Loading...
HomeMy WebLinkAbout10153- ATLANTIC SHEETS 2-4 REVISEDWHITE POINT DREDGE MATERIAL PLACEMENT SITE, SEE SHEET 5 15' BREAK FOR TIDAL FLUSHING AND FISH PASSAGE, SEE TYPICAL SECTION SHEET 10 ENGINEERED WAVE ATTENUATORS, TYP SEE DETAIL SHEET 10 APPROX LIMITS OF DREDGING INCLUDING SIDE SLOPE, TYP GRANITE ROCK SILL, SEE TYPICAL SECTION SHEET 10 N:422,467 E:2,799,251 USACE SETBACK LINE N:424,107 E:2,799,831 N:424,411 E:2,799,201 N:423,925 E:2,800,003 N:423,880 E:2,800,024 N:423,583 E:2,799,981 CHANNEL BASE IMPACT AREA 6+008+0010+0012+0014+0016+0018+0020+0022+002 4 + 0 0 32 + 0 0 30 + 0 0 28 + 0 0 26 + 0 0 N:423,775 E:2,799,950 NO DREDGE MATERIAL PLACEMENT LANDWARD OF USACE EASEMENT LINE N:424,087 E:2,800,376 USACE EASEMENT LINE ATLANTIC HARBOR MAINTENANCE DREDGING & LIVING SHORELINE MLLW MOFFATT & NICHOL CARTERET COUNTY NAVIGATION PROJECT REVISED - JANUARY 2020 11 PROJECT SITE PLAN 2 LEGEND DREDGE IMPACT LIMITS USACE SETBACK LINE MAINTENANCE CHANNEL BASELINE MAINTENANCE CHANNEL BASE IMPACT AREA MAINTENANCE CHANNEL SIDE SLOPE IMPACT AREA GRANITE ROCK SILL 150'0'150'300' SCALE: 1''=300' 1.ATTENUATORS SHOULD BE CONSTRUCTED SIDE BY SIDE TO SPAN 25' IN TOTAL LENGTH PER STRUCTURE. 2.ATTENTUATORS SHOULD BE CENTERED ON THE 15' TIDAL GAP TO ENSURE A 5' OVERLAP OF THE STRUCTURE PER SIDE. 3.ATTENUATOR STRUCTURE SHOULD BE POSITIONED 5' SEAWARD OF GRANITE ROCK SILL SCOUR ROCK. 4.WAVE ATTENUATORS SHALL INCLUDE A LIGHTED AID TO NAVIGATION (ATON) AT LOCATIONS AS SHOWN ON SHEET 8. WAVE ATTENUATOR CONSTRUCTION NOTES: WHITE POINT DREDGE MATERIAL PLACEMENT SITE, SEE SHEET 5 USACE SETBACK LINE APPROX LIMITS OF DREDGING INCLUDING SIDE SLOPE, TYP 6+008+0010+0012+0014+0016+0018+0020+0022+002 4 + 0 0 32 + 0 0 30 + 0 0 28 + 0 0 26 + 0 0 N:422,467 E:2,799,251 CHANNEL BASE IMPACT AREA N:424,107 E:2,799,831 N:423,925 E:2,800,003 N:423,880 E:2,800,024 N:423,583 E:2,799,981 N:424,411 E:2,799,201 Maintenance Dredge Control Table Station Azimuth (˚)Depth (MLLW)Width (FT)Side Slope (H':V')Dredge Density (cy/ft) Cummulative Volume (CY) 6+00 123.17 -6 MLLW +1 40 5:1 0.6 7+00 123.17 -6 MLLW +1 40 5:1 0.8 59 8+00 123.17 -6 MLLW +1 40 5:1 1.0 156 9+00 123.17 -6 MLLW +1 40 5:1 1.3 268 10+00 123.17 -6 MLLW +1 40 5:1 1.4 401 11+00 123.17 -6 MLLW +1 40 5:1 1.7 555 12+00 123.17 -6 MLLW +1 40 5:1 3.4 808 13+00 123.17 -6 MLLW +1 40 5:1 6.5 1,304 14+00 123.17 -6 MLLW +1 40 5:1 9.1 2,084 15+00 123.17 -6 MLLW +1 40 5:1 8.5 2,961 16+00 123.17 -6 MLLW +1 40 5:1 8.2 3,795 17+00 123.17 -6 MLLW +1 40 5:1 7.6 4,588 18+00 123.17 -6 MLLW +1 40 5:1 8.0 5,369 19+00 110.83 -6 MLLW +1 40 5:1 10.2 6,280 20+00 98.66 -6 MLLW +1 40 5:1 9.7 7,278 21+00 98.66 -6 MLLW +1 40 5:1 10.3 8,276 22+00 81.71 -6 MLLW +1 36.6 5:1 10.0 9,291 22+50 55.7 -6 MLLW +1 20.2 3:1 5.8 9,687 23+00 46.53 -5 MLLW +1 25 3:1 4.9 9,955 24+00 46.53 -5 MLLW +1 30 3:1 4.1 10,403 25+00 36.15 -5 MLLW +1 45.7 5:1 4.0 10,807 26+00 25.77 -5 MLLW +1 40 5:1 3.0 11,156 27+00 25.77 -5 MLLW +1 170 5:1 6.2 11,615 28+00 25.77 -5 MLLW +1 170 5:1 5.0 12,174 29+00 25.77 -5 MLLW +1 170 5:1 3.8 12,615 30+00 25.77 -5 MLLW +1 170 5:1 3.2 12,966 31+00 25.77 -5 MLLW +1 170 5:1 0.6 13,159 32+00 25.77 -5 MLLW +1 170 5:1 1.1 13,247 ATLANTIC HARBOR MAINTENANCE DREDGING & LIVING SHORELINE MLLW MOFFATT & NICHOL CARTERET COUNTY NAVIGATION PROJECT REVISED - JANUARY 2020 11 DREDGE PLAN 3 150'0'150'300' SCALE: 1''=300' SEE SHEET 9 FOR DREDGE TYPICAL SECTIONS. LEGEND DREDGE IMPACT LIMITS USACE SETBACK LINE MAINTENANCE CHANNEL BASELINE MAINTENANCE CHANNEL BASE IMPACT AREA MAINTENANCE CHANNEL SIDE SLOPE IMPACT AREA NOTE: USACE AUTHORIZED NAVIGATION CHANNEL (BASE) USACE SETBACK LINE N:423,775 E:2,799,950 N:424,087 E:2,800,376 NO DREDGE MATERIAL PLACEMENT LANDWARD OF USACE EASEMENT LINE USACE EASEMENT LINE N:422,467 E:2,799,251 N:424,411 E:2,799,201 MAINTENANCE CHANNEL BASE (IMPACT AREA) N:424,107 E:2,799,831 N:423,925 E:2,800,003 N:423,880 E:2,800,024 N:423,583 E:2,799,981 6+008+0010+0012+0014+0016+0018+0020+0022+002 4 + 0 0 32 + 0 0 30 + 0 0 28 + 0 0 26 + 0 0 ATLANTIC HARBOR MAINTENANCE DREDGING & LIVING SHORELINE MLLW MOFFATT & NICHOL CARTERET COUNTY NAVIGATION PROJECT REVISED - JANUARY 2020 11 USACE AUTHORIZED NAVIGATION CHANNEL 4 150'0'150'300' SCALE: 1''=300' LEGEND USACE AUTHORIZED NAVIGATION CHANNEL (BASE) USACE SETBACK LINE MAINTENANCE CHANNEL BASELINE MAINTENANCE CHANNEL BASE (IMPACT AREA)