Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1-20 Petty, Joan & Glenn
Permit Class *EW Permit Number 1-20 STATE OF NORTH CAROLINA Department of Environmental Quality and 0 Coastal Resources Commission 0 Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Joan and Glenn Petty, 776 Ransdell Rd., Louisburg, NC 27549 Authorizing development in Carteret County at adi to Brooks Creek at 113 Maxwell Dr., on Harkers Island , as requested in the permittee's application dated 8/21/19 (MP-1,4) and dated "Received DCM MHD City 8/28/19" (MP-2), incl art workplan drawings (4), Survey and C1-C3 all dated "Received DCM MHD City 8/28/19". This permit, issued on January 2, 2020 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation )f these terms may be subject to fines, imprisonment or civil action; or may cause the permit to oe min aria voia. Dockine Facility Replacement 1) This permit authorizes only the demolition of the existing docking facility and the construction of the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2023 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary or Dial ana the Unar of the Coastal Resources Commission. —fay Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Joa -and Glenn Petty Permit No. 1-20 Page 2 of 4 ADDITIONAL CONDITIONS 3) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 4) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 5) This permit authorizes a maximum of 2 formalized boat slips. 6) The authorized covered platform shall not be enclosed. Any material used on the sides shall not obstruct view and shall be permeable to air and water. Screen or wire on the sides along with benches are permitted. Lattice is specifically excluded from being used under this authorization. 7) The roof of the covered platform shall not be designed for second story use. 8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Excavation 9) In order to protect juvenile shrimp and frnfrsh populations, no excavation or filling shall be permitted between April 1 and September 30 of any year without the prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies. 10) No excavation shall take place outside of the area indicated on the workplan drawings. 11) Excavation shall not exceed -4.5 feet below the normal low water level. In no case shall the depth of excavation exceed the depth of connecting waters. 12) The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. 13) No excavated or fill material shall be placed at any time in any vegetated wetlands or surrounding waters. Spoil Disposal 14) No spoil material shall be placed within 30 feet of the normal high water line. 15) All excavated materials shall be confined above normal high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. 16) The spoil disposal area shall be inspected and approved by a representative of the Division of Coastal Management prior to the commencement of any dredging activities. 4oa r� and Glenn Petty Permit No. 1-20 Page 3 of 4 ADDITIONAL CONDITIONS 17) The permittee and/or his contractor shall take all necessary precautions to ensure that the spoil material is properly contained during transport to the disposal site, and that all the proper coordination has taken place with the local or state governments to ensure that any damage to public streets caused by transport of the spoil material has been addressed. 18) In order to protect waters adjacent to the designated dredge spoil disposal site, the permittee shall provide the Division of Marine Fisheries — Shellfish Sanitation Section the dredge plan and the location of the spoil disposal site prior to any dredging activity, so a swimming advisory or shellfish closure determination can be made, and documentation of this coordination provided to the Division of Coastal Management. Maintenance Clause 19) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any maintenance excavation work authorized by this permit, and such notification shall include: A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the original permit plans with cross -hatching indicating the area to be maintained, the area to be used for spoil disposal, and the estimated amount of material to. be removed. The location, design and holding capacity of the spoil disposal site shall be approved by a representative of the Division prior to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee's signature shown anew on the original plan. USACE Conditions 20) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish & Wildlife Service's Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at http://www.fws.aov/ne-es/iiiai-ninal/maiiatee auidelines.odf. General 21) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 22) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third parry. 23) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2019-02174). Joan_ and Glenn Petty Permit No. 1-20 ' Page 4 of 4 ADDITIONAL CONDITIONS NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2019-1287. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Glenn & loan Petty COUNTY: Carteret PROJECT NAME: LOCATION OF PROJECT:113 Maxwell Dr. Harkers Island DATE APPLICATION RECEIVED COMPLETE BY FIELD: 9123119 FIELD RECOMMENDATION: Attached: To Be Forwarded: n/a CONSISTENCY DETERMINATION: Attached: To Be Forwarded: n/a FIELD REPRESENTATIVE: Ryan Davenport DISTRICT OFFICE: Morehead City DISTRICT MANAGER REVIEW: B) DATE RECEIVED BY MAJOR PERMITS UNIT: PUBLIC NOTICE REC'D: 9/25/19 ADJ. RIP. PROP NOTICES REC'D:: &28119 APPLICATION ASSIGNED TO: "W - C) 75 DAY DEADLINE: ` ('7114 MAIL OUT DATE: FEE REC'D: $400.00 END OF NOTICE DATE: DEED REC'D: 8128119 ON: 9 "N q 150 DAY DEADLINE: T' Zl Zo STATE DUE DATE: tcqZ, 1( 9 AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES DCM — Field Representative tt lZ���9 tiZGyo.�ru c DCM — LUP Consistency Determination to Z 9 C ; Local Permit Officer Corps of Engineers — Regulatory Branch 12l ( 7,0149Q-07A7 D WR — 401 Section it 174 DWR — Public Water Supply DENIER — Stormwater Management DEMLR — Sediment and Erosion State Property Office lc/lZ >, Wildlife Resources Commission i1(1-7 DMF — Shellfish Sanitation Section 9 LG ((I I kL DMF — Habitat & Enhancement 104'7 1 q "' � >6� ( g. 3 DNCR — State Historic Preservation Office 10/7 4 DNCR — Natural Heritage Program NCDOT DCA — Rural Economic Development Q 1� 1 Roy."Co"009ii M.ICHA%BL',&. REGAN ;BXAXTON DWY-11 S DI September, 23, 2019 MEMORANDUM: FROM:; Gregg BIb'd1'n1a1lr1; Assistant, Major Permits Co o' rdirtptor NCDEQ-DIvIsIonWCoasteWanagenjentI 406:Commerce 'AvehM01eload.CI ,IN`C28567 wipotot: 0AWIld Appllcant: Glenn.'& Joan Petty Project Location: 113 Maxwdll'Vr. Harkbia Island, Cirtqrot County Proposed Project: ProposegAo roplado exl6tIng pier and, dredge Please Indicate below yourag.6hcy,s;oositi6h,or.v!eWool6t on:the Ordposed:projdct:alnd roturnAls form io:Gregiyr8odha it the addressaboiia bysOotdberl1j,2019: lfyouIhavelany questions, ragardidg,tho lorppip4q. . 007Z008-w q-approprjate, In-dept4cbrilments 4 p_jo.jq.ct,,'jqpn (2Q)'Q with suppOrting.d�kta,is�rqqqpste,d.;, REPLY: This I agency has no, 00i0lin'to ihe1pFqjecVas propqELeq;: "Additional comments be attk4;ftqd-" This agency has no comment on the;pr6posad project, This agency'approves,o , of the project -only If-the'recommended'eha.ng,es are Incol'pdrated.. See attactietl; This agendy'abjects to the prpfort,f6r-reasons,-40scribed'in the attached comments. RECEIVED SEP 2 6 2019 MP SECTION MHD I.EavimmentA al MM MI . qgtM 400 Cmmim Am Morehead City, NC 28557 (2520004808 NORTH CAROLINA r+:vlingrrl+lN<If k+rr�lfj• September 23, 2019 MEMORANDUM: FROM: Gregg,Bodnar, Assistant Major Permits Coordinator NCDEQ Division of•Coastal:Management 400 Commerce Ave„ Morehead City,, NC 28557 Fax: 252-247-3330 (Courier 04 18.33) areoc.bodnar('la ncdenr.00v SUBJECT: CAMA Major Permit Application Review Applicant: Glenn & Joan Petty Project Location: 113 Maxwett:Dr. Harkens Island, Carteret County Proposed Project: Proposes to replace existing pier and dredge ROY MICHAEL S. BRAXT`ON Mma"Iq DfWs Please indicate below your agency's position or viewpoint on the:proposed project and return this form to Gregg Bodnar at the -address above by October 21, 2019, If you have regarding the proposed project, contact Heather Styron (252) 808-280&when.appropriate, in-c with supporting data is requested, REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" his agency has no comment on the proposed project. This agencyapproves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached pRINT NAME e eGt AGENCY; IV L Ce) M M ti^l;c- SIGNATURE ; SEP 2 7 2019 MP SECTION MH® State of North Carolina 1, Environmental Quality i Coastal MamaBentenl 400 Commerce Ave. Morehead City, NC.28557 (252)80872808 ''�eao..,r• NORTH CAROLINA En vironntental,Qnpltty September23, 2019' MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Perm ts'Coordihator NCDEQ - Division of Coastal,Management 400 Commerce Ave., Morehead City, NC 28657 Fax:252447-3330 (Cour1i1rQ=16; 3J aregg.bodri4 a.ncdenr.gov SUBJECT: CAMA Major .Permif Application Review Applicant: Glenn'& Joan Petty Project Location: 113 Maxwell Dr. Harkers Island, Carteret County Proposed Project: Proposes to replace existing pier and dredge ROY COOPER Gmemor 141ICHAEL S. REGAN Secrelary BRAXTON:DAVIS Dimclor, DNisioli ofCoar/nl Mmmgemenl Please indicate below your agency's position or viewpoint on the proposedproject and return this form to Greaa Bodnar at the address- above by October 21, 2019. If you have any questions regarding; the proposed project, contact Heather Styron (252) 808-2808when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the.project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the.project only if the recommended changes are incorporated. See attached. _ This agency objects to the project for reasons.described in, the attached comments.. X See Attachedl PRINT NAME Shannon Myers KGENcV Shellfish Sanitation and Recreation Water Quality RECE0�E® SIGNATURE for Shannon Jenkins SEP 2 7 2019 IMP SECTION 6� HD pATE September 26, 2019 $tat. orNmih'Caroliva l ;Lnvironmemel Quality I Coastal'Managemenl 400 Cwna,rde Aeu Morehead City, NC 28557 (252) 808e2808 ROY COOPER Governor MICHAEL S. REGAN Secretary STEPHEN W.MURPHEY Director September 26, 2019 MEMORANDUM TO: Gregg Bodnar, Major Permits Processing Coordinator Division of Coastal Management From: Shannon Myers, Environmental Specialist Through: Shannon Jenkins, Section Chief Shellfish Sanitation & Recreational Water Quality SUBJECT: CAMA Major Permit Application Review Applicant: Glenn and Joan Petty Project Location: 113 Maxwell Drive, Harkers Island, Carteret County Proposed Project: Proposes to replace existing pier and dredge The planned spoil disposal site for this project is not specified within the application. Because the dredge material is being removed from an area that is closed to shellfishing, discharges from the dewatering of the spoils into swimming waters between the months of April and October will cause a swimming advisory to be posted. Additionally, any discharge from the dredge spoils at any time into approved shellfishing waters will cause a shellfish closure. It is requested that our section be notified of the dredging plan and spoil disposal location prior to any dredging activity once a contractor is selected, so that we can determine at that time if a swimming advisory or shellfish closure is needed. RECEIVE® SEP 2 7 2019 MP tECTBON 61 HD State of North Carolina I Division of Marine Fisheries 3441 Arendell Street I P.0.13= 769 I Morehead City North Carolina 28557 252-726-7021 0 September 23, 2019 MEMORANDUM FROM Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) arena bodnaraZncdenr.gov SUBJECT, CAMA Major Permit Application Review Applicant: Glenn & Joan Petty Project Location: 113 Maxwell Dr. Harkens Island, Carteret County Proposed Project: Proposes to replace existing pier and dredge ROY COOPER Gnrrmor MICHAEL S. REGAN Sa Wry BRAXTON DAVIS 61rtxror, fhn, m ufCo Id mw,.g mm Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greaa Bodnar at the address above by October 21, 2019. If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME VAC-HEL 6VE-40RI CY AGENCY SIGNATURE -� DATE I01211q Sure M'Nwh Carolina Fmvonmenul (Mbly I Coaval ManaBcmrnl 40DCbmner"Me Morehead Cl(y,NC28532 (252)8062808 RECEIVED SEP 2 6 2019 DCM-MHD CITY ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director MEMORANDUM NORTH CAROLINA EnvfronmentalQtwBty TO: Gregg Bodnar, Asst. Major Permits Coordinator Division of Coastal Management FROM: Rachel Love-Adrick, District Planner/ti pi Division of Coastal Management * ( SUBJECT: Major Permit Application by Joan & Glenn Petty Date: October 2, 2019 Consistency Determination: The request is consistent with/not in conflict with Carteret County Land Use Plan certified by the CRC on December 20, 2010. Overview: The project is located at 113 Maxwell Dr., Harkers Island, Carteret County; adjacent to Brooks Creek. The property is .69 acres and existing development includes a single family home and a two slip docking facility. The applicant is proposing to excavate around their planned dock to create a channel to connect to the existing channel that leads to into Harker's Island Harbor of Refuge. The excavation would be 47.5' long and 48.3' wide with a final depth of-4.5' at NLW. A total of 213 cubic yards of material would be excavated during this project. The new dock would be located in the same footprint as the existing dock. The new dock would have a 17' x 21' covered platform, and a 13' x 13' boatlift would be placed on either side of the platform. AECs onsite include Estuarine Waters and Public Trust Areas. Brooks Creek surface water classifications are SA (Market Shellfishing, Salt Water) and HQW (High Quality Water). The site is not designated as a Primary Nursery Area, SAV is located near the shore, and is closed to the harvest of shellfish. A 50' fringe of high and low marsh exists along the shoreline. There are oysters in the intertidal zone along the shoreline. A review of historic/cultural resources was not provided. Anticipated impacts Excavation will result in the disturbance of 2,294 ft2 of shallow bottom habitat that has not been previously excavated. Turbidity impacts can be expected during the removal of the 213 cubic yards of material. Final bottom soundings will be -4.5' NLW connecting to -6' NLW and greater. Intended use of this project is for boating ingress and egress to an existing two slip docking facility that will be replaced in the same North Carolina Department of Environmental Quality i Division of Coastal Management Morehead City Office i 400 Commerce Avenue I Morehead City, North Carolina 28557 252.808.2808 footprint. The 300 ftZ of Coastal Wetland shading would remain the same. The dock would usurp 995ft2 of PTA and shade 657ft2. Basis for Determination: The project site is subject to the 2005 Carteret County Land Use Plan Update. The Future Land Use Map (FLUM) designates the site as Limited Transition (land) and Conservation (Areas of Environmertal Concern). Uses allowed in Areas of Environmental Concern are those consistent with the State's minimum use standards and state and federal regulations. The following LUP policies may be applicable to this request: Policy 2.4 Carteret County's policies for development in estuarine and public trust waters are as follow: 1. Carteret County will only allow development activities in estuarine and public trust waters that are associated with water -dependent uses, consistent with state and federal standards, and meet all local policies contained in this plan. 3. Marinas and other docking facilities must be constructed in accordance with state requirements and must meet local requirements contained in 1.0 Public Access. RWMW IFm4MhM�M@W� North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252:b08.2808 Car d-r` (V Received: 09/24/2019 • State Historic Preservation Offi&PY COOPER A jfr:,, Cawmw MICIIAEL S. REGAN >nkan BRAXTON DAVIS n,�. lxwMa, oJ('oaraf ManaxrweM September 23, 2019 ER 19-2874 MEMORANDUM I)ue - 10/9/ 19 FROM Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16.33) gregg.bodnarancdenr.gov A- SAlow SUBJECT CA MA Major Permit Application Review t o/ V Applicant: Glenn S Joan Petty Project Location: 113 Maxwell Dr. Harkers Island, Carteret County Proposed Project: Proposes to roplace existing pier and dredge Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by October 21, 2019. If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. Th s agency approves of the project only if the recommended changes are incorporated. See attached Ths agency objects to the project for reasons described in the attached comments PRINT NAME Renee Gledhill -Earley AGENCY State Historic Preservation Office SIGNATURE RECEIVED DATE ID "� ' OCT 0 7 2019 DCM-MHD CITY Sii,ne I Fmvnsac,nY Q%.W' I C.Md Mans .., BOO Cnnnk A%t M,n o,eld t„Y. KCUSS7 t21=18011-2M SEP 2 5 2019 SEP 2 3,2019, IX NORTH CAROLINA Fmvonnt; jrtul Quality September 23, 2019 MEMORANDUM: FROM: Gregg,Bodnar,AssistantMajor PermitsCoordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NO 28557 Fax: 252-247-3330'(Coyr 18 33j aredd,bod nar(aZncdenr.gov SUBJECT: CAMA, Major Permit Application Review Applicant: Glenn & Joan Petty Project1ocation: 113 Maxwell Dr. Harkers Island, Carteret County Proposed Project: Proposes to replace existing pier and dredge ROY COOPER Gos•emor MICHAEL S. REGAN $enmary BRAXT.ON DAVIS Wl Clor. now." ofc ayat Afanagemnll Please indicate below your agency's position or viewpoint on the proposed project and return this; form to Gregg Bodnar at the address: b ve by October 2l, 2019. Ifyou have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate; in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project,onlyif-the recommended changes are incorporated. See attached, This agency objects to the project for reasons described in the attached comments. 9 P.t�� RECEIVE® OCT 2 1 2019 MP SECTION Mfg® Slate or North Carolina i 1711aironmental Quality i Coastal Mnnaecmnil 00 Comment Ave. Morchead City, NC 28557 (252) 808-2808 0 0011111 OAWAINA f }p•1r41Illi2plc]i7):f0iill' _ __ September23,_2019 _ MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits. Coordinator NCDEQ:- Division. of Coastal -Management 40Q Commerce Ave., Morehead City, NC 28557 Fax: 262-247-3330'(Coarier 04.1643) gregg.bodnarCgd)ncdenngov SUBJECT: CAMA Major Permit Application Review Applicant: Glenn & Joan Petty Project Location: 773.Maxwell Dr. Harkers Island, Carteret County Proposed Project: Proposes to, replace existing pier and dredge ROY COOPER (m'rnrur MICHAEL S. REGAN +.nwory BR'AXTON DAVIS nueclk nia-von ufcoaval ,llnnngernent Please, indicate below your agency's position or viewpoint:on the proposed project and returnthis form to Greaa'Bodnarat'the address above by October 21, 2019. If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project'as,proposed, "Additional comments may be:attached" v This agency has no comment on the proposed project. P'9 This agency approves of the project only if the'recommendetl changes a.� Cln✓� are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT,NAME wCiACLO- Lli arc AGENCY SIGNATURE ""awla_ kj ""eg_) DATE ltCY�`� c'��ia2Udq tl`0EO/ENIED OCT 2 3 2019 IIMP SECTION MHD Slate ofNath Carolina I Eucironinealal Qualliy I Coastal Ma,.8cincnl 400Conuisercc'A%v.Morehead Ciiy,NC28557 (252)808.2808 1 . q`. i �Qsif#t 't$fdAR+YIr ix ,.:t 1:13r3E4p dch+ rt ,fa;raW txlkr; 4t"71av �) 1•,4k;t'et DocuSign Envelope ID: 87782082-65C9A5AD-B9D3-C8CCD8FF9394 ROY COOPER Governor MICHAEL S. REGAN secretary LINDA CULPEPPER Director Joan and Glen Petty 776 Ransdell Road Louisburg, NC 27549 Subject Property: NORTH CAROLINA Environmental Quality November 7, 2019 DWR Project # 2019-1287 Carteret County 113 Maxwell Drive- Brooks Creek- Barkers Island Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. and Mrs. Petty, You have our approval, in accordance with the attached conditions and those listed below to allow for new excavation of a boat basin, and the replacement of an existing private docking facility within Brooks Creek, as described in your application received by the N.C. Division of Water Resources (DWR) on August 24, 2019. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number 4175 (GC4175). This Certification allows you to use the General Permit No.198000291 when issued by the U.S. Army Corps of Engineers. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non -discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit This Certification can also be found on line at: httn•//aortalncdenro> web/wg/swo/ws/401/certsandpermits. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given North Carolina Department of Environmental Quality I Division of Water Resources D_E �� Wilmington Regional Office I IV Cardinal Drive Extension I Wilmington, North Carolina 28405 ' DocuSlgn Envelope ID: B7782082-65C9A6AD-B9D3-C8CCD8FF9394 a copy of this approval letter and General Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name 115A NCAC 02H .0501 and .0502}. 2. Any final construction plans for this project must include or reference the application and plans approved by the Division under this authorization letter and certification. The applicant will also be required to evaluate all acquired permits to assure that they are consistent and all relative impacts are accounted for and shown on the construction plans. [15A NCAC 02H .0502 (b) and 15A NCAC 02H .0506 (4)] The applicant shall require his contractors (and/or agents) to comply with all of the terms of this Certification, and shall provide each of its contractors (and/or agents) a copy of this Certification. 3. A pre -construction meeting must be held with the Division prior to the start of the project phases so that the contractors and/or agents fully understand the conditions associated with this certification. [15A NCAC 02H .0507 (c) and 1'5A NCAC 02H .0502 (e)] 4. Turbidity Standard The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 213.0220. Appropriate sediment and erosion control practices must be used to meet this standard. Turbidity curtains shall be used as appropriate. Please notify this Office if any turbidity issues arise at 910.796.7215 S. All wetlands, streams, surface waters, and riparian buffers located within 50 feet of the construction area on the project site shall be clearly marked (example- orange fabric fencing) prior to any land disturbing activities and must be maintained on the property until the project phase is completed. [15A NCAC 02H .0506 (b) (2) and (c)(2) and 15A NCAC 02H .0507 (c)] 6. Appropriate measures should be installed prior to any land clearing activities to protect waters and wetlands from turbidity and/ or sedimentation. These measures should be routinely inspected and properly maintained, and excavated materials should be contained outside the wetland boundary. Excessive silt and sediment loads can have numerous detrimental effects on aquatic resources including destruction of spawning habitat, suffocation of eggs, and clogging of gills of aquatic species. [15A NCAC 02H .0506 (b)(3) and (c)(3)] 7. This General Certification shall expire on the same day as the expiration date of the corresponding General Permit. The conditions in effect on the date of issuance of the Certification for a specific project shall remain in effect for the life of the project, regardless of the expiration of this Certification. 8. The permittee shall require its contractors and/or agents to comply with the terms of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project a copy of this certification. A copy of this certification including all conditions shall be available at the project site during the construction and maintenance of this project. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] DocuSign Envelope ID: B7782082-65C9-45AD-B9D3-C8CCD8FF9394 9. Continuine Comnliance: The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with 303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, than the Division may reevaluate and modify this General Water Quality Certification. [15A NCAC 02H .0507(d)] 10. All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permittee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Wilmington Regional Office at 910.796,7215 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act [15A NCAC 02H .0506 (b)(3) and (c)(3), 15ANCAC 02B .0200 (3)(f), and GS 143 Article 21A]. 11. Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(0]. 12. This certification grants permission to the director, an authorized representative of the Director, or DEQ staff, upon the presentation of proper credentials, to enter the property during normal business hours 15A NCAC 02H.0502(e). 13. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant and/or authorized agent is required to return a completed certificate of completion form to the NCDEQ DWR 401 and Buffers Unit North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699 within ten days of project completion. The certification of completion is available at: http• //portal ncdenr org/web/wq/swp/ws/401/certsandpermits/apply/forms). Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing DocuSign Envelope ID: 67782082-65C9-45AD-B9D3-C8CCD8FF9394 fee is received in the OAH during normal office hours (Monday through Friday between 8:00 am and 5:00 pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (S) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Ifsending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: Bill Lane, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please telephone Robb Mairs in the DWR Wilmington Regional Office at 910.796.7215 or Robb MairsOncdering-ov. Sincerely, 1DocuSIgned by: 1wn& 5 .� 6" Morella Sanchez King,'Wegioiial Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ Enclosures: GC 4175 Liz Hair - USACE Wilmington Regulatory Field Office -Electronic Copy DWR 401 & Buffer Permitting Branch file-LF Gregg Bodnar- NCDCM Morehead City Office -Electronic Copy Avolis Engineering, PA (avolisengieering@embargmail.com)- Electronic Copy WiRO Bodnar, Gregg From: Davenport, Ryan Sent: Monday, November 25, 2019 4:58 PM To: Brownlow, Roy Cc: Bodnar, Gregg Subject: RE: Petty G regg, I recommend the permit be issued based on comments from resource agencies. Ryan From: Brownlow, Roy Sent: Monday, November 25, 2019 1:00 PM To: Davenport, Ryan <ryan.davenport@ncdenr.gov> Cc: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: RE: Petty Ryan, Please submit any recommendations or conditions you would have for the Petty dock and dredging project in HI. Please copy me on those when submitting. Thanks, Roy Brownlow District Manager, Division of Coastal Management North Carolina Departrnent of Environmental Quality 252.808.2808 (Office) Roy.Brownlowonodenr igov Enal caresWxfer" to wd kan ribs acoass s strtncr b No NWh C&okw FLt&, Auc�, Law arKY rrxry fxr (AgjrAWW to tYwdtra M From: Bodnar, Gregg <Rregg.bodnar@ncdenr.gov> Sent: Monday, November 25, 2019 10:47 AM To: Davenport, Ryan <rvan.davenport@ncdenr.gov> Cc: Brownlow, Roy <roy.brownlow@ncdenr.eov> Subject: Petty Any Recommendations? Gregg a3 riohTnl'AP ftdtk, 7trri�von+n.ntat(?:ta,ir�� ;E.'1�1•D`1.,2`�'•c��1:, September 23,209 MEMORANDtIMt FROM:, GreggB ROYcopp' Qnlwgt.. MICH 1EL 9. REOAN smrinry BRAXTON DA'VIS L/n?tor_ Ulwvmi b/c6aifal, illunn�;enlegl gtiP 2©19 SUBJECT: LAMAN1aJolrPermitApptication,Review l�E Applicant: Gtenn &;Jon Petty j arkers;island, Caiferet county Pro ect Location^ 113 Maxwell.Dr. H„ I P.ioposed.Project:, Proposes to replace existing,pier and dredge Please indicate below your agericq position or viewpoint on"the proposed project and return this form to,Grega Bodnar'atthe address above by Octpber 29, ?019. If you have anypquesbons, re gardingahe proposed project, cohtact Heather Styron (252) 808-Z80$"when appropr!at e,'$71depth comments. .with supporting data is.requested'. REPLY. This agenc has no objection to the project�as proposed. '"Additionaljcommentsmay be -attached" This agenc, has no comment,on the prpposed project: This agenc�, approves<of the project only if.the recommended; changes: are incorporated, See attached, I This''agency'objects to the project for reasonsi described in the attache&cojnments. P�GENCY ;SIGidCA: URE RECEIVED DEC 2 2019 MP SECTION MHD enl Bodnar, Gregg From: Mairs, Robb L Sent: Thursday, November 07, 2019 8:55 AM To: Bodnar, Gregg Subject: RE: Projects Gregg, please see below. Letters will follow through LF. Thanks, From: Bodnar, Gregg Sent: Wednesday, November 6, 2019 11:03 AM To: Mairs, Robb L <robb.mairs@ncdenr.gov> Subject: Projects Hey Robb, Just checking in on a few... Moorecoastal Investments: This will not require written approval (DWR#2019-1269). Mark yusko: This will require written approval (DWR#2019-1234) through our GC 4175. Wainwrights Slough: This will require written approval (DWR#2019-1032) through our GC 4175. Joan and Glenn Petty: This will require written approval (DWR#2019-1287) through our GC 4175. Thanks, Gregg Gregg Bodnar Assistant Major Permits Coordinator �� Division of Coastal Management NKDepartment of Environmental Quality 252 808 2908 ext 215 (Office) V Greee.Bodnar(Oncdenneov Emoil correspondence to and from this address is subject to the North Carolina Public Records low and moy be disclosed to third parties. Bodnar, Gregg From: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Sent: Friday, November 08, 2019 12:46 PM To: Bodnar, Gregg Subject: [External] RE: Projects CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to repo rt.spam@nc.gov<mailto:repo rt.spam@nc.gov> Petty Action ID is SAW-2019-02174. Processing as PGP 291. Notice will go out today -----Original Message ----- From: Bodnar, Gregg [mailto:gregg.bodnar@ncdenr.gov] Sent: Wednesday, November 6, 2019 11:27 AM To: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Subject: [Non-DoD Source] Projects Hey Liz, Just checking in on a couple... Wainwrights Petty Thanks, Gregg 1� 1 z/� fig DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 December 12, 2019 Regulatory Division Action ID No. SAW-2019-02174/113 Maxwell Drive/Petty dredge Mr. Jonathan Howell Division of Coastal Management North Carolina Department of Environmental Quality 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Howell: Reference the application of Glenn and Joan Petty, associated with the replacement of an existing pier and dredging within waters of Brooks Creek, located at 113 Maxwell Drive, in Harker's Island, Carteret County, North Carolina. Specifically, the applicant proposes to reconstruct the existing fixed 5' X 117' pier with a 17'X21' covered platform. The MP-4 form and plans show that (2) 18'X12' boatlifts would be installed, however, the bioreport states that (2) 13 'X 13' boatlifts would be installed, one on either side of the platformp. The docking facility would have a total of two slips. Additionally, the applicant proposes to excavate a new basin surrounding the dock. The proposed basin would extend off the existing harbor of refuge channel. It would be 47.5' long and 48.3' wide with a final depth of-4.5' at NLW. A total of213 cubic yards of material would be excavated during this project. Spoils would be trucked offsite to an approved location to be determined It should be noted that there is a discrepancy in the applicant's volume of dredged material to be removed provided on the plans, based on the dredge footprint provided in the application. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the modification to the State authorization: 1. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at 0 -2- htto://www.fws.aov/nc-es/mammal/manatee auidelines.pdf 2. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772-2191. 3. All work authorized by this permit must be performed in strict compliance with the submitted plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 4.Except as specified in the plans attached to this permit, no excavation, fill'or mechanized land -clearing activities shall take place -at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 5. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 6. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Resources at (919) 733- 5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 7.Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 8. If the permittee discovers any previously unknown historic or archeological remains while accomplishing the authorized work, he will immediately notify the Wilmington District Engineer who will initiate the required coordination procedures. 9.The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this -3- project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 10. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). 11. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 12. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre -project condition. 13. Violations of these conditions or violations of Section 404 of the Clean Water Actor Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Questions or comments may be addressed to Ms. Liz Hair Wilmington Field Office, Regulatory Division, telephone (910) 251-4049 or email at sarah,e.hair@usace.army.mil. Sincerely, Liz Hair, Project Manager Wilmington Regulatory Field Office M Electronic copy furnished: Mr. Todd Allen Bowers US EPA Region 4 Life Scientist -Water Protection Division Mr. Gregg Bodnar/MR. Ryan Davenport North Carolina Department of Environmental Quality- Division of Coastal Management Ms. Karen Higgins/Mr. Robb Mairs North Carolina Department of Environmental Quality -Division of Water Resources Mr. Pete Benjamin/Ms. Kathy Matthews U.S. Fish and Wildlife Service -Fish and Wildlife Enhancement Dr. Pace Wilber/ Ms. Twyla Cheatwood National Marine Fisheries Service -Habitat Conservation Division Bodnar, Gregg From: Weychert, Curtis R Sent: Wednesday, December 11, 2019 8:46 AM To: Bodnar, Gregg Subject: Petty Project Additional Comments Gregg, after looking at the projects nearby, there was a recommended moratorium on similar projects involving dredging. We would also recommend this for the Glenn and Joan Petty project as well. There was a relatively significant presence of oysters in the project area that would be affected by dredging impacts to the water. For these reasons, it would be better to perform the work outside of the April 1-September 30 period to reduce potential impacts to nearby valuable fish nursery habitats. Curtis Weychert Fisheries Resource Specialist North Carolina Division of Marine Fisheries North Carolina Department of Environmental Quality 252-808-8050 Curt. Wevchert(cDncdenr oov 3441 Arendell Street Morehead City, NC 28557 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 January 14, 2020 Regulatory Division Action ID No. SAW-2019-02174 and State Permit No. 1-20 Mr. and Mrs. Glenn and Joan Petty 776 Ransdell Road Louisburg, North Carolina 27549 Dear Mr. and Mrs. Petty: Reference your application for a Department of the Army permit to replace an existing pier and perform dredging at 113 Maxwell Drive, adjacent to Brooks Creek, in Harkers Island, Carteret County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of the CAMA-Corps Programmatic Permit process (copy attached) for construction activities that receive authorization from the State of North Carolina. Therefore, you may commence construction activity in strict accordance with applicable State authorization, attached Federal special conditions, and the approved plan. Failure to comply with the State authorization or conditions of the Federal permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Your Department of the Army permit will expire on December 31, 2021. Questions or comments may be addressed to Ms. Liz Hair, Wilmington Field Office, Regulatory Branch, telephone 910-251-4049. Sincerely, i Digitally signed by HAIR.SARAH. { HAIR.SARAH.EA.105469351 A.10546935 \fl t@:2ozo.01.1411:21:21 -05,00; Liz Hair, Project Manager Wilmington Regulatory Field Office -2- Enclosures: Plans CAMA permit Manatee Guidelines GP 291 conditions Electronic Copies Furnished (with enclosures): Avolis Engineering, Pa; Mr. Kevin Avolis Electronic Copy Furnished (without enclosures): NOAA/NMFS; Mr. Fritz Rhode/Ms. Twyla Cheatwood NOAA/NMFS; Dr. Pace Wilber NCDEQ/DCM; Mr. Jonathan Howell NCDEQ/DCM; Ms. Tara McPherson NCDEQ/DWR; Mr. Robb Mairs NCDEQ/DWR; Mr. Gregg Bodnar NCDEQ/DWR; Mr. Mac Haupt USFWS; Mr. Pete Benjamin/Ms. Kathy Matthews USEPA; Mr. Todd Allen Bowers USCG; BOSN3 Ryan Taylor e 'This is a word processing form to be completed in Microsoft Word"" NC Division of Coastal Management Major Permit Application Computer Sheet /0112012) Applicant: �^ G ` Date: Project Site County Stab.. District: DElizabeth City Washington Worehead City []Wilmington Project Name: pier extension with platform Rover File: ;_fe of initial application submittal (EX 1/8/2007), Date application "received as complete" in the Field office (DC• 1/W007): Permit Aulhorization: MA redge & Fill OBoth SITE DESCRIPTION/PERMIT INFORMATION PNA: Yes 0No Photos Taken: Yes ❑ No❑ Setback Required (riparian): Yes No Critical Habitat: U Yes LJNo UNotSure 15 foot waiver obtained. Yes F570 Hazard Notification Returned: ❑Yes []No SAV: Yes No of Sure Shell Bottom: Yes No Not Sure Temporary Impacts: es LJNo Sandbags: Yes UNo U Not Sure Did the land se classification come hum countyLUP: s []No Mitigation Required (optional): ❑Yes;f�wo Moratorium Conditions: Yes No ❑NA Environmen al Assessment Done: []Yes ❑No ❑NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) Future Water Supply (FWS) Nutrient Sensitive Waters (NSW) Swamp Waters (SW) High Quality Waters (HQW) Outstanding Resource Waters (ORM WETLANDS IMPACTED El (404) Corp. of Engineers (Jurisdictional El (LS) Sea lavender (Limonium sp.) El (SS) Glasswort ( Salicomia sp.) wetlands) El (CJ) Saw grass (Cladium jamaicense) (SA) Salt marsh cordgrass (Spartina ❑ (Sr Salt reed grass (Spartina altemiflora) cynosuroides) El (DS) Salt or spike grass (Disfichlis (SC) Bullmsh or three square (Scirpus El (TY) Cattail (Typha sp.) spicata) Sp.) El (JR) Black needlerush (Juncus (SP) Salt/meadow grass (Spartina roemerianus) patens) APPLICATION FEE No fee required - $0.00 III(A) Private w/D&F up to 1 acre; 3490 KI III(D) Priv. public orcomm w/D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 El Minor Modification to a CAMA Major Major Modification to a CAMA Major IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 El Permit Transfer- $100 Ill(B) Public or commercial w/D&F to 1 Express Permit - $2000 acre; 3490 can be applied - $400 EJ Major development extension request - 11. Public or commercial/no dredge $100 and/or fill - $400 El I. Private no dredge and/or fill - $250 ❑ Ill(C) Priv. public or Comm wM&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 252.808-2808 :: 1-888-4RCOAST :: www.nceoaStalmanagement.net revised: 02115/10 NC Division q# Coastal Mgt. Application Computer Sheet, rage 2 of al Applicant: Date: �1�/1�Idci Describe be ow t 'is ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found In yourAcHvities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension t Dimension 2 Dimension 3 Dimension 4 One One Ci�CAtp�l(�/ New Work;O Replace N Maint ❑ ❑ Y ❑ N I I New Work Replace 2 Maint ❑ ❑ Y ❑ N New Work Replete Maint ❑ ❑ Y ❑ N �j t '' New Work Replace cy a Maint ❑ ❑ Y ❑ N C I New Work,®' Replace / G C Maint ❑ ❑ Y❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N NewWorkO Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y [IN New Work Replace Maint ❑ ❑ Y ❑ N New Work El Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N revised 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet. Paae 3 of 41 t New Work Replace Maint ❑ ❑ Y ❑.N New Work Replace - Maint ❑ ❑ Y ❑ N New Work El Replace Maint❑ ❑Y[IN 02115/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 4) Applicant. PC VJ J Date: I I [111,61 Describe below the HABITAT disturbances forthe application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. FL (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft (Anticipated final disturbance. Excludes any restoration and/or temp Impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration andror temp impact amount Dredge Fill ❑ Both ❑ Other ❑ 27tGly Dredge ❑ Fill [I Both ❑ Other M II CCGJW Dredge ❑ Fill ❑ Both ❑ Other ❑ v Dredge 0 Fill 0 Both Other Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ , Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808.2808 :: 1-888.4RCOAST :: www.nccoastaimanagement.net revised: 02M 5/10 2. 0 5 Q FIELD INVESTIGATION REPORT APPLICANT'S NAME: Glen Petty LOCATION OF PROJECT SITE: 113 Maxwell Dr., Harkers Island Latitude:34°42'40.83"N Longitude:76°34'56.89"W a INVESTIGATION TYPE: CAMA, D&F INVESTIGATIVE PROCEDURE: Dates of Site Visit— 9/10/19 Was Applicant Present —No PROCESSING PROCEDURE SITE DESCRIPTION: Application Received — 8/28/19 Application Complete- 8/28/19 Office — Morehead City (A) Local Land Use Plan — Carteret County Land Classification from LUP — Limited Transition (B) AEC(s) Involved: EW, PTA (C) Water Dependent: (yes) (D) Intended Use: Private (E) Wastewater Treatment: Existing — Community Planned — NA (F) Type of Structures: Existing — Residents, Dock Planned — New Excavation (G) Estimated Annual Rate of Erosion: N/A Source — N/A HABITAT DESCRIPTION: DREDGED SHADED USURPED (A)Open Water 2294ft2 657ft2 995ft2 (B) Coastal Wetlands 300ft2 (D) Total Area Disturbed: 3589ftz (E) Primary Nursery Area: No (F) Water Classification: SA (G) Shellfish Classification: closed 8. PROJECT SUMMARY: The applicant is proposing to excavate around their proposed dock and create a channel to connect to the existing channel leading into the Harker's Island Harbor of Refuge. Field Investigation Report: Glenn Petty Page 02 9. NARRATIVE DESCRIPTION: The Glenn Petty project is located at 113 Maxwell Dr. on Harkers Island adjacent Brooks Creek. Brooks Creek connects to Back Sound and has an existing federal channel connecting to Harker's Island Harbor of Refuge. This property is .69 ac in its entirety and has an existing single family home. Extending off of high ground is a two slip docking facility. A 50' fringe of high and low marsh exists along the shoreline. There are oysters in the intertidal zone along the shoreline. The bottom of Brooks Creek in this area is mostly sand and silt with patches of SAV near shore. The channel leading into the Harkers Island Harbor of Refuge is approx. 30' offshore of the existing dock. A new channel West of this project was excavated and authorized under CAMA Major Permit #29-19. Water depths around the existing dock are -1' to -2' at NLW. Water depths in the harbor of refuge channel are -4' to -6'. The Division of Water Resources classifies this area of Core Sound as SA waters. This is not a Primary Nursery Area. This portion of Brooks Creek is closed to harvesting shellfish. The parcel is classified in the Carteret Co. LUP as Limited Transition. 10. PROJECT DESCRIPTION: Glenn Petty is proposing to construct a new dock in the same footprint of the existing dock. The new dock would have a ITX21' covered platform. A 13'X13' boatlift would be placed on each side of the platform. No additional shading impacts to Coastal Wetlands would occur. The docking facility would have a total of two slips. Additionally, Mr. Petty wishes to excavate a new basin surrounding the dock. The proposed basin would extend off the existing harbor of refuge channel. It would be 47.5' long and 48.3' wide with a final depth of -4.5' at NLW. A total of 213 cubic yards of material would be excavated during this project. Spoils would be trucked offsite to an approved location to be determined. Offloading of barges would occur in Brooks Basin. No additional slips would result from the project. There are patches of SAV existing along the shoreline but none were noted in the excavation area at the time of site visit. Excavation would occur 35' away from nearest Coastal Wetlands. Applicant has chosen not to connect to basin to the West because of connecting water depths. 11. ANTICIPATED IMPACTS: Excavation will result in the disturbance of 2294sq ft of shallow bottom habitat that has not been previously excavated. Turbidity impacts can be expected during the removal of the 213 cubic yards of material. Final bottom soundings will be -4.5' NLW connecting to -6' NLW and greater. Intended use of this project is for boating ingress and egress to an existing two slip docking facility that will be replaced in the same footprint. The 300ft2 of Coastal Wetland shading would remain the same. The dock would usurp 995ft2 of PTA and shade 657ft2. Name: Ryan Davenport Date: 9/11/19 Morehead City man IR-1 APPLICATION for Major Development Permit past revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. PrimaryApplicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name Joan MI M Last Name Petty Applicant 2: First Name Glenn MI T Last Name Petty If additional applicants, please attach an additional page(s) with names listed. Mailing Address 776 Ransdell Road PO Box City Louisburg State NC ZIP 27549 Country USA Phone No. 919-669-9877 ext. FAX No. Street Address (if different from above) City State ZIP Email 2. Agent/Contractor Information Business Name Avolis Engineering, Pa Agent/ Contractor 1: First Name MI Last Name J. Kevin Avolis Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 15564 New Bern NC ZIP Phone No. 1 Phone No. 2 28561 252 - 633.0068 ext. 252 - 671 - 9333 ext. FAX No. Contractor # C-0706 Street Address (if different from above) City State ZIP 5405 Morton Road New Bern NC 28562 - Email RECEIVED avolisengineedng@embargmail.com <Form continues on back> AUG 2 8 2019 DCM-MHD CITY 252.808-2808 :: 1.888-4RCOAST :: www.nccoastalmanagernent.net Farm DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 113 Maxwell Drive Subdivision Name ty State Zip Harkens Point [H�ackers Island NC 28531 - Phone No. Lot No. (a) (d many, attach additional page with list) 919 - 669 - 9877 ext. 23, 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Brooks Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown North River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 151.2 30,086 SF, 0.69 AC C. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (if many lot sizes, please attach additional page with a list) 6 ®NHW or ❑NWL e. Vegetation on tract Grass vegetation in yard area, coastal grasses and shrubby vegetation along shoreline. I. Man-made features and uses now on tract Lot is occupied by residential dwelling. Existing pier and boat lift is located in Brooks Creek servicing this property. g. Identify and describe the existing land uses adjacent to the proposed project site. Single-family residential dwellings about the property on each side. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) []Yes ❑No ISINA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No [DNA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> RECEIVED AUG 2 S 2019 DG f'MI ID GIT 252-808-2808 :: 1.888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Wastewater disposed is to public sewer system servicing Harkers Point Subdivision. o. Describe existing drinking water supply source. Existing well on site. p. Describe existing stone water management or treatment systems. All stormwater runoff occurs through sheet flow action to vegetated areas off site. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑PubliGGovernment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The proposed pier and boat lifts will allow for the storage and use of boats for recreational purposes on the adjoining coastal waters. The dredging activities will ensure proper access to adjoing channel areas. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Dredging - Excavator (1), Barge (1), Dump Truck (1) Pier - Barge (1), Pile Driver (1) See also attached Narrative. d. List all development activities you propose. Construction of pier walkway, platform and shelter area. Construction of two (2) boat lifts. Completion of dredging in area of new dock facility. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 100 ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area []Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. The only runoff from the proposed project will be from rainfall runoff from the pier structure. No concentrated runoff will occur. I. Will wastewater or stonnwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes [:)No ❑NA j. Is there any mitigation proposed? []Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED AUG 2 S 2019 252-808.2808 :: 1-888-4RCOAST :: www,nccoasti4t"i'W41D0YF"t Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (t) are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name John Kevin Avolis Phone No. 252-671-9333 Address 102 Creekview Road, New Bern, NC 28562 Name Josh Lane Phone No. Address 10590 Highway 55 West, Dover, NC 28526 -Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pennittee, and issuing dates. Not Known h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certilfitcation and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certi that the information provided in this application is truthful to the best of my knowledge. Date Print Name Joan MacNair Petty 8 Glenn Thomas Petty Signature T•T,,� Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development RECEIVED ®DCM MP-4 Structures Information AUG 2 S 2W9 BC-Iwwwn CITY 252-808.2808 .. 1-888-4RCOAST .. www.ncconsta l management. net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL stabilization Length 47.5 Width 48.3 Avg. Existing 2' NA NA Depth Final Project 4.5' NA NA Depth 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Silty Sand 432 Cubic Yards C. (1) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV SSB OWL ❑None III) Describe the purpose of the excavation in these areas: Allow proper access to pier facilities. 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. Approved Contractor Disposal Area c. (1) Do you claim title to disposal area? []Yes ®No ❑NA (ii) If no, attach a letter granting permission from the owner e. (1) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of disposal in these areas: d. High -ground excavation in cubic yards. None ❑This section not applicable b. Dimensions of disposal area. To be determined. d. (i) Will a disposal area be available for future maintenance? ®Yes ❑No ❑NA III) If yes, where? f. (i) Does the disposal include any area in the water? []Yes ®No ❑NA III) If yes, how much water area is affected? RECEIVED AUG 2 S 2019 DCM-MHD CITY 252.808-2808 :: 1-888-4RCOAST :: www.neeoastalmanaaament.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: ❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap Breakwater/Sill Other i. Source of fill material. f. (i) Has there been shoreline erosion during preceding 12 months? []Yes []No []NA (h) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. AUG 2 S 2019 4. OTHER FILL ACTIVITIES oem is seatlon not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brouaht to the site? ❑Yes ❑No DNA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (5B), or other wetlands (WL)? If any boxes are checked, provide the (ii) Amount of material to be placed in the water number of square feet affected. (III) Dimensions of fill area ❑CW ❑SAV _ ❑SB (iv) Purpose of fill ❑WL []None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? No upland excavation/fill will occur. Excavator, Barge, Dump Truck c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project []Yes ®No ❑NA site? ❑Yes ®No []NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Joan MacNair Petty 8 Glenn Thomas Petty Date Applicant Name I ((VV\\")) I W TPier Replacement &Dredging 113 Maxwell Drive, Harkers Island, North Carolina � nyplicent Signature Project Name 252-808.2808 :: t-888.4RCOAST :: www.ncaoastalmanagemant.nat revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS '°` ❑This section not applicable : . a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ❑Commercial ❑Public/Govemment ®Private/Community ❑Yes ®No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? []Yes ®No (ii) Number 1 If yes: (Ili) Length 117' (100' Walkway) (ii) Number (iv) Width 5' (iii) Length (v) Floating []Yes ®No (iv) Width (v) Floating ❑Yes ❑No e. (i) Are Platforms included? ®Yes []No f. (i) Are Boatlifts included? ®Yes []NO If yes: If yes: (ii) Number 1 (ii) Number 2 (Ili) Length 21 (Ili) Length 18, (iv) Width 17 (iv) Width 12' (v) Floating ❑Yes ®No Note: Roofed areas are calculated from ddpline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 2 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 2 ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips') only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: I. Check the proposed type of siting: ❑ Land cut and access channel ®Open water; dredging for basin and/or channel []Open water; no dredging required ❑Other; please describe: k. Typical boat length: 25' in. (i) Will the facility have tie pilings? []Yes ®No (ii) If yes number of tie pilings? I. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout I. (1) Will the facility be open to the general public? []Yes ®N°RECEIVED AUG 2 9 2019 DCM-MHD CITY 252-808.2808 :: 1-888-4RCOAST :: www. nccoastalmanagement. net revised: 12/27/06 FOrrn DCM MP-4 (structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ® This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED m. Is the marinaidocking facility proposed within a primary or secondary nursery area? AUG 2 S 2019 []Yes ❑No DCM-MHD CITY 252.808.2808:: 1-888-4RCOA8T :: yr w.nccoastaimanagement.net revised: 12127106 Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the manna/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAW shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ❑This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑PublidGovernment ®Private/Community (Ii) Number 1 (III) Length 18 (Drip Line) (iv) Width 13 (Drip Line) Note: Roofed areas are calculated from ddpline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (n) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c Maximum distance beyond NHW, NWL or wetlands B. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑PublidGovernment ❑Private/Community c. Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, N present. b. Number d. Description of buoy (color, inscription, size, anchor, etc.) e. Arc of the swing ,wur 2 AUG 2 8 2019 c.p `51:.p4 R r'zT~'a {Si.F t7)Y�> dti q.v .S 7. GENERAL 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmapagement net revised: 12/27/06 Fortin DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines 38' (East) 43.4' (West) Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 188' e. (i) Will navigational aids be required as a result of the project? ❑Yes ❑No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. 55.7' (East) 66.2' (West) d. Water depth at waterward end of structure at NLW or NWL 1.5 Feet Deep 0 NLW (Existing) 4.5 Feet Deep (cD NLW (Proposed) B. OTHER ®This section not applicable a. Give complete description: S 211Iq Date Pier Replacement Dredging 113 Maxwell Drive, Harkers Island, North Carolina Project Name Joan MacNair Petty/Glenn Thomas Petty Applicant Name Ap icant Signature RECEIVED AUG 2 8 Z019 Lr:t\1_MHD CITY 252-808-2808 :: 1-888-4RCOA5T :: www.nccoa_staIr anagem_ent.net revised: 12/27/06 DCM Coordinator: &ay&% Permit #: t _Zy MAILING DISTRIBUTION SHEET Agents: DCM Field Offices Elizabeth City Washington Alporchead City R,,tJ Wilmington US ACOE Offices: -am r",/ (with revised work plan drawings) (OBJECTIONS ) Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffens (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Jordan Jessup (TBD) Greg Curry (TBD) Liz Hair (Carteret, Onslow, Pend 'RFad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: Renee Gledhill -Earley at Environmental.Review@ncdcr.go4 Heidi Cox (WIRO) Curt Weychert David Harris Shannon Jenkins / Sharon Gupton State Property: Tim Walton / Mike Moser DEMLR/DWR: Sheri Montalvo / Shelton Sullivan 3 Clif Whitfield (WARD) Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs - 401 (Carteret, Onslow, Pender) , Chad Coburn - 401 (Brunswick, New Hanover) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Natural Heritage Program LPO: Maria Dunn (WARD) 44 Rodney Butler (NCDOT)Travis Wilson ROV COOPER Gdvw Gr• MICHAEL S. REGAN Secretary BRAXTON C. DAVIS DflecW Glenn and Joan Petty 776 Ransdell Rd. Louisburg, NC 27549 Dear Mr. and Mrs. Petty, NORTH CAROLINA Environmental Quality December 6, 2019 This letter is in reference to the application submitted for a Coastal Area Management Act Major Permit to undertake development activities to construct a docking facility and perform dredging, in Carteret County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c) which would make February 21, 2020 the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, should you have any question on the status of your application, do not hesitate to contact me by phone (252-808-2808 ext. 215) or e-mail (gregg.bodnar@ncdenr.gov). Sincerely, tN Gregory W. Bodnar Assistant Major Permits Coordinator Cc: DCM Morehead City J. Kevin Avolis, Avolis Engineering, Pa (via email) ,.,...a D_ Q2� North Carolina Departmem of Envfronmentai Quality : Dhislon of Coastal Management Morehead Ctty Office 1 400 Commerce Avenue I Morehead CRy, North Carolina 28557 252.8082808 PROJECT NARRATIVE Pier Replacement and Dredging 113 Maxwell Drive Harkers Island, North Carolina The owners of the property located at 113 Maxwell Drive in Harkers Island, Carteret County, North Carolina, Mrs. Joan MacNair Petty and Mr. Glenn Thomas Petty are proposing to replace the existing pier and boat lift facilities that are located adjacent to their residence on Brooks Creek. The existing pier and boat lift facilities were damaged by recent and past storm events and are in a state of disrepair. It is proposed that the existing timber pier and single boat lift be removed in its entirety. All timber piles will be completely removed by pulling with a barge mounted excavator. No bottom disturbance is proposed to occur associated with the planned demolition activities. Following demolition, it is proposed that dredging activities as outlined on the project plans be completed. The dredging activities are required to increase water depths at the pier facilities to allow proper access for boating activities. The extent of dredging depicted on the project plans was minimized to the extent possible to ensure full access to the adjacent channel area and access to the proposed boat lifts. All dredging will be completed with a barge -mounted excavator. Dredge spoil will be stockpiled within a secure enclosure on the barge. The spoil will be transported to a remote unloading area where it will be unloaded into dump trucks and transported to an approved dredge spoil disposal area. A total of approximately 432 cubic yards of dredge spoil will be generated by the excavation. All dredging activities will be completed by a competent local dredging contractor who will be selected after the CAMA permitting process has been completed. Following the dredging operation, a new timber -framed and concrete decked (Hog Slat Decking) pier walkway and platform will be constructed. A sheltered area covering a total of 234 SF (drip line) will be constructed over a portion of the platform area. Two boat lifts will be installed as shown on the project plans. Piles for the new pier and the boat lifts will be installed utilizing a barge -mounted pile driver. Decking installation will be completed from the barge and from upland areas of the site. Normal hand tools will also be employed to complete the construction. All construction waste will be collected on upland areas of the site and will be properly disposed of. It is proposed that no coastal wetland areas or coastal vegetation be disturbed to complete the project. RECEIVED AUG 2 8 2019 DCM-MHD CITY AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Joan MacNair Petty & Glenn Thomas Petty Mailing Address: Phone Number: Email Address: 776 Ransdell Road Louisburg, NC 27549 (919)669-9877 I certify that I have authorized Avolis Engineering, PA Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: Pier Replacement and Dredging at my property located at 113 Maxwell Drive, Harkers Island In Carteret County. 1 furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signature Joan MacNair Petty & Glenn Thomas Petty Print or Type Name Owners Title / / Date RECEIVED This certification is valid through 03 / 30 / 2020 AUG U S 2019 DCM-MHD CITY ADJACENT RIPARIAN PROPERTY OWNER STATEMENT hereby certify that I own property adjacent to Joan MacNair Petty & Glenn Thomas Petty ru . Ln ru DOVD F P526 M1CefiW Mall Free $3.50 0545 ru $ 03 Exife a eCtl kaysgpAgytNtdJ N mR" Copreck6ox, ❑ ReNm AacdM meNcapl1 $ O ❑9pturn 7"M (ekc—O $ Sri-Iln PostmaH O mee Mail RmeldeO D-- $ cnetn Here O ❑munsigreturePegue 6 � O ❑anon Slgnatve ReaowaeaoWmrS o Postage $7.35 $ I08/07/2019 TotelPostagean Ff 0 .85 $ Q- SentT O r- osh ►, P - Stree! tlApf No orP Box No. I (�5-40 E %wv � W✓- --- — - - I (Name of Property Owner) id, North Carolina Iss, Lot, Block, Road, etc.) in Carteret N.C. (City/Town and/or County) wn below, the development proposed at the above Iposal. 7sal. WING OF PROPOSED DEVELOPMENT till in description below or attach a site drawing) RECEIVED AUG 2 S 2019 DCM-MHD CITY WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Informati n) gnature Joan MacNair Petty & Glenn Thomas Petty Print or Type Name 776 Ransdell Road Mailing Address Louisburg, NC 27549 City/State/Zip (919)669-9877 Tele ho umber/email address pg� Date (Ad' perty O er Information) Signat * Josh Lane Print or Type Name 10590 Highway 55 West Mailing Address Dover, NC 28526 City/State/Zip 252-560.33).5 Telephone Nu%iber/email address 9/�zy Date* (Revised Aug. 2014) *Valid for one calendar year after signature* JOAN MACNAIR PETTY AND GLENN THOMAS PETTY 776 Ransdell Road, Louisburg, NC 27549 CERTIFIED MAIL NO. - Return Receipt Requested August 6, 2019 Mr. & Mrs. Josh Lane 10590 Highway 55 West Dover, NC 28526 Dear Josh and Kristen: We are applying for a CAMA Major Permit to replace the existing pier and complete dredging, located at our residence at 113 Maxwell Drive on Brooks Creek, Carteret County, North Carolina. The specifics of the proposed work are contained in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, we are required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections or comments to this proposal, please send your written comments to: Mr. Ryan Davenport Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. I have enclosed an Adjacent Riparian Property Owner Statement form and a properly addressed envelope for your use in responding to this request. No comment received within 30 days of your receipt of this notice will be considered as no objection. If you have any questions, please feel free to call me at (919)369-5552. Thank you for your assistance in this matter. Sincerely, Joan MacNair Petty Glenn Thomas Petty RECEIVED AUG 2 8 2019 DCM-MHD CITY M U.S. Postal Service... CERTIFIED MAILcl RECEIPT N Dorne,4ic Mail Only ra N DOVIR, 1 N r- akwr� $3.50 ii545 N s 03 ees lu.w mv..enxsnsvpoPMtl r- O ❑wwnrac�m.�v» s §" R-44 s Sl 1.1 111 Postmark O WFiltll.tl NUM ReWk4W DM6 6f..o. t�..�f7 Hera 0 0n ft e..tra+b a $0.0 O Oi SWss..x.va.[)*. : PFi— $7.35 ow 08/07/2019 sl .85 o oH. s.m ret+ lwIS� - i ---'-----'------------------------_..-..... r . F/4. M X%'G'. o�._ l iia. we�L----------------------- -- --- RECEIVED AUG 2 8 2019 DCM-MHD CITY Co Dom tic Mail Only M1 rV nu NEW BER ! NC `5i ;, ,. ..... r ru CerdW M.1 F. 43.SCI Ij54 5 N $ f�� ervices&Fees ❑R(cMckerW, tldM eMn q��v+mebroPr) f i(i flf� G 0 ❑RNurn gecNP, (eledmnlc) f Posbrwk p jfe aDorm Reran WWa y 6 Hera 0 �Anull Sgv,ure fleguir� f_�A_/y� iV VV C]Anuh Signature qei tW MlWyi C3 PM+ ge E7.35 C3 08/07/2C119 TOW fte g.-and F. 0i "' t111.85 Sf(R Ta y Certified Mail service provides the following ben tA9ts: • A receipt (this person of the Certified Mail label. for an electronic return recelp '. a retail to the addressees authorized agent Important Reminders. -Adult signature service, which requires the • You may purchase Certified Mall service with angles to be at least 21 years of age (not First -Class Mail•, First -Class Package Services, available at retail). or Prior -by Map -service. -Adult signature restricted delivery service, which •Cersfied Mail service is notavailable for requires the signee to be at least 21 years of age International mail. and provides delivery to the addressee specified • Insurance coverage is Rotavailable for purchaae byname, or to the addressee's authorized agent with Cedified Mail service. However, the purchase (not available at retail. of CeNhed Mail service tices not change the •To ensure that your Cerfified Mail receipt is Insurance coverage automatically included with accepted as legal proof of mailing, it should bear certain Priority Mail items. USPS postmark. if you would like a poshnark on • Par an additional fee, and win a proper this Cerbfled Mail receipt, glossae present your endorsement on the mailpiece, you may request Cultured Mail item at a Post Office-for Me following services: postmarking. If you dent need a postmark on this -fletum receipt service, which provides a record Certified Mail receipt, detach the bwmd potion of delivery Qncluding the recipient's signature). of this label, affix it to the mailpiece, apply You can request a hardcopy return receipt or ae appropriate postage, and deposit the mailpiece. electronic version. fm a hardcepy return receipt, complete PS Form 3511, Oomes6'p Rehm Receipt, attach PS Form 3811 to your mailpiece; •Aunlque identifier for your mailpiece. associate for assisznce.To rE aaduDlicah •Elec4onic verification of delivery or attempted returnreceiptfar no adoituone presdfR Nu oellvery, USPS®-posMaMed Certrsed .receipt tO the •Arecortl of delivery (Including the reciplerrts retail associate. signature) that is retained by me Postal Service" -yflesmcled delivery seMce, :h p�rvldes foraspecified period. deliveryto the addressees cified by name, or IMPONPAM Sava this receipt for your records. PS Form 3800, APni M15 (Reverse) PSN 75a0.02-0 !)W ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Joan MacNair Petty & Glenn Thomas Petty property located at (Name of Property Owner) 113 Maxwell Drive, Hackers Island, North Carolina (Address, Lot, Block, Road, etc.) on Brooks Creek in Carteret N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above loc{tlt W- (�� I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) See Project Drawings. RECEIVED AUG 2 8 2019 DCM-MHD CITY WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. XI do not wish to waive the 15' (Property Owner Information) Signature Joan MacNair Petty & Glenn Thomas Petty volis I Print or Type Name pe Nami YNBern, 776 Ransdell Road Road Mailing Address dress Louisburg, NC 27549 C 28562 City/State/Zip Cityy/State/Zip (919)669-9877 (252)671-9333 Telephone Number/email address Telephone Numbe, Date I)ate* 'Valid for one calendar year after signature' Owner Information) email address (Revised Aug. 2014) JOAN MACNAIR PETTY AND GLENN THOMAS PETTY 776 Ransdell Road, Louisburg, NC 27549 CERTIFIED MAIL NO. - Return Receipt Requested August 6, 2019 Mr. & Mrs. J. Kevin Avolis 102 Creekview Road New Bern, NC 28562 Dear Kevin and Kim: We are applying for a CAMA Major Permit to replace the existing pier and complete dredging, located at our residence at 113 Maxwell Drive on Brooks Creek, Carteret County, North Carolina. The specifics of the proposed work are contained in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, we are required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections or comments to this proposal, please send your written comments to: Mr. Ryan Davenport Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. I have enclosed an Adjacent Riparian Property Owner Statement form and a properly addressed envelope for your use in responding to this request. No comment received within 30 days of your receipt of this notice will be considered as no objection. If you have any questions, please feel free to call me at (919)369-5552. Thank you for your assistance in this matter. RECEIVED Sincerely, Joan MacNair Petty Glenn Thomas Petty AUG 2 S ZW9 DCM-MHD CITY U.S. Postal Service"' CERTIFIED MAIL° RECEIPT Domestic Mail Only 1 For:deli�,ery information. visitnjir.,en,:.- . .............. C` CertlfiW Mall Fea r $ $3.50 0545 •tra rvicea&Fees fcnx'+eu+oerw are) 0ReNmRec 03 o pl(halloopy) s O ❑Ral Hecapt lelc) t kn ri O pre. Postmark Mall RemneW UXINsy 6 t7 I]MUX sienaN. FeeuXeO f-- Hare ❑MUX Sig wa, ReatrkYM CNAiery S •'-' • �J V O Postage M1 $7.35 s p TolelPoatapea leale 08/07/2019 Er a 510.85 o� 1T r-q r.� Xt.N�Q ¢............ ....................... RECEIVED AOG 2 9 Z019 DCM-MRD CITY 4. ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Joan MacNair Petty & Glenn Thomas Petty 's (Name of Property Owner) property located at 113 Maxwell Drive, Harkers Island, North Carolina (Address, Lot, Block, Road, etc.) on Brooks Creek in Carteret N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above to ti I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT proposing development must fill in description below or attach a site drawing) See Project Drawings. RECEIVED AUG 21 2019 DCM-MHD CITY WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) Signature Joan MacNair Petty & Glenn Thomas Petty Print or Type Name 776 Ransdell Road Mailing Address Louisburg, NC 27549 City/StatelZip (919)669-9877 Telephone Number/email address Date (Adjacent Property Owner Information) /wmdoel6e Clnature* n Kevin Avolis PNnt or Tvoe Name ff Creekview Road Mailing Address New Bern, NC 28562 Date * /email address *Valid for one calendar year after signature* (Revised Aug. 2014) JOAN MACNAIR PETTY AND GLENN THOMAS PETTY 776 Ransdell Road, Louisburg, NC 27549 F019 07CO oaGO :P.23�,ZA 9�/8 CERTIFIED MAIL NO. - Return Receipt Requested August 6, 2019 Mr. & Mrs. J. Kevin Avolis 102 Creekview Road New Bern, NC 28562 Dear Kevin and Kim: We are applying for a CAMA Major Permit to replace the existing pier and complete dredging, located at our residence at 113 Maxwell Drive on Brooks Creek, Carteret County, North Carolina. The specifics of the proposed work are contained in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, we are required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections or comments to this proposal, please send your written comments to: Mr. Ryan Davenport Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. I have enclosed an Adjacent Riparian Property Owner Statement form and a properly addressed envelope for your use in responding to this request. No comment received within 30 days of your receipt of this notice will be considered as no objection. If you have any questions, please feel free to call me at (919)369-5552. Thank you for your assistance in this matter. RECEIVED Sincerely, AUG 21 2019 Jo acNair Petty DCM-MHD CITY t n Thomas Petty (�JY JOAN MACNAIR PETTY AND GLENN THOMAS PETTY 776 Ransdell Road, Louisburg, NC 27549 CERTIFIED MAIL NO. - Return Receipt Requested August 6, 2019 Mr. & Mrs. J. Kevin Avolis 102 Creekview Road New Bern, NC 28562 Dear Kevin and Kim: We are applying for a CAMA Major Permit to replace the existing pier and complete dredging, located at our residence at 113 Maxwell Drive on Brooks Creek, Carteret County, North Carolina. The specifics of the proposed work are contained in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, we are required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections or comments to this proposal, please send your written comments to: Mr. Ryan Davenport Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. I have enclosed an Adjacent Riparian Property Owner Statement form and a properly addressed envelope for your use in responding to this request. No comment received within 30 days of your receipt of this notice will be considered as no objection. If you have any questions, please feel free to call me at (919)369-5552. Thank you for your assistance in this matter. Sincerely, Joan MacNair Petty RECEIVED Glenn Thomas Petty AUG 0 8 2019 DCM-MHD CITY ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Joan MacNair Petty & Glenn Thomas Petty (Name of Property Owner) property located at 113 Maxwell Drive, Harkens Island, North Carolina (Address, Lot, Block, Road, etc.) on Brooks Creek in Carteret (Waterbody) (City/Town and/or County) I N.C. The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) See Project Draw ngs. WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) Signature Joan MacNair Petty & Glenn Thomas Petty Print or Type Name 776 Ransdell Road Mailing Address Louisburg, NC 27549 City/State2ip (919)669-9877 Telephone Number/email address Dare *Valid for one calendar year after signature* (Adjacent Property Owner Information) .SiQnature* Jot% Kevin Avolis Print or Type Name 102 Creekview Road Mailing Address New Bern, NC 28562 Cityy/State/Zip (252)671-9333 Telephone Number/email address Date* -RECEIVED (Revised Uug.,2r)81410t9 DCM-MHD CITY JOAN MACNAIR PETTY AND GLENN THOMAS PETTY 776 Ransdell Road, Louisburg, NC 27549 CERTIFIED MAIL NO. - Return Receipt Requested August 6, 2019 Mr. & Mrs. Josh lane 10590 Highway 55 West Dover, NC 28526 Dear Josh and Kristen: We are applying for a CAMA Major Permit to replace the existing pier and complete dredging, located at our residence at113 Maxwell Drive on Brooks Creek, Carteret County, North Carolina. The specifics of the proposed work are contained in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, we are required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections or comments to this proposal, please send your written comments to: Mr. Ryan Davenport Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. I have enclosed an Adjacent Riparian Property Owner Statement form and a properly addressed envelope for your use in responding to this request. No comment received within 30 days of your receipt of this notice will be considered as no objection. If you have any questions, please feel free to call me at (919)369-5552. Thank you for your assistance in this matter. Sincerely, Joan MacNair Petty Glenn Thomas Petty RECEIVED AUG 0 8 2019 DCM-MHD CITY ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Joan MacNair Petty & Glenn Thomas Petty property located at (Name of Property Owner) 113 Maxwell Drive, Harkers Island, North Carolina I (Address, Lot, Block, Road, etc.) on Brooks Creek in Carteret N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) See Project Drawings. WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) Signature Joan MacNair Petty & Glenn Thomas Petty Print or Type Name 776 Ransdell Road Mailing Address Louisburg, NC 27549 Cityy/State/Zip (919)669-9877 Telephone Number/email address Date *Valid for one calendar year after signature* (Adjacent Property Owner Information) Signature Josh Lane Print or Type Name 10590 Highway 55 West Mailing Address Dover, NC 28526 City/StatelZip Telephone Number/email address Date* NED (RevisedAu%201 9 DCM-MHD CITY AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Joan MacNair Petty & Glenn Thomas Petty Mailing Address: 776 Ransdell Road Louisburg, NC 27549 Phone Number: (919)669-9677 Email Address: I certify that I have authorized Avolis Engineering, PA Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: Pier Replacement and Dredging at my property located at 113 Maxwell Drive, Harkers Island In Carteret County. I furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: / f u.A 1V � �I 0/ 1 fl Joan MacNair Petty & Glenn Thomas Petty Owners Print or Type Name Title 8 1�'l_I Iq Date This certification is valid through 03 / 30 / 2020 RECEIVED AUG 2 8 2019 DCM-MHD CITY FOR REGISTRATION REGISTER OF DEEDS Karen S. Hardesty Carteret County, NC June 19, 2019 3,31:18 PM DEED # Pages 3 Fee:$26.00 , NC Revenue Stamp $000 FILE # 1641125 c4. / InshrwW ► MpWad 8)r. Atbnrey Darata J. Bogp, PLUG, 3M HkI**24, Nompmt NO 29 M Md Afbr Reoordrrg Ta AtlortW Darns J. Booms, PLLC, W5 Httiway24, Nommit NC 2MM NA lD .'13a17016648 '- QUITCLWDEED -%o-ps 4 Sbb of Marti Caolhie CW*of Carbret THIS DM), made tva , by mid Wis eer, Joan MWNdr PW)' old Glom Thanaa Pft co-Tnsbee dThe Cm** MacNair Carl krevombeTWMlboJoan MacNairPe%,cMdT-11,2MGna a), aid GlemThoml:Pettyand wtle,Joan MmMirPetty Gne rbe(e), d 118 WomM DMt Hakae is a NC 2101; WiMESSETH: That said GtarEor(s), for ad in carldaralon of to elan d 0.00 ($M Dda(s) b Oak In had peld, lie modpt d wHch is hereby acalo vbdgad have renised ad by tiaae praaib do scribe, sebase, and f rwar q t Wm urb to Qraiee(e) ad tidr heirs and asaign all ri^ tie; cWrrand ttsatd tie said Gmribr(s) h and bar cwWn tads parcel d brd IOV ad behp in tie Cowry d Go*% and Slab d Norlh Cwd W In Hakaa Island Tb nehIp, ad rr are pakxlsydesalbed am t ftw SesAMWhed f3dibl W TO HAVEAND TO HOLD tie skmeaid tact or parcel d lad and d pdvilegas tierarrb bd"ng b to Gwas(a) ad Kerr Haire aid @NVO, flee and dedrerged d ell rfpbt "a claim. or li ft t d tie Grwtxr s) a aryorre datrir>0 b%teadi, a under hart N TES IXW WHEREOF, sell Granbr(a) have hemsto set heir herds and sede he dW at yaw met above wrMtert Ginn Thorrrs PWy (aael) (eed) SecF- VED AUG2S2019 DCM-MAD CITY submitted electron1Cally by "ATTORNEY DONNA J. e0"S, PLLC" in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Carteret county Register of Deeds. 1841126 STATE OF COLORA20 4a-i— wt I, P14s ; x = !�'fP'Z ary Public for State and Canty shown above, do hereby =y that Joan MacNair Petty and Glenn Thomas Petty personally appeared before me this day and acknowledged the due execution of the foregoing document. This the rt►w day of June, 2019. 1/ Notary Public My Commission Expires:_ 7 A1A 2 MARY JF tA(f#$ F �9?HiJNp NSi7:ki(YYU:;l.t0 &TATE OP COLDRA00 NDTPJiY IU20181027807 MY COMM�9SION FY?StES JULY$ ypyy RECEIVED AUG 2 8 2619 DCM-MHD CITY 1641125 ATTACHMENT BEING all of Lot 23, Harker's Pant Subdivision as shown on a plat prepared by Sttmd Engineering, PA. recorded in Map Book 29, Page 24, Gsr*etGounty Registry, refererceto said map being rnadefor grealeroertairrlycf description. RECEIVED AUG 2 8 2019 DCM-MHD CITY PErrY 113 Maxmil Dma, Haft[$ Island, NC 2MI FOR REGISTRATION REGISTER OF DEEDS Karen S. Hardesty Carteret County, NC June 19, 2019 3:31:18 PM DEED # Pages: 3 Fee:$26.00 , NC Revenue Stamp:$0.00 FILE # 1641126 jr struff ad Prep"! By. Albmey Dora J. Bow, PLLC, 5M Hiphwey24, NONPOM NO MM Akan A1lr Recaft Rx A ffmy Doors J. Boggs, PLLC, MM FNgl`w y24, Newport; NO MM bu 9 Oco CttumCtAIM DEED StAvr.(S 4 Stele of Nall Caroline County of Carteret THIS DEED, rnedeilis , by and bet~ Joan MecNdr Pety' and Glenn Thomas Petly, co-1halmee d The Caroline MacNalr Carl kTemcableThatfboJanAAmcNeirPet rMJ7-11,2012,Ckantr(s),andGieanThorrifaPdyandwkJoenMeA3rPetits Granlml s), of 113 Maxwell DO", Hakere Isler4 NO 2M1; WITNESSETH: That Bald Grartbt(s), for and in conslderabon of M win of 0.00 (50M Dcla(a) to their In hand paid, To reodptdwhch Is hereby aclmowiedped, have rerriaed and by lleee preeenk do rerrrbe, Islam, and toraverquiblaim uloille GrW06(e) and lnelr halms and saspw all lie; claim, and hlbrea(d to said Gr *Ks) In and lo a cabin bad orperoal of lend lying and b*V Inl,e Cartyd Carteret and Stab of Norll Carc4m in Harkers Island Township, and more perfcrJay deemed as MONO: SwAirded Eididt"A" TO HAVEAND TO HOLD the aforesaid trot or parcel d lad and BE pdvkgw /rareunlo bel"rig to the Qaiee(s) and eneir rare at aealgnis, tore and discharged of all mini( title, claim, or lrftW of lie Gratir(e) or anyone datr" bg rttra#p or under 11arL IN TEST P"4Y WHEREOF, Bald Grailor(a) have hereunto ad their bade and seats the day and veer first aWm writ9arL { (seal) J— alrPedy _ 1N"� tern Thames (seal) (seal) (sag) RECEIVED Submitted electronically by "ATTORNEY DONNA J. BOGGS, PLLC" in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Carteret county Register of Deeds. AUG O 8 2019 DCM-MHD CITY 1641125 STATE OF COLOR00 w- I,!�5�,_ , 0Iotary Public for State and County shown above, do hereby certify that Joan MacNair Petty and Glenn Thomas Petty personally appeared before me this day and acknowledged the due execution of the foregoing document. This the YJrw day of June, 2019. Notary Public My Commission Expires: 7 /4 1A Z 7Cypg te<O::R:1gHpLpE7O'OIW57347JOi�:qVJVLY1N•,C�STT Ewl CMiAl RECEIVED AUG 0 S 2019 DCM-MHD CITY 1641125 ATTACHMENT BEING all of Lot23, Harker's Point Subdivision as shown on a plat prepared by Stroud Engineering, PA. recorded in Map Book 29, Page 24, Carteret County Registry, reference to said map being made for greater certainty of description. RECEIVED PEM 113 Maxwell Dmje, HOrkeis Island, NO 28MI AUG 0 8 2019 DCM-MHD CITY ROY COOPER Governor MICHAEL S. REGAN Secrelary BRAXTON DAVIS Dbeclor Coastal Management ENVIRONMENTAL QUALITY Carteret News Times Re: Public Notice — Carteret Co. Dear Sir: Please publish the attached Notice in the 9/25/19 issue of the Carteret News Times. The State Office of Budget and Management require an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Jessica Gibson, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Davenport Management Representative Enclosure cc: Roy Brownlow, District Manager Doug Huggett, Major Permits Coordinator State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 NOTICE OF FILING OF A PPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A-119(b) that an application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on 8/28/19. According to the application, Mr. Glen Petty applied to excavate a 2294ftz basin and construct a dock at 113 Maxwell Dr. on Harkers Island. A copy of the entire application may be examined or copied at the office of Ryan Davenport, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808 2808 during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to 10/14/19, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISHED ON: 9/25/19 State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 N-1. r�v_ Coastal Management ENVIRONMENTAL OUALITY Avolis Engineering C/O Kevin Avolis PO Box.15564 New Bern, NC 28561 Dear Mr. Avolis: ROY COOPER Coveraor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director 9/19/19 The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development at 113 Maxwell Dr. The complete package was received on 8/28/19. The projected deadline for making a decision is 11/11/19. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from 8/28/19, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Si cure-ly Ryan Davenport oastal Management Representative Enclosure cc: Doug Huggett, Major Permits Coordinator Roy Brownlow, District Manager/Compliance Coordinator State of North Carolina I Environmental Quality I Centel Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 All M I m A m DCM Coordinator: Gregg Bodnar Applicant: Distributed Yes® No ❑ Distribution Date: AGENCY WIRO WARD LPO 4tachel Love Adrict MHC Rachel Love Adrick Washingon DCM Planner Mike Chris tenbury Wilmington Charlan Owens Eliz City US COE: Liz Hair Raleigh Bland (Beaufort Camden, Chowan, (Carteret, Onslow, Pender) Craven, Hertford, Hyde, Perquimans, Tyrrell) Tyler Crumbley (Temporarily away Josh Peletier — (Berrie, Currituck, Dare, Gates, everything goes to Liz) Pamlico, Pasquotank, Washington) USCOE (NC DOT) (Brunswick, New Hanover) DOT - Tom Steffans—(Beaufort, Carteret, DOT Brad Shaver Craven, Pamlico (Brunswick, New Hanover, Onslow, Pender) Mark Zeigler (Onslow, Pender, New Community Assistance Hanover, Brunswick) Lee Padrick (Beaufort Carteret Craven, Eliz tolipjtl►li9M (Beaufort Carteret, Craven City, Pamlico, Washington) Eliz City, Pamlico, Washington Cultural Resources joee Gledhill-EMAM Renee Gledhill -Earley Div. of Water Infrastructure iN&i Cox Clif Whitfield David Harris Shannon Jenkins & Sharon Gupton Marine Fisheries dt WeychdOWIRO NC DOT jWd'FlaFAM Shellfish Sanitation ftpnnon Jenkins & Sharon Gupton Tllm Walton & Mike Moser & Wanda State Property Tim Walton & Mike Moser & Wanda Hillard rillard idbiari A. Montalvo & Shelt4,*WAS DEMLR/DWR: Sheri A. Montalvo (NC DOT) Kristy Lynn Carpenter Kristy Lynn Carpenter DEMLR Sediment & Erosion ,an Sams Sami Dumpor Storm water Shristine Half Roger Thorpe DWR 401 @pbb Mair#(Carteret New Hanover Anthony Scarbraugh Onslow, Pender,) Chad Coburn (Brunswick) (NC DOT) Joanne Steenhuis Brunswick, New Garcy Ward Hanover, Onslow, Pender WRC WARD) Maria Dunn (WARD) WRC (NC DOT) Travis Wilson Travis Wilson Natural Heritage Program 4Il @R@99MW@r Rodney Bulter C:\Users\ajcannon\Desktop\Major Permit Processing\Maj Comment Distribution Sheet 2019.docx Revised : 5/7/2019 a NC Division of Coastal Management Cashier's Official Receipt Received From: Cr- Permit No.: Piolyj r Applicant's Name: 9353 A B0 Date: ( 1 20 s 14OD in I 1 / Check No.: 1 Q ED C County: A("fit ":L W lY Project Address: h 3 nM%u-,w\l DL )T' Please retain receipt for your records as proof of payment for permit issued. Signature of Agent or Applicant: Date: Signature of Field Representative: o Date: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director, Drvuron ofCoosraf Managemem September 23, 2019 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregg. bod nar(a)ncdenr.aov SUBJECT: CAMA Major Permit Application Review Applicant: Glenn & Joan Petty Project Location: 113 Maxwell Dr. Harkers Island, Carteret County Proposed Project: Proposes to replace existing pier and dredge Please indicate below your agency's position or viewpoint on the proposed project and return this form to this form to Gregg at the address above by October 21, 2019. If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. `*Additional comments may be attached" This agency has no comment on the proposed project. PRINT NAME AGENCY SIGNATURE This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 MAJOR /PERMIT FEE MATRIX C, ''`e 5I I Aaalicant: l'�I ei� Yi � T 119-WaXWeU Qr r H.L Selection Development Type Fee DCM % DWQ (14300 1601 435100093 1625 6253) (24300 1602 435100095 2341) I. Private, non-commercial development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial development that does not $400 100% ($400) 0% (SO) involve the filling or excavation of any wetlands open water areas: Major Modification to a $250 100% ($250) 0% ($0) Por CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non - El commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 4097 (See attached) can be applied: III(B). Public or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 4097 (See attached) can be applied: III(C). If General Water 71 uality Certification No. $400 60% ($240) 40% ($160) 097 (see attached) co d X4 be applied, but DCM sta determined that additional review and written DWQ 2 2019 6 concurrence is needed AUG because of concerns related to water quality or DCM-MHD CITY aquatic life: III(D). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) cannot be applied: IV. For development that involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or III open water areas: AVOLIS ENGINEERING, PA P.O. Box 15564 New Bern, North Carolina 28561 252.633.0068 License No. C-0706 August 27, 2019 Mr. Ryan Davenport Client and Enforcement Representative NC Division of Coastal Management 400 Commerce Avenue Morehead City, INC 28557 RE: CAMA Permit Petty Residence, 113 Maxwell Drive, Harkers Island, Carteret County, North Carolina AE Project No. 19052 Dear Ryan: Enclosed please find our CAMA Permit application package for the above -referenced project consisting of the following: • Project Plans (Three Copies) CAMA Application with Narrative (Original and One Copy) • Property Deed (One Copy) • Riparian Owner Statements with Cover Letters and Certified Mail Green Card Receipts (One Copy) • Authorized Agent Form (Original) • Digital Copy of All Documents (CD and Thumb Drive) • $400 Permit Fee We appreciate your assistance. Should you have any questions, please do not hesitate to call. Sincerely,; Kevin Avolis, P.E. RECEIVED AUG 2 8 2019 DCM-MHD CITY �otl�n�r�e xoaYp - DCM MP-1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name Joan MI M Last Name Petty Applicant 2: First Name Glenn MI T Last Name Petty If additional applicants, please attach an additional page(s) with names listed. Mailing Address 776 Ransdell Road PO Box City Louisburg State NC ZIP 27549 Country USA Phone No. 919 - 669 - 9877 ext. FAX No. - - Street Address (If different from above) City state ZIP Email 2. AgentContractor Information Business Name Avolis Engineering, Pa Agent/ Contractor 1: First Name MI Last Name J. Kevin Avolis Agentl Contractor 2: First Name MI Last Name Mailing Address PO Box City State 15564 New Bem NC ZIP Phone No. 1 Phone No. 2 28561 252 - 633 - 0068 ext. 252 - 671 - 9333 ext. FAX No. Contractor # C-0706 Street Address (6 different from above) City State ZIP 5405 Morton Road New Bern NC 28562 - Email avolisengineedng@embargmail.com {RECEIVED <Form continues on backs AUG 2 S 2019 DCM-MHD CITY 252-6vb-,---cud :c 1-888-4RCOAST :: www.nccoastaimanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 113 Maxwell Drive Subdivision Name City State Zip Harkers Point Harkens Island NC 28531 - Phone No. Lot No. (a) (if many, attach additional page with list) 919 - 669 - 9877 ext. 23, 1 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Brooks Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown North River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 151.2 30,086 SF, 0.69 AC c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 6 ®NHW or ❑NWL e. Vegetation on tract Grass vegetation in yard area, coastal grasses and shrubby vegetation along shoreline. f. Man-made features and uses now on tract Lot is occupied by residential dwelling. Existing pier and boat lift is located in Brooks Creek servicing this property. g. Identify and describe the existing land uses adlacent to the proposed project site. Single-family residential dwellings about the property on each side. h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, it applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> MCI CIVCLJ AUG 2 8 2019 Q(-M_MHr) (-IIY 252-808-2808 .. 11-888-41RCGASY .. www. nccoa sta l management. net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Wastewater disposed is to public sewer system servicing Harkers Point Subdivision. o. Describe existing drinking water supply source. Existing well on site. p. Describe existing stone water management or treatment systems. All stormwater runoff occurs through sheet flow action to vegetated areas off site. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? []Commercial ❑Publir/Government ®PrivatelCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. The proposed pier and boat lifts will allow for the storage and use of boats for recreational purposes on the adjoining coastal waters. The dredging activities will ensure proper access to adjoing channel areas. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Dredging - Excavator (1), Barge (1), Dump Truck (1) Pier - Barge (1), Pile Driver (1) See also attached Narrative. d. List all development activities you propose. Construction of pier walkway, platform and shelter area. Construction of two (2) boat lifts. Completion of dredging in area of new dock facility. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 100 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes COW ❑NA that the public has established use o% h. Describe location and type of existing and proposed discharges to waters of the state. The only runoff from the proposed project will be from rainfall runoff from the pier structure. No concentrated runoff will occur. I. Will wastewater or stormwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. RFrFIVED <Form continues on back> AUG 2 g 2019 r, M_MHD CITY 252.808-2808 :: 1-888-4RCOAST :: www. nccoastal management. net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (t) are always applicable to any major development application. Please consult the application instruction booklet on how to propedy prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name John Kevin Avolis Phone No. 252-671-9333 Address 102 Creekview Road, New Bern, NC 28562 Name Josh Lane Phone No. Address 10590 Highway 55 West, Dover, NC 28526 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pernidee, and issuing dates. Not Known h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1.10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certi that the information provided in this application is truthful to the best of my knowledge. Date CA Print Name Joan MacNair Petty & Glenn Thomas Petty 1\ 1�/ Signature ' T. V �4rl Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culver� ❑DCM MP-3 Upland Development RECEIVtD ®DCM MP-4 Structures Information AUG 2 S Z019 DCM_MHD CITY 252-808-2808 :: 1-888-4RCOAST :: www. nCCOasta l management. net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length 47.5 Width 48.3 Avg. Existing 2' NA NA Depth Final Project 4.5' NA NA Depth 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Silty Sand 432 Cubic Yards c. (1) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), None or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ®SB OWL []None III) Describe the purpose of the excavation in these areas: Allow proper access to pier facilities. 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Approved Contractor Disposal Area To be determined. c. (1) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ®No ❑NA ®Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV []SB OWL ®None (ii) Describe the purpose of disposal in these areas: I. (i) Does the disposal include any area in the water? ❑Yes ®No ❑NA III) If yes, how much water area is affected? RECEIVED AUG 2 8 2019 DCM-MHD CITY 252-808-2808 :: 1-888.4RCOAST :: www.nccoastlaimanagement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ®This section not applicable (if development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization. b. Length: []Bulkhead ❑Riprap ❑Breakwater/Sill []Other: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead badffill _ Riprap Breakwater/Sill _ Other _ i. Source of fill material. f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes [ If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? No upland excavation/fill will occur. Excavator, Barge, Dump Truck c. (1) Will navigational aids be required as a result of the project? []Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. Date Pier Replacement & Dredging 113 Maxwell Drive, Harkers Island, North Carolina Project Name d. (i) Will wetlands be crossed in transporting equipment to project site? []Yes ®No []NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Joan MacNair Petty & Glenn Thomas Petry Applicant Name Applicant Signature Ag 2 9 Z019 D CITe 252-808-2808 :: 1-888-4RCOAST :: vvww.nccoastalmanagement.net revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial [][public/Government ®Private/Community ❑This section not applicable b. (i) Will the facility be open to the general public? []Yes ONO c. (i) Docks) and/or piers) d. (i) Are Finger Piers included? ❑Yes ®No (ii) Number 1 If yes: (III) Length 117' (100' Walkway) (ii) Number (iv) Width 5' (iii) Length (v) Floating ❑Yes ONO (iv) Width (v) Floating ❑Yes []NO e. (i) Are Platforms included? ®Yes [:]No f. (i) Are Boatlifts included? ®Yes [_—]No If yes: If yes: (ii) Number 1 (ii) Number 2 (III) Length 21 (iii) Length 18' (iv) Width 17 (iv) Width 12' (v) Floating ❑Yes ONO Note: Roofed areas are calculated from ddpline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 2 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 2 ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat raid number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel ®Open water; dredging for basin and/or channel ❑Open water; no dredging required ❑Other; please describe: k. Typical boat length: 25' m. (i) Will the facility have tie pilings? []Yes ONO (ii) If yes number of tie pilings? j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout I. (i) Will the facility be open to the general public? ❑Yes ONO RECEIVED AUG 2 8 2019 DCM-MHD CITY 252-808-2808 :: 1-888-4RCOA3T :: www.nccoastaim_anagement.net revised: 12/27/06 Form DCM MP-4 (structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpouk Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? In Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? AUG l 8 2019 ❑Yes ❑No DCM-MHD CITY 252.808-2808 :: 1-888-4RCOAST :: w .nccoastalmanagennent.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes []No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CM, submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SS ❑WL []None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes []No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) This section not applicable a. (i) Is the boathouse structure(s): []Commercial ❑PublidGovernment ®Private/Community (ii) Number 1 (iii) Length 18 (Drib Line) IN) Width 13 (Drip Line) Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width _ 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands B. MOORING PILINGS and BUOYS ® This section not applicable a. Is the structure(s): ❑Commercial ❑PubliclGovernment ❑Private/Community Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED AUG 2 S Z019 em MW17) CITY 252-808.2808 :: 1-888-4RC OAS"f .: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines 38' (East) 43.4' (West) Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 188' e. (i) Will navigational aids be required as a result of the project? ❑Yes ❑No [:]NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. 55.7' (East) 66.2' (West) d. Water depth at waterward end of structure at NLW or NWL 1.5 Feet Deep Cad NLW (Existing) 4.5 Feet Deep (cD NLW (Proposed) 8. OTHER ®This section not applicable a. Give complete description: Date ' Pier Replacement Dredging 113 Maxwell Drive, Harkers Island, North Carolina Project Name Joan MacNair Petty/Glenn Thomas Petty Applicant Name Ap icant Signature RECEIVED AUG 2 8 2019 DCM-MHD CITY 252.808-2808:: 1-888-4RCOAST:: w .nceoastalmanagement.net revised: 12/27/06 PROJECT NARRATIVE Pier Replacement and Dredging 113 Maxwell Drive Harkers Island, North Carolina The owners of the property located at 113 Maxwell Drive in Harkers Island, Carteret County, North Carolina, Mrs. Joan MacNair Petty and Mr. Glenn Thomas Petty are proposing to replace the existing pier and boat lift facilities that are located adjacent to their residence on Brooks Creek. The existing pier and boat lift facilities were damaged by recent and past storm events and are in a state of disrepair. It is proposed that the existing timber pier and single boat lift be removed in its entirety. All timber piles will be completely removed by pulling with a barge mounted excavator. No bottom disturbance is proposed to occur associated with the planned demolition activities. Following demolition, it is proposed that dredging activities as outlined on the project plans be completed. The dredging activities are required to increase water depths at the pier facilities to allow proper access for boating activities. The extent of dredging depicted on the project plans was minimized to the extent possible to ensure full access to the adjacent channel area and access to the proposed boat lifts. All dredging will be completed with a barge -mounted excavator. Dredge spoil will be stockpiled within a secure enclosure on the barge. The spoil will be transported to a remote unloading area where it will be unloaded into dump trucks and transported to an approved dredge spoil disposal area. A total of approximately 432 cubic yards of dredge spoil will be generated by the excavation. All dredging activities will be completed by a competent local dredging contractor who will be selected after the CAMA permitting process has been completed. Following the dredging operation, a new timber -framed and concrete decked (Hog Slat Decking) pier walkway and platform will be constructed. A sheltered area covering a total of 234 SF (drip line) will be constructed over a portion of the platform area. Two boat lifts will be installed as shown on the project plans. Piles for the new pier and the boat lifts will be installed utilizing a barge -mounted pile driver. Decking installation will be completed from the barge and from upland areas of the site. Normal hand tools will also be employed to complete the construction. All construction waste will be collected on upland areas of the site and will be properly disposed of. It is proposed that no coastal wetland areas or coastal vegetation be disturbed to complete the project. RECEIVED AUG 2 S 2019 DCM-MHD CITY gem Mr-1 APPLICATION for Major Development Permit (last revised 12/27/06) �i North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name Joan MI M Last Name Petty Applicant 2: First Name Glenn MI T Last Name Petty If additional applicants, please attach an additional page(s) with names listed. Mailing Address 776 Ransdell Road PO Box City Louisburg State NC ZIP 27549 Country USA Phone No. 919-669-9877 ext. FAX No. Street Address (if different from above) City State ZIP Email 2. Agent/Contractor Information Business Name Avolis Engineering, Pa Agent/ Contractor 1: First Name MI Last Name J. Kevin Avolis Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 15564 New Bern NC ZIP Phone No. 1 Phone No. 2 28561 252-633-0068 ext. 252-671-9333 a*. FAX No. Contractor t C-0706 Street Address (if different from above) City State 5405 Morton Road New Bern NC T28562 - Email avolisengineering@embargmail.com <Form continues on back> REGtry w AUG 0 9 2019 252-808-2808 :: 1-888.4RCOAST :: www.nccoastalmanagemerpDp-MHD CITY Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. 0 Carteret 113 Maxwell Drive Subdivision Name City Stale Zip Harkens Point Harkers Island NC 28531 - Phone No. Lot No.(s) (if many, attach additional page with list) 919 - 669 - 9877 ext. 23, 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Brooks Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown North River e. Is proposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes SNo work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 151.2 30,086 SF, 0.69 AC c. Size of Individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 6 SNHW or ❑NWL e. Vegetation on tract Grass vegetation in yard area, coastal grasses and shrubby vegetation along shoreline. i I. Man-made features and uses now on tract Lot is occupied by residential dwelling. Existing pier and boat lift is located in Brooks Creek servicing this property. g. Identify and describe the existing land uses adjacent to the proposed project site. Single-family residential dwellings about the property on each side. In. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) []Yes []No RNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes SNo k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes SNo DNA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes SNo ❑NA National Register listed or eligible property? <Form continues on next page> RECEIVED AUG 0 8 2019 2 5 2 - 8 0 8 - 2 8 0 8 .. 1-888-4RCOAST .. www.nccoastalmanagemenDeM_MHD CITY Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit in. (1) Are there wetlands on the site? ❑Yes ®No (li) Are there coastal wetlands on the site? ®Yes []NO (Ili) If yes to either (1) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) - n. Describe existing wastewater treatment facilities. Wastewater disposed is to public sewer system servicing Harkers Point Subdivision. o. Describe existing drinking water supply source. Existing well on site. p. Describe existing storm water management or treatment systems. All stormwater runoff occurs through sheet flow action to vegetated areas off site. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government I$ jPrivatelCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. The proposed pier and boat lifts will allow for the storage and use of boats for recreational purposes on the adjoining coastal waters. The dredging activities will ensure proper access to adjoing channel areas. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it Is to be stored. Dredging - Excavator (1), Barge (1), Dump Truck (1) Pier - Barge (1), Pile Driver (1) See also attached Narrative. d. List all development activities you propose. Construction of pier walkway, platform and shelter area. Construction of two (2) boat lifts. Completion of dredging in area of new dock facility. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 100 HSq.Ft or []Acres g. WIII the proposed project encroach on any public easement, public accessway or other area (-]Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. The only runoff from the proposed project will be from rainfall runoff from the pier structure. No concentrated runoff will occur. i. Will wastewater or stonnwaler be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED 0 8 2019 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net DCM-MHD CITY Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (n are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name John Kevin Avolis Phone No. 252-671-9333 Address 102 Creekvlew Road, New Bern, NC 28562 Name Josh Lane Phone No. Address 10590 Highway 55 West, Dover, NC 28526 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Not Known h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. to Enter on I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name Joan MacNair Petty & Glenn Thomas Petty Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information RECEIVED 0 8 2019 252.808-2808 :: 1.888.4RCOAST :: www.nccoastalmanagementt.not D CITY Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) — stabilization Length 47.5 Width 48.3 Avg. Existing 2' NA NA Depth Final Project 4.5' NA NA Depth 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Silty Sand 432 Cubic Yards c. (I) Does the area to be excavated include coastal wetlandstmarsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), None or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ®SB ❑WL ❑None III) Describe the purpose of the excavation in these areas: Allow proper access to pier facilities. 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Approved Contractor Disposal Area To be determined. c. (I) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? []Yes ®No ❑NA ®Yes []No ❑NA (ii) If no, attach a letter granting permission from the owner. (11) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (1) Does the disposal Include any area in the water! (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ®No ❑NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV ❑SB _ ❑WL ®None III) Describe the purpose of disposal in these areas: RECEIVED AUG 0 8 2019 nCM-MHD CITY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmananement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: ❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead backfill _ Riprap Breakwater/Sill Other I. Source of fill material. b. Length: Width: _ d. Maximum distance waterward of NHW or NWL: I. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No DNA (ii) If yes, slate amount of erosion and source of erosion amount information. In. Type of fill material. 4. OTHER FILL ACTMTIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ONO ❑NA b. (1) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water (III) Dimensions of fill area (iv) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? No upland excavation/fill will occur. c. (i) Will navigational aids be required as a result of the project? ❑Yes NNo DNA III) If yes, explain what type and how they will be implemented. Date Pier Replacement & Dredging 113 Maxwell Drive, Harkers Island, North Carolina Project Name submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV _ ❑SB OWL ❑None (ii) Describe the purpose of the fill in these areas: b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Excavator, Barge, Dump Truck d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No DNA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Joan MacNair Petty & Glenn Thomas Petty Applicant Name Applicant Signature RECEIVhU 4,, AUG 0 S 2013 252-808-2808 :: 1-888.4RCOAST :: w .nccoastalmanaaement.net DCM' a /26106 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: []Commercial ❑PublicIGovernment ®Private/Community c. (i) Dock(s) and/or pier(s) (it) Number 1 (iii) Length 117' (100' Walkway) (iv) Width V (v) Floating []Yes ®No e. (i) ArePlatforms included? ®Yes ❑No If yes: (it) Number 1 (III) Length 21 (iv) Width 17 (v) Floating ❑Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 2 (it) Number of slips existing 2 I. Check the proposed type of siting: ❑ Land cal and access channel ®Open water; dredging for basin and/or channel []Open water; no dredging required ❑Other; please describe: k. Typical boat length: 22 V m. (I) Will the facility have tie pilings? ❑Yes ®No (II) If yes number of tie pilings? El This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Are Finger Piers included? []Yes ®No If yes: (ii) Number (III) Length (iv) Width _ (v) Floating []Yes []No f. (i) Are Boatlifts included? ®Yes ❑No If yes: III) Number g (III) Length ff IN) Width 12' h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ('Wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Ooen Runabout I. (1) Will the facilittyy be open to the genera liulCliaZE1VED ❑Yes ®No F((CCC AUG 0 S 2019 DCM-MHD CITY 252-808-2808 :: 1-8884RCOAST :: www.nccoastalmananement.net revised: 12/27/06 Form DCM MP-4 (structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. I. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and 'No Wake" signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marinatdocking facility proposed within a primary or secondary nursery area? ❑Yes ❑No AUG U S 2019 252.808-2808 :: t-888.4RCOAST :: vvww.nccoastatmanaoement.net revised: 1212R06 Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area? []Yes []NO o. Is the madnaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)7 If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL 1--]None p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ❑Yes []No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ❑This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Govemment ®Private/Community (it) Number 1 (iii) Length 18 (Drip Line) IN) Width 13 (Drip Line) Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (it) Length _ (III) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, if present. e. Arc of the swing _ 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED AUG 0 S 2019 ^G1144MHD r(TY 252.808-2808 :: 1.888.4RCOAST :: www.nccoastaimanagement.net revised: 12127/06 Form DCM MP-4 (structures, Page 4 of 4) a. Proximity of structures) to adjacent riparian property lines 38' (East) 43.4' (West) Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body >$ e. (I) Will navigational aids be required as a result of the project? ❑Yes ❑No ❑NA (ii) If yes, explain what type and how they will be Implemented. b. Proximity of structure(s) to adjacent docking facilities. 55.7' (East) 66.2' (West) d. Water depth at waterward end of structure at NLW or NWL 1.5 Feet Deep Co! NLW (Existing) 4.5 Feet Deep Co) NLW (Proposed) 8. OTHER ®This section not applicable a. Give complete description: Dale Pier Replacement Dredging 113 Maxwell Drive, Harkers Island, North Carolina Project Name Joan MacNair Petty/Glenn Thomas Petty Applicant Name Applicant Signature RECEIVED pl_)(; 0 8 Z019 DC4u)-mHD CITY 252.808-2808 :: 1.888.4RCOAST :: www.nccoastaimanauement.net revised: 12127/06 PROJECT NARRATIVE Pier Replacement and Dredging 113 Maxwell Drive Harkers Island, North Carolina The owners of the property located at 113 Maxwell Drive in Harkers Island, Carteret County, North Carolina, Mrs. Joan MacNair Petty and Mr. Glenn Thomas Petty are proposing to replace the existing pier and boat lift facilities that are located adjacent to their residence on Brooks Creek. The existing pier and boat lift facilities were damaged by recent and past storm events and are in a state of disrepair. It is proposed that the existing timber pier and single boat lift be removed in its entirety. All timber piles will be completely removed by pulling with a barge mounted excavator. No bottom disturbance is proposed to occur associated with the planned demolition activities. Following demolition, it is proposed that dredging activities as outlined on the project plans be completed. The dredging activities are required to increase water depths at the pier facilities to allow proper access for boating activities. The extent of dredging depicted on the project plans was minimized to the extent possible to ensure full access to the adjacent channel area and access to the proposed boat lifts. All dredging will be completed with a barge -mounted excavator. Dredge spoil will be stockpiled within a secure enclosure on the barge. The spoil will be transported to a remote unloading area where it will be unloaded into dump trucks and transported to an approved dredge spoil disposal area. A total of approximately 432 cubic yards of dredge spoil will be generated by the excavation. All dredging activities will be completed by a competent local dredging contractor who will be selected after the CAMA permitting process has been completed. Following the dredging operation, a new timber -framed and concrete decked (Hog Slat Decking) pier walkway and platform will be constructed. A sheltered area covering a total of 234 SF (drip line) will be constructed over a portion of the platform area. Two boat lifts will be installed as shown on the project plans. Piles for the new pier and the boat lifts will be installed utilizing a barge -mounted pile driver. Decking installation will be completed from the barge and from upland areas of the site. Normal hand tools will also be employed to complete the construction. All construction waste will be collected on upland areas of the site and will be properly disposed of. It is proposed that no coastal wetland areas or coastal vegetation be disturbed to complete the project. RECEIVED AUG 0 8 2019 DCM-MHD CITY AiIO GHW-W00 610d 8 Z 9nv a3AI333a All J I F. 20 it IQ I — — LOT 12 ti ;@ / r m til - - '"------------------- S180I5'541W 508.16' -- �� I LOT 24 G1RVE I IW s I AAC LENGTH I aim LENGTH am BEAR m RITA MU G I me, 1 W.04' 1 BO.01' S 6MOY E 41146' BOUNDARY RETRACEMENT & PHYSICAL SURVEY FOR GEORGE MORGAN WOMBLE, IV 113 MAXWELL DR LOT 23 HARKERS POINT S%D HARKERS ISLAND TOWNSHIP CARTERET COUNTY, N.C. SCALE 1'=30' 1 ae7EWro~*40-= Imo'" lamomr PC= er.0 I PO BOX 2103,379 ARRINGTON RD., BEAUFORT, N.C. 252-728-5848 PHONE ENAK JPHIMALAET.COy O J jb �aco v,i"9 LA 'O ffif':11iti1:�t &en I m a rn a O rn 6 i ll0 GHW-W0a slog 8 0 gnv LOT 22 ------- � N 22041f54' E 228.6i _ i z i r S 18015,54, W 308]6' t iq LOT 24 GINS no --j At LHIOTH CHORD LENGTH-- CHCRO BARING DELTA ANGLE G (1313.83' 10004' IOD.01' S 69'30Oi E 471'45' BOUNDARY RETRACEMENT a PHYSICAL SURVEY FOR LOT 23 HARKERS POINT S\D MARKERS ISLAND TOWNSHIP CARTERET COUNTY, N.C. SCALE 1'=30' -:s:ex:• i I 2 STE DATA, 0111f1t !m YrcHai Pol\r & Pm Tnwnm Prtly n6 Ronsi A. La'NEa9. m 2n`9 09) µ9-Nn VhRNL " NRk ]0.m9 S. 069 MAS 91f Accism nJ YAYIIFIL CNIrc HNMLRS aANO. Nc TAN PNR2 0'. 7JRSmGN6mOW DIED RERFSRaS @£ I9II2S STE LINK Am NIMT, ff9VIQS NTuT - PUNT[ mLL SOLE INC -RNA% (HN oun ISIAIO 4N➢ co Nc IDEAM�RS NQ 1, THE PFW'M6 AATIR CNIE Im AS "Imc 5 91LgS L1FD: WAX MTpI CW9iN'.11NM X M, MIING A STEW µSt OF PVC PIPE, _ 1111 In 1 1 1 1 1 •_LAB 1 1 11 V, it 1 ` 11 ` 1\ ' ``. •-'= \` •_SQ aHNI-WIC'•' �\ �\ `\ `\ ,1 1` I� \LAC 1 1 � • / 1 1 Y2 C13AI3038 .-SAP. _ m BROOKS CREEKS �`. 1`1�°°u \1 \f \s`iTl \\ _IaeF •_IW �\ a ssS 11 11 \\ NATLR cfPMS 91ma ARE AT NmIN1 Un MTA I \ Yd 21a \\\\ I\ Taa\� .-sN `/ \I \ ` \\ \\ MISTING PIER- / \ \ "� \ \ \• BE REMOVED \ 1 \ \ \ \ \ \ •-�ro \.1�5.m 1 4 I •�T. 11 •�%\1 a•-A.]4%.+N3a 11 •aR 11 o lyaNyi,.oe 1�11 r•3%A�j I YAK 1 1 I . spa •41s/ I AI L k \STE PLAN -EXISTING CONDITIONS & DEMOLITION ®Y C1 C1 SCALE: 1-=20' -I!O •-Sn SPECIAL SCHEDULING NOTE. I.NAM' Marim Fishenes Sartre has NI1'isnW gMMs 9umlims for I aCe IMA IMlmrdremiee. Tne LOMraclor la to pml �serrars amq lR creM raa Ve j�[IewM1le EIeE9 Hcm th waM. II a mrire mamma (a WtlemzmPMin or a mrNear N dmavee wimm Iw melere a Ile Pmget. Ine adkn. eraJa m armpLs c� ma semra IeXXe ana II IMn k no IaW mite anlw9alPo m Ile wa1R na. m Paetrrvirg. lnm1P] Tiler Ne le ml naiW] 2. The LOMrit to fsh dw0 AM "odwmfis ana.MNe[toomitA irw1w Ah,,,rilk as Aire IP lisn.,ew9MRe. Tml KAMI can ars thAP rx mr am.aa now¢a a AWof Asnnsawreisum Ile eaae naNs basemIle vties as mlK+lo lle wrrvdl d feM1 N MMIMe. liy / -11° IIDO UIT OBSERVED SAY-\ / M I • �� 5 . _I1511 1.UNII$ OF COASTAL, S2GEfA', I TRA / . I /I APNRIeN WE — — / ci.l.0 •Ym i ,s, 1 •_r_�•_,.n EXISTING PILE / •-Mm TO BE REII�Mfir •-I%\m,� -I% / / loss ��•.``.. f10RM&i NIGH �.n 1 .�I _I% ice_•_-.. PRELIMINARY NOT FOR CONSTRUCTION RELEASE FOR PERMITS 8/6/2019 GN;ir:� •"] LOT 22 ;h lhiT�l u, JOSH & KRISTEN LANE J.. •las �� 2N n151. PILE 121 IA. xa . Aa A tiN .'. YN:OCS .SN M � 5 vs % • ARI i21. 2n •2M S-:;mi3 9}• s.a 2N .la .112 .SW ON Ul y .y. i%:. a n n JLad •za LOT 23 .1 •-OaNa�R /. I, .. ..CA. •. • • ]J .2a y2 , iHl • 2m 37I 2n-in,y w \ \ -LQ ` •EXISTING BOAT LET?2!-.-_._. •.��. a An 1 1 \\ T E REMO O, yV' af. nss •ta / ?1H•• -In • 4 p •a.15 •21,. 2i •lm L-IW T I /•_ .'•... ••. W Ao .� ,2.M •sal LIE \ 1 /f (•, s a's'v 2% y/�� 2p Il �2 '¢ T H h'. A .lfi I 4 f IV "' T :.._::m LOT 24 KEMN & KIM AVOLIS Ex aan 2'1 MI I"%PAM 219 tl Als C`V 611,6a:v-laleo c l MORGAN '♦ ♦♦ �♦ x -2.82 4 88 \ \A-504 } 1 \ 11 11 I \\ \\ I000 _vein 1 -s.98 � \ ti \ p \ \ C 1 ♦ ♦ x _ -2.3 CONTROL DREDGE DEPM=4.5' (0 NLWL) j -2.87 11 ♦ ♦1 BROOKS CREEP( 1M1fR CdIM 9MM ME wT xIMb.1l IOW IMTfP x -5.82 I ' x �5.2 1 I I /x -5.89 x _5[ll t OF I 1 I A ENLARGED SITE PM -NEW WORK G C3 SCALE: 1--10' DECKING • J ` x T1.63 x -1.40 / ;i.09 ' UNITS OF COASTAL VEGETATION 1 OF DREDGING I x -7/UM$ 70x -j, ] 4324SFT0.097 ACRES I 42 COTAL 1 1 .59 �.'� X -1.33 1 / / I x -0.89 x -1.22 x _y'1/7 I / NORMAL NIGH WATEO -1.22 !--M20.47/ ••�. i g -1.53 3 1 3 COVERED AREA 5WIDE 000' LONG WALKWAY, 234 SF (DRIP LNE) , 500 SF *I/I 7*R �-� ♦1 xIl 4 i l UFF `I`I ♦ I � \I 5 q.5' x`T4.�2 12" ROUND wOOO PILE (TYP.) TOP OF DECKING ELEVATKM=3.0'3 Fr 1 1,��m 2c x 08673 -o.sa X t6.79 .9 -0.6 fyyT ° 2`I DECKING NgWMI HNRI WATER ELEVATION=+D.96' _V - - - - 12• POUND WOOD PILE (TYPJ - EACH PILE • • NgUMAL LOW WATER ELflATKIN=-1.32' -_ 2'a8' GROSS BRACING -------------------s-- ---------- 1EXISTING BOTTOM ELEVATION = VARIES i �y 6 J GHW[[-W0a az 8 o q n VNCROSS SECT ON F1 YA SN SPECIAL SCHEDULING NOTE: 1. NagoOW Mara F.W.Sanity Nxxw.w g0 W.ieefawla Wi ft*,waR d"mu Tna cwn�ma�is loges comers aoay Ne Nad.I..ux Aeaaa wfW. empirq. Mc �n llie wal9� nama��m mamma la mmemu main vamn•wl® eMarva] wiNin I W meters of the ggecl, IM av+riM alnM Ee Yly{P VW , No lix MN Na Ma. It Nan u Iro la W mix amicpal0! In Ila wdHlle. m pieelHigl, Now mNM NIB ie col na'essay. 2. TM CBntrado� aMl mange aq mnlM wRslrunon aarNxb milm¢aeXerMlnornN ar9 eamage IOINA aae wilWile. Ib mI e6NN 6Nme wiJk. DNmwlmwww Awes w otlelwix agnNcaWY erelaN th luliva NEi1W IMaee bNapgedalbmb� title aunNM aIf0N0m wbgb. PIER SUMMARY TOTAL WALKWAY AREA = 5'W a 1DO'L =500 SF TOTAL PLATFORM AREA = 17'x21' = 357 SF TOTAL COVERED WALKWAY AREA = 234 SF (DRIP LINE) TOTAL NUMBER OF BOAT LFTS = 2 DREDGING SUMMARY: TOTAL DREDGING AREA = 4,2" SF, 0.097 AC, TOTAL DREDGING VOLUME = 432 CUBIC YARDS �.m.....®._ ...... ....,....-..--re+..m.,,mrz _ . .. ....._ram C TYPICAL CONCRETE DECK PANEL - NOT TO sGi4E PRELIMINARY NOT FOR CONSTRUCTION RELEASE FOR PERMITS 8/6/2019 coot r�aFc I• . IR' a cos 0.e e z Pg W 6 . zEp� mom$ z=W Wwz ate^ asp x QUm� O n d d C� MORGAN RECEIVED AUG 0 8 2019 DCIy_MHD CITY