HomeMy WebLinkAbout1-20 Oversized PlansLICENSE NO. C-0706RELEASE FOR PERMITS
8/28/2019
SPECIAL SCHEDULING NOTE:
1. National Marine Fisheries Service has established general guidelines for pier and dock work
that involve noise. The Contractor is to post observers along the creek near the job site while
dredging, etc. in the water. If a marine mammal (a bottlenose dolphin or a manatee) is
observed within 100 meters of the project, the activity should be stopped until the animal has
left the area. If there is no loud noise anticipated in the water (i.e. no pile driving), this 100
meter rule is not necessary.
2. The Contractor shall manage and control construction activities to minimize interference with
and damage to fish and wildlife. Do not disturb fish and wildlife. Do not alter water flows or
otherwise significantly disturb the native habitat related to the project and critical to the
survival of fish and wildlife.BROOKS CREEKISLAND ROADM
A
X
W
E
L
L
D
R
I
V
E
H
A
R
K
E
R
S
P
O
I
N
T
R
D
LICENSE NO. C-0706 SPECIAL SCHEDULING NOTE:
1. National Marine Fisheries Service has established general guidelines for pier and dock work
that involve noise. The Contractor is to post observers along the creek near the job site while
dredging, etc. in the water. If a marine mammal (a bottlenose dolphin or a manatee) is
observed within 100 meters of the project, the activity should be stopped until the animal has
left the area. If there is no loud noise anticipated in the water (i.e. no pile driving), this 100
meter rule is not necessary.
2. The Contractor shall manage and control construction activities to minimize interference with
and damage to fish and wildlife. Do not disturb fish and wildlife. Do not alter water flows or
otherwise significantly disturb the native habitat related to the project and critical to the
survival of fish and wildlife.
RELEASE FOR PERMITS
8/28/2019
LICENSE NO. C-0706 SPECIAL SCHEDULING NOTE:
1. National Marine Fisheries Service has established general guidelines for pier and dock work
that involve noise. The Contractor is to post observers along the creek near the job site while
dredging, etc. in the water. If a marine mammal (a bottlenose dolphin or a manatee) is
observed within 100 meters of the project, the activity should be stopped until the animal has
left the area. If there is no loud noise anticipated in the water (i.e. no pile driving), this 100
meter rule is not necessary.
2. The Contractor shall manage and control construction activities to minimize interference with
and damage to fish and wildlife. Do not disturb fish and wildlife. Do not alter water flows or
otherwise significantly disturb the native habitat related to the project and critical to the
survival of fish and wildlife.
RELEASE FOR PERMITS
8/28/2019