Loading...
HomeMy WebLinkAbout76-20 Carteret Community CollegePermit Class • -NEW STATE OF NORTH CAROLINA d� Department of Environmental Quality and Coastal Resources Commission Vermt"t for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Carteret Community College, 3505 Arendell St., Morehead City, NC 28557 Permit Number 76-20 Authorizing development in Carteret County at adi. to Bogue Sound and the AIW W. at 3505 Arendell St., in Morehead City . as requested in the permittee's application dated 2/20/20, incl att workplan drawings (14). Sheets 1.2.4-9.11-14 of 14 all dated 2/20/20 and Sheets 3.10 of 14 both dated "Revised 6/18/20". This permit, issued on June 29, 2020 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization 1) Unless specifically altered herein, this permit authorizes the demolition of existing shoreline protection structures and the construction of the proposed rip rap and cutoff wall shoreline stabilization and other associated shoreline stabilization structures, all as expressly and specifically set forth in the attached workplan drawings. 2) The authorized shoreline stabilization structures shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 3) No vegetated wetlands shall be excavated or filled, even temporarily. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the Char qualified persons within twenty (20) days of the issuing date. of the Coastal Resources Commission-.. ' / This permit must be accessible on -site to Department ��(/`K/( personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2023 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management program. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Carter2t Community College ADDITIONAL CONDITIONS Living Shoreline Permit No. 76-20 Page 2 of 4 4) The alignment of the toe of the living shoreline sections shall not exceed the alignment as depicted in the attached permit application and workplan drawings. 5) The living shoreline sections material shall consist of clean oyster shell, granite, marl, or broken concrete. Sill materials shall be of a sufficient size and design to prevent its movement from the approved alignment by wave or current action. The permittee shall be responsible for immediate removal of any materials or debris that becomes dislodged or moves outside the authorized alignment. 6) No open water shall be excavated or filled, even temporarily, outside of the approved living shoreline alignment. 7) The height of the permitted living shoreline shall not exceed six inches above normal high water level. 8) The living shoreline shall have at least one; ten -foot opening at every 100 feet. 9) The living shoreline sections shall be marked at 50-foot intervals with yellow reflectors extending at least three feet above normal high-water level. 10) The living shoreline shall not extend into the adjacent riparian property to the east and the toe of the living shoreline shall not extend greater than 25 feet waterward of the normal high water level within the 15 foot riparian corridor setback of the property to the east. 11) In accordance with commitments made by the permittee and in order to satisfy concerns of the resource agencies, the fill associated with the Coastal Wetlands plantings is hereby deleted. Any and all reference to the originally proposed fill for Coastal Wetland plantings is hereby considered null and void. 12) In accordance with commitments made by the permittee, the Estuarine Waters located between the living shoreline sections and the shoreline shall be planted with native Coastal Wetland species, all expressly and specifically detailed in the attached narrative and workplan drawings. This Coastal Wetland planting area shall be monitored, and replanted as necessary, for a minimum period of 5 years after the first planting event, or until the Division of Coastal Management has notified the permittee in writing that the planting efforts has been deemed successful. Documentation of the monitoring results shall be provided annually to the Division of Coastal Management. If, after 5 years, the Division of Coastal Management determines the plantings unsuccessful, remediation of the planting area may be required. 13) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat does not result from the construction of the authorized living shoreline sections.. The living shoreline sections shall be located in areas with no SAV coverage at the time of construction, to the greatest extent practicable. Carter,pt Community College Permit No. 76-20 Page 3 of 4 ADDITIONAL CONDITIONS NOTE: The permittee is strongly encouraged to coordinate with the NC DMF and other resource agencies to conduct monitoring of the SAV within the area of the living shoreline sections to further the scientific knowledge between SAV and living shorelines. Upland Development 14) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the walkway and other associated infrastructure, all as expressly and specifically set forth in the attached permit application and workplan drawings. Stormwater Manaecment 15) The Division of Energy, Mineral and Land Resources (DEMLR) has determined this project will require a Stormwater Management permit. The permittee shall receive a Stormwater Management permit from DEMLR prior to the initiation of any construction. Submit this plan to the Division of Energy, Mineral and Land Resources, Land Quality Section, 127 Cardinal Drive Extension, Wilmington, NC 28405. Any violation of the permit approved by DEMLR shall be considered a violation of this CAMA permit. Sedimentation and Erosion Control NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Division of Energy, Mineral and Land Resources, Land Quality Section, 127 Cardinal Drive Extension, Wilmington, NC 28405. 16) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 17) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. 18) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of any phase of grading on cut or filled slopes. USACE Conditions 19) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish & Wildlife Service's Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at htti)://www.fws.gov/nc-es/mammal/manatee Fuidelines.pdf. C.ytercj Community College ADDITIONAL CONDITIONS General Permit No. 76-20 Page 4 of 4 20) The alignment of the authorized shoreline stabilization structures and the living shoreline sections shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re - staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. 21) No vegetated wetlands shall be excavated or filled, even temporarily. 22) This permit does not authorize any excavation. 23) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 24) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third party. 25) All debris associated with the removal or construction of the permitted facility shall be contained within the authorized project area and removed to an appropriate upland location. Turbidity curtains shall be installed during the demolition of the existing shoreline protection structures, all as expressly and specifically set forth in the attached workplan drawings 26) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2020-00766) issued 6/26/20. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2017-1568 v2. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. I DIVISION OF COASTAL MANAGEMENT Application Processing Notes �nn V�1nn In4 Applicant: _ cax-��Ytt um1-rlun-- tj�r Type: (Check all that apply) New ,. Major Mod _ Permit# - — Minor Mod _ Renewal _ Transfer Permit Coordinator: - Pmd-n_ )c Field Representative: _ _a I _ n Date Time �I a3'ao� prov� , S41r n.cY Jw5�- Message cent J�U., CDrnw�rl - tJ Jb oc lK t3� Accr- VA4t 1 a ( 4tcC�W b„� Oro 40WZe G ✓a la 6(�, tfo Its C--4q� Su rVy uvl, ,o tdd � 75 o� `iz5h L"�44( Jaw b�i7lio rewtov;�gJka 511%Sr�(4lCuwe..T DCM Coordinator: E'er flo V Permit #:—AVC�10 Permittee: Agents DCM Field Offices F�i�atiP*ti [ Washington (with revised work plan drawings) Morehead ` n \ �n�� Wilmington (OBJECTIONS ) US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Kim Harding David Harris Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan Clif Whitfield (WARO) Jimmy Harrison Washington: Anthony Scarbraugh401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs — 401 (Brunswick, New Hanover) Holley Snider-401 (Carteret, Onslow, Pender) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Natural Heritage Program LPO: Maria Dunn (WARD) Rodney Butler (NCDOT)Travis Wilson gem MP-1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Infonnadon Business Name Carteret Community College (Coe) / Coo Trustees Projed Name (if applicable) Shoreline Improvement Project Last Name Sparks Applicant 1: First Name Steve MI Applicant 2: First Name MI Last Name if additional applicants, please attach an additional pages) with names listed. Mailing Address 3505 Arendell Street PO Box City Morehead City State NC ZIP 28557 Country Phone No. 252-222-6087 ext. FAX No. 252-222-6077 Street Address (if different from above) City State ZIP Email sparkss@carteret.edu 2. Agent/Contractor Information Business Name Arendell Engineers Agent/ Contractor 1: First Name MI Last Name James (Bill) W. Forman, Jr., P.E. Agent/ Contractor 2: First Name MI Last Name Meiling Address PO Box City State 1004 Arendell Street Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252 - 622 - 4338 ext. ext. FAX No. Contractor N C-1509 Street Address (if different from above) City State ZIP Email bill@arendellengineers.com <Form continues on back> FEB 8 4 2011 2 5 2 - 8 0 8 - 2 8 0 8 :: 1-888.4 RCOAST :: ww w. n c c o a s t a l m a n a 9 e m • DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Carteret Community College COUNTY: Carteret PROJECT NAME: LOCATION OF PROJECT: Morehead City DATE APPLICATION RECEIVED COMPLETE BY FIELD: 3-16-20 FIELD RECOMMENDATION: Attached: Yes FIELD REPRESENTATIVE: Heather Styron DISTRICT MANAGER REVIEW: Roy Brownlow B) DATE RECEIVED BY MAJOR PERMITS UNIT: 4/23/2020 APPLICATION ASSIGNED TO: Bodnar PUBLIC NOTICE REC'D: 4-5-20 ADJ. RIP. PROP NOTICES REC'D: 3/16/2020 C) 75 DAY DEADLINE: 5-30-20 al; 4-K(10 HOLDS: EMAIL OUT DATE: 4-23-20 PERMIT FINAL ACTION: ISSUE DENY To Be Forwarded: Yes DISTRICT OFFICE: MHC FEE RECD: $400 # 9060590 (60/40 split) END OF NOTICE DATE: 4-25-20 DEED RECD: 3/16/2020Yes 150 DAY DEADLINE: STATE DUE DATE: Click or tap to enter a date. AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES DCM - Field Rep ��h Io DCM — LUP Consistency Determination q =p �o, �5, s 4- Local Permit Officer Corps of Engineers - Regulatory Branch Zb70 CO-1(�(e DWR-401 Section V O ?yt7- tvleO J� DWR—Public Water Supply DEMLR—Stormwater S LI2o DEMLR - Sed and Erosion S� v DOA - State Property Office Wildlife Resources Commission s�l$ Z 7 i0 (T To bIC c' DMF - Shellfish Section DMF - Habitat & Enhancement tl (1 i jJ ary 5u� c (i i) a DNCR- Archives&History v / ?p X DNCR- Natural Heritage Program NCDOT NC Dept of Commerce ri 1d ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director MEMORANDUM: TO: GREGG BODNAR I4Z11]3�me W.rl W,f1%. W4Zi1►1 THRU: ROY BROWNLOW NORTH CAROLINA Environmental Quality April 20, 2020 SUBJECT: COMMENTS & RECOMMENDATIONS - CAMA MAJOR PERMIT- CARTERET COMMUNITY COLLEGE, SHORELINE STABILIZATION AND LIVING SHORELINE PROJECT, MOREHEAD CITY, CARTERET COUNTY The following are my comments and recommendations regarding the aforementioned proposal. The proposal is for shoreline improvements and pier additions. The site is currently a total of 44.3 (1,929,925sf) total acres that contains the Carteret Community College Campus and the CCC Trustees property which includes the NC State University Center for Marine Sciences and Technology (CMAST). CCC and CMAST currently maintain two adjacent research sanctuaries, located along Bogue Sound and the ICW as well as a mariculture demonstration center. There is a one -slip research pier with all associated infrastructure and 2.5 coves with tombolo's along the property (five parcels). There are marked SAV areas within the western CMAST cove. The substrate is a predominately sandy bottom with some loamy sand bottom.. The development conforms to the guidelines set forth under 15A NCAC 07H .0208. Assuming that state and federal agencies concur with the proposal, the District recommends the project be authorized as proposed, contingent upon the following conditions: • All work shall remain within the areas shown on plats dated received 2/24/2020 and shall remain outside of any SAV habitat. • The applicant shall be responsible for any part of the system that should become displaced, dilapidated or no longer in use. • No more than two slips total are authorized (one existing and one new) • The landward edge of the sill shall not exceed a maximum of 30' beyond NHW and shall contain gaps every, 100 feet. • The riprap shall be landward of any coastal wetlands. RECEIVE® �DWQ MAY 1 1 2020 North Carolina Department of Environmental Quality I Division of Coastal Managements P SECTION Id H Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252.8082808 ROY COOPER B`a04Y5qfPP MICHAEL S. REGAN &OEP7 KORTH CARCUNA Bmn�arr.,aaau7 � crrilr April 23; 24128 FROM: Gregg Bodnar, Assistant Major Permits Coordinator h1CDEQ - Division of Coastal Management 4110 Commerce Ave_, Morehead City, NC 25557 Fax 252-247-3330 ( cturie,dl4--9f-33J areoa_hadnartcdnncddeeir_aw SUBJECT_ CAMA,Pemritpfi Yan Review Applicant: Carteret Community Coltege Project Location: 3505 Arendell St, Morehead City, Carteret County Proposed Project: Walking trial, observation piers, docking facility, and sill BRAXTON DAVIS fiouckm, t1�e�ra, gRF.'e¢Yrct dt-mgruncxt Please indicate below your agencys position or viewpoint an the proposed project and Mum this form to Greua Bodnar at the address above by May 13, 202Q If you have arty questions regarding the proposed project contact Heather Styran CM) 808-2803 when appropriate, in-depth comments with supporting data is requested. REPLY: This agencyfia—s iiq abjection to the project as proposed. "Additional comments may be attached" X This agency has no commend an the proposed project_ This agency approves of the project only it the recommended changes are incorporated_ See attached_ This agency objects to the project for reasons described in the attached comments_ pa'-mE Lee Padrick r E; NC Commerce 4-24-20 rL.B APR 2 4 2020 RIP SECTION MHD r�. NORTH CAROLINA bt, m nmewaf QaaRp April 23, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregg.bodnar(a)ncdenr.gov SUBJECT: CAMA Permit Application Review Applicant: Carteret Community College ROY COOPER Covenror MICHAEL S. REGAN .5'ecmiary Project Location: 3505 Arendell St, Morehead City, Carteret County Proposed Project: Walking trial, observation piers, docking facility, and sill BRAXTON DAVIS Director. Divivion ofC'oosral Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by May 13, 2020. If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. *Please see the attached memo for comments regarding backfill material PRINT NAME Shannon Myers AGENCY NCDMF- Shellfish Sanitation and Recreational Water Quality SIGNATURE 5rr,7?Zw_z4,d-forShannonJenkins RECEIVE® DATE May 6, 2020 MAY 7 2020 State of North Catalina I Environmental Quality l Coastal Management M SECTION 7dllr8® 400 Commerce Are. Morehead City, NC 28557 (252) 808-2808 Marine Fisheries ENVIRONMENTAL OUALITV May 6, 2020 MEMORANDUM TO: From: Through: SUBJECT: Applicant: Project Location: Proposed Project: ROY COOPER caVernar MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Gregg Bodner, Assistant Major Permits Coordinator Division of Coastal Management Shannon Myers, Environmental Specialist Shellfish Sanitation & Recreational Water Quality Shannon Jenkins, Section Chief Shellfish Sanitation & Recreational Water Quality CAMA Major Permit Application Review Carteret Community College. 3505 Arendell St,Morehead City,Carteret County Walking trail, observation piers, docking facility, and sill The proposed project is located in waters that are currently classified as approved for the harvesting of shellfish. Although the overall purpose and function of the project does not raise any concerns for the Shellfish Sanitation and Recreational Water Quality Section, the source of backfill material is not specified in the application Concern is centered upon the transfer of backfill material or waters from closed shellfishing areas to open shellfishing areas. As such, consideration of the following is requested: If discharges of dredged or fill materials from waters closed to the harvest of shellfish are placed in waters that are open to the harvest of shellfish, prior notification shall be given to the Shellfish Sanitation and Recreational Water Quality Section so that appropriate temporary closures to the harvest of shellfish may be put in place. RECEIVED MAY 7 2020 Nothing Compares� State of North Carolina I Division of Marine Fisheries 3441 Arendell Street I P.O. Box 769 1 Morehead City. North Carolina 28540 P SECTION M H D 252-726-7021 Bodnar, Gregg From: Sams, Dan Sent: Wednesday, May 6, 2020 10:22 AM To: Cannon, Amanda J; Hall, Christine Cc: Bodnar, Gregg Subject: Re: CAMA Major Permit Application - Carteret Community College Outlooks 365's features are not allowing me to modify the document, so this e-mail is the response. Comments attached: The project will require both Erosion and Sediment Control plan application and approval and State Stormwater plan application and approval. Thanks.... dan.sams From: Cannon, Amanda J <Amanda.Cannon@ncdenr.gov> t cgwI � Sent: Thursday, April 23, 2020 9:25 PM To: Jeannie Drake <leannie.Drake@moreheadcitync.org>; Love-Adrick, Rachel A <rachel.love-adrick@ncdenr.gov>; Liz Hair <Sarah.E.Hair@usace.army.mil>; Padrick, Lee <Ipadrick@nccommerce.com>; DCR - Environmental —Review <Environmental.Review@ncdcr.gov>; Cox, Heidi <heidi.cox@ncdenr.gov>; Deaton, Anne <anne.deaton@ncdenr.gov>; Harrison, James A <James.Harrison@ncdenr.gov>; Harris, David B <davidharris@ncdot.gov>; Jenkins, Shannon <shannon.jenkins@ncdenr.gov>; Gupton, Sharon <sharon.gupton@ncdenr.gov>; Walton, Tim <tim.walton@doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Hilliard, Wanda <wanda.hilliard@doa.nc.gov>; Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>; Sullivan, Shelton <shelton.sullivan@ncdenr.gov>; Sams, Dan <dan.sams@ncdenr.gov>; Hall, Christine <Christine.Hall @ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Butler, Rodney A <Rodney.Butler@ncdcr.gov> Cc: Styron, Heather M. <heather.m.styron@ncdenr.gov>; Brownlow, Roy <roy.brownlow@ncdenr.gov>; Bodnar, Gregg <gregg.bod nar@ ncden r.gov> Subject: CAMA Major Permit Application - Carteret Community College Hello All! Please accept this correspondence as the official distribution of CAMA application from Carteret Community College for development in Morehead City, Carteret County. Attachments include: Field Investigative Report, work plans, comment sheet, and any other documents intended for you. NOTE: Please complete the bottom portion of the comment sheet with your information and signature. *RETURN TO GREGG BODNAR at Greee.bodnar(a,ncdenr.eov* NO oversized work plans have been submitted by the applicant For questions or concerns, please contact Gregg Bodnar at 252-8b8-2808 x215. Thank you! f i 0 NORTH CAROLINA En,wonmemal olfahrJ' April 23, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) areao.bodnaraC..ncdenr.00v SUBJECT: CAMA Permit Application Review ROY COOPER Governor MICHAEL S. REGAN Secretary Applicant: Carteret Community College Project Location: 3505 Arendell St, Morehead City, Carteret County Proposed Project: Walking trial, observation piers, docking facility, and sill BRAXTON DAVIS Direct.,, Division r fC'nastal Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by May 13, 2020. If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested. REPLY: PRINT AGENCY SIGNATURE DATE X_ This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Rachel Love-Adrick WW DC 4/29/2020 State ofNotth Camlina I Envimnmental Qwlity I Coastal Management 400 Commnce Ave. Morehead City, NC 28557 (252) 808-2808 RECEIVE® APR 2 9 2020 MP SECTION MHD ROY COOPER Governor MICHAEL S. REGAN Seavary BRAXTON C. DAVIS Director MEMORANDUM NORTH CAROLINA Environmental Quality TO: Gregg Bodnar, Major Permits Processing Coordinator Division of Coastal Management FROM: Rachel Love-Adrick, District Planner Division of Coastal Management SUBJECT: Major Permit Request by Carteret Community College DATE: April 29, 2020 Consistency Determination: The request is consistent with/not in conflict with the Town of Morehead City Land Use Plan certified by the CRC on September 28, 2007. Overview: The project is located at 3505 Arendell St adjacent to Bogue Sound in Morehead City, Carteret County. The applicant is proposing construct a public walking trail, two observation piers, a 1-slip docking facility with kayak launch, shoreline stabilization and sill construction (see field report and application for specifics). The college property consists of five parcels totaling 44.3 acres (1,929,925 ft'), and is 4' to 20' above nhw depending on location. The upland vegetation mainly consists of lawn grasses and trees. There are wetlands along this area of the property and consist of Spartina alterniflora, Spartina patens, Juncus roemerianus, and non -coastal wetlands. Existing development includes buildings, existing utilities, research pier, platform and slip with boatlift, Mariculture Demonstration Center, groins, breakwaters, and riprap. AEC's involved include: Estuarine Waters (EW), Public Trust Areas (PTA), and Estuarine Shorelines (ES). This section of Bogue Sound has a classification of HQW/SA Waters. The site is not a Primary Nursery Area, and is open to taking of shellfish. Water depths within this project location are -6 inches nlw/mlw to -12' nlw/mlw (field verified), depending on location. The bottom substrate is sand and there are SAV located and marked within the western cove area around 303 College Circle. The width of the waterbody within this location is approximately 2,800 feet plus per Google Earth. The east edge of the property is 245' from the setback of the AIWW. A previous major permit 18-18 was issued as well as a previous Stormwater permit 960424. A review of shellfish beds, cultural resources, and archaeological resources was not provided. APR 2 9 2020 North Carolina Department of Environmental Quality I DlvisionofCoastal Management Morehead CltyOffice 1400 Commerce Avenue I Morehead City. North Carolina ZSZB082808 MP SECTION A3® • Anticipated impacts resulting from this project are expected to: fill and usurp 18,567 ft'of shallow bottom habitat, shade and incorporate 3,100 ft' of open water and 320 ft' of coastal wetlands, fill and disturb 21,335 ft' of high ground. A total BUA of 11.6% within the 75' AEC is proposed with 41.5% for the entire tract. Because all proposed development is located within the existing pier head lengths as well landward 245' of USACOE channel setbacks, there should be no navigation issues. Basis for Determination: The project site is in the Town of Morehead City and is subject to the 2007 Town of Morehead City Core Land Use Plan Update. The Future Land Use Map (FLUM) designates the site as "Public/ Institutional" and "Conservation/Open Space' (due to the sites location in Estuarine Waters, Estuarine Shorelines and Public Trust Area AECs). Please note that the Conservation/Open Space FLUM designation has a lot coverage limit of 40%, the project has a built upon area of 11.6% within the 75' AEC, and therefore meets this requirement. The land use types are defined as follows: Public and Institutional (pg. 107): The Public and Institutional classification encompasses approximately 1.2 square miles (744 acres) or about 8 percent of the total planning jurisdictional area. The majority of the properties classified as Public and Institutional are located in the south central portion of the Town planning jurisdiction in the southwestern section of Neighborhood 4. Sugarloaf Island, located in Neighborhood 1, is also designated as Public and Institutional. The largest individual properties within the Public and Institutional classification include the Carteret General Hospital, the Carteret Community College, NC Divisions of Marine Fisheries complex, and the Carteret County Civic Center. The Public and Institutional classification is intended to delineate large land areas that are used for intensive public and educational purposes. Land uses within this classification include primarily government buildings and service facilities, public recreational facilities, and public educational facilities. Some private office and institutional facilities may also be included within this classification. Minimum lot sizes are generally dependent upon the specific nature and characteristics of the land use but typically range from 5,000 to 40,000 square feet for low intensity uses to multiple acres for more intensive land uses. Land uses within the Public and Institutional -designated areas are generally compatible with the OP, Office and Professional and IC, Institutional Campus zoning districts. Generally, public water service is needed to support the land uses characteristic of this classification. Public sewer is needed to support the most intensive public and institutional uses. Adequate streets to accommodate higher traffic volumes are necessary to support the intensity of development expected within the Public and Institutional Classification. Conservation/Open Space (pg. 109): Conservation/Open Space areas are scattered throughout the Morehead jurisdiction and include coastal wetlands, estuarine waters, estuarine shoreline, public trust areas, and '404' wetlands. Due to the small size of such areas, they are not individually identified on the Future Land Use Map. Generally, the precise location of such areas must be determined by field investigation. Conservation/Open Space areas that are delineated on the Future Land Use Map include the NC Coastal Land Trust tract located in the north central portion of the.planning jurisdiction (in Neighborhood 5) and the Newport River Marshes and Phillips Island (in Neighborhood 7). These Conservation/Open Space -designated areas encompass approximately 1.9 square miles (1,229 acres) or approximately 13 percent of the planning jurisdictional area. The Conservation/Open Space classification is intended to delineate areas where traditional land uses are not desirable or expected to develop. Land development may, however, include public building and facilities necessary to support existing land uses within the areas classified as Conservation/Open Space. Lot coverage is limited to 40% and building heights are limited to 35 feet. Land uses within the D_EQ10 APR 2 9 2020 North Cardin Department of Environmental Quality I Division of Coastal Management Morehead City Office 1400 Commerce Avenue I Morehead City, North Carolina 28557 252.808.2808 rVIP SECTION MHD 1 Conservation/Open Space -designated areas are generally compatible with the FP, Floodplain zoning district. Public water or sewer utilities are not needed to support the types and intensities of land uses in these areas. Extensions of water and sewer utilities into these areas are not expected or encouraged (pg. 109). The following LUP policies may be applicable to this request: 4.2.6 Areas of Environmental Concern Policy 1, pg. 94: The Town of Morehead City supports state and federal law regarding land use and development in AECs. Policy5,pg.94: Morehead City supports the use standards for estuarine and public trust areas as specified in 15A NCAC.0207. � APR 2 9 2020 u�mmaaA99 North Carolina Department of Environmental Quality I Division of Coastal Managements fi SECTION MH Morehead City Office 1400 Commerce Avenue I Morehead City, North Carolina 2855 252908.2808 Bodnar, Gregg From: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Sent: Monday, May 4, 2020 5:52 PM To: kathryn_matthews@fws.gov, Leigh_Mann@fws.gov; pace.wilber@noaa.gov; Pete_Benjamin@fws.gov, Owens, Jennifer L CIV USARMY CESAW (USA); HORTON, J TODD CIV USARMY CESAW (US); Arnette, Justin R CIV USARMY CESAW (USA); DCR - Environmental_Review; Bowers, Todd; Ryan.L.Taylor@uscg.mil; fritz.rohde; matt creelman; Bodnar, Gregg; Twyla Cheatwood; John; Mairs, Robb L; MacPherson, Tara; Howell, Jonathan; Styron, Heather M.; ethan coble Cc: Charles, Thomas P CIV USARMY CESAW (USA) Subject: [External) CAMA MAJOR/PGP 291/SAW-2020-00766/Carteret Community College shoreline stabilization Attachments: SAW-2020-00766 Carteret Community College_shoreline stabilization_ePN.pdf, CCC - Field Report.pdf; CCC - Application.pdf; CCC - Plans.pdf I 1141t, External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment I0s,... W am@a nc--gov All, Pursuant to the CAMA-Corps Programmatic Permit process, the North Carolina Division of Coastal Management (NCDCM) has forwarded to our office a copy of the CAMA permit application, Field Investigation Report and BioReport for the subject project. The attached notice requests federal agency comments on this project by June 3, 2020. The proposed site is located within waters of Bogue Sound, at 3505 Arendell Street, in Morehead City, Carteret County, North Carolina. Coordinates are 34.721790 N,-76.758904 W. The applicant proposes to construct a pedestrian public walkway, 2 observation piers, an additional pier with one boat slip and a kayak launch, shoreline stabilization, and sill construction. Specifically, the project consists of the following activities: Walkway: Construction of a 10' wide pervious sidewalk/walkway around the outer boundaries of the five parcels that encompass the CCC/CCC Trustees campus. The sidewalk/walkway would start along the eastern Arendell Street side of the campus and extend south towards Bogue Sound, follow along the south side of the campus (along Bogue Sound) to the west and then extend north towards Arendell Street. All portions of the sidewalk/walkway within the 30' CAMA buffer would consist of elevated slatted concrete panels which is a pervious design. Pier Construction: The first of two proposed observation piers would be located along the western portion of the college parcels and directly south of the CMAST and Aquaculture Laboratory Buildings. All portions of the pier and platform would be landward of NHW approximately 5' to 7', would connect to an elevated sidewalk and would be open to the public. The fixed pier would be 30' x 24' and intersect a 10' X 20' platform and would be located approximately 90' from the western riparian access line. Per the applicant, due to ADA regulations the access would be 10' wide. To the east Bodnar, Gregg From: Deaton, Anne Sent: Wednesday, June 17, 2020 4:12 PM To: John Wade; Dunn, Maria T.; Bodnar, Gregg;'Lexia Weaver' Cc: Harrison, James A; Griffin, Michael T; bill@arendellengineers.com; Mairs, Robb L; 'Hair, Sarah E CIV CESAW CESAD (US' Subject: RE: [External] SAV Survey at Carteret Community College DMF also appreciates the modifications to minimize impacts to SAV while still allowing wetland enhancement and erosion control to occur via living shorelines. We are concerned but uncertain on the effect of the structures to the SAV between the western rock sills. I would like to request that NCCF include monitoring of the four existing SAV patches with their other required monitoring. That would be informative for design of other projects in the future. Construction following the last proposed design and including SAV monitoring, DMF's concerns will be addressed. Best regards, Anne From: John Wade[mailto:john@arendellengineers.com] Sent: Wednesday, June 17, 202010:09 AM To: Dunn, Maria T. <maria.dunn@ncwildlife.org>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Deaton, Anne <anne.deaton@ncdenr.gov>;'Lexia Weaver' <lexiaw@nccoast.org> Cc: Harrison, James A <James.Harrison@ncdenr.gov>; Griffin, Michael T <michael.griffin@ncdenr.gov>; bill@arendellengineers.com; Mairs, Robb L <robb.mairs@ncdenr.gov>;'Hair, Sarah E CIV CESAW CESAD (US' <Sa ra h. E.Ha it@usace.a rmy.m il> Subject: RE: [External] SAV Survey at Carteret Community College q not tltkhnks or open attac After coordinating with Gregg, we have revised the proposed sill plan again this morning. We are requesting to keep the marsh sill openings at the 2 west SAV locations as was shown on the previous drawing but have relocated the sill opening at the eastern end away from the SAVs in order to provide the offshore sill opening protection. In regards to the request to fill behind the sill, after consulting with Lexia Weaver with the Coastal Fed, we have agreed to remove the request to place fill behind the sill. We will allow for natural accretion to occur. Planting of the spartina is still proposed and will occur in locations behind that sill that are suitable for the plants. Your review of the proposed plan at your earliest convenience is requested. Thanks, John John J. Wade, P.E. Vice President Arendell Engineers 1004 Arendell Street Morehead City, NC 28557 0 NORTII CAROI..INA N,'cnm-anmenial Onalin April 23, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) areao. bod nar(a)ncden r. eov SUBJECT: CAMA Permit Application Review ROY COOPER Gove/ .r MICHAEL S. REGAN secretary Applicant: Carteret Community College Project Location: 3505 Arendell St, Morehead City, Carteret County Proposed Project: Walking trial, observation piers, docking facility, and sill BRAXTON DAVIS Direcloq Division afCom'lal Monagemen! Please indicate below your agency's position or viewpoint on the proposed project and return this form to Grego Bodnar at the address above by May 13, 2020. If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. X This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME James Harrison AGENCY, NCDMF SIGNATURE Yr� DATE 05/12/2020 RECEIVED M AY 1 3 2020 MIP SECTION FID State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave.. Morehead City, NC 28557 (252) 808-2808 Jr ROY COOPER Governor MICHAEL S. REGAN Secretary STEPHEN W.MURPHEY Dfrector MEMORANDUM: TO: Gregg Bodnar, NCDCM Assistant Major Permits Coordinator FROM: James Harrison, NCDMF Fisheries Resource Specialist SUBJECT: Carteret Community College, Carteret County DATE: May 11, 2020 A North Carolina Division of Marine Fisheries (DMF) Fisheries Resource Specialist has reviewed the CAMA Permit application for proposed actions that impact fish and fish habitats. The proposed project will be located at Carteret Community College, 3505 Arendell Street, within Morehead City. The applicant is proposing to construct a 10' wide pervious sidewalk/walkway, two observation platform piers, a pier with a one -slip docking facility and kayak launch, two sections of riprap shoreline stabilization, and an offshore sill. The proposed project occurs within an area with a historical record of submerged aquatic vegetation (SAV), and SAV presence was also noted in the field report. SAV is a highly valuable habitat, both environmentally and economically. These habitats provide nursery. Foraging, and/or spawning areas for various recreationally and commercially important fish and invertebrate species. Additionally, SAV plays a critical role in natural erosion control and shoreline stabilization, as well as water quality enhancement, primary production, and nutrient cycling. Therefore, it is crucial that SAV be protected in order to maintain and these critical environmental contributions. Additional information is needed in order to adequately and accurately review this permit application. NCDMF requests that a survey for SAV be completed during the active growth period, and the results of this survey should be provided to DMF prior to commencement of construction. The survey report should include an overlay of the proposed project components in relation to mapped SAV. Please contact Jimmy Harrison at (252) 948-3835 or at james.harrison@ncdenr.gov with any additional questions or concerns. Thank you for considering our comments. RECEFI ED M AY 1 3 2020 State of North Carolina I Division of Marine Fisheries MP SECTION M H D 3441 Arendell Street I P.O. Box 7691 Morehead City, North Carolina 28557 252-726-7021 Bodnar, Gregg From: Dunn, Maria T. Sent: Wednesday, June 17, 2020 10:48 AM To: John Wade; Bodnar, Gregg; Deaton, Anne; 'Lexia Weaver' Cc: Harrison, James A; Griffin, Michael T; bill@arendellengineers.com; Mairs, Robb L; 'Hair, Sarah E CIV CESAW CESAD (US' Subject: RE: [External] SAV Survey at Carteret Community College NCWRC has reviewed the revisions and appreciates the measures to further minimize impacts to SAV and SAV habitat. The sill redesign presented in the previous email and the removal of fill landward the sill has addressed the concerns expressed in our May correspondence and subsequent communications. NCWRC has no additional comment at this time. We do believe this is a good demonstration site for living shorelines. The public exposure to this type of shoreline stabilization should be a positive. Thank you for your cooperation with regard to project modifications that minimized resource impacts and set a good guideline example for other endeavors. Please do not hesitate to contact me if I can be of additional assistance. Maria Maria T. Dunn Coastal Coordinator NC Wildlife Resources Commission 943 Washington Sq. Mall Washington, INC 27889 office: 252-948-3916 fax: 252-975-3716 www.ncwildlife.oro Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: John Wade <john@arendellengineers.com> Sent: Wednesday, June 17, 202010:09 AM To: Dunn, Maria T. <maria.dunn@ncwildlife.org>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Deaton, Anne <anne.deaton@ncdenr.gov>; 'Lexia Weaver' <lexiaw@nccoast.org> Cc: Harrison, James A <James.Harrison@ncdenr.gov>; Griffin, Michael T <michael.griffin@ncdenr.gov>; bill@arendellengineers.com; Mairs, Robb L <robb.mairs@ncdenr.gov>;'Hair, Sarah E CIV CESAW CESAD (US' <Sara h. E.Ha it@usace.a rmy. mil> Subject: RE: [External] SAV Survey at Carteret Community College fXaii. Dc not click links or open attachments unless you verify. Send all suspicious email as an attachment to .. ". ROY COOPER 111 MICHAEL S. REGAN 13RAXTON DAVIS ✓'. 7-C. b 4.24'C) � April 23, 2020 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management p/,4 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier04-16-33) ;eir c gregg.bodnar(mncdenr.gov�� SUBJECT: CAMA Permit Application Review Applicant: Carteret Community College Project Location: 3506 Arendell St, Morehead City, Carteret County Proposed Project: Walking trial, observation piers, docking facility, and sill Please indicate below your agency's position or viewpoint on the proposed project and return this form to Grcaa Bodnar at the address above by lifay 13, 2020, If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. t (� ._=i� �tASQ SYP �Gheal'. PRINT NAME rl0. l u n (i AGENCY : l(A�RC . SIGNATURE ar✓ RECEN LD DATE S-IS-7o',o MAY 1 5 2020 State OCNolfficamm l avimtmemalQ=fitylcoaaal MooagwerS � SECTION q _��A%A i'\I I$,¢jy P4�, 400 Commerce Ave. Morehead City, NC 28557 (252) 808.2808 v O Y � IY`Y'I� b i:-,. a>° N ® North Carolina Wildlife Resources Commission Gordon Myers, Executive Director lu 1 a1i71t111700liihl TO: Gregg Bodnar Division of Coastal Management North Carolina Department of Environmental Quality FROM: Maria T. Dunn, Coastal Coordinator Habitat Conservation Division DATE: May 15, 2020 MAY 1 5 2020 P SECTION MHD SUBJECT: CAMA Dredge/Fill Permit Application for Carteret Community College, Carteret County, North Carolina. Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed the permit application with regard to impacts on fish and wildlife resources. The project site is located at 3505 Arendell Street in Morehead City along the shore of and within Bogue Sound. Our comments are provided in accordance with provisions of the Coastal Area Management Act (G.S. 113A-100 through 113A-128), as amended, Sections 401 and 404 of the Clean Water Act, as amended, and the Fish and Wildlife Coordination Act (48 Stat 401, as amended; 16 U.S.C. 661 et seq.). The applicant proposes to construct a walking trail, two observation piers, docking facility with kayak launch, riprap refurbishment, and offshore sill with planting. Upland development includes walkways and accesses that will incorporate designs that take into consideration existing storrnwater management and permits. The docking facility and kayak launch appear to have water depths around -3' NWL for the kayak launch and -6'for the slip as interpreted from the plans, though depths were not provided in the application or field report The 1,125' sill is proposed to be 30' waterward NWL in some locations, measuring 12' wide and 4' high. The planting of Spartina altemiflora is referenced in the proposal. A NCDEQ meeting for this project was conducted on December 20, 2019. The Bogue Sound at this location is classified SA HQW by the Environmental Management Commission and is open to shellfish harvesting. The NCWRC has reviewed the permit application. Staff attended the preapplication meeting and commented on the proposal at that time. Below are comments stated at the meeting and are reemphasized below: Mailing Address: Habitat Conservation • 1721 Mail Service Center a Raleigh, NC 27699-1721 Telephone: (919)707-0220 • Fax: (919) 707-0028 of j • The NCWRC prefers no fill be placed in the water landward the sill to facilitate the planting of coastal wetlands. Coastal wetland species can be planted as appropriate for their success in existing conditions. Neither the permit application nor field report discussed proposed fill placement The plans, however, did indicate fill. Often sediment accretion occurs in time. The planting of coastal wetlands can occur once the structure and site has equilibrated without the placement of fill in shallow water habitats. These shallow water areas provide important habitat areas for numerous aquatic species and should not be filled. • A submerged aquatic vegetation (SAV) survey should be conducted for the site. The plans indicate SAV is observed in the area, per NCDMF staff. Due to the amount of material placed in the water and concerns expressed by NCDMF, the NCWRC supports their request for a SAV survey. Structures should not be placed in SAV areas. • NCWRC supports requests made by NCDMF or Shellfish Sanitation to nummize shellfish impacts. This may include surveys or relocation of shellfish in an impacted area. There are areas of the project that may also affect leased shellfish areas. These interactions should be addressed. • The sill should be designed to have 5' openings for every 100' of sill. • The sill design should have a height of+1' NHW. This was discussed during the meeting but was difficult to tell from the proposal if this is the current design. • The field report states the sill is 12' wide, but the application and plats indicate a 20' wide sill at the bottom. This width, especially in SAV habitat areas, should be reduced. This can be accomplished with a reduction in sill height, placement of segments behind rather than in front of the openings, or the use of vertical structures m front of sill openings. We appreciate the opportunity to review and comment on this permit application If you need further assistance or additional information, please contact me at (252) 948-3916 or at niaria.dunna.ncwildlife.om RECEIVED MAY 1 5 2020 &1P SECTION IIIHD 1 ROY COOPER NUCHAIiI, S. REGAN BRAXTON DAVIS April 23, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-1633) grego.bodnarcCbncdenr.cov SUBJECT: CAMA Permit Application Review Applicant: Carteret Community College Project Location: 3505 Arendell St, Morehead City, Carteret County Proposed Project: Walking trial, observation piers, docking facility, and sill Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnarat the address above by May 13, 2020. If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" ✓ This agency has no comment on the proposed project. 1. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME /Al andQ "I i li Cced AGENCY _�f4XAJ.. .._ t� SIGNATURE ldl&_At&dL_ DATE 60- Z7,U MAY 2 7 2020 MP SECTION MHD State ofNonb Carolira; Envir.rzal Quality I feudal.Maaape l . 000Cavumme Ave..\lo.bead Citg NC28551 (252)808-2808 Received: 5/14/2020 Historic Preservation Office ROY COOPER T Ga,mar y MICHAEL S. REGAN iii .Secrelary BRAXTON DAVIS NORTH CAROLINA Director, Diriaiun ufCoaval unrir'onmzntai Ch;ain�' ER 20-1021 Managemem April 23, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator Due: 5/22/2020 NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 NC Fax: 252-247-3330 (Courier04-16-33) A__ gregg.bodnar ncdenr.gov SBA 05/15/2020 SUBJECT: CAMA Permit Application Review Applicant: Carteret Community College S__ NC Project Location: 3605 Arendell St, Morehead City, Carteret County KBH 05/31/2020 Proposed Project: Walking trial, observation piers, docking facility, and sill Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by May 13, 2020. If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Renee Gledhill -Earley PRINT NAME Historic Preservation Office AGENCY SIGNATURE 06/01/2020 DATE cc: heather.m.stryon@ncdener.gov; sarah.e.hair@usace.army.mil State of Noah Carolina I Environmental Quality I Coastal Management 400 Commerce Ave. Moorhead City, NC 28557 (252) 808-2808 DocuSign Envelope ID: 542FBD3C-.HB-0E5F-879B-0CCC802F071!38 ROY COOPER Govemor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quadty June 19, 2020 Carteret Community College (CCC) / CCC Trustees ATTN: Steve Sparks 3505 Arendell Street Morehead City, NC 28557 RECEIVED JUN 2 2 2020 MP SECTION MHD DWR # 2017-1568v2 Carteret County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Shoreline Improvement Project (3505 Arendell Street — Morehead City, NC 28557) Dear Mr. Sparks: You have our approval, in accordance with the attached conditions and those listed below for the construction of an upland public walking trail, associated access piers, fixed platforms, fixed finger pier, and floating dock to provide kayak access and a one (1) formalized slip within Bogue Sound. This authorization further allows for enhancing shoreline stabilization which includes riprap removal and replacement, and the installment of a marsh sill, permanently impacting approximately 0.43 acres of shallow bottom habitat, and further enhancing approximately 0.77 acres of shallow bottom habitat by planting of smooth cordgrass (Spartina alterni/lora) landward of the marsh sill, as described in your CAMA Major Development Permit application, which was received by the Division of Water Resources (Division) on April 23, 2020, sequential information received June 17, 2020 and June 18, 2020. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number 4175 (GC 4175). This Certification allows you to use the General Permit No. 198000291 when issued by the US Army Corps of Engineers and the CAMA Major Permit when issued by the Division of Coastal Management. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion. and Sediment Control, Non - discharge, Water Supply Watershed, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed on the following pages. The Additional Conditions of the Certification are: I. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. �FQ North Carolina Department of Environmental Quality I Division of Water Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 26405 ^�\ 910.796.7215 DocuSign Envelope ID: 542FBD3C-8F33-4E5F-879B-OCCC802F07B8 1"J 2. The applicani t shall require his contractors (and/or agents) to comply with all of the terms of this Certification, and shall provide each of its contractors (and/or agents) a copy of this Certification. 3. This General Certification shall expire on the same day as the expiration date of the corresponding General Permit. The conditions in effect on the date of issuance of the Certification for a specific project shall remain in effect for the life of the project, regardless of the expiration of this Certification. 4. The applicant/permitee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with 303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, than the Division may reevaluate and modify this General Water Quality Certification. 5. All mechanized equipment operated near surface waters shall be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or other toxic materials. Construction shall be staged in order to minimize the exposure of equipment to surface waters to the maximum extent practicable. Fueling, lubrication and general equipment maintenance shall be performed in a manner to prevent, to the maximum extent practicable, contamination of surface waters by fuels and oils. [15A NCAC 02H .0506(b)(3) and (c)(3) and 15A NCAC 02B .0211 (12)] 6. The permittee shall report to the Wilmington Regional Office at (910) 796-7215 (after hours and on weekends call 800-858-0368) any noncompliance with this certification, any violation of stream or wetland standards [15A NCAC 02B .0200] including but not limited to sediment impacts [ 15A NCAC 02B .02001. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case -by -case basis. Moratoriums You will comply with any moratoriums per the NC Division of Marine Fisheries and the NC Wildlife Resources Commission. In water work moratoriums shall be observed as required by the NC Division of Marine Fisheries, NC Wildlife Resources, US Fish and Wildlife and National Marine Fisheries. 'If such activities should take place during periods of high biological activity (e.g. anadromous species and shorebirds), biological monitoring may be required at the request of other state and federal agencies and coordinated with these dredging activities. 8. The Permittee shall adhere specially to 15A NCAC 02B .0221 Tidal Salt Water Quality for Class SA Waters (3)(g) pH: shall be normal for waters in the area, which generally shall range between 6.8 and 8.5 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions; (1) Turbidity: the turbidity in the receiving water shall not exceed 25 NTU; if turbidity exceeds this level due to natural background conditions, the existing turbidity level shall not be increased. [15A NCAC 02B .0221 ] JUN 2 2 2020 MP SECTION KIPID DocuSign Envelope ID: 542FBD3C-8F3B-4E5F-879B-OCCC802F07B8 9. Please note that the area surrounding the project site contains submerged aquatic vegetation (SAVs). No impacts to SAVs are authorized by this certification outside the approved impacts specified herein. [15A NCAC 07H .0208(b)] 10. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant and/or authorized agent is required to return the enclosed certificate of completion form to the NCDENR DWR 401 and Buffers Unit North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699 within ten days of project completion (the certification of completion is also available at: https://edocs.deg.nc.gov/Forms/Certificate-of-Completio . Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAR. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00 am and 5:00 pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: Ifsending via US Postal Service: Ifsending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: Bill Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 JUN 2 2 2020 MP SECTION MHD DocuSign Envelope ID: 542FBD3C-BF3B-4E5F-879B-OCCC802FO7B8 7 f This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please telephone Robb Mairs in the DWR Wilmington Regional Office at 910.796.7303 or Robb.Mairs(oncdenr.gov. Sincerely, DocuSlBnetl by- ' E9ABA1dAC7DDd36... Morella Sanchez -King, Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ Enclosures: GC 4175 cc: Gregg Bodnar and Curt Weychert, DCM Morehead City Office, EC Liz Hair, USACE Wilmington Regulatory Field Office, EC James Forman, Arendell Engineers, EC DWR 401 & Buffer Permitting Branch file-LF WiRO J U N 2 2 2020 t DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 June 25, 2020 Regulatory Division Action ID No. SAW-2020-00766 Mr. Jonathan Howell Division of Coastal Management North Carolina Department of Environmental Quality 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Howell: E C E I'VE D JUN 2 6 2020 MP SECTION MF•IF? Reference the application of Carteret Community College/Carteret Community College Trustees, associated with the construction of a pedestrian public walkway, observation piers, an additional pier with a single boat slip and kayak launch, shoreline stabilization, and a sill, in waters of Bogue,Sound, at 3505 Arendell Street, in Morehead City, Carteret County, North Carolina. Specifically, the project consists of the following activities: Walkway: Construction of a 10' wide pervious sidewalk/walkway around the outer boundaries of the five parcels that encompass the CCC/CCC Trustees campus. The sidewalk/walkway would start along the eastern Arendell Street side of the campus and extend south towards Bogue Sound, follow along the south side of the campus (along Bogue Sound) to the west and then extend north towards Arendell Street. All portions of the sidewalk/walkway within the 30' CAMA buffer would consist of elevated slatted concrete panels which is a pervious design. Pier Construction: The first of two proposed observation piers would be located along the western portion of the college parcels and directly south of the CMAST and Aquaculture Laboratory Buildings. All portions of the pier and platform would be landward of NHW approximately 5' to 7', would connect to an elevated sidewalk and be open to the public. The fixed pier would be 10' x 24', intersect a 10' X 20' platform, and would be located approximately 90' from the western riparian access line. To the east, approximately 750' from the proposed observation pier one location is an existing one -slip docking facility to remain as is. The second proposed observation.pier would be located along the east side of the property approximately 300' from the eastern riparian access line. It would be located along the parcel east of the Civic Center property. The access would connect to the proposed pervious sidewalk/walkway and extend south for 30' RECEIVED i -2- JUN 2 9�90 and int s��t VWU would then continue for the final 26'. This portion would be located over coastal �: � O S E�r 1 alid would be elevated a minimum of three feet above substrate. The fixed pier would be 5' x 56' (total length) and intersect a 12' x 20' t-head platform. A 7' x 20' section of the platform would be located over a section of proposed marsh sill. The third pier proposed is a one -slip docking facility with a kayak launch. It would be located approximately 700' to the west of the eastern riparian access line and 245 landward of the AI W W setback. The width of the pier would be 10' wide and would extend from the proposed walkway/sidewalk over high ground for 46' until it intersects high water and then continue south for 32' over coastal wetlands and a portion of the proposed sill. It would continue over open water for the final 58' and would intersect a 20' x 50' 1-head platform (easterly direction). There would be a 12' wide x 40' long wet slip on the landward side (northern) of the proposed platform. A 6' x 40' finger would extend from the pier to the east and would help designate the wet -slip. A 4' x 20' floating kayak launch would extend north 15' and along the landward side of the proposed fixed finger and would be accessed by a gangway. Shoreline Stabilization (2 locations): Proposed material is NC DOT # 57 marl or granite stone (6" thickness), NCDOT class B marl or granite stone with (8" thickness) and filter fabric. Area 1: Located along the proposed one -slip docking facility with kayak launch. 360' linear feet of existing concrete debris would be removed to the ground beneath, replaced with filter fabric, smaller stone base with the larger riprap on top. The base of the riprap would be a maximum of 20' wide. A 330' concrete and vinyl cutoff wall would be constructed landward of the proposed riprap with the top of the proposed wall at ground level and would then tie into the existing vinyl wall along the center segment. Area 2: Located along the eastern side of the property and within the area of the proposed observation platform number two. Approximately 295' linear feet of existing concrete debris would be removed to the ground beneath, replaced with filter fabric, smaller stone base with the larger riprap on top. The base of the riprap would be a maximum of 20' in width. A 310' concrete and vinyl cutoff wall would be constructed landward of the proposed riprap with the top of the proposed wall at ground level. Sill Construction: The sill will be constructed as outlined in the revised plan received June 17, 2020 titled "Alternate Option Living Shoreline Plan". No fill is proposed landward of the sill. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the modification to the State authorization: 1. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at http://www.fws.gov/nc-es/mammal/manatee euidelines.odf. 2. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. -3- For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772-2191. 3. All work authorized by this permit must be performed in strict compliance with the submitted plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 4. Except as specified in the plans attached to this permit, no excavation, Ell or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 5. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 6. All mechanized equipment will he regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Resources at (919) 733- 5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 7. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 8. If the permittee discovers any previously unknown historic or archeological remains while accomplishing the authorized work, he will immediately notify the Wilmington District Engineer who will initiate the required coordination procedures. 9.The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 10. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally,RE'efEiVED JUN 2 6 2020 IMP SECTION MHO r. me must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter I I3A Article 4). 11. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction-related'discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 12. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre -project condition. 13. Violations of these conditions or violations of Section 404 of the Clean Water Actor Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Questions or comments may be addressed to Ms. Liz Hair Wilmington Field Office, Regulatory Division, telephone (910) 251-4049 or email at sarah.e.hair@usace.army.mil. Sincerely, HAIR.SARAH. Digitally signed by HAIR.SARAH.EA.10546 EA.10546935 93512 Date: 2020.06.25 12 15:59:11-04'00' Liz Hair, Project Manager Wilmington Regulatory Field Office Electronic Copy Furnished (without enclosures): USEPA; Mr. Todd Allen Bowers NCDEQ/DCM; Mr. Gregg Bodnar/Ms. Tara McPherson NCDEQ/DWR; Mr. Robb Mairs USFWS; Mr. Pete Benjamin/Mr. John Ellis NMFS; Mr. Pace Wilber/Ms. Twyla Cheatwood J U N 2 6 2020 NP SECTION MH® DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Carteret Community College c/o Arendell Engineers 2. LOCATION OF PROJECT SITE: 3505 Arendell Street, in Morehead City, Carteret County. Longitude: 34*43121 Latitude: 76°45'23 INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 3/16/2020 Was Applicant Present —No Photos Taken — no 5. PROCESSING PROCEDURE: Application Received: Officially Submitted: 1/30/2020 Complete — 3/16/2020 Office - MHC 6. SITE DESCRIPTION: (A) Local Land Use Plan — Morehead City- Certified 9/28/2007 Land Classification from LUP — Public Institutional/Conservation (B) AEC(s) Involved: EW, PTA, ES (C) Water Dependent: Yes (D) Intended Use: Public/Government (E) Wastewater Treatment: Existing — Morehead City Sewer Planned - None (F) Type of Structures: Existing —research pier, platform and slip with boatlift, riprap, buildings, existing utilities, Mariculture Demonstration Center Planned -Public walking trail, two smaller observation piers, a 1-slip pier with a kayak launch, shoreline stabilization and sill installation (G) Estimated Annual Rate of Erosion: N/A Source — N/A HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Shallow bottom N/A 18,567 ft2 N/A (B) Open water N/A N/A 3,100 ft2 shaded/Inc. (C) High Ground N/A 21,335 ft2 N/A (D) Coastal wetlands N/A N/A 320 sf shaded (D) Total Area Disturbed 43,322 ft2 (E) Primary Nursery Area: No (F) Water Classification: HQW/SA Open: Yes 8. Project Summary: The proposed project is for the construction of a public walking trail, two observation piers, a 1-slip docking facility with kayak launch, shoreline stabilization and sill Field Investigation Report Carteret Community College 3505 Arendell Street Page 2 of 3 construction. 9. Narrative Description: The Carteret Community College/CCC Trustees project is located at 3505 Arendell Street within Morehead City, Carteret County. The site is found by following 70 East (Arendell St.) towards Carteret Health Care hospital. The college will be located directly across from the hospital entrance along Arendell St. The site location is along the entire south side of the college property. The college property is 44.3 acres (1,929,925st) in its entirety and 4' to 20' above nhw depending on location and is along Bogue Sound and consist of five parcels. The upland vegetation mainly consists of lawn grasses and trees. There are wetlands along this area of the property and consist of Spartina alteiniflora, Spartina patens, Juncus roemerianus and non - coastal wetlands. There are existing groins and breakwaters along the property (cove areas) that were permitted in the past. The Division of Water Resources classifies this area as HQW/SA Waters. This area of Bogue Sound is not designated as a Primary Nursery Area and is open to the taking of shellfish. The Morehead City Land Use Plan classifies this area as Public Institutional with Conservation within the AECs. Water depths within this project location are -6 inches nlw/mlw to -12' nlw/mlw (field verified), depending on location. The bottom substrate is sand and there are SAV located and marked within the western cove area around 303 College Circle. The width of the waterbody within this location is approximately 2,800 feet plus per Google Earth. The east edge of the property is 245' from the setback of the AIW W. A previous major permit 18- 18 was issued as well as a previous Stormwater permit 960424. 10) Proposed Development: As a part of the Colleges waterfront access project and implementation of living shorelines with the help of grant funding through the National Fish and Wildlife Foundation's Emergency Coastal Resilience Fund, the applicants are proposing the construction of a public walking trail, two observation piers, a 1-slip docking facility with kayak launch, riprap shoreline stabilization and sill construction. The applicants are proposing to construct a 10' wide pervious sidewalk/walkway around the outer boundaries of the five parcels that encompass the CCC/CCC Trustees campus. The sidewalk/walkway would start along the eastern Arendell Street side of the campus and extend south towards Bogue Sound, follow along the south side of the campus (along Bogue Sound) to the west and then extend north towards Arendell Street. All portions of the sidewalk/walkway within the 30' CAMA buffer would consist of elevated slatted concrete panels which is a pervious design. The total BUA within the 75' CAMA AEC is 11.6% with a total of 41.5% BUA for the entire tract/tracts. Carteret Community College/CCC Trustees is currently working with NCDEQ Stormwater section on modyfying their current stormwater permits (#960424) for the site. Field Investigation Report Carteret Community College 3505 Arendell Street Page 3 of 3 The first of two proposed observation piers would be located along the western portion of the college parcels and directly south of the CMAST and Aquaculture Laboratory Buildings. All portions of the pier and platform would be landward of NHW approximately 5' to 7', would connect to an elevated sidewalk and would be open to the public. The fixed pier would be 10' x 24' and intersect a 10' X 20' platform and would be located approximately 90' from the western riparian access line. Per the applicant, due to ADA regulations the access would be 10' wide. To the east approximately 750' from the proposed observation pier one location is an existing one -slip docking facility that would remain unchanged. The second proposed observation pier would be located along the east side of the property approximately 300' from the eastern riparian access line. It would be located along the parcel east of the Civic Center property. The access would connect to the proposed pervious sidewalk/walkway and extend south for 30' and intersect normal high water. It would then continue for the final 26'. This portion would be located over coastal wetlands and would be elevated a minimum of three feet above substrate. The fixed pier would be 5' x 56' (total length) and intersect a 12' x 20' t-head platform. A 7' x 20' section of the platform would be located over a section of proposed marsh sill. The final pier proposed for the project is a one -slip docking facility with a kayak launch. It would be located approximately 700' to the west of the eastern riparian access line and 245 landward of the AIW W setback. The width of the pier would be 10' wide and would extend from the proposed walkway/sidewalk over high ground for 46' until it intersects high water and then continue south for 32' over coastal wetlands and a portion of the proposed sill. It would continue over open water for the final 58' and would intersect a 20' x 50' 1-head platform (easterly direction). There would be a 12' wide x 40' long wet slip on the landward side (northern) of the proposed platform. A 6' x 40' finger would extend from the pier to the east and would help designate the wet -slip. A 4' x 20' floating kayak launch would extend north 15' and along the landward side of the proposed fixed finger and would be accessed by a gangway. The applicants are also proposing to stabilize the existing shoreline with rock riprap within two sections that need to be replaced. They are proposing to use NCDOT #57 marl or granite stone with a 6" thickness, NCDOT class B marl or granite stone with an 8" thickness and filter fabric. The first area for the riprap replacement for shoreline protection would be located along the proposed one -slip docking facility with kayak launch. 360' linear feet of existing concrete debris would be removed to the ground beneath, replaced with filter fabric, smaller stone base with the larger riprap on top. The base of the riprap would be a maximum of 20' wide. A 330' concrete and vinyl cutoff wall would be constructed landward of the proposed riprap with the top of the proposed wall at ground level and would then tie into the existing vinyl wall along the center segment. Per the applicant the purpose of the wall is to minimize and attenuate water runoff from the land at the back of the riprap and keep soil from the upland from being eroded and scoured from landward of Field Investigation Report Carteret Community College 3505 Arendell Street Page 4 of 4 the revetment. The second proposed rock iprap area would be located along the eastern side of the property and within the area of the proposed observation platform number two. Approximately 295' linear feet of existing concrete debris would be removed to the ground beneath, replaced with filter fabric, smaller stone base with the larger riprap on top. The base of the riprap would be a maximum of 20' in width. A 310' concrete and vinyl cutoff wall would be constructed landward of the proposed riprap with the top of the proposed wall at ground level. The final portion of the project is for the construction of an offshore sill along the property. The sill would start approximately 1,125' east of the western riparian access line. It would be 12' wide, 1,280' long, 4' high and a maximum of 30' waterward ofNHW. The top of the sill would have an elevation of+2' and would have gaps every 200 feet with riprap sill segments offshore of the gaps to help prevent erosion of the marsh at the gaps. The areas landward of the sill placement shall be planted with Spartina Altemiflora. 11. Anticipated Impacts: The proposed development would fill and usurp 18,567 ft2of shallow bottom habitat, shade and incorporate 3,100 112 of open water and grade, shade 320 sf of coastal wetlands, fill and disturb 21,335 ft2of high ground. A total BUA of 11.6% within the 75' AEC is proposed with 41.5% for the entire tract. Because all proposed development is located within the existing pier head lengths as well landward 245' of USACOE channel setbacks, there should be no navigation issues. Name: Heather M. Styron Date: 4/20/2020 Office: Morehead City *'This is a word processing form to be completed in Microsoft Word — NC Division of Coastal Management Major permit Application Computer Sheet (11/01/2012) Applicant Carteret Community College Date: 11120117 Project Site County Carteret Staff: HMS District: []Elizabeth City Washington ®Morehead City ❑Wilmington Project Name: mariculture demonstration center Date of initial application submittal (EX 1AV20071113117 Date application "received as complete" in the Field office (EX 1/&2007): 11/3/17 Permit Authorization: ®CAMA ❑Dredge & Fill ZBoth SITE DESCRIPTION/PERMIT INFORMATION PNA: El Yes ZNo Photos Taken: Yes E No❑ Setback Required (riparian): El Yes No Critical Habitat: 0 Yes SNo ❑Not Sure 15 foot waiver obtained: El Yes SNo Hazard Notification Returned: ❑Yes ®No SAV: Yes ❑No Not Sure Shell Bottom: Yes ZNo Not Temporary Impacts: Yes No Sure Sandbags: Yes ONo Not Sure Did the land use classification come from Mitigation Required (optional): countyLUP: ❑Yes ®No ❑Yes ®No Moratorium Conditions: Yes ZNo Environmental Assessment Done: ❑NA ❑Yes ®No❑NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) Future Water Supply (FWS) Nutrient Sensitive Waters (NSW) Swamp Waters (SW) High Quality Waters (HQW) U Outstanding Resource Waters (ORW) WETLANDS IMPACTED (404) Corp. of Engineers (Jurisdictional 0 (LS) Sea lavender (Limonium sp.) El (SS) Glasswort (Salicomia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina (SY) Salt reed grass (Spartina altemifiom) cynosuroides) (DS) Salt or spike grass (Distichlis (SC) Bullnrsh or three square (Schpus (TY) Cattail (Typha sp.) spicata) sp.) (JR) Black needlerush (Juncus (SP) SaWmeadow grass (Spartina roemerianus) patens) APPLICATION FEE No fee required - $0.00 M(A) Private w/D&F up to 1 acre; Z III(D) Priv. public or Comm w/D&F to 1 3490 can be applied - $250 acre; 3490 can't be applied - $400 El Minor Modification to a CAMA Major Major Modification to. a CAMA Major IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 Permit Transfer- $100 III(B) Public or commercial w/D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 El Major development extension request - It. Public or commerciaUno dredge $100 and/or fill - $400 252-808-2808 :: 1-888-4RCOAST :: www.neeoastalmanaaement.ne! revised: 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant. Carteret Community College Date: 11120117 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found In your Activities code sheet TYPE REPLACE Activity Name Number Choose Choose Dimension f Dimension 2 Dimension 3 Dimension 4 One One Off bottom 11 New Wont Replace 45.5"1 41"w 25"h cages Maint ❑ ❑ Y O N floating 9 New Work N Replace 40" 1 18" w bags/cages/ Maint❑ ❑ Y ®N 36" 1 24" w 8" h baskets 36" 1 12" h Protective 4 New Won 0 Replace 10, 10, netting panels I Maint ❑ ❑ Y M N FLUPSY 1 New Wont 0 Replace Maint ❑ ❑ Y ❑ N Demos. 1 New Work Replace 70' 40' avillion Maint ❑ ❑ Y ❑ N Floating 1 New Work 0 Replace 10' 7 platform Maint ❑ ❑ Y ❑ N New Wont 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work CF Replace Maint ❑ ❑ Y ❑ N New Work 0 Replete Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work EF Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N revised 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant Carteret Community College Date: 11120117 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for Disturbance total includes any anticipated restoration or tamp impacts) FINAL Sq. FL (Anticipated final disturbance. Excludes any restoration andror temp impact amount TOTAL Feet (Applied for Disturbance total includes any anticipated restoration or tamp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration andror temp impact amount Shallow bottom Dredge ❑ Fill ® Both ❑ Other ❑ 542sf 542sf Open water Dredge ❑ Fill ❑ Both ❑ Other ® 708sf 708sf High ground Dredge ❑ Fill ❑ Both ❑ Other ❑ 4,000 sf 4,000 sf Coastal wetlands Dredge Fill Both11Other 320sf 320sf Dredge ❑ Fiff ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fifi ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: wwwmccoastalmanahhement.net revised: 02/15/10 ON MP-1 APPLICATION for Malor Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant Landowner Information Business Name Project Name (if applicable) Carteret Community College (Ccc) / Ccc Trustees Shoreline Improvement Project Applicant 1: First Name MI Last Name Steve Sparks Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 3505 Arendell Street Morehead City NC ZIP Country Phone No. FAX No. 28557 252-222-6087 ext. 252-222-6077 Street Address (ff different from above) City State ZIP Email sparkss@carteret.edu 2. AgentContractor Information Business Name Arendell Engineers Agent/ Contractor 1: First Name MI Last Name James (Bill) W. Forman, Jr., P.E. Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 1004 Arendell Street Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252 - 622 - 4338 ext. ext. FAX No. Contractor # C-1509 Street Address (if different from above) City State ZIP Email bill@arendellengineers.com <Form continues on back> FU324z NcATY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagem .net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 3505 Arendell Street U.S. Highway 70 Subdivision Name City State Zip Morehead City NC 28557- Phone No. Lot No. (a) (d many, attach additional page with list) 252-222-6087 ext. 637618217539000,637618310573000,6376183141691000, 637618410639000,637618413985000 a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Bogue Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Bogue Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. Town of Morehead City 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 2,550 If 1,929,925 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or See Attached List of Parcels, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 4' - 20' ®NHW or ❑NWL e. Vegetation on tract Grass lawn and coastal scrub. f. Man-made features and uses now on tract Existing man-made features on site include classroom, administrative, civic center, & research structures, parking areas, and sidewalks. There is existing shoreline protection including fiberform concrete mats, riprap, and construction debris used as riprap. A timber pier with one (1) boat slip and platform is located near the center of the site. Two offshore breakwater sills and are located along the western end of the shoreline along with riprap sills. g. Identify and describe the existing land uses ad seen to the proposed project site. Adjacent land uses include the Division of Marine Fisheries to the east, a hospital, gas station, and office building to the north, and residential to the west. The southern property borders Bogue Sound. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Office & Professional (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? KtUkIVED <Form continues on next page> FEB 2 4 �11120 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagemen-MHDCITY Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes []No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Wastewater from the site is collected by the Town of Morehead City wastewater infrastructure. o. Describe existing drinking water supply source. Drinking water is provided by the Town of Morehead City public water supply. p. Describe existing storm water management or treatment systems. Existing stormwater management systems include wet ponds and other various systems with outlets to Bogue Sound. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Daily operations of the site will include a public walking trail with access to both of the two (2) smaller piers and one (1) longer pier. Shoreline improvements will be constructed to repair Hurricanes Florence & Dorian damage and to protect the existing shoreline from further erosion. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Construction of the piers, shoreline stabilization, and marsh sills will be by conventional marine construction equipment including barges and cranes. The equipment will be onsite only a sufficient time to complete the pile driving, pier installation, and shoreline protection work. Materials for in -water improvements will be stored in upland areas and transferred to barges for in -water construction. Timber pier piles will be driven into the substrate to minimize turbidity. d. List all development activities you propose. The construction of three (3) piers and shoreline improvements including removing and replacing existing riprap and the installation of a marsh sill, backfill, and planting of spartina alterniflora below the normal high water line. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 48,100 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. There are at least four (4) existing stormwater discharges to waters of the state. There are no proposed additional discharges. I. Will wastewater or stormwater be discharged into a wetland? ®Yes ❑No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ®No ❑NA j. Is there any mitigation proposed? ❑Yes []No ®NA If yes, attach a mitigation proposal. <Form continues on back> Kt(;tIVtU FEB 2 4 2rJr0 252-808-2808 :: 1-888-4RCOAST :: www. nccoasta l management.8 M-MHD CITY Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (t) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other Instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Albert & Marie Libby Phone No. Address 8775 SW 144m Street, Palmetta Bay, FL 33176 Name N.C. Division of Marine Fisheries Phone No. Address 3411 Arendell Street, Morehead City, NC 28557 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, perrnittee, and issuing dates. CAMA Major Permit 18-18 dated 3/1/2018 N.C. Coastal Stormwater Permit No. 960424 CAMA permit 143-97 h. Signed consultant or agent authorization forth, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), lt necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date =&o z-* Z * Print Name Carteret Community Colleg Carter ommunity College Trustees Signature 777 Please indicate application attachments pertaining to your proposed project. I ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development ®DCM MP-4 Structures Information RECEIVED FEB 2 4 2020 252-808-2808 :: 1-888-4RCOAST :: www. nccoasta lma nagement. net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length 1,280 LF Total Width 12 feet Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlandstmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL []None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. c. (i) Do you claim title to disposal area? []Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of disposal in these areas: d. High -ground excavation in cubic yards. ®This section not applicable b. Dimensions of disposal area. d. (i) Will a disposal area be available for future maintenance? ❑Yes []No ❑NA (ii) If yes, where? (i) Does the disposal include any area in the water? []Yes []No ❑NA (ii) If yes, how much water area is affected? DECEIVED FEB 2 4 2UZC P:W_11iur� pµ=e 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net � e, e £ revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 3) 3. SHORELINE STABILIZATION ❑This section not applicable (if development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: 661 If ❑Bulkhead ®Riprap ®Breakwater/Sill ®Other: Armorflex (Alternate) c. Average distance waterward of NHW or NWL: (Riprap/Armorflex), 30' (Marsh Sill) e. Type of stabilization material: Graded Riprap (Base Bid); Armorflex (Alternative) Width: —20' d. Maximum distance waterward of NHW or NWL: 14' (Riprap); —60' (Marsh Sill which follows the -2 contour) f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ONO ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill _ Riprap 3 207 sf Graded Riprap Breakwater/Sill 13,700 sf Other i. Source of fill material. Unknown 4. OTHER FILL ACTIVITIES This section not applicable (Excluding Shoreline Stabilization) a. (il Will fill material be brouaht to the site? MYes ONO ❑NA b. M Will fill material be placed in coastal wetlands/marsh (CW). If yes, (ii) Amount of material to be placed in the water 33.366 sf (iii) Dimensions of fill area Varies (iv) Purpose of fill No fill is proposed as part of the Base Bid project. Fill will only be placed between the shoreline stabilization and marsh sills as part of the Alternative project so that wetlands may be planted. submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV OSB Minimal OWL ❑None (ii) Describe the purpose of the fill in these areas: Oyster beds will be relocated on -she prior to placing fill material behind marsh sill structures in order to provide area for marsh plantings. 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Excavated material will be kept on -she through the use of a turbidity curtain. Fill material will be seeded or sodded immediately and silt fence will be used as necessary to prevent sediment from entering the water. c. (i) Will navigational aids be required as a result of the project? ®Yes ONO ❑NA (ii) If yes, explain what type and how they will be implemented. Warning posts will be installed at the toe of the marsh sills approximately 50' on center with yellow reflectors extending at least three feet above normal high water. Construction of the structures will be by conventional marine construction including barges and cranes. d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ONO ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. RECEIVED 252-808-2808 :: 1-888-4RCOAST :: v .necoastalmanasrement.net revised: 12126/06 OCM-MHD CITY 02/20/2020 Date Shoreline Improvement Project Project Name Carteret Community College / Carteret Community College Trustees Applicant Name Appli tSignature RECEIVED FEB24,t2N VGM_MHp CITY 252-808-2808 :: 1.888.4RCOAS7 www.nccoastaimanagement.net revised: 12/26/06 Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. 21 - See attached list of parcels. There are no proposed buildings. Proposed upland structures include a 10' wide elevated pervious sidewalk and one (1) pier with a 200 sf platform. Pier & platform will not extend beyond the normal high water line. c. Density (give the number of residential units and the units per acre). N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes ®No ❑NA (ii) If yes, list the date submitted: Will be submitted prior to construction. g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 11.6% i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 41.5% j. Describe proposed method of sewage disposal. Site is served by the Town of Morehead City's municipal wastewater system. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industriall commercial effluent, "wash down" and residential discharges). No new discharges are proposed as part of this project. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 20,895 square feet for the proposed elevated pervious sidewalk in the CAMA buffer. f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes [:]No ®NA (ii) If yes, list the date submitted: The College is working with NCDEQ Stormwater on updating and their current stormwater permits for the site. k. Have the facilities described in Item (i) received state or local approval? ®Yes []No ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stonmwater design? []Yes ❑No ®NA If yes, attach appropriate documentation. RECEIVED FEB G 4 , 9 252-808-28082 :: 1.888-4RCOAST :: wwwmccoastalmanagement.net Uiwis�tl; 1�§/,�Pyy Form DCM MP-3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Site is served by the Town of Morehead City's municipal water system. o. When was the lot(s) platted and recorded? Unknown. t i / vp 'L D Date Shoreline Improvement Project Project Name Carteret Community College / Carteret Community College Trustees Applicant nt Si n. (i) Will water be impounded? ❑Yes []No ONA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes ❑No ®NA RECEIVED FEB 24c19 ®CM.MHD CITY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement. net revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ®PublictGovernment ❑Private/Community c. (i) Dock(s) and/or pier(s) (li) Number 2 (III) Length (Pier #2) 126'. (Pier #3) 56' (iv) Width (Pier #2) 10', (Pier #3) 5' (v) Floating ❑Yes ®No e. (i) Are Platforms included? ®Yes []No If yes: (ii) Number 2 (III) Length (Pier #2) 20'. (Pier #3) 12' IN) Width (Pier #2) 50'. (Pier #3) 20' (v) Floating ❑Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 1 Pier #2 (ii) Number of slips existing 1 - Existino Pier i. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: 18' - 35' ❑This section not applicable b. (i) Will the facility be open to the general public? ®Yes ❑No d. (i) Are Finger Piers included? ®Yes []No If yes: III) Number 2 - Both on Pier #2 (III) Length 40' (Fixed). 20' (Floating) (iv) Width 6' (Fixed). 4' (Floating) (v) Floating ❑Yes ❑No f. (1) Are Boatlifts included? []Yes ®No If yes: (ii) Number (III) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ('Wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ® Other, please describe: Slip will only be for transient boats, no overnight dockage will be oermited. j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Typical boats to be served will be academic research boats, center consoles, and skiffs. V,M-MHD CITY 252-608-2808:: 1-a8a-4ncoasT :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) m. (i) Will the facility have tie pilings? (i) Will the facility be open to the general public? ❑Yes ®No ®Yes ❑No (ii) If yes number of tie pilings? 2. DOCKING FACIUMMARINA OPERATIONS ❑This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. No pump out facilities will be provided. c. Describe the disposal of solid waste, fish offal and trash. All solid waste will be collected at the College's solid waste containers. d. How will overboard discharge of sewage from boats be controlled? No overboard discharge of sewage will be allowed. Signs will be placed at the slip indicating this policy. e. (i) Give the location and number of "No Sewage Discharge" signs proposed. 1 - At the slip on Pier #2. (ii) Give the location and number of "Pumpout Available" signs proposed. 0 f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. Not Applicable g. Where will residue from vessel maintenance be disposed of? Not Applicable h. Give the number of channel markers and "No Wake" signs proposed. Not Applicable I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. Not Applicable j. What will be the marina policy on overnight and live -aboard dockage? No overnight or live -aboard dockage will be allowed. k. Describe design measures that promote boat basin Flushing? Not Applicable n r_n r_ 11 fc n FEB 2 4 1%, ) QCM-MMD CITY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmsnaaement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) I. If this project is an expansion of an existing marina, what types of services are currently provided? Not Applicable m. Is the marina/docking facility proposed within a primary or secondary nursery area? []Yes SNo n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell botto (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL SNone p. Is the proposed manna/docking facility located within or within close proximity to any shellfish leases? ®Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. Proposed pier is approximately 150 feet east of a shellfish lease held by NC Sea Grant. 3. BOATHOUSE (including covered lifts) SThis section not appl ab a. (i) Is the boathouse structure(s): ❑Commercial ❑PubliclGovemment ❑Private/Community (ii) Number (III) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) SThis section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ❑This section not applicable a. Length 1,458 If b. Average distance from NHW, NWL, or wetlands 30' from NHW c. Maximum distance beyond NHW, NWL or wetlands 50' from NHW 6. MOORING PILINGS and BUOYS SThis section not appli able a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. RECEIVED FEB 2 4 2020 b. Number _ d. Description of buoy (color, inscription, size, anchor, etc.) DCM-MHD CITY 252-808-2808 :: 1-888-4RCOAST :: w .nccoastalmanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) e. Arc of the swing 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines Pier #1 is approximately 150 feet from the adjacent property line. Proposed shoreline protection on the east end of the project will extend up to the College's property line. Note: For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body —6,800 feet e. (1) Will navigational aids be required as a result of the project? ®Yes ❑No ❑NA (ii) If yes, explain what type and how they will be implemented. Warning posts will be installed at the base of the marsh sills as part of the alternative project. b. Proximity of structure(s) to adjacent docking facilities. Shoreline protection on the east end of the project is approximately is approximately 220 feet from the NC DMF marina. d. Water depth at waterward end of structure at NLW or NWL —12' 8. OTHER ®This section not applicable a. Give complete description: The base project will include a vinyl and concrete cutoff wall behind the proposed riprap on the east and west ends of the shoreline project. The wall will be constructed to grade. The west end will be approximately 330 feet in length and the east end will be approximately 310 feet in length. Common to both the base project and alternate project will bean extension of the existing vinyl retaining. It will be extended approximately 80 feet to the west and 160 feet to the east to front the existing buildings. Date Shoreline Improvements Project Name Carteret Community College / Carteret Community College Trustees Applican NameRECEIVED Ap cant Signature FEB 2 4 2020 [)CAN-MHD CITY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Bodnar, Gregg From: John Wade <john@arendellengineers.com> Sent: Wednesday, June 17, 2020 10:09 AM To: Dunn, Maria T.; Bodnar, Gregg; Deaton, Anne;'Lexia Weaver' Cc: Harrison, James A; Griffin, Michael T, bill@arendellengineers.com; Mairs, Robb L;'Hair, Sarah E CIV CESAW CESAD (US' Subject: RE: (External] SAV Survey at Carteret Community College Attachments: CCC Shoreline Improvements - Marsh Sill Plan With SAVs Revised 061720.pdf After coordinating with Gregg, we have revised the proposed sill plan again this morning. We are requesting to keep the marsh sill openings at the 2 west SAV locations as was shown on the previous drawing but have relocated the sill opening at the eastern end away from the SAVs in order to provide the offshore sill opening protection. In regards to the request to fill behind the sill, after consulting with Lexia Weaver with the Coastal Fed, we have agreed to remove the request to place fill behind the sill. We will allow for natural accretion to occur. Planting of the spartina is still proposed and will occur in locations behind that sill that are suitable for the plants. Your review of the proposed plan at your earliest convenience is requested. Thanks, John John J. Wade, P.E. Vice President Arendell Engineers 1004 Arendell Street Morehead City, NC 28557 Office: (252) 622-4338 Cell: (252) 723-2796 www.ArendellEnizineers.com (arendelleneineers.coml N.C. Certification C-1509 From: Dunn, Maria T. [mailto:maria.dunn@ncwildlife.org] Sent: Wednesday, June 17, 2020 9:02 AM ToLJohn Wade <john@arendellengineers.com>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Deaton, Anne <anne.deaton@ncdenr.gov>;'Lexia Weaver' <lexiaw@nccoast.org> Cc: Harrison, James A <James.Harrison@ncdenr.gov>; Griffin, Michael T <michael.griffin@ncdenr.gov>; bill@arendellengineers.com; Mairs, Robb L <robb.mairs@ncdenr.gov> Subject: RE: [External] SAV Survey at Carteret Community College NCWRC appreciates the coordination to provide information regarding SAV presence and redesign of the sill to avoid impacts to visible SAV this season. However, as stated in our comments, NCWRC prefers no fill be placed landward the sill to minimize impacts to likely SAV habitat areas and shallow water habitats. Coastal wetland species can be planted in areas with appropriate elevations and the remainder of the areas allowed to accrete sediments or simply serve as important shallow water habitat areas. The removal of any fill would definitely reduce impacts to SAV and mostly likely allow the project to proceed more quickly with less agency concerns. ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director May 22, 2020 John Wade Arendell Engineers john@arendellengineers.com F/4F SUBJECT: Coastal Area Management Act (CAMA) Permit Application Submittal for Carteret Community College, in Carteret County Dear Sir: This letter is in response to the above referenced CAMA permit application, which was accepted as complete by the Division's Morehead City office on March 16, 2020. Processing of the application is ongoing. However, it has been determined that additional information will be required prior to the Division taking final action on your application. The required item is summarized below: 1) Correspondence submitted by NC Division of Marine Fisheries (DMF) requested an on - site submerged aquatic vegetation (SAV) survey to be conducted to determine potential impacts to SAV. Through coordination methodologies were discussed and a survey date of June 1, 2020 was provided. Therefore, it is necessary that processing of your permit application be placed in abeyance until such time as the SAV survey is completed and accepted by the resource agencies. If you have any questions concerning these matters, please feel free to contact me by telephone at (252) 808-2808 extension 215, or by email at gregg.bodnar(a),ncdenr.gov. CC: DCM files Sincerely, Gregg Bodnar Division of Coastal Management Assistant Major Permits Coordinator North Carolina Department ofrnvlronmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252.808.2808 .i Bodnar, Gregg From: Bodnar, Gregg Sent: Friday, May 22, 2020 2:37 PM To: John Wade Subject: Carteret Community College Attachments: Carteret Community College ON HOLD.pdf Afternoon John, Since there will be a slight delay in conducting the SAV survey and creating the report I have placed the project on hold for the additional information request. Once the survey is accepted then I will take it back off hold and hopefully we will have comments from DMF, WRC, DWR and USACE shortly thereafter. Thanks, Gregg •xsn.• R E tipua�oi a eT�e�.ex.i �� Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 US 2808 ext 22S (Office) Gregg Bodnar@ncdenr gov EmaH correspondence to and from this address Is subject to the North Carofhra Public Records low and may be disdosed to third portks, W& Bodnar, Gregg From: John Wade <john@arendellengineers.com> Sent: Friday, May 15, 2020 10:00 AM To: Bodnar, Gregg; 'Bill Forman' Subject: [External] RE: Carteret Community College External -email. Do not dick links or open attachments unless you verify. Sendal1 suspicious email as"in tt� attf �fto Gregg, Thanks for the comments. Coastal Federation is working to get the SAV survey done ASAP and we will provide that to you. When we had the pre -application meeting in December, the SAV survey was discussed and DMF mentioned that we could use the latest SAV survey that they had completed and that was shown on the plans. As for the fill, the contract specifications state Fill material for marsh grass propagation shall be fine to medium sand in accordance with the Wentworth sediment size classification, Phi size 1.5 to 3.5. Soil material shall be free of contaminants and muddy clayey content. The soil should match the texture and content of the bottom material along the shoreline of the project to the greatest extent possible. Contractor shall provide the source of the material and provide access to the source for inspection by the Engineer. Use of the material is subject to approval of the Engineer. If the soil is dredged spoil material, the location of the dredging shall be provided. We do not have a specific source for this material but the Contractor will have to provide a submittal on where they will be sourcing the material. Please let me know if you have any additional comments and we will send the SAV survey to you as soon as we receive it. Thanks, John John J. Wade, P.E. Vice President Arendell Engineers 1004 Arendell Street Morehead City, NC 28557 Office: (252) 622-4338 Cell: (252) 723-2796 www.ArendellEnizineers.com rarendelleneineers.coml N.C. Certification C-1509 From: Bodnar, Gregg [mailto:gregg.bodnar@ncdenr.gov] Sent: Wednesday, May 13, 2020 2:34 PM To: Bill Forman <bill@arendellengineers.com>; John Wade <john@arendellengineers.com> Subject: Carteret Community College Afternoon all, TA DMF is requesting an SAV survey for the living shoreline (see above). Also, Shellfish Sanitation as asked about the source of the fill for the wetland planting since the area is open to shellfishing. Since we are in the SAV active growing season hopefully the survey should not talk too long and not require a hold for the additional information. The attachment above has the contact information for DMF if you have any questions pertaining to the survey. Thanks, Gregg d, erma�t� mu.� Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmernal Quality 252 SM 2808 eM 215 (Office) G%MBodnarpncd enr.gov Email correspondence to and from this address Is subject to the North earoNna Pubfic Retards caw and may be disclosed to third parties, Bodnar, Gregg From: Styron, Heather M. Sent: Tuesday, April 28, 2020 9:46 AM To: Bodnar, Gregg Subject: RE: [External] FW: Project Notification for ID 20200562 Ver 1 for 3505 Arendell St I agree with you in that this does not meet our definition of develpoment and feel like whatever DMF would want to do this would be ok. From: Bodnar, Gregg Sent: Tuesday, April 28, 2020 9:02 AM To: Styron, Heather M. <heather.m.styron@ncdenr.gov> Subject: RE: [External] FW: Project Notification for ID 20200562 Ver 1 for 3505 Arendell St So they are asking to relocate the oysters before the application is processed? If so we would not consider that development, right?. I would contact DMF (Anne Deaton and/or Jimmy Harrison) to discuss so they have record and an OK. Thoughts? Gregg From: Styron, Heather M. <heather.m.styron@ncdenr.gov> Sent: Tuesday, April 28, 2020 8:57 AM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: FW: [External] FW: Project Notification for ID 20200562 Ver 1 for 3505 Arendell St Hey Gregg, Please see the highlighted area below because I forgot to mention this in my bio report (totally my fault). Is this something that could be done before permit issuance through DMF guidance etc.? Thanks, Heather From: John Wade[mailto:iohn@arendellengineers.coml Sent: Monday, April 27, 2020 4:20 PM To: Styron, Heather M. <heather.m.styron@ncdenr.gov> Subject: [External] FW: Project Notification for ID 20200562 Ver 1 for 3505 Arendell St Heather, The College received the email below from DWR. Is this for the CAMA permit? Also, in the permit submittal, we discussed that the existing oysters that are growing on the riprap would be relocated on -site. The College has had a Boy 1. Scout approach them about completing this as part of their Eagle Scout project. Would this be acceptable and if so, how quickly could this work begin? Thanks, John John J. Wade, P.E. Vice President Arendell Engineers 1004 Arendell Street Morehead City, NC 28557 Office: (252) 622-4338 Cell: (252) 723-2796 www.ArendellEneincers.com farendelleneineers.coml N.C. Certification C-1509 From: Stephen Sparks [mailto:soarkssCdcarteret.edu] Sent: Monday, April 27, 2020 2:24 PM To: John Wade <6ohn0arendellengineers.com> Subject: FW: Project Notification for ID 20200562 Ver 1 for 3505 Arendell St Would this be our shoreline project? Steve Sparks Vice President, Operations and Facilities Carteret Community College 3505 Arendell Street Morehead City, NC 28557 252-222-6087 saarkss@carteret.edu "A Sound Education" From: laserfiche(@ncdenr.gov <Iaserfiche@ncdenr.gov> Sent: Monday, April 27, 2020 1:04 PM To: Stephen Sparks <spa rkssCcDca rteret.ed u> Subject: Project Notification for ID 20200562 Ver 1 for 3505 Arendell St I` [CAUTION]: This email originated outside of the Carteret Community College email system. Do not click E ; links or oven attachments unless you have verified the sender and know the content is safe. The North Carolina Division of Water Resources has received application or request that you submitted on 4/23/2020 for 3505 Arendell St. The ID number for that project is 20200562, Version 1. Reviewer Contact Information: Robb Mairs - robb.mairs@ncdenr.gov Wilmington Regional Office - (910) 796-7215 If you have questions, please contact one of the staff members listed below: "transportation Projects Contact: Kristi Lynn Carpenter at kristilynn.carpenter .ncdenr.gov All other Projects Contact: Sheri Montalvo at sheri.montalvo@ncdenr.gov Project file link: https:Hedocs deq ne.eov/WaterResources/Browse.aspx?dbid=0&startid=l l56203 If this permit application was submitted outside of standard business hours, it will be considered to have been received on the next business day. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored. Privacy & Confidentiality Notice - Email correspondence to and from this address is subject to the North Carolina Public Records Law and shall be disclosed to third parties when required. (N.C.G.S. Ch. 132) Privacy & Confidentiality Notice - Email correspondence to and from this address is subject to the North Carolina Public Records Law and shall be disclosed to third parties when required. (N.C.G.S. Ch. 132) t ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Arendell Engineers John Wade john@arendellengineers.com NORTH CAROLINA Environmental Quality June 18, 2020 SUBJECT: Coastal Area Management Act (CAMA) Permit Application Submittal for Carteret Community College, in Carteret County 101Tiuiatm. reN This letter is in response to the above referenced CAMA permit application for Carteret Community College, which was accepted as complete by the Division's Morehead City office on March 16, 2020. On May 22, 2020, processing of your application was placed on hold pending resolution of a Submerged Aquatic Vegetation (SAV) survey and approval. This office received the SAV survey and subsequent redesign of the project on June 17, 2020. Therefore, processing of your permit application has officially resumed. The revised projected 75-day deadline for making a decision is June 25, 2020. Please feel free to contact me by phone at (252) 808-2808 ext. 215 if you would like to discuss this matter further. Sincerely, Gregg Bodnar Assistant Major Permits Coordinator North Carolina Department of Environmental QualBy I Division of Coastal Management Morehead Ctty Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252.8082808 Bodnar, Gregg From: Bodnar, Gregg Sent: Thursday, June 18, 2020 9:52 AM To: 'John Wade' Cc: Mairs, Robb L; 'Hair, Sarah E CIV CESAW CESAD (US)'; Styron, Heather M. Subject: Carteret Community College Off Hold Attachments: Carteret Community College OFF HOLD.pdf Morning John, With the acceptance of the SAV survey, the redesign resulting from the survey and the acceptance of the redesign by WRC and DMF to date, the project was taken off hold as of June 17, 2020. Please see above for the off hold memo for your file. Thanks, Gregg Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental quality 2S2 BW 28M ext 21S (Office) Gre nar ncd ng go_v Email correspondence to and from this address is subject to the North Carolina Public Records law and may be disclosed to third parties, Bodnar, Gregg From: Lexia Weaver <lexiaw@nccoast.org> Sent: Tuesday, June 9, 2020 2:33 PM To: Harrison, James A; Griffin, Michael T; Deaton, Anne; John J. Wade; Bodnar, Gregg Subject: Fwd: [External] SAV Survey at Carteret Community College Attachments:" CCC_SAV.pdf; 2020-06-09 CCC SAV Survey Data.xlsx Good afternoon everyone, This morning we surveyed vegetation and shellfish along 5 transects perpendicular to the CCC shoreline. See attached map and associated data. The transects are approximately 250 ft. apart and their locations were chosen to get representation of the various current stabilization measures, while also avoiding the stormwater outfalls and the locations of the proposed piers to be able to perform post -construction monitoring at these same locations later. Each transect was surveyed every 15 ft. with the exception of Transect 1 which was surveyed every 5 feet within the marsh area to capture the vegetation diversity there. We were not able to survey further than 30 ft. offshore for transects 4 and 5 without snorkel/dive gear due to deeper water depths at these locations. In summary, there were numerous clumps of macroalgae close to shore as well as some oyster clumps that could easily be confused with SAV on aerial images. See photos below. We only found one location with the presence of SAV, likely, shoal grass, Haioduie wrightii, at transect 2, 45 feet from shore. See photo below. This data is highlighted in yellow in the attached spreadsheet. I believe the landward toe of the granite sill is proposed to be 30 feet from NHW with a width of 12 feet which gets us to 42 ft. from NHW, 3 ft. away from the existing SAV. One idea would be to change the location of the proposed sill in the vicinity of transect 2 by placing the sill closer to shore to abide by the Section .2700 General Permit for the Construction of Marsh Sills Specific Condition: "All sills shall have a minimum setback of 10 feet from any native submerged aquatic vegetation." Once we have the drone imagery, we will see if there are additional areas that need to be ground-truthed. Let me know if this information is sufficient to issue the permit or if we need to perform a more in-depth survey in the vicinity of Transect 2 where the SAV was found and complete the survey for transects 4 and 5. I can also clean up the data more and compile it into a more formal report if needed, but I just wanted to get the data to you as soon as possible. -Lexia Macroalgae clumps: 1 l y1p� Wr 5Xmm 64 , : ECA v :Gov - G' P A-sv@e DD p per, J G ©6�3 M ( cuNtu9 Latitude Longitude Transect Description 34.72262-76.7546 1 Just waterward of marsh edge. Oysters under 5%. 34.72261-76.75461 1 Marsh edge. 17.5' from PVC post. 5%Spartina alterniflora (smooth cordgrass). 34.72262-76.75458 1 5' landward of marsh edge. 85%Spartina alterniflora (saltmeadow hay). Spartina patens (saltmeadow hay), 5-10%Salicornia virginica (glasswort), 1% Borrichia frutescens (seaoxyeye), 3%Solidago sempervirens (seaside 34.72262-76.75458 1 goldenrod). 15' landward of marsh edge . 90%Juncus roemerianus (black needlerush), 5%Spartina alterniflora (smooth cordgrass), 1%Spartina patens 34.72266-76.75458 1 (saltmeadow hay) 20' landward of marsh edge. 40% Schoenoplectus americanus (three -square bulrush), 1% Borrichia frutescens (seaoxeye), 2% Iva frutescens (marsh- 34.72265-76.75458 1 elder). 34.72265-76.75459 1 25' landward of marsh edge. 40%cattail, 30% Schoenoplectus americanus (three -square bulrush), 5% pennywort. 34.72256-76.7546 1 15' waterward of marsh edge. No vegetation. Some shell hash. 34.72252-76.7546 1 30' waterward of marsh edge. No vegetation. 34.7225-76.75463 1 45' waterward of marsh edge. No vegetation. 34.72246-76.75464 1 60' waterward of marsh edge. No vegetation. 34.72242-76.75464 1 75' waterward of marsh edge. No vegetation. 34.7227-76.75559 2 Oyster edge. 70%oysters. _ 34.72269-76.75559 2 15' landward of oyster edge. granite stones. 34.72266-76.75559 2 15' waterward of oyster edge. 10% macroalgae. 34.72263-76.75561 2 30' waterward of oyster edge. 2% shell hash. ' 34.72257-76.75562 2 45' waterward of oyster edge. 15%SAV, likely Halodule wrightii (shoal grass) - 34.72254-76.75562 2 60' waterward of oyster edge. No vegetation. 34.72249-76.75561 2 75' waterward of oyster edge. No vegetation. 34.72262-76.75666 3 At PVC post. 20%Solidago sempervirens (seaside goldenrod), 10% pennywort. 34.72255-76.75665 3 Shoreline edge. 3%macroalgae . 34.72259-76.75663 3 15' landward of shoreline edge. Concrete pillows. 34.72252-76.75664 3 15' waterward of shoreline edge. 5% macroalgae. 34.7225-76.75665 3 30' waterward of shoreline edge. Shell hash. 34.72245-76.75663 3 45' waterward of shoreline edge. No vegetation. - 34.72241-76.75662 3 60' waterward of shoreline edge. No vegetation. 34.72237-76.75661 3 75' waterward of shoreline edge. No vegetation. 34.7223-76.75749 4 At PVS post. Granite. 34.72224-76.75748 4 Shoreline edge. 15%macroalgae 34.72227-76.75748 4 15' landward of shoreline edge. Granite. 34.72221-76.75746 4 15' waterward of shoreline edge. 10% algae 34.72219-76.75745 4 30' waterward of shoreline edge. 75%shell hash. 34.72211-76.75827 5 Shoreline edge. 70%oysters. 34.72213-76.75827 5 15' landward of shoreline edge. 50% Borrichia frutescens (sea oxeye), rock. 34.72213-76.75928 5 30' landward of shoreline edge. 20% Borrichia frutescens (sea oxeye), rock. 34.72206-76.75825 5 15' waterward of shoreline edge. 30%Codium fragile (deadman's fingers), 2% shell hash. 34.72204-76.75825 5 30' waterward of shoreline edge. No vegetation. z I 1 1 Macroalgae found: 7 SAVfound: Lexia M. Weaver, Ph.D. Coastal Scientist and Central Regional Manager 252-393-8185 (o) 252-646-2408 (c) 3609 Highway 24 (Ocean) Newport, NC 28570 Visit www.nccoast.org rnccoast.oral to join or learn more. Get the latest coastal news with Coastal Review Online rcoastaIreview. orol. On Tue, Jun 9, 2020 at 7:25 AM Deaton, Anne <anne.deaton(ancdenr.gov> wrote: Good luck! CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS MAJOR CAMA PERMIT APPLICATION MOREHEAD CITY, CARTERET COUNTY, NORTH CAROLINA PROJECT NARRATIVE February 20, 2020 INTRODUCTION Carteret Community College and property owned by the College is located between Arendell Street and the shoreline of Bogue Sound in the 3500 block of Arendell Street in Morehead City, Carteret County, North Carolina. The shoreline of the property runs east to west for approximately 2,550 feet. Buildings, parking, and open green spaces are located along the shoreline in many places less than 50 feet from the normal high tide line. There are five (5) parcels along the waterfront that are owned by the Carteret Community College and the Carteret Community College Board of Trustees (Sheet A). These two (2) entities will be joint applicants for the permit. A combination of hard and soft shoreline stabilization measures are proposed as two alternative projects, the base bid revetment project and the living shoreline alternate project. The objective of the living shoreline alternative is to minimize the hard armoring of the shoreline limiting rehabilitation to locations fronting critical infrastructure and supplement those measures with living shoreline treatment. This alternative is dependent upon receipt of grant funding that has been applied for by the College through the National Fish and Wildlife Foundation's Emergency Coastal Resilience Fund. The living shoreline measures will provide aesthetic and environmental enhancements as well as toe protection for the shoreface armoring measures. An articulated concrete mat is proposed to armor the shoreline in lieu of the riprap revetment in the living shoreline project. A site plan of the proposed improvements is shown on Sheet 03. PROJECT DESCRIPTION Western Segment - Western end of college property. No shoreline stabilization improvements are proposed to the existing and functioning living shoreline improvements at the Carteret Community College Shoreline Improvements RECEIVED February 20, 2020 Major CAMA Permit Application — Narrative Page 1 of 6 FEB 2 4 2UZU DCM-MHD CITY western end of the project in front of the CMAST and Aquaculture Laboratory buildings. As part of the College's waterfront access project, an observation deck and 10' wide sidewalk along the shoreline is proposed. The observation deck will be of light timber construction and include a pier 10 ft. wide extending approximately 22 ft. seaward to a 12 ft. by 20 ft. platform above high ground. (Sheet 08). This pier will be connected to the public elevated sidewalk and open to the public with educational installed on the pier therefore a 10' width is recommended. Western Segment — Base Bid Revetment Project - Shoreline segment fronting the parking lot, Student Center and Civic Center. Two alternatives are presented for stabilization of the western segment of the shoreline. Sheet 04 shows a base bid project that includes removal of the concrete debris along approximately 360 linear feet of shoreline and replacement with a conventional layered riprap revetment. Revetment improvements involve complete removal of the concrete debris down to the ground beneath and replacement with a graded riprap revetment with a filter layer on the ground, an intermediate stone size fill and a layer of larger armor stones. A concrete and vinyl cutoff wall will be constructed along the landward edge of the revetment with an approximate length of 330 feet. The top of the wall will be at the ground level and will tie into the vinyl wall in the center segment. The purpose of the wall is to minimize and attenuate water runoff from the land at the back of the riprap and keep soil from the upland from being eroded from behind the revetment. A section of the revetment is shown on Sheet 05. Western Segment — Alternative Living Shoreline Project. This alternative involves a softer treatment of the shoreline including armoring of the upper shoreline by removing the concrete debris, grading to a 3:1 slope and placing an AmorFlex© articulated concrete mat along the shore face. The voids in the armor units are then filled with soil and grassed. That grass can be maintained or left to grow unmaintained. The ArmorFlex© mat is placed on a foundation layer of filter fabric and aggregate that is sized larger than the voids in the armor mat. Sheet 10 provides a plan view of this alternative. A riprap sill with a 12 ft. wide base, 4 ft. high will be placed some 30 feet seaward of the mean high water line offshore of the toe of the AmorFlex© mat at an elevation of approximately -2, NAVD88. The top of the sill will be at elevation +2. There will be gaps in the sill at intervals of Carteret Community College Shoreline Improvements RECEIVED Major CAMA Permit Application — Narrative February 20, 2020 Page 2 of 6 FEB 2 4 2020 DCM-MHD CITY 200 feet with riprap sill segments offshore of the gaps to prevent erosion of the marsh at the gaps. The bottoms between the toe of the armor and the sill will be filled with sand and planted with marsh grasses at elevations conducive to propagation of marsh grasses. This will provide both aesthetic and environmental enhancements of the shoreline as an alternative to hardening with riprap. A section illustrating the improvements is shown on Sheet 11. Common to both the base bid and alternative living shoreline project along the western segment is construction of an elevated pervious Hogslat concrete sidewalk 10 feet wide along shoreline landward of the revetment (Sheet 03). This elevated walkway will be outside of the 30' CAMA buffer except for where it will connect to the piers. Also common to both is construction of a public water access pier 10 feet wide extending approximately 128 feet from shore with a 20 ft. by 50 ft. platform at the seaward end and one 6 ft. by 40 ft. finger pier on the eastern side of the walkway in deeper water. The finger pier will have a 4 ft. by 20' floating dock that will be used as a kayak launch. An articulated gangway will connect the two (2) structures (Sheet 09). This pier will be accessible to the public as it is connected to the proposed elevated pervious sidewalk and therefore a 10 foot width is recommended. Center Segment — Base Bid Project - Shoreline fronting the Civic Center and Smith Building. The concrete Fiberform mattress will be saw cut approximately 4 feet from the face of the wall and that space cleaned out and filled with a graded riprap filter and armor stone. The plan for the center segment improvements is shown in Sheet 04. A typical section of the improvements is shown on Sheet 06. Center Segment — Alternative Living Shoreline Project. The offshore riprap sill will be placed at approximate elevation of -2 NAVD88 with the crest of the sill at elevation +2.0 (Sheet 10). There will be gaps in the sill every 200 feet to facilitate flushing from behind the sill and short sill sections fronting the gaps to protect against erosion hot spots of the fill and grasses at the gaps. Common to both the base bid revetment and alternative living shoreline projects along the center segment is construction of a continuous elevated pervious Hogslat concrete sidewalk 10 feet wide along the shoreline landward of the revetment, an extension of the existing vinyl Carteret Community College Shoreline Improvements February 20, 2020 Major CAMA Permit Application — Narrative Page 3 of 6 FEB 2 4 2020 DCM-MHD CITY retaining wall approximately 80 feet to the west and 160 feet to the east to front the existing buildings, and repair of stormwater outfalls. Eastern Segment — Base Bid Revetment Project - Shoreline fronting the welding and construction trades building. Improvements under the revetment project along this segment of the shoreline are similar to the improvements proposed for the western segment under the base bid revetment project. Revetment improvements involve complete removal of the concrete debris down to the ground beneath and replacement with a graded riprap revetment with a filter layer on the ground, an intermediate stone size fill and a layer of larger armor stones. A concrete and vinyl cutoff wall will be constructed along the landward edge of the revetment with an approximate length of 310 feet. The top of the wall will be at the ground level. A plan of these improvements is shown on Sheet 04. Eastern Segment— Alternative Living Shoreline Project. The living shoreline improvements in the eastern segment are an extension of the offshore riprap sill and marsh grass planting project along the western segment. The tops of the riprap sills with be nearly submerged at high tide. Treated timber witness posts will be driven at the toe of the riprap with reflective material at the top to serve as a warning for shallow draft boats navigating near the shoreline and prevent them from running aground on the riprap sills (Sheet 13). Common to both the base bid revetment and alternative living shoreline projects along the eastern segment is construction of a continuous elevated concrete sidewalk 10 feet wide along shoreline landward of the revetment, and construction of a second public observation deck with a 5 ft. wide pier extending some 40 ft. from shore with a 12 ft. by 20 ft. platform on the seaward end (Sheet 08). The platform will not extend more than 6' over the proposed wetland plantings. This pier will be connected to the public elevated sidewalk and open to the public with educational installed on the pier therefore a 10' width is recommended. EXISTING CONDITIONS Site Topography and Hydrography - The topography of the upland development site is relatively flat varying from 4 to 20 feet in elevation on the site. The base flood elevation at the site is 9 feet (NAVD 88 datum). RECEIVED Carteret Community College Shoreline Improvements Major CAMA Permit Application — Narrative FEB 2 4 2020 February 20, 2020 Page 4 of 6 DCM-MHD CITY Land Use — The use of the site is as a state-owned college with academic, administrative, civic center & research buildings on the site Wetlands - There are small pockets of coastal wetlands near the east and west ends of the shoreline repair project. These wetlands will not be impacted as part of the project. There are no wetlands where the piers will be located. There are existing oyster clusters along the base of the riprap to be removed and small oyster beds located seaward of the shoreline. These oyster clusters will be removed and relocated on -site. Areas of Archeological or Historic Value — There are no known areas of archeological or historic value on the site. Navigation — The three (3) proposed piers and the marsh sill will be located outside of the setback from the federal channel. The federal channel boundary line runs parallel to the shoreline. Stormwater — The College is working with a consultant to combine the existing NC state stormwater permits for the site. The consultant is working with Christine Hall from NCDEQ METHODS OF CONSTRUCTION Construction of the piers, shoreline stabilization, and marsh sills will be by conventional marine construction equipment including barges and cranes. The equipment will be onsite only a sufficient time to complete the pile driving, pier installation, and shoreline protection work. Materials for in -water improvements will be stored in upland areas and transferred to barges for in -water construction. Timber pier piles will be driven into the substrate to minimize turbidity. PROJECT SCHEDULE Construction of shoreline improvement project is expected to start soon after permit issuance and within the permitted time frame. Carteret Community College Shoreline Improvements FRECEFebruary 20, 2020 Major CAMA Permit Application — Narrative Page 5 of 6 FEB 2 4 2020 DCM-MHD CITY COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT The Regulatory Reform Act of 2011 (SB 781) was passed by North Carolina Legislature in July 2011. This bill eliminates the requirement for an environmental assessment (EA) for any project requiring a Major CAMA permit. Therefore, the proposed project is not subject to N. C. Environmental Policy Act review. ADJACENT PROPERTY OWNERS Letters notifying adjacent properties owners of the Carteret Community College Shoreline Improvements CAMA Permit Application have been sent to the following properties owners by certified mail. Copies of those letters are attached. Adjacent Riparian Property Owners N.C. Division of Marine Fisheries 3411 Arendell Street Morehead City, NC 28557 Albert & Marie Libby 8775 SW 1441 Street Palmetta Bay, FL 33176 REC;:j1.4r.p Carteret Community College Shoreline Improvements February 20, 2020 Major CAMA Permit Application — Narrative FEB 2 4 2020 Page 6 of 6 DCM-MHD CITY N/F LIBBY, ALBERT ETUX MARIE "� CARTERET COMMUNITY � COLLEGE FOUNDATION CARTERET COMMUNITY — - CARTERET COMMUNITY COLLEGE FOUNDATION Nff — - — . __ J COLLEGE TRUSTEES CARTERET L J_ / ARE COMMUNITY COLLEGE U.S. STREET HHIGHNIGHWAY ril / 11 NIF CARTERET COMMUNITY �7 COLLEGE FOUNDATION Ti- CARTERET COMMUNITY L COLLEGE 1 CARTERET COMMUNITY ' COLLEGE TRUSTEES Iff 1 CARTERET COMMUNITY COLLEGE I- - I f I NIF CARTERET COMMUNITY COLLEGE I NIF CARTERET COUNTY � CARTERET COMMUNITY COLLEGETRUSTEES NIF� CARTERETCOMMUNITY COLLEGE NIF CARTERET NIF COMMUNITY COLLEGE CARTERET COMMUNITY COLLEGE RECEIVED FEB 2 4 2020 DCM-MHD CITY NIF NC DIVISION OF MARINE FISHERIES NO DESflRCN 61 M1E w ... .. H AREN DELL I Y s 2 "`� '� NLO WG! CARTERET ART 505 COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 PROIELi CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS [IGWNG IIIIE ADJACENT PROPERTY OWNERS KSIGWI - R reoe Carteret Community College Shoreline Improvements - Platform Dimension Table Structure Length (ft) Width (ft) Total Area (sf) Existing Platform 13.67 26.25 359 Pier #2 Platform 20 50 1000 Pier #2 Finger Pier 6 40 240 Pier #2 Floating Dock 4 20 80 Pier #3 Platform 12 20 240 Total 1919 RECEIVED FEB 2 4 2020 DCM-MHD CITY Carteret Community College List of Parcels Parcel PIN Owner Parcel Size (acres) Deed Referenced 637618217539000* Carteret Community College Trustees 6.14 1636-8 637618310573000* Carteret Community College 4.48 544-357 637618314691000* Carteret Community College 7.44 369-25 637618410639000* Carteret Community College 3.61 464-87 637618413985000* Carteret Community College Trustees 6.49 1657-447 637618326043000 Carteret Community College 3.89 920-43 637618324176000 Carteret Community College 0.597 920-43 637618322193000 Carteret Community College Foundation 0.463 807-121 637618322116000 Carteret Community College Foundation 0.606 807-121 637618323245000 Carteret Community College Foundation 0.143 807-121 637618322236000 Carteret Community College Foundation 0.099 807-121 637618321206000 Carteret Community College Foundation 0.286 1613-308 637618320098000 Carteret Community College Foundation 0.323 738-99 637618312913000 Carteret Community College 0.784 1032-204 637618310974000 Carteret Community College 0.51 781-125 637618228180000 Carteret Community College Trustees 0.943 1237484 637618226127000 Carteret Community College Trustees 3.43 1552-330 637617223029000 Carteret Community College Trustees 0.827 1636-8 637617222002000 Carteret Community College Foundation 0.41 1400-397 637617211974000 Carteret Community College Foundation 0.123 1400-397 637617220169000 Carteret Community College Foundation 0.792 1488-85 637618319945000 Carteret County 1.919 522-471 44.31 Rc�ci"✓� FE8 2 4 i0a Dc"ND Clly Major CAMA Permit Application Carteret Community College Shoreline Improvements Morehead City, North Carolina February 20, 2020 Applicant: Carteret Community College / Carteret Community College Trustees 3505 Arendell Street Morehead City, NC 28557 Prepared For: North Carolina Department of Environmental Quality Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Prepared By: ARENDELL ENGINEERS 1004 Arendell Street Morehead City, North Carolina 28557 (252) 622-4338 NC Certification No. C-1509 RECEIVED FEB 2 4 2020 CCM-MHD CITY ufTllll�l lo T1111• _7 Eidr\1711111N7_II[4P CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS MOREHEAD CITY. CARTERET COUNTY. NORTH CAROLINA Table of Contents DCM MP — 1 Application for Major Development Permit DCM MP — 2 Excavation and Fill DCM MP — 3 Upland Development DCM MP —4 Structures PROJECT NARRATIVE INTRODUCTION PROJECT DESCRIPTION Western Segment —Western end of college property Western Segment — Base Bid Revetment Project — Shoreline segment fronting the parking lot, Student Center, and Civic Center. Western Segment —Alternative Living Shoreline Project Center Segment — Base Bid Project — Shoreline fronting the Civic Center and Smith Building Center Segment —Alternative Living Shoreline Project Eastern Segment — Base Bid Revetment Project — Shoreline fronting the welding and construction trades building Eastern Segment —Alternative Living Shoreline Project. EXISTING CONDITIONS Site Topography and Hydrography Land Use Wetlands Areas of Archaeological or Historic Value Navigation METHODS OF CONSTRUCTION PROJECT SCHEDULE COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT ADJACENT PROPERTY OWNERS Email from Christine Hall Dated 12/10/2019 Platform Dimension Table Carteret Community College — List of Parcels RECEIVED Waterfront Parcel Deeds Parcel Pin: 637618217539000, Deed Reference: 1636-8 FEB 2 4 2120 Parcel Pin: 637618310573000, Deed Reference: 544-357 QCM-MHD CITY Parcel Pin: 637618314691000, Deed Reference: 369-25 Parcel Pin: 637618410639000, Deed Reference: 464-87 Parcel Pin: 637618413985000, Deed Reference: 1657-447 Figure A — Adjacent Property Owners Application Drawings Sheet 01 —Vicinity Map Sheet 02 — Existing Conditions & Demolition Plan Sheet 03 — Overall Schematic Site Plan Sheet 04 — Base Bid Revetment Project Sheet 05 — Base Bid Sections Sheet 1 of 3 Sheet 06 — Base Bid Sections Sheet 2 of 3 Sheet 07 — Base Bid Sections Sheet 3 of 3 Sheet 08 — Piers #1 & #3 Plan & Profile Sheet 09 — Pier #2 Plan & Profile Sheet 10 — Alternate Option Living Shoreline Plan Sheet 11 — Alternate Option Sections Sheet 1 of 3 Sheet 12 — Alternate Option Sections Sheet 2 of 3 Sheet 13 — Alternate Option Sections Sheet 3 of 3 Sheet 14 - Details Adjacent Property Owner Notification Letters Authorized Agent Letter RECEIVED FEB 2 4 2020 DCM-MHD CITY AARENDELL 1004 Arendell Street Morehead City, North Carolina 28557 (252)622.4338 N. C. Certification No. C•1509 February 20, 2020 Ms. Heather Styron N.C. Division of Coastal Management 400 Commerce Avenue Phone: (252) 808-2808 Morehead City, NC 28557 Email: heather.m.styronaa. ncdenr.gov Re: Carteret Community College Shoreline Improvements (19063) Major CAMA Permit Submittal Morehead City, North Carolina Dear Ms. Styron: On behalf of the Carteret Community College and the Carteret Community College Board of Trustees please find enclosed the Major CAMA submittal package for the Shoreline Improvement Project at the Carteret Community College in Morehead City, North Carolina. This package has been revised to address the comments provided during our preliminary submittal review meeting on February 19, 2020. A check for $400.00 is enclosed made payable to NCDEQ. A copy of the transmittal letter to the adjacent property owners is included with this submittal. The permit documents have been sent to the adjacent property owners via Certified mail. The return receipts will be submitted to your office once they are received. If you have any questions, please feel free to contact myself or Bill Forman. We appreciate your help with this project. Sincerely, ARENDELL ENGINEERS John J. Wade, P.E. Vice President Cc: Steve Sparks, Carteret Community College Lexia Weaver, Coastal Federation (via Email) Bill Forman, Arendell Engineers RECEIVED FEB 2 4 2020 OW-MHD CITY Styron, Heather M. From: John Wade <john@arendellengineers.com> Sent: Monday, March 16, 2020 8:13 AM To: Styron, Heather M. Subject: RE: [External] CCC Adjacent Property Attachments: Libby - Certified Mail Receipt.pdf Heather, Attached is a scan of the green card that was sent to the Libby's last week. Do I need to bring you the hard copies? Thanks, John John J. Wade, P.E. Vice President Arendell Engineers 1004 Arendell Street Morehead City, NC 28557 Office: (252) 622-4338 Cell: (252) 723-2796 www.ArendellEneineers.com rarendelleneineers.coml N.C. Certification C-1509 From: Styron, Heather M. [mailto:heather.m.styron@ncdenr.gov] Sent: Saturday, March 14, 2020 1:41 PM To: John Wade <john@arendellengineers.com> Subject: RE: [External] CCC Adjacent Property Great and Thanks John. From: John Wade[mailto:[ohn@arendellenaineers.coml Sent: Thursday, March 12, 2020 5:27 PM To: Styron, Heather M. <heather.m.stvron@ncdenr.gov> Cc:'Bill Forman' <bill@a rendellengineers.com> Subject: [External] CCC Adjacent Property Heather, It appears the adjacent property notification was delivered this afternoon. Hopefully I will get the green card back no later than Monday. Also, the original package sent to Florida is on its way back to me. Thanks, John John J. Wade, P.E. Vice President Arendell Engineers 1004 Arendell Street Morehead City, NC 28557 Office: (252) 622-4338 Cell: (252) 723-2796 www.ArendellEngineers.com rarendellengineers.coml N.C. Certification C-1509 Advertising Receipt Jessica Gibson NC Division of Coastal Management 400 Commerce Avenue MOREHEAD CITY, NC 28557 CARTERET PUBLISHING 4206 Bridges Street Ext. PO Box 1679 Morehead City, NC 28557 Phone: (252)726-7081 Fax:(252)726-6016 Cust#: 13112292 000 Ad#: 13585434 Phone: (252)808-2808 Date: 04/02/20 Ad taker: Adm Salesperson: Classification: 175 Description Start Stop Ins. CosUDay, Surcharges Total 01 Carteret County News -Time 04/05/20 04/05/20 1 69.87 69.87 Payment Reference: Credit Card Holder: Credit Card Number: Credit Card Expiration: Credit Card Verification #: Credit Card Verification Amt: 0.00 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received as complete on 3116/2020. According to said application, Carteret Community College and the Carteret Community College Board of Trustees proposes to Total: 69.87 Tax: 0.00 Net: 69.87 Prepaid: 0.00 Total Due 69.87 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Envi- ronment and Natural Re- sources hereby gives pub- lic notice as required by NCGS 113A-119(b) that application for a develop- ment permit in an Area of Environmental Concern as designated under the LA- MA was received as com- plete on 3/16/2020. Ac- cording to said application, Carteret Community Col- lege and the Carteret Community College Board of Trustees proposes to construct two observation piers with platforms, a third pier with one slip and a kayak launch, construction of a public walking trail with access to the piers, shoreline stabilization and sill construction along Ho- gue Sound for the 44.3- acre parcel located at 3505 Arendeil Street in Morehead City, NC. A copy of the entire applica- tion may be examined or copied at the office of Heather Styron, NC Divi- sion of Coastal Manage- ment, located at 400 Com- merce Avenue, Morehead City, NC, (252) 808.2808 during normal business hours. Comments mailed to Brax- ton C. Davis, Director, Di- vision of Coastal Manage- ment, 400 Commerce Ave- nue, Morehead City, N.C. 28557, prior to 4/25/20, will be considered In mak- ing the permit decision. Later comments will be ac- cepted and considered up to the time of permit deci- sion. Project modification may occur based on re- view and comment by the public and state and feder- al agencies. Notice of the permit decision In this mat- ter will be provided upon written request. A5 John Wade From: Hall, Christine <Christine.Hall@ncdenr.gov> Sent: Tuesday, December 10, 2019 9:07 AM To: Hardison, Lyn; Weychert, Curtis R; twyla.cheatwood@noaa.gov, fritz.rohde; kathryn_matthews@fws.gov, Dunn, Maria T.; Styron, Heather M.; Brownlow, Roy, Hair, Sarah E CIV CESAW CESAD (US; Haines, Andrew; Mairs, Robb L; sparkss@carteret.edu; John Wade; Hall, Rhonda B Subject: RE: Carteret Community College Scoping Meeting Lyn, Thanks for including me in the invite; however, stormwater will not be able to attend on December 2016. Additionally, there are other stormwater compliance concerns on campus that require additional discussion beyond the scope of this proposed project. I will work with John Wade directly to see if a separate stormwater scoping meeting is needed. To facilitate the discussion at this one -stop meeting, here are some general stormwater concerns regarding the proposed project: 1. Much of the campus is covered by overlapping and conflicting stormwater permits. Additionally, improvements and modifications within permitted areas have been made to the campus that were not submitted to stormwater for review and approval. My understanding is that efforts are being made to resolve these issues in a master stormwater plan and permit for the campus. 2. The information provided does not identify the type of material proposed for the walkway. It is noted that it will be constructed upland of the 30' CAMA buffer; however, I couldn't find a discussion regarding the stormwater setback/buffer. How does this project anticipate to meet or provide an exemption to the 50' vegetated setback required in the 2017 stormwater rules? Of if this area is covered under a previous permit and it is intended to remain covered under that permit— how will the applicable stormwater buffer rules from the applicable set of rules be met? 3. 1 do not have any comments at this time on the shoreline improvements or piers. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Appointment ----- From: Hardison, Lyn Sent: Monday, December 9, 2019 5:06 PM To: Weychert, Curtis R; twyla.cheatwood@noaa.gov; fritz.rohde; kathryn_matthews@fws.gov; Dunn, Maria T.; Styron, Heather M.; Brownlow, Roy; Hair, Sarah E CIV CESAW CESAD (US; Haines, Andrew; Mairs, Robb L; sparkss@carteret.edu; John Wade; Hall, Christine; Hall, Rhonda B Subject: Carteret Community College Scoping Meeting When: Friday, December 20, 2019 10:00 AM-11:30 AM (UTC-05:00) Eastern Time (US & Canada). Where: STATEOP MEETME 30919-420-1374 Please mark your calendars for this meeting which will be held at Carteret Community College, McGee Bldg. board room. See attached map. For those that need to call in please dial 1-919-420-1374. RECEIVED If there are others that need to attend, please forward this invitation to them. FEB 2 4 2:jA ®CM-MHD CITY January 30, 2020 N.C. Division of Coastal Management Morehead City Regional Office 400 Commerce Avenue Morehead City, NC 28557 Re: Authorized Agent Agreement Carteret Community College Shoreline Improvements Morehead City, North Carolina Ms. Styron: This is to inform you that James W. (Bill) Forman, Jr., P.E. and Arendell Engineers are the Authorized Agent for the referenced project. Arendell Engineers is authorized to act on behalf of the applicant on matters related to the CAMA Major Permit and related federal permits. Please call me if you have any questions or need additional information. Sincerely, Yr.hn Hauser President, Carteret Community College i Mr. Michael Curtis Chair, CCC Board of Trustees RECEIVED FEB 2 4 2020 DCM-MHD CITY AARENDELL IVLL C OASTAL ENVIRONMENTAL 1004 Arendell Street Morehead City, North Carolina 28557 (252) 622-4338 N.C. Certification No. C-1509 February 20, 2020 N.C. Division of Marine Fisheries 3411 Arendell Street Morehead City, NC 28557 Re. Carteret Community College Shoreline Improvements (19062) Major CAMA Permit Application Morehead City, Carteret County, North Carolina To Whom It May Concern: In accordance with the requirements of the Division of Coastal Management CAMA Major Permit Application, a copy of the permit application and supporting documentation for the referenced project is provided for your information. If you have questions concerning the proposed project, please contact Mr. John J. Wade, PE of Arendell Engineers in Morehead City at (252) 622-4338. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within 30 days of this application. Submit comments to N.C. Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina, 28557. No comment within 30 days of your receipt of this notice will be considered as no objection. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS John J. Wade, P.E. Vice President Enclosures RECEIVED FEB 2 4 NZO DCM-MHD CITY A ARENDELL .. exvixorvxeura 1004 Arendell Street Morehead City, North Carolina 28557 (252)622.4338 N.C. Certification No. C-1509 February 20, 2020 Albert & Marie Libby 8775 SW 14411' Street Palmetta Bay, FL 33176 Re: Carteret Community College Shoreline Improvements (19062) Major CAMA Permit Application Morehead City, Carteret County, North Carolina To Whom It May Concern: In accordance with the requirements of the Division of Coastal Management CAMA Major Permit Application, a copy of the permit application and supporting documentation for the referenced project is provided for your information. If you have questions concerning the proposed project, please contact Mr. John J. Wade, PE of Arendell Engineers in Morehead City at (252) 622-4338. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within 30 days of this application. Submit comments to N.C. Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina, 28557. No comment within 30 days of your receipt of this notice will be considered as no objection. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS John J. Wade, P.E. Vice President Enclosures RECEIVED FEB 2 4 2020 DCM-MHD CITY CW MN frame 1, Z end 3.So" ■ rA.■ Prtnt your name end addr an the tev.as 1 i`m that we can mtum tee card toyou.■ lWech tNe a■d to the book of the melPleM N a an tlr coal reeeee w.,ut. L. u•kawwyemar nn..oeom emll UW f\I bar' l v �ia�iQ. L,- 6bt Im.rdrkw.ds... elw.: o ra 1 ti-7; am-ks S�.�e,4, O Mcrekgozk &tD NC 3. a85S 7 _ IIIIIIIIIIIIIIIIIIIIIIIIIIIIHill IIIIIIIIIIIII D*M 9590 9402 2056 6132 5150 39 L3E. ""rn+a.eeio.eI,." oti o 7019 0140 0001 0232 5661 2015 PON 1610II2-0ODe069 Omrac Retu.i. Recepi ■ Complete Items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. X D.-is delivery address different from item 7 r Vr= If YES, enter delivery address below: 0 No 8"t_1S SW lN�*"STZ�t'r PAuOt�A 3RY Fl_ S >% 1 co ❑ Priority Mall EV-30 eol"1810 mall" aRegistered III II IIIII I IIIIIII'I III ❑ AduR Maroon Restricted Delivery ❑ Mad Reatdoted II"III'I I'lI I'IIIIIIII 9590 9402 2058 6132 5150 15 13 Off Od Maae ❑ CHdf 10 0 Codified Mail Rastricted Delivery ❑ Collect on Delivery Return D Return for 2. Article Number (Frans(., from Service lab.l) ❑ Collect on Delivery Restricted Delivery ❑ Insured Mad ❑SignatureConfirnnatlon'- Signature Confrtmaficn Restricted DelvW' lall Restricted Delivery 7019 0140 0001 0229 8125 ai — Domestic Return Receipt Ps Form 3811. July 2015 PSN 7aO-O2.000 4/3/2020 USPS.com® - USPS Tracking® Results USPS Tracking® Track Another Package + Tracking Number: 70190140000102298125 FAQs > Remove X Your item was delivered to an individual at the address at 3:18 pm on March 31, 2020 in MIAMI, FL 33176. G Delivered March 31, 2020 at 3:18 pm Delivered, Left with Individual MIAMI, FL 33176 Get Updates u Text & Email Updates Tracking History u n March 31, 2020, 3:18 pm Delivered, Left with Individual MIAMI, FL 33176 Your item was delivered to an individual at the address at 3:18 pm on March 31, 2020 in MIAMI, FL 33176. March 31, 2020 In Transit to Next Facility March 28, 2020, 12:09 am Departed USPS Regional Destination Facility OPA LOCKA FL DISTRIBUTION CENTER CD to o. a' m 0 x https:/Aools.usps.com/gofrrackConfirmAction?qtc_tLabelsl=70l90140000102298125 1/3 4/3/2020 USPS.com® - USPS Tracking® Results March 27, 2020, 5:30 pm Arrived at USPS Regional Destination Facility OPA LOCKA FL DISTRIBUTION CENTER March 26, 2020, 10:24 pm Departed USPS Facility TAMPA, FL 33630 March 26, 2020, 4:09 pm Arrived at USPS Facility TAMPA, FL 33630 March 24, 2020, 1:39 pm Arrived at USPS Regional Facility GAINESVILLE FL DISTRIBUTION CENTER March 11, 2020, 11:25 am Return to Sender MIAMI, FL 33116 February 25, 2020, 2:23 pm Notice Left (No Authorized Recipient Available) MIAMI, FL 33176 February 23, 2020, 5:18 pm Departed USPS Regional Destination Facility OPA LOCKA FL DISTRIBUTION CENTER February 22, 2020,12:51 am Arrived at USPS Regional Destination Facility OPA LOCKA FL DISTRIBUTION CENTER February 20, 2020, 10:24 pm Arrived at USPS Regional Origin Facility CHARLOTTE NC DISTRIBUTION CENTER February 20, 2020, 2:08 pm Departed Post Office m N a v ce x https://tools.usps.com/gofTrackConfirmAcdon?qtc tLabelsi=70190140000102298125 213 4/3/2020 USPS.com® - USPS Tracking® Results MOREHEAD CITY, NC 28557 February 20, 2020, 9:44 am USPS in possession of item MOREHEAD CITY, NC 28557 Product Information See Less ^ Can't find what you're looking for? Go to our FAQs section to find answers to your tracking questions. m a c 01 0 FAQs https.1/tools.usps.com/goFrmckConfiirmAction?qtc tLabeisl=70190140000102298125 3/3 Complete:.items 1,2; entl'3: lA. Signature-- ■ Print your name and address on the reverse X Agent so thyt we can return thecard to you. + _ ❑ Addressee -.R Attach this card to the back of the.. mallpiece, or -on the front If space permits,. e, ed by (Printedt, ame) c. o )e of elivery 4r Article:Addreesed to: CU., is Celiveryaddressdifferent from item 1'_0 s' If YES enter delivery address below, _❑No 3. Service Type ❑Regist Mail ail'"-' ❑Adult at9nzture ❑ Re9lsterad MR- O ed atureRestrloted Oellvey ❑ Registered Mail Restdpted 9590.940214435329482052 OCeriKad Mail® Pa4very Ce ACerUnedMall Restdctedoenvery ❑neturn'Reoelptfor ❑ Collect on eeGvev/ , yr=�.,MenPhdp e g (3Collecton Delivery Restdoted beJjWay OaignefureCanfNmauon- p 2i.Ar0ole Number sferfmmseMcelabe9_ _ 701q r i { i aii: ¢ L' t t ( r ( O ai netuie CO4,f=on 6 1'40 dOtl116229 18118 1 aiihestddedCeuveyE+ ;R�SMdeabauvey + 'PS Form 3811, July 2015PSN 7530-02-000.9053 Domestic Return Recelpt ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS oirector 3/30/2020 NORTH CAROLINA Environmental Quality Carteret Community College/CCC Trustees C/o Arendell Engineers 1004 Arendell Street Morehead City, NC 28557 Dear Sirs: The NC Division of Coastal Management hereby aclmowledges receipt of your application for State approval for development of your property located on Bogue Sound at 3505 Arendell Street in Morehead City, Carteret County. The application was received as complete on 3/16/2020, and appears to be adequate for processing at this time. The projected deadline for malting a decision is 5/30/20. An additional 75-day review period is provided by law when such time is necessary to complete the review. Ifyou have notbeen notified of final action bythe initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from 3/16/2020, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project Such a meeting will be held within five worldng days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant NCGS 113A-119Cb) requires that Notice of an application be posted at the location of the proposed development Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, I -Feat< e.r M..StIJ, row Heather M. Styron Coastal Management Representative North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City. North Carolina 28557 252.8082808 AMA PERMIT APPLIED FOR PROJECT: Public walking trail, three piers(two observation and one 1-slip with ka ak launch), shoreline improvements, sill installation. COMMENTS ACCEPTED THROUGH 412512020 APPLICANT: Carteret Comm./CCC Trustees c/o Arendell Engineers 1004 Arendell Street Morehead City, NC 28557 252-622-4338 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Heather Styron - DCM 400 Commerce Avenue Morehead City, NC 28557 (252)808-2808 ext. 216 ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Carteret News Times November 12, 2014 PO Box 1679 Morehead City, NC 28557 Re: Public Notice - Carteret Community College and the Carteret Community College Board of Trustees, 3505 Arendell Street, Morehead City Dear Sirs: Please publish the attached Notice in the 4/5/2020 issue of the Carteret News Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Jessica Gibson, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, HEATHER. M. STYR_ON Heather M. Styron Coastal Management Representative North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252.8082808 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received as complete on 3/16/2020. According to said application, Carteret Community College and the Carteret Community College Board of Trustees proposes to construct two observation piers with platforms, a third pier with one slip and a kayak launch, construction of a public walking trail with access to the piers, shoreline stabilization and sill construction along Bogue Sound for the 44.3-acre parcel located at 3505 Arendell Street in Morehead City, NC. A copy of the entire application may be examined or copied at the office of Heather Styron, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808-2808 during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to 4/25/20, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request PUBLISH ON: 4/5/2020 North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252.8082808 PIS � �3�L,18Z11 s �gboo Co31(o 11 ZZ 30 000 C)tzD: /("3c'-S FILE # 16MM FOR REGISTRAIION REGISTER OF DEEDS Karen S. Hardesty Carteret County. NC April 24: 2019 03:04 31 PM BWC DEED 3 P FEE. $26 00 FILE # 1636008 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $0.00 [No Consideration —Name Change] Parcel Identifier No. 6376.17.22.30296000 and 6376.18.21.7539000 Verified by County on the _ day of 20 Vvlai]Box to: Taylor and Taylor PA This instrument was prepared by: Derek Taylor. Taylor and Taylor. PA Brief description for the Index: Tract on Hwy 70, Morehead City THIS DEED made this l4iV day of .eft- 2019, by and between Carteret Community College 3505 Arendell Street Morehead City, NC 28557 Board of Trustees of Carteret Community College 3505 Arendell Street Morehead City, NC 28557 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the Town of Morehead City, Carteret County, North Carolina and more particularly described as follows: See attached EXHIBIT A No title search was requested of nor performed by the attorney preparing this Deed. No portion of the property herein conveyed includes the primary residence of a Grantor. See Exhibit A attached hereto for reference to the Books and Pages ofthe recorded deeds by which the Grantor acquired the property. RECEIVED FEB 2 4 2020 NC Bar Association Form No. 3 01976, Revised 0 I/12010 Printed by Agreement with the NC Bar Association DCM.MHD CITY TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: Restrictive covenants, easements and rights of way of record, if any. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. CARTERET COMMUNITY COLLEGE By. !/it ohn Hauser - President State of North Carolina County of Carteret 1, the undersigned Notary Public of the County and State aforesaid, certify that John Hauser personally came before me this day and acknowledged that he is the President of Carteret Community College, a North Carolina corporation and that by authority duly given and as the act of such entity, he signed the foregoing instrument in its name on its behalf as its act and deed. WITNESS my hand and notarial stamp or seal, this of q . day of /'r t 2019. ```111EU111t, , OM .... <'•. . My.commisSIA es: lAorq j, JAffixkea`'9� 9 �9 GeC IC COUNT' ` %% 1j"11111011% Notary Public DwtGp >_ Notary's Printed or Typed Name RECEIVED FEB 2 4 2020 NC Bar Association Form No. 3 ® 1976, Revised m 1/1/2010 DCM-MHD CITY Printed by Agreement with the NC Bar Association 10.1:11031W STATE OF NORTH CAROLINA CARTERET COUNTY Tract I (Parcel number 6376.17.22.30296000): BEING all of that certain property shown and described by survey entitled "BOUNDARY AND SIGN LEASE SURVEY FOR CARTERET COMMUNITY COLLEGE AND GEORGE AJLOUNY", prepared by Arthur R. Denning, PLS, dated August 22, 2016 and recorded in Map Book 33, Page 341 in the Carteret County Registry. This foregoing property is conveyed subject to that certain perpetual Lease Agreement for the two sign sites designated as TRACT 1 and TRACT 2 on the aforesaid survey recorded in Map Book 33, Page 341, a Memorandum of said Lease Assignment being recorded in Book 1552, Page 24, Carteret County Registry. The property hereinabove described was acquired by Grantor by instrument recorded in Book 1552, page 23. A map showing the above described property is recorded in Map Book 33, page 341. Tract If (Split from parcel number 6376.17.22.30296000 and added to parcel number 6376.18.21.7539000): BEING that certain tract or parcel of land designated as "Tract 2" and described by plat entitled "Recombination Survey for Janette G. Ajlouny Revocable Trust and Carteret Community College" which is recorded in Map Book 32, Page 253 Carteret County Registry and to which reference is hereby made for a more particular description. The property hereinabove described was acquired by Grantor by instrument recorded in Book 1423, page 337. A map showing the above described property is recorded in Map Book 32, page 253. Tract III (Part of parcel number 6376.18.21.7539000 previously parcel number 13014F0423): Beginning at an iron pipe located in the southern line of the Tom Potter Oil Company Property as recorded in deed book 346, page 449, thence from said iron pipe and following the western line of what is now Carteret Community College Property, S 06-04-00 E, 680.60 feet to an iron rod set at mean high water of Bogue Sound; thence following said mean high water line the following bearings and distances: N 53-50-15 W, 56.01 feet; N 78-13-26 W, 44.82 feet; N 39-21-23 W, 94.05 feet; N 45-19-22 W, 217.48 feet; N 52-08-38 W, 95.05 feet; N 54-12-37 W, 81.34 feet; N 52-56-02, W 71.79 feet; N 62-38-02 W, 102.09 feet; S 86-09-36 W, 15.73 feet; S 7148-14 W, 23.15 feet; S 33-24-57 W, 60.54 feet; thence leaving said mean high water and following the eastern line of A. Libby and Claude Moon, N 03-54-29 E, 105.48 feet to an existing iron pipe; thence continuing with said line N 03-54-29 E, 264.13 feet to an existing iron pipe in the southern line of Tom Potter Oil Company, thence along said line S 80-16-21 E, 574.53 feet to the point and place of beginning, containing 6.28 acres. For additional reference see General Grading Plan by Stroud Engineering, P.A., dated March 10,1994. The property hereinabove described was acquired by Grantor by instrument recorded in Book 740, page 17. RECEIVED FEB 2 4 2020 NC Bar Association Form No. 3 © 1976, Revised ® 1/12010 DCM-M HD CITY Printed by Agreement with the NC Bar Association T,rE — nn4Ttl catt�ll?I�. c9 . :, H ��.. Ra,I Estate — R .. f►TE ET (J�Li f�IA "�: '1 t rn�e Tir. = The foregoing cert;` ^atefS) Of ''8 5 0.0 0 _ is (are) certified is h: correct. This instrum nt was sented for regis1r::fi5n and recorded in this offic Bnok 60 Pa, This day of ,19 at L�(1'clo�k ;. Sharon Piner i egister 1 n, By Deputy .:, Ov f Sp. Exclse Tax Recording Time, Book and Page y Tax Lot No .................... 13-14-F-4-22 ....................................................................... Parcel Identifier No....................................I......................... � Verified by ........................ .... County on the ................ day of .............. .......................... ................. 1: Y 'j I Mail after recording to41 ......... .............. ..... . .............................................................................................................. Henr S. Manning, Jr., P. O. Box 109, Ralei h NC rjThis instrument was prepared by...............i�............................................................................................................ g....L ............... Brief description for the Index 2 tracts Morehead Townshi NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this .....11..... day of ........... August .... ....... ...... .... ....... .... 19..$.6....., by and between GRANTOR Standard Products of North Carolina, Incorporated RECEIVED FEB 2 4 2020 DCM-MHD CITY GRANTEE Carteret Technical College 3505 Arendell Street Morehead City, North Carolina. 28557-2989 Enter in appropriate block for each party: name, address, and, if appropriate, character of entity, e.q. corporation or partnership. The designation Grantor and Grantee as used herein: shall include.said.parties, their heirs, -successors, and assil shall include singular, plural, masculine;leminine or neuter sa,required by context WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is acknowledged, has and by these presents does grant; bargain, sell and convey unto the Grantee in fee simple, certain lot or parcel of land situated in the City of ..........Morehead,,,,,,.,, Morehead .................. ................... TL a;tlret.......... County, North Carolina and more particularly described as follows: RECEIVED FEB 2 4 20P0 DCM.MHD CITY The property hereinabove described was'acquired by Grantor by instrument recorded in ............................................ A map allowing the above described property is recorded in Plat Book ............................... page....................... TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto bel the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will w•a defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: Subject to the right of way of the spur track of Atlantic & North Carol Railroad Company as set out in Book 18, page 11, and the right of way o the State Highway Commission; and easement to Carolina Telephone & Tele Company recorded in Book 180, page 155; all in the Office of the Regist of Deeds of Carteret County. IN WITNESS WHEREOF, the Grantor has hereunto set his hand and seal, or If corporate, has caused this Instrument to be s c arpurats name by its duly authorised officers and Its seal to be hereunto affixed by authority of its Board of Blrectors, the day an above written. Standard - Products of North :Carolina, z^nc: ---------------- ------ --------------- �' (Cerpor'e Name) Pr tdent '� ATTXIT: -------------------------------------------------------- __ v____ _. ----_----__ J� -__.-- :....------ ..•.secretary o oast, 6en1) M pe ----------------------------------------------------- MP; i<OteliilCiRDLeFA, ___._. ___.... ------------ county. . 1; a Notary Public of the County, and State.. aforesaid, certify that. a .R personally appeared before me this day and acknowledged the execution of the foregoing Instrument. phand and official stamp or seal, this ___. day of -------------------- -------------------- 19.._. ,MY commission expires: --- _.:r______ __________ ________�__J._._____. __ ----------- N. SEAL -STAMP NA8b1eM. __. _.__[?_7,� �9_:! �tS___-_-__County J� .. 1. a Notary Public of the Cnuntv and State aforesaid. certifv that _7_LA.�✓._e.. C• A111 V I EXHIBIT A TRACT 1: REG'E#VED FEB 2 4 LA DCM.MHD CITY In Morehead Township: The south 50 feet of Lot Twenty -Four (24), part of Lot Thirty -Five (35), and all of Lot Thirty -Six (36), of the John C. Banks Subdivision, according to the map thereof (not recorded) by Philip K. Ball, Registered Sur- veyor, made September, 1949, described by metes and bounds, as follows: .Beginning at a point in the north line of the right of way (see Book 18, page 11) of the spur track of the Atlantic & North Carolina Railroad Company, it being the southeast corner of the lot conveyed by John C. Banks to R. W. Taylor & Company by deed recorded in Book 121, page 536, Office of the Register of Deeds of Carteret County; also, it being the southwest corner of Lot 36 aforesaid; runs thence North 40 00' East, along the west line of Lot 36 and Lot 24, 83 feet to a point in the west line of Lot 24 of said map; thence South 860 00' East, 100 feet to a point in the east line of Lot 24, thence South 41 00' West, 53.2 feet to the north line of the right of way of said spur track; thence North 590 30' East, along the north line of said spur track, 70.5 feet to a point; thence South 40 00' West, approxi- mately 86 feet to the north line of R. W. Taylor & Company; and thence North 830 017' West, along the R. W. Taylor & Company line, approximately 159.4 feet to the point of beginning; and being the identical lands conveyed to Grantor herein by deed from .R'..W....Tayl,or &.Co..,_inc.,,.dated .July.6, 1964:.and, duly:recorded.,in. the.Carteret'.County Registry in Book 252, page.'480:`. TRACT 2s Being all .that certain other parcel. of land conveyed to Grantor. by. deed from R. W. Taylor & company; :Inc. , dated July'.61 1964. nn4n4- in ehe' :.1. .r 'i Poly � ;...r'. •. 850 49' West, 133 feet; thence North 50 06' West, crossing the right of way of the spur track of the Atlantic and North Carolina Railroad, and the paved State Highway, 534.7 feet to a point; thence South 790 20' East, crossing the paved State Highway, 181.8 feet to a point in the east line of the dead end of Banks Street; thence South 40 58' West, 143.5 feet to the point of be- ginning. NOTE: Tracts 1 and 2 described above comprise all of the property owned by Grantor that is adjoined on the East by proper- ty now owned by Grantee, and adjoined on the West by property owned by the State of North Carolina. Prepared by John H. Phillips, attorney, Morehead City, N. C. all IjrARRANTY DEED NORTH CAROLINA, CARTERET COUNTY This Deed, made this 27th day of September, 19742 by ZAPATA HAYNIE CORPORATION, a Virginia corporation, formerly Carolina , Menhaden Products, Inc., with an office and place of business. in RECEIVED Baltimore, Marylar_d, party of the first part, to THE BOARD OF TRUSTEES OF CARTERET TECHNICAL INSTITUTEy ITS SUCCESSORS AND FEB 742920 ASSIGNS, of Carteret County, North Carolina, party of the secoracm- LtLt ;I" part: itiITNESSETH, that said party of :the first part in -consideration of One Hundred Dollars (6100.06) and -other good and.yaluable con- siderations to it paid by party,of the second part; the .receipt of which is hereby acknowledged;. has bargained and sold, and by these presents does grant,'bargain, sell and convey to said 'party of the second part, its successors and;assignsi...a,certain :tract C or parcel of land in Morehead.Township'�-;Carteret County;'North Carolina, more particularly described'as follows: BEGINNING at a concrete monument in -the east side of an access road leading to U. S. Highway #70, which point is the south- west corner of the present North Carolina Highway Patrol Sta- tion tract and the present northwest corner of the Carteret Technical Institute property; running thence along the west line of the Carteret Technical Institute property S. 8-39' 00" W. 313.13 feet to an iron post in the highwater mark of Bogue Sound; running thence along the highwater mark N: 80 1 11 1 i i i i i i i 57' 50" W. 10.0 feet; S. 67-22' W. 52 .19 feet; S. 31-04' 30" W. av 66.10 feet; S. 80-32140" W. 369.12 feet; S. 67-39'40" W. 131:07 -, feet; N. 85-59140" W. 55.50 feet to an iron pipe, which pipe v'.0 W gD� IS situated in the southeast corner of that tract of land i12 belonging to Standard Products, Inc.; running thence along. N the east line of Standard Products, Inc. AT. 6-33140" E. 508.63 --; feet; N. 83-54' W. 7.0 feet; N. 6-33140" E. 87.74 feet; Qu37-54' E. 28.28 feet; N. 5-3835" E. 43.81 feet; N 5-48'115" E. 38.05 feet; S. 80-00' E. 14.54 feet;, S. 86-01'l0" E.:.10'! =� a� feet; S. 82-09' E. 25.65 feet; S. 74-45' E. 10.15 feet.; N. 9 S 11' E. 9.91 feet to a concrete monument;.:running thence S.'.83-: p 28'40" E. 116.4 feet to a concrete monument; thence S.- 2-35'. x? u 20" If. 27.95 feet; thence:S. 74-45'40" E..10.95.feet;-con- 0ttO ...ji 1 tinuing thence S. 9-54130" E. 105.25 feet;_ S,: 83-371.5011 -E..: Eli 210.64 feet; S. 80-57'50" E. 123.95 feet to the po'int.of,' beginning. Being the same property conveyed:*to Carolina. Menhaden Products, Inc. in Book 240,'page 37.. Carolina Men= G i C P U-AA.. P....A....te T.' ..nffod 4nin Rnv 4. PnnrhiA .Q Tne- in �';- - 2 - And the said party of the first part for itself and its successors and assigns, covenants with said party of the second part, its successors and assigns, that it is seized of said premises in fee and has right to convey in fee simple; that the same are free and clear from all encumbrances and that it does hereby forever warrant and will forever defend the said title to the same against the claims of all persons whomsoever. IN WITNESS WHEREOF, the said Zapata Haynie Corporation has oaused this instrument to be signed in its name by its President and attested by its Assistant Secretary, with its corporate seal hereto affixed, and all by order of its Board of Directors duly given the day and year first above written. ('Corporate Seal) cv FAT T'R..STF;D E J. Conra Pis istant Sec ZAPATAA AYNIE CORPORATION By Allen--V. Haynie President STATE OF MARYLAND, CITY OF BALTIMORE I, WII le„ EI)WAIZh Fni ,,�,L/Z , Notary Public, do hereby certify that personally appeared before me this day Allen W. Haynie, who, being by me duly sworn, says that he is the President of Zapata Haynie Corporation, and that he knows that Earl J. Conrad, Jr. is Assistant Secretary, and that he knows the common seal of said Corporation; that the Corporation's name was subscribed to the within Warranty Deed by him as President and was attested by its Assistant Secre- tary, with its corporate seal thereto affixed, and all by order of its Board of Directors duly given, and that the said instru- ment is the act and deed of said Zapata Haynie Corporation..-:.., Witness my hand and Notarial Seal, this OcT�(iF2 , 1974.. STATs CORPcRAT1ON.CQWi4181i1OW..-. 0, ViRrxiNeA-:.:.- MAN 11,41bAr. on December 31, 19733 by amendment of its Articles of Incorporation, the name of Haynie Products, Inc., was changed to Zapata Haynie Corporati RECEIVED FEB 2 4 WO I)CM.MHD.CITY 'Amv/d/w/d/ (W STATE OF NORTH CAROLINA D E E D COUNTY OF CARTERET THIS DEED, made this the /2-A day of FEB 244"1 OCM.MHD 1982, by the STATE OF NORTH CAROLINA, a body politic and corporate, party of the first part, to CARTERET TECHNICAL INSTITUTE, party of the second part; W I T N E S S E T H: THAT, WHEREAS, the Department of Natural Resources and Community Development of the State of North Carolina has authorized the execution of this instrument; and WHEREAS, the Council of State at a meeting held in the City of Raleigh, North Carolina, on the,.2nd day of February, 1982, approved this conveyance and directed execution of this instrument; NOW, THEREFORE, in consideration of the sum of TEN DOLLARS and other good and valuable consideration to them paid by the party of the second part, the receipt of which is hereby acknowledged, the party of the first part has bargained and sold and by these presents does hereby bargain, sell and convey unto the said party of the second part, its successors and assigns, all those certain tracts or parcels of land situate,.lying and of Bogue Sound; runs thence with said mean high water line the following courses and distances; North 84 deg. 03 min. West 228.2 feet; South 82 deg. 02 min. [Jest 198.6 feet; South 80 deg. 10 min. West 339.4 feet to a point, a corner of the Wallace Fisheries property; runs thence North 5 deg. 00 min. East 357.1 feet to a point, a corner of property occupied by the N. C. Highway Patrol; thence with the line of the Highway Patrol property South 89 deg. 03 min. Rast 199.6 feet to a point; thence North 5 deg. OO min. East 400.25 feet to a point in the southern right -of. -way line of U.S. Highway No. 70; and runs thence with said right-of- way line South 84 deg. 15 min. East 543.8 feet to the point of Beginning, containing 9.85 acres more or le:;!;, and being all of Tract "A" as shown on a plat of the "Camp Glen Prop- erty" of the N.C. Department of Conservation and Development, made by J. G. Hassell, registered surveyor, and dated November 1966. TRACT II Located in Morehead Township, Carteret County, North Carolina, and being more particularly described as: BEGINNING al. ;in iron pin located North 84 deg. 15 min. West 200.00 feet along the south right-of-way of U.S. Highway 70 (also known as Arendcll Street) from an existing bolt in the centerline of the south- ern extension of 35th Street; said beginning point also being the northeast corner of Tract A and the northwest corner of Tract B as shown on a plat entitled "State of North Carolina, Department of Conservation and Development, Division of Com- mercial and Sport Fisheries; Camp Glen Property" by J. C. Hassell RLS dated November, 1966. Thence with the south right- of-way of U.S. 70 South 84 deg. 15 min. East 31.01 feet to an iron stake, a new corner; thence along a new line: South 04 deg. 24 min. West 641.65 feet to an iron stake, a new corner at the high water mark of Bogue Sound; thence w th the high water mark of Bogue Sound North 75 deg. 40 min. West 31- 47 feet to an iron stake, the southeast corner of Tract A; Lhence with the east line of Tract A North 04 deg. 24 min. Enst 636.95 feet to an iron pin, the point and place of Beginning, It being the intent of this instrument to convey a 31 foot wide strip east of and adjacent to Tract A and runni.ni; from U.S. Highway 70 to Bogue Sound. Containing 0.454 acres more or less. TO HAVE AND TO HOLD the aforesaid tracts or parcels of land and all privileges and appurtenances thereunto belonging to the said party of the second part, its successors and assigns, forever. IN TESTIMONY WHEREOF, the State of North Carolina has caused this instrument to be executed in its name by JAMES B. HUNT, JR., Governor, attested by THAD SURE, Secretary of State, and the Great Seal of the State of North Carolina hereunto affixed, by virtue of the power and authorityRECNED aforesaid, all as of the day and year first above written. �(/� FEb 4 IITM DEED APPROVED FORS I APPROVED AS TO FORM: RUFUS L. EDMISTEN Attorney General,_ BY: Assistant Attorney General STATE OF NORTH CAROLINA gaffe. �-J� RECEIVED FEB 2 4 2020 DCM-MHD CITY 0 STATE OF NORTH CAROLINA COUNTY OF WAKE I, DEBORAH AMN CANDLER, a Notary Public in and for the County and State aforesaiu, do hereby certify that JAMES B. HUNT, JR., Governor of the State of North Carolina, and THAD SURE, Secretary of State of North Carolina, personally came before me this day and being by me duly sworn says each for himself that he knows the Great Seal of the State of North Carolina and that the seal affixed to the foregoing instrument is the Great Seal of the State; that JAMES B. HUNT, JR „ Governor of said State, and THAD LURE, Secretary of State, subscribed their names thereto, all by virtue of a resolution of the Council of State; and that said instrument is the act and deed of the State of North Carolina. IN WITNESS WHEREOF, /I have hereunto set my hand and Notarial Seal, this the 1.2 m day of v `%< < Cti' 198 Notary Public My Commission Expires: My COMMSIon Espucs 8-2q-a.i Now 146 Q vim- � NOitTH CA'?OLINA, CNATERET 11 dp The foregoir? certifica<P*) w CON is (are) certified to be correct. This instrument was pre- RECEIVED sented� f r �eQistratio919A—z-at&�07clo- recorded in this offer it. y ---�� S N, Book of gk FEB 2 4 2020 Sharon Piner Register of deeds } DCM-MHD CITY 11)/V1/�, 1 AA/ p\ N. (o'er l C918'-1 1 11 8 s00 (D oGrr o 1( —H�,-) RECEMID FEB 2 4 2020 DCM-MHD CITY NORTH CAROLINA NON -WARRANTY DEED FOR REGISTRATION REGISTER OF CEEOS Karen S Hardesty Carteret County. NC December 16, 2019 03:37 33 PM BWC DEED 3 P FEE: $26.00 FILE # 1657441 Excite Tax: - 0 — I %CGS 105-228281 Parcel Identifier No. 637618413985M Verified by County on the day of 20 wlall/Box to: Taylor and Taylor, PA This instrur ant was prepared by: Derek Taylor, Taylor and Taylor, PA Brief description for the index: McGee Building and Lot, 6.49 acres THIS DEED mule this day of GRANTOR Carteret County (a NC body politic and corporate) 302 Courthouse Square Beaufort, NC 29516 20 , by and between IseUeaaaa Board of Trustees of Carteret Commuatty College 3505 Arendeli Street Morehead City, NC 28557 The designation Grantor and Grantee as used herein shell include said parties, their heirs, successors, and nasigns, and shalt include stngulm, plural, masculine, feminine or neuter as required by contexL WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has end by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that curtain lot, parcel of lend situated in Morehead City, Morehead Township, Carteret County, North Caroline and more particularly descnbed as fellows: SEE EXHIBIT A ATTACHED HERETO AND INCORPORATED HERE BY REFERENCE NO TITLE SEARCH REQUESTED OF NOR PERFORMED BY DRAFTING ATTORNEY The property heremabove described was acquired by Grantor by inertmman2 recorded in Book 1238, page 476. No portion of the property herein conveyed includes the primary residence of a Grantor. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grandee in fee sinvIc. Pays 1 of 3 NC Bar Anocutm Perm No. 7 O 7R013 Printed by Ayremeet whh the NC Bu Asswiation North Camltna Bar Asextabon - NC Bar Form Na 7 North Cardin A w isuon of ReahoM [= - SwAnd Form 7C �J The Grantor makes no warranty, express or implied, as to title to the property hereimbove dasc nIx4 IN WITNESS WHEREOF, the GraMa has duly executed the foregoing as of the day end yew first above written. CARTFJMT COUNTY K� t SEAL) Rachel Hemmer, Clerk to the Carteret County Board of Commissioners State of North Carolina -n Mark MmsBeld of (SEAL) Carteret County Board of Commissioners County of Carteret L the umderaigoed Notary Public of the County and State efores" =14 that Muir MansfiWpenanally appeased before me this day and aclmowledpd that he is the Chairmen of the Board of Commissioners of Carteret County aW that by authority duly given and " the act of Carteret County, the foregoing instrument was signed in the County's name by such Chairman of the Board of Commissioners. Witness my hand and Notarial Seal this the PNIE FF (SEAL) �� 6f2�2a2��irsy: State of North Carolina "=rfktTCOV�./ 1 � f� day of 17C6Cy W Y _ . 20 l 1. 6i r� hie Jft'/RCA — Notary Public County of Carteret I, the undersigned Notary Public ofthe County and State aforesaid, certify thatRachel Hammer personally appeared bd m me this day and scimowledged that she is the Clark to the Board of Commissioners of Carteret County and that by authority duly given and as the act of Carteret County, the foregoing instrument was signed in the Cmmty's nartle by such Clerk of the Bond ofCommimionaa. Witness my hand and Notarial Seal this the ' day of _Vtceffll Y 20 •,IN1111111111,,,1j, (SEAL) ,� OIE FeRCG, ; MY co; ,,OTAny COMMAI Yv I �✓1 AOBL\G TFRFT CCO�� NC By Awddim Form No. 7 0 7/2013 Rind by Awmnrad v,* the NC By Amodetion c ✓f� _ _. Ugh _ _ . Notary Prrbllc u RECEMD FEB 2 4 2VP PW2or3 DCM-MHu' .' Nona Camden By Aaeooienon —NC Bw Form No. 7 North C 01ia Anociafm ofRaftcMInc. —Stardod Form STATE OF NORTH CAROLINA COUNTY OF CARTERET MOREHEAD TOWNSHIP Pert of Parcel ID - 6376.18.41.3985000 EcppufE-A certain parcel of land and all improvements located thereon. which is described as beginning at painted mark on the South edge of a sidewalk, said mark being N 84' 15' 00" W, 171.23 feet from a magnetic nail set at the intersection of the southern right-cf--way margin of U.S. Highway 70 and the centerline of 350 Street ertanded and Bom this Point and Place of Bcglnning for it first call of S W 24' 00" W, 641.25 feet to a point in the high watermark of Bogue Samd; thence along and with the high watermaric of Bogue Sound N 950 2T 02" W, 68.74 feet to s pofiP, thence N 7V 29' 11" W, 51.71 feet to a point; thence N 700 58' 35" W, 62.51 feet to a point; thence N 81" 31' 58" W, 92.24 fee[ to a point; thence S 890 02' 27" W, 14126 Sect to n point; dienee leaving the high watermark of Bogue Sound N 06' 14' 59" W, 316.00 fed to an hon pipe; thane N 04" 53' 45" E, 327.41 feet to a magnetic nail ad in or near the southern edge of a sidewalk thence along end with said sidewalk S 94" 15' 00" E, 459.01 feet to the Point and Platt of Beginning containing 6.49 acres more or Iess. This property, is the same as depicted upon that rmrecarded survey map entitled "Survey of Area Far Deed of [tust Prepared For Carteret Community College and Carteret County," dated June 20, 2007 and prepared by Powell Surveying Company, P.A. Reserved from the above described property is a perpetual, noneidosive easement for ingress, egress, regress and placement of utilities as described below: lKa wment A: A twenty -fora (24) foot wide easement which is bounded twelve (12) feet on either side of a centerline rtmoing from a beginning point located in the eastern property line of the above -described Property which is S 04" 24' 00" W, 12 fed $em a painted mark on the South edge of a aldeNalk located N 940 15, DO" W,171.23 fed from a magnetic nail set at the intmmution ofthe southern rigin-of-way, margin ofU. S. Highway 70 and the centerline of 35'h Street extended, and thence mmning N 940 15' 00" W, 459.11 fed to the terminating point of the centerline in the western property be of the above described Property. Roa.ment A: A thirty, (30) foot wide msement which is bounded fifteen (15) fed on either aide of It centerline naming firm m a begirming point located in the south= edge of a sidewalk, said point being N 94" 15, 00" W, 31021 The tom a painted mark on the South edge of the sane said sidewak that mark being N 84° 15' DO" W,171.23 fed from a megwdc nail ed at the intersection of the southern right-of-way margin of U.S. Highway 70 and the centerline of 350' Street extended and from this beginning naming S 050 45' 00" W, 14033 fed to the terminating point of the centerline of the easement Ragment C: A twenty-fmr (24) foot wide easement which is bounded twelve (12) fat an either side of a centerline beginning st a point which is the terminus of Easement B above and running N 840 25' 49" W, 146.51 fret to the terminating point of the centerline in the western property line of the above described property Conveyance of Property is subject to the above easements end all other easements, coveomfaandnashiediass of record. Grantor and Grmtm are tax-exempt entities KK FEB L 4 2020 PW 3 of 3 ®CiM-M H D CITY NC Bar Awooxbm Font No. 7 O 7=13 PrtNad by Agrammt with the NC By Aaaooitbw Naar Cantina Bar Ammiatbn -NC Bar Form Na 7 Nast Carolhm Anocldlm of Rnhon, far - SwWard Forth 7 PI�� �3�� igZ��s39aoo Co31(o 11 LZ3oZ�oo0 oalD: i(.'3('-a TILE # 1636008 FOR REGISTRATION REGISTER OF DEEDS Karen S. Hardesty Carteret County, NC Ppri1 24, 2019 03:04 31 PM BWC DEED 3 P FEE. $26 00 FILE # 1636008 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $0.00 (No Consideration —Name Change] Parcel Identifier No. 6376.17.22.30296000 and 6376.18.21.7539000 Verified by County on the day of 20 Aail/Box to: Taylor and Taylor. PA This instrument was prepared by: Derek Taylor, Taylor and Taylor. PA Brief description for the Index: Tract on Hwy 70, Morehead City THIS DEED made this —,,Z4-ry day of ,2ii 2019, by and between GRANTOR Carteret Community College 3505 Arendell Street Morehead City, NC 28557 Board of Trustees of Carteret Community College 3505 Arendell Street Morehead City, NC 28557 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the Town of Morehead City, Carteret County, North Carolina and more particularly described as follows: See attached EXHIBIT A No title search was requested of nor performed by the attorney preparing this Deed. No portion of the property herein conveyed includes the primary residence of a Grantor. See Exhibit A attached hereto for reference to the Books and Pages of the recorded deeds by which the Grantor acquired the property. RECEIVED JAN 3 0 2020 NC Bar Association Form No. 3 ® 1976, Revised m I/12010 Printed by Agreement with the NC Bar Association DCM-MHD CITY TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: Restrictive covenants, easements and rights of way of record, if any. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. CARTERET COMMUNITY COLLEGE By. ohm Hauser - President State of North Carolina County of Carteret I, the undersigned Notary Public of the County and State aforesaid, certify that John Hauser personally came before me this day and acknowledged that he is the President of Carteret Community College, a North Carolina corporation and that by authority duly given and as the act of such entity, he signed the foregoing instnunent in its name on its behalf as its act and deed. WITNESS my hand and notarial stamp or seal, this A .day of 2019. 11r#I# LIA �.` My.Com nAs t yes: 2b fNK NOTq 13 ( puc�ea`'9< : m = GeCIC ' •.....•'a0 % Notary Public DmfGA J, Notary's Printed or Typed Name RECEIVED JAN 3 U 2020 NC BarAssociation Form No. 3 © 1976, Revised© 1/I2010_ FI Printed by Ageement with the NC Bar Association EXHIBIT A STATE OF NORTH CAROLINA CARTERET COUNTY Tract I (Parcel number 6376.17.22.30296000): BEING all of that certain property shown and described by survey entitled "BOUNDARY AND SIGN LEASE SURVEY FOR CARTERET COMMUNITY COLLEGE AND GEORGE AJLOUNY", prepared by Arthur R. Denning, PLS, dated August 22, 2016 and recorded in Map Book 33, Page 341 in the Carteret County Registry. This foregoing property is conveyed subject to that certain perpetual Lease Agreement for the two sign sites designated as TRACT 1 and TRACT 2 on the aforesaid survey recorded in Map Book 33, Page 341, a Memorandum of said Lease Assignment being recorded in Book 1552, Page 24, Carteret County Registry. The property hereinabove described was acquired by Grantor by instrument recorded in Book 1552, page 23. A map showing the above described property is recorded in Map Book 33, page 341. Tract II (Split from parcel number 6376.17.22.30296000 and added to parcel number 6376.18.21.7539000): BEING that certain tract or parcel of land designated as "Tract 2" and described by plat entitled "Recombination Survey for Janette G. Ajlouny Revocable Trust and Carteret Community College" which is recorded in Map Book 32, Page 253 Carteret County Registry and to which reference is hereby made for a more particular description. The property hereinabove described was acquired by Grantor by instrument recorded in Book 1423, page 337. A map showing the above described property is recorded in Map Book 32, page 253. Tract III (Part of parcel number 6376.18.21.7539000 previously parcel number 13014F0423): Beginning at an iron pipe located in the southern line of the Tom Potter Oil Company Property as recorded in deed book 346, page 449, thence from said iron pipe and following the western line of what is now Carteret Community College Property, S 06-04-00 E, 680.60 feet to an iron rod set at mean high water of Bogue Sound; thence following said mean high water line the following bearings and distances: N 53-50-15 W, 56.01 feet; N 78-13-26 W, 44.82 feet; N 39-21-23 W, 94.05 feet; N 45-19-22 W, 217.48 feet; N 52-08-38 W, 95.05 feet; N 54-12-37 W, 81.34 feet; N 52-56-02, W 71.79 feet; N 62-38-02 W, 102.09 feet; S 86-09-36 W, 15.73 feet; S 71-48-14 W, 23.15 feet; S 33-24-57 W, 60.54 feet; thence leaving said mean high water and following the eastern line of A. Libby and Claude Moon, N 03-54-29 E, 105.48 feet to an existing iron pipe; thence continuing with said line N 03-54-29 E, 264.13 feet to an existing iron pipe in the southern line of Tom Potter Oil Company, thence along said line S 80-16-21 E, 574.53 feet to the point and place of beginning, containing 6.28 acres. For additional reference see General Grading Plan by Stroud Engineering, P.A., dated March 10, 1994. The property hereinabove described was acquired by Grantor by instrument recorded in Book 740, page 17. NC Bar Association Fotm No. 3 0 1976, Revised 0 11 2010 Printed by Agreement with the NC Bar Association RECEIVED JAN 3 0 2020 DC"HD CITY m !;TATE o< CAP tt Noises S 5 0. 0 0 Tax Lot No. Verified by ................. by.................................. CAROLIN!, CA"ERET Me foregoing cert;` c t2(s) of l Finstrumi!4'as is (are) certif;ed tc h: correct. Thi sented for regisir;ltion and recorded in this offic Brio PA - This "day of ,— � at l�(1'cfoeh i c f Sharon Piner ( Deputy 6) Recording Time, Book and Page .................. Parcel Identifier No. ..13-14—F-4-22 ....................... Countyon the ................ day of ......................................................... 13 Mail after recording to .........✓......�...t.,tt/Lt .W. i.(�.... !.................... .............................................................................................................................................................................................................. i This instrument was prepared by S. Manninc.r Jr... P. O. Box 109r Raleigh, NC l................................................... . . .. . Brief description for the Index 2 tracts Morehead Township `�A NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this .....11..... day of ... ........ August ........... .......... .......... .. 19-8.6. —, by and between GRANTOR Standard Products of North Carolina, Incorporated GRANTEE Carteret Technical College 3505 Arendell Street Dorehead Cityr North Carolina 28557-2989 RECEIVED JAN 3 0 2020 Enter In appropriate block for each party: name, address, and, It appropriate, chwimewn 0 e"Moration or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs,.successors, and assil shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, certain lot or parcel of. land situated in the City of ..........Morehead ...... ............... I .... I ........ Morehead,.............;. T< Carteret.......... County, North Carolina and more particularly described as follows: RECEIVED JAN 3 0 2020 (ACM-MHD CITY The property hereinabove described was acquired by Grantor by instrument recorded in .............. A map showing the above described property is recorded in Plat Book ............................... page...................... TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto bet the Grantee in fee Simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will tea defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: Subject to the right of way of the spur track of Atlantic & North Carol Railroad Company as set out in Book 18, page 11, and the right of way o the State Highway Commission; and easement to Carolina Telephone & Tele Company recorded in Book 180, page 155; all in the Office of the Regist of Deeds of Carteret County. IN WITNESS WHEREOF, the Grantor has hereunto set his hand and seal, or If corporate• has caused this instrument to be s corporate blame by its duly authorized officers and Its seal to be hereunto affixed by authority of Its Board of Directors, the day an above written. Standard -Products of North:Carolina, Talc: ------- (CorPor� Name) -----_--1 .a . -------- ---- ------------Pr 'dent ATTEST: -------------- _------------- ________________________ J- q -------------- -------- _V ... lacy o Olaf, seer) Wq SEAL-ETAMp) 17oR791�CGaGtdYA------------- -. ------------ County. " •�•> J 1; a Notary Public of the County_ and State, aforesaid,. certify that-_-_--r . . u_.__ __.. ............. r -------- _—___I r .__. . _. _ _/---_ ---------------- _rp personally appeared before me this day and acknowledged the execution of the faregoing Instrument. •• P hand and official stamp or seal, this _:. ..._ day of ----- .._ I------------------------------- •. �; I l: •.�". My commisslon expires: ------ _._.__:------- ------------------ 1---.----------- ------------- N, ,V,f�IQq� A• - SEA"TAMP NliaT:LtCA✓f�ralN`1, ------- -97=9�5__�'.!i--------Conbty. T _ 1, a Notary Public of the County and Slate aforesaid, eertlfy that -D [9.i✓C_.. A RECEIVED EXHIBIT A JAN 30 2020 ®CM-MHU CITY TRACT 1: } In Morehead Township: The south 50 feet of Lot Twenty -Four (24), part of Lot Thirty -Five (35), and all of Lot Thirty -Six (36), of the John C. Banks Subdivision, according to the map thereof (not recorded) by Philip K. Ball, Registered Sur- veyor, made September, 1949, described by metes and bounds, as ;4a follows: Beginning at a point in the north line of the right of way (see Book 18, page 11) of the spur track of the Atlantic & North Carolina Railroad Company, it being the southeast corner of the lot conveyed by John C. Banks to R. W. Taylor & Company by deed recorded in Book 121, page 536, Office of the Register of 41 Deeds of Carteret County; also, it being the southwest corner of Lot 36 aforesaid; runs thence North 40 00' East, along the west line of Lot 36 and Lot 24, 83 feet to a point in the west line of 4:. Lot 24 of said map; thence South 860 00' East, 100 feet to a ` point in the east line of Lot 24, thence South 40 00' West, 53.2 } feet to the north line of the right of way of said spur track; thence North 590 30' East, along the north line of'said spur track, 70.5 feet to a point; thence South 40 00' West, approxi- ,, mately 86 feet to the north line of R. W. Taylor & Company; and ?' thence North 830 017' West, along the R. W. Taylor & Company line, approximately 159.4 feet to the point of beginning; and being the identical lands conveyed to Grantor herein by deed from R. W..Taylor & Co., inc.,,.dated,J.uly 6, 1964..and duly. recorded., in = the Carteret.County Registry in Book 252, page 400.` �t TRACT 2: Being all that certain other parcel of land conveyed to ° Grantor by deed from R. W. Taylor & Company, :Inc. , dated July 6, 1064. y.• In.Morehead Township: Beginning at a point in the ,:�� _r:• ck ate. ;ye ..,.J :, 850 49' West, 133 feet; thence North 50 06' West, crossing the right of way of the spur track of the Atlantic and North Carolina Railroad, and the paved State Highway, 534.7 feet to a point; thence South 791 20' East, crossing the paved State Highway, 181.8 feet to a point in the east line of the dead end of Banks Street; thence South 40 58' West, 143.5 feet to the point of be- ginning. NOTE: Tracts 1 and 2 described above comprise all of the property owned by Grantor that is adjoined on the East by proper- ty now owned by Grantee, and adjoined on the West by property owned by the State of North Carolina. ' _�)OCJ� 0 357 Prepared by John H. Phillips, attorney, Morehead CitA, N.�C�. WARRANTY DEED JAN 3 0 2020 NORTH CAROLINA, CARTERET COUNTY IOO This Deed, made this 27th day of Septe290,9774;11by ZAPATA HAYNIE CORPORATION, a Virginia corporation, formerly Carolina Menhaden Products, Inc., with an office and place of business.:n Baltimore, Maryland, party of the first part, to THE BOARD.OF TRUSTEES OF CARTERET TECHNICAL !NSTITUTE; ITS SUCCESSORS AND ASSIGNS, of Carteret County, North Carolina, party of the second part: 4:ITNESSETH, that said party of:the first part inconsideration of One Hundred Dollars (6100.06) and other good and.yaluable con- siderations to it paid by party,of the second part; the .receipt of which is hereby acknowledged; has bargained and sold,.and by these presents does grant, bargain* sell and convey to said party 0 of the second part, its successors And ;assigns;..,a.certain :tract or parcel of land in Morehead. To Carteret County;"Nortli Carolina, more particularly described as follows: BEGINNING at a concrete monument in the east side of in -Access road leading to U. S. Highway #70, which point is the south- west corner of the present North Carolina Highway Patrol Sta- tion tract and the present northwest corner of the Carteret Technical Institute property; running thence along the west line of the Carteret Technical Institute property S. 8-39' 00" W. 313.13 feet to an iron post in the highwater mark of Bogue Sound; running thence along the highwater mark N. 80 111i i1li 57'50" W. 10.0 feet; S. 67-22' W. 52.19 feet; S. 31-04'30" W. „ 66.10 feet; S. 80-32140" W. 369.12 feet; S. 67-39'40" W. 131:07 feet; N. 85-59140" W. 55.50 feet to an iron pipe, which pipe �.u` is situated in the southeast corner of that tract of land W V1 t i ! belonging to Standard Products, Inc.; running thence along.: a� ,,,j the east line of Standard Products, Inc. N. 6-33340" E._508.63. —i feet; N. 83-54' W. 7.0 feet; N. 6-33140" E. 87.74 feet; N. 37-54' E. 28.28 feet; N. 5-38135 E. 43.81 feet; N. 5-48115" ') E. 38.05 feet; S. 80-00' E. 14.54 feet; S. 86-0111011 E.: 10::45 `_= a feet; S. 82-09' E. 25.65 feet; S. 74-45' E. 10.1$ feet.;, N. 9 11' E. 9.91 feet to a concrete monument;.:running thence S.. 83-: 28140" E. 116.4 feet to a concrete monument; thence S. 2-351.' x? u 20" W. 27.95 feet; thence.S. 74-45140" E..70:95.feet;-con- 0 MO ti tinuing thence S. 9-54130" E. 105.25 feet; S.. 83-37'.5011 E..: 210.64 feet; S. 80-57150" E. 123.95 feet to the. point of.. ,Fy �• beginning. Being the same property conveyed. to daroliaa'.' Menhaden Products, Inc. in Book 240, page 37. Carolina Mein= haden Products, Inc. merged into Haynie Products, Inc. in And the said party of the first part for itself and its successors and assigns, covenants with said party of the second part, its successors and assigns, that it is seized of zaid premises in fee and has right to convey in fee simple; that the same are free and clear from all encumbrances and that it does hereby forever warrant and will forever defend the said title to the same against the claims of all persons whomsoever. IN WITNESS WHEREOF, the said Zapata Haynie Corporation has caused this instrument to be signed in its name by its President and attested by its Assistant Secretary, with its corporate seal hereto affixed, and all by order of its Board of Directors duly given the day and year first above written. ('Corporate Seal) ZAPATAA 4YNNIE CORPORATION Allen--V. Haynie President RECEIVED JAN 3 0 2020 GCM-MHD CITY STATE OF MARYLAND, CITY OF BALTIMORE I, WILLIAM E))WA2A Fn,LSE/1 , Notary Public, do hereby certify that personally appeared before me this day Allen W. Haynie, who, being by me duly sworn, says that he is the President of Zapata Haynie Corporation, and that he knows that Earl J. Conrad, Jr. is Assistant Secretary, and that he knows the common seal of said Corporation; that the Corporation's name was subscribed to the within Warranty Deed by him as President and was attested by its Assistant Secre- tary, with its corporate seal thereto affixed, and all by order of its Board of Directors duly given, and that the said instru- ment is the act and deed of said Zapata Haynie Corporation,..... „_E:' Witness my hand and Notarial Seal, this T'':" d�%• Sf.. 0CITI1QF(Z , 1974.. •,� , ...}+."'^.: .". STATB CORPORATION'.COMM16s1ON-..• Y�?��"��� . .:. ... : ONO'y`x,.'.,:.;{i",•y,, 'RICNM . VIRGINIA '� • v ��tCtt�' L��1✓��O1tt�tOlt LOt1t11tt��tOli on December 31, 3973, by amendment of its Articles of Incorporation, the name of Haynie Products, Inc., was changed to Zapata Haynie Corpora RECEIVED JAN 3 0 2020 ®CM-MHD CITY :..���/..... , .., 1l:. ....� 1r�•�iriiiliiirz; 7/i/iiil•/%7/.�IIGO//.: -liI STATE OF NORTH CAROLINA D E E D COUNTY OF CARTERET pXCENEO JAN 30'01 THIS DEED, made this the 12A day of 1982, by the STATE OF NORTH CAROLINA, a body politic and corporate, party of the first part, to CARTERET TECHNICAL INSTITUTE, party of the second part; W I T N E S S E T H: THAT, WHEREAS, the Department of Natural Resources and Community Development of the State of North Carolina has authorized the execution of this instrument; and WHEREAS, the Council of State at a meeting held in the City of Raleigh, North Carolina, on the-2nd day of February, 1982, approved this conveyance and directed execution of this instrument; NOW, THEREFORE, in consideration of the sum of TEN DOLLARS and other good and valuable consideration to them paid by the party of the second part, the receipt of which is hereby acknowledged, the party of the first part has bargained and sold and by these presents does hereby bargain sell and convey unto the said party of the second part, its successors and assigns, all those certain tracts or parcels of land situate, lying and of Bogue Sound; runs thence with said mean high water line the following courses and distances; North 84 deg. 03 min. West 228.2 feet; South 82 deg. 02 min. West 198.6 feet; South 80 deg. 10 min. West 339.4 feet to a point, a corner of the Wallace Fisheries property; runs thence North 5 deg. 00 min. East 357.1 feet to a point, a corner of property occupied by the N. C. Highway Patrol; thence with the line of the Highway Patrol property South 89 deg. 03 min. lust 199.6 feet to a point; thence North 5 deg. OO min. East 400.25 feet to a point in the southern right-of-way line of U.S. Highway No. 70; and runs thence with said right-of- way line South 84 deg. 15 min. East 543.8 feet ni the point of Beginning, containing 9.85 acres more or leas, and he:ing all of Tract "A" as shown on a plat of the "Camp Glen Prop- erty" of the N.C. Department of Conservation and Development, made by J. G. Hassell, registered surveyor, and dated November 1966. TRACT II Located in Morehead Township, Carteret County, North (:arol.ina, and being more particularly described as: BEGINNING at. ;in iron pin located North 84 deg. 15 min. West 200.00 feet along the south right-of-way of U.S. Highway 70 (also known as Arendel.l Street) from an existing bolt in the centerline of the SOUth- ern extension of 35th Street; said beginning point also being the northeast corner of Tract A and the northwest corner of Tract B as shown on a plat entitled "State of North Carolina, Department of Conservation and Development, Divi::ion of Com- mercial and Sport Fisheries; Camp Glen Property" by J. C. Hassell RLS dated November, 1966. Thence with the south right- of-way of U.S. 70 South 84 deg. 15 min. East 31..01 feet to an iron stake, a new corner; thence along a new line: South 04 deg. 24 min. West 641.65 feet to an iron stake, a new corner at the high water mark of Bogue Sound; thence with the high water mark of Bogue Sound North 75 deg. 40 min. West 31..47 feet to an iron stake, the southeast corner of Tract A; thence with the east line of Tract A North 04 deg. 24 min. East 636.95 feet to an iron pin, the point and place of Beginning. 1.q RECE being the intent of this instrument to convey a 31 foot wide strip east of and adjacent to Tract A and running front U.S. Highway 70 to Bogue Sound. Containing 0.454 acres more or JAN less. TO HAVE AND TO HOLD the aforesaid tracts or parcels of hind privileges and appurtenances thereunto belonging to the said party of: the second part, its successors and assigns, forever. IN TESTIMONY WHEREOF, the State of North Carolina has caused this instrument to be executed in its name by JAMES B. HUNT, JR., Governor, attested by THAD SURE, Secretary of State, and the Great Seal or the State of North Carolina hereunto affixed, by virtue of the power and authority aforesaid, all as of the day and year first above written. i CITY DEED APPROVED FOR REGISTI{AT101i rnv nnnnrl Accirta[ti STATE OF NORTH CAROLINA APPROVED AS TO FORM: RUFUS L. EDMISTEN Attorney General. BY: Assist t Attorney General zkU(`� RECEIVED JAN 3 0 2020 (CM.MHD CITY 61by &,) STATE OF NORTH CAROLINA COUNTY OF 14AKE I, DEBORAH QrV CANDLER, a Notary Public in and for the County and State aforesaiu, do hereby certify that JAMES B. HUNT, JR., Governor of the State of North Carolina, and THAD EIRE, Secretary of State of North Carolina, personally came before me this day and being by me duly sworn says each for himself that he knows the Great Seal of the State of North Carolina and that the seal affixed to the foregoing instrument is the Great Seal of the State; that JAMES B. HUNT, JR., Governor of said State, and THAD SURE, Secretary of State, subscribed their names thereto, all by virtue of a resolution of the Council of State; and that said instrument is the act and deed of the State of North Carolina. IN WITNESS WHEREOF, /I have hereunto set my hand and Notarial Seal, this the 1.2 day of Ct' 198 _�31. 4kZigw,c� an 2L./ r. Notary Public My Commission Expires: 18Y Connsuun Etpues 8.21-b; N)A u6 0 kale ,� NOi�TH cn�ozlNa, c,�RTEREr c0 Nj'1'�/tL I 11 ',L2J The foregoiP? certiflcatw(s) o � J is (are) cer'cified to be correct. This instrument was Pre - RECEIVED senteY r feaistratios 7 d recorded in this otfi tr JAN 3 0 2020 Bh sk Y of p��4'= i9R- ate O'clock 9. Sharon Piner DCM-MHD CITY (� Register o eeds PAN; Co1BL- 1 3I85000 wo: I&S5- NORTH CAROUNA NON -WARRANTY DEED Excise Tax: - 0 - I V CGS 105-228281 Parcel Identi ierNo. __,hdaiYBox to: Taylor and Taylor, PA FOR REGISTRF1r10N REGISTER OF DEEDS Karen S Hardesty Carteret County. 11C December 16, 2019 03:37 33 PM BWC DEED 3 P FEE: $26.00 FILE # 1657441 Verified by County on the day of 20 This instrument was prepared by: Derek Taylor, Taylor and Taylor, PA Brief description for the Index: McGee BoOdhig and Lot, 6A9 acres THIS DEED muse this day of 20. by and between Carteret County (a NC body politic and corporate) 302 Courthouse Square Beaufort, NC 28516 Board of Trustee of Carteret Commuotty ColkV 3505 Arendell Street Morehead City, NC 28M7 The deaignetion Grantor and Grantee as used herein shall Include said parties, their heirs, successors, and assips, and shall include singular. plural, masoulfne, feminine or noutor as required by context. WITNESSETH, that the Grantor, for a valuable consideration laid by the Grantee, the receipt ofwhieh is hereby sclmowledpd, has and by these presents does grant, bargnio, sell and convey unto the Grantee in fee simple, all that curtain lot, parcel of land situated in Morehead City, Morehead Township, Carteret County, North Carolina and more particularly described u follows: SEE EJ{33II$IT A ATTACHED HERETO AND INCORPORATED HERE BY REFERENCE NO TITLE SEARCH REQUESTED OF NOR PERFORMED RYDRAFTING ATTORNEY The property hereinabove described was acquired by Grantor by insti m ear t recorded in Book 1238, page 476. No portion of the property herein conveyed includes the primary residence of a Grantor. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges mid appurtamncea tir" t D the Grantee In fee simple. 1 of l 'JAN 3 0 6d PapNC Bar Anociatim Form Na 7 0 7/2013 : OCM-MHD CITY Mftd 6y Aareevamt W" We NC Ha Awodatim Nart6 Grebes Ber Asseeleeoo —NC Bar Fa m No. 7 Nora1 Cantina Asioeiabon of Raab^ Ira — Syndird Farts 7 �1` The Grantor ma kos no warranty, express or implied, as to title to the property hereinehove described. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. CARTERET COUNTY Rsclrel Hanvmr, cleric to the Carteret County Board of Commissions State of North Carolina r ir`e1U— (SEAL) Markk ManaEeld, Carteret County Board of Commissioners County of Carteret 1, the undamped Notary Public of the County and State aforesaid, certify that Mark MaosSeldpersonally appeesedbefore me this day and acknowledged that he is the Chairman of the Board of Commissioners of Carteret County and that by authority duly given and as the act of Carteret County, the foregoing instrument was signed in the County's name by such Chairman of the Board of Commisslones. Witness my hand and Notarial Seal this the (SEAL) _ f1Y dn 5/2/2n2'{�irsy: State of North Carolina "pN1E FFRCo,, ..�. 0 TA I? — z I +� day of PCCClyiW 201q. kIC ja u Notary Public County of Carteret 1, the undersigned Notary Public of the County and State aforesaid, certify thatRacbel Hemmer personally appeared before me this day and acknowledged that she is the Clark to the Board of Commissioners of Carteret County and that by authority duly given and as the act of Carteret County, the foregoing instrument was signed in the County's name by such Clark of the Board of Commissioners. Witness my hand and Notarial Seal this the .. day of V&el(4 .20 I. (SEAL);~F� PNIE FF�iG;G�; I CY = C—D 0TA/�y' w"I-siurl _- c7 IfaZ: "VBI_\G;�� COVN.,". NC I1arAncelalim FamNo. 707=13 tila0ed by Areeaa vA the NC Hv Anodadoa —✓Ihle _ __ . Notary Public ECEIVED JAN ;� (I �'20 Paso 2 of OCM-MHD CITY North Cwlina Her A&000yfbn —NC Bar Fan No. 7 North Carolin Amoc"oo of Raho,a, ire. — Standard Faen 7 STATE OF NORTH CAROLINA COUNTY OF CARTERET MOREHEAD TOWNSHIP Part of Parcel ID - 6376.18.41,3995000 &aWW - A certain parcel of land and all improvements located thereon which is described as beginning at a painted mark on the South edge of a sidewalk, said mark being N 84015' 00" W, 171.23 feat from a magnetic nail set at the intersection of the southern right-of-way margin of U.S. Highway 70 and the ca ntarline of 35a Street extended and from this Point and Place of Beginning for it first call of S 040 24' 00" W, 64125 feet toll point in the high watermark of Bogue Sound; thence along and with the high watermark of Bogue Sound N 850 2T 02" W, 68.74 feet to a point thence N 790 29' 11" W, 51,7 t foet to a point; thence N 700 5813511 W, 62.51 feet to a pond; thence N 810 31' 58" W, 92.24 feet to a point; thence S 890 02' 27" W, 14126 feet to a point; thmtca leaving the high watermark of Bogue Sound N 060 14' 58" W, 316.00 fed to an iron pipe; thence N 040 53' 45" E, 327.41 toot to a magnetic nail sat in or near the southern edge of a sidewalk thane along and with said sidewalk S 84015' 00" E, 459.01 fad to the Point and Place of Beginning containing 6.49 acres more or less. This property is the same as depicted upon that unrecorded survey map emitted "Survey of Area For Deed of Trust Prepared For Carteret Community College and Carteret County," dated hue 20, 2007 and prepared by Powell Surveying Company, PA. Reserved from the above described property Is a perpetual, nonexclasive easement for Ingress, egress, regress and placement of atil des as described below: Rant At A twenty-fou (24) foot wide easement which is bounded twelve (12) fed on either side of a dine running ficn a beginning point located m the eastern property line of the abovedeacnbed Property which is S 040 24' 00" W. 12 feet from a painted merit on the South edge of a sidewalk located N 940 15' 00" W,171.23 fed f m a magnetic nail set at the intersection ofthe southern right-of-way margin ofU.S. Highway 70 and the centerline of 35' Street extended, and thence running N 840 15' 00" W, 459.11 That to the terminating point of the centerline in the western property line of the above described Property. EilOmiYL L A thirty (30) foot wide easement which is bounded fifteen (15) fed on either side of a centerline running from a beginning point located in the southern edge of a sidewak said point being N 9n4�0 15' 00" W, 3102m 1 fed fioa painted mark on the South edge of the same said sidewalk, that mark being N 940 15' 00" W,171.23 feet from a magnetic nail ad at the intersection ofthe southern rightof-way margin of U.S. Highway 70 and the centerline of 3511 Street extended and from this beginning running S 050 45' 00" W,14033 feet to the terminating point of the centerline of the easement a•.'meet C• A twenty-four (24) foot wide easement which is bounded twelve (12) feet on either side of a centerline beginning at a point which is the terminus of Easement B above and running N 940 25' 49" W, 146.51 feat to the terminating point of the centerline in the western property line of the above described Property. Conveyance of Property is subject to the above easements and all other easameg yQ h and restrictions of record. Grantor and Grantee are tax-exempt entities [ Aze l�' JAN 3 0 2020 Pop 3 of3 WM-111HD CITY NC Bar AnDmxtem Farm No. 7 0 V2013 Prtrtbd by AFtrrtmt Yeah the NC Bar AnW iarim North C=Um Bar Airociallon - NC Bar Form NO. 7 Nast Cnv]hr Aaeociatim of Rultcn, Im. - SWKMA Fam 7 � Q � s O \N to v nl r z � y pm m 60 U o y E m 4 m y' v Z 2 y Dm r Q U U ¢ m a" as Q o a RECEIVED FEB 2 4 2020 DCM-MHD CITY 31505� I MAJOR PERMIT FEE MATRIX NtC Applicant: eAAfV1& AT-IffdelI evelopment Type Fee DCM % DW.Q (14300 1601'4351000931625.a253) (243001602 435100096 2341) ate, non-commercial lopment that does not $250 100%($250) .0%($0)e the filling orvation ffe of any wetlands en water areas: blic or commercial lopment that does not " $400 100% ($40.0) 0%($0) e the filling or vation of any wetlandsen water. areas: r1Major Modification.to a $250 100% ($250) 0% ($0) CAMA Major ermit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A. B, C,, or D below applies: III(A). Private, non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 4097 (See attached can be applied: ° III(B): RLblic or commercial = _.. development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 4097 (See attached) can be a lied: III(C): If General Water Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see. attached) could be.applied, but DCM staff determined that additional t review and written DWQ �, 1-•�1 concurrence is needed se of concerns d to water quality or. ^ 0�� Ul ic life: . If General Water ty Certification No. $400 60% ($240) 40% ($160) (see attached) cannot q.see lied: r development that es the filling and/or . $475 60% ($285) 40%($190ation of more thancre of wetlands and/or Water areas: Awd , I I MAJOR PERMIT FEE MATRIX 1- , AtijC A licant: UMMUOICY r llonv I Arer�del� Development Type Fee DCM % DWQ p7development (14300 16014351000931625 6253) (243001602 436100095 2341) I. Private, non-commercial that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: II. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, D below applies: on- El am elopment, if Quality :ca $250 100% ($250) 0% ($0) . 4097 (See e applied: ublic or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 4097 (See attached) applied: If General Water y Certification No. $400 60% ($240) 40% ($160) 74097 see attached) could plied, but DCM staff ined that additional and written DWQ rrence is needed because of ater'q concerns d to water quality or c life: If General Water Lt4097 Quality Certification see attached) cannot $400 60%($240) 40%($160) lied: IV. For development that El involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or open water areas: DCM Coordinator: Applicant: Distributed Yes® No IAI.UflM Distribution Date: AGENCY WIRO WARO DMJYI of MN(- \l!L LPO achel Love Adrick MHC Rachel Love Adrick Washingon DCM Planner Mike Christenbury Wilmington Charlan Owens Eliz City US COE: I tlz Hair Raleigh Bland (Beaufort, Camden, Chowan, (Carteret Onslow, Pender) Craven, Hertford, Hyde, Perquimons, Tyrrell) Jordan Jessup (TBD) Josh Peletier— (Bertie, Currituck, Dare, Gates, Greg Curry (TDB) Pamlico, Posquotank, Washington) USCOE (NC DOT) (Brunswick, New Hanover) DOT- Tom Steffans—(Beaufort, Carteret, DOT Brad Shaver Craven, Pamlico (Brunswick, New Hanover, Onslow, Pender) Mark Zeigler (Onslow, Pender, New Community Assistance Hanover, Brunswick) Lee Padrick (Beaufort, Carteret, Craven, Eliz e Padrick (Beaufort Carteret Craven City, Pamlico, Washington) EBz City, Pamlico, Washington Cultural Resources Arenee Gledhill -Earley Renee Gledhill -Earley Div. of Water Infrastructure w6eldl Cox Clif Whitfield Marine Fisheries Anne Deatona(I(l_h Anne Deaton David Harris NC DOT V David Harris Shellfish Sanitation Shanr9n/Jenkins & Shha�aroriGupto�✓nn Shannon Jenkins & Sharon Gupton State Property Tim Walton & Mikevl&ser & Wanda Tim Walton & Mike Moser & Wanda Hillard Hillard A. Montalvo/Shelton Sullivan Sheri A. Montalvo/ Shelton Sullivan DEMLR/DWR: 14heri (NC DOT) Kristy Lynn Carpenter Kristy Lynn Carpenter DEMLR Sediment & Erosion Sams Sami Dumpor Storm water Christine Hall Roger Thorpe DWR 401 obb Mairs (Carteret, New Hanover Anthony Scarbraugh Onslow, Pender,) Chad Coburn (Brunswick) (NC DOT) Joanne Steenhuis Brunswick, New Garcy Ward Hanover, Onslow, Pender WRC Maria Dunn (WARD) Maria Dunn (WARO) WRC (NC DOT) Travis Wilson Travis Wilson Natural Heritage Program odney Bulter Rodney Butter D.\Amanda\Amanda\Major Permit Processing\2020 Admin forms\Major Comment Distribution Sheet 2020.docx Revised : 5/7/2019 ARENDELL .Ivit-COASTAL ENVIRONMENTAL 1004 Arendell Street Morehead City, North Carolina 28557 (252)622.4338 N. C. Certification No. C•1509 January 30, 2020 N.C. Division of Coastal Management Morehead City Regional Office 400 Commerce Avenue Morehead City, NC 28557 Re: Major CAMA Permit Pre -Submittal Review Carteret Community College Shoreline Improvements Morehead City, North Carolina Ms. Styron: On behalf of the Carteret Community College and the Carteret Community College Board of Trustees, please find included with this letter the preliminary CAMA Major Permit submittal for a pre -submittal review by your office. The following information is still needed to complete the submittal: 1. AEC Impervious Area % 2. Total Upland Impervious Area % 3. Walkway alignment and section 4. Normal high water line outside of the proposed shoreline improvement area. A review of the submittal for completion is requested at your earliest convenience. We will have all applicable documents signed and a check for $400.00 made payable to NCDEQ for the final submittal in addition to the information above. Please call me if you have any questions or need additional information. Sincerely, John J. Wade, P.E. Vice President Cc: Steve Sparks, Carteret Community College DECEIVED JAN 3 0 2020 DCM-MHD CITY PRELIMINARY DRAWING NOT FOR CONSTRUCTION Major CAMA Permit Application Carteret Community College Shoreline Improvements Morehead City, North Carolina January 30, 2020 Applicant: Carteret Community College / Carteret Community College Trustees 3505 Arendell Street Morehead City, NC 28557 Prepared For: North Carolina Department of Environmental Quality Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Prepared By: ARENDELL ENGINEERS 1004 Arendell Street Morehead City, North Carolina 28557 (252)622-4338 NC Certification No. C-1509 RECEIVED JAN 3 0 2020 CCM-MHD Crry MAJOR CAMA PERMIT APPLICATION CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS MOREHEAD CITY, CARTERET COUNTY, NORTH CAROLINA Table of Contents DCM MP — 1 Application for Major Development Permit DCM MP — 2 Excavation and Fill DCM MP-3 Upland Development DCM MP —4 Structures PROJECT NARRATIVE INTRODUCTION PROJECT DESCRIPTION Western Segment — Western end of college property Western Segment — Base Bid Revetment Project — Shoreline segment fronting the parking lot, Student Center, and Civic Center. Western Segment —Alternative Living Shoreline Project Center Segment — Base Bid Project — Shoreline fronting the Civic Center and Smith Building Center Segment —Alternative Living Shoreline Project Eastern Segment — Base Bid Revetment Project — Shoreline fronting the welding and construction trades building Eastern Segment —Alternative Living Shoreline Project. EXISTING CONDITIONS Site Topography and Hydrography Land Use Wetlands Areas of Archaeological or Historic Value Navigation METHODS OF CONSTRUCTION PROJECT SCHEDULE COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT ADJACENT PROPERTY OWNERS Platform Dimension Table Carteret Community College — List of Parcels RECEIVED Waterfront Parcel Deeds Parcel Pin: 637618217539000, Deed Reference: 1636-8 JAN 3 O zL'.] Parcel Pin: 637618310573000, Deed Reference: 544-357 ®CM-MHU CITY Parcel Pin: 637618314691000, Deed Reference: 369-25 Parcel Pin: 637618410639000, Deed Reference: 464-87 Parcel Pin: 637618413985000, Deed Reference: 1657-447 Figure A — Adjacent Property Owners Application Drawings Sheet 01 —Vicinity Map Sheet 02 — Existing Conditions & Demolition Plan Sheet 03 — Overall Schematic Site Plan Sheet 04 — Base Bid Revetment Project Sheet 05 — Base Bid Sections Sheet 1 of 3 Sheet 06 — Base Bid Sections Sheet 2 of 3 Sheet 07 — Base Bid Sections Sheet 3 of 3 Sheet 08 — Piers #1 & #3 Plan & Profile Sheet 09 — Pier #2 Plan & Profile Sheet 10 — Alternate Option Living Shoreline Plan Sheet 11 — Alternate Option Sections Sheet 1 of 3 Sheet 12 — Alternate Option Sections Sheet 2 of 3 Sheet 13 — Alternate Option Sections Sheet 3 of 3 Sheet 14 - Details Adjacent Property Owner Notification Letters Authorized Agent Letter RECEIVED JAN 3 0 2020 ocm-MHD CITY ON MP-1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Carteret Community College (Ccc) / Ccc Trustees Project Name (if applicable) Shoreline Improvement Project Applicant 1: First Name Steve MI Last Name Sparks Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 3505 Arendell Street PO Box City Morehead City State NC ZIP 28557 Country Phone No. 252-222-6087 ext. FAX No. 252-222-6077 Street Address (if different from above) City State ZIP Email sparkss@carteret.edu 2. Agent/Contractor Information Business Name Arendell Engineers Agent/ Contractor 1: First Name MI Last Name James (Bill) W. Forman, Jr., P.E. Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 1004 Arendell Street Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252 - 622 - 4338 ext. ext. FAX No. Contractor # C-1509 Street Address (if different from above) City State ZIP Email bill@arendellengineers.com RECEIVED <Form continues on back> JAN 3 0 ZRO 0(-M-MHD CITY 252-808-2808 .. 1-888-4RCOAST .. www. nccoastal management. net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 3505 Arendell Street U.S. Highway 70 Subdivision Name City State Zip Morehead City NC 28557 - Phone No. Lot No.(s) (d many, attach additional page with list) 252-222-6087 ext. 637618217539000,637618310573000,6376183141691000, 637618410639000,637618413985000 a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Bogue Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Bogue Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Town of Morehead City 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 2,550 If 1,788,268 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or See Attached List of Parcels, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 4' - 20' ®NHW or ❑NWL e. Vegetation on tract Grass lawn and coastal scrub. f. Man-made features and uses now on tract Existing man-made features on site include classroom, administrative, civic center, & research structures, parking areas, and sidewalks. g. Identify and describe the existing land uses adlacent to the proposed project site. Adjacent land uses include the Division of Marine Fisheries to the east, a hospital, gas station, and office building to the north, and residential to the west. The southern property borders Bogue Sound. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Office & Professional (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> Ktlitt V tU JAN 3 0 2020 252-808-2808 :. 1-888-4RCOAST :: www. n ccdfl4rFAYiWSWInt. net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes []No (ii) Are there coastal wetlands on the site? ®Yes []No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Wastewater from the site is collected by the Town of Morehead City wastewater infrastructure. o. Describe existing drinking water supply source. Drinking water is provided by the Town of Morehead City public water supply. p. Describe existing storm water management or treatment systems. Existing stormwater management systems include wet ponds and other various systems with outlets to Bogue Sound. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Daily operations of the site will include a public walking trail with access to both of the two (2) smaller piers and one (1) longer pier. Shoreline improvements will be constructed to repair Hurricanes Florence & Dorian damage and to protect the existing shoreline from further erosion. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Construction of the piers, shoreline stabilization, and marsh sills will be by conventional marine construction equipment including barges and cranes. The equipment will be onsite only a sufficient time to complete the pile driving, pier installation, and shoreline protection work. Materials for in -water improvements will be stored in upland areas and transferred to barges for in -water construction. Timber pier piles will be driven into the substrate to minimize turbidity. d. List all development activities you propose. The construction of three (3) piers and shoreline improvements including removing and replacing existing riprap and the installation of a marsh sill, backfill, and planting of spartina alterniflora below the normal high water line. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 48,100 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes []No ❑NA that the public has established use of? It. Describe location and type of existing and proposed discharges to waters of the state. There are at least four (4) existing stormwater discharges to waters of the state. There are no proposed additional discharges. I. Will wastewater or stormwater be discharged into a wetland? ®Yes ❑No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ®No ❑NA j. Is there any mitigation proposed? ❑Yes ❑No SNA If yes, attach a mitigation proposal. KtliCtvcv <Forrn continues on back> JAN 3 0 2020 252.808-2808 :: 1-888-4RCOAST :: MM-MHUCCl na nageme nt. net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (i) are ahvays applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Albert & Made Libby Phone No. Address 8775 SW 1W Street, Palmetfa Bay, FL 33176 Name N.C. Division of Marine Fisheries Phone No, Address 3411 Arendell Street, Morehead City, NC 28557 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, If applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name Carteret Community College I Carteret Community College Trustees Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development ®DCM MP4 Structures Information RECEIVED JAN 3 0 2020 DGM MHO CITY 252-808-2808 :. 1-888-4RCOAST :: www.nccoastaimanagement.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length 1,280 LF Total Width 12 feet Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. 332 cy c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV OSB Unknown ❑WL ❑None III) Describe the purpose of the excavation in these areas: Riprap currently has oysters attached at various locations. These oysters will be removed by hand and relocated on the site by the College's aquaculture program or contractor. El This section not applicable Type of material to be ex( Concrete riprap debris d. High -ground excavation in cubic yards. 513 cy 12. DISPOSAL OF EXCAVATED MATERIAL [I This section not applicable a. Location of disposal area. To be determined by the Contractor. c. (1) Do you calm title to disposal area? ❑Yes ❑No ®NA III) If no, attach a letter granting permission from the owner. e. area. Unknown d. (i) Will a disposal area be available for future maintenance? []Yes []No ®NA (ii) If yes, where? (i) Does the disposal area include any coastal wetlandstmarsh f. (i) Does the disposal include any area in the water! (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ❑No ®NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. yes, how much water area is affected? ❑CW ❑SAV ❑SB RECENM OWL ❑None (ii) Describe the purpose of disposal in these areas: JAN 3 0 2020 DCM-MHD CITY 252-808-2808 :: 1-888-4RCOAST :: www.ncconstalmanagement.net revised: 12/26/06 RECEIVED Form DCM MP-2 (Excavation and Fill, Page 2 of 3) w430ZON ❑Bulkhead ®Riprap ®Breakwater/Sill ®Other: Width: —20' Armorflex (Alternate) c. Average distance waterward of NHW or NWL: 5' d. Maximum distance waterward of NHW or NWL: 14' (Riprap); —60' (Riprap/Armorflex), 30' (Marsh Sill) (Marsh Sill which follows the -2 contour) e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 Graded Riprap (Base Bid); Armortlex (Alternative) months? []Yes ®No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill _ Riprap 3 207 sf Graded Riprap Breakwater/Sill 13,700 sf Other I. Source of fill material. Unknown 4. OTHER FILL ACTIVITIES [I This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ®Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (11) Amount of material to be placed in the water 33,366 sf (iii) Dimensions of fill area Varies (iv) Purpose of fill No fill is proposed as part of the Base Bid project. Fill will only be placed between the shoreline stabilization and marsh sills as part of the Alternative project so that wetlands may be planted. submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ®SB Minimal OWL ❑None (ii) Describe the purpose of the fill in these areas: Oyster beds will be relocated on-ske prior to placing fill material behind marsh sill structures in order to provide area for marsh plantings. 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Excavated material will be kept on -site through the use of a turbidity curtain. Fill material will be seeded or sodded immediately and sift fence will be used as necessary to prevent sediment from entering the water. c. (i) Will navigational aids be required as a result of the project? ®Yes []No ❑NA (ii) If yes, explain what type and how they will be implemented. Warning posts will be installed at the toe of the marsh sills approximately 50' on center with yellow reflectors extending at least three feet above normal high water. Construction of the structures will be by conventional marine construction including barges and cranes. d. (i) Will wetlands be crossed in transporting equipment to project site? []Yes ®No [_]NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. 252-808.2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 3 of 3) Shoreline Improvements Date Project Name Carteret Community College / Carteret Community College Trustees Applicant Name Applicant Signature RECEIVED JAN 3 0 2020 pCM-MHD CITY 252-808.2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 pXCE1VED Form DCM MP-3 UPLAND DEVELOPMENT BAN V4 2CITY (Construction and/or land disturbing activities) QCM-NIHD C Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. 21 - See attached list of parcels. There are no proposed buildings. Proposed upland structures include a 10' wide elevated pervious sidewalk and one (1) pier with a 200 sf platform. Pier & platform will not extend beyond the normal high water line. c. Density (give the number of residential units and the units per acre). N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes ®No ❑NA (ii) If yes, list the date submitted: Will be submitted prior to construction. g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. I. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. j. Describe proposed method of sewage disposal. Site is served by the Town of Morehead City's municipal wastewater system. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). No new discharges are proposed as part of this project. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 20,895 square feet for the proposed elevated pervious sidewalk in the CAMA buffer. f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. h. Projects that require a CAMA Major Development Permit may also require a Stonmwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes ❑No UNA (ii) If yes, list the date submitted: The College is working with NCDEQ Stormwater on updating and their current stormwater permits for the site. k. Have the facilities described in Item (i) received state or local approval? ®Yes ❑No ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? []Yes ❑No UNA If yes, attach appropriate documentation. 252-808-28082 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26106 Form DCM MP-3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Site is served by the Town of Morehead City's municipal water system. o. When was the lot(s) platted and recorded? Unknown. Date Shoreline Improvements Project Name Carteret Community College / Carteret Community College Trustees Applicant Name Applicant Signature n. (i) Will water be impounded? []Yes []No ®NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? []Yes ❑No ®NA RECEIVED JAN 3 0 ZM DCm-WiD CITY 252-808-2808:: 1-888-4RCOAST :: w nccoastal management. net revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑commercial NPubliclGovernment ❑Private/Community c. (I) Dock(s) and/or pier(s) (ii) Number 2 (III) Length (Pier #2) 126'. (Pier #3) 56' (iv) Width (Pier#2) 10'. (Pier #3) 5' (v) Floating []Yes NNo e. (i) Are Platforms included? NYes []No If yes: (ii) Number 2 (III) Length (Pier #2) 20'. (Pier #3) 12' (iv) Width (Pier #2) 50'. (Pier #3) 20' (v) Floating ❑Yes NNo Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 1 Pier #2 (ii) Number of slips existing 1 - Existing Pier i. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and/or channel NOpen water; no dredging required []Other; please describe: k. Typical boat length: 16' - 35' ❑This section not applicable b. (i) Will the facility be open to the general public? ®Yes []No d. (i) Are Finger Piers included? NYes []No If yes: (ii) Number 2 - Both on Pier #2 (III) Length 40' (Fixed). 20' (Floating) (iv) Width 6' (Fixed). 4' (Floating) (v) Floating ❑Yes []No f. (I) Are Boatlifts included? ❑Yes NNo If yes: (ii) Number (iii) Length (tv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ('Wet slips') only, number of slips: _ ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: N Other, please describe: Slip will only be for transient boats, no overnight dockage will be permited. j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Typical boats to be served will be academic research boats, center consoles, and skiffs. RECEIVED JAN 3 0 2020 DCM-MHD CITY 252-808-2808 :: 1-a8a-4RCOAST :: www.necoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) m. (i) Will the facility have tie pilings? (i) Will the facility be open to the general public? []Yes ®No ®Yes ❑No (ii) If yes number of tie pilings? 2. DOCKING FACILITY/MARINA OPERATIONS ❑This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. No pump out facilities will be provided. C. Describe the disposal of solid waste, fish offal and trash. All solid waste will be collected at the College's solid waste containers. d. How will overboard discharge of sewage from boats be controlled? No overboard discharge of sewage will be allowed. Signs will be placed at the slip indicating this policy. e. (i) Give the location and number of "No Sewage Discharge" signs proposed. 1 - At the slip on Pier #2. (ii) Give the location and number of "Pumpout Available" signs proposed. 0 f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. Not Applicable g. Where will residue from vessel maintenance be disposed of? Not Applicable h. Give the number of channel markers and "No Wake" signs proposed. Not Applicable I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. Not Applicable j. What will be the marina policy on overnight and live -aboard dockage? No overnight or live -aboard dockage will be allowed. k. Describe design measures that promote boat basin flushing? Not Applicable RECEIVED JAN 3 0 2020 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmana revised: 12127/06 Form DCM MP-4 (Structures, Page 3 of 4) I. If this project is an expansion of an existing marina, what types of services are currently provided? Not Applicable m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ®No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ®Yes []No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. Proposed pier is approximately 150 feet east of a shellfish lease held by NC Sea Grant. 13. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑PublidGovernment ❑Private/Community (ii) Number (iii) Length IN) Width Note: Roofed areas are calculated from ddpline dimensions. 14. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable I a. (i) Number (ii) Length (iii) Width 15. BREAKWATER (e.g., wood, sheetpile, etc.) ❑This section not applicable I a. Length 1,4581f c. Maximum distance beyond NHW, NWL or wetlands 50' from NHW b. Average distance from NHW, NWL, or wetlands 30' from NHW 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑PublidGovernment ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. RECEIVED JAN 3 0 2020 b. Number d. Description of buoy (color, inscription, size, anchor, etc.) ()CM_MHD CITY 252-808.2808 :: 1-888-4RCOAST :: www.nccoastaimanagament.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) e. Arc of the swing 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines Pier #1 is approximately 150 feet from the adjacent property line. Proposed shoreline protection on the east end of the project will extend up to the College's property line. Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body —6,800 feet e. (i) Will navigational aids be required as a result of the project? ®Yes []No ❑NA (if) If yes, explain what type and how they will be implemented. Warning posts will be installed at the base of the marsh sills as part of the alternative project. b. Proximity of structure(s) to adjacent docking facilities. Shoreline protection on the east end of the project is approximately is approximately 220 feet from the NC DMF marina. d. Water depth at waterward end of structure at NLW or NWL _1P• 8. OTHER ®This section not applicable a. Give complete description: The base project will include a vinyl and concrete cutoff wall behind the proposed riprap on the east and west ends of the shoreline project. The wall will be constructed to grade. The west end will be approximately 330 feet in length and the east end will be approximately 310 feet in length. Common to both the base project and alternate project will be an extension of the existing vinyl retaining. It will be extended approximately 80 feet to the west and 160 feet to the east to front the existing buildings. Date Shoreline Improvements Project Name Carteret Community College / Carteret Community College Trustees Applicant Name Applicant Signature RECEIVED JAN 3 0 2020 bDCM-MHD CITY 252-808.2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS MAJOR CAMA PERMIT APPLICATION MOREHEAD CITY, CARTERET COUNTY, NORTH CAROLINA PROJECT NARRATIVE January 30, 2020 INTRODUCTION Carteret Community College and property owned by the College is located between Arendell Street and the shoreline of Bogue Sound in the 3500 block of Arendell Street in Morehead City, Carteret County, North Carolina. The shoreline of the property runs east to west for approximately 2,550 feet. Buildings, parking, and open green spaces are located along the shoreline in many places less than 50 feet from the normal high tide line. There are five (5) parcels along the waterfront that are owned by the Carteret Community College and the Carteret Community College Board of Trustees (Sheet A). These two (2) entities will be joint applicants for the permit. A combination of hard and soft shoreline stabilization measures are proposed as two alternative projects, the base bid revetment project and the living shoreline alternate project. The objective of the living shoreline alternative is to minimize the hard armoring of the shoreline limiting rehabilitation to locations fronting critical infrastructure and supplement those measures with living shoreline treatment. This alternative is dependent upon receipt of grant funding that has been applied for by the College through the National Fish and Wildlife Foundation's Emergency Coastal Resilience Fund. The living shoreline measures will provide aesthetic and environmental enhancements as well as toe protection for the shoreface armoring measures. An articulated concrete mat is proposed to armor the shoreline in lieu of the riprap revetment in the living shoreline project. A site plan of the proposed improvements is shown on Sheet 03. PROJECT DESCRIPTION Western Segment - Western end of college property. No shoreline stabilization improvements are proposed to the existing and functioning living shoreline improvements at the Carteret Community College Shoreline Improvements °""' January 30, 2020 Major CAMA Permit Application — Narrative Page 1 of 6 JAN 3 0 2020 j)CM.MHD CITY western end of the project in front of the CMAST and Aquaculture Laboratory buildings. As part of the College's waterfront access project, an observation deck and 10' wide sidewalk along the shoreline is proposed. The observation deck will be of light timber construction and include a pier 10 ft. wide extending approximately 22 ft. seaward to a 12 ft. by 20 ft. platform above high ground. (Sheet 08). This pier will be connected to the public elevated sidewalk and open to the public with educational installed on the pier therefore a 10' width is recommended. Western Segment — Base Bid Revetment Project - Shoreline segment fronting the parking lot, Student Center and Civic Center. Two alternatives are presented for stabilization of the western segment of the shoreline. Sheet 04 shows a base bid project that includes removal of the concrete debris along approximately 360 linear feet of shoreline and replacement with a conventional layered riprap revetment. Revetment improvements involve complete removal of the concrete debris down to the ground beneath and replacement with a graded riprap revetment with a filter layer on the ground, an intermediate stone size fill and a layer of larger armor stones. A concrete and vinyl cutoff wall will be constructed along the landward edge of the revetment with an approximate length of 330 feet. The top of the wall will be at the ground level and will tie into the vinyl wall in the center segment. The purpose of the wall is to minimize and attenuate water runoff from the land at the back of the riprap and keep soil from the upland from being eroded from behind the revetment. A section of the revetment is shown on Sheet 05. Western Segment— Alternative Living Shoreline Project. This alternative involves a softer treatment of the shoreline including armoring of the upper shoreline by removing the concrete debris, grading to a 3:1 slope and placing an AmorFlex© articulated concrete mat along the shore face. The voids in the armor units are then filled with soil and grassed. That grass can be maintained or left to grow unmaintained. The ArmorFlex© mat is placed on a foundation layer of filter fabric and aggregate that is sized larger than the voids in the armor mat. Sheet 10 provides a plan view of this alternative. A riprap sill with a 12 ft. wide base, 4 ft. high will be placed some 30 feet seaward of the mean high water line offshore of the toe of the AmorFlex© mat at an elevation of approximately -2, NAVD88. The top of the sill will be at elevation +2. There will be gaps in the sill at intervals of Carteret Community College Shoreline Improvements RECEIVED January 30, 2020 Major CAMA Permit Application — Narrative Page 2 of 6 JAN 3 0 ZON ,)CM-MHD CITY 200 feet with riprap sill segments offshore of the gaps to prevent erosion of the marsh at the gaps. The bottoms between the toe of the armor and the sill will be filled with sand and planted with marsh grasses at elevations conducive to propagation of marsh grasses. This will provide both aesthetic and environmental enhancements of the shoreline as an alternative to hardening with riprap. A section illustrating the improvements is shown on Sheet 11. Common to both the base bid and alternative living shoreline project along the western segment is construction of an elevated pervious Hogslat concrete sidewalk 10 feet wide along shoreline landward of the revetment (Sheet 03). This elevated walkway will be outside of the 30' CAMA buffer except for where it will connect to the piers. Also common to both is construction of a public water access pier 10 feet wide extending approximately 128 feet from shore with a 20 ft. by 50 ft. platform at the seaward end and one 6 ft. by 40 ft. finger pier on the eastern side of the walkway in deeper water. The finger pier will have a 4 ft. by 20' floating dock that will be used as a kayak launch. An articulated gangway will connect the two (2) structures (Sheet 09). This pier will be accessible to the public as it is connected to the proposed elevated pervious sidewalk and therefore a 10 foot width is recommended. Center Segment— Base Bid Project- Shoreline fronting the Civic Center and Smith Building. The concrete Fiberform mattress will be saw cut approximately 4 feet from the face of the wall and that space cleaned out and filled with a graded riprap filter and armor stone. The plan for the center segment improvements is shown in Sheet 04. A typical section of the improvements is shown on Sheet 06. Center Segment— Alternative Living Shoreline Project. The offshore riprap sill will be placed at approximate elevation of -2 NAVD88 with the crest of the sill at elevation +2.0 (Sheet 10). There will be gaps in the sill every 200 feet to facilitate flushing from behind the sill and short sill sections fronting the gaps to protect against erosion hot spots of the fill and grasses at the gaps. Common to both the base bid revetment and alternative living shoreline projects along the center segment is construction of a continuous elevated pervious Hogslat concrete sidewalk 10 feet wide along the shoreline landward of the revetment, an extension of the existing vinyl Carteret Community College Shoreline Improvements January 30, 2020 Major CAMA Permit Application — Narrative Page 3 of 6 retaining wall approximately 80 feet to the west and 160 feet to the east to front the existing buildings, and repair of stormwater outfalls. Eastern Segment — Base Bid Revetment Project - Shoreline fronting the welding and construction trades building. Improvements under the revetment project along this segment of the shoreline are similar to the improvements proposed for the western segment under the base bid revetment project. Revetment improvements involve complete removal of the concrete debris down to the ground beneath and replacement with a graded riprap revetment with a filter layer on the ground, an intermediate stone size fill and a layer of larger armor stones. A concrete and vinyl cutoff wall will be constructed along the landward edge of the revetment with an approximate length of 310 feet. The top of the wall will be at the ground level. A plan of these improvements is shown on Sheet 04. Eastern Segment— Alternative Living Shoreline Project. The living shoreline improvements in the eastern segment are an extension of the offshore riprap sill and marsh grass planting project along the western segment. The tops of the riprap sills with be nearly submerged at high tide. Treated timber witness posts will be driven at the toe of the riprap with reflective material at the top to serve as a warning for shallow draft boats navigating near the shoreline and prevent them from running aground on the riprap sills (Sheet 13). Common to both the base bid revetment and alternative living shoreline projects along the eastern segment is construction of a continuous elevated concrete sidewalk 10 feet wide along shoreline landward of the revetment, and construction of a second public observation deck with a 5 ft. wide pier extending some 40 ft. from shore with a 12 ft. by 20 ft. platform on the seaward end (Sheet 08). The platform will not extend more than 6' over the proposed wetland plantings. This pier will be connected to the public elevated sidewalk and open to the public with educational installed on the pier therefore a 10' width is recommended. RECEIVED JAN 3 0 2020 OCM-MHD CITY Carteret Community College Shoreline Improvements January 30, 2020 Major CAMA Permit Application — Narrative Page 4 of 6 EXISTING CONDITIONS Site Topography and Hydrography - The topography of the upland development site is relatively flat varying from 4 to 20 feet in elevation on the site. The base flood elevation at the site is 9 feet (NAVD 88 datum). Land Use — The use of the site is as a state-owned college with academic, administrative, civic center & research buildings on the site. Wetlands - There are small pockets of coastal wetlands near the east and west ends of the shoreline repair project. These wetlands will not be impacted as part of the project. There are no wetlands where the piers will be located. There are existing oyster clusters along the base of the riprap to be removed and small oyster beds located seaward of the shoreline. These oyster clusters will be removed and relocated on -site. Areas of Archeological or Historic Value — There are no known areas of archeological or historic value on the site. Navigation — The three (3) proposed piers and the marsh sill will be located outside of the setback from the federal channel. The federal channel boundary line runs parallel to the shoreline. METHODS OF CONSTRUCTION Construction of the piers, shoreline stabilization, and marsh sills will be by conventional marine construction equipment including barges and cranes. The equipment will be onsite only a sufficient time to complete the pile driving, pier installation, and shoreline protection work. Materials for in -water improvements will be stored in upland areas and transferred to barges for in -water construction. Timber pier piles will be driven into the substrate to minimize turbidity. PROJECT SCHEDULE Construction of shoreline improvement project is expected to start soon after permit issuance and within the permitted time frame. RECEIVED JAN 3 0 2020 Carteret Community College Shoreline Improvements �pA-MHD CITYJanuary 30, 2020 Major CAMA Permit Application — Narrative Page 5 of 6 COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT The Regulatory Reform Act of 2011 (SB 781) was passed by North Carolina Legislature in July 2011. This bill eliminates the requirement for an environmental assessment (EA) for any project requiring a Major CAMA permit. Therefore, the proposed project is not subject to N. C. Environmental Policy Act review. ADJACENT PROPERTY OWNERS Letters notifying adjacent properties owners of the Carteret Community College Shoreline Improvements CAMA Permit Application have been sent to the following properties owners by certified mail. Copies of those letters are attached. Adjacent Riparian Property Owners N.C. Division of Marine Fisheries 3411 Arendell Street Morehead City, NC 28557 Albert & Marie Libby 8775 SW 144t^ Street Palmetta Bay, FL 33176 5teceNEO pCM-I,jlyit7 CITY Carteret Community College Shoreline Improvements January 30, 2020 Major CAMA Permit Application — Narrative Page 6 of 6 Carteret Community College Shoreline Improvements - Platform Dimension Table Structure Length (ft) Width (ft) Total Area (sf) Existing Platform 13.67 26.25 359 Pier #2 Platform 20 50 1000 Pier #2 Finger Pier 6 40 240 Pier #2 Floating Dock 4 20 80 Pier #3 Platform 12 20 240 Total 1919 RECEIVED JAN � 0 Z020 DCM-MHD CITY Carteret Community College List of Parcels Parcel PIN Owner Parcel Size (acres) Deed Referenced 637618217539000* Carteret Community College Trustees 6.24 1636-8 637618310573000* Carteret Community College 4.48 544-357 637618314691000* Carteret Community College 7.44 369-25 637618410639000* Carteret Community College 3.61 464-87 637618413985000* Carteret Community College Trustees 6.49 1657447 637618326043000 Carteret Community College 3.89 920-43 637618324176000 Carteret Community College 0.597 92043 637618322193000 Carteret Community College Foundation 0.463 807-121 637618322116000 Carteret Community College Foundation 0.606 807-121 637618323245000 Carteret Community College Foundation 0.143 807-121 637618322236000 Carteret Community College Foundation 0.099 807-121 637618321206000 Carteret Community College Foundation 0.286 1613-308 637618320098000 Carteret Community College Foundation 0.323 738-99 637618312913000 Carteret Community College 0.784 1032-204 637618310974000 Carteret Community College 0.51 781-125 637618228180000 Carteret Community College Trustees 0.508 1237-484 637618226127000 Carteret Community College Trustees 1.689 1552-330 637617223029000 Carteret Community College Trustees 1.57 1636-8 637617222002000 Carteret Community College Foundation 0.41 1400-397 637617211974000 Carteret Community College Foundation 0.123 1400-397 637617220169000 Carteret Community College Foundation 0.792 1488-85 *Denotes Waterfront Parcels RECEIVED JAN 3 0 2020 DCM-MHU CITY ARENDELL ENGINEERS ® CIVIL - COASTAL - ENVIRONMENTAL 1004 Arendell Street Morehead City, North Carolina 28557 (252)622-4338 N.C. Certification No. C-1509 January 30, 2020 N.C. Division of Marine Fisheries 3411 Arendell Street Morehead City, NC 28557 Re: Carteret Community College Shoreline Improvements (19062) Major CAMA Permit Application Morehead City, Carteret County, North Carolina To Whom It May Concern: In accordance with the requirements of the Division of Coastal Management CAMA Major Permit Application, a copy of the permit application and supporting documentation for the referenced project is provided for your information. If you have questions concerning the proposed project, please contact Mr. John J. Wade, PE of Arendell Engineers in Morehead City at (252) 622-4338. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within 30 days of this application. Submit comments to N.C. Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina, 28557. No comment within 30 days of your receipt of this notice will be considered as no objection. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS John J. Wade, P.E. Project Engineer Enclosures ARENDELL ® ENGINEERS ® CIVIL - COASTAL - ENVIRONMENTAL 1004 Arendell Street Morehead City, North Carolina 28557 (252) 622.4338 N.C. Certification No. C•1509 January 30, 2020 Albert & Marie Libby 8775 SW 1441h Street Palmetta Bay, FL 33176 Re: Carteret Community College Shoreline Improvements (19062) Major LAMA Permit Application Morehead City, Carteret County, North Carolina To Whom It May Concern In accordance with the requirements of the Division of Coastal Management CAW Major Permit Application, a copy of the permit application and supporting documentation for the referenced project is provided for your information. If you have questions concerning the proposed project, please contact Mr. John J. Wade, PE of Arendell Engineers in Morehead City at (252) 622-4338. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within 30 days of this application. Submit comments to N.C. Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina, 28557. No comment within 30 days of your receipt of this notice will be considered as no objection. Thank you for your assistance on this matter Sincerely, ARENDELL ENGINEERS John J. Wade, P.E. Project Engineer Enclosures January 30, 2020 N.C. Division of Coastal Management Morehead City Regional Office 400 Commerce Avenue Morehead City, NC 28557 Re. Authorized Agent Agreement Carteret Community College Shoreline Improvements Morehead City, North Carolina Ms. Styron: This is to inform you that James W. (Bill) Forman, Jr., P.E. and Arendell Engineers are the Authorized Agent for the referenced project. Arendell Engineers is authorized to act on behalf of the applicant on matters related to the CAMA Major Permit and related federal permits. Please call me if you have any questions or need additional information. Sincerely, Dr. John Hauser Mr. Michael Curtis President, Carteret Community College Chair, CCC Board of Trustees �1� _------\ EX. CURB = & GUTTER NHW - �,• c COASTAL WETLANDS N.C. SEA GRANT - - �— BOTTOM LEASE EX. DI REMOVE DOUBLE 8" H PVC SW PIPES FOR MH INSTALLATION -- —� EX. RIPRAP TO EX. MARSH SILL BE REMOVED EX. CONC. EX VINYL BULKHEAD BRYANT STUDENT SIDEWALK EX. DI W/ PIPE W/TIMBER CAP THROUGH VINYL DOUBLE 8" 0 PVC CENTER o FOR PERMITTING _ BULKH D o /— SW PIPES ESCARPMENTAREA - -----' -- USE ONLY TO BE REPAIRED— _75' AEC LINE -- — o': aamuvululu, EX. CONC. PAD g TO BE REMOVED, EX. SW PIPE OUTLET m— - SF _ _-�'� ` j REMOVE SEDIMENT SAW CUT EX. FIBERFORM TO ° °• ' 'i" ` __ — — 30' CAMA BUFFER) FROM INV PROVIDE 4' CLEARANCE _ = SEAL �l 4 • • %r BETWEEN MAT AND BULKHEAD 'n 10733 SAW CUT EX. FIBERFORM TO s=.,',,••°� PROVIDE 4' CLEARANCE '•........ - BETWEEN MAT AND BULKHEAD CUT FIBERFORM & ''i4C �A SW PIPE FOR NEW EX. RIPRAP TO NHW HEADWALL -0 2a 2,,p BE REMOVED EX. RIPRAP TO BOGUE SOUND TURBIDITY BE REMOVED SA;HQW 20-36-(8.5) BOGUE SOUND CURTAIN SA;HQW 20-36-(8.5) DECEIVED EXISTING CONDITIONS & DEMOLITION PLAN SCALE: 1" = 60' MICHAEL J. SMITH BUILDING ; ' _ 75' AEC LINE EX. SW PIPE ---- EX. CONC. OUTFALL TO I t -- SIDEWALK. REMAIN ` 30' CAMA BUFFER VEGETATION TO BE REMOVED RIPRAP TO BE REMOVED TO - ,- - - - - - - - - ; j•=�.1�-�� Lam'/ --1 v � SAW CUT EX. FIBERFORM TO PROVIDE 4' CLEARANCE y BETWEEN MAT AND BULKHEAD -' BOGUE SOUND - ---- -- SA;HQW 20-36-(8.5) \ \ RIPRAP SAVs PER NCDMF, NOT _ _ _ TO REEMAINMAIN - TO CONFIRMED BY OBSERVATION \ - NHW 11 15' RIPARIAN EXISTING CONDITIONS & DEMOLITION PLAN�BUFFER SCALE: 1" = 60' \ ARENDELL ENGINEER-- .,.,......TA .............. 1004 ARENDELL STREET MOREHEAD CITY, NC 2&%7 PHONE: (252)622 wxw.e dellengi"eers N.C. CERTIFICATION NO. C-1%9 -1C '. COASTAL WETLANDS i CLIENT.PROJECT.' CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET CARTERET COMMUNITY COLLEGE MOREHEAD CITY, NC 28557 SHORELINE IMPROVEMENTS FEB 2 4 2020 SCALE (IN FEET): DCM-MHD CITY 0' 60' 120' DEMOLITION NOTES 1. ALL DEMOLITION MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OFF THE CONSTRUCTION SITE IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES, REGULATIONS, AND ORDINANCES. 2. PAYMENT OF FEES FOR DISPOSAL IN DISPOSAL AREAS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 3. IN THE COMPANY OF THE OWNER OR ENGINEER, CONTRACTOR SHALL VISIT THE SITE AND VERIFY THE EXTENT AND LOCATION OF THE SELECTIVE DEMOLITION REQUIRED. 4. IN THE EVENT OF DEMOLITION OF ITEMS NOT DESIGNATED TO BE DEMOLISHED, THE CONTRACTOR SHALL PROMPTLY REPLACE SUCH ITEMS TO THE APPROVAL OF THE OWNER OR THE ENGINEER AT NO ADDITIONAL COST TO THE OWNER. 5. ALL MISCELLANEOUS CONCRETE MATERIALS ALONG THE FIBERFORM SHORELINE PROTECTION SHALL BE REMOVED. 6. REMOVE STONE AND DEBRIS WHERE INDICATED DOWN TO GROUND BELOW. GRADE GROUND TO REQUIRED SLOPE FOR PLACEMENT OF RIPRAP AND UNDERLAYERS. 7. DO NOT PLACE NEW FILTER FABRIC -ON ROCK OR DEBRIS. REMOVE AND GRADE GROUND SURFACE BEFORE PLACING FABRIC AND FILTER STONE. DRAWING TITLE: EXISTING CONDITIONS & DEMOLITION PLAN 92=020 �2 oam.: iJw NT--V MF ,Rent 19062 CRYSTAL COAST ------- CIVIC CENTER I— FOR PERMITTING BRYANT STUDENT EX. HEADWALL & EX. CONC. SIDEWALK USE ONLY CENTER OUTLET TO REMAIN - TO BE REPLACED W/ ELEVATED WAKLWAY NEW 10' WALKWAY EX. VINYL BULKHEAD W/ CONC. SIDEWALK TO TIMBERCAP 5' 7AEC LINE DOUBLE 8" O PVC BE REPAIRED j __z s 30' CAMA BUFFER ;yt'-{ SW PIPES - --- i o — = SEAL = --�� — - 10733 ---- ---o --- NEW 4' 0 o NEW 10' o MANHOLE �+ WALKWAY + - NEW HEADWALL - 1� l 1 — + / EX. CONC. FIBERFORM %sl"r.+ SHORELINE PROTECTION _----- --" j'�L, << IANA _".o 1 NHW WETLANDS - TO REMAIN NOTE: ALL PROPOSED WALKWAYS WITHIN 75' AEC BUFFER WILL BE ELEVATED CONCRETE HOGSLAT. NEW RIPRAP PROTECTION NEW RIPRAP PROTECTION BETWEEN EX. FIBERFORM BETWEEN EX. FIBERFORM MAT AND BULKHEAD -- MAT AND BULKHEAD NEW 18" 0 - HDPE SW PIPE NEW CONC. &VINYL NEW REPAIR CONC. & NEW HEADWALL --- NEW RIPRAP VINYL CUTOFF WALL NEW 10' X 126' PIER WITH 20' X PROTECTION CUTOFF WALL 50' PLATFORM AND (1) 6' X 40' FINGER PIER W/ KAYAK LAUNCH - BASE BID - REVETMENT PROJECT SCALE: 1" = 60' MICHAEL J. SMITH ,--- --- EX. HEADWALL & 75' AEC LINE BUILDING OUTLET TO REMAIN NEW 10' WALKWAY - --� NEW 10' WALKWAY i EX. SIDEWALK I o ^ r NEW CONC & VINYL CUTOFF WALL ; i o l �- �- NEW REPAIR CONC. & ---- VINYL CUTOFF WALL` NEW RIPRAP PROTECTION BETWEEN EX. FIBERFORM MAT AND BULKHEAD EX. CONC. FIBERFORM SHORELINE PROTECTION R® ARENDELL E ENGINEERS 1004 ARENDELL STREET MOREHEAD CITY, NC 2E55] PHONE: (252)6M-338 CERTIFICATION NO. -1 N.C. CERTIFICATION N0. G1509 30' CAMA BUFFER NEW CONC. & VINYL --------- CUTOFF WALL .. �•�--- ._ V� RAP NEW RIP �..•I�� 'L =-Y--- PROTECTION NEW RIP P PROTECTI • •s L •• - 4 EX. RIPRAP TO REMAIN BASE BID - REVETMENT PROJECT SCALE: 1" = 60' CLIENT.' CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 PROJECT CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS RECEIVED FEB 2 4 ZION --�\ DCM-MHD CITY \ \ L 15' RIPARIAN SCALE (IN FEET): BUFFER 0' 60' 120' DRAWING TITLE: BASE BID REVETMENT PROJECT w�: r 7'=60' wrE 02/2D= 04 J W MF a"aEcrr 19062 20' 15' 10, O 5' w 0' 20' 20' 15' 10, O 5' F- w 0' 20' NO. DESCRIPTION BY DATE 1+79 0. 2+59 0' A ARENDELL riEERS 1004 ARENOELL STREET MOREHEAD CITY, NO 28W PHONE (252) 622-338 N.C. CERTIFICATION NO. D-1509 20' 20' OFFSET OFFSET CUEW CARTERET COMMUNITY COLLEGE 3505 AREN DELL STREET MOREHEAD CITY, NC 28557 40' 40' 60' m PROJECT, CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS FOR PERMITTING USE ONLY 20' aNtwuumun,,,, 15' "� essi = ea SEAL 10, - ` 1107333 5' Z f /Zo 80' 20' 15' 10, 5' 0' -5' -10, 15' 80' DRAWING TITLE: BASE BID SECTIONS SHEET 1 OF 3 RECEIVED FEB 8 4 2020 DCM-MHD CITY �� 9FEFfY 1�=10' 02/202020 OC wwrx ar, im esmafnev: JWF axosr. 19062 5+18 FOR PERMITTING 20' 20' USE ONLY ... __. ... u1w uu,,, . ._ 15' CONC.&VINYL ... ........ 15' `�`\``\�Na 'S"CAJ��� u EX. SIDEWALK TO BE r7 CUTOFF WALL ... .... .. �OQES 7Q"4'.�2 REPLACED WIELEVATED .. : 'y z CONC. WALKWAY _.. _ - 10........................I ... NCDOT CLASS B STONE MARL .. .. ...... ....... 10, _ a� -5 _. _733 .... . .. ........, _ OR GRANITE, 8" THICKNESS .. _ _... _ .. �Q z EX. FIBERFORM .. O 5' BACKFILL...... 4' MIN. CONC. MAT . ' .. .. .. 5' %''�A... .... _ .................... _. °� m _ _.. NHW ......_.. 0' ...... ... ... .. 0' w _ yo/Za ls� _. _. . NCDOT N57 STONE FILTER FABRIC _5- ....... MARL OR GRANITE . ......: ...... _ 5 ........................... .. ........................... ..__.....__............_..........._...............___....___................._........ ............... .................. 6" THICKNESS.....................:.........................:.........................:..........................:.........................:..........................E..........................:......................... ...,....._—.........................._.............;.._....._.__......._;._......._.._......_..:..........................:..._.._.. __........_..._..._.._... ....._.__..._...._..;........._........................._......._.._.:........................_i......._..._.._.......:;_.....__..............i........._..............;..........................i.........-..__.... _...i _.............. _....... -10.......................... .......................... ..........................:.........................:.............................................................................:..........................:........... ............... :......................... _10' .... .... _... ..... _... _... .. _........ NOTE: ALL PROPOSED WALKWAYS _..... ..... .... _.... ...__. __. .. ....._.. WITHIN 75' AEC BUFFER WILL BE 1g _.__...... 15' ELEVATED CONCRETE HOGSLAT. 20' 0' 20' 40' 60' 80' OFFSET NOTE: EX. SHORELINE PROTECTION TO 6+40 BE SAW CUT & REMOVED IF LESS THAN 4' AWAY FROM EX. & NEW WALLS. A ARENDELL '=INEERS 1" ARENDELL STREET MOREHEAD CITY, NO 28557 PHONE: )252) 622dM wCE TIFICATION NO.. C-1 N.C. CERTIFICATION N0. G1509 CUENT. CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 PROJECT.' CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS RECEIVED FEB 2 4 2020 ®CM-MHLa CITY DRAWMO TITLE BASE BID SECTIONS SHEET 2 OF 3 swe P-10' s�err 06 DAM 02rAM20 °"""" JJw FPPRWE°B JWF PROJEUV 19062 15' 10, A z 0 0' w w -5' -10, 1520' 0' 20' 15' 10, 5' z 0 r 0' w J W -5' -10, N0. DESCRIPTION BY DATE A A—ARENDELL ENGINEERS IDUARENDELLSfREEL MOREHEAD CITY, NC 2W57 PHONE: (252) 62216 N.C. CERTIFICATION NO. O1509 Kii OFFSET OFFSET CLIENT. CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 40' 40' 60' 60' PROJECT. CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS FOR PERMITTING USE ONLY 15' \``o�auununun,,,, 10' °a� s SEAL 5' _ ` 10733 ,%;sI ki N� a U' AM -5' Z/*Z 40 80' 15' 10, 5' 0' 51 RECEIVED -10' FEB 2 4 NZ0 OCM-MHD CITY DRAWING TITLE:. BASE BID SECTIONS SHEET 3 OF 3 1*-1P sxa .An: 0=020 JWF PROD l 19062 NHW 30' CAMA BUFFER I 10, -24 I I + I -L-+ - 011 --� 10,/:: ELEVATED I CONC. WALKWAY 75' AEC LINE \\ BOTTOM LEASE \ BOUNDARY NOTE: PIER #1TOHAVE OSFOF PIER #1 PLAN SCALE (IN FEET): SHADING WATERWARD OF NHW. SCALE: 1" = 30' 60!� 0' 30' 60' PIER ELEVATION TO MATCH SIDEWALK 10, r— NEW SIDEWALK — 0 0 ....... Itll V EX.GRADE L u L -0+10 0+00 GUARD J NHW 1.11' 0+50 1+00 1+25 STATION PIER #1 PROFILE SCALE: H: 1" = 30'; V:1" = 7.5' 75' AEC LINE 10, NEW ELEVATED g WALKWAY IF EX. CON . / PA I NEW ARMORFLEX BY CONTECH � II NOTE: PIER #3 TO HAVE 370 SF OF SHADING WATERWARD OF NHW. NOTE: ALL PROPOSED WALKWAYS WITHIN 75' AEC BUFFER WILL BE ELEVATED CONCRETE HOGSLAT. PIER ELEVATION TO MATCH S 10, NEW SIDE 5' z O 0' L J L -5' WON BUFFER II 5' SCALE: 1" = 30' FOR PERMITTING USE ONLY o`d\�NAL Q FFss 7 `°•4 SEAL 10733 ~4. �Nam" �e•=: ..odd MARSH SILL SCALE (IN FEET): 0' 30' 60' -0+10 0+00 0+50 1+00 1+25 STATION PIER #3 PROFILE SCALE: H: 1" = 30'; V: 1" = 7.5' / J 0i/7 711 0 RECEIVED FEB 2 4 2020 ®CM-MHC CITY A ARENDELL SENT PROI. DPAWNcnne AS SHOWN G I N E E R S pA1 OZIM020 CARTERET COMMUNITY COLLEGE 1OD4 ARENOEu STREET CARTERET COMMUNITY COLLEGE PIERS #1&#3 ""`"'a''` Jill MOREHEAD CITY, NO23567 3505 ARENDELL STREET PHONE. (252)822-M MOREHEAD CITY, NC 26557 SHORELINE IMPROVEMENTS PLAN & PROFILE w mom: SwF www.arentlellmgineersc"m N.C. CERTIFICATION NO. C-1 W cxoEa. �gpgp 1 1� 1i 1 NEW SHORELINE 1 EX. CURB & GUTTER 1 1 NEW ELEVATED SIDEWALK 75' AEC LINE -A 1 PIER ELEVATION TO MATCH SIDEWALK NEW ELEVATEI WALKWA' NOTE: ALL PROPOSED WALKWAYS WITHIN 75' AEC BUFFER WILL BE ELEVATED CONCRETE HOGSLAT. ARMORFLEX OPEN CELI SHORELINE PROTECTION 3:1 MAX SLOPE 0+00 0+50 1+00 1+50 2+00 STATION PIER #2 PROFILE SCALE: H: 1" = 30'; V: 1" = 7.5' EIEI♦EIEIEIEIEIEI♦ AARENDELL 1004 ARENDELL STREET MOREHEAD CITY, NC 2857 PHONE: 1252)622-M CERTIFICATION CERTIFICATION N0. G1508 WENT: CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 26557 NOTE: PIER #2 TO HAVE 2,264 SF OF SHADING WATERWARD OF NHW. PROJECT. CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS FOR PERMITTING USE ONLY "pU4Unu1°uuuu��gi SFJ�L� i ` 10733 y)zo/Zoe SCALE (IN FEET): 0' 30' 69 DRAWING 777LE PIER #2 PLAN & PROFILE RECEIVED FEB 2 4 2020 CCM-MHD CITY srAre: sHfrr P=fiO' are: 02/202020 09 JjW .vcno.> w JWF vxacctc 19062 20' 15' 10/ OD PLANT (I ARMOR FLEX -/*�n ��[y o' 20' 40/ 60' 80/ /�����T ��//���-| �J|�O8O �[y�T|/lN UU|T� yN8[]DU SILL �T8 � �D [�|[-[���[-��L~��||\J|�VV|||||V|/�|���||�J|L.L.~��|�\��'��]�7 SCALE: 10=10' 20' 15' 10, 0 5' Lu 01 Lu -5 ^1[Y ,n --------`----------------~--------.'--------.�--------.�--------'`--------�--------�'- ----��-��������`�-�------���--------�--------' � --------.�--------.--------.�--------�i----� ---.......--------.--------..--------��----.(rRLL � � � --------'�--------' � OVER ARMOR � � --------'�--------'�--------`�--------'�--------'�----- � � -'�--------��--------��--------. -'�--------��--------��--------.�--------.�--------.�----- ............. -..... !.... .... -........................ -...... .--------.�--------.�----- --------. .--------i--------.�--------. --------.�--------�!-------. : .--' FLEX.PLANTNV � � � � � -------��----- -------��----- --------�.------.......................... ��������.�������.......................... � ! � � -------..-----' �����������....... -------~. ..--^^-~ -------������������-����-. . ~~~.~~. -------�-------� �-- .~~`...`�----- ��-����----.�--------. --------��------ --------.�------ ------ -----' -------�----- POST, ** -----'^~^`..~^ ...................... ......................... --------��--------'-------'. -�----_'-..,�.,~�.,===�= m� ��-�"'"'",�"..,, -------.�--------. '`----------------..----- --------.�--------.-------'� --------.�--------.--------.�--------��-- '�--------��--------��----- '�--------'!--------.�----- --------'�------�-�������-���������������-�--------��-- --------.�--------�-------�NCDOTCLASSBSTUNE-'/---'�--� ����� ''.---'EX�GR/VlE-------'�----- '�r�'------!--------..----NLW - --------. .--------f------- --------.�--------��-------.. MARLORGRANO��8" ��/�---- ----- �----- � !��� -.----'�----. FILTER FABR|(�-�l- --� L'F|LL�/g�R�L '�`=°�--------------.�--------� '�--------'--------.�--------. � --------�'--~~^~^-''-^--^--- --------.�--------�-------� --------.�--------.--------..--------�--------�.--------.�--------..---. --------. .--------.--------'`----------------�.--------.�--------.�--------.`------' --------.�--------.--------..--------��--------�.--------. --~-----�.......................... --------.�--------�--------'`--------�'--------�'-------'`+--------�--------�'------'U-`-------^.--'-----~--------� --------.�--------.--------'�--------.--------.�--------'--------~--------.�------'u- |--------.�--------1--------'�--------. |--------��--------1--------..--------.!--------. TH|CKNESS------------' ------�--------��' ------^^^..~^~~^-~~^.!^-^^^^~^~^^�~^~^^^^---!'--~~^^~^^�^----~--'!~~~^--- --------. --------'�--------.�--------��--------��--------��--------��--------�| --------'!--------.�--------. VVRAPTOE -'�- ' --�-'--------'--------'�--------� ---�GRADEoD�l1 --. `' --. --------��--------��------' --------. '�--------'--------.�--------. '�--------'--------.r-------' ''--------'--------'-------- '.--------.--------..--------. 'r-------'------^^~�--------� --------'�--------�.--------� .--------.!...... -............................. ----�| NO DESCRIPTION BY DATE 20' 40/ [l�[�[�T �// / �/�~| ��U��8��[/�T|/�0UV|TU ��U�-[�/�\[- SECTION |���� WITH � | SCALE 1"=10, 60' 80' K0\OSH S||| OTA 3472 FOR PERMITTING , A������0 � & 1004 ARLNOLESTREET CARTERET COMMUNITY COLLEGE ALTERNATE OPTION SECTIONS JJw PHONE. (252) 6U 3M MOREHEAD CITY, NC 28557 SHORELINE IMPROVEMENTS SHEET 1 OF 3 AF ��DW JWF N.C. CERTIFICATION NO. C-1509 19062 20' 15, EX. REPLAC Z O 5' Q Lu 0' J w NOTE: ALL PROPOSED WALKWAYS WITHIN 75' AEC BUFFER WILL BE ELEVATED CONCRETE HOGSLAT. 20' 15' EX. REPLAC I -5' -10, 15' L -20' 0' 20' 40' 60' OFFSET FIBERFORM SECTION WITH MARSH SILL - STA 6+40 SCALE: 1" =10' 80 NOTE: EX. SHORELINE PROTECTION TO BE SAW CUT & REMOVED IF LESS THAN 4' AWAY FROM EX. & NEW WALLS. 0' 20' 40' 60, 80' 100, OFFSET FIBERFORM SECTION WITH MARSH SILL - STA 7+88 SCALE: 1" =10' A ARENDELL CLIENT.PROJECT DRAWING TIRE BEERS CARTERET COMMUNITY COLLEGE 1004 ARENOELL STREET" CARTERET COMMUNITY COLLEGE ALTERNATE OPTION SECTIONS MOREHEAD Clr , NC 26557 3505 ARENDELL STREET PHONE: (252)622-336 SHORELINE IMPROVEMENTS SHEET 2 OF 3 w .axideffe gq "erscan MOREHEAD CITY, NC 28557 N.C. CERTIFICATION NO. G7509 FOR PERMITTING USE ONLY RECEIVED FEB 2 4 2020 DCM-MHD CITY SL. 9 u. T=70 Dart: 0=002D NAM BY J 12 asvRorEoar. JWF Prsaa[cr" 19062 15' 10, Z O 5, Lu 0' .J Lu -5' -10, -20' 0' 20' 40' 60' OFFSET RIPRAP SECTION WITH MARSH SILL - STA 10+50 SCALE: 1" =10' 20' 15' T�} Z O 5' Q Lu 0' J Lu A -10, 15' -20' 1 20' 40' OFFSET Rl EX. MARSH SILL WITH NEW TOE PROTECTION - STA 13+53 SCALE: 1" = 19 A :3 100, 100, A ARENDELL CLIENTPROJECT. DRAWING 7I7LE lNEERS CARTERETCOMMUNITYCOLLEGE 1004ARENOELL srREEr" CARTERET COMMUNITY COLLEGE ALTERNATE OPTION SECTIONS MOREHEAD CITY, NC2M 3505 ARENDELL STREET PRONE. (252I522330 SHORELINE IMPROVEMENTS SHEET 3 OF 3 ," &.ddfe ,m MOREHEAD CITY, NC 28557 N.C. CERTIFICATION NO.015M FOR PERMITTING USE ONLY '& V RECEIVED FEB 24 2` pCM-MHU CITY actor_ ax>7• 1'=10' DAM 02=020 R oNa. JJw 13 MPRa DW JWF PROECT# 19D02 - _ FOR PERMITTING NEW 18" 0 HDPE NEW RIPRAP .� USE ONLY SHORELINE SW PIPE. EX. VINYL — PROTECTION N BUS — SW PIPE �fNa""�-• ��/ '''o �L _ E 7 SEAL�'' NEW SHORELINE10733 ss6,' PROTECTION /Zj� •......tJ��+ NEW CONIC. HEADWALL `` MATCH. EX. INV. EL IX. FIBERFORM NEW CONC. HEADWALL SHORELINE PROTECTION INV. EL. 0.94' MEAN HIGH -�/ WATER LINE -IV SPARTINA ,V MEAN HIGH �RN FLORA �FLORA WATER LI� ALTERN �( NEW HEADWALL OUTFALL - STA 2+87 NEW HEADWALL OUTFALL - STA 7+76 SCALE: 1' = 5' ---- SCALE: V = 5' 1 12' � 4' t EL. 2' t 1 CLASS 2 ARMOR STONE NHW 2 o FILTER FABRIC WRAPPED EX. GRADE 1 BACK BETWEEN ARMOR �� AND FILTER LAYER 40. DESCRIPTION BY DATE AARENDELL 1004 ARENDELL STREETx MOREHEAD CITY, NC 2W PHONE: (252)6U-M ..m dellwpe mn N.C. CERTIFICATION N0. C-1509 EL. -2't 6" NCDOT CLASS A RIPRAP BEDDING STONE RECEIVED MARSH SILL SECTION - TYPICAL SCALE: NOT TO SCALE FEB 2 4 2020 CLJENP CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 PROJECT. CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS DRAWING TITLE: DETAILS DCM-MHD CITY 02/200020 JJW JWF 19062 A / NF CARTERET COMMUNITY N/F I F T7 COLLEGE FOUNDATION CARTERET COMMUNITY CARTERET COMMUNITY COLLEGE FOUNDATION N/F - - - L COLLEGE TRUSTEES CARTERET COMMUNITY COLLEGE ARENDELL STREET U.S. HIGHWAY 70 NIF Fj CARTERET COMMUNITY / - - 111��� COLLEGE FOUNDATION / - - CARTERET - COMMUNITY COLLEGE I N/F CARTERET COUNTY N/F CARTERET COMMUNITY N/F / N _ COLLEGE TRUSTEES NC DIVISION OF CARTERET COMMUNITY I N/F MARINE FISHERIES COLLEGE I CARTERET COMMUNITY COLLEGE CARTERET COMMUNITY I I CARTERET I COLLEGE TRUSTEES N/F I CARTERET CARTERET N/F NIF COMMUNITY COLLEGE LIBBY, ALBERT COMMUNITY COMMUNITY COLLEGE ETUX MARIE I COLLEGE 1 � I I � NO, OESCPJPTION BY DATE " ARENDELL 1004 ARENDELL STREET� MOREHEAD CITY, NO M7 PHONE: (252) 522 M xwERTIFI CATION NO..mn N.C. CERTIFICATION M1t7. G75W CLIENT. CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 PROJECT.' CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS RECEIVED JAN 3 0 202O jDCM-MHD CITY DRAWING TITLE erNE AS SHOM ADJACENT PROPERTY OWNERS A wE 077162020 reiaer ev J' w JWF ma.[crx 19062 DUPLIN PENDER LENOIR �� CRAVEN JONES ONSLOW 35TH STREET HIGHWAY 70 BOGUE SOUND PAMLICO CARTERET COUNTY BRIDGES STREET PROJECT LOCATION - AREA OF INTEREST AARENDELL PPOJECT77TlE: PREFAREDFOR DRAWMc 7ITLE: iao<aaExoEiEsrar CARTERET COMMUNITY CARTERET COMMUNITY COLLEGE ucaEHM Ciro, NC COLLEGE SHORELINE 3505 ARENDELL STREET VICINITY MAP iaMe. (2sz)saem �e.emyw, m IMPROVEMENTS MOREHEAD CITY, NC 28557 r+.c. � ro c1sm TO YHE BHfR N.T.S. 01 STm ll& Gi=0 J,I'N ma.�rs 19062 8 i MEAN HIGII WATER LINE i EX. CURB & GUTTER EX. DI REMOVE DOUBLE 8" 0 PVC SW PIPES FOR MH INSTALLATION DOUBLE 8" 0 PVC EX. CONC. EX. VINYL BULKHEAD BRYANT STUDENT ^� SIDEWALK r Wi TIMBER CAP EX. DI WI PIPE CENTER I THROUGH VIN SW PIPES ESCARPMENT AREA TO BE REPAIRED __75'AECLINE__ o_ EX. CONC. PAD TO BE REMOVED,} EX. SW PIPE OUTLET _ REMOVE SEDIMENT ' —Li= CUT EX. FIBERFORM TO FROM INV VIDE4' CLEARANCE — BETWEEN MAT AND BULKHEAD SAW CUT EX. FIBERFORM TO PROVIDE 4' CLEARANCE BETWEEN MAT AND BULKHEAD CUT FIBERFORM & EX. RIPRAP TO NHW COASTAL _--- - EX. RIPRAP TO __-- _ BE REMOVED EX. RIPRAP TO WETLANDS 4 _ ,, BE REMOVED EX. MARSH SILL \ TURBIDITY BE REMOVED BOGUE SOUND CURTAIN �- SA;HQW 20-36-(8.5) _ N.C. SEA GRANT BOTTOM LEASE EXISTING CONDITIONS & DEMOLITION PLAN SCALE: 1" = 60' SW PIPE FOR NEW HEADWALL BOGUESOUND SA;HQW 20-36-(8.5) RECEIVED FOR PERMITTING 3 USE ONLY J JAN 3 0 2020 SCALE (IN FEET): DCM-MHD CITY 66!!� 0' 60' 120' DEMOLITION NOTES EX. SW PIPE J -�-- -------_, 1. ; ALL DEMOLITION MATERIALS SHALL BECOME THE PROPERTY / i )UTFALL TO I - , OF THE CONTRACTOR AND SHALL BE DISPOSED OF OFF THE _ REMAIN - 30' CAMA ! CONSTRUCTION SITE IN ACCORDANCE WITH ALL APPLICABLE VEGETATION BUFFER j -- LOCAL, STATE, AND FEDERAL CODES, REGULATIONS, AND C� TO BE REMOVED , / ❑ - 1 T_- / ORDINANCES. ,, ,"------_ ` 2. PAYMENT OF FEES FOR DISPOSAL IN DISPOSAL AREAS SHALL r BE THE RESPONSIBILITY OF THE CONTRACTOR. 3. IN THE COMPANY OF THE OWNER OR ENGINEER, - ;� \ CONTRACTOR SHALL VISIT THE SITE AND VERIFY THE EXTENT RIPRAP TO �� _\,u, � -�� AND LOCATION OF THE SELECTIVE DEMOLITION REQUIRED. B E REMOVED 11 �-" _...__ E �� / `^ 4. IN THE EVENT OF DEMOLITION OF ITEMS NOT DESIGNATED TO _ ; g TURBIDITY RIPRAP TO MEAN HIGH BE DEMOLISHED, THE CONTRACTOR SHALL PROMPTLY CURTAIN `-- �.,, y� - BE REMOVED WATER LINE 1•'' •, REPLACE SUCH ITEMS TO THE APPROVAL OF THE OWNER OR SAW CUT EX. FIBERFORM TO _� "' �"' - �c ; \ ' ,i THE ENGINEER AT NOADDITIONAL COST TO THE OWNER. PROVIDE 4' CLEARANCE _ 1U' ,i' - - COASTAL 5. ALL MISCELLANEOUS CONCRETE MATERIALS ALONG THE BETWEEN MAT AND BULKHEAD 1 BOGUE SOUND - WETLANDS FIBERFORM SHORELINE PROTECTION SHALL BE REMOVED. SA;HQW 20-36-(8.5) �_ 6. ",max; L REMOVE STONE AND DEBRIS WHERE INDICATED DOWN TO �- - __ SAVs PER NCDMF, NOT � EX. RIPRAP -'-' - - _ - - � � � GROUND BELOW. GRADE GROUND TO REQUIRED SLOPE FOR _ TO REMAIN �' CONFIRMED BY OBSERVATION - PLACEMENT OF RIPRAP AND UNDERLAYERS. \ 7. \ DO NOT PLACE NEW FILTER FABRIC ON ROCK OR DEBRIS. \ REMOVE AND GRADE GROUND SURFACE BEFORE PLACING EXISTING CONDITIONS & DEMOLITION PLAN '�_, ' �� i FABRIC AND FILTER STONE. SCALE: 1" = 60' NO. DESCRIPTION BY DATE AARENDELL EF&G!�& EFTS 16 ARENDELLSTREET MOREHEAD CITY, NC 26 1 PHONE (252)6M-nB CERTIFICATION NO C -1 N.C. CERTIFICATION N0. C-1509 CLJEAM CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 PROJECT.' CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS DRAWLNO nnE EXISTING CONDITIONS & DEMOLITION PLAN sw SNFEit. 1._60, 01116rim ^ gNMN ex JJW (� of Aw6a.Eoer: JWF r6orEcr" 16062 PROPOSED PIER #1 BOTTOM LEASE BOUNDARY USAGE CHANNE LINE t �'! Ft PROPOSED WALKWAY d Ail r * CARTERET COMMUNITY COLLEGE ttP a . ►�,. � PROPOSED ,. �' ; _ — _ __ _ WALKWAY EXISTING PIER AARENDELL IDA MENDELL STREET MOREHEAD CITY, NC 2B557 PHONE: (252)M-338 CATION NO C 1 N C. CERTIFICATION N0. G15B9 PROPOSED PIER #2 BOGUESOUND (SA;HQW) ARENDELLSTREET U.S. HIGHWAY 70 AREA OF SHORELINE IMPROVEMENTS OVERALL SCHEMATIC SITE PLAN SCALE: 1" = 200' GJRf! — CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, INC 28557 PROPOSED PIER #3 USAGE CHANNEL SETBACK LINE PROPOSED WALKWAY ONLY IAM SAVs PER STATE SURVEY, NOT CONFIRMED BY OBSERVATION J 30 2020 C -MHD CITY SCALE (IN FEET): 0' 60, 120' sire 1'=200' NE mnBrzozo Jjw03 PPNNUEOBf. .nvF aRWE t 19D52 MICHAEL J. SMITH BUILDING NEW 10' SIDEWALK -• EX. SIDEWALK �— NEW REPAIR CONC. & -_ VINYL CUTOFF WALL - SCALE: 1" = 60' EX. HEADWALL & OUTLET TO REMAIN o NEW CONC & VINYL CUTOFF WALL NEW RIPRAP PROTECTION BETWEEN EX. FIBERFORM MAT AND BULKHEAD EX. CONC. FIBERFORM SHORELINE PROTECTION ARENDELL ENGIP , I- S 1" ARENDELLSTREET�E MOREHEAD CRY, NO 28 57 PHONE: (252)622-M w ..emndellenginemwm N.C. CERTIFICATION NO. C 1l 6 75' AEC LINE NEW 10' SIDEWALK • NEW RIPRAP PROTECTION ,s.•..ia .I•` NEW RIP . •TECTI `o:.• NEW 5' X 56' PIER W/ 12' X 20' PLATFORM EX. RIPRAP TO REMAIN BASE BID - REVETMENT PROJECT SCALE: 1" = 60' CLIENT. CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 PROJECT.' -`L j— MHW WETLANDS CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS CRYSTAL COAST CIVIC: (;FNTFR DRAWING TIRE.' BASE BID REVETMENT PROJECT OR PERMITTING SE ONLY AM SCALE (IN FEET): 0' 60, 120' are 6v1srz6z6 0� oRnrmev: JJIN aPPxweeer: JNF PR6iELTP. 19062 20' 15, 10, O 5' w 0, w -5' -10, O 5' F w 0, -20 N0. DESCRIPTION BY DATE 1+79 u 2+59 y OFFSET ............. .........I................ 6" THICKNESS: ............................:......................... . ................... .....................................................;......................... NCDOT CLASS B STONE .................................................... :......................... ....... .................................. ................................ >................... ......;. MARL OR GRANITE, _...:._ ........... 8„ THICKNESS m A ARENDELL cf SLY 10M4 NDELLSTREEf MOREHEAD CITY, NO 28557 PHONE: (252) 3nM8 CERTIFICATION NO..rCA N.C. CERTIFICATION NO C4509 ZU' OFFSET CLIENT CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 4U' till All 0 PROJECT CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS 20' 15' 10, 5' 0' -5' -10, 15' 80' 1 5' 80F , DRAWING TnLE: BASE BID SECTIONS SHEET 1 OF 3 FOR PERMITTI `�� USE ONLY ®� wunulun,.. RECEIVED JAN 3 0 2020 DCM-MHD CITY S 7 81E 'f ,•=10 Wert: 01116rm oPArx av: JW OJ JWP vao.[cre 19062 20' 15' CONC. SI 10, -5. -19 -15' � -20 20' 15, 10, O 5' w 0' w -5' -10, -15' v w 4U' 6+40 OFFSET 20' 15' 10, 5' 0' -5' -10, 80' S ............. ....... ....... .._....... ................ .........;.......... _................ _............... ......:;.. _. _.. _. _........ _................... _......;.. _......... _.................... .. _...... _. _..;. _......... .......... . _ ........................................ . ...............................................................,.............................................................................:....................................I............... ........ . • . .......... CONC. .:::::::::::: BULKHEAD WI ;:;; ;:;:;;:;:;: NCDOT CLASS B STONE ; ................................:........................................................................................................ ......................................_........._.......:............................._.........._........_......................_.. ......... SIDEWALK TIMBER CAP ...... .. MARL OR GRANITE, :......................; ................. ....................... ... 8" THICKNESS .............. . _. ..: ., . . ........... ..... .. ... .... _.... ......................... ......._.............—................................... ..... _..t 4 MIN.::::::::[ EX. FIBERFORM:;-....::::::::::...:......:::.::::.....-.......::::::................. :::::::::::::::::::'......................... ........................................... ..... . z0 NO. DESCRIPTION BY DATE u AARENDELL .......... dial "m 1004 MENDELL STREET MOREHEAD CITY, NC 28W PHONE: (252) 622-33B ..maaelleegm" .= N.C. CERTIRGATION NO. C-1509 2u' 40' OFFSET CLIENT CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 60' PROJECT. CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS 20' 15' 10, 5' 0' -5' -10, 80' S \.-tSE ONLY NOTE: EX. SHORELINE PROTECTION TO BE SAW CUT & REMOVED IF LESS THAN 4' AWAY FROM EX. & NEW WALLS. DRAWING 777LE BASE BID SECTIONS SHEET 2 OF 3 RECEIVED JAN 3 0 2020 DCM-MHD CITY SLNE: bEEiR 1'=1V DAM 01/10020 wuxwer: J7N On o rrPaovEoer JINP PPOhITR 19062 -752L( -20' N0. DESCRIPTION BY DATE N m A ARENDELL e<GI RE < —r 1-1 1004A WELL STREET MOREHEAD CITY, NC 28552 PHONE (252) 6ffi338 xwwRPFICATIOncers.mn N.C. CERTIFICATION N0. G1509 2V OFFSET fm 29 40' OFFSET CLIENT' CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 60' 21 PROJECT: CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS 80' 15' 10, 5' 0' -5' -10, -J -15' 80, FOR PERMITTING USE ONLY F zt; RECEIVED JAN 3 0 2020 DRAN7NG 777LE: xNE 1' = 70' &EE k BASE BID SECTIONS O% wre 01/16M20 °""" k" env SHEET 3 OF 3 3wP PROERk t�62 10, �— - - + -20'= - --� 1 D' BOTTOM LEASE BOUNDARY PIER #1 PLAN SCALE (IN FEET): SCALE: 1" = 30' 60!� 0' 30' 60, PIER ELEVATION TO GUARD MATCH SIDEWALK 10' NEW SIDEWALK 5' ........................................................................................ z O NHW 1.11' F- ... . Lu EX. GRADE ----` NLW -1.97' W 5. .... ........- .. .. _... . .... :..� ........ ........._......__.._ -0+10 0+00 0+50 1+00 1+25 STATION PIER #1 PROFILE SCALE: H: 1" = 30'; V:1" = 7.5' NO. DESCRIPTION BY DATE AARENDELL ENGINEERS 18 MENDELLSTREET MOREHEAD CITY, NC 2855/ PHONE: (252) M-338 N.C. CERTIFICATION N0. G1509 75' AEC LINE 10, NEW SIDEWALK - � o EX. CONC. PAD NEW BY � RFLEX BY CONTECHTECH .. I CLIENT CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 PIER ELEVATION TO MATCH SIDEWALK 10' � NEW SIDE 5' z O W J W MEAN HIGH a " 0 a Vim a r►� SCALE: 1" = 30' .FOR PERMITTING . I X_USE ONLY SPARTJNJA ALTERNIFLO 1' O.C. GRID, - 12' 20' 0 MARSH SILL SCALE (IN FEET): 0' 30' 60, -0+10 0+00 0+50 1+00 1+25 STATION PIER #3 PROFILE SCALE: H: 1" = 30'; V: 1"= 7.5' PROJECT.' CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS DRAWING TITLE: PIERS #1 & #3 PLAN & PROFILE 10733 ,< RECEIVED JAN 3 0 2020 SCLLE: SIEEIR. ASSHOWN Me avlanoan oRrvmer: JJW On a JWF rRo�crr 19062 MEAN HIGH FOR WATER NE NEW WARNING POST 20' USE ONLY NEW ARMORFLEX a @ 50- D.C., TYP,_, EV SHORELINE PROTECTION 4 - ------ % SLIP #1 EX. CURB & GUTTER 20` L 10, . ..... FLOATING DOCKI 50' KAYAK LAUNCH 12 10 NEW ELEVATED ... ......'TT ....... N1. SIDEWALK NEW SPARTINA NEW PIER ....... . 76AEC LINE 1 d ALTERNIFLORA EX. RIPRAP @ 1- GRID TO REMAIN NEW MARSH SILL ry PIER #2 PLAN SCALE (IN FEET): SCALE: 1"= 30' PIER ELEVATION 10, TO MATCH SIDEWALK NEW SIDEWALK-:�'u 01 30' 60' ARMORFLEX OPEN CELL SHORELINE PROTECTION 3:1 MAX SLOPE NO. DESCRIPTION BY DATE 0+00 0+50 1+00 1+50 2+00 STATION PIER #2 PROFILE SCALE: H: 1" = 30'; V: 1"= 7.5' ARENDELL CLJENF- A EP4GIN ERS • .......... 'A' IDD4 ARENDELL STREET MOREHEAD C", NC 457 CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET PHONE: (252) =-M ��dellenpn�= N.C. CERTFICATION NO C-1MO MOREHEAD CITY, NC 28557 PROJECT.' CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS DRAMNG TITLE' PIER #2 PLAN & PROFILE RECIEWED JAN 3 0 2020 DCM-MHD CITY V=w 01/1612020 Jjw JWF vxascrc 19062 0 0 NEW ARMORFLEX nj 1.,— l.ir NEW 10' SIDEWALK NEW 28 LF 18" 0 HDPE C1A1 PIPE (nl 1 anO/ 50' PLATFORM AND 16' X 40' FINGER PIER W/ KAYAK LAUNCH NEW CLASS B RIPRAP BETWEEN EX. FIBERFORM & EX. BULKHEAD ALTERNIFLORA @ V GRID LIVING SHORELINE PLAN STA 0+00 - 8+00 SCALE: 1" = 60' NEW CONIC CAP & VINYL CUTOFF WALL MICHAEL J. SMITH EX. DI & SW PIPES BUILDING EX. HEADWALL & OUTLET TO REMAIN, STA 9+76 30' CAMA / _ 1 BUFFER IV79 AARENDELL NGINEERS 1009ARENDEUSTREET MOREHEAD CITY, NO 28W PHONE: (252)622338 N.C. CERTIFICATION NO. b1509 NEW 5'X40'PIERW/ - 12' TYP, = 12' X 20' PLATFORM 12TYP..•T,;, ., MARSH SILL i SPARTINA 10, TYP. � _ ALTERNIFLORA (1) PER SF SAVs PER NCDMF, NOT _[ RSH SILL — CONFIRMED BY OBSERVATION CRYSTAL COAST CIVIC CENTER NEW HEADWALL STA 7+76 — EX. OUTFALL TO REMAIN STA 6+27 SPARTINA ALTERNIFLORA @ 1' GRID NEW 10' SIDEWALK 75' AEC LINE NEW CONIC CAP & VINYL CUTOFF WALL a _ NEW ARMORFLEX ti SHORELINE PROTECTION NHW i INSTALL 5' WIDE ARMOR STONE, T THICK WARNING POST @ 50' O.C., TYP LIVING SHORELINE PLAN STA 8+00 - END CLIENT' CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 _ COASTAL j WETLANDS EX. RIPRAP TO REMAIN P/L EXTENDED, ARMOR STONE TO STOP AT P/L CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS ORAMNO TITLE lvTTING ez LY ALTERNATE OPTION LIVING SHORELINE PLAN RECEIVED JAN 3 0 ZOZO T)CM-MHD CITY SCALE (IN FEET): 0' 80, 160' are 01116202J MIN esmdtn°r: JWF atu>[nk 19062 R M 20' 15, 10, Z O 5' H Q W 0 J W DESCRIPTION -5' -10, 15' 0' 20' 40' 60' 80' OFFSET RIPRAP SECTION WITH MARSH SILL - STA 2+59 SCALE: 1" = 10' 100, ................ ...:....................................................:................................. ...............................................................................;.........................:.........................I..........................; ......................... :.... .......................................................................... ........................................................................................ .........................:....................................................:.........................:............. ........................................... :........................:.......................... I 6" FILL OVER ARMOR ...................................................... :...................... ..........................;......................... ;......... ................ :..................... .....:.........................:.........................:..........................:. ::.::;:::...:::.::::::::...:::::.:::.::::.:::::::::.:::::::::::.::::::..::::::.::::::::::::::::::::::::.::::::::::..::.::::::::::::............................ ...:.......................... .......................... :......................... :..........................:..........................; ......................... .... ..................... :......................... .. ....................... ...:.. ........:...... FLEX, PLANT WI :... ..................... ..........................:................................................... ..... .......................... ................................................... ...................:....................................................:.........................:............ .......................... :.................. .......:...................................... BERMUDA SOD ............. :..........................:.........................:.........................:..........................:.......................:::::.....................:: ...... ..................... .......................................................................................................................................................................... .........................:..........................:..........................:.........................:........................:..........................:.............. SPARTINAALTERNIFLORA.:::......... ........... ..................... MARSH SILL..........;..........................;......................... ......................... :.......................... .......................... :......................... :........................ :..........................:............ () .................. PLANT 1 PER SF ....... .................... ..................... ;... .........................:............................................... EX. GRADE............................................ ARMOR ..................................................:.... FLEX WARNING POST,.............................................:: .........................:............................................... ............................ .......... :::: BEGIN FILL ;::::3' ABOVE NHW ...:.. .................. .................................. ..:::::: . ................................................................................................. .............................i........................ 4 1..... ... E L. -0.43' :::::..................... .................... .................... ..................... ... ..... ..........:................................................................ ......... : .... ... ..... .. NHW ....: ...................... .................... .............. ......................... :....................................................:......................... :............................................... ......................... : ................... ................... ..: NCDOT CLASS B STONE ..................:........... .......... ........EL-2.0'±::::............:.................... :. .. .......:.......... . EX.GRADE* .................... .......... E......... .................... NLW :................................................. :........................:...................... MARL OR GRANITE 6"::::.:::::::::::.:.::::::::::.::::........... ......;.. ........................ ; ..... FILTER FABRIC, :............... .................... ................. .........................'......................... ..........................;.............................................. :.......................... THICKNESS :::::::::::::::::::::::::::::::::::::::.::: FILL MATERIAL, WRAP TOE ..... ...;.......................... .........................,......................... ......................... .... .................. GRADE @ 20:1 ... :.......................... ........................... .......................... ....................................................I....................... ..................................................... ............... ............I.. .................... .................... ..................... .................... .................... ..................... -20' 0' 20' 40' 60' 80' 100, OFFSET RIPRAP SECTION WITH MARSH SILL - STA 3+72 SCALE: 1" = 10' BY DATE A ARENDELL+L �� PROJECT. DRAWING nTLE: Er`�:::... CARTERET COMMUNITY COLLEGE :y E. 10M ARENDELL STREET ` CARTERET COMMUNITY COLLEGE ALTERNATE OPTION SECTIONS MOREHEAD CRY, NC 2ffig 3505 ARENDELL STREET PHONE: (252)6223i8 MOREHEAD CITY, NC 28557 SHORELINE IMPROVEMENTS SHEET 1 OF 3 N.C. CERTIFICATION CATION N0. O1599 FOR ONLY REC EIVED EI VE® JAN 3 0 2020 DCM-MHD CITY eruE: aHErx P=10 �� 91/162920 11 owwer JIW PWRQrEDB JNF °RO�r 19952 z C Q LL -20' 0' 20' 40' 60' 80' NOTE: EX. SHORELINE PROTr&N TO OFFSET BE SAW CUT & REMOVED IF LESS THAN FIBERFORM SECTION WITH MARSH SILL - STA 6+40 4'AWAY FROM EX. & NEW WALLS. SCALE: 1" = 10' 20' 15' 10, Z O 5' tr a W 0' J Lu -5' 10, 15' ....................................................I............................... EX. VINYL BULKHEAD W/ ........................ .....................................; NCDOTCLASS B STONE ........................ ......... ..................... :......................... ....................... .....,..........................:.........................;......................... ..........................:..........................c.........................:.........................:..........................:..........................:......................... .................. ............................................ ........ ...................... ;........................ :.................................................... ........................ ..:................. ........ ...........................;.......................... ;......................... TIMBERCAP ....................... COrvu....................................................: ..MARL OR GRANITE, ..........................:.........................:.........................:......................... :.......................... ,......... ................ _......................... :...................................................:.................... ................................................:.... SIDEWALK......................... ............ .............:..... 8" THICKNESS .......................... :.......................... :......................... :.........................:....................... .......................... :.............. ............ :..................................................... .. :..... ....... ..................:....................................... ..................................... : ........................... SPARTINAALTERNIFLORA""""'e"""""" "' MARSH SILL .......................................:.........................:......................... .........................:..........................................................................:........................:... PLANT @ V GRID ....................................................... ......................... ;........................;... 4. MIN:... WARNING POST ....... ...................;.......................... ......................... .............................................................................. ................................................................... EX. FIBERFORM... ..:..........................:..........................:....................... d 3' ABOVE NHW..........................:.................................................... :..................................:...... N .MAT BEGIN FILL :::::.:::::::::.::::.:: ....:.........................:..........................:............. ..... ........:............. ........... . .........................<............................................ ........................................................................... :.................................:......................; . @ EL.-0.43'........ ...... ......... ;...................................................:..........................5.................NHW .................... .................... ............. . ......... .. .. ..;.. .......................................................................................... ;.. ..... EX. GRADE......................:..::........................................... .........................:................................................:.........................:....... .............................. ................:.......................... :.... ...................... :.... ........... ..NLW ................................................................................................. .......................:........ CDOT 7 STONE ................. N 1i5 ...................... FILTER FABRIC ....:..........................:...................... FILL MATERIAL ....:.........................: ............... .... ..................... .................... .................... ..................... .... :.......... ............... :.......................... :......... ................. :......................... ........................;........ MARL OR GRANITE ........... :........ :.... ...................... '. . :........................ GRADE @ 20:1....;::::::::::.::::.::::::::::i................... ::::::::::.....:::::::::::.::::::::....:::::::::::...:::::::::::.::.::...::............................... .................... ... 6' THICKNESS ..............:....................... ..................... ............. .................... .............. ..................... -20' F NO. I DESCRIPTION I BY I DATE I 0' 20' 40' 60' OFFSET FIBERFORM SECTION WITH MARSH SILL - STA 7+88 SCALE: 1" = 10' AA_ REND_ELL K G 3004 ARENDELL S1REEf .E MOREHEAD CITY, NC 2859 PHONE: (252) 6n-338 xwv mMellengineea.= N.C. CERTIFICATION W. G75M CLIENT CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 PROJECT.' CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS :m DRAWING RTIF: ALTERNATE OPTION SECTIONS SHEET 2 OF 3 RECEIVE® .IAN 3 0 2020 Ii CM-MHC CITY SLVE 81EEfY 1'=1R wre 07fl62020 APa�� WP PPO.ECi! 19062 .............................................................................:................... _....... _......... _... 20' 15, 10, Z O 5' f-- Lu 0' J Lu -20' ......L..... _k..... :I tL.-U.43'....\..... C.l'.'....IL_.;._... r,—..tA.UKAUt........... 11"IX RIPRAP SECTION WITH MARSH SILL - STA 10+50 SCALE: 1" =10' 0' 20' 40' 60' OFFSET EX. MARSH SILL WITH NEW TOE PROTECTION - STA 13+53 SCALE: 1" = 10' AARENDELL "GINE,ER 1004ARENDELLSTREET MOREHEAD CITY, NC 28W PHONE: (2M 622-338 wwE TIFICATIOacers.�mn N.C. CERTIFICATION N0. G1509 CLIENT: CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 PROJECT.' CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS 100, 100, DRAWING 77TLE ALTERNATE OPTION SECTIONS SHEET 3 OF 3 FOR PERMITTING USE ONLY aAR0 e� s�C ry RECEIVED JAN 3 0 2020 DCM-MHD CITY etas srx 1'=10' °�'� ovl6rzozo 13 ° JW �rrnovEoar: JWF pp0'� 19062 ...... NEW 18" 0 HDPE SW PIPE' N NEW RIPRAP SHORELINE' �— �j EX. VINYL — PROTECTION / BULKHEAD �— EX. 18* 0 — SW PIPE NEW SHORELINE PROTECTION NEW C )NC. HEADWALL INV. EL. 0.94' ......... -IV... -IV SPARTINA ,V !. �Y MEAN HIGH AlpRNIFLORA WATER LI &/ Q/ NEW HEADWALL OUTFALL - STA 2+87 SCALE: 1" = 5' NO. DESCRIPTION BY DATE AARENDELL 1004 ARENDELL STREET" MOREHEAD CRY, NC 2W PHONE: (252) 622-M wwwRTIFI ATIOiN NO. C-n N.C. CERTIFICATION N0. G1509 EL. 2' f NHW y �N;7:1Td EL. -2'f NEW CONC. HEADWALL MATCH. EX. INV. EL EX. FIBERFORM . SHORELINE PROTECTION - MEAN HIGH WATER LINE -�/ V SPARTINA -I/ ALTERNIFLORA lv NEW HEADWALL OUTFALL_- STA 7+76 SCALE: 1" = 5' 12' r4+� 1 CLASS 2 ARMOR STONE 1Z 1� o FILTER FABRIC WRAPPED BACK BETWEEN ARMOR AND FILTER LAYER 6" NCDOT CLASS A RIPRAP BEDDING STONE MARSH SILL SECTION - TYPICAL SCALE: NOT TO SCALE CLIENT. CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 PROJECT.' CARTERET COMMUNITY COLLEGE SHORELINE IMPROVEMENTS DRAWMG TITLE DETAILS FOR PERMITTING USE ONLY 4t, RECENED JAN 3 0 2020 DCM-MHD CITY sx=sre AS SHOWN wre 0711fi2020 m"vasr JJW �R WF anoEcrr 19062 ll it I ,-u „d 7A F r� ` ��� - ' ; • FOR PERMITTING : r (� r USE ONLY `•'x' "...,�s - ' ► _!!.. _� ARENDELL STREA \```"`aWunmr4n(t PROPOSED .�jf low U.S. HIGHWAY " •.�C4J�/'' •a WALKWAY ,; a.• ESS/��� - - =a SEAL • _ s = y _III 733� + a S% PROPOSED n # WALKWAY r CARTERET COMMUNITY COLLEGE NOTE: ALL PROPOSED WALKWAYS , PROPOSED WITHIN 75' AEC BUFFER WILL BE PIER #1 ELEVATED CONCRETE HOGSLAT. BOTTOM LEASE ✓ ; ., Sar BOUNDARY ►•-.. 1 PROPOSED � - _.____—��„�;.'`I! � a,a . --------------- 15' RIPARIAN WALKWAY >F . BUFFER' •' ... � u•. SAY nY NHW _ . o RIPARIAN BUFF"ER PROPOSED -t EXISTING PIER P'ER ii3 PROPOSED AREA OF SHORELINE SAVs PER STATE PIER #2 IMPROVEMENTS SURVEY, NOT CONFIRMED BY OBSERVATION USACE CHANNE LINE A ARENDELL ?5 100a ARENDELL STREET MOREHEAD CITY, INC 2&W PHONE (M)6M 338 CERTIFICATION O. C-I N.C. CERTIFICATION N0. C1509 BOGUESOUND (SA;HQW) USACE CHANNEL SETBACK LINE CIJENT.. PROJECT CARTERET COMMUNITY COLLEGE3505 CARTERET COMMUNITY COLLEGE OREHE DCITY,NDELL SC285 SHORELINE IMPROVEMENTS MOREHEAD CITY, NC 28557 DRAWING TITLE OVERALL SCHEMATIC SITE PLAN SCALE (IN FEET): 60%im" 0' 60' 120' 9Hfk r=zar 02=020 JJW 03 JWF 78062 NOTE: ALL PROPOSED WALKWAYS WITHIN 75' AEC BUFFER WILL BE ELEVATED CONCRETE HOGSLAT. NEW 10' WALKWAY NEW 28 LF 18" 0 HDPE MAI DIDG n 1 zn0% MICHAEL J. SMITH BUILDING NEW ARMORFLEX n.."ri Wr NEW CLASS B RIPRAP BETWEEN EX. FIBERFORM & EX. BULKHEAD SPARTINA — ALTERNIFLORA NEW ARMORFLEX SHORELINE PROTECTION 50' PLATFORM AND 16' X 40' n @ V GRID FINGER PIER WI KAYAK LAUNCH LIVING SHORELINE PLAN STA 0+00 - 8+00 SCALE: 1" = 60' _ NEW CONC CAP & VINYL CUTOFF WALL EX. DI & SW PIPES EX. HEADWALL & OUTLET ' = TO REMAIN, STA 9+76 ( �/\ 30' CAMA BUFFER CRYSTAL COAST CIVIC CENTER NEW HEADWALL STA 7+76 �- NEW 10' WALKWAY 75' AEC LINE NEW CONIC CAP & VINYL CUTOFF WALL $ ` _ NEW ARMORFLEX SHORELINE PROTECTION HW EX. OUTFALL TO REMAIN STA 6+27 SPARTINA ALTERNIFLORA @ 1' GRID NEW 5' X 40' PIER WI o 12' X 20' PLATFORM 7— NHW 12' TYP l -• ~- 22' TYP. MARSH SILL 10' TYP Y 2O'TYP. SPARTINA �__ ALTERNIFLORA (1)DI — INSTALL 5' WIDE ARMOR NHW PER SF J STONE, T THICK SAVs PER NCDMF, NOT MARSH SILL WARNING POST CONFIRMED BY OBSERVATION @ 50' O.C., TYP. LIVING SHORELINE PLAN STA 8+00 - END SCALE: 1" = 60' NARENDELL "ENGINEERS 1004 ARENDELL STREET MOREHEAD CITY, NC 28957 PHONE: (252)622-336 wCERTIFICATIONNO. am N.C. CERTIFICATION N0. G1509 CLIENT: CARTERET COMMUNITY COLLEGE 3505 ARENDELL STREET MOREHEAD CITY, NC 28557 COASTAL EX, RIPRAP WETLANDS TO REMAIN y P/L EXTENDED, ARMOR STONE TO STOP AT P/L v \�- 15' RIPARIAN BUFFER PROJECT.' DRAW NG TITLE CARTERET COMMUNITY COLLEGE ALTERNATE OPTION SHORELINE IMPROVEMENTS LIVING SHORELINE PLAN FOR PERMITTING USE ONLY fa SEAL 10733 6� 2. '..,. I AM y/zv/Zv�D RECEIVED FEB 2 4 2020 fDCM-MHD CITY SCALE (IN FEET): 0' �5n, 160' w,E JJW JWF maEcre 19062