HomeMy WebLinkAbout2-19 Gupta, Amit....................
Permit Class Permit Number
NEW 2-19
STATE OF NORTH CAROLINA
Department uali
p Q tY---•------- -
and
Coastal Resources Commission
Vermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Amit Gupta, PO Box 90, Kill Devil Hills NC 27948
Authorizing development in Dare County at adj. to Jean Quite Creek. at 4065 Creek
Road, in Kitty Hawk as requested in the permittee's application dated 9/4/18, including
attached workplan drawing (1), dated "Revised 9/19/18".
This permit, issued on January 7, 2019 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
,1 LnCSC terms may oe suoject to lines, imprisonment or civil action; or may cause the permit to be null and void.
Shoreline Stabilization - Bulkhead
1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached
workplan drawings.
2) No vegetated wetlands shall be excavated or filled, even temporarily.'
3) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a
representative of the Division of Coastal Management within a maximum of 30 days prior to the start
of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse
weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM
within a maximum of 30 days prior to the new expected start of construction.
(See attached sheets for Additional Conditions)
"1'his permit action maybe appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2022
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
Brax on C. Davis, Director
ivision of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Permit No. 2-19
Page 2 of 3
ADDITIONAL CONDITIONS
The bulkhead shall be constructed prior to any backfilling activities.
The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
The fill material shall be clean and free of any pollutants except in trace quantities.
All backfill material shall be obtained from a high ground source and confined behind the permitted
bulkhead.
No backfill material is to be placed within 30 feet of the normal water line, except that which will be
used to backfill the area behind the permitted bulkhead.
Sedimentation and Erosion Control
A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of
grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
Docking Facility Expansion
This permit authorizes only the piers, platform, boat lift, jet ski launch and kayak floating platform, and
other structures and uses located in or over the water that are expressly and specifically set forth in the
'permit application. No other structure, whether floating or stationary, shall become a permanent part of
-this docking facility without permit modification. No non -water dependent uses of structures shall be
conducted on, in or over Public Trust waters without permit modification. —
The pemuttee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
This permit authorizes a maximum of 2 formalized boat slips.
The boathouse and covered platform shall not be completely enclosed or have side coverage more than
one half the height of the side, from the roof waterward. The footprint of the boathouse and covered
platform shall not exceed the dimensions on the authorized workplans. Any material used on the sides
shall not obstruct view and shall be permeable to air and water. Screen or wire on the sides along with
'benches and knee walls are permitted. Lattice is specifically excluded from being used under this
The authorized boathouse and covered platform shall be single story, and shall not be designed to allow
for second story use.
Permit No. 2-19
Page 3 of 3
_ ADDITIONAL -CONDITIONS _
No attempt shall be made by the permittee to prevent the full and free useby the public of all navigable
waters at or adjacent to the authorized work.
Upland Development
Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities
associated with the development of the above referenced property, including the homesite, driveway,
pool and apron, and other associated_ infrastructure, all as expressly and specifically set forth in the
attached permit application and workplan drawings.
Stormwater Management
The Division of Energy, Mineral and Land Resources (DEMLR) has determined this project will require
a Stormwater Management permit. The permittee shall receive a Stormwater Management permit from
:, DEMLR prior to the initiation of any construction. Any violation of the permit approved by DEMLR
`',fshall be considered a violation of this CAMA permit.
General
:''This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the
permitted activity without having it transferred to a third party.
The permittee and/or his or her contractor shall meet with a representative of the Division prior to
;..project initiation.
This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit.198000291 (Action ID SAW-2017-01394) issued 1/7/19.
The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4144 and assigned the project DWR Project No. 2018-1396.
Future development of the pemuttee's property may require a modification of this permit.
Contact a representative of the Division at (252) 264-3901 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal water level.
An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
Coastal Management
ENVIRONMENTAL QUALITY
Amit Gupta
PO Box 90
Kill Devil Hills, NC 27948
Dear Mr. Gupta:
January 7, 2019
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
S
The enclosed permit constitutes authorization under the Coastal Area Management Act,
and where applicable, the State Dredge and Fill Law, for you to proceed with your project
proposal. The original (buff -colored form) is retained by you and it must be available on site
when the project is inspected for compliance. Please sign both the original and the copy and
return the copy to this office in the enclosed envelope. Signing the permit and proceeding
means you have waived your right of appeal described below.
If you object to the permit or any of the conditions, you may request a hearing pursuant
to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with
NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your
permit. You should also be aware that another qualified party may submit an objection to the
issuance of this permit within twenty (20) days.
The project plan is subject to those conditions appearing on the permit form. Otherwise,
all work must be carried out in accordance with your application. Modifications, time extensions,
and future maintenance requires additional approval. Please read your permit carefully prior to
starting work and review all project plans, as approved. If you are having the work done by a
contractor, it would be to your benefit to be sure that he fully understands all permit
requirements.
From time to time, Department personnel will visit the project site. To facilitate this
review, we request that you complete and mail the enclosed Notice Card just prior to work
initiation. However, if questions arise concerning permit conditions, environmental safeguards,
or problem areas, you may contact Department personnel at any time for assistance. By
working in accordance with the permit, you will be helping to protect our vitally important coastal
resources.
Enclosure
Sincerely,
v d{,w11"
Douglas V. Huggett
Major Permits Manager
N.C. Division of Coastal Management
State of North Carotlna I Environmental Quality l Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City. NC 28557
2528082808
� " � _.
r-- .� - '�
` , � ,�
t.f'
DCM Coordinator: L V Permit #: 9 _
MAHdNG DISTRIBUTION SHEET
Permittee:i� ldtt� 4� L�Dl4,h�G 2jgtf�j
DCM Field Offices
Elizabeth City (with revised work plan drawings)
Morehead City
Washington
Wilmington
US ACOE Offices:
Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans,
Tyrrell) —+�
osh Peletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington)
Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico)
Bill Biddlecome (NC DOT -Remainder ECitylWashington District)
Wilmington: Tyler Crumbley (Brunswick, New Hanover)
Liz Hair (Carteret, Onslow, Pender)
Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Cultural Resources:
Public Water Supply:
Marine Fisheries:
NC DOT:
Shellfish Sanitation:
State Property:
DEMLR/DWR:
Renee Gledhill -Earley at Environmental.Review@ncdcr.gov
Heidi Cox (WIRO)
Shane Staples
David Hams
Shannon Jenkins / Sharron Gupton
Tim Walton / Mike Moser
Sheri Montalvo
Clif Whitfield (WARO)
Curt Weychert
Washington: Anthony Scarbraugh-401
Roger Thorpe-Stormwater
Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck,
Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington)
Wilmington: Robb Maus — 401 (Carteret, Onslow, Pender)
Chad Coburn — 401 (Brunswick, New Hanover)
Georgette Scott - Stormwater
Wildlife Resources:
Natural Heritage Program
LPO:
Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Maria Dunn (WARD)
Rodney Butler
Fax Distribution: Permittee #:
(NCDOT) Travis Wilson
■�� Received
APPLICATION for S_t' 2 4 20i0
Major Developmont Permit DCM-EC
(tact revised 1227106)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name Project Name (if applicable)
Applicant 1: First Name MI Last Name
Amit Gupta
Applicant 2: First Name MI Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address PO Box
90
ZIP Country Phone No.
27948 USA 252.441-9003 ext.
Street Address (if different from above) City
Email
agupta@icrsaga.com
2. Agent/Contractor Information
Business Name
Environmental Professionals, Inc.
Agen# Contractor 1: First Name MI Last Name
George H. Wood
Agent/ Contractor 2: First Name MI Last Name
Mailing Address PO Box
3368
ZIP Phone No.1
27948 252-441-0239 ext.
FAX No. Contractor#
Street Address (if different from above) City
1404 S. Virginia Dare Trail Kill Devil Hills
Email
obxwood@yahoo.com
<Form continues on back>
City State
Kill Devil Hills NC
FAX No.
State ZIP
City State
Kill Devil Hills NC
Phone No. 2
252-423-1234 ext.105
State ZIP
NC 27948-
RF-CF-Mo
OCT 12 2018
CITY
Form DCM MP-1 (Page 2 of 4) APPLICATION for r
Major Development Permit
3 ' Project Location
County (can be multiple)
Street Address
State Rd. #
Dare
4065 Creek Road
Subdivision Name
City
State
Zip
Martins Road
Kitty Hawk
NC
27949 -
Phone No.
Lot No.(s) (if many, attach additional page with list)
- - ext.
17, 1 1 ,
a. In which NC Over basin is the project located?
b. Name of body of water nearest to proposed project
Pasquotank
Jean Guile Creek
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural []Manmade ❑Unknown
Currituck Sound
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes ❑No
work falls within.
Dare County
4., Site Description
a.
Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
105
28,050
c.
Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
28,050, 1
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
+/- 5 ❑NHW or ®NWL
e.
Vegetation on tract
None
Received
f.
Man-made features and uses now on tract S_-p 2 4 207o
pier and "tee" head
DMEC
g.
Identify and describe the existing land uses ad'acen to the proposed project site.
residential to south
unimproved to north
h.
How does local government zone the tract?
I. Is the proposed project consistent with the applicable zoning?
Residential
(Attach zoning compliance certificate, if applicable)
®Yes []No ❑NA
j.
Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k.
Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA
If yes, by whom?
I.
Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page>
252.808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net
I I FSrm DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ❑Yes ®No
(ii) Are there coastal wetlands on the site? ❑Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No
(Attach documentation, if available)
n. Describeeristingwastewatertmatmentfadlities.
None
o. Describe existing drinking water supply source. Received
None Sa' 2
p. Describe existing storm water management or treatment systems.
None
-. v
5. Activides and Impacts
a.
Will the project be for commercial, public, or private use?
❑Commercial ❑Public/Government
®Private/Community
b.
Give a brief description of purpose, use, and daily operations of the project when complete.
single-family residential and private boating access
c.
Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
The house, pier, and bulkhead will be constructed using traditional hand tools and machines. All materials will be stored on
site.
d.
List all development activities you propose.N
Single-family house, construct a 10 x 20 covered boat lift, 10 x 20 expansion of the
"tee" head, jet ski lifil, and floating kayak
launch (di X It, S0. V 1
a
JZ 2
e.
Are the proposed activities maintenance of an existing project, new work, or both?
Both
f.
What is the approximate total disturbed land area resulting from the proposed project?
®Sq.Ft or []Acres
a8'oso Q"
g.
Will the proposed project encroach on any public easemernt, public accessway or other area
®Yes ❑No ❑NA
that the public has established use of?
h.
Describe location and type of existing and proposed discharges to waters of the slate.
None
I.
Will wastewater or stonnwater be discharged into a wetland?
❑Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water?
❑Yes []No ®NA
j.
Is there any mitigation proposed?
❑Yes ®No ❑NA
If yes, attach a mitigation proposal.
<Form continues on back> OCT 12 2018
.vwnccoista l manditfYm`en t. net
Form DCM MP-1 (Page 4 of 4) APPLICATION for r )
Major Development Permit
8. Additional Wonnation
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application
instruction booklet on how to propedy prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly Indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to gulde agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with stale application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments an the proposed project to the Division of Coastal Management
Name Donald 8 Mary Rossi Phone No.
Address 472 Hillcrest Drive, Latrobe, PA 15550
Name Randall Jones Phone No.
Address 5024 N. Virginia Dare Trail, Kitty Hawk, NC 27949
Name Phone No.
Address
g. A list of previous state or federal permits Issued for work on the project tract Include permit numbers, pernittee, and issuing dates.
h. Signed consultant or agent authorization form, V applicable.
1. Wetland delineation, If necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
K. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). If necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained In the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
1 further certify that the Information provided In this application is truthful to the best of my knowledge.
Date September 4, 2018 Print Name George H. Woad, CEP, PWS
Signature �ia�_ J/ Al#,j
Please Indicate application attachments pertaining to your proposed project.
®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts Received
®DCM MP-3 Upland Development
®DCM MP-4 Structures Information $_a 2 4 201,9
DCM-EC
"..3-3❑ ?da., .. a..1Sa-'N,{:Y.'!Lk I ., i";.'- .pay .".) .;r" 1 v Zi. Vr!, -, n itCE
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access
Other
Channel
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
(NLW or
Breakwater
shoreline
NWL)
sfabitizedon
Length
Width
Avg. Existing
NA
NA
Depth
Final Project
NA
NA
I
:J
Depth
I
1.
EXCAVATION
®This section not applicable
a.
Amount of material to be excavated from below NHW or NWL in
b.
Type of material to be excavated.
cubic yards.
c.
(i) Does the area to be excavated include coastal wetlandsimarsh
d.
High -ground excavation in cubic yards.
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB _
❑WL []None
(ii) Describe the purpose of the excavation in these areas:
2.
DISPOSAL OF EXCAVATED MATEMIAL
®This
section not applicable
a.
Location of disposal area.
b.
Dimensions of disposal area.
c.
(i) Do you claim title to disposal area?
d.
(i) Will a disposal area be available for future maintenance?
❑Yes ❑No ❑NA
❑Yes ❑No ❑NA
(ii) If no, attach a letter granting permission from the owner.
(ii) If yes, where?
e.
(1) Does the disposal area include any coastal wedands/marsh
f.
(1) Does the disposal Include any area in the water?
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
❑Yes ❑No ❑NA
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
(li) If yes, how much water area is affected?
❑CW ❑SAV ❑SS _
❑WL ❑None
(II) Describe the purpose of disposal in these areas:
RECEIVED
Received
OCT 12 2018
d 2oi3
DCM-MHD CITY
DCM-EC
Form ®CM MP-2 (Excavation and Fill, Page 2 of 2) V
3 :SHORELINE STABILIZATION ❑Fhls section Qot app6catile
;; (tf development is'a.wood groin; use MP-4 = St(uctures).
a. Type of shoreline stabilization:
®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other:
c. Average distance waterward of NHW or NWL: +/- 7'
e. Type of stabilization material:
Vinyl
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill 459 Riprap
Breakwater/Sill Other
i. Source of fill material.
Commercial Supplier
b. Length: 105
Width: 1
d. Maximum distance waterward of NHW or NWL: +/-10'
I. (i) Has there been shoreline erosion during preceding 12
months?
®Yes ❑No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
2 feet - aerial
h. Type of fill material.
Sand
4 ' OTHER FILL ACTIVITIES ®This section not applioatile
(Excluding Shoreline Stabilization)
a. (1) Will fill material be brought to the site? []Yes []No []NA b.
If yes,
(ii) Amount of material to be placed in the water
(III) Dimensions of fill area
(iv) Purpose of fill
a. How will excavated or fill material be kept on site and erosion
controlled?
Silt fence until grassed
c. (i) Will navigational aids be required as a result of the project?
[]Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
N/A
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected. '
❑CW ❑SAV _ ❑SB
❑WL []None
(ii) Describe the purpose of the fill in these areas:
b. What type of construction equipment will be used (e.g., dragline,
backhoe, or hydraulic dredge)?
waterject
d. (1) Will wetlands be crossed in transporting equipment to project
site? []Yes ®No []NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
N/A
September 4, 2618. Amit Gupta
Date Applicant ame
A_nit Gupta - Martina Point &
plicaht Signature
Project Name _ Si:f' 24 2fl1;)
D tYl EC
252-808.2808 :: 1.888-4RCOAST :: vvww.nccoastalmananement.nei revised: 12/26/06
Received
Form DCM MP-3
S_' Z 4 20?3
UPLAND DEVELOPMENT DIME
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
GENERAL UPLAND DEVELOPMENT
a. Type and number of buildings, facilities, units or structures
b.
Number of lots or parcels.
proposed.
t
1
c. Density (give the number of residential units and the units per
d.
Size of area to be graded, filled, or disturbed including roads,
acre).
ditches, etc.(,�$1$09{1'i 7A!Z.1
.1 unit at 1.5/acre
128,959 28,050 in existing lot plus 459 s.f. of proposed
fill behind bulkhead
e. If the proposed project will disturb more than one acre of land, the
f.
List the materials (such as mad, paver stone, asphatt, or concrete)
Division of Land Resources must receive an erosion and
to be used for impervious surfaces.
sedimentation control plan at least 30 days before land -disturbing
concrete drive & gunite pool
activity begins.
(i) If applicable, has a sedimentation and erosion control plan been
submitted to the Division of Land Resources?
[]Yes ®No ❑NA
III) If yes, list the date submitted: N/A
g. Give the percentage of the tract within the coastal shoreline AEC to
h.
Projects that require a CAMA Major Development Permit may also
be covered by impervious and/or built -upon surfaces, such as
require a Stornwater Certification.
pavement, building, rooftops, or to be used for vehicular driveways
(i) Has a site development plan been submitted to the Division of
or parking.
Water Quality for review?
0
[]Yes ®No ❑NA
i. Give the percentage of the entire tract to be covered by impervious
(ii) If yes, list the date submitted: N/A_
and/or built -upon surfaces, such as pavement, building, rooftops,
or to be used for vehicular driveways or parking.
+/- 25
j. Describe proposed method of sewage disposal.
k.
Have the facilities described in Item (1) received state or local
on site ground absorption
approval?
[]Yes ®No ❑NA
If yes, attach appropriate documentation.
I. Describe location and type of proposed discharges to waters of the
m.
Does the proposed project include an innovative stormwater
state (e.g., surface runoff, sanitary wastewater, industrial/
design?
commercial effluent, "wash down" and residential discharges).
❑Yes ®No ❑NA
none
If yes, attach appropriate documentation. RECEIVED
OCT 12 2018
DCM-MHD CITY
252-808-28082 n 1.888-4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06
Form OCNI P-: (Lopianci Deveivpne-.nt, Pxgn ? of 2)
m. Describe proposed drinking water supply source (e.g., well,
community, public system, etc.)
municipal
o. When was the lot(s) platted and recorded?
January 1984
September 4, 2018
Date
Amit Gupta - Martins Point
n. (I) Will water be impounded? ❑Yes ®No []NA
(ii) If yes, how many acres? WA
p. If proposed development Ise subdivision, will additional utirrfles be
Installed for this upland development?
❑Yes ❑No ®NA
Received
Project Name SP 2 4 20))
Amit Gupta
Applica Name ®CM.EC
Ampilgant signature vf
2:i�-elj8-'�.3t'W :: I-iisi+-J_Si`1:4,3 P,,g3 CYV'PJ44.4CCVS14`.ft:a?elY.�gf ni�ixl,ft£L �C'IiS:?`.i: }2%25itiv
4 1' ' Received
Form DCM MP-4
2 4 20t9
STRUCTURES /�
(Construction within Public Trust Areas) DCM'EC
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. (i) Is the docking facility/marina:
❑Commercial ❑Public/Government OPrivate/Communily
[I This section not applicable
b. (i) Will the facility be open to the general public?
❑Yes ®No
c. (i) Dock(s) and/or piers)
d. (!)Are Finger Piers included? []Yes ®No
(ii) Number 1
if yes:
(III)Length 52 J
(..)
n Number
(iv) Width 6
(iii) Length
(v) Floating ❑Yes ®No
(iv) Width _
(v) Floating ❑Yes ❑No
e. (i) Are Platforms included? ®Yes ❑No
f. (i) Are Boatlifts included? ®Yes []No
If yes:
If yes:
(ii) Number 2
(il) Number 2
(III) Length 20 8
(iii) Length 12 10
(iv)Width 20 3
(iv)Width 10 4
(v) Floating []Yes ®No
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
h. Check all the types of services to be provided.
2
❑ Full service, including travel lift and/or rail, repair or
(ii) Number of slips existing
maintenance service
1
❑ Dockage, fuel, and marine supplies
❑ Dockage ('Wet slips) only, number of slips:
❑ Dry storage; number of boats: _
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
i. Check the proposed type of siting:
❑ Land cut and access channel
❑Open water, dredging for basin and/or channel
®Open water, no dredging required
❑Other, please describe:
k. Typical boat length: 20'
m. (i) Will the facility have tie pilings?
[]Yes ®No
(ii) If yes number of tie pilings?
N/A
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
open runabout, met ski, kayak
I. (1) Will the facility be open to the general public?
❑Yes ®No
k1=iEIVED
252_Si18-28tyt� a-F.,Rd2-ARa'+JAci �-. wa,:°a.nc4.n�s SSa3rn�nag+zmel�t.n4',3 '.. .
DCM-MMD CITY
rtavol 0CM #'ASP-4 ; v4rats;swra.>, Page 2 of 4)
2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable
a. Check each of the following sanitary facilities that will be Included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number. _; Location:
❑ Showers ecesved
❑ Boatholding tank pumpout; Give type and location:
5,.:1' 2 4 2011
b. Describe treatment type and disposal location for all sanitary wastewater. D I E C
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (1) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of "Pumpout Available" signs proposed.
f. Describe the special design,d applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes ❑No
.�i�' uiP.- ,zk. a�$ , '@ 3...3+fd+t F: R'a :" ;� •s ,.., ,�. .,.. lUe �C.h1:1 rr zsa#,fl?rt r_y ... � c!_�it�.�
Forgt DCM MP-4 (Structures, Page 3 of A)
n. Is the marina/docking facility proposed within or adjacent to any shelfsh harvesting area?
❑Yes ❑No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlandstmarsh (CW ), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (W L)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered tits) El This section not applicable
a. (i) Is the boathouse struclure(s): ❑Commercial ❑PLiblic/Government NPrivale/Community Received
(ii) Number 1
(bii) Length 22 S_f 2 4 20';)
IN) Width 11
Note: Roofed areas are calculated from driptine dimensions. DMG C
A GROIN (e.g., wood, sheetptle, etc. If a rock groin, use MP-2, Excavation and Fill.) N This section not applicable
a. (i) Number
(11) Length _
(iii) Width
& BREAKWATER (e.g., wood, sheetpile, etc.) NThis section not applicable
a. Length _ b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS NThis section not applicable
a. Is the structure(s):
❑Commercial ❑Public/Government ❑Private/Community
C. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, d present.
e. Arc of the swing
It. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
RECEIVED
OCT 12 2018
k�CM-ti4klA�CJ: i ra7-Lie
Form DCM PAP-4 (Structures, Page 4 of 4)
s
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines
22'
Note: For buoy or mooring piling, use am of swing including length
of vessel.
c. Width of water body
973
e. (i) Will navigational aids be required as a result of the project?
[]Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
b. Probmity of structure(s) to adjacent docking facilkies.
66 feet
d. Water depth at waterward end of structure at NLW or NWL
-2.7
8. OTHER ®This section not applicable
a. Give complete descdption:
September 4, 2018
Date
�Ce1��d
Amit Gupta- Martins Point
Project Name
SOH 2 4 7fi1(I
Amit Gupta
Applicant Name / J ..
/1
®CM -EC
Applicant SignAure
252-808-2808 :: 9.888-4RCOAS7 :: www nccoa_stalmanagement.net revised: 12/27106
ROY COOPER w()R i II Cnitol 1 11�
Governor - I 1W 0 ,aR12.
MICHAELS.REGAN
secreeary
BRAXTON C. DAVIS
Director
December 7, 2018
Environmental Professionals Inc.
George Wood
PO Box 3368
Kill Devil Hills, NC 27948
Dear Mr. Wood,
Fj4F
This letter is in reference to the application submitted for Amit Gupta, for a Coastal Area
Management Act Major Permit to undertake development activities to expand an existing
docking facility and shoreline stabilization, in Carteret County.
Although processing of the application is nearing completion, additional time is needed for this
office to complete the review and make a decision on your request. Therefore, it is necessary that
the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c)
which would make February 21, 2019 the new deadline for reaching a decision on your request.
However, we expect to take action prior to that time and will do so as soon as possible. In the
interim, should you have any question on the status of your application, do not hesitate to contact
me by phone (252-808-2808 ext. 215) or e-mail (gregg.bodnar@ncdenr.gov).
Sincerely,
Gregory W. Bodnar
Assistant Major Permits Coordinator
Cc: DCM Elizabeth City (via email)
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557
252.8082808
I�
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME: Amit Gupta
2. LOCATION OF PROJECT SITE: 4065 Creek Road, within the Martins Point
subdivision, Dare County, adjacent to Jean Guite
Creek.
Photo Index — 2006: 185-7226 (B 13)
Lat/Long: 36.1122470 N,-75.7446880 W
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 9/6/2018; 9/19/2018
Was Applicant Present - No; Agent Present
5. PROCESSING PROCEDURE: Application Received Complete - 9/24/2018
Office - Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Dare County
Land Classification from LUP - Community Residential, Conservation
(B) AEC(s) Involved: Public Trust Area (PTA) & Public Trust Shoreline (PTS)
(C) Water Dependent: Yes
(D) Intended Use: Private
(E) Wastewater Treatment: Existing - N/A
Planned - Septic
(F) Type of Structures: Existing - Pier & platform
Planned - Bulkhead, docking facility and SFD within
highground
(G) Estimated Annual Rate of Erosion: 2 feet/year
Source - Applicant
7. HABITAT DESCRIPTION: [AREA, square feet (W)]
DREDGED FILLED OTHER
(A) Public Trust Area AEC
±459 ft2
±528 ft2 shaded
(B) Public Trust Shoreline AEC
±2,691 ft2 disturbed
(C) Highground Disturbance (Non -AEC)
±25,359 ft2 disturbed
(D) Total Area Disturbed: 29,037 ft2 (0.67acres)
(E) Primary Nursery Area: Yes RECEIVED
(F) Water Classification: SC Open to Shellfishing: No
OCT'�°'�
DC110441 ' (�3TY
E:
Amit Gupta
Field Investigation Report
Page 2
8. PROJECT SUMMARY: The applicant proposes to construct a bulkhead waterward of
normal water level (NWL) that will tie into and align with adjoining bulkheads. The
existing platform on the pier is proposed to be expanded and roofed. Two formalized
slips will be created through the construction of a boathouse (with lift) and the
installation of a jet -ski lift. A single-family dwelling and pool will be constructed within
the highground area landward of the PTS Area of Environmental Concern (AEC).
Proiect Settin
The site of the proposed development is located at 4065 Creek Road, Lot #17 within Martins
Point subdivision, Dare County, and is adjacent to Jean Guite Creek.
The property is a vacant lot that has been cleared in preparation for the eminent construction of
a single-family dwelling. It is 28,050 ft2 (0.64 acres) in size and elevations are >_4' above NWL.
According to the USDA's Natural Resources Conservation Service's Web Soil Survey, the soil
on the property is made up of fripp fine sand (FrD). Based on available information, no
archaeological sites are on or near this property.
The shoreline is ±105' in length with ±97' of it in a natural state void of wetlands. A wooden
bulkhead on the south side was constructed ±8' beyond the property line onto the applicants
Lot and a bulkhead on the north side was ended ±15' short of the property line. A steep erosion
escarpment that is ±4' in height exists landward of NWL. Existing structures within the shoreline
area include a ±63'x6' "T" head pier with a 20'x10' platform.
The adjacent property to the north is a vacant wooded Lot that has a bulkheaded shoreline and
the adjacent property to the south has been developed with a bulkheaded shoreline, a docking
facility and a single-family residence.
The waters of Jean Guite Creek are classified as SC by the Environmental Management
Commission, are not open to shellfish taking and have been designated as an inland Primary
Nursery Area (PNA) by the NC Wildlife Resources Commission. Jean Guite Creek is ±973'
wide at the location of the site and water depths within the project area range ±0.5' to 3' below
NWL. The bottom substrate within the project area is made up of fine sands and is void of
Submerged Aquatic Vegetation (SAV). A 23'x6' patch of isolated coastal wetlands consisting
of black needlerush (Juncus roemerianus) is located 20' waterward of NWL on the south side
of the existing pier.
Development Proposal
In order to prevent further erosion to the site, the applicant proposes to stabilize the shoreline
by constructing 105' of vinyl bulkhead. The proposed alignment will remove and replace ±8' of
the wooden bulkhead that crossed over the southern property line and will extend ±75'
northward to NWL. The alignment will then follow. NWL for 22' to the property line where it will
then return landward 16'. The proposed bulkhead alignment will have an overall average of
±4.4' waterward of NWL with a maximum distance of ±10'. Water, depths within this area
average -0.75 ft below NWL and the bulkhead will be backfilled with clean sand fill from an
offsite upland source.
k
Amit Gupta
Field Investigation Report
Page 3
The applicant proposes to expand the existing 20'x10' platform on the pier to a 20'x20' platform
and install a 12'x10' boatlift on the south side. A roof with drip -line measurements of 32'x22' will
then be constructed over both the platform and the boatlift creating a 22'x11' boathouse (slip
#1). A ±10'x4' jet -ski lift will be installed on the north side of the platform (slip #2) and an ±8'x3'
floating kayak launch platform will be installed at the intersection of the pier and platform on the
south side. Water depths within this area range from 2' to 3' below NWL and is void of SAV.
The proposed pier development meets the 1/4 width rule and does not encroach within the 15'
setback.
No further development is proposed within CAMA AEC's; however, a two-story six -bedroom
single-family dwelling with a pool, driveway and septic system is proposed to be constructed
within the highground area. The reported percentage of impervious coverage for the tract is
25%.
Anticipated Impacts
. The construction of the bulkhead along the proposed alignment will result in the filling of
±459 ft2 of the Public Trust Area AEC with clean sand fill from an upland source.
• The construction of the bulkhead along the proposed alignment will result in the placement
of ±13 cubic yards of fill material below NWL.
• The construction of the bulkhead will result in ±2,691 ft2 of land disturbance within the Public
Trust Shoreline AEC.
• The proposed docking facility expansion will result in ±528 ft2 of additional platform shading
for a total of 728 sf2 within the Public Trust Area AEC.
• Non -AEC highground disturbance for the construction of the single-family dwelling, septic,
pool and driveway is 25,359 ft2.
Submitted by: Ron Renaldi
Date: October 2, 2018
RECEIVED
OCT ' 2 M8
DCM-MHD Cif`/
AMIT GUPTA — CAMA MAJOR DEVELOPMENT PERMIT
PROJECT NARRATIVE
REVISED SEPTEMBER 19, 2018
The applicant purchased Lot 17, Block 6, Section 1, Martins Point which is a +/- .64-acre tract at 4065 Creek Road
and adjacent to Jean Guite Creek. The property has recently been cleared and a silt fence installed along the +/- 105
feet of shoreline. A +/- 62-foot long x 6-foot wide pier extends into the creek to access an existing 10' x 20' "tee"
head. A bulkhead encroaches from the south neighbor +/- 8.4 feet onto the property.
Jean Guite Creek is a favorite location for boaters and skiers and the unprotected shoreline is eroding. The applicant
proposes to stabilize the shoreline by tying into the bulkhead to the south (by removing the encroaching bulkhead and
replacing with a vinyl bulkhead) and extending to the property to the nofth (which is bulkheaded but falls short of
reaching the property line). The proposed alignment will average +/- 7' from NWL and not exceed ten feet at the
maximum distance. The bulkhead will be at the same height as the adjoining bulkhead to the south and two 16-foot
return walls will extend into property for protection. The +/- 459 s.f. of shallow water will be backfilled.
The applicant proposes to expand the existing "tee" to include a 10' x 20' "tee" (for a total of 20' x 20') and a 10' x
t}49' boat lifi-both of which will be covered. The proposed covered area is 704 s.f. to the drip line. The applicant also
proposes a 4 x 10 jet ski lift and a 8' x 3'floating kayak launch. No additional development within the 30-foot public
trust AEC is proposed, and that area will be grassed and landscaped.
The upland development will include a pool, decking, single-family residence, parking, drive, and on -site wastewater
disposal.
±11.W iVw NwL Z.A.R.
Received
SEP 2 4 2910
QCM-EC
RECEIVED
OCT ' 2 2018
DCM-MHU CITY
AUTHORIZATION TO ACT AS REPRESENTATIVE FORM
Landowner of record authorizes Environmental Professionals, Inc. to:
1. enter the property to gather environmental and site information, including delineation of
environmental regulatory jurisdictions;
2. enter the site with the regulatory agencies (i.e. U.S. Army Corps of Engineers,
North Carolina Division of Coastal Management, North Carolina Division of Water
Quality, etc.) as needed to review regulatory alignment(s) and/or to identify additional
regulatory jurisdictions;
3. submit plats and other information to acquire regulatory agency confirmations, approvals,
and/or determinations (U.S. Army Corps of Engineers, North Carolina Division of
Coastal Management, North Carolina Division of Water Quality, etc.); and
4, act as agent for the purposes of obtaining environmental permits, authorizations, and/or
determinations.
o "IgM b,
Qtttl� �d
sena---
Lan owner
Client
8/8/2018 6:32:04 AM PDT
Date
Date
Received
sP2-i;;
DCM-EC
RECEIVED
OCT 12 2018
DCM-MHD CITY
Received
aui gibes . I;
h��I �sll! i?,
�1;,;A11gust 31, 2018
Mr. Randall Jones
5024 N. Virginia Dare Trail
Kitty Hawk, NC 27949
Dear Mr. Jones,
(Via Certified/Return Receipt Requested Mailing)
e 4 2o1J'
DCM-EC
This letter is with reference to property which is adjacent to yours on Creek Road in Martins Point,
North Carolina owned by Mr. Amit Gupta. Environmental Professionals, Inc. is representing Mr. Gupta to obtain
permits to construct a bulkhead, pier, tce head, covered boat lift, jet ski lift, and kayak launch as shown on the
attached plat.
Should you have any questions regarding this request, please contact me or the North Carolina Division of Coastal
Management within 30 days of receipt of this letter (contact information noted below). Failure to do so will be
considered as "no objection" to the proposed plan.
Environmental Professionals, Inc.
Attn: Mr. George Wood, CEP, PWS
P.O. Box 3368
Kill Devil Hills, NC 27948
Telephone No.: 252-441-0239
Cell No.: 25I423-1234
Email Address: obxwoodWvahoo.com
North Carolina Division of Coastal Management
Attn: Mr. Ron Renaldi
401 S. Griffin Street — Suite 300
Elizabeth City, NC 27909
Telephone No.: 252-264-3901
Email Address: ronald.renaldipncdenr.gov
Thank you for your consideration of this matter.
Sincerely,
Environmental Professionals, Inc.
Gec a H. Wood. CEP, PWS
I have no objection to the project described in this correspondence. RECEIVED
I have objection to the project described in this correspondence.
OCT 12 2018
0CM-MHD CITY
P.O. B0%3348 GO.L hl:ltl.11[i.IS. tiORTiI C.li;Ul.t':.1 177.111
TELENJOAE: 2.V-44t-109 • PAX: 252-141-a721 • LAI,Ut.: de.,>a,wb.ryn4ur.an.r
� y
PAID
M V �{ ILLS, NO
MILLS,
K
i
1I
low
AMOUNTS
OEM.$7.41
1000
27M R2304MI14408.03
Mr. Randall Jones
5024 N. Virginia Dare Trail
Kitt% hash, NC 27949
■ Complete Items 1, 2, and 9. Alm oomplate
item 4 It Restricted Delivery Is desired.
o Prim your name and address on the. reverse
so Mat we can return• Attach U* Lard to the back of the card to e malipkoe,
or on the front If space permit.
1. Artlsle Addressed to:
N� Mr. Randall Jones
A 5024 N. Virginia Dare Trail
Kitty Hamk, NC 27949
A. Slanature
X 13 ABeat
❑.Addressee
S. ReceNW by (Pdnfed Name) C. Date of DaWmy
D. N dsfkery edr8ess diftema from Item 17 0 Yee
If YES, enter deffvery address txtovc R1 No
3. ddS,e,M,,,��s''e��Ty��p''e _
yr,r r Mail ❑ Express Mell
iU gegztDrod Cl ReWm ReCstpr for Memhandlsa
13 Insured Men 13 C.O.D.
4. Restricted Dellvery72. (Ekes Fes) p Yes
Article Number7016 0600 coon A997 AMMA
Received
co
Domestic
'
rn
o"""°° 48
$
4 7010 Ir
ir
C3
�fleUniRe aR0��Wptm.d.w$ u.uu r
DCM-EC
0
❑Cer"fle"Mall fleaMclatl DelNery S Hm r�
❑P Slenet Reg w $ R0QQQ
❑MWI SIDneMefl""ctetl DalNwyO
oPostage
$1.21
o$
ro•mg•.Da 09/01J2018
.41
s _ _
.B
sent
0
BSee ZWA Donald & Mary Rossi
r`
472 Hillcrest Drive
Liry 3ti.ie.
Latrobe, PA 15650
Postal
CERTIFIED
o RECEIPT
00
tr
Domestic Mail Only
ru
d -
m
w
p"
r.!,m tl Meal Fea 40.13
tr
$
'1C
Ili- V
0J
Ices& ees (rMX•Iq myp."�.p�l•yf�
❑fl.M1un Receipt{ maMo �h " bw
C3
C3
❑flatum Receipt ItlernmlU •. Q�
❑CvtlAxIMWIRrsMkbODaM i �1
Pgc7mark
QQAtlu
859g Wm Regp
• so 00
HBte
❑N SiDnetvp ReaVkbtl Dd9
s
oPostage
$
r3
09/0112018
Pe•W•.• .41
s
a
o
NiiRaidAWf?
Mr. Randall Jones
t`
etii'aeia 2/P.'
5024 N. Virginia Dare Trail
Kitty Hawk. NC 27949
Received
�nni���iayi►���
August 31, 2018
Donald & Mary Rossi
472 Hillerest Drive
Latrobe, PA 15650
Dear Mr. & Mrs. Rossi,
(Via Certified/Return Receipt Requested Mailing)
z 4 231)
DCM-EC
This letter is with reference to property which is adjacent to yours on Creek Road in Martins Point,
North Carolina owned by Mr. Amit Gupta. Environmental Professionals, Inc. is representing Mr. Gupta to obtain
permits to construct a bulkhead, pier, tee head, covered boat lift, jet ski lift, and kayak launch as shown on the
attached plat.
Should you have any questions regarding this request, please contact me or the North Carolina Division of Coastal
Management within 30 days of receipt of this letter (contact information noted below). Failure to do so will be
considered as "no objection" to the proposed plan.
Environmental Professionals, Inc,
Attn: Mr. George Wood, CEP, PW5
P.O. Box 3368
Kill Devil Hills, NC 27948
Telephone No.: 252-441-0239
Cell No.: 252-423-1234
Email Address: obxwoodGPyahoo.com
North Carolina Division of Coastal Management
Attn: Mr. Ron Renaldi
401 S. Griffin Street — Suite 300
Elizabeth City, NC 27909
Telephone No.: 252-264-3901
Email Address: ronald.renaldiamcdear.gov
Thank you for your consideration of this matter.
Sincerely,
Environmental Professionals, Inc.
George H. Wood, CEP, PWS
_ I have no objection to the project described in this correspondence.
_ I have objection to the project described in this correspondence. RFCFp,
'V�0
OCT
Q 12 2016
cA,1% c/n
P.O. SON 33GR • IULL DECH. HILLS. NORTH CAROLINA 279411
TELEPHONE: 252-4414a239 • FAX: 2M441-4721 • F81A1L: U115R',nita4l t3�,MlYn,i'
111111 t I fl ---- 1111 .. , . -
I ��, �llf I I.,
pq ZZ. laa�- -1
Received
K'? 2 4 -/ai,i
DCM-EC
7016 0600 0000 8993 6489
iv -
Mee 4 j
ENViRON':t£PiTAL PROFESSIONALS, INC.
TO
11r Mark Jones
1966 N. Comtnoitwealth Avenue
Los Angeles, CA 90027
gµ �p T 8 @PAID � -
2T8d8 1'
RbS°l�f
M041
3
ar
K Complete Hems 1, 2, and 3. "" t] Agent ,.
1i Pint your name and address on the reverse X Addressee t
�
eo that we can return the a d to you. _ ..
" -M Attach this card to the hack of the maliplece, B. Received b):(PrGded Marne) C.: Date of oeirre+y
' or on the front H space permits.
❑ Y
1:. Article Addressed to:_: M Is dellveryadckew diHerentfrom Item 1P
- .H YM enter delinry address Mew p'NO
..
;1%1r ilark Jones
:.
900275129-1N
10/23/18
RETIIRtJ TO &PND2ZA»e
'JNABLk'i'TO FFORWARD �eearLiR�t+ccea.
tSNABLE TO Folt D for RETVRr7 TO 8L"NDER
October 4, 2018 (Via Certified/Return Receipt Requested Mailing)
Mr. Mark Jones
1966 N. Commonwealth Avenue
Los Angeles, CA 90027
Dear Mr. Jones.
This letter is with reference to property which is adjacent to yours on Creek Road in Martins Point,
North Carolina owned by Mr. Amit Gupta. Environmental Professionals, Inc. is representing Mr. Gupta to obtain
permits to wnstruet a bulkhead, pier, tee head, covered boat lift, jet ski [ill, and kayak launch as shown on the
attached pint.
Should you have any questions regarding this request, please contact me or the North Carolina Division of Coastal
Management within 30 days of receipt of this letter (contact information noted below). Failure to do so will be
considered as "no objection' to the proposed plan.
Environmental Professionals, Inc.
Attn: Mr. George Wood, CEP, PWS
P.O. Box 3368
Kill Devil Hills, NC 27948
Telephone No.: 252-441-0239
Cell No.: 252423-1234
Email Address: obxw9od(a'vahoo,con1
North Carolina Division of Coastal Management
Attn: Mr. Ron Renaldi
401 S. Griffin Street — Suite 300
Elizabeth City, NC 27909
Telephone No.: 252-264-3901
Email Address: rmmld.renaldi(a�.ncdenr.gov
Thank you for your consideration of this matter.
Sincerely,
Environmental Professionals, Inc.
Gd ood. CEP, PWS
Attachment: a/s
1 have no objection to the project described in this correspondence.
I have objection to the project described in this correspondence.
P.O. 110\ 339,8 . K11.1. 111A 11 1111 I.s, \I11111 C %ROLIN t 274411
TELEPHONE: 252441-0239 • EMAIL:
m
s
m
m
Ir
n^
ED
0
0
0
O
O
a
c
-0
A
O
N
r tl:S,
oPosta['SeYuic�'"
� T
CE,RTIFIIED,M�41L�
REC,EI;PT I
Ooinesilc
MeflOgjp
$3.45
tra q
kklad GSmY 5 - ,`
21:21 oc
s7.41 rlu/.t
i
Mr. MAN-l( Jones
1966 N. Cmumonwenilli Avenue
Los Angeics,.CA -90027
ROY COOPER
Governor
HBCHAELS.REGAN
Secretary
BRAXTON C. DAVIS
Director
Amit Gupta
P.O. Box 90
Kill Devil Hills, NC 27948
Dear Mr. Gupta:
NORTH Quably
Envili
October 5, 2018
The NC Division of Coastal Management hereby acknowledges receipt of your application for
State approval for development of your property located 4065 Creek Road, Martin's Point in Dare
County. It was received complete on September 24, 2018 and appears to be adequate for
processing at this time. The projected deadline for making a decision is December 8, 2018. An
additional 75-day review period is provided by law when such time is necessary to complete the
review. If you have not been notified of a final action by the initial deadline stated above, you
should consider the review period extended. Under those circumstances, this letter will serve as
your notice of an extended review. However, an additional letter will be provided on or about the
75th day.
If this agency does not render a permit decision within 70 days from September 24, 2018, you may
request a meeting with the Director of the Division of Coastal Management and permit staff to
discuss the status of your project. Such a meeting will be held within five working days from the
receipt of your written request and shall include the property owner, developer, and project
designer/consultant.
NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed
development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted
at the property of your proposed development. You should post this notice at a conspicuous point
along your property where it can be observed from a public road. Some examples would be:
Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your
property, or at a point along the road right-of-way where a private road would lead one into your
property. Failure to post this notice could result in an incomplete application.
RECEIVED
OCT 122018
North Carolina Department of Environmental Quality I Division of Coastal Management DC M-M H D CITY
Elizabeth City Office 1 401 South GrifFln Street. Suite 300 1 Elizabeth City, North Carolina 27909
2522643901
October 5, 2018
Page 2 of 2
An onsite inspection will be made, and if additional information is required, you will be contacted
by the appropriate State or Federal agency. Please contact Ron Renaldi, Field Representative, if
you have any questions and or if you wish to receive a copy of his field report.
Sincerely,
��XVAA' vy l
Frank Jennings/
District Manager, Northeastern District
NC Division of Coastal Management
FJ/eg
Enclosure
cc: Doug Huggett, Major Permits Coordinator, DCM, Morehead City, NC
Ron Renaldi, DCM, Elizabeth City, NC
George Wood, Environmental Professionals, Inc.
North Carolina Department of Environmental Quality I Dtvislon of Coastal Management
Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City. North Carolina 27909
2522643901
c
YJ
N0T1(0'/17wA
WfA' J'i EM
APPLIED FOR
PROJECT: Construct a bulkhead, expand and roof an existing
pier, construct a boathouse with a lift, install a
jet -ski lift and construct a single-family residence
with a pool.
LOMMENTS ACCEPTED THROUGH October27, zo�8
9PLICANT:
Amit Gupta
1065 Creek Road
N M
FO Kitty Hawk, NC 27949
252-441-9003
FOR MORE DETAILS CONTACT
THE LOCAL PERMIT OFFICER BELOW:
�-� Ron Renaldi,
Division of Coastal Management
401 S. Griffin Street, Suite 300
Elizabeth City, NC 27909
252-264-3901, ext. 237
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Dimaor
1/- 11 11*id►9 0
TO: Susan Simpson
The Coastland Times
Manteo, NC 27954
legals@thecoastiandtimes.net
FROM: Ella Godfrey
DATE: October 4, 2018
SUBJECT: Public Notice: Amit Gupta
Please publish the attached Notice in the Sunday, October 7, 2018 issue of The
Coastland Times.
The State Office of Budget and Management requires an original Affidavit of Publication
prior to payment for newspaper advertising. Please send the affidavit, an original copy
of the published notice, and an original invoice to Melissa Sebastian, NC Division
of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557,
(Telephone 252-808-2808).
Thank you for your assistance in this matter. If you should have any questions, please
contact me at our Elizabeth City office (252) 264-3901.
Attachment
cc: Doug Huggett, Major Permits Coordinator, DCM, Morehead City
Sarah Young, PIC, DCM, Raleigh
Melissa Sebastian, Accounts Payable, DCM, Morehead City
File
RECEIVED
OCT 12 2018
North Carolina Department of Environmental Quality 1 Division of Coastal Management
Elizabeth City Office ! 401 South Griffin Street, Suite 300 i Elizabeth City. North Caroma'btM-M H D CITY
252.264.3901 lJli
NOTICE OF FILING OF
APPLICATION FOR CAMA MAJOR
DEVELOPMENT PERMIT
The NC Department of Environmental Quality hereby gives public notice as
required by NCGS 113A-119(b) that application for a development permit in an AEC as
designated under the CAMA was received on 09/24/18. Amit Gupta proposes to
construct a bulkhead that will align with adjoining bulkheads, expand and roof an existing
pier, construct a boathouse with a lift, install a jet -ski lift and build a single-family residence
with a pool, located at 4065 Creek Road in Dare County
A copy of the entire application may be reviewed at the office of the Division of
Coastal Management, located at 401 S Griffin St, Ste 300, Elizabeth City, NC, 252-264-
3901 during normal business hours. Comments mailed to Braxton Davis, Director, DCM,
400 Commerce Avenue, Morehead City, NC 28557, prior o 10/2718, ill be considered
in making the permit decision. Later comments will be consi a up to the time of permit
decision. Project modification may occur based on review & comment by the public, state
& federal agencies. Notice of the permit decision in this matter will be provided upon
written request.
PLEASE PUBLISH ON: Sunday, October 7, 2018
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909
252.264.3901
r
G FY,CMPT
�O DARE COUNTY TAX
COLLECTO
16
O
LAN�SFER NUMBER:
1% TRANSFER FEE: $0.00
EXCISE ��QQXX: S0.00
PARCEL M1)028588017
Prepared by and return to:
E. Crouse Gray, Jr., Attorney at Law
■ Bemued North C na Attobe pa
Delinquent taxn, if arc to be paW by the closing
attorney to the Corn x Collector upon disbursement
of closing proceeds.
GRAY&. LLOYD, L.L.I�
3120 N. Croarsne 1
Kill Devil Hills, NC 27948 o ,
(919) 4414338 t
Our File No. 10589-059
Boox 2245 PAGE 604 (3)
r000saata II
Recorded: 06002018 03:39:49 PM
BY: CLAUDIA HARRINGTON
Vanmla MCMWM, Rryratr of Deeds
Dare Gouty, NC
Fee Ant: MOO NC Exces Taos $0.00
NORTH CAROLAIA, DARE COi O
TEEIS DEED OF CORRECTIO ade this the Z� day of, 2018, by
and between BERNARD E. DE LURY WIFE, JANE F. DE L YWR of 00 Black -Eyed
Susan lane, Vienna, VA 21182, Grantor, an'N1i1T GUPTA of PO Box 90, Kill Devil Hills, NC i
27948, Grantee:
The designation Grantor and Grantee as used herein shall include said parties, thew heirs,
successors and assigns, and shall include singular, Plural, masculine, feminine orneuteras required
by context.
�O
V11`
V11`
Y"
0
Received
S-:p 2 t;
DCM-EC
RECEIVED
OCT 12 2018
DCM-MHD CITY
Book 2245 Page 604
WITNESSETH:
�. THAT WHEREAS, said Grantorheretofomexecuted toGrantee acertain deed dated March
21, 2018, and recorded in Book 2231, Page 475, in the office of the Register of Deeds of Dare
��• County, and whereas, by mutual mistake said deed contained an error in that the deed stated the
Qproperty was in Block IV, ; whereas, it was intended that the deed state the property was located in
�Ock VI; and whereas, said Grantee has requested Grantor to correct said error and Grantor has
so to do; and whereas, the correct description intended to be inserted in said former dad is
_ set out;
W THEREFORE, Grantor, for the purpose of correcting said error and for a valuable
consi n,thereaiptofwhichisherebyacknowlodgeddoesgrant bargain sell and conveyunto
the Gma that certain lot or parcel of land situated in the Town of Kitty Hawk, Atlantic
Township, rCounty, North Carolina, and more particularly described as follows:
Lot 17, Block VI, Section 1, as shown on that certain plat entitled
"Martin's Point, Lot Revision; Block VI, Section 1, Lots 134 and Block
1,Section H, ts129,"prepared by TrIaogleEnglneeringServices, luc�
dated Jan S,19K which plat is recorded in Plat Cabinet B, Slides
327, 328, 329, and 331, Dare County Registry.
The property harve described was acquired by Grantor by instruments recorded in
Book 567, Page 485, Dare ty Public Registry.
TO HAVE AND TO�ma the aforesaid lot or parcel of land and all privileges and
appurtenances thereto belonging(othe Grantee in fa simple.
And the Grantor covenants with a Grantee, that Grantor is seized of the premises in fee
simple, has the right to convey the sani�simple; that title is marketable and free and clear of
all encumbrances, and that Grantor will tanddefendthetitleagainstthelawfulclaimsofall
persons whomsoever except for the ex' s hereinafter stated
Title to the property hereinabove descr%d is subject to the following exceptions:
1. Exception is taken to 2018 ad valorciiOxes.
2. Exception is taken to any easements and restrictions of record
0
w�
d
0
Received
S'r' xJ «:;i
DCM-EC
Book 2245 Page 605
0 IN WITNESS WHEREOF, the Grantorhas hereunto set hand and seal the dayand year first
above written. _
(SEAL)
Y De Lury
(SEAL)
..._ eF. De
J�
4 a5tjary Public oftbe State aforesaid, certify that BERNARD E. DE LURY AND WIFE,
JANE F. URY personally appeared before me this day and aclmowledged the execution of
the foregoing i4manent.
Witness my hand and official stamp or seal this the day of
'3unif, �o .2018.
NOTARY PUBLIC
(Seal -Stamp) My Commission Expires: 015/ 3 /12-
Registration Number: 7767
�4� (is applicable)
c µw m �Y'
O
NAWGRVCfiwMSAGAC.wd.d WJ05B9059 P)[.It,ag5ie.1MnmYPt;S)DeW,111OSB9019RmpCvwr.Lnr.TorxasB�DaA
Deceived
5-"•P24,
DCM-EC
RECEIVED
OCT 12 2018
Dec
Book 2245 Page 606
MAJOR PERMIT FEE MATRIX
Applicant* A m ' � G v •n}y
Selection
Development Type
Fee
DCM %
(14300 16014351000931625 6253)
DWQ %
(243001602 435100095 2341)
i. Private, non-commercial
❑
development that does not
$2S0
100% ($250)
0% ($0)
Ithe filling or
excavation of any wetlands
or o en water areas:
If. Public or commercial
development that does not
$400
100% ($400)
0% ($0)
involve the filling or
excavation of any wetlands
or open water areas:
Major Modification to a
$250
100% ($250)
0% ($0)
CAMA Major permit
III. For development that
involves the filling and/or
excavation of up to 1 acre
of wetlands and/or open
water areas, determine if A,
B. C, or D below ap lies:
IIom Private,
commercial development, 'rf
$250
100% ($250)
0% ($0)
General Water Quality
tun 5 nv'S I ,\ F .fit arts,
Certification No. 4097 (See
,� �y tom...
attached can be applied.
4r
III(B). Public or commercial
development, "rf General
$400
100%($400)
0% ($0)
Water Quality Certification
No. 4097 (See attached)
can be applied:
III(C). If General Water
Quality Certification No.
$400
60% ($240)
40% ($160)
4097 (see attached) could
be applied, but DCM staff
determined that additional
review and written DWQ
concurrence is needed
because of concerns
related to water quality or
life:
General Water
ertification No.
$400
60%($240)
40°�($160)
;aa
e attached) cannot
d:
evelopment that
the filling and/or
$475
60% ($285)
40% ($190)
excavation of more than
OCT 12 2018
one acre of wetlands and/or
open water areas:
n
Received R
Permit No.:
Applicant's
Project Add
NC Division of Coastal Management
Cashier's Official Receipt
6661 ABC D
Date: v 20 Z�
Please retain receipt for your records as proof of payment for permit issued.
Signature of Agent or Applicant: G' `
Signature of Field Representative: ✓
i
Date:
Date:
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL AND PROCESSING RECORD
A) APPLICANT: Amit Gupta County: Dare
LOCATION OF PROJECT: 4065 Creek Road, Martin's Point
DATE APPLICATION RECEIVED COMPLETE BY FIELD REP: 09/24/18
FIELD RECOMMENDATION: Attached: NO To Be Forwarded: YES
CONSISTENCY DETERMINATION: Attached: NO
FIELD REPRESENTATIVE: Ron Renaldi
DISTRICT MANAGER REVIEW:
To Be Forwarded: YES
DISTRICT OFFICE: Elizabeth Citv
Date:
B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: S 400 (60/40%)
PUBLIC NOTICE REC'D: Advertise, 10/07/18 END OF NOTICE DATE: Comments due: 10/27/18
ADJ. RIP. PROP NOTICES REC'D: DEED RECD:
APPLICATION ASSIGNED TO: & (`2 jq RY' ON: t�/ls Ag
C) 75 DAY DEADLINE: 12/08/18 '17 150 DAY DEADLINE: Z 1211I g
MAIL OUT DATE: Circulation:10/05/18
FEDERAL DUE DATE:
PERMIT FINAL ACTION: ISSUE
STATE DUE DATE: Comments due: 10/26/18
FED COMMENTS REC'D:
DENY
DRAFT
AGENCY
DATE
OBJECTIONS:
NOTES
COMMENTS
YES NO
RETURNED
Coastal Management - Regional Representative
t,17.2, 60
L
Coastal Management - LUPConsistency
'Islie.
Division of Community Assistance
�: I((
`C
Land Quality Section—DEMLR
DWR/DWQ — Agttif�n' '40
4,46
Ke ^
Zola - Qq (�
DWR/DWQ -Storm Water
(0/16 his
I
4l
DWR — Public Water Supply
to /o
its
State Property Office
Division of Archives & History —Cultural Res.
Division of Env. Health —Shellfish Sanitation
t01(t It 6
Division of Highways --DOT
Wildlife Resources Commission
0
cRECEIVeD
Local Permit Office/Planning Dept. L.yt,ol
DMF—FA4 Fisheries Resource Specialist
to lbllg
�c
OCT
Corps of Engineers
D
_..._. �.►1Y
�-irral �+kag �.osrq"1
ROY COOPER
Govemor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Dlmdor
October 15, 2018
MEMORANDUM
NORTH CAROLINA
Environmental Quality
RECEIVED
OCT 1 5 2018 .
Karen Higgins, Compliance and Permitting Unit Supervisor
DWR - Water Quality Program
FROM: Doug Huggett, Major Permits Coordinator
c/o Gregg Bodnar, Assistant Major Permits Coordinator
Division of Coastal Management
SUBJECT: CAMA Permit Application Review
Applicant: Amit Gupta
Project Location: 4065 Creek Road, Martins Point, Dare County
Proposed Project: Construct a bulkhead, expand and roof an existing pier, construct a
boathouse with a lift, install jet -ski lift and a single-family residence
with pool.
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 10/26/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330).
If you have any questions regarding the proposed project, please contact Ron Renaldi at (252) 264-
3901. When appropriate, in-depth comments with supporting data are requested.
REPLY: This agency has no objection to the project as proposed.
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments." """
SIGNED �y Scaz6 DATE
10/15/18
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1 401 South Griffin Street, Suite 3001 Elizabeth Clty. North Carolina 27909
2522643901
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C.,DAVIS
Director
October 5,'20.18
MEMORANDUM
NORTH CAROLINA
Environmental Quality
Lee Padrick .
Division of Community Assistance
RECEIVED
OCT 1 2 2018
MP SECTION MHD
FROM: Doug Huggett, Major Permits Coordinator
c/o Gregg Bodnar, Assistant Major Permits Coordinator
Division of 'Coastal Management
SUBJECT: CAMA Permit Application Review
Applicant: Amit Gupta,
Project Location: 4065 Creek Road, Martins Point, Dare County
Proposed Project: Construct a bulkhead, expand and roof an existing pier, construct a
boathouse with a lift, install jet -ski lift and a single-family residence
with pool.
Please indicate below your agency's position or viewpoint on the, proposed project and return this
form by 10/26/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330).
If you have any questions regarding the proposed project, please contact Ron Renaldi at (252) 264-
3901. When appropriate, in-depth comments with supporting data are requested.
REPLY: This agency has no objection to the project as proposed.
his agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED � - DATE / e
�DFQ�.
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth CityOffice 1 401 South Griffin Street, Suite 300 1 ElIzalieth City, North Carolina 27909
252264.3901
tNct.r lvc.0 vt l 1'11UIU
ROY COOPER
Gayemar
MCHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
October 5, 2018
MEMORANDUM
TO:
FROM:
SUBJECT:
Applicant.
Project Location:
NORTH CAROLINA
EnWronmenta►Quaftty
RECEIVED
OCT 1-1 2018
. DCM-WARO
Clif Whitfield, Environmental Engineer
DWR-Public Water Supply Section, WaRO
Doug Huggett, Major Permits Coordinator a
c/o Gregg Bodnar, Assistant Major Permits Coordinator RECEIVED'
Division of Coastal Management
CAMA Permit Application Review
Amit Gupta
4065 Creek Road, Martins Point, Dare County
OCT 1 1 2018
MP SECTION MHD
Proposed Project: Construct a bulkhead, expand and roof an existing pier, construct a
boathouse with a lift, install jet -ski lift and a single-family residence
with pool.
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 10/26/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330).
If you have any questions regarding the proposed project, please contact Ron Renaldi at (252) 264-
3901. When appropriate, in-depth comments with supporting data are requested.
REPLY: This agency has no objection to the project as proposed.
ZThjs agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED W.,�✓�/, ea� DATE
.A9 Q)
ow!�won.ae-,narp,�
North CaruWm Department a Mwironmental Quality I Division of Coastal Management
Elizabeth QtyOffice 1401 South Griffin Street, Sulte300 I WAethCity, North Carolina 27909
2522643901
ROYCOOPER
Governor
MICHAEL S. REGAN
Semetary
BRAXTON C. DAVIS
Director
October; 5,;2018
MEMORANDUM
TO:
NORTH CAROLINA
Environmental Quallty
Shannon Jenkins
Environmental Health -Shellfish Sanitation
FROM: Doug Huggett; Major Permits Coordinator
c/o Gregg Bodnar, Assistant Major Permits Coordinator
Division of Coastal Management
SUBJECT: CAMA Permit Application Review
Applicant; Amit Gupta
Project Location: 4065 Creek Road, Martins Point;, Dare. County
RECEIVED
OCT 1 8 2018
FIfiP SECTION MHD
Proposed Project: Construct a bulkhead, expand and roof an existing pier, construct a
boathouse with ;a lift, install jet -ski lift and a single-family residence
with pool.
Please indicate below your agency's position or viewpoint on the proposed -project and return this
form,by 10/26/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330).
If you have any questions regarding the, proposed project, please contactRon Renaldi_at (252) 264-
3901. When appropriate, -in-depth comments with supporting data are.requested.
REPLY: This agency .has no objectionto the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED //6CCLZ Ut Vk--(LV
fbe- Shanrt on,, J e n 'i n S
DATE 1011,41
North Carolina Department of Environmental Quality I DlvislonofCoastal Management
Elizabeth Cltyoffim 1 401 South Gr ffin Street; Suite 360 1 Elizabeth City, North Carolina 27909
252.2643901
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Dlredor
October 5, 2018
MEMORANDUM
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
NORTH CAROLINA
6hvlronmentalQuaUty
RCCEIVFq
OCT 11 7,018
DOM-Ffshorlou
WARD
Shane Staples, Fisheries Resource Specialist
Division of Coastal Management, WaRO
RECEIVED
OCT 11 2018
DCM-WAR®
RECEIVED
Doug Huggett, Major Permits Coordinator
c/o Gregg Bodnar, Assistant Major Permits Coordinator OCT 2 9 2018
Division of Coastal Management
CAMA Permit Application Review MP SECTION MHD
Amit Gupta
4065 Creek Road, Martins Point, Dare County
Proposed Project: Construct a bulkhead, expand and roof an existing pier, construct a
boathouse with a lift, install jet -ski lift and a single -fancily residence
with pool.
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 10/26/18 to 400 Commerce Avenue, Morehead City NC 28557 (fax: 252-247-3330).
If you have any questions regarding the proposed project, please contact Ron Renaldi at (252) 264-
3901. When appropriate, in-depth comments with supporting data are requested.
REPLY: This agency has no objection to the project as proposed.
V This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
commen pp
SIGNED iC.e-1`DATE Ac ,6'111,?
DQ�
North Carolina Department of Environmental Quality I Division of Coastal Management
Elbabeth City Offloe 1401Sauth Griffin Street, Suite 3001 Eltrabeth City, North Carolina 27909
2522643901
Bodnar, Gregg
From: Moore, Bill
Sent: Thursday, October 25, 2018 10:51 AM
To: 'obxwood@yahoo.com'
Cc: Bodnar, Gregg
Subject: Amit Gupta Project
Hey George, hope you are doing well,
I reviewed the CAMA application for the Amit Gupta project at Martins Point. The proposed
single family residence will trigger a stormwater permit. Based on the lot size of 28,050 sf, the
low density threshold would be 6732 sf of impervious area. If the project exceeds this
amount of impervious area, then a high density permit with some type of engineered sw
controls may be necessary. We can discuss permitting options, the possible use of
permeable pavements to stay under the LID threshold, and figure out the best approach for
this site. I have not contacted Mr. Gupta yet; wanted to give you a heads -up.
Bill Moore, Environmental Engineer
Division of Energy, Mineral and Land Resources
943 Washington Square Mall
Washington, NC 27889
(252) 946-6481
1
'ROY'COOPER
Governor'
MICHAEL S. REGAN
seQemry
BRAXTONC. DAVIS
Dimctor
October 5, 20118
MEMORANDUM,
TO:,
FROM:
SUBJECT,
Applicant:
Prdject Location:;
Proposed Project:
Maria Tripp
NC Wildlite
c/o Greg,,
Division.
CAMA
Amit'Gupta
4065 `.Creels
Construct a
boathouse m
with pool.
Please indicate,bel'owyor
form by 10/26/18 to 400
If you have any questions
3901. When appropriate,
RECEIVE®
0CT 3 0 2018
MP SECTION MHD
Commission
Major Permits Coordinator
tar, Assistant Major Permits Coordinator
Review
Martins Point,, Date County
khead, expand and roof an. existing pier,.. construct a
a. lift, .install' jet -ski 'lift and a. single-family ,residence.
position.or viewpoint, on the proposed project and return this
Avenue; Morehead City, NC 2855'7 (fax: 252-242:3330):
he proposed project, please.contact'Ron Renaldi at (252)264-
munents with' supporting data+are, requested.
REPLY: This agencyhas no objection to the project as proposed.
—,,Zhis,agency has; no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated.! See attached.
This agency objects to the project, for reasons described in the attached.
comments: I
SIGNED t I DATE I D--I 8-1Z)l 25
DEQ
�ev.iw moipvrq
}forth C.11. Departmett of Fnvlronmental Quality I Dlvislon ofCaasW Management.
EkabetharyOffice 1401_Soat_h GrifflnStr tSu1te300I EInabah City• North Carollm 27909
=643901
ROY COOPER NORTH CAROLINA
Governor Envho entat Quality
MICHAEL S. REGAN
secretary
BRAXTON C. DAVIS
Director
MEMORANDUM
TO: Gregg Bodnar, Assistant Major Permits Coordinator
THROUGH: Frank Jennings, District Manager .74F
FROM: Ron Renaldi, Field Representative 1Z.A.-Z,
DATE: October 22, 2018
SUBJECT: Amit Gupta Major Permit Recommendations
The applicant proposes to construct a bulkhead waterward of normal water level (NWL) that will
tie into and align with adjoining bulkheads. The existing platform on the pier is proposed to be
expanded and roofed. Two formalized slips will be created through the construction of a
boathouse (with lift) and the installation of a jet -ski lift. A single-family dwelling and pool will
be constructed within the highground area landward of the PTS Area of Environmental Concern
(AEC).
The site of the proposed development is located at 4065 Creek Road, Lot #17 within Martins
Point subdivision, Dare County, and is adjacent to Jean Guite Creek.
The development proposal involves the Public Trust Area (PTA) & Public Trust Shoreline (PTS)
Areas of Environmental Concern (AEC's).
I have reviewed the Rules of the Coastal Resources Commission (CRC) as they pertain to this
project and my findings are as follows:
15A NCAC 07H.0208 Use Standards
Paragraph (a) addresses General Use Standards, and sub -paragraph (1) precludes uses that are
not water dependent within the EW and PTA and lists uses that may be considered water
dependent.
Consistent: The proposed development is consistent with the intent of this rule.
�� RECEIVED
�D_E
OCT
North Carolina Department of Environmental Quality I Division of Coastal Management DCM-MHD CITY
Elizabeth City Office 1 401 South Griffin Street. Suite 301 1 Elizabeth City, North Carolina 27909
252.264.3901
Gregg Bodnar, Assistant Major Permits Coordinator
Amit Gupta Major Permit Recommendations
October 22, 2018
Page 2
Paragraph (a)(2)(A) states that the location, design, and need for development, as well as the
construction activities involved shall be consistent with the management objective of the
Estuarine and Ocean System AEC and shall be sited and designed to avoid significant adverse
impacts upon the productivity and biologic integrity of coastal wetlands, shellfish beds,
submerged aquatic vegetation as defined by the Marine Fisheries Commission, and spawning
and nursery areas.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(B) states that development shall comply with state and federal water and air
quality standards.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(C) states that development shall not cause irreversible damage to documented
archaeological or historic resources as identified by the N.C. Department of Cultural Resources.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(D) states that development shall not increase siltation.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(E) states that development shall not create stagnant water bodies.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(F) states that development shall be timed to avoid significant adverse impacts
on life cycles of estuarine and ocean resources.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(G) states that development shall not jeopardize the use of the waters for
navigation or for other public trust rights in public trust areas including estuarine waters.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (b) addresses Specific Use Standards. Of these, subparagraphs (6) Piers and Docking
Facilities and (7) Bulkheads pertain to this project, and those subparagraphs not listed are not
applicable to this project.
Paragraph (6) Piers and Docking Facilities
Subparagraph (6)(A) states that piers shall not exceed six feet in width. Piers greater than six
feet in width shall be permitted only if the greater width is necessary for safe use, to improve
public access, or to support a water dependent use that cannot otherwise occur.
Consistent: The proposed development is consistent with the intent of this rule.
Gregg Bodnar, Assistant Major Permits Coordinator
Amit Gupta Major Permit Recommendations
October 22, 2018
Page 3
Subparagraph (6)(B) states that the total square footage of shaded impact for docks and mooring
facilities (excluding the pier) allowed shall be 8 square feet per linear foot of shoreline with a
maximum of 2,000 square feet. In calculating the shaded impact, uncovered open water slips
shall not be counted in the total. Projects requiring dimensions greater than those stated in this
Rule shall be permitted only if the greater dimensions are necessary for safe use, to improve
public access, or to support a water dependent use that cannot otherwise occur. Size restrictions
do not apply to marinas.
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (6)(C) states that piers and docking facilities over coastal wetlands shall be no
wider than six feet and shall be elevated at least three feet above any coastal wetland substrate as
measured from the bottom of the decking.
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (6)(D) states that a boathouse shall not exceed 400 square feet except to
accommodate a documented need for a larger boathouse and shall have sides extending no
farther than one-half the height of the walls and covering only the top half of the walls.
Measurements of square footage shall be taken of the greatest exterior dimensions. Boathouses
shall not be allowed on lots with less than 75 linear feet of shoreline. Size restrictions do not
apply to marinas.
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (6)(E) states that the total area enclosed by an individual boat lift shall not exceed
400 square feet except to accommodate a documented need for a larger boat lift.
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (6)(F) states that piers and docking facilities shall be single story. They may be
roofed but shall not be designed to allow second story use.
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (6)(G) states that pier and docking facility length shall be limited by:
(i) not extending beyond the established pier or docking facility length along the same shoreline
for similar use; (This restriction does not apply to piers 100 feet or less in length unless
necessary to avoid unreasonable interference with navigation or other uses of the waters by the
public);
Consistent: The proposed development is consistent with the intent of this rule.
(ii) not extending into the channel portion of the water body;
RECEIVED
Consistent: The proposed development is consistent with the intent of this rule. OCT 2 9 2018
DCM-MHD CITY
Gregg Bodnar, Assistant Major Permits Coordinator
Amit Gupta Major Permit Recommendations
October 22, 2018
Page 4
(iii) not extending more than one-fourth the width of a natural water body, or human -made canal
or basin. Measurements to determine widths of the water body, canals or basins shall be made
from the waterward edge of any coastal wetland vegetation that borders the water body. The
one-fourth length limitation does not apply in areas where the U.S. Army Corps of Engineers, or
a local government in consultation with the Corps of Engineers, has established an official
pier -head line. The one-fourth length limitation does not apply when the proposed pier is located
between longer piers or docking facilities within 200 feet of the applicant's property. However,
the proposed pier or docking facility shall not be longer than the pier head line established by the
adjacent piers or docking facilities, nor longer than one-third the width of the water body.
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (6)(I) states that piers and docking facilities shall not interfere with the access to
any riparian property and shall have a minimum setback of 15 feet between any part of the pier
or docking facility and the adjacent property owner's areas of riparian access.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (7) Bulkheads
Subparagraph (7)(A) states, "Bulkhead alignment, for the purpose of shoreline stabilization, shall
approximate the location of normal high water or normal water level."
Inconsistent: The proposed bulkhead alignment averages ±4.4' waterward of NWL.
Subparagraph (7)(B) states, "Bulkheads shall be constructed landward of coastal wetlands in
order to avoid significant adverse impacts to the resources."
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (7)(C) states, "Bulkhead backfill material shall be obtained from an upland source
approved by the Division of Coastal Management pursuant to this Section, or if the bulkhead is a
part of a permitted project involving excavation from a non -upland source, the material so
obtained may be contained behind the bulkhead."
Consistent: The applicants have indicated that clean fill will be used.
Subparagraph (7)(D) states, `Bulkheads shall be permitted below normal high water or normal
water level only when the following standards are met:
(i) the property to be bulkheaded has an identifiable erosion problem, whether it results from
natural causes or adjacent bulkheads, or it has unusual geographic or geologic features, e.g. steep
grade bank, which will cause the applicant unreasonable hardship under the other provisions of
this Rule;
Consistent: The proposed development is consistent with the intent of this rule.
Gregg Bodnar, Assistant Major Permits Coordinator
Amit Gupta Major Permit Recommendations
October 22, 2018
Page 5
(ii) the bulkhead alignment extends no further below normal high water or normal water level
than necessary to allow recovery of the area eroded in the year prior to the date of application, to
align with adjacent bulkheads, or to mitigate the unreasonable hardship resulting from the
unusual geographic or geologic features;
Consistent: The proposed development is consistent with the intent of this rule.
(iii) the bulkhead alignment will not adversely impact public trust rights or the property of
adjacent riparian owners;
Consistent: The proposed development is consistent with the intent of this rule.
(iv) the need for a bulkhead below normal high water or normal water level is documented
by the Division of Coastal Management;
Consistent: The proposed development is documented in a Field Investigation Report.
(v) the property to be bulkheaded is in a nonoceanfront area.
Consistent: The proposed development is consistent with the intent of this rule.
15A NCAC 07H.0209 Coastal Shorelines
(c) Management Objective. The management objective is to ensure that shoreline development
is compatible with the dynamic nature of coastal shorelines as well as the values and the
management objectives of the estuarine and ocean system. Other objectives are to conserve and
manage the important natural features of the estuarine and ocean system so as to safeguard and
perpetuate their biological, social, aesthetic, and economic values; to coordinate and establish a
management system capable of conserving and utilizing these shorelines so as to maximize their
benefits to the estuarine and ocean system and the people of North Carolina.
Consistent: The proposed development is consistent with the intent of this rule.
(d) Use Standards. Acceptable uses shall be those consistent with the management objectives in
Paragraph (c) of this Rule. These uses shall be limited to those types of development activities
that will not be detrimental to the public trust rights and the biological and physical functions of
the estuarine and ocean system. Every effort shall be made by the permit applicant to avoid,
mitigate or reduce adverse impacts of development to estuarine and coastal systems through the
planning and design of the development project. In every instance, the particular location, use,
and design characteristics shall comply with the general use and specific use standards for
coastal shorelines, and where applicable, the general use and specific use standards for coastal
wetlands, estuarine waters, and public trust areas described in Rule .0208 of this
Section. Development shall be compatible with the following standards:
(1) All development projects, proposals, and designs shall preserve and not weaken or eliminate
natural barriers to erosion including peat marshland, resistant clay shorelines, and cypremIVED
protective fringe areas adjacent to vulnerable shorelines.
Consistent: The proposed development is consistent with the intent of this rule. OCT 2 9 2018
DCM-MHD CITY
Gregg Bodnar, Assistant Major Permits Coordinator
Amit Gupta Major Permit Recommendations
October 22, 2018
Page 6
(2) All development projects, proposals, and designs shall limit the construction of impervious
surfaces and areas not allowing natural drainage to only so much as is necessary to adequately
service the major purpose or use for which the lot is to be developed. Impervious surfaces shall
not exceed 30 percent of the AEC area of the lot, unless the applicant can effectively
demonstrate, through innovative design, that the protection provided by the design would be
equal to or exceed the protection by the 30 percent limitation. Redevelopment of areas
exceeding the 30 percent impervious surface limitation may be permitted if impervious areas are
not increased and the applicant designs the project to comply with the intent of the rule to the
maximum extent feasible.
Consistent: The proposed development is consistent with the intent of this rule.
(3) All development projects, proposals, and designs shall comply with the following mandatory
standards of the North Carolina Sedimentation Pollution Corxtrol Act of 1973:
(A) All development projects, proposals, and designs shall provide for a buffer zone along the
margin of the estuarine water which is sufficient to confine visible siltation within 25 percent of
the buffer zone nearest the land disturbing development.
Consistent: The proposed development is consistent with the intent of this rule.
(13) No development project proposal or design shall permit an angle for graded slopes or fill
which is greater than an angle which can be retained by vegetative cover or other erosion -control
devices or structures.
Consistent: The proposed development is consistent with the intent of this rule.
(C) All development projects, proposals, and designs which involve uncovering more than one
acre of land shall plant a ground cover sufficient to restrain erosion within 30 working days of
completion of the grading; provided that this shall not apply to clearing land for the purpose of
forming a reservoir later to be inundated.
Consistent: The proposed development is consistent with the intent of this rule.
(4) Development shall not have a significant adverse impact on estuarine and ocean
resources. Significant adverse impacts include development that would directly or indirectly
impair water quality standards, increase shoreline erosion, alter coastal wetlands or Submerged
Aquatic Vegetation (SAV), deposit spoils waterward of normal water level or normal high water,
or cause degradation of shellfish beds.
Consistent: The proposed development is consistent with the intent of this rule.
(5) Development shall not interfere with existing public rights of access to, or use of, navigable
waters or public resources.
Consistent: The proposed development is consistent with the intent of this rule.
Gregg Bodnar, Assistant Major Permits Coordinator
Amit Gupta Major Permit Recommendations
October 22, 2018
Page 7
(7) Development shall not cause irreversible damage to valuable, historic architectural or
archaeological resources as documented by the local historic commission or the North Carolina
Department of Cultural Resources.
Consistent: The proposed development is consistent with the intent of this rule.
(8) Established common-law and statutory public rights of access to the public trust lands and
waters in estuarine areas shall not be eliminated or restricted. Development shall not encroach
upon public accessways nor shall it limit the intended use of the accessways.
Consistent: The proposed development is consistent with the intent of this rule.
(10) Within the Coastal Shorelines category (estuarine and public trust shoreline AECs), new
development shall be located a distance of 30 feet landward of the normal water level or normal
high-water level, with the exception of the following:
(A) Water -dependent uses as described in Rule 07H .0208(a)(1) of this Section;
Consistent: The proposed development is consistent with the intent of this rule.
Based on my review of the applicable subsections of the North Carolina Administrative Code,
the permit application and plans, I recommend a permit be issued to Amit Gupta for the
development as proposed.
RECEIVED
OCT 2 9 2018
DCM-MHD CITY
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
October 5, 2018
MEMORANDUM
TO:
NORTH CAROLINA
Environmental Quality
Tim Walton, Director
State Property Office
RECEIVE®
OCT 09 2018
DOA
STATE PROPERTY
OFFICE
FROM: Doug Huggett, Major Pern its Coordinator
c/o Gregg Bodnar, Assistant Major Permits Coordinator
Division of Coastal Management
SUBJECT: CAMA Permit Application Review
Applicant: Amit Gupta
Project Location: 4065 Creek Road, Martins Point, Dare County
RECEIVED
NOV 0 2 2018
')CM-MHD CITY
Proposed Project: Construct a bulkhead, expand and roof an existing pier, construct a
boathouse with a lift, install jet -ski lift and a single-family residence
with pool.
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 10/26/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330).
If you have any questions regarding the proposed project, please contact Ron Renaldi at (252) 264-
3901. When appropriate, in-depth comments with supporting data are requested.
REPLY: This agency has no objection to the project as proposed.
✓ This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments. , >
SIGNED 1)&M-6t&' `' DATE Qcb-6A 2,0"2018
D_EQ7`A5
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1 401 South Griffin Street, Sulte 300 1 Elizabeth City, North Carolina 27909
252.2643901
ROY COOPER
Governor
MICHAEL S. REGAN
seaerary
BRAXTON C. DAVIS
Director
October 5, 2018
TO:
NORTH CAROLINA
Environmental Quality
Charlan Owens, District Planner
Division of Coastal Management
FROM: Doug Huggett, Major Permits Coordinator
c/o Gregg Bodnar, Assistant Major Permits Coordinator
Division of Coastal Management
SUBJECT: CAMA Permit Application Review
Applicant: Amit Gupta
Project Location: 4065 Creek Road, Martins Point, Dare County
Proposed Project: Construct a bulkhead, expand and roof an existing pier, construct a
boathouse with a lift, install jet -ski lift and a single-family residence
with pool.
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 10/26/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330).
If you have any questions regarding the proposed project, please contact Ron Renaldi at (252) 264-
3901. When appropriate, in-depth comments with supporting data are requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
S EC comments
SIG DATE o-I8-2o1b REIC NED
Nov 0 9 2018
North Carolina Department of Environmental Quality I Division of Coastal Management DCM-MHD CITY
Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolhna 27909
252.2643901
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
MEMORANDUM
NORTH CAROLINA
Environmental Quality
TO: Gregg Bodnar, Major Permits Processing Coordinator
Division of Coasol Management
FROM: Charlan Owen ICP, NE District Planner
Division of Coastal Management
SUBJECT: Major Permit Request by Amit Gupta to install 105 linear feet of vinyl bulkhead, a
20 foot by 20 foot terminus pier platform, a 12 foot by 10 foot boatlift, a 22 foot by
11 foot boathouse with a roof drip -line of 32 feet by 22 feet, a 10 foot by 4 foot jet -
ski lift, and an 8 foot by 3 foot floating kayak launch platform on Jean Guite Creek,
and construct a single-family dwelling with associated pool, driveway, and septic
system; on property located at 4065 Creek Road, within the Martins Point
Subdivision, in Dare County.
DATE: October 18, 2018
Consistency Determination: The request is consistent with/not in conflict with the Dare
County 2009 Land Use Plan certified by the CRC on February
24, 2011.
Overview: The subject property consists of a .64 acre vacant lot with 105 linear feet of shoreline
along Jean Guite Creek. Water depths within the creek at this location range from -.5 to -3 feet
below Normal Water Level (NWL). A 4 foot high erosion escarpment is located landward of NWL.
Site elevations are approximately 4 feet above NWL. The property has recently been cleared.
Existing shoreline improvements consist of a 6 foot wide by 63 foot long "T" head pier with a 10
foot by 20 foot terminus platform and 8 linear feet of bulkhead extending from the property to the
south. The subject property is primarily located within AE (EL 7) Floodzone, with Shaded X zone
in a portion of the interior.
Installation of 105 linear feet of vinyl bulkhead, a 20 foot by 20 foot terminus pier platform, a 12
foot by 10 foot boatlift, a 22 foot by 11 foot boathouse with a roof drip -line of 32 feet by 22 feet, a
10 foot by 4 foot jet -ski lift, and an 8 foot by 3 foot floating kayak launch platform, and construction
of a single-family dwelling with associated pool, driveway, and septic system are proposed.
Existing bulkhead will be replaced. Bulkhead alignment will extend from the southern property
line northward 75 feet to NWL, follow NWL for 22 feet to the northern property line, then return
landward for 16 feet. The bulkhead alignment will be an average of 4.4 feet waterward of NWL
with a maximum distance of 10 feet. The existing pier platform will be expanded. A roof will be
constructed over the platform and boatlift to create the boathouse. The jet -ski -lift will be installed
north of the platform and the floating kayak launch will be installed on the south side of the platform
RECEIVED
NOV 0 g 2018
North Carolina Department of Fmhonmental Quality I Divislon of Coastal Management
Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 D C M-M H D CITY
252.2643901
North Carolina Department of Environmental Quality
Division of Coastal Management
MEMORANDUM
Page 2 of 4
at the pier intersection. Two (2) slips will be created. The single-family dwelling and associated
site improvements will be constructed greater than 40 feet from the shoreline.
The waters of Jean Guite Creek are designated as Class SC waters, as inland Primary Nursery
Areas (PNA) by the NC Wildlife Resources Commission and are closed to shellfish taking. Jean
Guite Creek is approximately 973 feet wide at the project area. The bottom substrate within the
project area is made up of fine sands and is void of submerged aquatic vegetation (SAV). Based
on available information, there are no archaeological sites on or near the property.
Anticipated Impacts resulting from this project are expected to include: the filling of 459 sq. ft. of
Public Trust Area of Environmental Concern (AEC); the shading of 528 sq. ft. of Public Trust AEC,
and; the disturbance of 2,691 sq. ft. of Public Trust Shoreline AEC and .58 acre of Highground
outside of an AEC.
Basis for Determination:
The Dare County Land Classification Map identifies the subject property as "Community
Residential'. As indicated on Page 217, the "Conservation" designation applies to all CAMA
Areas of Environmental Concern (AECs) and all federal lands except for the bombing ranges on
the Mainland and some state - owned lands in Frisco and Buxton.
As indicated on Page 214 for the "Community Residential' designation, "(t)he Community
Residential classification is used to identify areas predominantly developed with low density
residential dwellings."
As indicated on Page 217 for the "Conservation" designation, "...development should be
limited to residential development and traditional accessory uses permitted in the CAMA AECs
such as but not limited to piers, docks, and crab - shedders." The purpose of the "Conservation"
classification is to provide for the effective long - term management and protection of significant,
limited, or irreplaceable areas. Land disturbing activities should not occur unless in conjunction
with an authorized development. Authorized development should include provisions and
conditions that minimize impacts to any natural, cultural, historic, and scenic values of the areas
authorized for development.
The following LUP policies may be applicable to this request.
Public Access:
Policy PA#1, Page 142.
"Dare County supports the preservation and protection of the public's right to
access and use of the public trust areas and waters."
RECEIVED
NOV 0 g 2018
DCM-MHD CITY
North Carolina Department of Environmental Quality
Division of Coastal Management
Land Use Comoatibility:
Policy LUC#3, Page 152.
"Residential structures shall be the preferred land use in unincorporated Dare
County for both seasonal accommodations and permanent housing. All new
residential structures, whether attached or detached, are encouraged to be
on a scale that is consistent with existing neighborhood patterns of
development."
Policy LUC#14, Page 159.
"Tree clearing and land disturbing activities on small residential lots or other
private property should be done prescriptively or according to the guidelines
of NC Cooperative Extension office or the UNC Coastal Studies Institute. The
use of fill material on private property, although not currently regulated by the
Dare County Zoning Ordinance, should be accomplished in a responsible
manner."
Archaeological/Historic Resources
Policy LUC#15, Page 159.
"The Dare County Board of Commissioners supports the protection of
structures, lands, and artifacts that have been identified by the NC
Department of Cultural Resources, Division of Archives and History, as
archaeologically or historically significant. On a case -by -case basis individual
protection/management strategies should be implemented to ensure
archaeological and/or historical resources are not destroyed."
Natural Hazards:
Estuarine Systems
Implementation Strategy, Page 180.
.11. Rely on existing CAMA AEC regulations to address
development activities along the ocean beaches, estuarine
shoreline, and other public trust areas in unincorporated Dare
County..."
MEMORANDUM
Page 3 of 4
RECEIVED
NOV 0 g 2018
DCM-MHD CITY
North Carolina Department of Environmental Quality
Division of Coastal Management
Policy NH#5, Page 181.
"Dare County supports, as minimum standards, the administration and
enforcement of all applicable floodplain management regulations and the
National Flood Insurance Program..."
Water Quality:
Policy WQ#2, Page 188.
"Development projects shall be designed and constructed to minimize
detrimental impacts on surface water quality, groundwater quality, and air
quality. Structures should be designed to fit the natural topographic conditions
and vegetation versus modifications to natural conditions to accommodate
structures."
Policy WQ#5, Page 190.
"Efforts to manage stormwater runoff should be based on local conditions and
natural features..."
Fisheries Resources
Policy WQ#11, Page 193.
"Dare County recognizes the importance of our surrounding waters that serve
as habitats for the area's abundant fisheries resources. The continued
productivity of Dare County's fisheries shall be fostered through restoration
and protection of the unique ecosystems upon which they depend. Dare
County supports measures to protect and preserve designated primary
nursery areas by the Division of Marine Fisheries..."
MEMORANDUM
Page 4 of 4
RECEIVED
NOV 0 9 7018
DCM-MHD CITY
NORTH CAROLINA
ROY COOPER Envhvamenrol Qua ft
oovenW
HCHAEL S. REGAN
sem"Iy
UNDA CULPEPPER
bt&Vft D&Wtor December 07, 2018
DWR Project # 2018-1396
Dare County
Amit Gupta
PO Box 90
Kill Devil Hills, North Carolina 27948
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS
4065 Creek Road; Kitty Hawk, NC; Martins Point subdivision — Construct a bulkhead,
expand and roof an existing pier, construct a boathouse with a lift, install jet -ski lift.
Dear Mr. Gupta:
You have our approval for the impacts listed below for the purpose described in your application dated
September 4, 2018 and received by the Division of Water Resources (Division) on October 12, 2018. These
impacts are covered by the attached Water Quality General Certification Number 4144 and the conditions
listed below. This certification is associated with the use of Regional General Permit Number 291 once it
is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal,
state or local permits before proceeding with your project, including those required by (but not limited
to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations.
This approval requires you to follow the conditions listed in the enclosed certifications) or general
permit and the following additional conditions:
1. The following impacts are hereby approved, provided that all the other specific and general
conditions of the Certification are met. No other impacts are approved, including incidental
impacts. (15A NCAC 02B .0506(b)(c))j
Type of Impact
Amount Approved
(units)
Permanent
Amount Approved
(units)
Temporary
Plan location/
Reference
Attached
Open Waters
OW1— boat lift
0.01(acres)
0 (acres)
Sheet 1 of 1
Wetlands
W1-fill
0.01(acres)
0 (acres)
Sheet 1 of 1
North Carolina Department of Fnvironmental Quality Division of Water Resources - Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889
252-946-6481
2. Water Quality Certification
The proposed project must comply with all the conditions of the General Water Quality
Certification(s) 4144. [15A NCAC 02B .0507(c)]
Continuing Compliance
3. During construction of the proposed project, fueling, lubrication and general equipment
maintenance should not take place within 50 feet of a waterbody or wetlands to prevent
contamination by fuel and oils. 115A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200
(3)(f)]
4. The permittee shall report to the Washington Regional Office any noncompliance with this
certification, any violation of stream or wetland standards [15A NCAC 02B .02001 including but
not limited to sediment impacts, and any violation of state regulated riparian buffer rules [15A
NCAC 02B .0200]. Information shall be provided orally within 24 hours (or the next business day
if a weekend or holiday) from the time the applicant became aware of the circumstances. A
written submission shall also be provided within 5 business days of the time the applicant
becomes aware of the circumstances. The written submission shall contain a description of the
noncompliance, and its causes; the period of noncompliance, including exact dates and times, if
the noncompliance has not been corrected, the anticipated time compliance is expected to
continue; and steps taken or planned to reduce, eliminate, and, prevent reoccurrence of the
noncompliance. The Division may waive the written submision requirement on a case -by -case
basis.
5. This approval and their conditions are final and binding unless contested. [G.S. 143-215.51
These Certifications can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a
written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as
OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH
Clerk's Office at (919) 431-3000 for information.
Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition
is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received
in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding
official state holidays).
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition
along with any applicable OAH filing fee is received by the OAH within five (5) business days following the
faxed transmission.
North Carolina Department of Environmental Quality [Division of Water Resources- Washington Regional Office
943 Washington square Mall, Washington, North Carolina 27889
252-946-6481
Mailing address for the OAH:
If sending via US Postal Service: If sending via delivery service (UPS, FedEx,
etc.):
Office of Administrative Hearings Office of Administrative Hearings
6714 Mail Service Center 1711 New Hope Church Road
Raleigh, NC 27699-6714 Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to DENR:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division under section 401 of the Clean Water Rules. Please
contact Chris Pullinger at 252-948-3922 or chris.pullinger ncdenr.eov if you have any questions or
concerns.
Sincerely,
11ahka "
David May, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Enclosures: GC4144
Certification of Completion
cc: Josh Pelletier, USACE Washington Regulatory Field Office (via e-mail)
Ron Renaldi, DCM Elizabeth City Regional Office (via e-mail)
Gregg Bodnar, DCM Morehead City (via e-mail)
George Wood, Environmental Professionals, Inc. (via e-mail: obxwood(@Vahoo.com)
DWR WaRO 401 files
Laserfiche
DES
North Carolina Department of Environmental Quality IDivision of Water Resources- Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27989
252-946-6481
Jean Case Greek.
FROPOM IOk
TEE HEM
R7
a.S4.j¢N(• FlLL AM
n
NLOT 17
LOT 17
I
mile
aca-a sxmx'.r
rAtmsrtwr
Wji'EaW4p4YARFMA9
OHA = SCATS 1' - SO'
f
Z 9
CJF 0
Received
5YS4203
DCM-EC
ATLANTIC
OCEAN
D 22'a V (704 S.F.)
TEE HEAD & BOATUFT
will
'
arar a =2W r
wP
"mlA 'e r
-
mmCutoLmommomN
MPCU[
" W DFSODPCE9.
vmp.*
r
aLLVN®TIDC
I99&0133Y1
AI'
PROJECT NOTES:
TOTAL FILL AREA- 459 S.F.
MAN. DISTANCE FROM N.W.L-10'
AFNACE DISTANCE FROM N.W.L- Yf
.Y a1a44 a R. 24.
R.F.0.
Q�Y Y o/ry10% o—1@Y�39 eaA1fMF 6vTA MD RRarm
uAMA NIAl1UK r'tKMI I mrru .A IIUN rUK
AMIT GUPTA
4065 CREEK ROAD, MARTINS POINT,N.C. 27949
LOT 17, BLOCK 6, SECTION 1, MARTIN'S POINT
DARE COUNTY, N.C.
0u
1 > I
ISIMMOWTAL
Planning for a Better Envlronment
1404 S. "to Dora Trall
P.O. BOX 3388 - KILL DEVIL WLLS, NO 27948
MCNEOW)4*0319 FAMZ4*a>'YI
Sit- U
January 7, 2018 W L(7(14
Regulatory Division
Action ID No. SAW 2017-01394
Mr. Doug Huggett
Division of Coastal Management
North Carolina Department of Environment
and Natural Resources
400 Commerce Avenue
Morehead City, North Carolina 28557-3421
Dear Mr. Huggett:
RECEIVED
JAN 7 2019
PIP SECTION MHD
Reference the application of Mr. Amit Gupta for Department of the Army construct
approximately 105 linear feet of bulkhead, to tie into two adjacent bulkheads, an average of 4.4
feet waterward of NWL, expand an existing platform to 20' x 20', install a roof over the platform
and boatlift and install a 10' x 4' jet -ski lift at 4065 Creed Road, adjacent to Jean Guite Creek,
Kitty Hawk, Dare County, North Carolina.
The Federal agencies have completed review of the proposal as presented by the
application and your field investigation report.
We recommend that the following conditions be included in the State authorization:
1. All work authorized by this permit must be performed in strict compliance with the
attached plans, which are a part of this permit. Any modification to these plans must be approved
by the US Army Corps of Engineers (USACE) prior to implementation.
2. The permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structure or work herein authorized, or
if, in the opinion of the Secretary of the Army or his authorized representative, said structure or
work shall cause unreasonable obstruction to the free navigation of the navigable waters, the
permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove,
relocate, or alter the structural work or obstructions caused thereby, without expense to the
United States. No claim shall be made against the United States on account of any such removal,
relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE
Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910-
3282 at least two weeks prior to beginning work and upon completion of work.
JAN 7 2019
MP SECTION MHD
3. Except as specified in the plans attached to this permit, no excavation, fill or mechanized
land -clearing activities shall take place at any time in the construction or maintenance of this
project, in such a manner as to impair normal flows and circulation patterns within waters or
wetlands or to reduce the reach of waters or wetlands.
4. Except as authorized by this permit or any USACE approved modification to this
permit, no excavation, fill or mechanized land -clearing activities shall take place at'any time in
the construction or maintenance of this project, within waters or wetlands. This permit does not
authorize temporary placement or double handling of excavated or fill material within waters or
wetlands outside the permitted area. This prohibition applies to all borrow and fill activities
connected with this project.
5. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands
shall be generated from an upland source and will be clean and free of any pollutants except in
trace quantities. Metal products, organic materials (including debris from land clearing
activities), or unsightly debris will not be used.
6. The authorized structure and associated activity must not interfere with the public's right
to free navigation on all navigable waters of the United States. No attempt will be made by the
permittee to prevent the full and free use by the public of all navigable waters at or adjacent to
the authorized work for reason other than safety.
7. The permittee shall advise the Corps in writing at least two weeks prior to beginning the
work authorized by this permit and again upon completion of the work authorized by this permit.
8. The permittee shall require its contractors and/or agents to comply with the terms and
conditions of this permit in the construction and maintenance of this project, and shall provide
each of its contractors and/or agents associated with the construction or maintenance of this
project with a copy of this permit. A copy of this permit, including all conditions, shall be
available at the project site during construction and maintenance of this project.
9. The permittee shall employ all sedimentation and erosion control measures necessary to
prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit
area. This shall include, but is not limited to, the immediate installation of silt fencing or similar
appropriate devices around all areas subject to soil disturbance or the movement of earthen fill,
and the immediate stabilization of all disturbed areas. Additionally, the project must remain in
full compliance with -all aspects of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statutes Chapter 113A Article 4).
10. The activity will be conducted in such a manner as to prevent a significant increase in
turbidity outside the area of construction or construction -related discharge. Increases such that
the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by
the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all
saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not
considered significant.
11. Violations of these conditions or violations of Section 404 of the Clean Water Act or
Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District
U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation.
Questions or comments may be addressed to Mr. Josh Pelletier, Washington Field Office,
Regulatory Division, telephone (910) 251-4605.
Sincerely,
Josh Pelletier
Regulatory Project Manager
Copies Furnished:
Mr. Ian McMillan
North Carolina Division of Water Quality
1650 Mail Service Center
Raleigh, North Carolina 27699-1650
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636-3726
Mr. Ken Riley
National Marine Fisheries Service
Habitat Conservation Service
101 Pivers Island Road
Beaufort, North Carolina 28516
Mr. Jeffrey Garnett
Wetlands and Marine Regulatory Section
Water Protection Division -Region IV
U.S. Environmental Protection Agency
61 Forsyth Street, SW
Atlanta, Georgia 30303
RECEIVED
JAN 7 2019
MP SECTION MHD
Frank Jennings, District Manager
Washington Field Office
North Carolina Division of Coastal Management
RECEIVED
JAN 7 2019
I' h SECTION 19 HD
—This is a word processing form to be completed in Microsoft Word***
NC, Division of Coastal Management
Major Permit Application Computer Sheet
(1110112012)
Applicant: Amit Gupta
Date: October2, 2018
Project Site County: Dare
Staff.. Ron Renaldf
District: ®Elizabeth City El Washington
❑Morehead City ❑Wilmington
Project Name:
Rover File:
Date o/ initial application submittal (EX. • 11Y2007),, 911012018
Date application "received as complete" in the Field office (EX: 11812007): 912412018
Permit Authorization: ®CAMA ❑Dredge & Fill ❑Both
SITE DESCRIPTION/PERMIT INFORMATION
PNA: ® Yes No
Photos Taken: Yes ®N
Setback Required (riparian): ❑ Yes
No
Critical Habitat: ❑ Yes ❑ No ❑ Not Sure
15 foot waiver obtained: Yes 0 No
Hazard Notification Returned:
El Yes ®No
SAV E]Yes ®No ❑Not Sure
Shell Bottom: []Yes ®No ❑ Not
Temporary Impacts: ®Yes No
Sure
Sandbags: Yes ®No ❑ Not Sure
Did the land use classification come from
Mitigation Required (optional):
county LUP:®Yes [I No
El Yes ®No
Moratorium Conditions: ❑Yes ®No
Environmental Assessment Done:
❑NA
❑Yes ❑No®NA
SECONDARY WATER CLASSIFICATION - OPTIONAL (choose MAX of 4)
❑ Future Water Supply (FWS)
Nutrient Sensitive Waters (NSW)
Swamp Waters (SW)
❑ High Quality Waters (HOW)
LJ Outstanding Resource Waters (ORWI
WETLANDS IMPACTED
❑ (404) Corp. of Engineers (Jurisdictional
❑ (LS) Sea lavender (Limonium sp.)
❑ (SS) Glasswort (Salicomia Sp.)
wetlands)
❑ (CJ) Saw grass (Cladium jamaicense)
❑ (SA) Salt marsh cordgrass (Spartina
(SY) Satt reed grass (Spartina
attemitlora)
cynosuroides)
❑ (DS) Salt or spike grass (Dishchlis
(SC) Bullrush or three square (Scirpus
(TY) Cattail (Typha sp.)
spicata)
Sp.)
❑ (JR) Black needterush (Juncus
❑ (SP) Satt/meadow grass (Spartina
roemerianus)
patens)
APPLICATION FEE
❑ No tee required - $0.00
M III(A) Private w/ D&F up to 1 acre;
❑ III(D) Prtv. public or comet w/ D&F to 1
3490 can be applied - $250
acre; 3490 cant be applied - $400
❑ Minor Modification to a CAMA Major
Major Modification to a CAMA Major
IV Any development involving D&F o/
permit - $100
permit - $250
more than 1 acre - $475
❑ Permit Transfer - $100
❑ III(B) Public or commercial w/ D&F to 1
Express Permit - $2000
acre; 3490 can be applied - $400
❑ Major development extension request -
❑ 11. Public or commercial/no dredge
RECEIVED
$100
and/or fill - $400
❑ 1. Private no dredge and/or fill - $250
M III(C) Priv. public or comm w /D&F to 1
OCT 12 2W
acre, 3490 can be applied, DCM needs
DWQ agreement - $400
uvw,-,.,...
252.808.2808 :: 1-888-4RCOAST :: www.nccoastalmanaaement.net revised: Nov. 2012
NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) s
Applicant: Amit Gupta
Date: October2, 2018
Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of
measurement found in your Activities code sheet
TYPE
REPLACE
Activity Name
Number
Choose
Choose
Dimension 1
Dimension 2
Dimension 3
Dimension 4
One
One
Boat lift
1
New Work ®
Replace
12
10
Maint ❑
❑ Y ON
New Work ®
Replace
Boat lift
1
Maint ❑
❑ Y ON
10
4
Boat slips
2
New Work ®
Replace
2
Maint ❑
❑ Y ® N
Platform
1
New Work ®
Replace
20
10
Maint ❑
❑ Y ® N
Platform
1
New Work ®
Replace
8
3
Maint ❑
❑ Y ON
New Work ®
Replace
Boathouse
1
Maint ❑
❑ Y ® N
22
11
Bulkhead (not
1
New Work ®
Replace
105
1
4
4.4
nwl vinyl)
Maint El
❑ Y ON
Fill (shoreline
1
New Work ®
Replace
13
stab below nwl)
Maint ❑
❑ Y ON
High Ground
1
New Work ®
Replace
105
30
Disturbance
Maint El
❑ Y ON
New Work ❑
Replace
Maint❑
❑Y❑N
New Work [:1
Replace
Maint❑
❑Y❑N
'
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work ®
Replace
Maint ❑
❑ Y ON
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint I--]
❑Y❑N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint❑
❑Y❑N
New Work❑
Replace
Maint ❑
❑ Y ❑ N
New Work❑
Replace
Maint [I
❑ Y ❑ N
revised Nov. 2012
NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3)
Applicant: Amit Gupta
Date: October2, 2018
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. FL
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temD im cts)
FINAL Sq. Ft
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
ternimpacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration andror
temp impact
amount
Open water
Dredge ❑ Fill [IBoth ❑ Other
528
528
Shallow Bottom
Dredge ❑ Fill ® Both ❑ Other ❑
459
459
Shoreline
Dredge ❑ Fill ® Both ❑ Other ❑
105
105
High Ground
Dredge ❑ Fill ❑ Both ❑ Other ®
Z691
Z691
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
RECEIVED
OCT 12 2018
DCM-MHD CITY
252-808-2808 :: 1-8884RCOAST :: yr w.nccoastalmanaaement.net revised: Nov. 2012
ROY COOPER NORTH CAROLINA
Governor fnHronmental Quality
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS Director September 18, 2018
George Wood
Environmental Professionals, Inc.
PO Box 3368
Kill Devil Hills, NC 27948
Re: Gupta Major Permit Application for a Bulkhead & Docking Facility at 4065 Creek Rd.
Dear Mr. Wood:
The NC Division of Coastal Management hereby acknowledges receipt of your application on September 7,
2018, for State approval for the development of the referenced project. An initial screening of the submittal
package has been conducted as per 15A NCAC 07J.0204. This revealed certain deficiencies, which must be
corrected before the application package can be accepted as complete. To assist you in expediting the
permitting process as much as possible, I am notifying you of these deficiencies immediately so that they can
be quickly corrected to facilitate my detailed review. Please also refer to my September 6, 2018 and
September 11, 2018 emails in regard to an incorrect normal water level displayed on the site plan.
Because the deficiencies are easily correctable, I am not returning the entire original application package.
Please make the needed changes, and submit the appropriate documentation. With the retained copy of the
application, I can commence the detailed review. Please understand that the subsequent detailed review
may reveal additional areas where further information or documentation is required to demonstrate
compliance with the rules directly applicable to the proposed development. If this occurs, you will be notified
of such issues separately.
Our initial screening has identified the following deficiencies:
1. Not all questions on the application have been answered or indicated as "not applicable" Please
address the following items:
■ Form DCM-li
- Number 3(f), the planning jurisdiction is Dare County
- Number 4(b&c), the application lists the Lot size as 30,500 ft2 while the site plan
lists the Lot size as 28,050 ft. Please correct one or the other.
- Number 5(d), The application indicated that the existing pier and platform will be
rebuilt. Please add this to the narrative and indicate this on the site plan.
Form DCM-MP-2:
- Number 3, As indicated in my September 6, 2018 email to you, the normal water
level (NWL) displayed on the site plan is not correct and needs to be accurately
shown on the plan. The corrected NWL will change the values for the bulkhead
alignment average and maximum distances as well as the bulkhead
bac t-ea.
REMODE S E P 2 5 R",
North Carolina Department of Environmental Quality Division of Coastal Management DCM-MHD Cl-
Elizabeth City Office 1 401 South Griffin Street, Suite 3011 Elizabeth City, North Carolina 27909
George Wood
September 18, 2018
Page 2 of 2
■ Form DCM-MP-4:
- Number 1(c), move the 8x3 floating kayak platform dimensions to Number 1(e).
- Number 1(f), indicate the boatlift piling dimensions, which appear to be 12'x10'
per the site plan.
- Number 3, the boathouse dimensions should include the drip line (22'x11').
- Number 7(b), taking into consideration the boathouse, I get a measurement of
±66' to the adjacent docking facility to the south.
2. Adequate Work Plans or Drawings have not been submitted. Please address the following items:
■ A Plan View must be submitted that:
- Distinguishes between existing and proposed features; specifically indicate if the
existing pier and platform as being proposed to be replaced.
- Indicates approximate location of flagged Normal Water Level per September 6,
2018 site visit.
3. A Narrative Description of the proposed development was provided, but please add that the existing
pier and platform are to be replaced as indicated on MP-1 number 5(d).
4. Documentation of Notification of Riparian Property Owners must be provided. Please submit the
signed Certified Return -Mail Receipt for the notification to Randall Jones.
To expedite our response to your permitting request, we will commence the detailed review of your application
for a permit pending the receipt of the additional information requested above. However, the statutorily
provided 75/150 days allowed for review cannot commence until such time as we have received a complete
application package. Once your application has been accepted as complete, you will receive a separate
notification letter.
If it is not possible to render a permit decision within 70 days of the date when your application is received
complete, you may request a meeting with the Director of the Division of Coastal Management and permit
staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt
of your written request and shall include the property owner, developer, and project designer/consultant.
Please do not hesitate to contact me at our Elizabeth City office (252 264 3901) if you have any questions
regarding this letter or the permitting process.
Sincerely,
Ron Renaldi
Field Representative
Division of Coastal Management
cc: Greg Bodnar, Assistant Major Permits Coordinator, DCM, Morehead City
Frank Jennings, District Manager, DCM, Elizabeth City
Amit Gupta, Applicant, Kill Devil Hills
Jean GA to creek
PROPOSED 10k 20
sz
`\
TEE HEAD
� -y—iqa PROPOSED 10'x 20'
b
,3 BOATUF1
SI,pMI
F-
1
PROPOSED
ry�
PROPOSED 22'x 32' (704 S.F.)
0
0
4 M
JET SKI
COVERED TEE HEAD do BOATUFT
_
LIFT
b,.pf 1l
mmG
I
Lu
f
10'x
Lu
"
2
SITE
Pam'SLaE9I
+'NO
PROPOSED
I
0
, om
®ly®FLOATING
NI
R KAYAK LAUNCH
Jw Ri°%s 8ROE1L RAN�US/
74.0
VICINITY MAP
M
i
knu1e
LOr 18
scarf 4 x0m+v 1
MAR7NV PMr
P.CBSL&V
R/F oaVA[D & AbWY RO"
L�
'0
ak:
0 15 ]0 50
GRAPHIC SCALE 1' = 30'
FILL AREA
459 S.F._j
Pam/ IFF
LOT 17
28,050 S.F.
pm
OW
(I
TWO STORY B BEDROOM
SINGLE FAMILY DWELUN
=L;i
I
Received
S- P, G 4 /.Intl
DCM-EC
1' 0.1
1•►
• ; • AI
[or m
Brow A SEC70V 1
MAND0 PAWr
PC 0 S. J29
R/r R.WIDAIL AWS
PILE
L 1 rAIML
BULKHEAD SECTION
M1w
PROJECT NOTES:
TOTAL FILL AREA- 459 S.F.
MAX. DISTANCE FROM N.W.L.= 10'
AVERAGE DISTANCE FROM N.W.L.= 7't
-V5WA- r %w WAN t4.4'
R.A.R.
REV 2: 9/19/18 - REVISED SUM M AND PROJECT NOTM
REV 1: 9/15/18 - REVSED NVA. AND PROJECT N01E8.
CAMA MAJOR PERMIT APPLICATION FOR
AMIT GUPTA
4065 CREEK ROAD, MARTINS POINT,N.C. 27949
LOT 17, BLOCK 6, SECTION 1, MARTIN'S POINT
DARE COUNTY, N.C.
y.••v. OA16 dune rxoaer Nrt °o"
BYHROAAdElIC
r.ao• •/1e/1s K.a 1•-0.7• 1 a 1
AL PROFM OI VAL A AC
Planning for a Better Environment
1404 S. Vlrgtnta Dare Tra1
P.O. BOX 3388 —KILL DEVIL HILLS, NC 27M
PhVW MW 44RM PAX (SSA! 44POW
PROPOSED 10'x 26
TEE HEAD q^,K'71 A: PROPOSED 1O'x 20'
\PROSED r7r,
PROPOSED 22'x 32' (704 S.F.)
SKI _COVERED TEE HEAD & BOATLIFT
T 34aI e', 2t av
74.0'/ /I ia�isxRaomeuws/'
w�-f
for 1e
soar 4 wo m 1
ILWAVS PCwr
N/F wmD & awr A161£P'
f:J
;Awl i-vn � FILL AREA
/ i' 459 S.F.
NORMAL WAiEW I I ��
11
V I
I 1
uvsear,E,ve
LOT I
28,050 S.F.
vaa
�I
�I 1 �
PROPOSED
TWO STORY 6 BEDROOM
SINGLE FAMILY DWEWNG(
Q"m WAM
TN•
r, � i
'0
a4:
0 15 80 50
GRAPHIC SCALE: 1" — 30'
.m•. wm
R@C@IV@d
5: N 2 4 200
®CM -EC
0
W
U
W
Ir
LOT 18
8LOar A 2rmW /
MANAVT POW
PC B SC..TTB
N/f RNDAIL d'NES
i
OCINITY MAP
N.T.S.
yX•il[•7►i:
maw
�L:�L:�/.l
PILE
PROJECT NOTES:
TOTAL FILL AREA= 459 S.F.
MAX. DISTANCE FROM N.W.L.= 10'
AVERAGE DISTANCE FROM N.W.L.= 7'f
ASWA- �1w1.%V� t. 4.4'
R.A.R.
REV 2. 9/19/18 - REVISED BULKHEAD AND PROJECT NOTES
REV 1: 9/15/15 - REVISED NVA. AND PROJECT NOTES
CAMA MAJOR PERMIT APPLICATION FOR
AMIT GUPTA
4065 CREEK ROAD, MARTINS POINT,N.C. 27949
LOT 17, BLOCK 6, SECTION 1, MARTIN'S POINT
DARE COUNTY, N.C.
i•.ao s%Is/1s� N a ' 1s we om1 a 1
BVWXMOvrAL PROFESSONAL4 MC.
Planning for a Better Environment
1404 S Vk Io Dwe Trap