEE 10,955 AL. ."-NV CONTROL CORNER L _-C14 M. LOT �11 40o, SEMI -------- IT I_ REMAINDER ACTV 64 BIT' RIVERSOUND SEWAGE TREATMENT 'I Ty "I - - --------- Cl WYKNJDW USE DIRTANNAY FOR IHE WNEFITOFUOTSIZ L LIS! �ivl. v I goal 4, 10-3V49' E III \fZ FEW SET 21;9 N. 18-58,'07'. F ... 4 41, islo bo.. 1 2.D5' 4 CItl 2218.80 V.. 9 8 _j 2-35 OW, 1, N El: I F ­e---- i,o,r 1. 2 I&IMSTOR -4p Y� 10.051 AC, D . L . I . I III. B..rlRV REMAINDER OF TRACT V LI syrm as �W_ -iter-_ RIVERSOUND SEWAGE TREATMENTFACLITY A, ITS At WN g LOT 13 2 -_-(IOU YEAR ki N ipil -.384 'MOM U PA.) N Ova 03. IT 0.23 OF WASTEWATER TREAiMENT PLANT 10 50, Moe JOINT" LB N 26-W-6V E_ 1-24, 08 'we K Ll _-N-5vi" ViTur-­1 PER NCAC STATUTE I5AR%!.TOO7O6U%) ORINIFVAY FOR THE ri Sir i 8ENE19TOFLOM3&4O Y Z I _13 AM FIR .04 oe Ao N iewfir i i4s:0: So, A6 _LIIN44�b4 3 IT ?.fib OT 4 1 ­1 -- ---------- - 112 N44-5453-W 112�p_, 1.000 AC. 460 5*9 -L-i3 -sn�26-ov-vo LOT 3 as• L14 N-3TIZE 100)6 AC, --f- �4"Ilt 4� LIS N 20-39 53' A IRS 1,16 _11-ovsvos. E Ila 96 glik W ... ..... . . . .. .. .. afiSF2111"I �i .-4vljk "CITE A6 CiOdAl" SETBACK LINE -30' 211 ps Lml�_ 9-0'2! 24' F 108 284 CREEK BANK -------- ?0 i2l ... ....... . ..... .......................... kle- A. 50"MV 4E 131,20 r LIS N 34F!W�V E IMIDV, ps L20 N 17-11,41, E 108�991 001, A .-1.21 j liSWW4' V - - _T8_.CW ----- 0 172 N 2ri-vow-T - ------ 58. 15 123 _N _12A N 47'4VI6' f ..... . .... .. LOT 1 LO T 11 L26 Im 57-08.68. F 102, 7 7' n tO.048 AC, 10,552 AC, _1_28 N_45'16 02- E 104.59- Fat Ips L27 N US < J� I " OF _40 1.10'_E 21.92 at-1 - _'_1 .. . ........ OT 2 USE DRIVEWAY FOR THE L29 I 17.3oL20' E M11:9-C 0.334 AC. W WIDE J(TNT C�__ N-57 102.60 FIENEPTOPLOTS9. I. �41 WIOEJOINT 1 10 a 11 ONLY. W64:0; -E _6 IN 141 LU.__ Ii id 4 P �EV E S"B SBER, USE DRIVEWAY FOR THE 45 465.5 133 o7s: w BENEFIT OF LOTS I IT 2 OWL.. N 3F,3A,_,!!_�.5-r1 L34 - "R orwavi L35 S 00-26-17- E 155.0W --644 . . .......... 1. 1-— ._ --- i"I's Ol 1,36. _ S,12'24- SO- Wl__,_ CREEK SANK z L37 S 33-51 17'_r its SO LEGEND q ,38 _S 41'53 4W E 1411.22 To 233i M '-E - 6OM__ _W 0-0 �4o 7v ­F_ udi-aw C) IR(N P/7;;� REBAR CSo �;71 112- REBAR LOT 9 _IiIP -- -- __- (ONCE 01HtRWSj NOIED) 10,275 AC A 1 41 6 Z17�42 3V W 20 I.:.OT 1 �941:883 I CONCREft. M(hVUUJ.Nf FOUND 3o* m• w 548 AC 0'. N 21-42 SS-t IRON 12 ' IeEbTAR I _106.72 PIN f (AIND 1, 10 TIF_ N 06-46 11- E 50.00, 4t4f (UNLESS OrHER1172. NOTED) LB C1 A PONT NEITHER SET NOR FOUND •Do CONTROL COI yl HE 11. ANDS (.6) r , DRY-___ Au N: 852129 4S LAMA _'ZIHACK UNI kuoxj)-- 0114T E 2742841 MON TRSL (100 WAR rLOOD PLAIN) Ro CST. 0 99997911 APPROX 7 1160 IRE COMA arWT1eRSDlIEm N pERmir # W VDIENAL. WAAMIR&NI.? n, ON IWATERS OF IW YEOPW RIVER 6 IN MWE, THE EMIln SHORELINE 200 0 -100 400 0 0.00 V.? M U,�_]ANU POINI [*_Q:JIS )LUICAILD 10 THE MARINA FACILITY AIS RLIDUAIRD BY 15A NCAC SYR 0206(8)(D) OT TIC RN B OF TIC COASTAL RESOURCES COMMISSION CONSTRUCTION OF ANY I S, FINCIN PIERS, NATFORWI, OR UFI;Ks _00 - ------ -- IF OfDICATIAD SHORELINE 15 PROWINITED GRAPHIC SCALE: "=200' clomp By 0A h 9cvuloNs 41_�ll. If 114 v] 4-f2614 AMP M /M.M PA fA TO 1015 1 'THE FA RMS A r TENNESSEE LAND SURVEYING CO. (Rf v1sr/1) /�j 250,14r � V /114,'2014 AL WWD 01 18 A`40 SCALE �M?F � STA AQW WA ff RIMERSOMW IN. -BY --- - - ----- - - 560 W. BROAD STREET PHONE: 615-597-4085 �71_4427014 �AIARa_A_ -POW, FOR 1 100' - 'y ;iwllbw�., 4 - H I - : _��i ­­­­ ... ... - SM f� T x1v No, IV,10 X014 �11 5HOKENW CIWSfiY/LZM YEOPIN PA R I WERS SMITHVILLE, TN 371,66 FAX: 615-597-4091 gIJ012014 AMXV A� V MR I IV CA liAb5kf Ycop/m ropws///p LICENSE NO. C-3091 - cwfo_1�14 1* 14 - CHOWAN COUNTY, NORrIl CAR041NA 14� trey) t/4 �-,JAjite I J U \ SUBDIVISION BOUNDARY LINE 30' CAMA PUBLIC TRUST SHORELINE AEC SUBDIVISION LOTS AFFECTED BY REMOVAL OF SHORELINE PROTECTION RESTRICTION 5 s 8 s (90 LOTS; 325 SHORELINE MILES) 8'� u Bu ldiead maybe OK rI due b Wlad < 8 9 elevation ure S not needed now due to Sbw •+ elevausonao uPlar — non, but Shoreline Stafrom low ele elevation n to su transition hold low elevationbhantpe ve elevation of upland nub paid rlrage over time ri R Shoreline Stabilzaton not needed now but elevation nig upland could be subled '1 el fuWeroson Riprap could be utilized 9 _Wdloant erosion develop. an significant active at pNro O Existing bulkheaded lot Shoreline Stabilization not nxxded nov, Shoreline Slatelization not needed due to tderwve vd Kh I vefiands — Shoreline SUNly nol needed due to wetlands Shoreline Stabduabon not needed due to extenyve width of wetlands in front of uPl ds • • • • • • — BOUNDARY BETWEEN PHASE I AND PHASE II PHASE It- THE FARMS AT RNERSOUND 6A BUFFER AREA CA COMMON AREA DE DEVELOPER EASEMENT SPe SEWAGE PUMP STATION VS VACUUM STATION 1) Drawings derived from information available from live Chowan County GIS, and from Google Earth imagery. 2) Drawing is for planning & permitting purposes only and not Construction. 3) Copyright C 2018 SAMPSON CONTRACTING, INC. All rights reserved. This material is the property of SAMPSON CONTRACTING, INC., and is protected by the copyright laws of the United States and other countries. It may not be reproduced, distributed, or altered in any fashion by any entity without the express written consent of SAMPSON CONTRACTING, INC. Written consent is hereby granted to Yeopim Partners, LLO, and Miles Stockbridge, P.C. Written consent is herby granted to NC DCM, NC DEC, and the US ACOE for Permit processing purposes. DATE 1 1 Incorporate onsite rtleetirg carnrrents I 1a/08/18 PE STAMP SAMPSON CONTRACIIINC, INC i t25 Hurrt•rs TrNI Wa•t YEOPIM PARTNERS, LLC MINOR MODIFICATION SHORELINE STABILIZATION RESTRICTION As Indicaled DRAWING NU.: TS 02 - 011818 - 001 SHEET 1 OF 1 09A7/18 �0.:02-011818