HomeMy WebLinkAboutNTBEX_13-08_ Miller.t
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Braxton C. Davis
Governor Director
February 5, 2013
Exemption Number — NTBEX13-08
Micah Miller
7021 Chelsey Seanch Way
Alexandria VA 22315
RE: EXEMPTED PROJECT (MINOR) EXEMPTION
MAINTENANCE & REPAIR (15A NCAC 07K .0103 & .0209)
Exemption# NTBEX13-08
2324-1 New River Inlet Road, North Topsail Beach, NC
AREA OF ENVIRONMENTAL CONCERN — Ocean Hazard AEC
Dear Mr. Miller:
John E. Skvarla, III
Secretary
I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor
development permit under the Coastal Area Management Act. Based on the information provided, I have determined that the activity
you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing dated received
by DCM on 2/3/2013, and meets the conditions specified below. If your plans should change and your project will no longer meet these
conditions, please contact me before proceeding.
MAINTENANCE AND REPAIR
Structures may be repaired in a similar manner, size and location as the original structure. No expansions or additions are permissible.
The repairs are limited to 50% of the physical value of the existing structure and the following specific conditions.
(1) The project consists of repairing the ocean side deck and stair case, as shown on the attached drawing.
(2) The development must not disturb a land area of greater than 200 square feet on a slope of greater than 10
percent;
(3) The development must not involve removal, damage, or destruction of threatened or endangered animal or
plant species;
(4) The development must not alter naturally or artificially created surface drainage channels;
(5) The development must not alter the land form or vegetation of a frontal dune;
(6) The development must not be within 30 feet of normal water level or normal high water level; and
(7) The development must be consistent with all applicable use standards and local land use plans in effect at
the time the exemption is granted.
This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local
authorization. This exemption expires 90 days from the date of the letter.
Sincerely,
s Dai7hA—
Cc: DIRO
Terrie Woodle, Town of North Topsail Beach
02/03/2013 16:47 FAX 001
4 0 .1 �
1 -716I 1— —
,�it,IciN�G 1aJL�j
��iGb X 3 f� �""' J�9•�1�
Na7�
93 a Y --- / Ncw 4,16'zx a
wewJ-f
3X—s