Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Old Ferry
Channel
(Access
Channel)
Deer Creek
(Access
Channel)
Deer Creek
(Residential
Canal)
Boat Ramp Rock Groin Rock
Breakwater
Other
(excluding
shoreline
stabilization)
Length 6,750 ft 6,200 ft 6,000 ft
Width 50'- (6,150 ft)
30'- (600 ft)50' - (5,900 ft)
30' - (300 ft)
30' - (500 ft)
20' - (5,500 ft)
Avg. Existing
Depth -4 MLW -3 MLW -2 MLW NA NA
Final Project
Depth -6 MLW +1 -5 MLW+1 -5 MLW+1
-4 MLW + 0.5 NA NA
1. EXCAVATION This section not applicable
a.Amount of material to be excavated from below NHW or NWL in
cubic yards.
38,733 CY
b.Type of material to be excavated.
Silty sand, fines, mud.
c.(i) Does the area to be excavated include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
CW SAV SB
WL None
(ii) Describe the purpose of the excavation in these areas:
d.High-ground excavation in cubic yards.
0 CY
2. DISPOSAL OF EXCAVATED MATERIAL This section not applicable
a.Location of disposal area.
916 WB McLean Drive (Hwy 24), 307 Bayshore Drive, and
312,314,& 324 Live Oak Drive Cape Carteret (28584)
b.Dimensions of disposal area.
0.6 Ac - 916 WB McLean Drive (Hwy 24)
1.0 Ac - 312, 314, & 324 Live Oak Drive
0.6 Ac - 307 Bayshore Drive
c.(i) Do you claim title to disposal area?
Yes No NA
(ii) If no, attach a letter granting permission from the owner.
d.(i) Will a disposal area be available for future maintenance?
Yes No NA
(ii) If yes, where?
e.(i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
CW SAV SB
WL None
(ii) Describe the purpose of disposal in these areas:
f.(i) Does the disposal include any area in the water?
Yes No NA
(ii) If yes, how much water area is affected?
See Tab F - Consent of Use Agreements
Form DCM MP-2 (Excavation and Fill, Page 2 of 2)
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06
a.Type of shoreline stabilization:
Bulkhead Riprap Breakwater/Sill Other:
b.Length:
Width:
c.Average distance waterward of NHW or NWL:d.Maximum distance waterward of NHW or NWL:
e.Type of stabilization material:f.(i) Has there been shoreline erosion during preceding 12
months?
Yes No NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
g.Number of square feet of fill to be placed below water level.
Bulkhead backfill Riprap
Breakwater/Sill Other
h.Type of fill material.
i.Source of fill material.
4. OTHER FILL ACTIVITIES This section not applicable
(Excluding Shoreline Stabilization)
a.(i) Will fill material be brought to the site?Yes No NA
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
b.(i) Will fill material be placed in coastal wetlands/marsh (CW),
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
CW SAV SB
WL None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a.How will excavated or fill material be kept on site and erosion
controlled?
Silt fencing and erosion control berms
b.What type of construction equipment will be used (e.g., dragline,
backhoe, or hydraulic dredge)?
Excavator (backhoe) or bucket dredge, bobcat, dump trucks and
floating barges.
c.(i) Will navigational aids be required as a result of the project?
Yes No NA
(ii) If yes, explain what type and how they will be implemented.
d.(i) Will wetlands be crossed in transporting equipment to project
site? Yes No NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
May 01, 2020
Date
Old Ferry Channel & Deer Creek Maintenance Dredging
Project Name
Greg ' Rudi' Rudolph
Applicant Name
Applicant Signature
Applicant Signature
3. SHORELINE STABILIZATION
(If development is a wood groin, use MP-4 – Structures)
This section not applicable x