Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
120-20 Taylor, Margaret
Permit Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for Major Development in an Area of Environmental Concern pursuant to NCGS l I3A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to _ Margaret Taylor, PO Box 737, Snow Hill, NC 28580 Permit Number 120-20 Authorizing development in Carteret County at ado. to Adams Creek and the AIW W. at 786 Sea Gate Dr., near Newport as requested in the permittee's application dated 10/13/20, including attached workplan drawing (1), Sheet 1 of 1 dated "Revised 11/10/20". This permit, issued on December 17, 2020 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation )i tnese terms may be subject to tines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility Expansion 1) This permit authorizes only the demolition of the existing docking facility and the construction of the docks, piers, boat lifts, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2023 Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Margaret Taylor ADDITIONAL CONDITIONS Permit No. 120-20 Page 2 of 3 3) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 4) This permit authorizes a maximum of four (4) formalized boat slips. 5) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 6) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. 7) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 8) It is possible that the authorized structure may be damaged by wave wash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats. The permittee shall not hold the state of North Carolina or the United States liable for any such damage. 9) No portion of the permitted structure shall be located within 80 feet of the near bottom edge of the federally maintained AIWW channel. 10) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon.due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. USACE Conditions 11) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish & Wildlife Service's Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https://www.fws.gov/raleigh/pdfs/ManateeGuidelines20l7.pdf. General 12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. Margaret Taylor ADDITIONAL CONDITIONS Permit No. 120-20 Page 3 of 3 13) All debris associated with the removal or construction of the permitted docking facility shall be contained within the authorized project area and removed to an appropriate upland location. 14) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2001-01065). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2020-1675. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that many land disturbing activities are not authorized within 50 feet of the normal high water level unless specifically exempted by Environmental Management Commission's (EMC) Neuse River buffer regulations in place at the time of such development. NOTE: An application processing fee of $250 was received by DCM for this project. OCM MP-1 APPLICATION for Major Development Permit past revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name MI Last Name Margaret Taylor Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names listed. Mailing Address PO Box City State 737 Snow Hill NC ZIP Country No. FAX No. 28580 us 252 - 717 - 8746 ext. 252 - - Street Address (if different from above) City State ZIP 2734 Hwy 58 South Snow Hill NC _28580 Email buzz@tidetamer.com 2. Agent/Contractor Information Business Name The Cullipher Group, PA Agent/ Contractor 1: First Name Ron MI D Last Name Cullipher Agent/ Contractor 2: First Name MI Last Name Mailing Address 151A NC Hwy 24 PO Box City Morehead City State NC ZIP 28557 Phone No. 1 252 - 773 - 0090 ext.1003 Phone No. 2 ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email ron@tcgpa.com RECEIVED <Form continues on back> OCT 13 2020 DCM-MHD CITY 252.808-2808 :: 7.888.4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret County 786 Sea Gate Drive Subdivision Name City State Zip Sea Gate Newport �NC 28570 Phone No. Lot No.(s) (if many, attach additional page with list) 252 -717 -8746 ext. 63 "MaS4, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Neuse River Basin Adams Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ❑Manmade ❑Unknown Neuse River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes I]No work falls within. Carteret County Planning 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 199.27' 28278 Sq.Ft. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 4' ❑NHW or []NWL e. Vegetation on tract grassed yard f. Man-made features and uses now on tract existing residential home, bulkhead with riprap and docking facility(to be removed) g. Identify and describe the existing land uses adiacent to the proposed project site. residential h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? R15 (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ❑r No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> RECEIVED OCT 13 2020 252.808-2808 :: 1-888-4RCOAS7 ;: www.nccoastaimanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (1) Are there wetlands on the site? ❑Yes mNo (ii) Are there coastal wetlands on the site? []Yes mNo (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes mNo (Attach documentation, if available) n. Describe existing wastewater treatment facilities. onsite septic o. Describe existing drinking water supply source. well p. Describe existing storm water management or treatment systems. none 5. Activities and Impacts a Will the project be for commercial, public, or private use? []Commercial ❑Public/Government +❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Reconfigure existing docking facility to better navigate ICW and provide additional water access c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. barge/pile driver in water with excavator d. List all development activities you propose. reconstruct docking facilities and add floating platform e. Are the proposed activities maintenance of an existing project, new work, or both? new work f. What is the approximate total disturbed land area resulting from the proposed project? ❑Sq.Ft or ❑Acres N/A g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. none I. Will wastewater or storrrwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> tSC\/Cr V Gv OCT 13 2020 nagem 2 5 2 - 8 0 8 - 2 8 0 8 .. 1.888.4RCOAST .. w w w. n c c o a s t a l m aent.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (t) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name ,John & Mary Omalley Phone No. Address 802 Sea Gate Dr. Newport, NC 28570 Name ,Jeffrey Taylor Phone No. Address 776 Sea Gate Dr. Newport, NC 28570 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA Permit ( number and date unknown) h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the be t of my knowledge. 31 j Date JDtjLO Print Name b )It Signatur 0 Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts RECEIVED ❑DCM MP-3 Upland Development ❑+ DCM MP-4 Structures Information OCT 13 2020 DCM-MHD CITY 252.808-2808 :: 1-888.4 RCOAST :: w w w. n c c o a s t a l m a n a g e m e n t. n et IX-Titi11 fie] J,IJ,NMI! STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-t. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑PubliclGovemment ❑Private/Community [I This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ❑No c. (i) Dock(s) and/or piers) d. (i) Are Finger Piers included? ❑Yes []No (ii) Number 2 If yes: (iii) Length 1O' Q14 (ii) Number 3 (iv) Width ". 1I, (ill) Length (3)32 (v) Floating []Yes []No (iv) Width its, mA (v) Floating ❑Yes []No e. (i) Are Platforms included? ❑Yes ❑No f. (i) Are Boatlifts included? ❑Yes []No If yes: If yes: (III Number 2 (ii) Number 4 (ill) Length (1)32,(1)12 (ill) Length " (iv) Width 01012_")10 (iv) Width - (v) Floating ElYes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 4 ❑ Full service, including travel lift and/or rail, repair or Ill) Number of slips existing maintenance service 2 ❑ Dockage, fuel, and marine supplies El Dockage ('Peet slips") only, number of slips: 4 ❑ Dry storage; number of boats: ❑ Boat remp(s); number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and/or channel ❑Open water; no dredging required []Other; please describe: k. Typical boat length: 2424=50' m. (!)Will the facility have be pilings? ❑Yes []No (li) If yes number of be pilings? 20 j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). open I. (i) Will the facility be open to the general.pubyrzwSD ❑Yes ❑No c1 a MA CITY 252408.2808 :: 1-688.4RCOAST :: www.nocoastaimanaoement.net revised: 12/27/06 Form DCM MP-4 (structures, Page 2 of 4) 2. DOCIONG FACIUMMARINA OPERATIONS El This section not applicable a. Check each of the following sanitary facilities that will be Included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (it Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED OCT 13 2020 DCM-MHD CITY 252-808-2808 :: i-888-4RCOAST :: w .nccoastalmanaaement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes []No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes []No o. Is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑sAV ❑sB ❑WL []None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? []Yes []No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (induding covered lifts) O This section not applicable a. (I) Is the boathouse structure(e): ❑Commercial ❑Public/Govemment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Rooted areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheelpile, etc. If a rock groin, use MP-2, Excavation and Fill.) El This section not applicable a. (i) Number (fl) Length (III) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) El This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands B. MOORING PILINGS and BUOYS 0This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Govemment ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing b. Number _ d. Description of buoy (color, inscription, size, anchor, etc.) OCT 13 2020 DCM-MHD CITY 252-808-2808 :: 1-888-4RCOAST :: vnww.nccoastalmanaaement.net revised: 12127/06 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines greater than 15', see plan Note, For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body 450' e. (i) Will navigational aids be required as a result of the project? []Yes ❑No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. approximately 50' d. Water depth at waterward end of structure at NLW or NWL s NLW 8. OTHER ❑This secdw riot applicable a. Give complete description: Essentially reconstructiong existing docking facility at an angle parallel with waterway. Zo Date Margaret Taylor Project Project Name The Cullipher Group, PA agent RECEIVED 0 C T 13 2020 DCM-MIND CITY 252-808-2808 :: 1-888-4RCOAST :: w .nccoastalmanaaement.net revised: 12127/06 DCM Coordinator: ja Permit#: I2D-Z0 Agents: DCM Field Offices Elizabeth City Morehead City US ACOE Offices: Washington: MAILING DISTRIBUTIION 7 SHEET �CJIOr ?o �oX 73"1 V j f LI.ff, Washington groli Wilmington (with revised work plan drawings) (OBJECTIONS ) Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddiecome (NC DOT -Remainder ECity/Washington District) Wilmington: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) iz Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Renee Gledhill -Earley at Environmental.Review@ncdcr.govMW Heidi Cox (WIRO) Kim Harding David Harris Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan o Clif Whitfield (WARD) Harrison Washington: Chris Puliinger - 401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Wildlife Resources: Robb Mairs — 401 (Brunswick, New Hanover) Holley Snider — 401 (Carteret, Onslow, Pender) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Maria Dunn (WARD) Natural Heritage Program Rodney Butler 11 LPO: 4ert tuAA09- ]h 4 /� L. (NCDOT) Travis Wilson DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Margaret Taylor COUNTY: Carteret PROJECT NAME: LOCATION OF PROJECT: 786 Sea Gate Dr, Newport DATE APPLICATION RECEIVED COMPLETE BY FIELD:10-13-20 FIELD RECOMMENDATION: Attached: Yes FIELD REPRESENTATIVE: Connell DISTRICT MANAGER REVIEW: Roy Brownlow B) DATE RECEIVED BY MAJOR PERMITS UNIT: APPLICATION ASSIGNED TO: Bodnar PUBLIC NOTICE REC'D: 1141-20 ADJ. RIP. PROP NOTICES REC'D: 10/13/2020 C) 75 DAY DEADLINE: 12-27-20 HOLDS: EMAIL OUT DATE: 10-23-20 PERMIT FINAL, ACTION: ISSUE DENY To Be Forwarded: Yes DISTRICT OFFICE: MHC FEE REC'D: $250 # #2468 END OF NOTICE DATE: 11-30-20 DEED REC'D: Yes 150 DAY DEADLINE: STATE DUE DATE: Click or tap to enter a date. AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES DCM — Field Rep I l ?* Chi I la^S DCM — LUP Consistency Determination tl b CoNs Local Permit Officer Corps of Engineers — Regulatory Branch l DWR-401 Section 17,14102o2p_ DWR — Public Water Supply DEMLR — Stormwater DENIER — Sed and Erosion DOA — State Property Office Wildlife Resources Commission 6L L ZO `F DMF — Shellfish Section « (p l0=- DMF — Habitat & Enhancement WI 7J DNCR— Archives &History DNCR — Natural Heritage Program NCDOT NC Dept of Commerce Coastal Management ENVIRONMENTAL OUALITY MEMORANDUM DATE: October 23, 2020 TO: Gregg Bodnar THRU: Roy Brownlow FROM: Brad Connell ROY COOPER Gavemor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director SUBJECT: Comments and Recommendations - CAMA Major Permit —Margaret Taylor, Carteret County The following is my assessment and consequent recommendations of the above referenced proposal: This proposal incorporates 3,744 square feet of Public Trust waters. The proposal is adjacent to a Federal Channel. These waters of the Adams Creek ICW are closed to shellfish harvest. This waterbody is not a Primary Nursery Area. This area is subject to the Neuse River Basin Riparian Buffer Rules. Assuming other state and federal agencies concur, the Morehead City District staff recommends that the project be authorized with the following conditions: 1) This permit authorizes only the docks, piers, and other strictures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this marina/docking facility without permit modification. No non -water dependent uses of strictures may be conducted on, in or over public trust waters without permit modification. 2) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 3) This permit authorizes a maximum of four boat slips. At no time shall more than four vessels be moored or docked at the facility. The restriction of the number of vessels shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and personal watercraft. 4) It is possible that the authorized structure may be damaged by wave wash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats. The permittee shall not hold the United States liable for any such damage. 5) Approval of the structure was based on a determination that there would be no obstruction to navigation. Under conditions existing within the AIWW, a possibility exists that the structure may be damaged by Nothing Comparos7,�.,_ State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City. NC 28557 252 808 2808 T Taylor 10/19/2020 Page 2 of 2 wave wash from passing vessels. Unreasonable slowing down of vessel traffic cannot be required because such an action would tend to nullify the navigational benefits on which the AIWW was justified. Issuance of this permit should not be construed as relieving the permittee of tatting proper steps to ensure the structure and moored boats will not be damaged by wave wash normally to be expected in the AIWW. The permittee shall not hold the United States liable for any such damage. 6) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. CC: Roy Brownlow, DCM 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.ncooastalmanagement.net An Equal Opporlunity 1 Affirmatve Acton Employer 0 NORTH CAROLQJA zn�=M]Q=f1p- Odober 23, 2020 MEMORANDUM_ FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 4110 Commerce Avenue, Morehead City, NC 28557 Fax: 252-24-1-3330 (Courier 11-12-09) gregg.bodnar6NCDENR.gov SUBJECT CAMA/Dredge and Fill Application Review Applicant: Margaret Taylor Project Location: 786 Sea Gate Dr, Newport Carteret County Proposed Project Expand ejdsting docking facility ROY COOPtR G va MICHAEL S. REGAN Sc =.V ' BRAYTON DAVIS D:Fc=r, Dni-ivyg 6=rJ Please indicate below your agencyrs position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by November 20; 20201 if you have any questions regarding the proposed project, contact Brad Connell 252-808-2808_ when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional continents may be attached" X This agency has no comment on the proposed projecL r G'4 EW: ?SATE This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments - FAME Lee Padrick NC Commerce p 10-23-20 RECEIVED OCT 2 3 2020 MP SECTION 11,111D 9=afNatthC=1= I E=c ma "i QmL5ty1cga 3Mmegm= 117Ca[dsa1D&RFC.,W10maPMNC29A05 9197072/5 -- 1 4aw� NORTH CAROLINA Environmental Qualay October 23, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnar(a NCDENR.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Margaret Taylor Project Location: 786 Sea Gate Dr, Newport Carteret County Proposed Project: Expand existing docking facility ROY COOPER Governor MICHAEL S. REGAN seererary BRAXTON DAVIS Direelm Division ofCoarr l Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greao Bodnar at the address above by November 20, 2020. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: X This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Rachel Love-Adrick AGENCY Division of Coastal Management SIGNATURE V, W DATE 10/30/2020 RECEIVED NOIV 2 2020 MP SECTION RPHD State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ent,, Wilmington, NC 28405 919 796 7215 ROY COOPER Governor MICHAEL S. REGAN secretary BRAXTON C. DAVIS Director MEMORANDUM NORTH CAROLINA Environmental Quality �C TO: Gregg Bodnar, Major Permits Processing Coordinator �m��� Division of Coastal Management FROM: Rachel Love-Adrick, District Planner `D� NOV � 2020 Division of Coastal Management � (/� SUBJECT: Major Permit Request by Margaret Taylor DATE: October 30, 2020 Consistency Determination: The request is consistent with/not in conflict with the Carteret County Land Use Plan certified by the CRC on December 20, 2010. Overview: The property is located adjacent to the Adams Creek ICW at 786 Sea Gate Drive near Newport, Carteret County. This property is currently developed with a bulkhead, docking facility, rip rap, and a residential dwelling. This property is located within the Neuse River basin. The elevation of the adjacent high ground of the parcel is approximately 15' above the normal water level (NWL). Vegetation on the parcel mainly consists of lawn grasses. There are no Coastal Wetlands within the project area. The parcel has 199' of continuous shoreline along Adams Creek. Immediate offshore water depths adjacent to the parcel range from -3' to -11' normal water level (NWL). The subaqueous substrate is firm with shell. Areas of Environmental Concern (AECs) in the project area are Estuarine Waters, and Public Trust Areas. The project is located adjacent to Adams Creek ICW and is approximately 470' across at this location. This project is located near a Federal Channel, approximately 21' landward of the ICW channel setback. The waterbody is classified as SA; HOW; Nutrient Sensitive Waters, is not a Primary Nursery Area and is closed to shellfish harvest. Submerged aquatic vegetation was not observed and there are no cultural resources. This parcel is subject to the Neuse River Riparian Buffer Rules. The applicant is proposing to expand an existing private docking facility by replacing the existing 2-slip docking facility with a 4-slip docking facility. This expanded docking facility would extend 52' waterward of the shoreline. The proposed pier access would be 6' by 24' and would connect to a 12' by 32' floating platform that would be parallel.to the'shoreline. Two 6' by 32' finger piers would be on either end of the floating platform, also parallel to shore. Each finger pier would support access to boat lifts on each side, totaling four proposed boat slips. A 4'6" wide and 14' long platform connecting to an 8' by 32' platform North Carolina Department of Environmental Quality I DivisionofCoastalManagement Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252,11082808 l is proposed to encompass the southeastern boat lift. The applicant is also proposing a separate, stand-alone 5' by 20' gangway connected to the top of the existing bulkhead and leading to a 10' by 12' floating platform just north of the proposed 4-slip docking facility. Anticipated impacts This proposal is 21' landward of a Federal Channel setback, and would not be a hazard to navigation along this shoreline. The proposed docking facility would usurp 3,744 square feet of Public Trust Area. Traditional marine construction methodology will be utilized during the construction of this project. Turbidity impacts are not anticipated during the construction activities in Adams Creek. Basis for Determination: The project site is located in Carteret County and is subject to the 2005 Carteret County Land Use Plan Update. The Future Land Use Map (FLUM) designates the site as Rural and Conservation due to the sites location in AECs, and non -coastal wetlands. In the Conservation land use category, the county states: "Uses allowed by Carteret County in AECs are those that are consistent with the State's minimum use standards, except when the policies contained in this plan are more restrictive than State standards" (pg. 94). Regarding non -coastal wetlands, the county "accepts applicable state and federal regulations regarding development activity in non -coastal wetland areas, with the exception of Land Use Compatibility Policy 2.1.5 which exceeds state and federal standards" (pg. 94). The "Rural" land use category is defined as: "Areas included within the rural classification include lands that are appropriate for or presently used for agriculture, forestry, mineral extraction, and other uses that should be located in a relatively isolated and undeveloped area. The predominant land uses are agricultural and residential. However, public facilities, health care facilities, and scattered industrial and commercial uses are allowed. Areas classified as rural are usually served by individual wells and septic systems. No central water service is anticipated during the planning period". Residential densities average two dwelling units per acre, with a minimum lot size of 20,000 square feet (2.2 units per acre). Extensive portions of the Down East area are classified as rural, as are areas in northwest Carteret County. Within areas depicted as Conservation on the Future Land Use Map, there may be high -ground areas that are suitable for development. These high -ground areas shall be considered as Rural and development shall be consistent with densities and requirements contained in the Rural classification description, policies contained in the Land Use Plan, and applicable local, state, and federal regulations. The following LUP policies are applicable to this request: Policy 2.4 Carteret County's policies for development in estuarine and public trust waters are as follow: 1. Carteret County will only allow development activities in estuarine and public trust waters that are associated with water -dependent uses, consistent with state and federal standards, and meet all local policies contained in this plan. RECEIVE® North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City. North Carolina 28557 252.8082808 NOV 9 2020 NIP 11DEOCCRTM MHD NORTH CAROLINA Environmental Quality October 23, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) greoo. bodnar(o)NCDENR.00v SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Margaret Taylor Project Location: 786 Sea Gate Dr, Newport, Carteret County Proposed Project: Expand existing docking facility ROY COOPER GDvemor MICHAEL S. REGAN . Secretary BRAXTON DAVIS Director, Division of Coastal Management Please indicate below your agency's position or viewpoint on the proposed ro-ject and return this form to Gregg Bodnar at the address above by ovembeT'20, 2020 If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. ARINT NAME James Harrison RECEIVED E® GENcI NCDMF 1� OCT 2 9 2020 9NATUR9 f'n44,(-�BAp MP SECTION MHD WT9 29 October 2020 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 Received: 11/2/2020 Historic Preservation Office ER 20-2316 NORTH CAROLINA Environmental Oualily October 23, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnar()NCDENR.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Margaret Taylor Project Location: 786 Sea Gate Dr, Newport, Carteret County Proposed Project: Expand existing docking facility Due: 11/10/2020 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXT,ON DAVIS Direclor, Division oJCoastal Management NC - SBA 11/9/2020 Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by November 20,, 2020j If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Renee Gledhill -Earley AGENCY, SIGNATURE Historic Preservation Office RECEIVE® NOV 1 2 2020 11 /11 /2020 MP SECTION MHD State ofNoah Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Em., Wilmington, NC 28405 919 796 7215 NORTH CAROLINA Environniental Qualify October 23, 2020 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnarna NCDENR.aov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Margaret Taylor Project Location: 786 Sea Gate Dr, Newport Carteret County Proposed Project: Expand existing docking facility ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director, Division oJCoastal Management Please indicate below your agency's position or viewpoint on the proposed project and return this forin to Greaa Bodnar at the address above by November 20, 2020; If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection'to the project as proposed. "Additional comments may be attached" X_ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Shannon Myers AGENCY NCDMF- Shellfish Sanitation and Recreational Water Quality SfGNATURE Uh�MBR ' 4?w for Shannon Jenkins �ECEI®9E® DATE 11 /9/2020 NOY 1 0 2020 State ofNonh Carolina I Environmental Quality l Centel Management- MP SECTION MHD 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 Bodnar, Gregg From: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Sent: Thursday, November 5, 2020 3:09 PM To: kathryn_matthews@fws.gov, Leigh_Mann@fws.gov; pace.wilber@noaa.gov; Pete_Benjamin@fws.gov; Owens, Jennifer L CIV USARMY CESAW (USA); HORTON, J TODD CIV USARMY CESAW (US); Arnette, Justin R CIV USARMY CESAW (USA); DCR - Environmental_Review; Bowers, Todd; ethan coble; fritz.rohde; matt creelman; Twyla Cheatwood; Ellis, John; MacPherson, Tara; Howell, Jonathan; Wcjoski, Paul A; Bodnar, l/'1I Connell, Brad; Gregg; Snider, Holley; Tranter, Kent W CIV USARMY CESAW (USA); Bertram, Paul J BOSN3 Cc: Charles, Thomas P CIV USARMY CESAW (USA) Subject: [External] [WARNING: UNSCANNABLE EXTRACTION FAILED]CAMA MAJOR/PGP 291/ SAW-2001-01065/ Taylor Dock/Carteret Attachments: SAW-2001-01065 Taylor_ePN.pdf; Taylor- App and field report.pdf Taylor - Plans.pdf; Goog le Ea rth_P I a cema rk. kmz All, Pursuant to the CAMA-Corps Programmatic Permit process, the North Carolina Division of Coastal Management (NCDCM) has forwarded to our office a copy of the CAMA permit application, Field Investigation Report and BioReport for the subject project. The attached notice requests federal agency comments on this project by December 5, 2020. The site is located within waters adjacent to Adams Creek, at 786 Sea Gate Drive, in Newport, Carteret County, North Carolina. Coordinates are 34.852992 N,-76.690862 W. The applicant is proposing to replace an existing 2-slip docking facility with a 4-slip docking facility. The expanded docking facility would extend 52' waterward of the shoreline. The proposed pier access would be 6' by 24' and would connect to a 12' by 32' floating platform that would be parallel to the shoreline. Two 6' by 32' finger piers would be on either end of the floating platform, also parallel to shore. Each finger pier would support access to boat lifts on each side, totaling four proposed boat slips. A 4'6" wide and 14' long platform connecting to a 8' by 32' platform is proposed to encompass the southeastern boat lift. The applicant is also proposing a separate, standalone 5' by 20' gangway connected to the top of the existing bulkhead and leading to a 10' by 12' floating platform just north of the proposed 4-slip docking facility. Dredging is not proposed as a part of this project. The project site is located adjacent to the Corps federal channel, and is 21' landward of the federal channel setback. Please see the attached field investigation report, application, kmz file and plans for detailed information concerning the proposed project. EFH: This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson -Stevens Fishery Conservation and Management Act. The Corps' initial determination is that the proposed project may affect, but not likely adversely affect EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine Fisheries Service. The waters within the project area are not designated as PNA by the Division of Marine Fisheries, are classified as SA; HQW; Nutrient Sensitive Waters by the Division of Water Resources, and are closed to shell fishing. Average water depths within the project area range from -3' to -11' Normal Water Level r� DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 88 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-7343 November 9, 2020 Regulatory Division Action ID No. SAW-2001-01065 Ms. Margaret Taylor 2734 Hwy 58 South Post Office Box 737 Snow Hill, North Carolina 28580 buzzna.tidetamer.com Dear Ms. Taylor, A review of your application received by this office on October 23, 2020, for Department of the Army (DA) authorization to expand an existing docking facility, located in waters of Adams Creek, at 786 Sea Gate Drive, in Newport, Carteret County, North Carolina indicates it to be a candidate for Federal authorization pursuant to the CAMA-Corps Programmatic Permit process for construction activities that receive authorization from the State of North Carolina. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this permit process for any reason, you will be informed regarding its further management. If there are no unresolved differences in State - Federal positions or policies, the final action taken on your application by the State will result in your receiving written notice from us that your application is consistent with the Federal permit and you may commence your activity. Only after receiving such confirmation should you begin work. Your application, pursuant to Section 404 of the Clean Water Act, has been assigned Action ID No. SAW-2001-01065. RECEIVED NOV ' 0 2020 PAP SECTION IMHD -2- We will be coordinating your permit application with other Federal agencies. Please feel free to contact me at sarah.e.hair@usace.army.mil. Sincerely, Digitally signed by HAIR.SARAH.E HAIR.SARAH.EA.1054693 A.1054693512 Date: 2020.11.09 14:13:47-05'00' Liz Hair, Project Manager Wilmington Regulatory Field Office Electronic copies furnished: Mr. Gregg Bodnar NCDEQ-DCM gegg. bodnar(a.ncdevin gov ROY COOPER MICHAEL S. REGAN BRAXTON DAVIS d:n::prn;rm October 23, 2020 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400-Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) greaa. bod na rCo)NCD E N R.aov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Margaret Taylor Project Location: 786 Sea Gate Dr, Newport, Carteret County Proposed Project: Expand existing docking facility Please indicate below your agency's position or viewpoint on the,proposed project and return this form to Gregg Bodnar at the address above by November 20, 2020: If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME WC(Qn AC� )p Dim. SIGNATURE "l D." DATE i I " Ao -dy Stain oNonh Carolina I rnvironmcntal Quality Coastal Management 127 Cardinal Drive Ea., Wilmington, SC 28405 919796 7215 NOV 1 7 2020 MP SECTION PAM DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 December 2, 2020 Regulatory Division Action ID No. SAW-2001-01065 Mr. Jonathan Howell Division of Coastal Management North Carolina Department of Environmental Quality 400 Commerce Avenue Morehead City; North Carolina 28557-3421 Dear Mr. Howell: RECEIVED DEC 2 2020 MP SECTION MHD Reference the application of Margaret Taylor, associated with the expansion of an existing docking facility in waters of Adams Creek, adjacent to 786 Sea Gate Drive, in Newport, Carteret County, North Carolina. Specifically, the applicant proposes to replace an existing 2-slip docking facility with a 4- slip docking facility. The expanded docking facility would extend 52' waterward of the shoreline. The proposed pier access would be 6' by 24' and would connect to a 12' by 32' floating platform that would be parallel to the shoreline. Two 6' by 32' finger piers would be on either end of the floating platform, also parallel to shore. Each finger pier would support access to boat lifts on each side, totaling four proposed boat slips. A 4' 6" wide and 14' long platform connecting to an 8' by 32' platform is proposed to encompass the southeastern boat lift. Additionally,the applicant proposes a separate, standalone 5' by 20' gangway connected to the top of the existing bulkhead and leading to a 10' by 12' floating platform just north of the proposed 4-slip docking facility. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the modification to the State authorization: 1. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at http://www.fws.gov/nc-es/mammal/manatee euidelines.pdf. 2. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772-2191. -2- 3. All work authorized by this permit must be performed in strict compliance with the submitted plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 4. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 5. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 6. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Resources at (919) 733- 5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 7. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 8. If the permittee discovers any previously unknown historic or archeological remains while accomplishing the authorized work, he will immediately notify the Wilmington District Engineer who will initiate the required coordination procedures. 9.The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 10. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). RECEIVED DEC 2 2020 MP SECTION MHD -3- 11. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 12. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre -project condition. 13. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Questions or comments may be addressed to Ms. Liz Hair Wilmington Field Office, Regulatory Division, telephone (910) 251-4049 or email at sarah.e.hair@usace.army.mil. Sincerely, Digitally signed by HAIR.SARAH.E HAIR.SARAH.EA.105469351 2 A.1054693512 bate: 2020.12.0212:39:24 -05'00' Liz Hair, Project Manager Wilmington Regulatory Field Office Electronic Copy Furnished: USEPA; Mr. Todd Allen Bowers NCDEQ/DCM; Mr. Gregg Bodnar/Ms. Tara McPherson NCDEQ/DWR; Ms. Holley Snider USFWS; Mr. Pete Benjamin/Mr. John Ellis NMFS; Mr. Pace Wilber/Ms. Twyla Cheatwood DEC 2 2020 MP SECTION f IHD 0 C.2o.10.2L-01 October 23, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) g re Qg. b o d n a rlo. N C D E N R.g ov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Margaret Taylor Project Location: 786 Sea Gate Dr, Newport, Carteret County Proposed Project: Expand existing docking facility ROY COOPER MICHAEL S. REGAN BRAXTON DAVIS Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by November 20, 2020. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME pi�ZlIA n n AGENCY N tip- C SIGNATURE DATE I'2-0 Sate or North Canalin2 I Fnvhua,sntal Quality I Coastal Maoagemcv[ 127 Caviinal Drivc Fat., Wihmngwn, NC 2"05 9197967215 ON 2 2020 MP SECTION 9IHD NNIZIMMM �R. NORTH CAROLINA liln'ironnxavnl Uunlirc October 23, 2020 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) grenQ. bod n ar(a) N CDE N R.gov SUBJECT: CAMA / Dredge and Fill Application Review Applicant: Margaret Taylor Project.Location: 786 Sea Gate Dr, Newport, Carteret County Proposed Project: Expand existing docking facility ROY COOPER Cn rnm MICHAEL S. REGAN Seerelmy BRAXTON DAVIS Direelm Dirision o/ Coaaud Mawgemenl Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greqq Bodnar at the address above by November 20, 2020. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Holley Snider AGENCY SIGNATURE DATE DWR 401 Buffer Permitting Branch Holley olidet- 12/03/2020 State ofNonh Cemlim I Enviro u ntel Q l ty l Coamnl Mnnagem t 127 Cardinal Drive Fat., Wilmington, NC 28405 919 796 7215 RECEIVED DEC 4 2020 MP SECTION MHD Docu?,190 Envelope ID: 5D3CC15E-F676-4E60-89E5-4A5BABBiC976 ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality December 3, 2020 DWR # 2020-1675 Carteret County Margaret Taylor P.O. Box 737 Snow Hill, NC 28580 Subject: No Written Approval Required 786 Sea Gate Drive, Beaufort Dear Ms. Taylor: The Division of Water Resources (DWR) has received a copy of your CAMA Major permit application request dated received by this office on October 23, 2020. The application proposes to expand an existing docking facility. As proposed, the docking facility expansion would consist of reconstruction of the docking facility, including platforms, finger piers, boatlifts and a floating dock to provide dockage for up to four (4) vessels. The docking facility would be located in the waters of Adams Creek Canal which are classified as SA:HQW:NSW by the DWR. The DWR issues approval in the form of a Water Quality Certification (WQC) in conjunction with the CAMA Major Permit and General Permit(s) 19800291 or 197800056 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Permit when issued by the Division of Coastal Management. In accordance with the attached General Certification #4175 (GC 4175), the impacts described in your application do not require written authorization to utilize GC 4175. However, you are required to follow the conditions listed in the attached certification. You should get or otherwise comply with any other federal, state and local requirements before you go ahead with your project including (but not limited to) erosion and sediment control regulations. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at hfp://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. �sw DEC 4 2020 DEQJ� North Carolina Department of Environmental Quality Wilmington Regional Office 1127 Cardinal Drive Extension I Willmiinn ton, North Caa�m'llpo'a2�B' 55� g��p lL� 'r' Ov'e�� 910.796.7215 YY7@ �E9.0 ®''LOY�1 YF4Bd�1® Docurgn Envelope ID: 5D3CC15E-F676-4E60-89E5-4A5BA8B1C976 Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 DWR # 2020-1675 December 3, 2020 If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water. Please contact Holley Snider at 910-796-7304 or holley.snider(o)ncdenr.aov if you have any questions or concerns. Sincerely, uftB by:[KA" Sawkt'y—�i4 BA14AC/DG34_ Morelia Sanchez -King, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosures: GC 4175 cc: Sarah Hair, USACE Wilmington Regulatory Field Office, EC Gregg Bodnar, DCM, EC Ron Cullipher, Consultant, EC DWR 401 & Buffer Permitting Branch file-LF WiRO RECEIVE® DEC 4 2020 MP SECTION MHD DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Margaret Taylor LOCATION OF PROJECT SITE: The project is located adjacent to the Adams Creek ICW at 786 Sea Gate Drive near Newport, Carteret County. Latitude:34°51'10.88"N Longitude: 76141'27.55"W INVESTIGATION TYPE: CAMA INVESTIGATIVE PROCEDURE: Date(s) of Site Visit — several over the years Was Applicant or Agent Present —Yes Photos Taken — No PROCESSING PROCEDURE: Application Received —cc: 10/13/20 Office — MHC SITE DESCRIPTION: (A) Local Land Use Plan — Carteret County Land Classification from LUP —Rural with services (B) AEC(s) Involved: PTA, EW (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing — septic Planned - none (F) Type of Development: Existing — residence, docking facility, bulkhead, and rip rap Planned - expansion of existing docking facility (G) Estimated Annual Rate of Erosion: N/A Source — N/A HABITAT DESCRIPTION: DREDGED FILLED 1aLV=XrQLW2 (A) Open Water 3,744 ft incorp (E) Total Area Disturbed: 3,744 ftZ (F) Primary Nursery Area: No (G) Water Classification: SA; HQW; NSW Open: No (H) Cultural- Resources: None Proiect Summary: The applicant wishes to expand an existing docking facility adjacent to the Adams Creek ICW for private use in Carteret County. Field Investigation Report: Taylor Page 2 Narrative Description: The property is located adjacent to the Adams Creek ICW at 786 Sea Gate Drive near Newport, Carteret County. This property is currently developed with a bulkhead, docking facility, rip rap, and a residential dwelling. This property is located within the Neuse River basin. The adjacent riparian properties are similarly developed. The elevation of the adjacent high ground of the parcel is approximately 15' above the normal water level (NWL). Vegetation on the parcel mainly consists of lawn grasses. There are no Coastal Wetlands within the project area. The parcel has 199' of continuous shoreline along Adams Creek. Immediate offshore water depths adjacent to the parcel range from —3' to —1 l' normal water level (NWL). The subaqueous substrate is firm with shell. This proposal is located near a Federal Channel, approximately 21' landward of the ICW channel setback. There is not a cultural resource in the project area. This waterbody is approximately 470' across at this location. These estuarine waters are not classified as a Primary Nursery Area. Submerged aquatic vegetation was not observed at this location. This area is closed to shellfish harvest and is classified as SA; HQW; Nutrient Sensitive Waters. This parcel is subject to the Neuse River Riparian Buffer Rules. Proposed Development: The applicant proposes to expand an existing private docking facility adjacent to the Adams Creek ICW, northwest of Beaufort. The proposed development would take place adjacent to 786 Sea Gate Drive, Carteret County. This proposal is for private use adjacent to a residential dwelling. The applicant is proposing to replace the existing 2-slip docking facility with a 4-slip docking facility. This expanded docking facility would extend 52' waterward of the shoreline. The proposed pier access would be 6' by 24' and would connect to a 12' by 32' floating platform that would be parallel to the shoreline. Two 6' by 32' finger piers would be on either end of the floating platform, also parallel to shore. Each finger pier would support access to boat lifts on each side, -totaling four proposed boat slips. A 4'6" wide and 14' long platform connecting to a 8' by 32' platform is proposed to encompass the southeastern boat lift. The applicant is also proposing a separate, stand- alone 5' by 20' gangway connected to the top of the existing bulkhead and leading to a 10' by 12' floating platform just north of the proposed 4-slip docking facility. Anticipated Impacts: This proposal is 21' landward of a Federal Channel setback. This proposal would not be a hazard to navigation along this shoreline. The proposed docking facility would usurp 3,744 square feet of of Public Trust Area. Traditional marine construction methodology will be utilized during the constractioff-of this -project: Tarliidity impacts are not anticipated duringgnhe construction activities in Adams Creek. Brad Connell October 23, 2020 Morehead City Field Investigation Report: Taylor Paee 3 There is not a cultural resource in the vicinity of the project area. This project area is subject to the Neuse River Riparian Buffer Rules. These waters of Adams Creek ICW are not classified as a Primary Nursery Area and the presence of submerged aquatic vegetation was not observed. This area is closed to shellfish harvest and is classified as SA; HQW; Nutrient Sensitive Waters. Brad Connell October 23, 2020 Morehead City THE CULLIPHER GROUP, P.A. ENGINEERING & SURVEYING SERVICES Narrative —CAMA Major Permit Request Ms. Margaret Taylor 786 Sea Gate Drive Newport, NC 28570 Ms. Taylor owns the property located at 786 Sea Gate Drive in the Seagate Subdivision off the Intercoastal Waterway. She has an existing dock, platform and wetslip layout with a floating dock. She proposes to remove the existing facility and reconstruct to an orientation that is parallel with the waterway. The current skewed construction makes it difficult to dock boats. The improvements are well in excess of the riparian 15' setbacks such that waivers from both riparian owners will not be needed. Many of the components on the existing dock will be reused in the new construction. HESTRON PLAZA TWO 151-A NC HWY 24 MOREHEAD CITY, NC 28557 (252)773-0090 RECEIVED OCT 13 2020 ACM-MHD CITY Ron Cullipher From: laserfiche@ncdenr.gov Sent: Friday, October 09, 2020 3:16 PM To: Ron Cullipher Subject: Pre -Filing Meeting Request Acknowledgement - 786 Sea Gate Drive Dock - 20201396 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for 786 Sea Gate Drive Dock that you submitted on 10/5/2020. The ID number for that project is 20201396, Version 1. Reviewer Contact Information: Reviewer: Holley Snider Email: holley.snider@ncdenr.gov Reviewing Office: Wilmington Regional Office - (910) 796-7215 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. RECENED OCT 13 2020 DCM-MMU CITY ID#* 20201396 Version* 1 Regional Office * Wilmington Regional Office - (910) 796-7215 Reviewer Ust* Holley Snider Pre -Filing Meeting Request submitted 10/5/2020 Contact Name * Ronald Cullipher Contact Email Address* ron@tcgpa.com Project Name * 786 Sea Gate Drive Dock Project Owner* Margaret Taylor Project County* Carteret Owner Address: street Address 151 A NC Hwy 24 Address Lie 2 ay State /R root/RKjm Morehead City NC Rstal / Zip Cade Chrtry 28557 United States Is this a transportation project?* C Yes C No Type(s) of approval sought from the DWR: P 401 Water Quality Certification- r 401 WaterQualityCertifcation- Regular E)press r Individual Permit r Modification r Shoreline Stabilization Does this project have an existing project ID#? C Yes C No Do you know the name of the staff member you would like to request a meeting with? No Please give a brief project description below. Remove and replace residential docking facility with four slips. RECEIVED Please give a couple of dates you are available for a meeting. OCT 13 2020 1 on/2020 ACM-MHD CITY 10/14/2020 Please attach the documentation you would like to have the meeting about. 2 dcm•mpl.pdf 194.54KB 3 dcm-mp4.pdf 239.29KB 6 Dock Reconstruction Plan.pdf 2.93MB per 0* By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirtyday clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/5/2020 RECEIVED OCT 13 2020 )CbUI—IMHD CITY AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Margaret Taylor Mailing Address: PO Box 737 Snow Hill, NC 28580 Phone Number: 252-717-8746 Email Address: buzz@tidetamer.com I certify that I have authorized The Culliphet Group, PA Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessaryfor the following reconfiguration of docking g proposed development: facility at my property located at 786 Sea Gate Drive in Carteret County. l furthermore certify that 1 am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signature Margaret Taylor owner Print or Type Name �{ I. C Date RECEIVED This certification is valid through 08 /03 /2021 OCT 13 2020 OCBA-MID CITY Excise Tax —C'— , � • , r r (. _ .. ' f env �C:.': li?tS itlStruru,ilt was prc"- rl'ery �nr pG r��'4li c"i1Si rGCCTi:Cd in this 01lica ill U his ( 0 ��1%,- Ia siren ft Or v i2Mae :er Oi cads QY Recording TimElv.,:.;;ly Tax Lot No ................. ._ . ..... .__. Parcel Identifier No. _ 12-3B-1-1.__(-$P.. ) I.i" 5....... ....... ..... Verified by ..................................... .... County on the _ ... day of .... ...... ... ....._..--.. .-.... _ ..... 19_......... by........................................... ........... ................ ..... .......__............................................................................................. Mail after recording to .. ................ I. ......... I ................... RECEIVE ....—............................................................................ -_A/_ ... _.............................................. ..................- ................... . OCT 13 .... This instrument was prepared by ._...Hugh..C. Taltolt,...JY. ......._ ............. _... ............................................................. Brief description for the Index Lot 64, Block G, S.I, Sea Cate I DCM-MHD CITY NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this ...IB th.. . day of ._............. Januaacy._.. 19_83.... , by and between GRANTOR John W. O'Malley & wife, Mary Ann O'Malley GRANTEE Barry S. Taylor & wife, Margaret A. Taylor P.C. Box 280 Hookerton, North Carolina 28538 Enter in appropriate block for each party: name, address, and, If appropriate, character of entity, c.q. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, ane shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is heroby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all thw certain lot or parcel of land situated in the City of . .......... ...... ... ..—. ...................... Harlme..... Township - .....Carteret . County, North Carolina and more particularly described as follows: BEING the Southern one-half of Lot 64, in Block C, Section I, in Sea rate Subdivision, in aces ance with the map of same in Map Book 8, Page 90, Carteret County Registry, to which further reference is made for a more particular description thereof. N. C. Da Ague. Form No. 3 4 1976. Revised © 1977 — l.mn wdwnn B Co.. Inc.. Box m, v.dnma:d. N.C. 77090 RmIM by P9v,mtm nnh ln. h C. Bn A%=, _1981 The property hereinabove described Was acquired by Grantor by instrument recorded in ... b9ok..595.s...ptsgf'• ^4.^o•............ C-irteret.County.. `lei;1.str;'.......................................... ......................................................................................................................... A map showing the above described property is recorded in Plat Book ... C . _... ................ page .... r TO HAVE AND TO HOLD the :aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinaabove described is subject to the following exceptions: 1. °rotective Ccvonantn reccried in hook 3371 page 172, Carteret County Registry. 2. Easements anti rearictirns of record, if any. RECEIVED IN WITNESS tvIIEREOF, the Grantor has hereunto set 1 corporate name by Its duly authorized officers and its seal to be above written. __________________________________ (Corporate Name) By: .................................... .......... president ATTEST: .^ . If OCT 13 2020 DCM-MHD CITY be signed In Its r and your first ___________ V _______________________________________.___._______.......... (SEAL) a _________________Secretary (Corporate Seal) U ' .J_____________________________________________________________(SEAL) . ., fill-1L�BT. •, ` )tg$ NQRTII CAROLINA-'-------- County. n •: • � ``s : � 1, a Notary rn611c of the County and State aforesaid, certify that A ci.A a-47G... J1rb.v7, Aa:�---------------------------- Grantor, ' H • x' • , r+'. Cs ? _ personally appeared before me this day and acknowledged the execution of the foregoing instrument. Witness my .A .H, ,a �� W hand and official stamp or seal, this A- day of _�Sv�pta: 1M-�--------------- ___ to1. •.,, aiy commission expires: ��-)7-_)99d.?__.�sB...a—_�/DFdjY���^- ^� L.Q�s.Ci: aa�W Notary Public SF.AI.-STAatP NORTH CAROLINA_---------------------------------- county. 1, a Notary Public of the County and Slate aforesaid, certify that o personally came before me this day and Acknowledged that __-- he Is --------------------------- Secretary of m•----------------------------------------------------- a North Carolina corporation, and that by authority duly V qgiven and as the act of the corporation, the foregoing Instrument was signed In Its name by Its --------------- President, sealed with Its corporate seal and attested by ___________ as its ___________________________ secretary 7 Witness my hand and official stamp or seal, this ------- day of ___________________________ 10.--...... aly commission expires: ---- The foregoing Certificate(s) of --- _------------------------------ -------------------- __________. Notary Pubtit Is/are certified to be correct. This Instrument and this certificate are duly registered at the date and time and In the Book and Page shown on tht first page hereof. By __ OF DEEDS Fort ------------------------------------ COUNTS __-____Deputy/Assistant-negister of Deeds E)V�L �a3 N. C [tar �\.ac. Fonn Nn. J � - 1 %4. nevised �2 1977 - x.,,« we,a^n a co. iM., eo. In. v mono. N C. 27M RmW hp A e..mm.l N.h1M ai tl.n .l«.' 1. t' U-S--P-O�s6l Service Ln CERTIFIED MAIL,,, RECEIPT r,(Domestic to S CO Ne�OO+ Nc 411Zi � o AL USE m SPos ga $' 0557 rl SIG Cenifled Fee $(�•f•I I 0 Return Receipt Fee (Endorsement Requlred) $0.00 Postmark Here p Restricted Delivery Fee (Endorsement Requlred) - `n $1. 0 Total Postage O9/CI /7(2 S O� ant of 1 (�I^ ✓ 1^1��y� ' I b`iiee(Ap No1-1J.i-._�.-.....3..-..- M1 wPoeox NO. 4nn iL S Neyipgr� CO S $11 O Certified Fee O Return Receipt Fee G(Endorsement Required) ' $(i, - Restricted Delivery Fee C3 (EMorsement Required) in $1. O Total Postage & Fees t7 Or, y Sent To M1 wPoeox No. n P. 0551 06 Postmark Here THE CULLIPHER GROUP, P.A. ENGINEERING & SURVEYING SERVICES Certified Mail — Return Receipt Requested September 1, 2020 John & Mary Omalley 802 Sea Gate Drive Newport, NC 28570 Jeffrey Taylor 776 Sea Gate Drive Newport, NC 28570 Dear Adjacent Riparian Property Owner: Margaret Taylor is applying for a CAMA Major Permit to remove an existing dock, platform and wetslip layout with a floating dock and reconstruct to an orientation that is parallel with the waterway along with adding a 10x12 floating dock, located at 786 Sea Gate Drive, Newport, NC 28570, and adjacent to the Intracoastal Waterway/Adams Creek, Carteret County, North Carolina. The specifics of the proposed work are on the enclosed drawing. As the adjacent riparian property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached drawing, applications and narrative. Should you have any objections to this proposal, please send your written comments to Roy Brownlow, District Manager, at 400 Commerce Avenue, Morehead City, NC 28557, within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions on this project, please call me at 252-773-0090, or email me at ron@tcgpa.com HESTRON PLAZA TWO 251-A NC H WY 24 MOREHEAD CITY, NC 28557 (252) 773-0090 Sincerely, G� onald D. Cullipher, .E. RECEIVED Agent OCT 13 2020 4--)CM-MHD CITY UvS�s. use T—kk sF x + E a C M tooluaps.mm/ga/f�mA ?tPal=fullpa &tU=2&te428M=&tUa=701a015000Wd7184225%C auspsrom- ma&Ship Tnekfibbn.g. USPS Tracking° Track Mother Package t Tracking Number:70140150000047884225 Vour Mem was d ersd to an hd,,dual at the address at 11;06 am on September 3, 20201n NEWPORT, NC 28570. ®rMa Qt�.m�.. swv=n x'i�ia..,ee ow..n nre.w.is,c„ul1 PasWw Stan ex.In... Merrmtlerial Help Q Tr.kh Y M(U) C,et ttreiree Iitlarn�ed DeliveryaleaNire ro receNe wtorruled roefratwrn on ya++Pac�9ss Status G Delivered Septembo 3.2020 M IIM am OalNared. Lefty MN NEWPOFtT. NC 28570 Get Upaat" V Remove x 9 T*xt ✓1 EmM Updatm V Traddng Xk1ury V Product bdorm dlon V See Less Can't find what you're looking for? Go to our FA03 seolion to f§td a.. to your lraekirg questkxts. fQ Type here to searr O .� mm ti A x - m v w o m N O uIDSyern.. u5R rhaday. e x } f 4 0 A mo4wpcmMgnRrxKmfiimA nigtc tlabekt=701d01500000CMW49 - a x it O V:2-USPS.COM USPS Tracking' Track Another Package + Mail &Ship Track &Manage Tracking Number. 7O14O15OOOOO47884249 Your Item was delivered to an individual at the address at 11 03 am on September 3. 2O20 in NEWPORT. NC 28570, ® pa. O rea.v,. r. 1 1 -- Peaul $ton Siamese, lmematienal Treedes MO.> G,e! the bee IMermad DeiNeryB feature to receive .r. cmAW nph r rprrs on y packages Statue G Delivered September 3, X20 at ll.M an / Oaliwnd, Leh v dh L ,vldusl NBVFCQT. NC 28570 Get Updates V Text a Email Updates V Treekinp History V Product Information See Lee. ^ Can't find what you're looking for? Remove x u Go to our FAQ3 section to find answers to your tiaclung questions. UP�haeeO9gp�. o m -` 0 _ M < n o 0 m 0 ROY COOPER Gnrer»m' MICHAEL S. REGAN Secreraip BRAXTON C. DAVIS Direclm' Coastal Management ENVIRONMENTAL QUALITY October 19, 2020 Ms. Margaret Taylor PO Box 737 Snow Hill, NC 28580 Dear Ms. Taylor: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located adjacent to the Adams Creek ICW at 786 Sea Gate Drive near Newport, Carteret County. It was received on October 13, 2020, and appears to be adequate for processing at this time. The projected deadline for making a decision is December 27, 2020. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from October 13, 2020, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right- of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. Nothing Compares State of North Carolina I Envhomnental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 .... , : 252808-2808 T Taylor Page 2 of 2 10/19/20 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Brad Connell Coastal Management Representative BC Enclosure CC: Gregg Bodnar, Asst. Major Permits Coordinator Roy Brownlow, District Manager Ron Cullipher, The Cullipher Group, PA nothing Compares State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I, Morehead City, NC 28557 252 8082808 T N0T1(0*'$170A LAMA PERMIT APPLIED FOR PROJECT: Construction of a 4-slip docking facility adjacent to the Adams Creek ICW at 786 Sea Gate Drive. COMMENTS ACCEPTED THROUGH November30, 2020 APPLICANT: Margaret Taylor PO Box 737 Snow Hill, NC 28580 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW Brad Connell - DCM 400 Commerce Avenue Morehead City, NC 28557 (252)808-2808 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on October 13, 2020. According to said application, Ms. Margaret Taylor proposes to make construct a 4-slip docking facility adjacent to the Adams Creek ICW, at 786 Sea Gate Drive near Newport, Carteret County. A copy of the entire application may be examined or copied at the office of Brad Connell, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808-2808 during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to November 30, 2020, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISHED ON: November 8, 2020 Nothing Compares�..� State of North Carolina I Environmental Quality I CoasW Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 T ROY COOPER Govemor MICHAEL S. REGAN BRAXTON C. DAVIS 00, Coastal Management ENVIRONMENTAL QUALITY October 19, 2020 The Carteret News Times Legal Advertisement Section 5039 Executive Drive, Ste 300 Morehead City, NC 28557 Re: Public Notice — Margaret Taylor Dear Sir: Please publish the attached Notice in the November 8, 2020 issue of the News Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Jessica Gibson, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, Brad Connell Coastal Management Representative Enclosure cc: Gregg Bodnar Roy Brownlow Nothing Compares State of Noah Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 T ***This is a word processing form to be completed in Microsoft Word — NC Division of Coastal Management Major Permit Application Computer Sheet (11/1/2012) Applicant: Margaret Taylor Date: 10/1220 Project Site County: Carteret Staff: Brad Connell District: OElizabeth City Washington ®Morehead City ❑Wilmington Project Name: Taylor dock Date of initial application submittal (EX: 1/8/2007): 91120 Date application "received as complete" in the Field office (EX: 1/82007): 10111312020 Permit Authorization: ®CAMA Dredge & Fill Both SITE DESCRIPTION/PERMIT INFORMATION PNA: Yes ®No Photos Taken: Yes ❑ No® Setback Required (riparian): Yes No Critical Habitat: ❑Yes ONo Not Sure 15 foot waiver obtained: Yes ZNo Hazard Notification Returned: ❑Yes ®No SAV: Yes ZNo Not Sure Shell Bottom: Yes MNo ❑ Not Sure Temporary Impacts: ❑Yes ®No Sandbags: Yes ZNo Not Sure Did the land use classification come from county LUP: ®Yes ❑No Mitigation Required (optional): []Yes []No Moratorium Conditions: Yes ®No []NA Environmental Assessment Done: I ❑Yes ❑No ® NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) WETLANDS IMPACTED El (404) Corp. of Engineers (Jurisdictional (LS) Sea lavender (Limonium sp.) (SS) Glasswort (Salicornia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) (SA) Salt marsh cordgrass (Spartina (SY) Salt reed grass (Spartina altemiflora) cynosuroides) (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or three square (Scirpus (TY) Cattail (Typha sp.) spicata) sp.) (JR) Black needlerush (Juncos ❑ (SP) Salt/meadow grass (Spartina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 III(A) Private w/ D&F up to 1 acre; 3490 ❑ III(D) Priv. public or Comm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 Permit Transfer - $100 ❑ III(B) Public or commercial w/ D&F to 1 Express Permit - $2000 acre; 3490 can be applied - $400 Major development extension request - II. Public or commercial/no dredge $100 and/or fill - $400 I. Private no dredge and/or fill - $250 El III(C) Priv. public or Comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 252-806.2808 :: 1.888-4RCOAST :: www.neeoastalmananement.net revised: 02115110 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant: Taylor Dale: 10/23/20 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension Dimension 4 One One 3 Pier 2 New work ® Replace (" 5' 24', 20' Maint ❑ ®Y ® N Platform 1 New work Replace 12' 32' (floating) Maint ❑ ®Y ❑ N Finger piers 2 New Work Replace 6' 32' Maint ❑ ®Y ❑ N Boat slips 4 NewWorkEF Replace Maint ❑ I ❑ Y ON Platform 3 NewWorkN Replace 4.5', 8', 10' 14', 32', 12' floatin Maint ❑ ❑ Y UN revised 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant: Taylor Date: 102320 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Open Water Dredge ❑ Fill ❑ Both ❑ Other ® 3744 ft2 3744 ftz Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: w .nccoastalmanaaement.net revised: 02/15/10 MAJOR PERMIT FEE MATRIX ,Applicant: VA .Ir K , A U.4 & AVOV�- *960 W o9H A Selection Development Type Fee DCM % DWQ (14300 1601 4351000931625 6253) (24300 1602 435100095 2341) I. Private, non-commercial development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or open water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Ma or oermit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non - El commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 4097 (See attached can be applied: III(B). Public or commercial development, if General 00% ($400) 0% ($0) Water Quality Certification No. 4097(See attached) III can be applied: III(C). If General Water Quality Certification No. f$4006O%($240) 40% ($160) 4097 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) cannot be applied: IV. For development that ❑ involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or open water areas: DCM Coordinator: Gregg Bodnar Applicant: ay Distributed Yes® No ❑ Date• AGENCY WIRO WARD LPDXw�Y�'h J Rachel Love Adrick A Rachel Love Adrick Washingon DCM Planner Mike Christenbury Wilmington Charlan Owens Eliz City US COE: Liz Hair If Raleigh Bland (Beaufort Camden, Chowon, (Carteret Onslow, Pender) Craven, Hertford, Hyde, Perquimans, Tyrrell) Greg Curry Josh Peletier — (Bertie, Currituck, Dare, Gates, (Brunswick, New Hanover) Pamlico, Pasquotank, Washington) USCOE (NC DOT) DOT Brad Shaver DOT - Tom Steffans—(Beaufort, Carteret, (Brunswick, New Hanover, Onslow, Craven, Pamlico Pender) Mark Zeigler (Onslow, Pender, New Community Assistance Hanover, Brunswick) Lee Padrick (Beaufort Carteret Craven, Eliz Lee Padrick (Beaufort Carteret Craven City, Pamlico, Washington) Eliz City, Pamlico, Washington Cultural Resources Renee Gledhill -Earley Renee Gledhill -Earley Div. of Water Infrastructure Heidi Cox Clif Whitfield Marine Fisheries it 00"Ityly 1 y+� James Harrison NC DOT 30 David Harris David Harris Shellfish Sanitation Shannon Jenkins & Sharon Gupton Shannon Jenkins & Sharon Gupton State Property Tim Walton & Mike Moser & Wanda Tim Walton & Mike Moser & Wanda Hillard Hillard DEMLR/DWR: Sheri A. Montalvo Sheri A. Montalvo (NC DOT) Kristy Lynn Carpenter Kristy Lynn Carpenter DEMLR Sediment & Erosion Dan Sams Samir Dumpor Storm water Christine Hall Roger Thorpe DWR 401 Robb Mairs (Carteret, New Hanover Chris Pullinger Onslow, Pender, Brunswick —until further notice) (NC DOT) Joanne Steenhuis Brunswick, New Garcy Ward Hanover, Onslow, Pender WRC Maria Dunn (WARD) Maria Dunn (WARD) WRC (NC DOT) Travis Wilson Travis Wilson Natural Heritage Program flodney Butler Rodney Butler T:\MAJOR PERMITS SECTION\Permits\Forms and Templates\Admin\Maj Comment Distribution Sheet 2020.docx Revised : 5/7/2019 0 October 23, 2020 MEMORANDUM. FROM Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg. bodnar(iDNCDENR.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Margaret Taylor Project Location: 786 Sea Gate Dr, Newport Carteret County Proposed Project: Expand existing docking facility ROY COOPER Governor MICHAEL S. REGAN Secrclary BRAXTON DAVIS Dimclor, Divaum gfCoaaal Manageniem Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greaa Bodnar at the address above by November 20, 2020. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. PRINT NAME AGENCY SIGNATURE DATE This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. State ofNonh Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext, Wilmington, NC 28405 919 796 7215