Loading...
HomeMy WebLinkAboutNTBEX_13-54_ Policechelli (2)A.— V\-) NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis John E. Skvarla, III Governor Director Secretary May 1, 2013 Exemption Number — NTBEXI3-54 Joe Policechelli 220 Topsail Road North Topsail Beach, NC 28445 RE: EXEMPTED PROJECT (MINOR) EXEMPTION STRUCTURAL ACCESSWAY (15A NCAC 7K .0207) — Exemption# NTBEX13-54 220 Topsail Road, North Topsail Beach, NC AREA OF ENVIRONMENTAL CONCERN — Ocean Hazard AEC Dear Mr. Policechelli: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. Based on the information provided, I have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing dated received by DCM on 4/30/2013, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. STRUCTURAL ACCESSWAY EXEMPTED (1) The accessway must not exceed six feet in width and shall provide only pedestrian access to the ocean beach. (2) The accessway must be constructed so as to make negligible alterations to the frontal dunes. This means that the accessway must be constructed on raised posts or pilings of five feet or less in depth, so that wherever possible only the posts or pilings touch the frontal dunes without any alteration to the dunes. In no case shall the frontal dune be altered so as to significantly diminish its capacity as a protective barrier against flooding and erosion. (3) Construction of the accessway be shall consistent with all other applicable local ordinances and N. C. Building Code standards. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization. This exemption expires 90 days from the date of the letter. i cerely, XJas`oi-n-/DaiI, LPO Cc: DCM — WIRO Terrie Woodle, Town of North Topsail Beach 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX:910-395-3964 Internet: www.nccoastalmanagement.net Please Fill out Form COMPLETELY Permit Number BUILDING PERMIT APPLICATION North Topsail Beach 2008 Loggerhead Court North Topsail Beach, NC 28460 910-328-3186 Project Owner Name ob C PO L # Mailing Address '70eS ,6,f IIIJ 6 Signature Telephone Number 301 - S--zl(q . 3c0 � General Contractor col—) S� J N.C. License Number `` Expiration Date Local Privifege License 3 �J✓ Contact Number %� b ,3 L99 l 9 Signature Date Square Foo#age Estimated cost of Project Neafed Unheated 6w c,-- Description of M/Work 6OL40 �'i12.e)S.h-- !� E�yIJ ji�lir ci f �� ,�•1,�J1L �1 L,i.(�f 1, nrir ` � n.►f ;Ya-t,(_ ►7�'vii d�/.�4 S' l��.o•'v�''l For Office use Only *x $100.00 fine for not scheduling a final insl Additional Comments Issued By Date approved Receipt Number Building Permit Fee PIG/CIF Permit Fee Additional Fees TOTAL RECEIVED ectlon** ZONING FL®®®PLAIN DEVELOPMENT APPLIC j MO i VALID UNLESS SIGNED BY APPLXCAIIT APPLICATION Application shall be made prior to any development activities located within the Town of North Topsail Beach. The following Items may be required with the application fora zoning and floodplain development permit: 7 A plot plan drawn to scale, 7 V-zone Certification with accompanying plans and specifications verifying the engineered structure and any breakaway wall designs; and 7 an Elevation Certificate, I HEREBY CERTIFY THAT 1) ALL INFORMATION IN THIS APPLICATION IS CORRECT AND ALL WORK WILL COMPLY WITH NTB TOWN CODE AND ALL OTHER APPLICABLESTATE AND LOCAL LAWSAND ORDINANCES AND REGULATIONS. THEPLANN/NG DEPARTMENT WILL BE NOTIFIED OF ANY CHANGES IN THE APPROVED PLANS AND SPEC/FICATIONS FOR THE PROJECT PERMITTED HEREIN; 2)1 FURTHERMORE CERTIFY THA T/ AM AUTHORIZED TO GRANT AND DO IN FACT GRANT PERMISSION TO NTB ZONING & FLOODPLAIN ADMINISTRATOR AND HIS ER HER AGENT(S) TO ENTER ON THE PROPERTY NOTED D THE NIB PERMITS) FOR THE PURPOSE OF INSPECTIONS; 3) I, THE UNDERSIGNED, UNDERSTAND THAT THE ISSUANCE OFA SUPPFLOOORTING DATA DEVELOPMENT PERMIT' IS CONTINGENT UPON THEABOVE INFORMATION BEING CORRECTAND THAT THE PLANS AND SUPPORTING DATA HAVE BEEN OR SHALL BE PROVIDED AS REQUIRED. I ALSO UNDERSTAND THAT THE PRIOR TO OCCUPANCY OF THE STRUCTURE BEING PERMITTED, AN ELEVATION AND/OR FLOODPROOFING CERTIFICATE SIGNED 8Y A PROFESSIONAL ENGINEER OR REGISTERED LAND SURVEYOR MUST BE ON FILE WITH THE INSPECTION DEPARTMENT INDICATING THE "AS BU/1T" ELEVATIONS IN RELATION B MEAN SEA LEVEL (MSL). 4) . AM THE OWNER/AGENT/CONTRACT PURCHASER/LESSEE (CIRCLE ONE) AND BY SIGNATURE AUTHORIZFSUBMlTMAL OFTHISAPPLICATION. OWNER_ PUI,I (,ECyt(%t,C,{ ADDRESS L 7 .tJ � Pi/}�1 L, j•l, � NATU jE _ � ,� HONE O) • r% Iri qTY �f STATE ZfP � �f s1 EMApIL,�- APPLICANT ' H/� S N' G W r e4j 3USiNESS t,✓�GN0 � J G7tl SIGNATURE WDRESS 303 'HONE • C.>�oSs n 0 • `I W ✓)!\ CITY �-k�LU f 1CipGC STATE^ZIP Z �{ EMAIL ITE DATA HYSICALADDRESS_ a2,j 7,- ONING SETBACKS: FRONT(FT):—� TAX PARCEL ID # DTSIZE (SQ FT) TOTAL PROPOSED IMPERVIOUS( SURFACE (SQ FT) REAR(FT): OTHER(FT):_,. 'PLICATION FOR THE FOLLOWING DEVELOPMENT ONLY: . Excavation ❑ Road construction Residentlai Construction Fill ❑ Driveway Construction KWnresidentlal Construction ❑Replace HVAC Grading INCLUDEEN©SWPLANS ❑Additlon ❑Mechanfcal/Electdcal Utility Construction El Renovation ❑ Other (specify): SCRIPTION OF M DATA: )OD MAP#' FLOOD ZONE: ❑ VE [] AE :(FT): Regulatory flood elevation plus 2FTfreeboard (FT): CBRS: [] YES 0 NO IUCTURE BUILT AFTER JULY 2,1987 [] YES ❑ NO 1ELOPMENT STANDARDS DATA: o ELEVATION IN RELATION TO MEAN SEA LEVEL (MSL) AT OR ABOVE WHICH THE LOWEST FLOOR (INCLUDING BASEMENT) MUST BE CONSTRUCTED Fr. o ELEVATION IN RELATION TO MEAN SEA LEVEL (MSL) AT OR ABOVE WHICH ALL ATTENDANT UTILITIES TO INCLUDE, BUT NOT LIMITED TO, ALL HEATING, AIR CONDITIONING AND ELECTRICAL EQUIPMENT MUST BE INSTALLED • WILL GARAGE BE USED FOR ANY PURPOSE OTHER THAN PARKING VEHICLES, STORAGE OR BUILDING ACCESS? YES • PROPOSED METHOD OF ELEVATING THE STRUCTURE ❑ NO a WILL ANY WATERCOURSE BE ALTERED OR RELOCATED AS A RESULT OF THE PROPOSED DEVELOPMENT? YES ❑ NO o TOTAL AREA OF OPENINGS REQUIRED:- (1 SQ. INCH PER SQ. FT OF ENCLOSED FOOTPRINTAREA BELOW BFE).