Loading...
HomeMy WebLinkAbout153-21 Chambers, KennethPermit Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 _ Excavation and/or filling pursuant to NCGS 113-229 Permit Number 153-21 Issued to Kenneth Chambers, PO Box 3049, Atlantic Beach, NC 28512 Authorizing development in Carteret County at adj. to Dill Creek, at 1302 Barnacle Lane, in Morehead City , as requested in the permittee's application dated 4/28/21, including attached workplan drawing (1), dated "Revised 9/7/21". This permit, issued on November 29, 2021 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation rr tnese terms may De subject to nnes, imprisonment or cuvu action; or may cause me permit to De nun ana voia. Docking Facility 1) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether Floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) The waterward edge of the authorized docking facility shall be staked by the permittee prior to the start of the dock construction and the permittee shall contact the appropriate DCM Field Representative for an inspection to verify the authorized dock length and distance from NHW. The stake shall remain in place for the duration of the construction project. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be' accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit, the State of North Carolina agrees.that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Kenneth Chambers Permit No. 153-21 Page 2 of 3 ADDITIONAL CONDITIONS 3) Any portion of the permitted access pier and docking facilities built over wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet above the wetland substrate as measured from the bottom of the decking. 4) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the mooring. Any sewage discharged at the mooring shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 5) To reduce direct impacts to oyster resources, the permittee shall relocate all oysters falling within the footprint of pilings to an area immediately adjacent to the project area. 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) This permit authorizes a maximum of one (1) formalized boat slip. 8) In order to satisfy concerns of the resource agencies, physical stops shall be placed on the boat lift at a minimum height of 18" above the bottom substrate to prevent the boat lift from disturbing the bottom substrate. The physical stops shall remain in place for the life of the permitted docking facility. 9) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's area of riparian access. 10) The authorized covered platform shall not be enclosed. Any material used on the sides shall not obstruct view and shall be permeable to air and water. Screen or wire on the sides along with benches are permitted. Lattice is specifically excluded from being used under this authorization. l 1) The roof of the covered platform shall not be designed for second story use. 12) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 13) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. 14) The authorized project is located within a primary nursery area (PNA). Therefore, in accordance with NCAC 15A:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or excavation within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. Kenneth Chambers Permit No. 153-21 Page 3 of 3 ADDITIONAL CONDITIONS Sedimentation and Erosion Control 15) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 16) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. USACE Conditions 17) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish & Wildlife Service's Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https://www.fws.gov/raleigh/pdfs/ManateeGuidelines20l7.pdf. General 18) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 19) All construction debris associated with the removal or construction of the permitted docking facility shall be contained within the authorized project area and disposed of in an approved upland location. 20) In order to ensure compliance with the conditions of this Permit, the permittee and his contractor shall schedule a pre -construction conference with the Division of Coastal Management prior to the initiation of any mobilization activities. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2021-02006). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2007-1367 v10. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the mean high-water level. NOTE: An application processing fee of $250 was received by DCM for this project. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Chambers, Kenneth COUNTY: Carteret PROJECT NAME: LOCATION OF PROJECT: Mariners Point, Morehead City DATE APPLICATION RECEIVED COMPLETE BY FIELD: 7-9-21 FIELD RECOMMENDATION: Attached: Yes FIELD REPRESENTATIVE: Styron DISTRICT MANAGER REVIEW: Roy Brownlow B) DATE RECEIVED BY MAJOR PERMITS UNIT: APPLICATION ASSIGNED TO: Bodnar PUBLIC NOTICE REC'D: 9-8-21 ADJ. RIP. PROP NOTICES REC'D: 4/29/2021 To Be Forwarded: Yes DISTRICT OFFICE: MHC FEE REC'D: $250 Click or tap here to enter text. END OF NOTICE DATE: 9/8/2021 DEED REC'D: Yes 10 l L� C) 75 DAY DEADLINE: Cjick or tap to enter a date. 41--1- k /11(150 DAY DEADLINE: (g L HOLDS: 9Y7I21 " 9/1S�L 1 EMAIL OUT DATE: 9-15-21 PERMIT FINAL ACTION: ISSUE DENY STATE DUE DATE: Click or tap to enter a date. AGENCY DATE NOTES COMMENTS OBJECTIONS: RETURNED YES NO DCM — Field Rep al u 1 Z( Q1l(/ 14 Conk 1 DCM — LUP Consistency Determination Local Permit Officer Corps of Engineers— Regulatory Branch a112t t(\t I / Nutt <oatr.h i02(`c7A9(I DWR-401 Section It ( V DWR—Public Water Supply DEMLR — Stormwater DEMLR — Sed and Erosion DOA — State Property Office Wildlife Resources Commission DMF — Shellfish Section DMF — Habitat & Enhancement w/ll (ZI l0 t r DNCR — Archives & History !O f 1 S ` { I DNCR — Natural Heritage Program NCDOT NC Dept of Commerce k115 1, y ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director MEMORANDUM: TO: Gregg Bodnar FROM: HEATHER STYRON THRU: ROY BROWNLOW NORTH CAROLINA Environmental Quality September 21, 2021 SUBJECT: COMMENTS & RECOMMENDATIONS - CAMA MAJOR PERMIT-KENNETH CHAMBERS, 1302 BARNACLE LANE, MOREHEAD CITY, CARTERET COUNTY The following are my comments and recommendations regarding the aforementioned proposal. The proposal is for the construction of a pier, ]-head platform and boatlift. The water depths within this area are an average of-2.1' nlw. The proposed development is consistent with 15A NCAC 7H.0208. The Morehead City District office recommends the project be authorized as proposed on plats dated received 4/29/2021 contingent upon all applicable general conditions and the following standard conditions: The pier and platform should not exceed a maximum distance of 409' waterward of NHW and should not exceed a maximum of 75' from the oyster bed/coastal wetland due to the edge of channel as well as a 300' wide water body width (measured from edge of coastal wetlands/oyster rock to coastal wetlands). Recommend a stop system on the proposed boatlift due to the shallow water depth of -2' nlw within a PNA and the silty substrate. All development shall be a minimum of 15' from riparian access lines. PtECIV�D SEP 2 1 2021 PAP SECTION P:IHD North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 252.808.2808 ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director MEMORANDUM: TO: Gregg Bodnar FROM: HEATHER STYRON THRU: ROY BROWNLOW NORTH CAROLINA Environmental Quality September 6, 2021 SUBJECT: COMMENTS & RECOMMENDATIONS - CAMA MAJOR PERMIT-KENNETH CHAMBERS, 1302 BARNACLE LANE, MOREHEAD CITY, CARTERET COUNTY The following are my comments and recommendations regarding the aforementioned proposal. The proposal is for the construction of a pier, 1-head platform and boatlift. The water depths within this area are an average of -2.1' nlw. The proposed development is consistent with 15A NCAC 7H.0208. The Morehead City District office recommends the project be authorized as proposed on plats dated received 4/29/2021 contingent upon all applicable general conditions and the following standard conditions: The pier and platform should not exceed a maximum distance of approximately 409' waterward of NHW and should not exceed a maximum of 75' from the oyster bed/coastal wetland due to the edge of channel (location on plat incorrect and field verified) and 300' wide water body width (measured from edge of coastal wetlands/oyster rock to coastal wetlands). Recommend a stop system on the proposed boatlift due to the shallow water depth of -2' nlw within a PNA and the silty substrate. All development shall be a minimum of 15' from riparian access lines. North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City. North Carolina 28557 252.808.2808 ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director September 15, 2021 MEMORANDUM., NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnar cDNCDENR.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Chambers, Kenneth Project Location: 1302 Barnacle Ln, Carteret County Proposed Project: Pier, platform, boatlift in Mariners Point SD Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by October 15, 2021. If you have any questions regarding the proposed project, contact Heather Styron 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: x This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Mark Brown AGENCY Public Water SIGNATURE f4,k /moo DATE 9-16-21 m,�ruvr D E Q3�3 RECEIVED SEP 1 6 2021 North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 252.8082608 ROY COOPER Governor ELIZABETH S. BISER secretary BRAXTON DAVIS Director September 15, 2021 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) greQq. bod nar(@NCDENR.gov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Chambers, Kenneth Project Location: 1302 Barnacle Ln, Carteret County Proposed Project: Pier, platform, boatlift in Mariners Point SD Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by October 15, 2021. If you have any questions regarding the proposed project, contact Heather Styron 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: A This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Rachel Love-Adrick AGENCY DCM /) SIGNATURE 40, 6G DATE 9/16/2021 SEP 1 6 2021 �:^r-•. re,-•Fay-��;'a�r, y*,T .e--, D_E Q� North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 252.808.2808 ROY COOPER Governor ELIZABETH S. BISER secretary BRAXTON DAVIS Director MEMORANDUM NORTH CAROLINA Ettvlronmental Quality TO: Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management FROM: Rachel Love-Adrick, District Plann l� Division of Coastal ManagementT v� SUBJECT: Major Permit Request by Kenneth Chambers DATE: September 16, 2021 Sa Cm Va.Y fz� tl F D SEP 1 6 2021 fl!i? SECTIOP4 �gPl7) Consistency Determination: The request is consistent with/not in conflict with the Town of Morehead City Land Use Plan certified by the CRC on September 28, 2007. Overview: The project is located adjacent to Dill Creek at 1302 Barnacle Lane in the Mariners Point subdivision in Morehead City, Carteret County. Lot 45 is .520 acres (22,667 sf) in its entirety and is an average of 5' above NHW. The total length of the shoreline is 174'. The applicant is proposing a 6' x 427' pier, a 15' x 22' L- head platform and an 8' x 8' boatlift. The lot is not developed at this time and no upland development is proposed. Areas of Environmental Concern (AEC) in the project area include Estuarine Waters (EW), Coastal Wetlands (CW) and Public Trust Areas (PTA). This section of Dill Creek is classified as SA/HQW, is a Primary Nursery Area, and is closed to shellfishing. There is a 174' x 370' fringe of Coastal Wetlands present along the shore adjacent to Dill Creek. This fringe contains Smooth Coordgrass (Spartina alternitlora), Salt Grass (Distichlis spicato) and Salt Meadow Grass (Spartina patens). Within the waters of Dill Creek expanses of oyster beds are present. The water depths in Dill Creek are shallow (-2'nlw) and according to the applicant, reach-3' NL W within the channel portion and an average of-2' at NLW at the waterward end of the proposed structure. Extensive field work confirms the soundings as well as the channel edge along the property located approximately 83' from the edge of marsh/ oyster rock. The substrate in this area is thick organic mud. Anticipated impacts: The proposed pier would shade and incorporate 240 ft2 of coastal wetlands above NHW, as well as shade and incorporate 1962 ft2 of coastal wetlands and oyster beds. A total 690 ft2 of open water of would be shaded and 754 ftZ incorporated by the pier, platform and boatlift. Oyster beds containing healthy (productive) populations existing along the shoreline would be disturbed during the construction process. There would also be temporary turbidity during piling placement. �DEQA- North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1400 Commerce Avenue I Moorehead City, North Carolina 28557 25zsoe.2808 The Division of Land Resources approved the Sedimentation and Erosion control plan (CARTE-2006-440) on 6/19/06 with the DWQ Stormwater permit #SW8060625 issued on 7/12/06 for the existing s/d. No written concurrence is required by NCDWR per GC 4175. Based on the determination of the water body widths by the Division and the District, the structure should not cause a hindrance to navigation due to the location of the existing oyster beds. The oyster beds/coastal wetland area terminates approximately 360' waterward of NHW. The channel edge is located approximately 83' from the edge of the oyster beds. Basis for Determination: The project site is in the Town of Morehead City and is subject to the 2007 Town of Morehead City Core Land Use Plan Update. The Future Land Use Map (FLUM) designates the site as "Low Density Residential" and "Conservation/Open Space' (due to the sites location in Coastal Wetlands, Estuarine Waters and Public Trust Area AECs). The following LUP policies may be applicable to this request: 4.2.6 Areas of Environmental Concern Policy 1, pg. 94: The Town of Morehead City supports state and federal law regarding land use and development in AECs. Policy 2, pg. 94: Morehead City considers coastal wetland areas to be valuable passive recreation areas. These areas should be protected in their natural state. Only uses which are permitted by 15A NCAC 7H will be allowed. Policy 5, pg. 94: Morehead City supports the use standards for estuarine and public trust areas as specified in 15A NCAC.0207. D Q� ER IF= r 'a���,. 'WE D SEP 1 6 2021 North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 2528082808 ROY COOPER covernor ELIZABETH S. BISER sermrory BRAXTON DAVIS Dirrrmr September 15, 2021 MEMORANDUM: �� ,w:5jjTA7fo Al h NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax:252-247-3330 (Courier11-12-09) areas bodnaKbNCDENR.aov SUBJECT: CAIM9A / Dredge and Fill Application Review Applicant: Chambers, Kenneth Project Location: 1302 Barnacle Ln, Carteret County Proposed Project: Pier, platform, boatlift in Mariners Point SD Please indicate below your agency's position or viewpoint on the proposed project and return this form to Grean Bodnar at the address above by October 15, 2021. If you have any questions regarding the proposed project, contact Heather Styron 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached - This agency objects to the project for reasons described in the attached comments. PRINT NAME Lee Padrick AGENCY NCCommerce Rk CE�1I ED SIGNATURE Pac DATE 9-15-21. SEP 1 5 2021 D �p North Carolina Department of Envlronmemal Quallty I DivisionolCoastal Management J/ Mmeheod City Offlce 1400Commevur Avenge I Mooreheud City, Narlh Camlino 28557 252808.28OA ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director September 15, 2021 NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnartcDN CD EN R.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Chambers, Kenneth Project Location: 1302 Barnacle Ln, Carteret County Proposed Project: Pier, platform, boatlift in Mariners Point SD Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greaa Bodnar at the address above by October 15, 2021 If you have any questions regarding the proposed project, contact Heather Styron 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. X **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Shannon Myers AGENCY NCDMF- Shellfish Sanitation and Recreational Water Quality SIGNATURE for Shannon Jenkins DATE 9/23/2021 RIEDEIVD S E P 2 A 2021 IVP SECTION MHD DEQ�� North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 �'^"*�61—\0a 252.808.2808 1K ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director September 15, 2021 NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) Gregg. bodnar(a) NCD EN R.gov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Chambers, Kenneth Project Location: 1302 Barnacle Ln, Carteret County Proposed Project: Pier, platform, boatlift in Mariners Point SD Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by OQtOber 1 S, 202t If you have any questions regarding the proposed project, contact Heather Styron 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" _ This agency has no comment on the proposed project. X This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAMEJames Harrison AGENCY NCDMF SIGNATURE %R. n&k f'(6WY^isf/t'L DATE 8 October 2021 EzCEiVlD OCT 1 1 2021 MP SECTION MHD North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 my�mum�o�.wmm� /� 252.808.2808 IA ROY COOPER Governor JOHN NICHOLSON Interim Secretary KATHY B. RAWLS Director TO: Gregg Bodnar, NCDCM Assistant Major Permits Coordinator FROM: James Harrison, NCDMF Fisheries Resource Specialist SUBJECT: Chambers Residence, Carteret County DATE: 8 October 2021 A North Carolina Division of Marine Fisheries (DMF) Fisheries Resource Specialist has reviewed the permit application for proposed actions that may impact fish and/or fish habitats. The proposed work is located at 1302 Barnacle Lane, Morehead City, within Carteret County. The applicant is proposing to install a 6' by 427' pier, a 15' by 22' L-head platform, and an 8' by 8' boatlift. No upland development is proposed. Water depths are approximately -2' normal low water (NLW). This area is designated as a Primary Nursery Area (PNA) and the waters are classified as SA/HQW and is closed to the taking of shellfish. There are also oyster beds present within the project footprint. Areas designated as PNA are critical in the life history cycle of the species that utilize these areas as nursery habitat. Many of the species found in these areas have specific habitat requirements (i.e. temperature, salinity, and water velocity) for the susceptible stages of development, and waters designated as PNA meet those specific requirements. In addition to meeting the environmental requirements, these areas also often provide significant refuge habitat and foraging resources for species. Therefore, it is critical that these habitats be protected from impacts that may occur as a result of coastal development. Taking into consideration the PNA designation and the presence of oyster beds, DMF would oppose to the project unless the following recommendations are incorporated into the permit. First, the boat lift should incorporate stops at 18 inches to prevent the vessel from resting on the bottom and to limit vessel use during low tides when bottom disturbance could occur. Also, the platform should include design elements (i.e. railings) that prevent the structure from being used for the docking of vessels. The issuance of the permit should also be conditioned on no additional slips being added in the future. In order to protect the existing oyster resources, care should be taken no to smother oysters with equipment or sediment. Where impacts would be unavoidable (i.e. piling placement), oysters should be moved by hand to an area adjacent to the project. Lastly, the pilings should be the maximum distance apart to minimize wetlands and oyster resource impacts. Thank you for consideration of our comments and concerns. Please contact Jimmy Harrison at (252) 948-3835 or at james.harrisonAncdenngov with any further questions or concerns. RECEIVED State of North Carolina I Division of Marine Fisheries OCT 1 1 2021 3441 Arendell Street I P.O. Box 769 1 Morehead City, North Carolina 26557 252-726-7021 r" SECTION MHD ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director September 15, 2021 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC•28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnar aANCDENR.cov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Chambers, Kenneth Project Location: 1302 Barnacle Ln, Carteret County Proposed Project: Pier, platform, boatlift in Mariners Point SD Please indicate below your agency's position or viewpoint on the proposed project and retum this torrn to Gregg Bodnar at the address above by October 15, `2021 If you have any questions regarding the proposed project, contact Heather Styron 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" A, This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NARAE U iarn►d a w 6tt ar-d AGENCY �o�l�i �.�p.p�.pn"� _�Q,t,C� SIGNATURE WO_-rt0t0�- CL' �— RECEIVED DATE ncnmcran� D Q!� OCT 5 2021 DAP SECTMN MHD North Carolina Department of Environmental Quality 1 Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 252.808.2808 ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director September 15, 2021 NORTH CAROLINA Environmental Quality `" `� Received: 10/02/2021 �.�f'� State Historic Preservation Office ER 21-2274 A - DUE 10/13/21 10/12/2021 No comment — SBA FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg. bodnar(a) NCDEN R.gov SUBJECT: CAMA%Dredge and Fill Application Review Applicant: Chambers, Kenneth Project Location: 1302 Barnacle Ln, Carteret County Proposed Project: Pier, platform, boatlift in Mariners Point SD Please indicate below your agency's position or viewpoint on the proposed project and return this form to Grego Bodnar at the address above by 046ber_15, 2021.' If you have any questions regarding the proposed project, contact Heather Styron 252-80B-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Renee Gledhill -Earley AGENCY Historic Preservation Office SIGNATURE QwUU"" DATE 10/13/2021 RECEIVE® OCT 1 3 2021 MP SECTION MHD North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 2528082808 ROY COOPER Governor ELIZABETH.S. RISER Secretory BRAXTON DAVIS Director September 15, 2021 MEMORANDUM. NORTH CAROLINA .Environmental Quatity G.yl•c'9.01 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnar()NCDENR.gov SUBJECT: LAMA /Dredge and Fill Application Review Applicant: Chambers, Kenneth Project Location: 1302 Barnacle Ln, Carteret County Proposed Project: Pier, platform, boatllit In Mariners Point SD Please indicate below your agency's position or viewpoint ontheproposed project and return this form to Grego Bodnar at the address above by Odtober 45, ,2O If you have any questions regarding the proposed project, contact Heather Styron 252-808-2808. when appropriate, in-depth comments with supporting data is requested. no '`Additional comments may be attached" This agency has no comment on the proposed project. _--,.—'This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT.NAME McX1C 1 ' A nn AGENCY 1�IIC�t�IR C SIGNATURE. �A �-�- I)ATE 1D—I'k--'LpZ1 DE Q �YeM41 pY,N,� IVIE:D OCT 1 q 2021 MP,SECTION P4111 3 North. Carolina Department of Environmental Qaolity I Division of Coastal Management Morehead Clty office 1400 CommerreAvenue I Moorehead City, North Carolina 28557 252.808.2808 North Carolina Wildlife Resources Commission n Cameron Htgram, Executive Director lu T9u WIT, lul TO: Gregg Bodnar 1-1E E 9 V E® Division of Coastal Management North Carolina Department of Environmental Quality �,-,, TI- OCT 1 A 2021 FROM: Maria T. Dunn, Coastal Coordinator Habitat Conservation Division MP SECTION MHD DATE: October 14, 2021 SUBJECT: CAMA Dredge/Fill Permit Application for Kenneth Chambers, Carteret County, North Carolina. Biologists with the North Carolina Wildlife Resources.Commission (NCWRC) reviewed the permit application with regard to impacts on fish and wildlife resources. The project site:is located at 1302 Barnacle Lane within the Mariners Point SD in Morehead City, NC adjacent to Dill Creek. Our comments are provided in accordance with provisions of the Coastal Area Management Act (G.S. 113A-100 through 113A-128), as amended, Sections 401 and 404 of the Clean Water Act, as amended, and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661 et seq.). The applicant proposes to construct a 427' pier over coastal wetlands and open water, a 15' 22' L- platform, and an 8' by 8' boatlift A circulation of the projected is a requirement of the subdivision's Permit No. 167-07 for additional slip installation. The piers platform would extend 75' into the 300' water body, terminating 8' landward the channel. The water depth within the slip is approximately -2' NLW. Oysters are within the, area, located along the marsh. The substrate is thick organic mud. Dill Creek at this location is classified SA HQW by the Environmental Management Commission and is designated a primary nursery area (PNA) by the NC Division of Marine Fisheries. The NCWRC is very familiar with the site and the Mariner's Point subdivision. The allowance of the multi -slip facility was to minimize impacts from individual lots developing water access and compromising environmental resources. The waters of Dill Creek are designated aPNA. PNAs are defined as those areas inhabited by the embryonic, larval or juvenile life stages of marine or estuarine fish or crustacean species due to favorable physical, chemical or biological factors. As a designated PNA, the creek provides an impoiiant rearing'area for this variety of estuarine fishes and invertebrates that need relatively undisturbed habitats. Erosion of the marsh, sediment disturbance, turbidity, and contamination collectively will degrade vital habitat and forage for wildlife in Dill Creek. Resources within the creek and various marsh plants along the shore provide food and cover for a variety of wildlife such as blue Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 'F -- • Page 2 heron (Ardea herodias), sora rail (Porzana carolina), and pintail (Anas acuta). Extensive beds of oysters are also present along the shoreline and would be vulnerable to continuous boating activity. To minimize the impacts this facility may have, we request a construction moratorium from April 1— September 30 due to the designation of the water body, the SA H WQ water classification, the presence of oysters, and the importance of coastal marsh during the peak period of biological productivity. This moratorium should be observed for any portion of the structure that is constructed over coastal wetlands, oyster habitat, and open water. We appreciate the opportunity to review and comment on this permit application. If you need further assistance or additional information, please contact me at (252) 948-3916 or at maria.dunn@ncwildlife.org UP SECTION dVIh10 ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director DATE: FROM: SUBJECT: NORTH CAROLINA Environmental Quality October 28, 2021 Holley Snider ff s NCDEQ-Division Water Resources 401 Buffer Permitting Branch DWR #20071367v10 No Written Approval Required PROJECT LOCATION: 1302 Barnacle Lane, Morehead City, Carteret County Kenneth Chambers RZECEP r E ® NOV 1 2021 NIP SECTION AHD PROPOSED PROJECT: Construction of a private residential one -slip docking facility The Division of Water Resources (DWR) has received a copy of your CAMA Major permit application request dated received by this office on October 13, 2021. The waters of the Dill Creek are classified as SA;HQW by the Division of Water Resources (DWR) and have been determined to be a Primary Nursery Area (PNA) by the Division of Marine Fisheries (DMF). Please understand that the waters around your project area have been identified as a PNA and should requests for dredging within the proposed project area arise in the future, they will be denied. Please be aware that new dredging within a PNA is not permitted under 15A NCAC 02B .0220. This activity results in degradation of water quality standards and is therefore considered a water quality violation. Any turbidity standard violations of waters going into these creeks are also considered Water Quality Violations. [15A NCAC 02B .0220]. The Permittee shall comply with any moratoriums per the NC Division of Marine Fisheries and the NC Wildlife Resources Commission. Dredging moratoriums shall be observed as required by the NC Division of Marine Fisheries, NC Wildlife Resources, US Fish and Wildlife and National Marine Fisheries. If such activities should take place during periods of high biological activity (e.g. shorebird, or sea turtle nesting), biological monitoring may be required at the request of other state and federal agencies and coordinated with these dredging activities. [15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)] In accordance with the attached General Certification #4175 (GC 4175), the impacts described in your application do not require written authorization to utilize GC 4175. However, you are required to follow the conditions listed in the attached certification. You should also obtain and comply with any other federal, state and local requirements including (butnot limited to erosion and sedimentation control regulations and state stormwater requirements D North Carolina Department of Environmental Quality I Division of Water Resources Wilmington Regional Office 1127 Cardinal Drive Extension l Wilmington, North Carolina 28405 910.796.7215 before you proceed with your project). Also, the approval to proceed with your proposed impacts to waters a depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at htto://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. NOV 1 2021 MP SECTION MHD uoRm D rk 0 North Carolina Department of Environmental Quality 1 Division of Water Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 u��i 910.796.7215 ww•.. From: yajr, Sarah E CIV USARMY CESAW (USA) To: Bodnar. Greco Subject: [External] FW: CAMA MA]OR/GP 291/SAW-2021-02006_1302 Barnacle Lane -Chambers dock Date: Wednesday, November 10, 2021 1:59:55 PM CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Gregg, Hope all is well. Below are NMFS' comments/concerns regarding the proposed docking facility. They recommend stops and avoidance of oyster beds during construction. Any oysters that cannot be avoided should be relocated by hand. NMFS also recommends that permits state that future request for additional slips or dredging would not be supported by resource agencies. Liz From: Pace Wilber - NOAA Federal <pace.wilber@noaa.gov> Sent: Tuesday, November 9, 2021 2:50 PM To: Hair, Sarah E CIV USARMY CESAW (USA) <Sarah.E.Hair@usace.army.mil> Cc: Twyla Cheatwood - NOAA Federal <twyla.cheatwood@noaa.gov>; Fritz Rohde - NOAA Federal <fritz.rohde@noaa.gov> Subject: [Non-DoD Source] Re: [WARNING: UNSCANNABLE EXTRACTION FAILED][WARNING: UNSCANNABLE EXTRACTION FAILED]CAMA MAJOR/GP 291/SAW-2021-02006_1302 Barnacle Lane —Chambers dock Hi Liz. While we are generally ok with the project, the presence of oysters and the area being a PNA gives us some concern. We would like to see the project amended to reduce impacts to the estuarine bottom. As noted in NCDMF's letter, the desired impact minimization could be achieved by incorporating stops at 18 inches to prevent the floating dock from resting on the bottom and to limit vessel ingress and egress during low tides when bottom disturbance is more likely. The oyster patches should be avoided during construction. Oysters that cannot be avoided could be relocated by hand to a safe, nearby location. Lastly, we believe it would be helpful to the homeowner if the permit noted resource agencies are unlikely to support adding additional boat slips or dredging. If additional discussion is needed, please let us know. Pace On Tue, Oct 19, 2021 at 1:49 PM Hair, Sarah E CIV USARMY CESAW (USA) <Sarah,E.Hairausace.armv.mil> wrote: All, Pursuant to the CAMA-Corps Programmatic Permit process, the North Carolina Division of Coastal Management (NCDCM) has forwarded to our office a copy of the CAMA permit application, Field Investigation Report/ Bio-Report for the subject project. The attached notice requests federal agency comments on this project by November 18, 2021. The site is located within waters of/adjacent to Dill Creek, located at 1302 Barnacle Lane (in Mariners Point S/D), in Morehead City, Carteret County, North Carolina. Approximate Coordinates in Decimal Degrees are 34.734966 N,-76.719755 W. The applicant proposes to construct a new, single -slip docking facility. According to the plans, the proposal is to construct a 6' wide X 468' long access pier (427' waterward of NHW) over coastal wetlands, oyster rock, and open water, with a 22' x 15' L-head platform at the terminal end. The applicant is proposing a single 8' x 8' boatlift along the north side of the platform. The proposed structure is not located near a federal channel. Please see the attached field investigation report, application, kmz file, and plans for detailed information concerning the proposed project. EFH: This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson - Stevens Fishery Conservation and Management Act. The Corps' initial determination is that the proposed project may affect, but not likely adversely affect EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine Fisheries Service. The waters within the project area ARE designated as PNA by the NC Division of Marine Fisheries, are classified as SA; High Quality Waters by the NC Division of Water Resources, and are Closed to harvesting shell fish. Average water depths along the proposed platform and slip area are -2.0' at Normal Low Water (NLW). According to the BioReport, healthy/productive oyster populations would be disturbed during construction. ESA: The Corps has reviewed the project area, examined all information provided by the applicant and consulted the latest North Carolina Natural Heritage Database. Based on available information, the Corps has determined that the project may affect, but is not likely to adversely affect the West Indian Manatee. The use of Manatee Guidelines may be required as a permit condition. The project would have No Effect on any other federally listed species. NHPA 106: Pursuant to Section 106 of the National Historic Preservation Act (NHPA) of 1966, Appendix C of 33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C, the District Engineer consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that no historic properties, nor properties eligible for inclusion in the National Register, are present within the Corps' permit area: therefore, there will be no historic properties affected. Please contact me if you have any questions and provide comments at your earliest convenience, or by November 18, 2021. Thanks! Liz Hair Regulatory Project Manager Wilmington District US Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 Sarah.e.hair(@usace.army.mil Work Cell: 910-512-4456 Pace Wilber, Ph.D. Acting Assistant Regional Administrator Habitat Conservation Division NOAA Fisheries Service 331 Ft Johnson Road Charleston, SC 29412 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT. CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 November 24, 2021 Regulatory Division Action ID No. SAW-2021-02006 Mr. Jonathan Howell Division of Coastal Management North Carolina Department of Environmental Quality 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Howell: RECE ED NOV ') 9 2021 rimy GECTION 1110 Reference the application of the Mr. Kenneth Chambers to construct a new, private docking facility in waters of/adjacent to Dill Creek, located at 1302 Barnacle Lane, (in the Mariners Point Subdivision), in Morehead City, Carteret County, North Carolina. Specifically, the applicant proposes to construct a new, single -slip docking facility. According to the plans, the proposal is to construct a 6' wide X 468' long access pier (427' waterward of NHW) over coastal wetlands, oyster rock, and open water, with a 22' x 15' L-head platform at the terminal end. The applicant is proposing a single 8' x 8' boatlift along the north side of the platform. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the modification to the State authorization: 1. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at b=s://www.fws.gov/raleighWfs/ManateeGuidelines20l7.pd 2. Stops at 18 inches are recommended in order to prevent the floating dock from resting on the bottom, and to limit bottom disturbance associated with vessel ingress/egress during low tides. 3. The oyster patches should be avoided during construction. Oysters that cannot be avoided could be relocated by hand to a safe, nearby location. -2- Alft . 4. Future request for additional slips or dredging would not be supported by resource agencies. 5. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772-2191. 6. All work authorized by this permit must be performed in strict compliance with the submitted plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 7. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 8. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 9. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Resources at (919) 733- 5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 10. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 11. If the permittee discovers any previously unknown historic or archeological remains while accomplishing the authorized work, he will immediately notify the Wilmington District Engineer who will initiate the required coordination procedures. 12. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. RECENED E? vvCT10N MHO -3- 13. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter I I3A Article 4). 14. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 15. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre -project condition. 16. Violations of these conditions or violations of Section 404 of the Clean Water Actor Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Questions or comments may be addressed to Ms. Liz Hair Wilmington Field Office, Regulatory Division, telephone (910) 251-4049 or email at sarah.e.hair@usace.army.mil. Sincerely, Liz Hair, Project Manager Wilmington Regulatory Field Office Electronic Copy Furnished: USEPA; Mr. Todd Allen Bowers NCDEQ/DCM; Mr. Gregg Bodnar NCDEQ/DWR; Ms. Holley Snider USFWS; Mr. Pete Benjamin/Mr. John Ellis NMFS; Dr. Pace Wilber/Ms. Twyla Cheatwood Fl ` a, ME (3 E 1717 E. D NOV 9 9 2021 Fps 11P S:1Z Io 2 10 6 I IV, H T) DCM Coordinator: �til /> Permit #: Iv/ r MAMING DISTRIBUTION SHEET / Permittee: reO4t 1 1.� n %14t 6erx, ?�W 50eld?Z— DCM Field Offices Elizabeth City �-,Washington (with revised work plan drawings) Morehead City &l e`r/ Wilmington (OBJECTIONS ) US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Washington: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Kim Harding David Harris Shannon Jenkins / Sharon Lupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan Chris Pullinger — 401 Clif Whitfield (WARD) Jimmy Harrison Tina Martin - 401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Holley Snider — 401 (Carteret, Onslow, Pender, Brunswick, New Hanover) John Perry — 401 (TBD) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARD) Natural Heritage Program Rodney Butler Buse '(� (NCDOT) Travis Wilson BCH IR-1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Pr/maryApplicent/Landowner lnformation Business Name Project Name (if applicable) N/A N/A Applicant 1: First Name MI Last Name KENNETH N CHAMBERS Applicant 2: First Name MI Last Name N/A N/A N/A If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State NATHAN CHAMBERS 3049 Atlantic Beach NC ZIP Country Phone No. FAX No. 28512 USA 704 - 239 — 0691 ext. N/A - NIA - WA Street Address (if different from above) City State ZIP 607 ATLANTIC BEACH CAUSEWAY, SUITE 101 Atlantic Beach NC 28512- Email NATHANOCHAMBERSCOASTALREALTY.COM 2. AgenWontrector Information Business Name N/A Agent/ Contractor 1: First Name MI Last Name N/A N/A N/A Agentf Contractor 2: First Name MI Last Name N/A N/A N/A Mailing Address PO Box City State N/A N/A N/A N/A ZIP Phone No. 1 Phone No. 2 N/A N/A - N/A - WA ext. N/A N/A - N/A - N/A ext. N/A FAX No. Contractor f N/A WA WA N/A Street Address (if different from above) City State ZIP N/A N/A N/A N/A - Email N/A <Form continues on back> RECEIVED APR 29 2021 252•BOB-2808 :: 5 .,COAST :: www.nccoastaimanagement.net DCM-MHD CITY Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. ti CARTERET 1302 BARNACLE LANE N/A Subdivision Name City State Zip MARINERS POINTE MOREHEAD CITY NC 28557 - Phone No. Lot No.(s) (if many, attach additional page with list) 704 - 239 - 0691 art. 45, N/A, N/A, N/A, N/A a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project WHITE OAK RIVER CRAB POINT BAY c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project she. ®Natural ❑Manmade []Unknown NEWPORT RIVER e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. MOREHEAD CITY 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 174 22667 c. Size of individual lolls) d. Approximate elevation of tract above NHW (normal high water) or N/A, N/A, WA, N/A NAIL (normal water level) (If many lot sizes, please attach additional page with a list) 5 FEET ®NHW or ❑NWL e. Vegetation on tract VARIOUS GRASSES, MARSH GRASS AND A FEW LIVE OAKS f. Man-made features and uses now on tract NONE g. Identify and describe the existing land uses ad''ace to the proposed project site. VACANT SINGLE FAMILY HOUSE LOTS h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? R70-CU (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No ®NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does ft Involve a []Yes ®No []NA National Register listed or eligible property? <Form continues on next page> RECEIVED ' :i0"ift 252.808.2808 :: 1.888-4Rv,_AST :: www.nccoastaimanagement.net DCM-MHD CITY Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. 0) Are there wetlands on the sae? ®Yes []No (ii) Are there coastal wetlands on the site? ®Yes ❑No (III) If yes to either (i) or (it) above, has a delineation been conducted? []Yes ®No (Attach documentafion, if available) n. Describe existing wastewater treatment facilities. PUBLIC SEWER o. Describe existing ddnking water supply source. PUBLIC WATER p. Describe existing storm water management or treatment systems. EXISTING SHEET FLOW 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commerclel ❑Public/Govemment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. PRIVATE DOCK FOR HOME OWNER USE WITH BOAT LIFT. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. USING MATS AND FLOATING BARGES TO DRIVE IN APPROXIMATELY 120 PYLONS INTO THE GROUND WITH AN EXCAVATOR WITH A VIBRATORY HEAD ATTACHMENT. ONSITE FOR APPROXIMATELY 15 DAYS. d. Ust all development activities you propose. SINGLE FAMILY HOME BUILT ON LOT WITH PRIVATE DOCK e. Are the proposed activities maintenance of an existing project, new work, or both? N/A f. Whet is the approximate total disturbed land area resulting from the proposed project? 2772 ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public sccessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. N/A i. Will wastewater or stormwater be discharged Into a wetland? []Yes []No ®NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ❑No ®NA j. Is there any mitigation proposed? ❑Yes ❑No ®NA If yes, attach a mitigation proposal. <Form continues on back> RECEIVED APR 2 9 2021 252.808.2808 .. 9 ,:.88-4RCOAx,. .. www.nccoastaimanagement.netDCM—MHDCITY Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f)are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed realm receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name ROBERT AND WENDY BUSH Phone No. 303-660-1935 Address 1074 BUFFALO RIDGE ROAD, CASTLE PINE CO, 80108 Name CLARKE MERRELL Phone No. 252-725-5394 Address 800 HENDRICK BLVD., MOREHEAD CITY NC, 28557 Name WA Phone No. NIA Address WA g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. WA WA WA WA h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. I I3A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date _4/28/2021 Print Name _KENNETH NATHAN CHAMBERS_ Signature looekl-� Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information RECEIVED APR 29 2021 252.808.2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net DCM-MHD CITY Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Govemment ®Private/Community El This section not applicable b. () Witl the faddy be open to the general public? ❑Yes NNo c. (i) Dock(s) and/or pier(s) d. (!)Are Finger Piers included? []Yes NNo (ii)Number 1 If yes: (ii) Length 427 (ii) Number WA (iv) Width 6 (111) Length N/A (v) Floating []Yes NNo (iv) Width N/A (v) Floating ❑Yea []No e. (i) Are Platforms included? ®Yes []No f. () Are Boatlifts included? ®Yes ❑No If yes: If yes: (ii) Number 1 (it) Number 1 (iii) Length 15 (ill) Length 8 (iv) Width 22 (iv) Width 8 (v) Floating []Yes NNo Note: Roofed areas are calculated from dnpline dimensions. g. (I) Number of slips proposed h. Check all the types of services to be provided. 1 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 0 ❑ Dockage, fuel, and marine supplies ❑ Dockage ('Wet slips") only, number of slips: N/A ❑ Dry storage; number of boats: N/A ❑ Boat ramp(s); number of boat ramps: N/A ❑ Other, please describe: N/A i. Check the proposed type of siting: j. Describe the typical boats to be served (e.g., open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). ❑Open water; dredging for basin and/or channel Open Runabout NOpen water; no dredging required ❑Other; please describe: k. Typical boat length: 21 I. (1) Will the facility be open to the general public? m. (i) Will the facility have tie pilings? ❑Yes NNo RECEIVED ❑Yes NNo (ii) If yes number of be pilings? APR 29 ZOZI N/A DCM-MHD CITY 252-808-2808 :: 1.6a8-4RCOAST :: www.nccoastaimananoment.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACIUTY/MAR/NA OPERATIONS []This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: N/A; Location: N/A ❑ Showers ❑ Boatholding tank pumpout; Give type and location: N/A b. Describe treatment type and disposal location for all sanitary wastewater. N/A C. Describe the disposal of solid waste, fish offal and trash. N/A d. How will overboard discharge of sewage from boats be controlled? N/A e. () Give the location and number of "No Sewage Discharge" signs proposed. N/A (ii) Give the location and number of "Pumpout Available" signs proposed. N/A f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. N/A g. Where will residue from vessel maintenance be disposed of? N/A h. Give the number of channel markers and "No Wake" signs proposed. N/A i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. N/A j. What will be the marina policy on overnight and five -aboard dockage? N/A k. Describe design measures that promote boat basin flushing? N/A 1. If this project is an expansion of an existing marina, what types of services are currently provided? N/A RECEIVED m. Is the marina/docking facility proposed within a primary or secondary nursery area? ®Yes ❑No APR 29 2021 DCM-MHD CITY 'l52-8U8-2808 :: 1.868-4RCOAST :: www.ncc_oastalm__anagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes ®No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ®CW 2772 ❑SAV ®SB 2772 OWL _ []None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. N/A 3. BOATHOUSE (including covered lilts) ®This section not applicable a. (I) Is the boathouse structure(s): ❑Commercial ❑PubliGGovemment ❑Pdvate/Community (III Number N/A (III) Length N/A (iv) Width N/A Note. Roofed areas are calculated from dripline dimensions. 14. GROIN (e.g., wood, sheetpile, etc. Ma rock groin, use MP-Z Excavation and Fill.) ®This section not applicable a• (i) Number N/A (ii) Length N/A (ill) Width N/A 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length N/A c. Maximum distance beyond NHW, NWL or wetlands N/A b. Average distance from NHW, NWL, or wetlands N/A B, MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): []Commercial ❑PubliGGovemment ❑Pdvate/Community c. Distance to be placed beyond shoreline N/A Note: This should be measured from marsh edge, if present. e. Arc of the swing _ 7. GENERAL b. Number N/A d. Description of buoy (color, inscription, size, anchor, etc.) N/AN/A RECEIVED APR 2 9 2021 i)CM-MAID CITY �::: su8.2808 5 a.a-a- <;t AST :: www.nccoastalmanagement.net revised: 12127106 Form DCM MP-4 (structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines 20 feet Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 540 e. (1) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent doclung facilities. 647 FEET FROM DOCK TO NORTH AND 711 FEET FROM DOCK TO THE SOUTH. d. Water depth at waterward end of structure at NLW or NWL 3' & OTHER ❑This section not applicable a. Give complete description: 467 foot long dock with an L shaped end that is 15 by 22 feet by wide and a 8 by 8 boat lift at end. It is for a single family home. 4/28/2021 Date N/A Project Name Kenneth Nathan Chambers Applicant N/ame Applicant Signature RECEIVED APR 29 2021 DCM-MHD CITY 252-808.2808 :: 1.888.4RCOAST :: www.nccoastaimanagem nt.net revised: 1227/06 2. 3. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Kenneth Chambers, 1302 Barnacle Lane (lot 45 Mariners Point) C/O Stroud Engineering LOCATION OF PROJECT SITE: 1302 Barnacle Lane in Morehead City adjacent to Dill Cr. Longitude:76°43'12 Latitude:34°44'05 INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit— 9/20/2021 Was Applicant Present —NO 5. PROCESSING PROCEDURE: Application Received and Complete — 7/9/2021 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Morehead City dated 9/28/07 Land Classification from LUP — Low Density Residential/Conservation (B) AEC(s) Involved: CW, EW, PTA (C) Water Dependent: Dock(yes) (D) Intended Use: Private (E) Wastewater Treatment: Existing —Morehead City Sewer Planned - none (F) Type of Structures: Existing — Roads and infrastructure Planned — pier, platform, boatlift (G) Estimated Annual Rate of Erosion: N/A Source —N/A 7. HABITAT DESCRIPTION: (A) Coastal Wetlands/Oyster Rock Below NHW N/A N/A 1962112 Incorp. 1962ftz Shaded (B) Coastal Wetlands above NHW N/A N/A 240 ft2 Incorp. And shaded (C) Open Water ( pier, platform, N/A N/A 754112 Incorp. boatlift) 690ftz Shaded (D) Total Area Disturbed: 2,956111 (E) Primary Nursery Area: Yes (F) Water Classification: SA/HQW Open: No 8. PROJECT SUMMARY: The project is for a pier, platform and boatlift for lot 45 of the Mariners Point s/d. As a requirement of the original major permit for the s/d each lot would be required to apply for a major permit if individual docks were requested. Field Investigation Report: Chambers Lot 45 Mariners Point Page 02 9. Narrative Description: The lot 45 project is located at 1302 Barnacle Lane off Oglesby Rd which is part of the existing Mariners Point subdivision. Mariners Point was permitted through major permit # 167-07 for infrastructure, 149 lots and a docking facility. Oglesby Rd. is found by turning right off ofN. 20`h St. in Morehead City in the area locally known as Crab Point. Dill Creek borders this site to the east and north. Lot 45 is .520 acres (22,667) in its entirety and is an average of 5' above NHW. The total length of the shoreline is 174'. There is a 174' x 370' fringe of Coastal Wetlands presentalong the shore adjacent to Dill Creek. This fringe contains Smooth Coordgrass S artina altgrniflora), Salt Grass (Distichlis spicata) and Salt Meadow Grass (Spartina patens). Within the waters of Dill Creek expanses of oyster beds are present. The water depths in Dill Creek are shallow (-2'nlw) and according to the applicant, reach-3' NLW within the channel portion and an average of-2' at NLW at the waterward end of the proposed structure. Extensive field work confirms the soundings as well as the channel edge along the property located approximately 83' from the edge of marsh/ oyster rock. The substrate in this area is thick organic mud. The lot is not developed at this time. This section of Dill Creek is a PrimaryNursery Area as designated by the Division of Marine Fisheries and the Division of Water Quality classifies it as SA/HQW waters. The area in which the proposed project would take place is closed to the taking of shellfish. Morehead City's Land Use Plan dated 2007 classifies this area as Low Density Residential and Conservation within the AECs. 10. Project Description: The applicant is proposing a 6' x 427' pier, a 15' x 22' L- head platform and an 8' x 8' boatlift. No upland development is proposed. The pier would extend from high ground and. cross over coastal wetlands landward of NHW for approximately 40', coastal wetlands and oyster beds below NHW for approximately 327"and open water for 60' with a total length of 427' (area over the coastal wetlands/oyster beds and open water'). It would then intersect a 15' x 22' 1-head platform. There is one slip proposed with an 8' x 8' boatlift along the north side of the proposed platform. The maximum boat length would be 21' and of open runabout design. The water depths along the platform and within the slip is -2.0' nlw. The most water ward portion of the structure would be located 8' landward of the edge of the existing channel (incorrect on the plat). The Division has determined through previous permit activity, that the configuration of marsh and oyster beds along the shoreline of this property establishes the point from which to measure the water body for the immediate area, creating a width of 300'. In consideration of this, the impedance into the water body by the structure consequently extends approximately 75' into the 300' body of water and would be 8' landward of the channel edge. The pier and platform would be located approximately 20' from the north riparian access line and 30' from the south riparian access line. Riparian access lines where determined on the original major Field Investigation Report: Chambers Lot 45 Mariners Point Page 03 permit submittal for the subdivision as well as through field visits and aerial photography and are drawn relative to the channel location. All water depths and the outermost limit of the oyster rock, channel location and water body width have been field verified by DCM staff on numerous occasions throughout the years. II. Anticipated Impacts: The proposed pier as would shade and incorporate 240ft2 of coastal wetlands above NHW, as well as shade and incorporate 1962 ftz of coastal wetlands and oyster beds. A total 690 ftZ of open water of would be shaded and 754 ftz incorporated by the pier, platform and boatlift. Oyster beds containing healthy (productive) populations existing along the shoreline would be disturbed during the construction process. There would also be temporary turbidity during piling placement. The Division of Land Resources approved the Sedimentation and Erosion control plan (CARTE-2006-440) on 6/19/06 with the DWQ Stormwater permit #S W8060625 issued on 7/12/06 for the existing s/d. No written concurrence is required by NCD WR per GC 4175. Based on the determination of the water body widths by the Division and the District, the structure should not cause a hindrance to navigation due to the location of the existing oyster beds. The oyster beds/coastal wetland area terminates approximately 360' waterward of NHW. The channel edge is located approximately 83' from the edge of the oyster beds. Name Heather Styron Date 9/6/2021 Morehead City "*This is a word processing form to be completed In Microsoft Word' NC Division of Coastal Management Major Permit Application Computer Sheet (02/15/2010) Applicant: Kenneth Chambers Date: 9/8/2021 Project Site County Carteret Staff: HMS District: Elizabeth City Washington ®Morehead City ❑Wilmington Project Name: Kenneth CHambers Date application "received as complete" in the Field office (EX: 1/8/2007): 7/9/2021 Permit Authorization: CAMA Dredge & Fill Both SITE DESCRIPTION/PERMIT INFORMATION PNA: SYes No Photos Taken: Yeso No Setback Required (riparian): ZYes yes Critical Habitat: []Yes ®No []Not Sure 15 foot waiver obtained: Yes nNo Hazard Notification Returned: []Yes ®No SAV: Yes ZNo Not Sure Shell Bottom: Yes No Not Temporary Impacts: JDYes ❑No Sure Sandbags: []Yes []No Not Sure Did the land use classification come from Mitigation Required (optional): county LUP: []Yes ®No []Yes ®No Moratorium Conditions: NYes UNo Environmental Assessment Done: ❑NA ❑Yes ®No ❑NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) ❑ Future Water Supply (FWS) ❑ Nutrient Sensitive Waters (NSW) I El Swamp Waters (SW) High Quality Waters (HOW) ❑ Outstanding Resource Waters (ORW) WETLANDSIMPACTED (404) Corp. of Engineers (Jurisdictional (LS) Sea lavender (Limonium sp.) (SS) Glasswort ( Salicornia sp.) wetlands) (CJ) Saw grass (Cladium jamaicense) (SA) Salt marsh cordgrass (Spartina (SY) Salt reed grass (Spartina alterniflora) cynosuroides) (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or three square (Scirpus ❑ (TY) Cattail (Typha sp.) spicats) sp.) El (JR) Black needlerush (Juncus 0 (SP) Salt/meadow grass (Spartina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 III(A) Private w/ D&F up to 1 acre; ❑ III(D) Priv. public or Comm w/ D&F to 1 3490 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major ® Major Modification to a CAMA Major IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer - $100 III(B) Public or commercial w/ D&F to 1 Express Permit - $2000 acre; 3490 can be applied - $400 ❑ Major development extension request - 0 II. Public or commercial/no dredge $100 and/or fill - $400 ® 1. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or Comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 252-808-2808 :: 1.888.4RCOAST :: www.nccoastalmananement.net revised: 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant: Kenneth Chambers Date: 9/6/2021 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found In your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One Pier 1 New Work Replace 427' 6. Mains ❑ ❑ Y ON p latform 1 New Work Replace 22 15 Maint ❑ ❑ Y ON boatlift 1 New Work 0 Replace 8. 8' Maint ❑ ❑ Y [IN New Work 0 Replace Maint ❑ ❑ Y ON New Work 0 Replace Maint ❑ ❑ Y ® N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work B Replace Maint ❑ ❑ Y [IN New Work 0 Replace Maint ❑, ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y [IN New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y [IN New Work B Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y [IN New Work 0 Replace Maint ❑ ❑ Y [IN New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N revised 02115/10 ""This is a word processing form to be completed in Microsoft Word — Applicant: Kenneth Chambers Date: 9/6/2021 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact temp impacts) impact amount) temp impacts) amount Coastal wetlands above NHW Dredge ❑ Fill [I Both [I Other 2q0 240 Open water Dredge ❑ Fill ❑ Both ❑ Other ® 690 690 Coastal wetlands/oyster Dredge ❑ Fill ❑ Both ❑ Other ® 1962 1962 beds below NHW Dredge ❑ Fill ® Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808.2808 :: 1-888.4RCOA3T :: www.nccoastalmanaaement.net revised: 02/15/10 Keefe, Madeline J From: Styron, Heather M. Sent: Tuesday, September 7, 2021 10:43 AM To: Keefe, Madeline J Cc: Bodnar, Gregg Subject: FW: [External] Lot # 44 - Mariners Pointe Dock FYI for the one I sent to you yesterday. Gregg do we need to do a hold letter at this point i From: Jeremy McCombs [mailto:jmccombs@stroudengineer.com] Sent: Tuesday, September 7, 2021 10:23 AM To: Styron, Heather M. <heather.m.styron@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock 614 �b IJ gl-7la l -" !IWerp 40 (J ca �l� CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Heather, It looks like the edge of channel line on the plan is actually the edge of what we thought would be the edge of navigable waters. The edge of channel is out much further and I will have to do a revision on this plan. The numbers in the water are elevations of sea floor and we used the tides and currents charts from the Duke marine lab to establish water depths using the NAVD '88 datum which is what we used to establish the sea floor elevations. I think I will have to redo the one quarter line as well since the channel edge was defined incorrectly? I will revise this copy and send back to you here in a bit. Does everything else look ok? Thanks, Jeremy T McCombs, P1.5 Surveying Supervisor L-5355 STROUD ENGINEERING 422 H WY. 24 Morehead City, NC 28557 Tel: 252-247-7479 x227 Fax: 252-247-4098 ccombs0stroudenaineer.com http5://WWW,5trotAdengineer.com From: Styron, Heather M. <heather.m.styronPncdenr.gov> Sent: Monday, September 6, 20219:22 AM To: Jeremy McCombs <jmccombsCcustroudeneineer com> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock I see that you have the edge of channel landward of the platform and boatlift. I believe the edge of channel is actually 100 feet off of where you are proposing the platform and boatlift. I am saying this because one rule with permitting is no development to encroach into a channel. Also are these water depths at a normal low tide? From: Jeremy McCombs [mailto:imccombs(i+)stroudeneineer coml Sent: Friday, September 3, 20214:07 PM To: Styron, Heather M. <heather.m.stvron@ncdenr.¢ov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Heather, Please see the attached for Mr. Chambers. I can get hard copies over to you if needed. Have a good extended weekend. Thanks, Jeremy T McCombs, PIS Surveying Supervisor L-5355 s STROUD ENGINEERING 422 H WY. 24 Morehead City, NC 28557 Tel: 252-247-7479 x227 Fax: 252-247-4098 jmcc0mb505tr0udengineer.00m https://www.stroudeng i neer.COM From: Styron, Heather M. <heather.m.stvron@ncdenr.aov> Sent: Friday, September 3, 2021 2:49 PM To: Jeremy McCombs <]mccombs@strouden¢ineer.com> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock Did you happen to do a plat for Mr. Nathan Chambers for a majOor permit submittal? The lot is at 1302 Barnacle Lane in Mariners Point s/d. the plat he submitted is hard to see. From: Jeremy McCombs mailto:imccombs@stroudengineer.com] Sent: Wednesday, December 9, 2020 8:24 AM To: Styron, Heather M. <heather.m.stvron@ncdenr.Rov> Subject: [External] Lot # 44 - Mariners Pointe Dock CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning Heather, I hope you had a good Thanksgiving. I wanted to reach out to you about the attached plan to get some feedback and ask a few questions. I'm trying to develop a plan for a potential dock permit on Clarke Merrell's lot. There is a point of riparian setback intersection with lot #45 and I wanted to see how CAMA views this area to the south of the intersection of setback. I have advised them that they would need a setback waiver from Mr. Osbourne Hester and they want to approach him on this subject but I wanted to see if you could review and comment on the plan. The two items I've mentioned above as well as any other barriers you may see with the conceptual plan eventually being submitted as a CAMA major permit that we would need to address. Thank you for your time and if you would rather have a phone conversation; please reach out to me. Thanks, Jeremy T McCombs, P1,5 Surveying Supervisor L-5355 SG ROUD NEERING 3302-C Bridges Street Morehead City, NC 28557 Tel: 252-247-7479 x227 Fax: 252-247-4098 jmccombsC)stroudengirneer.com bttps://www.5troudenQineer.com Keefe, Madeline 1 From: Bodnar, Gregg Sent: Tuesday, September 7, 2021 10:47 AM To: Styron, Heather M.; Keefe, Madeline J Subject: RE: [External] Lot # 44 - Mariners Pointe Dock Is this one that timing issues? If yes then place on hold. If no then as long as they get it to us asap. Gregg From: Styron, Heather M. <heather.m.styron@ncdenr.gov> Sent: Tuesday, September 7, 2021 10:43 AM To: Keefe, Madeline J <Maddy.Keefe@ncdenr.gov> Cc: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: FW: [External] Lot # 44 - Mariners Pointe Dock FYI for the one I sent to you yesterday. Gregg do we need to do a hold letter at this point? From: Jeremy McCombs[mailto:[mccombs@stroudenaineer.com] Sent: Tuesday, September 7, 202110:23 AM To: Styron, Heather M. <heather.m.styron@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Heather, It looks like the edge of channel line on the plan is actually the edge of what we thought would be the edge of navigable waters. The edge of channel is out much further and I will have to do a revision on this plan. The numbers in the water are elevations of sea floor and we used the tides and currents charts from the Duke marine lab to establish water depths using the NAVD '88 datum which is what we used to establish the sea floor elevations. I think I will have to redo the one quarter line as well since the channel edge was defined incorrectly? I will revise this copy and send back to you here in a bit. Does everything else look ok? Thanks, Jeremy T McCombs, P1,5 Surveying Supervisor L-5355 SGROUD NEERING 422 H WY. 24 Morehead City, NC 28557 Tel: 252-247-7479 x227 Fax: 252-247-4098 jmccomb505tr0udengi neer.com bttp5://www,s-ttoudengineer.com From: Styron, Heather M. <heather.m.styron@ncdenr.aov> Sent: Monday, September 6, 20219:22 AM To: Jeremy McCombs <jmccombs@stroudeneineer.com> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock I see that you have the edge of channel landward of the platform and boatlift. I believe the edge of channel is actually 100 feet off of where you are proposing the platform and boatlift. I am saying this because one rule with permitting is no development to encroach into a channel. Also are these water depths at a normal low tide? From: Jeremy McCombs [mailto:imccombs@strouden¢ineer.coml Sent: Friday, September 3, 20214:07 PM To: Styron, Heather M. <heather.m.stvron@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Heather, Please see the attached for Mr. Chambers. I can get hard copies over to you if needed. Have a good extended weekend. Thonks, Jeremy T McCombs, P1,5 Surveying Supervisor L-5355 + SG ROUD NEERING 422 H WY. 24 Morehead City, NC 28557 Tel: 252-247-7479 x227 Fax: 252-247-4098 jmccombs@stroudengineer.com bttps://www.5ttouder)oineev.com From: Styron, Heather M. <heather.m.stvron@ncdenr.¢ov> Sent: Friday, September 3, 20212:49 PM To: Jeremy McCombs <imccombs@stroudenRineer.com> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock Did you happen to do a plat for Mr. Nathan Chambers for a majOor permit submittal? The lot is at 1302 Barnacle Lane in Mariners Point s/d. the plat he submitted is hard to see. From: Jeremy McCombs [mailto:imccombs@strouden¢ineer.com] Sent: Wednesday, December 9, 2020 8:24 AM To: Styron, Heather M. <heather.m.styron@ncdenr.aov> Subject: [External] Lot # 44 - Mariners Pointe Dock CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Soam. Good morning Heather, I hope you had a good Thanksgiving. I wanted to reach out to you about the attached plan to get some feedback and ask a few questions. I'm trying to develop a plan for a potential dock permit on Clarke Merrell's lot. There is a point of riparian setback intersection with lot #45 and I wanted to see how CAMA views this area to the south of the intersection of setback. I have advised them that they would need a setback waiver from Mr. Osbourne Hester and they want to approach him on this subject but I wanted to see if you could review and comment on the plan. The two items I've mentioned above as well as any other barriers you may see with the conceptual plan eventually being submitted as a CAMA major permit that we would need to address. Thank you for your time and if you would rather have a phone conversation; please reach out to me. Thanks, Jeremy T McCombs, PL5 Surveying Supervisor L-5355 STROUD ENGINEERING 3302-C Bridges Street Morehead City, NC 28557 Tel: 252-247-7479 x227 Fax: 252-247-4098 imccombs@stroudengineer.com https://www. stroudeng i neer.com Keefe, Madeline 1 From: Styron, Heather M. Sent: Tuesday, September 7, 2021 12:00 PM To: Keefe, Madeline 1 Subject: FW: [External] Lot # 44 - Mariners Pointe Dock Maddy please discuss this with Gregg. I sent this for circulation but we are going to put it on hold because we are waiting for the updated plans. From: Bodnar, Gregg Sent: Tuesday, September 7, 2021 11:59 AM To: Styron, Heather M. <heather.m.styron@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock Yes. It will come off hold once we review the updated plans and they are acceptable for circulation. G regg From: Styron, Heather M. <heather.m.stvron@ncdenr.gov> Sent: Tuesday, September 7, 2021 11:58 AM To: Bodnar, Gregg <Rreee.bodnarCc@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock This stops the clock correct and it will start for the remaining days once they submit what we need correct? From: Bodnar, Gregg Sent: Tuesday, September 7, 2021 11:30 AM To: Styron, Heather M. <heather.m.stvron@ncdenr.eov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock Just send them a quick email and we can add it to CDAITS. CC me as well. G regg From: Styron, Heather M. <heather.m.styron@ncdenr.zov> Sent: Tuesday, September 7, 2021 11:26 AM To: Bodnar, Gregg <Rreae.bodnar@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock I emailed it to Maddy for circulation yesterday but I have not seen anything from her yet. From: Bodnar, Gregg Sent: Tuesday, September 7, 2021 11:25 AM To: Styron, Heather M. <heather.m.styron@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock Has it been circulated yet? I have not seen it. G From: Styron, Heather M. <heather.m.stvron@ncdenr.gov> Sent: Tuesday, September 7, 2021 11:24 AM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock Do you do this or do I? From: Bodnar, Gregg Sent: Tuesday, September 7, 2021 11:12 AM To: Styron, Heather M. <heather.m.stvron@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock Hold G regg From: Styron, Heather M. <heather.m.stvron@ncdenr.gov> Sent: Tuesday, September 7, 2021 10:47 AM To: Bodnar, Gregg <gregg.bodnar@ncdenr.Rov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock September 22 will be the 75 days. From: Bodnar, Gregg Sent: Tuesday, September 7, 2021 10:47 AM To: Styron, Heather M. <heather.m.stvron@ncdenr.gov>; Keefe, Madeline J <Maddv.Keefe@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock Is this one that timing issues? If yes then place on hold. If no then as long as they get it to us asap. Gregg From: Styron, Heather M. <heather.m.stvron@ncdenr.gov> Sent: Tuesday, September 7, 2021 10:43 AM To: Keefe, Madeline J <Maddv.Keefe@ncdenr.gov> Cc: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: FW: [External] Lot # 44 - Mariners Pointe Dock FYI for the one I sent to you yesterday. Gregg do we need to do a hold letter at this point? From: Jeremy McCombs [mailto:imccombs@stroudengineer.com] Sent: Tuesday, September 7, 2021 10:23 AM To: Styron, Heather M. <heather.m.stvron@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Heather, It looks like the edge of channel line on the plan is actually the edge of what we thought would be the edge of navigable waters. The edge of channel is out much further and I will have to do a revision on this plan. The numbers in the water are elevations of sea floor and we used the tides and currents charts from the Duke marine lab to establish water depths using the NAVD '88 datum which is what we used to establish the sea floor elevations. I think I will have to redo the one quarter line as well since the channel edge was defined incorrectly? I will revise this copy and send back to you here in a bit. Does everything else look ok? Thanks, Jeremy T McCombs, PL5 Surveying Supervisor L-5355 + ST Roue ENGINEERING 422 H WY. 24 Morehead City, NC 28557 Tel: 252-247-7479 x227 Fax: 252-247-4098 jmccombs@stroudenQineer.com bttps://www.strOUdenl i r)eer.com From: Styron, Heather M. <heather.m.stvron@ncdenr.eov> Sent: Monday, September 6, 20219:22 AM To: Jeremy McCombs <[mccombs@stroudengineer.com> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock I see that you have the edge of channel landward of the platform and boatlift. I believe the edge of channel is actually 100 feet off of where you are proposing the platform and boatlift. I am saying this because one rule with permitting is no development to encroach into a channel. Also are these water depths at a normal low tide? From: Jeremy McCombs fmailto:imccombs(&stroudenaineer.com] Sent: Friday, September 3, 20214:07 PM To: Styron, Heather M. <heather.m.stvron@ncdenr.gov> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Heather, Please see the attached for Mr. Chambers. I can get hard copies over to you if needed. Have a good extended weekend. Thanks, Jeremy T McCombs, P1,5 Surveying Supervisor L-5355 STROUD ENGINEERING 422 H WY. 24 Morehead City, NC 28557 Tel: 252-247-7479 x227 Fax: 252-247-4098 imccom bs05troudengi neer.com bttp5://vvww.stroudengir)eey.com From: Styron, Heather M. <heather.m.stvron@ncdenr.aov> Sent: Friday, September 3, 20212:49 PM To: Jeremy McCombs <imccombs@strouden¢ineer.com> Subject: RE: [External] Lot # 44 - Mariners Pointe Dock Did you happen to do a plat for Mr. Nathan Chambers for a majOor permit submittal? The lot is at 1302 Barnacle Lane in Mariners Point s/d. the plat he submitted is hard to see. From: Jeremy McCombs [mailto:imccombs@strouden¢ineer.com] Sent: Wednesday, December 9, 2020 8:24 AM To: Styron, Heather M. <heather.m.stvron@ncdenr.aov> Subject: [External] Lot # 44- Mariners Pointe Dock CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning Heather, I hope you had a good Thanksgiving. I wanted to reach out to you about the attached plan to get some feedback and ask a few questions. I'm trying to develop a plan for a potential dock permit on Clarke Merrell's lot. There is a point of riparian setback intersection with lot #45 and I wanted to see how CAMA views this area to the south of the intersection of setback. I have advised them that they would need a setback waiver from Mr. Osbourne Hester and they want to approach him on this subject but I wanted to see if you could review and comment on the plan. The two items I've mentioned above as well as any other barriers you may see with the conceptual plan eventually being submitted as a CAMA major permit that we would need to address. Thank you for your time and if you would rather have a phone conversation; please reach out to me. Thanks Jeremy T McCombs, PG5 Project narrative for 1302 Barnacle Lane, Morehead City, NC 28557 Construct a 435 foot long dock with a L shaped dock head 15 by 22 feet. A Boat lift will be installed. Dock construction will have 8" to 10" diameter piles driven in with a vibratory head on an excavator. Piles will be driven every 8 feet and dock will be 6 feet wide. 2x8 cross members, 2x8 girders 2x6 deck joist and 2x6 deck boards. Dock will be for personal use. • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time ATTN PHONE PHIL THOMPSON (252)726-4433 DELIVERY NOTIFICATION INQUIRY FROM: CWV6i/ PHIL THOMPSON THE UPS STORE 4915 ARENDELL ST RM J MOREHEAD CITY NC 28557 September 22, 2021 Shipper E24138 Page 1 of 1 SHIPMENT TO: ROBERT BUSH 1074 BUFFALO RIDGE RD CASTLE PINES CO 80108 Shipper Number_._..................._.,E24138 Tracking Identification Number... 1ZE241380396896542 According to our records, 1 parcel was delivered on 05/01/21 at 10:54 A.M., and left at your CUSTOMER'S FRONT DOOR. PZJ6BYD:000A0000 September 22, 2021 Shipper E24138 Page 1 of 1 ATTN : PHIL THOMPSON PHONE : (252)726-4433 DELIVERY NOTIFICATION INQUIRY FROM: PHIL THOMPSON THE UPS STORE 4915 ARENDELL ST RM J MOREHEAD CITY NC 28557 SHIPMENT TO: CLARKE MERRELL 800 HEDRICK BLVD MOREHEAD CITY NC 28557 Shipper Number ......... .............E24138 Tracking Identification Number... 1ZE241380353814424 According to our records, 1 parcel was delivered on 04/29/21 at 3:58 P.M., and left at your CUSTOMER'S FRONT DOOR. PZJ6BYD:000A0000 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to KENNETH CHAMBERS s (Name of Property Owner) property located at 1302 BARANCLE LANE (LOT 45) (Address, Lot, Block, Road, etc.) on CRABPOINT BAY in MOREHEAD CITY N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) See attached drawing labeled: 1302 BARNACLE LANE MARINERS POINTE Lot 45 WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Prope ner tr-- Signature KENNETH CHAMBERS Print or Type Name PO BOX 3049 Mailing Address MOREHEAD CITY NC 28557 City/State/Zip 704-239-0691 T,ele7 3- f�q[nber Date �j / G / (Adjacent Property Owner Information) Signature ROBERT BUSH Print or Type Name 1704 BUFFALO RIDGE ROAD Mailing Address CASTLE PINE CO80108 City/State/Zip 303-660-1935 Telephone Number Date RECEIVED (Revised 6/18/2012) APR 29 2021 DCM-MHD CITY ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to KENNETH CHAMBERS ,s (Name of Property Owner) property located at 1302 BARANCLE LANE (LOT 45) (Address, Lot, Block, Road, etc.) on CRABPOINT BAY in MOREHEAD CITY N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) See attached drawing labeled: 1302 BARNACLE LANE MARINERS POINTE Lot 45 WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (vrope r�Wxm3 Information) ti Signature KENNETH CHAMBERS Print or Type Name PO BOX 3049 Mailing Address MOREHEAD CITY NC 28557 City/State/Zip 704-239-0691 Telephone Number W Z8/ Z l Date (Adjacent Property Owner Information) Signature CLARKE MERRELL Print or Type Name 800 HENDRICK BLVD. Mailing Address MOREHEAD CITY NC 28557 City/State/Zip 252-725-5394 Telephone Number Date RECEIVED (Revised 6/18/2012) APR 2 9 20Zi DCM-MHD CITY f1LE 1165206 rnn PFNSTPPIInN PEGISTFP OF of LPS Ka ren 5 Herdasty tercet Gninty. 14 October 15. 2019 03:05.16 P1 ANNA DEED 3 P FU S25 00 NC REVENUE STAMP: $371 00 FILE # 1652036 WARRANTY DEED YRPREPAREDIII': aESWICK, GOINES.WICKIZER&MEEKS.PLLC. 911 ARENDELL STREET, MOREHEAD CITY, NC28557 ETURNTO: DESWICK. GOINES. WICKIZER & MEEKS PLLC, 911 ARENDELL STREET, MOREHEAD CITY, NC 2SSS7 STATE OF NORTH CAROLINA COUNTY OF CARTERET Excise Tax: S 39L49' Parcel #638610467322000 THIS WARRANTY DEED made and entered into this rZL day of October, 2019, by and between: ,lames R. Anderson and wife, Kim C. Anderson 4704 San Juan Circle Morehead City, NC 28557 (GRANTOR) and Kenneth N. Chambers and Angela M. Chambers 21302 Barnacle Lane Morehead City NC 28557 (GRANTEE) The designation GRANTOR and GRANTEE as used herein shall include said parties, their heirs, successors and assigns and shall include singular, plural, masculine, feminine or neuter as required by context. wITNESSETH That the GRANTOR, ror a valuable consideration paid by the GRANTEE, the receipt of which is hereby acknowledged. has and by these presents does grant, bargain, sell and convey unto the GRANTEE in fee simple, all that certain lot, mitt or parcel of land situated in CARTERET COUNTY, North Carolina and more particularly described as follows: f% 1652036 See Exhibit A This being the same property conveyed to Grantors in Book 1498, Page 346, Carteret County Registry. This IS _NOT V the primary residence of the Grantor. The above -described property is conveyed and accepted subject to such easements, restrictions and rights of way as appear of record in the Carteret County Registry. TO HAVE AND TO HOLD the aforesaid lot, tract or parcel of land and all privileges and appurtenances thereto belonging to the GRANTEE in fee simple. And the GRANTOR covenants with the GRANTEE, that GRANTOR is seized of the premises in I'ce simple, has the right to convey the same in fee simple, is marketable and free and clear of all encumbrances, and that GRANTOR will warrant and defend the title against the lawful claims of all persons whomsoever excluding the exceptions stated herein and designated on the map referred to above. IN WITNESS WHEREOF, the GRANTOR has hereunto set its hand and seal, the day and year first above written. James R. Anderson BY: I V Cjcj� (SEAL) Kim C. Anderson STATE OF NORTH CAROLINA COUNTY 01: CARTERET 1, a Notary Public of the county and state aforesaid, certify that James R. and Kim C. Anderson, personally appeared before me this day and acknowledged the execution of the foregoing instrument. Witness my hand and official stamp or seal. this La day of October, 2019. expires: `so�Pad�nieOyq�i ALtD En LA 101r-t7p �c Printed Name of Notary 1652036 EXHIBIT "A" Being all of Lot 45, Mariners Pointe Subdivision, as recorded in Map Book 31, Pages 104 and 105, Carteret County Registry. ROY COOPER Governor ELIZABETH S. BISER Secretary BPAXTON DAVIS Director Carteret News Times PO Box 1679 Morehead City, NC 28557 NORTH CAROLINA Environmental Quality Re: Public Notice - Kenneth Chambers 1302 Barnacle Lane Dear Sir: September 3, 2021 Please publish the attached Notice in the 9/8/2021 issue of the Carteret News Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Jessica Gibson, NC Division of Coastal Management, 400 Commerce Avenue, Morehead.City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, HEATHER M. STYRON Heather M.Styron Coastal Management Representative North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City. North Carolina 28557 252.808.2808 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received as complete on 7/9/2021. According to said application, Mr. Kenneth Chambers proposes to install a pier, platform and boatlift at 1302 Barnacle Lane in Morehead City, NC. A copy of the entire application may be examined or copied at the office of Heather Styron, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808-2808 during normal business hours. Comments mailed to Braxton Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to 9/28/2021, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISH ON: 9/8/2021 DEQ� om� +aian..rua.vn� North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 252.808.2808 ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director Carteret News Times PO Box 1679 Morehead City, NC 28557 NORTH CAROLINA Environmental Quality Re: Public Notice - Kenneth Chambers 1362 Barnacle Lane Dear Sir: September 3, 2021 Please publish the attached Notice in the 9/8/2021 issue of the Carteret News Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Jessica Gibson, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, HEATHER M. STYR-ON Heather M. Styron Coastal Management Representative OryMW AFmvwmenW UioN\ /_ North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 252.808.280 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received as complete on 7/9/2021. According to said application, Mr. Kenneth Chambers proposes to install a pier, platform and boatlift at 1302 Barnacle Lane in Morehead City, NC. A copy of the entire application may be examined or copied at the office of Heather Styron, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808-2808 during normal business hours. Comments mailed to Braxton Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to 9/28/2021, will be considered in malting the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request PUBLISH ON: 9/8/2021 D_EQJ� North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City. North Carolina 28557 worm, nnttxwn ameiwuae`na.�ma000 252808.2808 ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director September 6, 2021 Kenneth Chambers P.0 Box 3049 Atlantic Beach, NC 28512 Dear Sirs: NORTH CAROLINA Environmental Quality The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located on Dills Creek in Carteret County. The site is at 1302 Barnacle Lane in Morehead City, Carteret County. The application was received as complete on 7/9/2021, and appears to be adequate for processing at this time. The projected deadline for making a decision is 9/22/2021. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from 7/9/2021, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, tteather M. Stuvovw Heather M. Styron Coastal Management Representative North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 252.808.2808 NoTl(*/13 CAMA PERMIT APPLIE FOR PROJECT: pier, platform and slip with boatlift COMMENTS ACCEPTED THROUGH September", 2021 APPLICANT. FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Kenneth Chambers Heather Styron - DCM 607 Atlantic Beach Causeway `1 400 Commerce Avenue Atlantic Beach, NC 28512 Morehead City, NC 28557 704-239-0691 (252)808-2808 NC Division of Coastal Management Cashier's Official Receipt (No spli') Received From: �.n&LAJAPrS QPQLaV Permit No.: I✓LCA r�i Applicant's Name: KGlIr)tfl� ('ltct u.,'� Address: I. isi cL 13991 A B(Z) D Date: 20 91 Check No.: 11 095 County: 6&-6e-+ Please retain receipt for your records as proof of payment for permit issued. Signature of Agent or Applicant: Signature of Field Representative: Date: DateldwAke ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director September 15, 2021 MEMORANDUM NORTH CAROLINA Environmental Quality FROM Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) oregg. bodnarONCDEN R.aov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Chambers, Kenneth Project Location: 1302 Barnacle Ln, Carteret County Proposed Project: Pier, platform, boatlift in Mariners Point SD Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greoo Bodnar at the address above by October 15, 2021. if you have any questions regarding the proposed project, contact Heather Styron 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" PRINT NAME AGENCY SIGNATURE DATE This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. �DWQ North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557 252.808.2808 MAJOR PERMIT FEE MATRIX Applicant: KenaeA C1tAyy%1;Ler-5 �4 I1a5 Selection Development Type Fee DCM % DWQ % (14300 1601 4351000931625 6253) (24300 1602 435100095 2341) I. Private, non-commercial development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Ma or Permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below a lies: III(A). Private, non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 4097 (See attached can be a lied: III(B). Public or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 4097 (See attached) can be a lied: III(C). If General Water EJ Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality Certification No. $400 6;($240) 40%($160) 4097 (see attached) cannot be a lied: IV. For development that involves the filling and/or $475 6 40% ($190) excavation of more than one acre of wetlands and/or o en water areas: DCM Coordinator: Gregg Bodnar Applicant: ML ha Distributed Yes® No ❑ Dates 16 On AGENCY WIRO WARD Rachel Love Adrick MHC Rachel love Adrick Washingon DCM Planner Mike Christenbury Wilmington Charlan Owens Eliz City US COE: j Liz Hair Raleigh Bland (Beaufort Camden, Chowan, (Carteret, Onslow, Pender) Craven, Hertford, Hyde, Perquimans, Tyrrell) Jordan Jessup (TBD) Josh Peletier— (Sertie, Currituck, Dare, Gates, Greg Curry (TDB) Pamlico, Posquotank, Washington) USCOE (NC DOT) (Brunswick, New Hanover) DOT - Tom Steffans—(Beaufort, Carteret, DOT Brad Shaver Craven, Pamlico (Brunswick, New Hanover, Onslow, Pender) Mark Zeigler (Onslow, Pender, New Community Assistance Hanover, Brunswick) Lee Padrick (Beaufort, Carteret Craven, Eliz Lee Padrick (Beaufort Carteret Craven City, Pamlico, Washington) Eliz City, Pamlico, Washington Cultural Resources Renee Gledhill -Earley Renee Gledhill -Earley Div. of Water Infrastructure Heidi Cox Clif Whitfield Marine Fisheries Kimberiee Harding Jimmy Harrison NC DOT David Harris David Harris Shellfish Sanitation Shannon Jenkins & Sharon Gupton Shannon Jenkins & Sharon Gupton State Property Tim Walton & Mike Moser & Wanda Tim Walton & Mike Moser & Wanda Hillard Hillard DEMLR/DWR: Sheri A. Montalvo/Shelton Sullivan Sheri A. Montalvo/ Shelton Sullivan (NC DOT) Kristy Lynn Carpenter Kristy Lynn Carpenter DEMLR Sediment & Erosion Dan Sams �tWnnW Sami Dumpor Storm water Christine Hall Jv% e-I Roger Thorpe DWR 401 Robb Mairs (Carteret, New Hanover Anthony Scarbraugh Onslow, Pender,) Chad Coburn (Brunswick) (NC DOT) Joanne Steenhuis Brunswick, New Garcy Ward Hanover, Onslow, Pender WRC Maria Dunn (WARD) Maria Dunn (WARO) WRC (NC DOT) Travis Wilson Travis Wilson Natural Heritage Program Rodney Bulter .; Rodney Bulter Project narrative for 1302 Barnacle Lane, Morehead City, NC 28557 Construct a 467 foot long dock with a L shaped dock head 15 by 22 feet. A Boat lift will be installed. Dock construction will have 8" to 10" diameter piles driven in with a vibratory head on an excavator. Piles will be driven every 8 feet and dock will be 6 feet wide. 2x8 cross members, 2x8 girders 2x6 deck joist and 2x6 deck boards. Dock will be for personal use. RECEIVED APR 2 9 2021 DCM-MHD CITY e L. I., �� LE TYPICAL OOCN SECTION NTS 07 D A Z BOAT LIFT CROSS SECTION v D NTS 17 r s ITm E '� e rt —NPC63Nt A ttY. BulM .1Y1WA]A61M61)130.0 ( m " ir.oil W6 10 4W NiYa— 1%A I NMWL Y GI Q) (( _y uxA3Nxow- - --7sY'Bt RA'. / E3 WR I. I FELO COLLECTION ON WAS AI B/t WRING. DATA CDLLEC IION Xa5 NL INEO WRING THE HOURS W 6d4n Od4 ELEVATIONS ONS HoulsOBTAF EO 8V INERTGOINGIAL L SURVEYING CLEvffI0N5 OBif INfO tlY INEpildl SORVEYIxG 4EiNW5. S, 2. VERTICAL DAWN BASED ON NAvo 'BIT. 1. WATER DEPTHS ACQUIRED USING NOAA: TIDES A CURRENTS TON. _ REFERENCE STATION 8656503 3ME.CAD 1111 HARBOR. CDN'M SLaiI OR: 065606 SEAUFORT. OUNE NRRTII 118. rv... TIDAL EPOCH 1901-2001. 1.V1 C.UP DOCK PROFILE F '`, CRAB POINT \♦•` BAY 1 SFR ,>,P;' } tTi ltftF�fii a \ f [iitt,l 111,4,4 A.47,• i \«..... \ 1 1 } : IN X4[:X44 Py0' CAMA MAJOR CHAMBERS PROPERTY DOCK LOT 45 - MARINER'S POINT MOREHEAD CITY TNSP. CARTERET COUNTY NORTH CAROLINA 9TROUD ENOINEBRINO. P.A. 1,310I59-00T RECEIVED V ISIA HIGHWAY W4 MORENEAD CITY. N.f�,,,�22p0J> DATEt I >-T09 /LICENSE NO.C-0617 "12/21 ^—+I: woo AL E. JBRBNY T.MCCOMB&P1.R ___ t" 50, ��PR 2 DCM-MHD CITY Project narrative for 1302 Barnacle Lane, Morehead City, NC 28557 Construct a 435 foot long dock with a L shaped dock head 15 by 22 feet. A Boat lift will be installed. Dock construction will have 8" to 10" diameter piles driven in with a vibratory head on an excavator. Piles will be driven every 8 feet and dock will be 6 feet wide. 2x8 cross members, 2x8 girders 2x6 deck joist and 2x6 deck boards. Dock will be for personal use. • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time ti VICINITY MAP MARINERS POINTE MOREHEAD CITY. NC o z .2- 0 x N/F F NOTES 1. FIELD SURVEY CONDUCTED ON 8/17/2020. DATA COLLECTION WAS OBTAINED DURING THE HOURS OF 6AM-LOAM DURING THE HOURS OF OUT GOING TIDE. ELEVATIONS OBTAINED BY INERTIAL SURVEYING METHODS. 2. VERTICAL DATUM BASED ON NAVD '88. ELEVATIONS ON PLAN VIEW ARE SEA FLOOR: DEPTHS OF WATER SHOWN ON PROFILE 8 CROSSECTIONAL VIEWS. 3. WATER DEPTHS ACOUIRED USING NOAA: TIDES 8 CURRENTS TOOL. REFERENCE STATION: 8656502 MOREHEAD CITY HARBOR. CONTROL STATION: 8656486 BEAUFORT, DUKE MARINE LAB, NC. TIDAL EPOCH 1983-2001. CK ING OT TYPICAL DOCK SECTION NITS FIN ....-........_... `--- OF OYSTER ROLK DOCK PROFILE 3.07 0.00 OI NT 1 25 0 50 100 KALE: 1'-50' CAMA MAJOR CHAMBERS PROPERTY DOCK LOT 45 - MAIBIN]ER'S POINT MOREHEAD CITY TWSP. CARTERET COUNTY NORTH CAROLINA STROUD ENGINEERING, P.A. LSMI89-001 422 HIGHWAY 24 VT MOREHEAD CITY, N.C. 28557 EL E: (252)247-7479 LICENSE NO.C-0847/12/21 ________REvisED: 9/7/2021 --JEREMY T. MCCOMBS, PLS " = 50' ....-........_... `--- OF OYSTER ROLK DOCK PROFILE 3.07 0.00 OI NT 1 25 0 50 100 KALE: 1'-50' CAMA MAJOR CHAMBERS PROPERTY DOCK LOT 45 - MAIBIN]ER'S POINT MOREHEAD CITY TWSP. CARTERET COUNTY NORTH CAROLINA STROUD ENGINEERING, P.A. LSMI89-001 422 HIGHWAY 24 VT MOREHEAD CITY, N.C. 28557 EL E: (252)247-7479 LICENSE NO.C-0847/12/21 ________REvisED: 9/7/2021 --JEREMY T. MCCOMBS, PLS " = 50'