HomeMy WebLinkAbout88-20 Kayye & MorganPermit Class
........... Permit Number
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and r�
Coastal Resources Commissti
Vermit
for
X Major Development in an Area of
pursuant to NCGS I I3A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Gary Kayye and Anne Morgan 3310 Environ Way, Chapel Hill NC 27517
Authorizing development in Currituck County adi. North Landing River & the Currituck Sound, at 122,128
and Parcel #00500000090000 Romm Pt. Rd., in Currituck Co., as requested in the permittee's application dtd
2/15/20 incl att workplan drawings (2) Sheet 1 of 2 dtd "Rev 3/24/20" and Sheet 2 of 2 dtd 1/20/20.
This permit, issued on August 27, 2020 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
)f these terms may be subject to fines, imprisonment or civil action; or may cause the permit to De nuts ana voia.
Shoreline Stabilization - Bulkhead
1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached
workplan drawings.
2) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the
approved bulkhead alignment.
3) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a
representative of the Division of Coastal Management within a maximum of 30 days prior to the start
of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse
weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM
within a maximum of 30 days prior to the new expected start of construction.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permiuce or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2023
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority or the secretary or ury ana tnc • naa
of the Coastal Resources Commission.
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Gary Kayye and Anne Morgan Permit No. 88-20
Page 2 of 4
ADDITIONAL CONDITIONS
4) The bulkhead shall be constructed prior to any backfilling activities.
5) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure
6) The fill material shall be clean and free of any pollutants except in trace quantities.
7) Unless altered herein, all backfill material shall be obtained from a high ground source and confined
behind the permitted bulkhead.
8) No backfill material is to be placed within 30 feet of the normal water level, except that which will be
used to backfill the area behind the permitted bulkhead.
9) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead.
Sedimentation and Erosion Control
10) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of
grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
11) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
12) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
Dockina Facility Reconfreuration at 122 Romm Point Rd.
13) This permit authorizes only the demolition of the existing facility, and the construction of the dock,
piers, and other structures and uses located in or over the water that are expressly and specifically set
forth in the permit application. No other structure, whether floating or stationary, shall become a
permanent part of this docking facility without permit modification. No non -water dependent uses of
structures shall be conducted on, in or over Public Trust waters without permit modification.
14) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharge at the docking facility shall be considered a violation of this
permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout
the entire existence of the permitted structure.
15) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
Gary Kayye and Anne Morgan Permit No. 88-20
Page 3 of 4
ADDITIONAL CONDITIONS
16) This permit does not authorize any new formalized boat slips. The docking facility is authorized for no
more than 1 formalized boat slip.
17) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
18) The authorized structure and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings.
USACE Conditions
19) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must
implement the U.S. Fish & Wildlife Service's Guidelines, and strictly adhere to all requirements therein.
The guidelines can be found at http://www.fws.gov/nc-es/mammal/manatee euidelines.ndf.
General
20) Should any of the Lots be sold prior to the initiation of construction of the above authorized
development, the permittee shall obtain a written agreement from the new owner(s) for authorization to
construct the portion of the authorized development within the property owner's riparian rights, and
submit it to the Division of Coastal Management prior to initiating construction.
21) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
22) All debris associated with the removal or construction of the permitted facility shall be contained within
the authorized project area and removed to an appropriate upland location.
23) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW-2020-00688) issued 8/27/20.
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4175 and assigned the project DWR Project No. 20-0514.
Gary Kayye and Anne Morgan
ADDITIONAL CONDITIONS
Permit No. 88-20
Page 4 of 4
NOTE: Future development'of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 264-3901 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal water level.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
DIVISION OF COASTAL MANAGEMENT
Application Processing Notes
Applicant:
Type: (Check all that apply)
New Major Mod Permit# _ _ Minor Mod Renewal Transfer
Permit Coordinator: bcX6VIoy,-
Field Representative:
Date Time
Message
MAC
A711n 4 �lr Ok t~CAG6
loll, I'D [)V� � W� 4
09Wj 4,0��
�ull� 6,�r-it�kiv
c'SPtI� F 1CWC; A,�c s Z Q 1
g/ll�
U�twa� � "lam
DCM Coordinator: A40, Permit #: ^Z
MAILING DISTRIBUTION SHEET
^�1 /GC�lAn
Agents: t N Sw4l� �vN/� /51 4NC obe, (>DW , /0(/IL(a /S� M4g:�t G�JK.tiX� i v
DCM Field Offices
WElizabeth City �a �tt1 ` Washington (with revised work plan drawings)
Morehead City Wilmington (OBJECTIONS )
US ACOE Offices:
Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans,
Tyrrell)
Josh Pelletier (Bertie,Currituck, Dare, Gates, Pamlico, Pasquotank, Washington)
Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico)
Bill Biddlecome (NC DOT -Remainder ECity/Washington District)
Wilmington:
Cultural Resources:
Public Water Supply:
Marine Fisheries:
NC DOT:
Shellfish Sanitation:
State Property:
DEMLR/DWR:
Greg Curry (Brunswick, New Hanover)
Liz Hair (Carteret, Onslow, Pender)
Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Renee Gledhill -Earley at Environmental.Review@ncdcr.gov
bwi --
Heidi Cox (WIRO)
Kim Harding
David Harris
Shannon Jenkins / Sharon Gupton
Tim Walton / Mike Moser
Sheri Montalvo / Shelton Sullivan
Clif Whitfield (WARD)
Jimmy Harrison
Washington: Anthony Scarbraugh-401
Roger Thorpe-Stormwater
Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck,
Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington)
Wilmington:
Wildlife Resources:
Natural Heritage Program
Robb Mairs — 401 (Brunswick, New Hanover)
Holley Snider-401 (Carteret, Onslow, Pender)
Christine Hall - Stormwater
Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Maria Dunn (WARO) -`
Rodney Butler
LPO: 1 ` 0, Loq)ft /*y4 `7
(NCDOT) Travis Wilson
DCM NP-1
APPLICATION for
3 n;;
Major Development Permit �cM_��
(last revlaed 12127/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary APPlicantJLandowner Informahlon
Business Name
Project Name (if applicable)
Applicant 1: First Name
Gary
MI Last Name
Kayye
Applicant 2: First Name
MI Last Name
Anne
Morgan
It sddillanel applicants, Please attach an additional
pegs(.) adih names hated.
Mailing Address
3310 Environ Way
PO Box
G1v
Chapel Hill
ZIP Gountry
Phone No.
27517 USA
919.868 _3358 ext.
Street Address (If dlBerent from above)
city
122 Romm Point Road
state sINC
Email
gary@theraveagency.com
FAX No.
2. Agent/Contractor information
Business Name
Lyn Small, Inc.
Agent/ ContractoE Ml
Last Name
LyF
Small
AgenV contractoMI
Last Name
Mailing Address
113 Ballast Rock Drive
PO Box ffC%wells Point
ZIP 27966 Phone No. 1
PhoneN
252- 491
_8562
FAX No. Contractorl
29760
Street Address (If different from above)
City g
Email
lyn@lsimarineobx Com and jdriver@Isimarineobx.com
<Form continues on back>
State
NC
ZIP
27429
State
NC
at
ZIP
RECEIVED
. I ;:,,,rr.<,t.ne1 APR 14 2020
DCM-MHD CITY
APPLICATION for
Major Development Permit
Street Address
Slats Rd. x
122 Romm Point Road Off of US 158
City State 21p
Currituck NC 27429
Lot NO.(s) (ff many, attach addillonal page with 1151)
122-128 . & vacant lot
a. In which NC river basin is the project located?
a Is the water body identified In (b) above, natural or manmade?
®Natural ❑Manmade j]Unknown
e. Is proposed work within city limits or planning judsdicfion?
®Yes ❑No
4. Site Description
a. Total length of shoreline on the tract (ft.)
525' across 3 lots
C. Size of individual tells)
0.44A) (;95A) (.66A)
(If many lot sizes, please attach additional page with a lisf)
e. Vegetation on tract
Pine, Yupon,scrub & Grass & Phragmites
b. I. Name of body of water nearest to proposed pr act
Noe+" L 0.rawv_) � t
d. Name the closest major watteer body to the proposed project '-eta
1. If applicable, list the planning Jurisdlctlon or city limit the proposed
work falls within.
Currituck County
b. Size of entire tract (sq.ft.)
139,000 sq ft
d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
❑NHW or ®NWL 4'
i. Man-made features end uses now on tract
2 residential homes with bulkhead, piers, platforms and boatlifts
g. Identify and describe the existing land uses adjacent to the proposed project site.
Rural residential
It. How does local government zone the tract?
Form DCM MP-1 (Page 2 of 4)
3. Project Location
County (an be multiple)
Currituck
Subdivision Name
Phone No.
919-868 -3358 ext.
I. Is the proposed project consistent with the applicable zoning?
SFM I (Attach zoning compliance certificate, if applicable)
Oyes []No ❑NA
j Is the proposed activity part of an urban waterfront redevelopment proposal?
❑Yes ®NO
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy, ❑ye
ONO ®NA
If yes, by whom?
I. is the proposed project located in a National Registered Histy, W Oloulut or does It Involve a National Register. Noted or eligible property? ❑Yee ®No ❑NA
<Form ooflttnrres on next ptplp
ReceigmlVED
zsz-sd0.2.80a .. •t.8(; .n,t.r:o,1•. 1 4 2020
n e st a lm on f4,, ...,,RIC
DCm-E&OHID CITY
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (I) Are there wetlands on the site? ®Yea ❑No
(if) Are there coastal wetlands on the site?
❑Yes ®No
(lli) If yes to either (i) or (it) above, has a delineation been conducted? ❑Yee ®No
(Attach documenisti if available)
n. Describe existing wastewater treatment facilities.
Two private septic systems
o. Describe existing drinking water supply source.
Currituck Co water dept
It. Describe extating storm we management or treatment systems.
NA
5. Activities and /mpacts
a. Will the project be for commerctel, public. or
®Private/Community
b. Dive a bdel description of purpose, use, and daily operations of the project when complete.
To provide new shore protection across two lots with aging bulkheads and one lot with failed bulkhead
and pier/platform
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where It Is to be stored.
Small excavator from shore
d. List all development activities you propose.
Bulkhead construction and pier construction and backfill
e. Are the proposed activities maintenance of an existing project, new work, or
Both
approximate total disturbed land area resulting from
ft
g. Will the proposed project encircle on any public easement, public acoessway or other area
that the public has established use of?
h. Des:
None ribe location entl type of existing and proposed discharges to waters of the state.
i. Will wastewater or stormwater be discharged into a wetland?
If yes, will this discharged water be of the same salinity as the receiving water?
j. la there any mitigation proposed?
It yes, attach a mitigation proposal.
<Form continues on backs
or
❑Yee ONO ONA
ReceiveItEcelvw
n
3 2010
s2.aoa•zao,+ R 14 2020
10CM-E:
f_ M-MHD CITY
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted In order for the application
package to be complete. Items (a) - A) are always applicable to any mayor development application. Please consult the application
Instruction booklet on low to property prepare the required Items below.
a. A project narrative.
b Pr accurate dated work plat i n already
plan wew and crr e i sectional orized o drawn to ecele. Please tthe present statue of the
Proposed project pl end potion already complete? 11 previously authorized work, dearly indicate on maps, plats, drawings to distinguish
between work completed end proposed.
c. A site or location map that is aufficlendy detailed ro guide sgency personnel unfamlliar with the ere, to the site.
d. A copy of the deed (with iste eppllcalion on or other Instrument under which the applicant detms tide to the ellected properties.
e. The appropriate eppllcalion lee. Check or money order made peyede b DENR.
$400.00
A lint of the names and complete atltlreanes of the adjacent waterfront (rtperienj landowners and aignetl reNrn recall as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed protect to the Division of Coastal Management.
Name U 8 ej/ U 1110 Phone No,
Address 1527 Oxtiorough IMount Pleasant, SC 29466
Name I111, 1 eneVlBVti II DOn Phone No.
Address 132 Romm Point, CUITitLl NC 27929
Name
Address
Phone No.
g. A list of previous state or federal permits Issued for work on the project trod. Include permh numbers, permlttes, and Issuing dates.
I Signed consultant or agent authorization form, II applicable.
I. Welland delineation, if necessary,
j. A signed AEC hazard notice for project, in oceanfront and Inlet areas.
k. A etetement of compliance with the I . Environmental Policy Act (N.I
Of public funds or use of public lands, attach a statement documentino
be
�.�.�. 1 .on I-r u), IT necessary. If the project Involves expena
compliance with the North Carolina Environmental Policy Act.
i unuerstano that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditlons and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date _ 0 -1 5- 090 Print Name Gary Kavvc
Signature
Please indicate application attachments pertaining to your proposed project.
®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
pDCM MPS Upland Development
pDCM I Structures Information
Receivel(6EIVED
guts 70a
.t,z.uo+t.aeae APR 14 2020
- ..[a nn z,n�ur;munt.n5
�CM-fte+M-MHD
CITY
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. 8e sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet,
Channel Other
(NLW or Canal Boat Basin Boat Ramp Rock Groin Rock (excluding
NWL) Breakwater shoreline
Length
Width
Avg, Exlsting
Depth
Final Project
Depth
1. EXCAVATION
a. Amount of material to
cubic yards.
or
Type of material to
NA NA
NA NA
®This section not applicable
C. Ill Does the area to be excavated include coastal wellands/marsh it. High -ground excavation in cubic yards.
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
OF other wetlands (WL)? If any boxes are checked, provide the
number of square test affected.
❑CW __ ❑SAV ❑SB _
OWL _ []None
(it) Describe the purpose of the excavation in these areas,
2. DISPOSAL OF EXCAVATED MATERIAL
a. Location of disposal area. 0 This section not applicable
b. Dimenelona of disposal area.
c. (i) Do you claim title to disposal area? it. (i) Will a disposal area be available for future maintenance?
Dyes ❑No ❑NA ❑Yes ❑No ❑NA
(ii) If no, attach a letter granting permission from the owner. (fi) It yes, where?
e. (i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation SA f• (I) Does the disposal include any area in the water?
or other wetlands WL ? 1 n ( V), shell bottom (SB), [Dyes
( ) 1 any boxes are checked, provide the []No ❑NA
number of square feet affected. In) If yes, how much water area is affected?
❑CW _ ❑SAV _— ❑SB _
OWL _ []None
(II) Describe the purpose of disposal in these areas;
'Received
AVO
is (`(� "RECEIVED
Aft 4 2020
DCM-MHD CITY
Form I)CM MP-2 (GNr:aVL9flort ato_I fill, P aqw z
3. SHORELINE STABILIZATION
(It development is a wood groin, use MP-4 — Structures)
a. Type of shoreline slabilizaton:
08ulkhead ❑Riprap ❑Breakwater/Sill ❑otter:
c. Average distance waterward of NHW or WL:
IY.Sr � C �a1�Ir z�
pe. Type o�tabilization material: �- oR•r u
Vinyl sheelpile
6163
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill Riprap _
kwa[erlSill p
Breahep
I. Source of fill met I, i
Upland borrow pit '4YaMdc'�
A OTHER FILL ACTIVITIES
(Excluding Shoreline Stabilization)
a. (f) Will fill material be brought to the site?
If yes,
(il) Amount of material to be placed in the water _
(III) Dimensions of fill area _
(Iv) Purpose of fill
5. GENERAL
a. How will excavated or fill material be kept on eft. and ero.bn
controlled?
Completed bulkhead
c. (I) Will navigational aids be required as a result of the project?
❑Yes Ohio ❑NA
(t) If yes, explain what type and how they will be implemented.
Date
02-15-2020
Project Name
Kayye Bulkhead & dock
252-f10B.48D8 :: 9-aba-4gCOA8T :: www.nu4c�_i:.. •`• _�, raft;..:
❑This section not applicable
Width: f_ l"CJ4 spry✓eb
Maximum distance yvateriviifitV NHW NVIL
NL
RSL 1-4—
(I) Has Has there been shoreline erosion during preceding U
months?
Dyes ONO ❑NA
(k) It yes, state amount of erosion and source of erosion amount
information.
Local observation and approx 17' per year
h. Type of fill material.
Clean send
®This section not applicable
Will fill material be placed in coastal wetlands/mareh (cW),
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW _ ❑SAV _ ❑SB _
❑WL r-INnne
(ii) Describe the purpose of the fill in these areas:
b. What type of constructlon equip
b&OkhOe, or hydraulic dredge)?
Excavator
d. (i) Will wetlands be crossed in transporting equipment to project
site? ❑yes ONO DNA
(III If yes, explain steps that will be taken to avoid or minimize
environmental Impacts.
Will
Applicant Name /'lFIVED
Gary Kayye is
Applicant Signature 4 L020
DCM-MHD CITY
revised: 'I:i12G/L'r'i
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITYAWARINA CHARACTERISTICS
❑This section not applicable
a. (I) Is the docking facllity/marina: b. (I) Will the facility be open to the general public?
❑Commercial ❑Public/Government ®Private/Community Oyes ONO
C. (1) Docks) and/or pier(s)
(11) Number
1
(III) Length
2g'
(IV) Width
6_
(V) Floating
Dyes ONO
e. (q Are Platforms included? ®Yes ❑No
If yes:
(ii) Number 2
IN) Length (16) (18)
(iv) Width (18) (4)
(v) Floating ❑Yes ONO
Note.' Roofed areas are calculated from ddpline dimensions,
g. (t) Number of slips proposed
0
(it) Number of slips existing
1
I. Check the proposed type of siting:
❑ Land cut and access channel
❑Open water; dredging for basin and/or channel
OOpen water; no dredging required
❑Other; please describe:
k. Typical boat length: 25'
in (1) Will the facility have tie pilings?
❑Yes ONO
00 If yes number of tie pilings?
2a2-UUa-28Ua :: 1•Ltia-ARCut. `.. vvH era _. ,
d. (I) Are Finger Piers Included? ❑Yes ONO
If yes:
(ii) Number _
(lit) Length
(IV) Width _
(v) Floating ❑Yes []No
f. (I) Are Boatlifts included? OYes ❑No
If yes:
(if) Number 1 (Existing)
(III) Length 12
(iv) Width 12
h. Check all the types of services to be provided.
❑ Full service, Including travel lift and/or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
❑ Dockage ("wet slips") Only, number of slips:
® Dry storage; number of boats: 1 (Existing)
❑ Boat temple); number of boat ramps:
❑ Other, please describe:
I. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
PWL'S and Skiffs
I. (i) Will the facility be open to the general public?
❑Yes ONO
'Recealved
RECEIVED
p�
yA�PyR�r141020
DCM,A4J4J) CITY
M-F
~reCl. 1 �Il'%ItrC
�V
Fnrm DCM MP-4 (Structures:;, P:,y,. old)
2. DOCKING FACILITy/MARINA OPERATIONS
a. Check each of the following sanitary facilities that will be Included In the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: Location:
❑ Showers
❑ Boatholding tank pumpout: Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater,
C. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (1) Give the location and number of 'No Sewage Discharge" signs proposed.
00 Give the location and number of "Pumpout Available' signs proposed.
®This section not applicable
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
In. Give the number of channel markers and "No Wake" signs proposed.
Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
I. Whet will be the marina policy on overnight and live -aboard dockage?
Ir. Describe design measures that promote boat basin flushing?
I. If this project Is an expansion of an existing marina, what types of services are currently provided?
:-Ju-2aob a 'I -ebb .
RECEIVED
APR 14 2020
eC@IV -MHD CITY
a'» taro
a(x
DCM=C
f'brfn dCM MP-4 (Strruaurr3s, Iral{a s ,,t =r)
in Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes ❑No
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
Elyse ONO
o. Is the marina/docking facility proposed within or adjacent to coastal wedandshnarsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? It any boxes are checked, provide the number of square feat affected.
❑CW __ ❑SAV ❑SB _
❑WL _ ❑None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? El Yes ❑No
It yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered ii
®This section not applicable
a. (I) Is the boathouse etruuMure(e):
❑Commerclal ❑PubliC/Government ❑Private/Community,
(Ip Number _
(III) Length
(iv) Width _
Hole: Roofed areas are calculated from dnpxne dimensions.
4, GROIN (e.g., wood, sheetpile, etc. It a rock groin, use Ili Excavation and Fill.) OThis section not applicable
a• (I) Number _
(it) Length
(si) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.)
®This section not applicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, N WL or wetlands
6. MOORING PILINGS and BUOYS
a. Is the structure(s):
[]Commercial ❑Public/Govemment ®Private/Community
a Distance to be placed beyond shoreline _
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
❑This section not applicable
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
I 'Ceived
;l
-----RECEIVED
APR 14 2020
0CM-MIID CITY
j
7. GENERAL
a. Proximity of structures) to adjacent riparian property I'
b. Proximity of structures) to adjacent docking lacditi
Note: For buoy or mooring piling, use arc of sl Including ieng 6 ,q�/b fe of vessel.
C. Width of water body
a miles +/-
e. (1) Will navigational aids be required as a result of the project?
❑Yes ®No DNA
(11) If yea, explain what type and how they will be implemented.
8. OTHER
a. Give complete description:
02-15-2020
Data
Project Name _
-Gary Kayye
Applicant Name
Applicant Signature
X02•sa8.2a08 :: 7-a68-4NCOSL';: -: .
d. Water depth at waterward end of structure at NLW or NWL
5'
❑This section not applicable
Received RECEIVED
tvill
Aw a 1010
(bc- APR 14 2020
(CX-EC DCM-MHD CITY
Rvls ,& I2127infii
ROY COOPER
Governor
MICHAEL S. PECAN
Secretory
BRAXTON C. DAVIS
Director
Gary Kayye (g_arvCa.theraveagencv.com)
Anne Morgan
Dear Mr. Kayye and Ms. Morgan,
NORTH CAROLINA
EnvlronmenralQuallty
August 24, 2020
This letter is in reference to the application submitted for a Coastal Area Management Act Major
Permit to undertake development activities construct a bulkhead and reconfigure an existing
docking facility, in.Eartelist County.
Although processing of the application is nearing completion, additional time is needed for this
office to complete the review and make a decision on your request. Therefore, it is necessary that
the standard review time be extended. An additional 75 days is provided by G.S. I I3A-122(c)
which would make November 5, 2020 the new deadline for reaching a decision on your request.
However, we expect to take action prior to that time and will do so as soon as possible. In the
interim, should you have any question on the status of your application, do not hesitate to contact
me by phone (252-808-2808 ext. 215) or e-mail (gregg.bodnar@ncdenr.gov).
Sincerely,
Gregory W. Bodnar
Assistant Major Permits Coordinator
Cc: DCM Elizabeth City
Lyn Small (lyn@isimarineobx.com)
AD Q�
North Carolina D"p eMof Environmental Quality I Division of Coastal Management
Morehead City Offke 1400 Commerce Avenue I Morehead City, North Carolina 28557
252.8081808
Bodnar, Gregg
From: Bodnar, Gregg
Sent: Monday, August 24, 2020 9:17 AM
To: gary@theraveagency.com'
Cc: Lyndon Small; Renaldi, Ronald; Godfrey, Ella M
Subject: Kayye and Morgan extension
Attachments: Kayye and Morgan EXT.pdf
Morning Mr. Kayye,
Please see above for the extension letter for the project. We had previously placed the project on hold due to USACE
needs and took the project off hold once USACE was satisfied on 6/22/20. This adjusted the 75 day date to
8/22/20. Unfortunately I have not received any authorization at this time. I have been in contact with the USACE
concerning your application and will do so again today. Once the USACE has completed their review I am confident I will
be able to make a final decision immediately thereafter.
Thanks,
Gregg
i dmme.ya�sce�r� /`�
j Gregg Bodnar
Assistant Major permits Coordinator
Division of Coastal Management
Department of Environmental Quality
252 808 2808 ext 215 (Office)
J Gregg.Bodnar@ncdenr.aov
Emet)correspondence to and from this addreabsubJect to the
NorthCoroBna Pubfk Records Low and may bedhdosed to thhd porda,
ROY COOPER NORTH CAROLINA
Governor Envf vn ental Qo0&y
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
June 22, 2020
Gary Kayye (g_aa&!eraveagency.com)
Anne Morgan
SUBJECT: Coastal Area Management Act (CAMA) Permit Application Submittal for Gazry
Kayye and Anne Morgan in Currituck County
Dear Mr. Kayye and Ms. Morgan:
This letter is in response to the above referenced CAMA permit application, which was accepted
as complete by the Division's Elizabeth City office on April 3, 2020. On April 17, 2020,
processing of your application was placed on hold pending resolution of issues with The NC
Division of Water Resources (NC DWR) and the US Army Corp of Engineers (USACE). This
office received correspondence from the USACE on June 10, 2020 noting that concerns have
been addressed and the project will be processed through the USACE 291 process. In addition,
the NC DWR issued their General Certification on June 18, 2020. Therefore, with the concerns
of the NC DWR and USACE satisfied, processing of your permit application has officially
resumed. The revised projected 75-day deadline for making a decision is August 22, 2020.
Please feel free to contact me by phone at (252) 808-2808 ext. 215 if you would like to discuss
this matter further.
Sincerely,
Ii
i
Gregg Bodnar
Assistant Major Permits Coordinator
CC: Lyn Small (ivnna.isimarineobx.com)
DCM Elizabeth City
Anthony Scarbraugh, DWR WaRO (via email)
Josh Peletier, USACE Washington Regulatory Field Office (via email)
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557
252.808.2808
h
Bodnar, Gregg
From:
Bodnar, Gregg
Sent:
Monday, June 22, 2020 4:07 PM
To:
'gary@theraveagency.com'
Cc:
Lyndon Small; Corbett, Robert W; Scarbraugh, Anthony; Pelletier, Josh R CIV CESAW
CESAD (USA)
Subject:
Kayye and Morgan DCM Off Hold
Attachments:
Kayye&Morgan OFF HOLD.pdf
Afternoon Mr. Kayye,
With DWR certification and USACE indicating that the project is again in process I am taking the project off hold. Please
see above for the adjusted 75 day date.
Regards,
Gregg
Gregg Bodnar
Assistant Major Permits Coordinator
Division of Coastal Management
Department of Environmental Quality
252 808 2808 ext 21S (Office)
remBqAnaE@ncdenr.&qv
&=H correspondence to and Jrom this address is subject to the
North CaroBoa Public Records Law and may be disclosed to third parties.
ROY COOPER
Gov w
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Dist w
Gary Kayye ( ary .theraveagency.com)
Anne Morgan
NORTH CAROLINA
Environmental Quality
April 17. 2020
SUBJECT: Coastal Area Management Act (CAMA) Permit Application Submittal for Gary
Kayye and Anne Morgan., in Currituck County
Dear Mr. Kayye and Ms. Morgan:
This letter is in response to the above referenced CAMA permit application, which was accepted
as complete by the Division's Elizabeth City office on April 3, 2020. Processing of the
application is ongoing. However, it has been determined that additional information will be
required prior to the Division taking final action on your application. The required item is
summarized below:
I) Based on correspondence submitted by The US Army Corp of Engineers (USACE) dated
April 15, 2020, the USACE has requested additional information concerning a wetland
delineation. A copy of the email detailing the request will be provided as an attachment
in the email with this notification.
Therefore, it is necessary that processing of your permit application be placed in abeyance until
such time as the required information is provided to the USACE and a copy of the approval
supplied to this office.
If you have any questions concerning these matters, please feel free to contact me by telephone
at (252) 808-2808 extension 215, or by email at grege.bodnar(&,ncdenr.gov.
North Carolina Department of Environmental Quality I Division of Coastal Management
Morehead Clty Office 1 400 Commerce Avenue I Morehead City. North Carolina 28557
252.8082808
Sincerely,
Gregg Bodnar
Division of Coastal Management
Assistant Major Permits Coordinator
CC:
Lyn Small (lyn@Isimarineobx.com)
Robert Corbett, DCM Elizabeth City
Anthony Scarbraugh, DWR WaRO (via email)
Josh Peletier, USACE Washington Regulatory Field Office (via email)
North Carolina Department of Environmental Quality I Division of CoastalManagement
Morehead City Office 1400 Commerce Avenue I Morehead City, North Carolina 28557
752.8082808
Bodnar, Gregg
From:
Pelletier, Josh R CIV CESAW CESAD (USA) <Josh.R.Pelletier@usace.army.mil>
Sent:
Wednesday, April 15, 2020 11:34 AM
To:
Corbett, Robert W
Cc:
Bodnar, Gregg
Subject:
[External] Kaye, Morgan--Romm Point
Robert,
I hope this finds you well. I received the CAMA Major application for Kaye, Morgan today. It appears the lot is wooded
that they are going to be bulkheading. I know its mentioned in the application but we will need a wetland delineation
completed along the shoreline before we can process on our end. I know with the site visit restrictions this could take
some time. Perhaps the applicant could utilize a consultant to complete a delineation report. That along with some
pictures could possibly give me enough information to complete this without a site visit. Let me know your thoughts and
how you and the applicant would like to proceed. Thanks and let me know if you have any questions!
Josh
Josh Pelletier
Project Manager
US Army Corps of Engineers
Washington Regulatory Field Office
2407 W. 5th Street
Washington, North Carolina 27889
Phone: (910) 251-4605
Email: josh.r.pelletier@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at:
http://corpsmapu.usace.army.mil/cm apex/f?P=136:4:0
Thank you for taking the time to visit this site and complete the survey.
Bodnar, Gregg
From: Bodnar, Gregg
Sent: Friday, April 17, 2020 8:06 AM
To: gary@theraveagency.com
Cc: Corbett, Robert W; lyn@lsimarineobx.com
Subject: Kayye Morgan CAMA Hold
Attachments: [External] Kaye, Morgan--Romm Point; Kayye and Morgan ON HOLD.docx
Morning Mr. Kayye,
Please see above for the hold notice for the project. I received a request from the USACE concerning a wetland
delineation (also attached above). Though documentation in your file notes that one was requested, the USACE has
provided additional information on how to complete one during current conditions. It is my understanding that USACE
has suspended site visits for the foreseeable future. Due to the request the project has been placed on hold until a
delineation can be conducted and the USACE is able to resume review. In the attached email is contact information for
the USACE in case you have any questions regarding conducting the delineation through a contractor.
Thanks,
Gregg
., R EQ�
Gregg Bodnar
Assistant Major Permits Coordinator
Division of Coastal Management
Department of Environmental Quality
252 ON 2US ext 21S (Office)
! GM%WnagPncdenr.aov
Email correspondence to andfrom this address is subject to the
North CaroNna Pablk Records Low and may be disclosed to third parties.
Bodnar, Gregg
From:
Sent:
To:
Cc:
Subject:
Attachments:
Hey all,
Sent out the hold this morning.
Thanks,
Gregg
Bodnar, Gregg
Friday, April 17, 2020 8:08 AM
Pelletier, Josh R CIV CESAW CESAD (USA); Scarbraugh, Anthony
Corbett, Robert W
Kayye and Morgan hold
Kayye and Morgan ON HOLD.pdf
rv,.DEQ�
m�rtrrereea tarm®.r_atNay�
Gregg Bodnar
Assistant Major Permits Coordinator
Division of Coastal Management
Department of Environmental Quaihy
252 808 28M ext 21S (Office)
Gremt.liodnarAsn cdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Low and may be disclosed to third parthx.
Bodnar, Gregg
From: Bodnar, Gregg
Sent: Thursday, April 16, 2020 4:27 PM
To: Corbett, Robert W
Subject: Kayye and Morgan
Hey Robert,
Looking over this one and noticed that the 3`^ property is owned by Room Point NC LLC., but they are not part of the
application. NC sec of state web site shows a Mary Romm as member. Do you know how this ties into the application ?
Thanks,
Gregg
�..� R E Q
Gregg Bodnar
Assistant Major permits Coordinator
Division of Coastal Management
Department of Environmental Quality
252 808 28W eM 215 (Office)
GreRe.Bodnariftcdenrsov
Email correspondence to and from this address is subject to the
North Carolina Public Records law and may be disclosed to third parties.
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL AND PROCESSING RECORD
APPLICANT: Gary Kayye & Anne Morgan COUNTY: Cu►rituck
PROJECT NAME: Bulkhead and docking facility
LOCATION OF PROJECT: 122,128, Parcel #00500000900000 Romm Point
DATE APPLICATION RECEIVED COMPLETE BY FIELD: 4-3-20
FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: No
FIELD REPRESENTATIVE: Robert Cor DISTRICT OFFICE: ELIZABETH CITY
DISTRICT MANAGER REVIEW: Date
B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: $400 (WO) # III(D)
APPLICATION ASSIGNED TO: Bodnar
PUBLIC NOTICE REC'D: 4-19-20 END OF NOTICE DATE: 5-9-20
ADJ. RIP. PROP NOTICES REC'D: DEED REC'D: Yes
C) 75 DAY DEAD�INE: 6-17-20 f j\JAV ley 150 DAY DEADLINE:
HOLDS: 001 p 1ty Aqlzltr
EMAIL OUT DATE: 4-14-20 STATE DUE DATE: 5-5-20
PERMIT FINAL ACTION: ISSUE DENY
AGENCY II DATE I NOTES
COMMENTS OBJECTIONS:
RETURNED YES NO
I DCM -Field Rep 17��/Lo I 1 16�M' r CXC I
DCM - LUP Consistency Determination
Local Permit Officer
Corps of Engineers - Regulatory Branch
I "Ill 70 \661
�(/�/poi
141115I70
Vr i/^C c Il w `� � ?qu
DWR-401 Section
1d 20-0�/
DWR- PublicWaterSupply
x
DEMLR - Stormwater
y 70
L?
DEMLR - Sed and Erosion
DOA - State Property Office
S (o w
Wildlife Resources Commission
i/l
)C
G ploR
DMF - Shellfish Section
4 70
%
DMF - Habitat&Enhancement
air 1�
K
DNCR- Archives&History
S I L0
)G
DNCR-Natural Heritage Program
0011/011
NC Dept of Commerce 11 " I11I7P 11 11 x 11 RECEIVED I
APR 14 2020
DCM-MHD CITY
,l 1. 1 1 � ; ;q
ROY COOPER NORTH CAROLINA
Governor EnvfronmeNa(Qudtfy
MIC14AEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director MEMORANDUM
TO: Gregg Bodnar, Assistant Major Permits Coordinator
THROUGH: Ron Renaldi, District Manager 12 A-R,
FROM: Robert Corbett, Field Representative Z (,C
DATE: April 8, 2020
SUBJECT: Gary Kayye & Anne Morgan Major Permit Recommendations
The applicants propose to construct a bulkhead across 3 separate lots with a maximum distance
waterward of 36' measured from normal water level. The applicants also propose to construct a
29' x 6' L shape pier with a 16'x 18' platform, as well as a 16' x 4' dropdown platform.
The site of the proposed development is located at 122, 128, and parcel # 005000000900000
Romm Point, off of SR 168, Currituck County, adjacent to the North Landing River of the
Currituck Sound.
The development proposal involves the Public Trust Area (PTA), Estuarine Waters (EW), and
Estuarine Shoreline (ES) Areas of Environmental Concern (AEC's).
I have reviewed the Rules of the Coastal Resources Commission (CRC) as they pertain to this
project and my findings are as follows:
15A NCAC 07H.0208 Use Standards
Paragraph (a) addresses General Use Standards, and sub -paragraph (1) precludes uses that are
not water dependent within the EW and PTA and lists uses that may be considered water
dependent.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a) (1) States "Uses which are not water dependent shall not be permitted in coastal
wetlands, estuarine waters, and public trust areas. Restaurants, residences, apartments, motels,
hotels, trailer parks, private roads, factories, and parking lots are examples of uses that are not
water dependent. Uses that are water dependent include: utility crossings, wind energy facilities,
docks, wharves, boat ramps, dredging, bridges and bridge approaches, revetments, bulkhe*CEIVED
DAPR 14 2020
North Carolina Department of Dwtnonmental Quality I Division of Coastal Management DCM-MHD CITY r
�izabeth City Office 1 401 South Griffin Street. Suite 3011 Elirabeth City. North Carolina 27909
Gregg Bodnar, Assistant Major Permits Coordinator
Gary KaWe & Anne Morgan Major Permit Recommendations
April 8, 2020
Page 2
culverts, groins, navigational aids, mooring pilings, navigational channels, access channels and
drainage ditches;"
Consistent: The proposed development is considered water -dependent.
Paragraph (a)(2)(A) states that the location, design, and need for development, as well as the
construction activities involved shall be consistent with the management objective of the
Estuarine and Ocean System AEC and shall be sited and designed to avoid significant adverse
impacts upon the productivity and biologic integrity of coastal wetlands, shellfish bed,
submerged aquatic vegetation as defined by the Marine Fisheries Commission, and spawning
and nursery areas.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(B) states that development shall comply with state and federal water and air
quality standards.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(C) states that development shall not cause irreversible damage to documented
archaeological or historic resources as identified by the N.C. Department of Cultural Resources.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(D) states that development shall not increase siltation.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(E) states that development shall not create stagnant water bodies.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(F) states that development shall be timed to avoid significant adverse impacts
on life cycles of estuarine and ocean resources.
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (a)(2)(G) states that development shall not jeopardize the use of the waters for
navigation or for other public trust rights in public trust areas including estuarine waters.
Consistent: The proposed development is consistent with the intent of this rule. RECEIVED
APR 14 2020
DCM-MHD CITY
Gregg Bodnar, Assistant Major Permits Coordinator
Gary Kayye & Anne Morgan Major Permit Recommendations
April 8, 2020 .
Page 3
Paragraph (b) addresses Specific Use Standards. Of these, subparagraphs (6) Piers and Docking
Facilities. (7) and Bulkheads, pertain to this project, and those subparagraphs not listed are not
applicable to this project.
Paragraph (6) Piers and Docking Facilities
Subparagraph (6) (A) states, "Piers shall not exceed six feet in width. Piers greater than six feet
in width shall be permitted only if the greater width is necessary for safe use, to improve public
access, or to support a water dependent use that cannot otherwise occur;"
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (6) (B) states, "The total square footage of shaded impact for docks and mooring
facilities (excluding the pier) allowed shall be eight square feet per linear foot of shoreline with a
maximum of 2,000 square feet. In calculating the shaded impact, uncovered open water slips
shall not be counted in the total. Projects requiring dimensions greater than those stated in this
Rule shall be permitted only if the greater dimensions are necessary for safe use, to improve
public access, or to support a water dependent use that cannot otherwise occur. Size restrictions
shall not apply to marinas;"
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (6) (C) states,. "Piers and docking facilities over coastal wetlands shall be no wider
than six feet and shall be elevated at least three feet above any coastal wetland substrate as
measured from the bottom of the decking;"
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (6) (D) states, "A boathouse shall not exceed 400 square feet except to
accommodate a documented need for a larger boathouse and shall have sides extending no
farther than one-half the height of the walls and covering only the top half of the walls.
Measurements of square footage shall be taken of the greatest exterior dimensions. Boathouses
shall not be allowed on lots with less than 75 linear feet of shoreline. Size restrictions do not
apply to marinas;"
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (6) (E) states, "The total area enclosed by an individual boat lift shall not exceed
400 square feet except to accommodate a documented need for a larger boat lift;"
Consistent: The proposed development is consistent with the intent of this rule. RECEIVED
APR 14 2020
DCM-MHD CITY
Gregg Bodnar, Assistant Major Permits Coordinator
Gary Kayye & Anne Morgan Major Permit Recommendations
April 8, 2020
Page 4
Paragraph (7) Bulkheads
Subparagraph (7) (A) states, "Bulkhead alignment, for the purpose of shoreline stabilization,
shall approximate the location of normal high water or normal water level."
Inconsistent: The proposed bulkhead alignment averages 14.5' waterard of NWL
Subparagraph (7) (B) states, "Bulkheads shall be constructed landward of coastal wetlands in
order to avoid significant adverse impacts to the resources."
Consistent: The proposed development is consistent with the intent of this rule.
Subparagraph (7) (C) states, 'Bulkhead backfill material shall be obtained from an upland source
approved by the Division of Coastal Management pursuant to this Section, or if the bulkhead is a
part of a permitted project involving excavation from a non -upland source, the material so
obtained may be contained behind the bulkhead."
Consistent: The applicants have indicated that clean fill will be used.
Subparagraph (7) (D) states, `Bulkheads shall be permitted below normal high water or normal
water level only when the following standards are met:
(i) the property to be bulkheaded has an identifiable erosion problem, whether it results from
natural causes or adjacent bulkheads, or it has unusual geographic or geologic features, e.g. steep
grade bank, which will cause the applicant unreasonable hardship under the other provisions of
this Rule;
Consistent: 'The proposed development is consistent with the intent of this rule.
(ii) the bulkhead alignment extends no further below normal high water or normal water level
than necessary to allow recovery of the area eroded in the year prior to the date of application, to
align with adjacent bulkheads, or to mitigate the unreasonable hardship resulting from the
unusual geographic or geologic features;
Consistent: The proposed bulkhead aligns with the adjacent property to the southwest.
(iii) the bulkhead alignment will not adversely impact public trust rights or the property of
adjacent riparian owners;
Consistent: The proposed development is consistent with the intent of this rule.
(iv) the need for a bulkhead below normal high water or normal water level is documented RECEIVED
APR 14 2020
OCM-MHD CITY
Gregg Bodnar, Assistant Major Permits Coordinator
Gary Kayye & Anne Morgan Major Permit Recommendations
April 8, 2020
Page 5
by the Division of Coastal Management;
Consistent: The proposed development is consistent with the intent of this rule.
(v) the property to be bulkheaded is in a nonoceanfront area."
Consistent: The proposed development is consistent with the intent of this rule.
15A NCAC 07K 0209 Use Standards
Paragraph (d) (1) states "All development projects, proposals, and designs shall preserve natural
barriers to erosion, including peat marshland, resistant clay shorelines, and cypress -gum
protective fringe areas adjacent to vulnerable shorelines."
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (d) (2) states "All development projects, proposals, and designs shall limit the
construction of impervious surfaces and areas not allowing natural drainage to only so much as is
necessary to service the primary purpose or use for which the lot is to be developed. Impervious
surfaces shall not exceed 30 percent of the AEC area of the lot, unless the applicant can
demonstrate, through innovative design, that the protection provided by the design would be
equal to or exceed the protection by the 30 percent limitation. Redevelopment of areas exceeding
the 30 percent impervious surface limitation shall be permitted if impervious areas are not
increased and the applicant designs the project to comply with the rule to the maximum extent
feasible."
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (d) (3) states "All development projects, proposals, and designs shall comply with the
following mandatory standards of the North Carolina Sedimentation Pollution Control Act of
1973:
(A) All development projects, proposals, and designs shall provide for a buffer zone along the
margin of the estuarine water that is sufficient to confine visible siltation within 25 percent of
the buffer zone nearest the land disturbing development.
Consistent: The proposed development is consistent with the intent of this rule.
(13) No development project proposal or design shall propose an angle for graded slopes or fill
that is greater than an angle that can be retained by vegetative cover or other erosion -control
devices or structures.
RECEIVED
APR 14 2020
DCM-MHD CITY
Gregg Bodnar, Assistant Major Permits Coordinator
Gary Kayye & Anne Morgan Major Permit Recommendations
April 8, 2020
Page 6
Consistent: The proposed development is consistent with the intent of this rule.
(C) All development projects, proposals, and designs that involve uncovering more than one acre
of land shall plant a ground cover sufficient to restrain erosion within 30 working days of
completion of the grading; unless the project involves clearing land for the purpose of forming a
reservoir later to be inundated."
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (d) (4) states "Development shall not have a significant adverse impact on estuarine
and ocean resources. Significant adverse impacts include development that would directly or
indirectly impair water quality increase shoreline erosion, alter coastal wetlands or Submerged
Aquatic Vegetation (SAV), deposit spoils waterward of normal water level or normal high water,
or cause degradation of shellfish beds."
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (d) (5) states "Development shall not interfere with existing public rights of access to,
or use of, navigable waters or public resources."
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (d) (6) states "No public facility shall be permitted if such a facility is likely to require
public expenditures for maintenance and continued use, unless it can be shown that the public
purpose served by the facility outweighs the required public expenditures for construction,
maintenance, and continued use."
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (d) (7) states "Development shall not cause irreversible damage to valuable, historic
architectural or archaeological resources as documented by the local historic commission or the
North Carolina Department of Natural and Cultural Resources."
Consistent: The proposed development is consistent with the intent of this rule.
Paragraph (d) (8) states `Established common-law and statutory public rights of access to the
public trust lands and waters in estuarine areas shall not be eliminated or restricted. Development
shall not encroach upon public accessways nor shall it limit the use of the accessways."
Consistent: The proposed development is consistent with the intent of this rule.
RECEIVED
APR 14 ZOZO
0CM-MHD CITY
Gregg Bodnar, Assistant Major Permits Coordinator
Gary KaWe & Anne Morgan Major Permit Recommendations
April 8, 2020
Page 7
Paragraph (d) (10) states "specific information, degrade the water quality or outstanding resource
values. (10) Within the Coastal Shorelines category (estuarine and public trust shoreline AECs),
new development shall be located a distance of 30 feet landward of the normal water level or
normal high water level, with the exception of the following:
(A) Water -dependent uses as described in Rule 07H .0208(a)(1) of this Section;"
Consistent: The proposed development is considered water dependent.
Based on my review of the applicable subsections of the North Carolina Administrative Code,
the permit application, and plans, I recommend issuing a permit be issued to Gary Kayye and
Anne Morgan for the development as proposed, provided the USACE approve the 404-wetland
fill.
RECEIVED
APR 14 2020
DCM-MHD CITY
Bodnar, Gregg
From: Moore, Bill
Sent: Wednesday, April 15, 2020 2:44 PM
To: Bodnar, Gregg
Subject: CAMA Major Applications - sw reviews
Hey Gregg,
Based my review of the following CAMA Major Applications, a stormwater permit will not be required for these projects
at this time. I have documented the following stormwater exemptions for our files. Please advise if you have any
questions.
1) Gary Kayye & Anne Morgan — Currituck County
2) Wilbert & Donna Watson — Pasquotank County
3) Baycliff HOA— Dare County
ROY`.000PER
Covembr
MICHAEL S. REGAN
secretary
BRAXTON C, DAVIS
Dlrcdor
April 14, 2020
MEMORANDUM:
FROM: Gregg Bodnar, Assistant Major Permits coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courler04-16.33)
gredsr bodnar(Mricderingov.
SUBJECT: CAMA /Dredge & Fill Application Review
Applicant:, Gary Kayye & Anne Morgan
Project Location: 122,128, Parcel #00500060900000 Romm.Polnt In Currltuck County
Proposed Project: Construct bulkhead across 3 lots, a L-shaped pier and a dropdown
platform
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Grean Bodnar at the address above by May 5, 2020. If you have any questions
regarding the proposed project, contact Robert Corbett (252-W.4-39016 ext. 2353 when appropriate, in-
depth comments with supporting, data is requested.
REPLY: This agency has no objection to the project as proposed.
"*Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
PRINT
AGEN(
SIGMA'
DATE
rh
D..EQ
APR 1 5 2020
MP SECTION MHD
North Carolina Department ofErMronmealal gttality.l Dlvlslon of Coastal Management
Elizabeth city orllce 1401South Gtif(NStreet,$uito3001 Elizabeth Clly,Norlh Carollna27909
252.264,3901
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
April 14, 2020
MEMORANDUM:
NORTH CAROLINA
Ehvlronmental Quality
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courler 04-16.33)
greoa.bodnar0rodenr.Qov
SUBJECT: CAMA/Dredge & Fill Application Review
Applicant: Gary Kayys & Anne Morgan
Project Location: 122,128, Parcel #00500000900000 Romm Point In Currituck County
Proposed Project: Construct a bulkhead across 3 lots, a L-shaped pier and a dropdown
platform
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Greprr Bodnar at the address above by May 5, 2020. If you have any questions
regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 2353 when appropriate, in-
depth comments with supporting data is requested.
REPLY: This,agency has no objection to the project as proposed.
"'Additional comments may be attached"
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME Kacee C Zinn
AGENCY
SIGNATURE
DATE
NCDMF Shellfish Sanitation
xci Z'� for Shannon Jenkins
4/14/20
vM,tlO Pm,YtlOut/
RECEIVE®
APR 1 4 2020
IWP SECTION NISI®
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1 401 South Griffin Street, Suite 3001 Elizabeth City, North Carolina 21909
252.264.3901
RAY COOPER
cmrrmsr
MICHAEL S. REGAN
Swearp
BRAXTON C. DAVIS
r ovo
April 14, 2020
NORM CAROLINA
EnWronmcorarQuortty
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEO - Division of Coastal Management
400 Commerce Ave.. Morehead City, NC 28557
Fax 252-247-3330 (Courier 04-16-23)
gregn.bodnarCa�ncdencigov
SUBJECT: CAMA/Dredge & Fill Application Review
Applicant: Gary Kayye & Anne Morgan
Project Location: 122,128, Parcel 000500000900000 Romm Point In Currituck County
Proposed Project: Construct a bulkhead across 3 lots, a L-shaped pier and a dropdown
platform
Please indicate glow your agency's position or viewpoint on the proposed project and
rotirrrr'this form to Grega Bodnar at the address above by May 5, 2020. If you have any questions
regarding the proposed project, contact Robert Corbett (252-264-3901, ext 2353 when appropriate, in-
depth comments vrith supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME Lee Padrick
AGENCY NC Commerce RECEIVED
SIGNATURE I (/ K 6®
DATE 4-17-20 APR 1 7 2020
MP SECTION MHD
MW
;:; � �
Nutth CH:ol+na Uervrtmrnt of rsrvho,usrnlr{ q,r.+rily i Uivi4am pt Costal ftn,anyemmt
ritrabrth City orflx.14035muh Csv+fln 5ltrrl. Adtr ]t1U 1 ptza6rU, Chy.tb,ih Cxn'}ns rt0U4
W 764 3901
ROY COOPER
('overiior
MICHAEL S. REGAN
Secretory
BRAXTON C. DAVIS
Director
April 14, 2020
MEMORANDUM:
N
yp;Apy+ a i �g�j.
e �q}ye
x: ahx
e
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ'-Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 25z247-3330 (Courier04-16-33)
grega.bodnarid,ncdenr:aov
SUBJECT: CAMA/Dredge & Fill Application Review
Applicant: Gery,t ayye & Anne Morgan
Project Location: 122,128, Parcel #00500000900000 Romm Point In Currltuck County
Proposed Project: Construct a bulkhead across,3 lots, a L-shaped pier and a dropdown
platform
Please indicate below your agency's position or viewpoint on the proposed: project and
return this form to Greaa Bodine at the address above by May 5, 2026. If you have any questions
regarding the proposed project, contact Robert Corbett (252-264-Ml, ut. 2353 when appropriate, in-
depth comments with supporting data is requested.
This agency has no objection to the project as
"Additional comments may be attached"
This agency has no comment on the proposed project.
_ This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
�comments,
RECEIVED'
APR 2 A 2020
MP SECTION MHD
North Carolina Department of Environmental Quality I Division of Coastal Management
aizabeth City Office 1.401 South Griffln Street, Suite 3001 EllmbethChy, North Carolina 27909
252164.3901
ROY,COOPER
Ocventor
MICHAEL S. REGAN.
'Secretary
BRAXTON C. DAVIS
Director
MEMORANDUM
NORTH CAROLINA
Environmental Quality
TO: Gregg Bodnar, Major Permits Processing Coordinator
Division of Coastal Management
FROM Chartan Owen6,'Nit Dlstliot Planner
-Division of COa _el Management
SUBJECT: Major Permit Request by Gary Kayye and Anne Morgan to install 425 linear feet
of vinyl bulkhead along Parcel # #005000000900000 Romm Point Road and at
122 and 128 Romm Point Road, and a 6 foot wide by 29 foot long "L" shaped pier
with a 16 foot by 18 foot terminus platform and a 16 foot by 4 foot drop down
platform at 122 Romm Point Road, on North Landing River; in the Crawford
Township, Currituck County.
DATE: April 27, 2020
Consistency Determination: The request is consistent with/not in conflict with the Currituck
County 2006 Core Land Use Plan (LUP) certified by the CRC on
May 18, 2007 as amended through July 2, 2019.
Overview: The project area consists of three (3) contiguous properties with a combined shoreline
of 560 linear feet along the North Landing River, which connects to the Currituck Sound. Parcel
#005000000900000 (owned by Romm Point NC, LLC) and the properties at 122 (Gary Kayye)
and 128 Romm Point Road (Anne Morgan) total 3 acres. Water depths range from -1 foot to -5
feet and average -3 feet near the shoreline. A 140 sq. ft: area of what appears to be Section 404
wetlands is located along the northernmost 60 feet of shoreline. Combined, the parcels average
an elevation of approximately 5 feet above Normal Water Level (NWL). The properties are
vegetated with grasses, shrubs and trees. The properties are primarily located outside of a
floodzone, with the shoreline fringe located within the AE Floodzone.
Existing site improvements include single family houses on 122 and 128 Romm Point Road. The
unaddressed parcel is vacant. Existing shoreline improvements consist of continuous aging and
remnant wooden bulkhead along each shoreline; a 25 foot bulkhead return wall lined with riprap
on the unaddressed parcel; a 6 foot wide by 16 foot long "T" head pier with an 8 foot by 16 foot
terminus platform and a 12 foot by 12 foot boat lift at 122 Romm Point Road, and; a 6 foot wide
by 27 foot long "L" shaped pier with a 16 foot by 16 foot terminus platform at 128 Romm Point
Road. The shoreline has an escarpment that ranges from 1 foot to 14 feet.
APR 2 8 2020
North Carolina Department of EnvirDnmentai Quality I Division of Coastal Management
Elizabeth City ollla 1401 South GrlfHn Street, Suite 3001 Ellwbeth City, North Carolina 2N09
2SZ264.3901 P SECTION MIL D
North Carolina Department of Environmental Quality
Division of Coastal Management
MEMORANDUM
Page 2 of 5
Installation of 425 linear feet of vinyl bulkhead and installation of a 6 foot wide by 29 foot long "L"
shaped pier with a 16 foot by 18 foot terminus platform and a 16 foot by 4 foot drop down plafform
are proposed. The bulkhead will tie into existing bulkheads on adjacent properties to the north
and south. The bulkhead will average 14.5 feet waterward of NWL with a maximum distance of
36 feet waterward of NWL. The "L" shaped pier will be located along the shoreline of 122 Romm
Point Road. The existing "T head pier at 122 Romm Point Road will be removed but the boat lift
will remain.
The waters of the North Landing River in this area are classified as SC and Joint Waters and are
closed to shellfish taking. No submerged aquatic vegetation was observed growing at the project
site. Based on available information, there appear to be no archaeological sites on or near the
property.
Anticipated impacts resulting from this project are expected to include: the excavation of .14 acre
of Public Trust Area/Estuarine Waters Areas of Environmental Concern (AEC); the shading of
526 sq. ft. of Public Trust Area/Estuarine Waters AEC, and; the disturbance of .20 acre of High
Ground within the Estuarine Shoreline AEC.
As indicated on the site plan, the 140 sq. ft. area of what appears to be Section 404 wetlands will
be backfilled. The staff report indicates that a USACE wetland delineation has not been
performed. A statement in the permit materials indicates that a site visit with a USACE agent will
be scheduled.
Basis for Determination:
The properties are designated as "Full Service Areas' on the Currituck County Future Land Use
Map (FLUM); with Areas of Environmental Concern (AECs) also designated as "Conservation
Areas" as indicated on Page 11-1. ' The properties are also located in the "Courthouse" sub area.
As indicated on Page 11-1, the purpose of the Conservation designation is to provide for the long-
term management and protection of significant, limited, or irreplaceable areas. Proper
management is needed to conserve the natural, cultural, recreational, scenic or biologically
productive values of these areas. The designation is applied to areas that should not be
developed at all (preserved), or if developed, done so in a very limited manner characterized by
careful planning and cautious attention to the conservation of environmental features. As
indicated on Page 11-2, the standards of the Conservation class shall be applied in accordance
with the site specific information made available during special studies and/or the land
development process.
Definitions of key words are provided on page 9-2. These words include "Encourage: to favor or
foster", "Should: Ought to, if no valid reason not to", and "Support: to shore up, may imply financial
support".
APR 2 g 2020
»o fill,
i ta� 4n:
North Carolina Department of Environmental Quality
Division of Coastal Management
MEMORANDUM
Page 3 of 5
Land Use Plan policies address the use of vegetated buffers to reduce pollutants and protect
water quality. In this case, bulkhead will help protect water quality by reducing soil erosion and
sedimentation.
The following LUP policies may be applicable to this request:
Public Access Policies (PA):
Policy PA1, Page 9-3.
'Public access to the sound and ocean waters of Currituck County is essential to
the quality of life of residents and visitors, as well as the economy of the area.
The County supports the establishment of ADDITIONAL PUBLIC AND PRIVATE
ACCESS opportunities to the waters of Currituck County...."
Land Use Compatibility:
Policy ES2, Page 9-5.
"NON -COASTAL WETLANDS... shall be conserved for the important role they
play in absorbing floodwaters, filtering pollutants from stormwater runoff,
recharging the ground water table, and providing critical habitat for many plant
and animal species. Currituck County supports the efforts of the U. S. Army
Corps of Engineers in protecting such wetlands through the Section 404 permit
program of the Clean Water Act as well as Section 401 water quality
certifications by the State of North Carolina."
Policy ES4, Pages 9-5 and 9-6.
"In approving new developments, Currituck County shall support the retention or
creation of vegetated buffer area along the ESTUARINE SHORELINES as a
simple, effective and low-cost means of preventing pollutants from entering
estuarine waters. Exceptions to this requirement may include developments
involving pre-existing man-made features such as hardened shorelines, ditches,
and canals... The County also supports CAMA use standards for all COASTAL
SHORELINES, whether estuarine or otherwise."
h UE.CIELiLI PY
APR 2 S 2020
jip STECTION PAID
North Carolina Department of Environmental Quality MEMORANDUM
Division of Coastal Management Page 4 of 5
Policy ES5, Page 9-6.
"Uses allowed in ESTUARINE WATERS must be water dependant (public
access, docks, piers, erosion control, and other CAMA-approved uses) and must
not interfere with the proper function, cleanliness, salinity, and circulation of the
resource..."
Policy ES6, Page 9-6.
"The location and design of piers and docks shall not unduly interfere with the
rights of the public to the free and unobstructed use of PUBLIC TRUST WATERS
for navigation, fishing, and other uses. Efforts to limit the length of piers into
public trust waters shall be supported."
Natural Hazards:
Policy NH 1, Page 9-16.
"The County recognizes the risks to life and property that exist within SPECIAL
FLOOD HAZARD AREAS (i.e. areas having a 1 % chance of flooding in any year)
that may be inundated during major storm events. The County will continue
taking measures to mitigate these risks and will avoid taking any action in these
areas that materially increases risks to life and property."
Policy NH2, Page 9-16.
"The County shall require development and redevelopment within SPECIAL
FLOOD HAZARD AREAS to meet the standards of the National Flood Insurance
Program and the County's Flood Damage Prevention Ordinance..."
Policy NH 8, Page 9-16.
"Currituck County encourages owners of PROPERTIES ALONG ESTUARINE
SHORELINES to employ the least hardened approach to shoreline stabilization
(i. e. marsh grass favored over riprap favored over bulkhead, etc.) provided that
reasonable access is available to install the technology available."
APR 2 g 2020
MP 5ECTiON MHD
North Carolina Department of Environmental Quality MEMORANDUM
Division of Coastal Management Page 5 of 5
Water Quality:
Policy WQ 3, Page 9-17.
"Currituck County supports policies, plans and actions that help protect the water
quality of the county's estuarine system by preventing SOIL EROSION AND
SEDIMENTATION, and by controlling the quantity and quality of STORMWATER
RUNOFF entering the estuary."
Policy WQ 4, Page 9-17.
"RUNOFF AND DRAINAGE from development, forestry and agricultural activities
shall be of a quality and quantity as near to natural conditions as possible. Post -
development runoff shall not exceed pre -development volumes."
Policy WQ 5, Page 9-17.
"Development that preserves the NATURAL FEATURES OF THE SITE,
including existing topography and significant existing vegetation, shall be
encouraged..."
Policy WQ 6, Page 9-17.
"Currituck County supports the retention or preservation of VEGETATED
BUFFERS along the edge of drainage ways, streams, and other components of
the estuarine system as an effective, low cost means of protecting water quality."
Local Countywide Concerns:
Policy HP4, Page 9-20.
"The DESTRUCTION OF SIGNIFICANT ARCHITECTURAL, HISTORIC
RESOURCES, AND ARCHAEOLOGICAL RESOURCES in the planning area
shall be discouraged."
�CEIVED
APR 2 R 2020
WITS SECTION MHD
ICLICI V CU:
0/2020
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
April 14, 2020
NORTH CAROLINA
Environmental Quality
ER 20-0907
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
QreQQ. bod nar(a)ncdenrgov
SUBJECT: CAMA / Dredge & Fill Application Review
Due: 5/15/2020
A-- NC
NCH
0510812020
Applicant: Gary Kayye 8, Anne Morgan
Project Location: 122,128, Parcel #00500000900000 Romm Point in Currituck County
Proposed Project: Construct a bulkhead across 3 lots, a L-shaped pier and a dropdown
platform
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Grean Bodnar at the address above by May 5, 2020. If you have any questions
regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 2353 when appropriate, in-
depth comments with supporting data is requested.
This agency has no objection to the project as proposed.
"Additional comments may be attached"
X This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME Renee Gledhill -Earley
AGENCY _ Historic Preservation Office RECOoff ED
SIGNATURE _ R.2�,WJL&L -
DATE 05/13/2020 MAY 1 3 2020
�DE �y MP SECTION MHD
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909
252.264.3901
ROY COOPER
Govemor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
April 14, 2020
MEMORANDUM:
�9uzgivm
NORTH CAROLINA
Environmental Quality
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax:252-247-3330 (Courier04-16.33)
greeg.bodnar( ncderILM
SUBJECT: CAMA/Dredge & Fill Application Review
Applicant: Gary Kayye & Anne Morgan
Project Location: 122,128, Parcel 000500000900000 Romm Point in Currituck County
Proposed Project: Construct a bulkhead across 3 lots, a L-shaped pier and a dropdown
platform
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Grego Bodnar at the address above by May 5, 2020. If you have any questions
regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 2353 when appropriate, in-
depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
h _)r— This agency has no comment on the proposed project.
(� h This agency approves of the project only if the recommended changes
� pp are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME WQ,u2-L0.�(1r0..rc)
n-
AGENCY I"�, WAn "
SIGNATURE f 2 )r-A.4 zA-e- 1-FLt eU RECEIVED
DATE &,'S ao 20
MAY 6 2020
MP SECTION MH®
North Carolina Department of Environmental Qoality I Dlvislon of Caastal Management
Elizabeth City Office 1401 South Griffin Street, Suite 9001 Elizabeth City, North Carolina 27909
252.2643901
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Gary Kayye and Anne Morgan
3310 Environ Way
Chapel Hill, NC 27517
6_,..
610
n� ll
NORTH CAROLINA
Environmental Quality
June 18, 2020
DWR Project # 20-0514
CURRITUCK County
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS
Bulkhead Installation across 3 lots at 122, 128, and Parcel #00500000900000
Romm Point, Currituck County
Dear Mr. Kayye and Ms. Morgan:
You have our approval for the impacts listed below for the purpose described in your application dated
April 14, 2020 and received by the Division of Water Resources (Division) on April 14, 2020 with
subsequent information received on June 10, 2020. These impacts are covered by the attached Water
Quality General Certification Number4175 and the conditions listed below. This certification is associated
with the use of Regional General Permit Number 291 once it is issued to you by the U.S. Army Corps of
Engineers. Please note that you should get any other federal, state or local permits before proceeding
with your project, including those required by (but not limited to) CAMA Major, Sediment and Erosion
Control, Non -Discharge, and Water Supply Watershed regulations.
This approval requires you to follow the conditions listed in the enclosed certification(s) orgeneral permit
and the following additional conditions:
1. The following impacts are hereby approved, provided that all the other specific and general
conditions of the Certification are met. No other impacts are approved, including incidental
impacts. [15A NCAC 02H .0506(b)(c)jj
Type of Impact
Amount
Amount
Plan location/ Reference
Approved (units)
Approved (units)
Attached
Permanent
Temporary
Wetland
W1 Bulkhead Fill
0.003 (acres)
0 (acres)
Sheet 1 of 2, 2 of 2
Waters
OW3 —Bulkhead Fill
0.142 (acres)
0 (acres)
Sheet 1 of 2, 2 of 2
OW2 — Shading from
0.012 (acres)
0 (acres)
Pier and Platform
2. Water Quality Certification
NNW ROUR X77
JUN 2 2 2020
gD_EQ�
mn .mwmwio� /'�
North Carolina Department of Environmental Quality I Division
st� oo(gqfWater Resources
p'
Washington Regional Office 1 943 Washington Square Mail 16y�$(dh m CTolOMg Ptl HD
252.946,6481
DWRg20-0514 f d%
401 APPROVAL
Page 2 of 4
The proposed project must comply with all the conditions of the General Water Quality
Certification(s) 4175. [15A NCAC 02H .0507(c)]
3: The applicant and/or authorized agent shall provide a completed Certificate of Completion form
to the Division within thirty (30) days of project completion (available at
http://edocs.deg.nc.gov/Forms/Certicate-of-Completion). [15A NCAC 02H .0506(b)(5)]
Continuing Compliance
4. During construction of the proposed project, fueling, lubrication and general equipment
maintenance should not take place within 50 feet of a waterbody or wetlands to prevent
contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0201
(f)]
5. The permittee shall report to the Washington Regional Office any noncompliance with this
certification, any violation of stream or wetland standards [15A NCAC 02B .0200] including but
not limited to sediment impacts, and any violation of state regulated riparian buffer rules [15A
NCAC 02B .0200). Information shall be provided orally within 24 hours (or the next business
day if a weekend or holiday) from the time the applicant became aware of the circumstances. A
written submission shall also be provided within 5 business days of the time the applicant
becomes aware of the circumstances. The written submission shall contain a description of the
noncompliance, and its causes; the period of noncompliance, including exact dates and times,
if the noncompliance has not been corrected, the anticipated time compliance is expected to
continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the
noncompliance. The Division may waive the written submission requirement on a case -by -case
basis.
6. Turbidity Standards
The Permittee shall adhere to Title 15A NCAC 02B .0220 Tidal Salt Water Quality for SC Waters,
including but not limited to:
[15A NCAC 02B .0220 (12)] pH: shall be between 6.8 and 6.5, except that swamp water may
have a pH as low as 4.3 if it is the result of natural conditions. [15A NCAC 02B .0220(12)]
[15A NCAC 02B .0220 (19)] Turbidity: the turbidity in the receiving waters shall not exceed 25
Nephelometric Turbidity Units; if turbidity exceeds this level due to natural background
conditions, the existing turbidity level shall not be increased. Compliance with this turbidity
standard shall be deemed met when land management activities employ Best Management
Practices. [15A NCAC 02B .0220(19)]
7. This approval and their conditions are final and binding unless contested. [G.S. 143-215.51
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a
written petition for an administrative hearing to the Office of Administrative Hearings hereby known as
RECEIVED
J U N 2 2 2020
MP SECTION MAD
D W R # 20-0514
401 APPROVAL
Page 3 of 4
OAH). A petition form may be obtained from the OAH at htto://www.ncoah.com/ or by calling the OAH
Clerk's Office at (919) 431-3000 for information.
Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition
is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received
in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding
official state holidays).
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition
along with any applicable OAH filing fee is received by the OAH within five (5) business days following the
faxed transmission.
Mailing address for the OAH:
If sending via US Postal Service: If sending via delivery service (UPS, FedEx,
etc.):
Office of Administrative Hearings Office of Administrative Hearings
6714 Mail Service Center 1711 New Hope Church Road
Raleigh, NC 27699-6714 Raleigh, NC 27609-6285
One (1) copy of the.petition must also be served to DENR:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division under section 401 of the Clean Water Rules. Please
contact Anthony Scarbraugh at 252-948-3924or anthony.scarbrauehCcpncdenr.eov if you have any
questions or concerns.
Enclosure: GC 4175
Sincerely,
RoGwt TM."
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
qq dl rs r�
JUN 2 2 2020
VIP SECTION IMF!®
DWR#20-0514 1
401APPROVAL
Page 4 of 4
cc: Lyn Small, Lyn Small, Inc. (via email: lyn@lsimarineonx.com)
Josh Pelletier, USACE Washington Regulatory Field Office (via e-mail)
Gregg Bodnar, DCM Morehead City (via e-mail)
Robert Corbett, DCM Elizabeth City (via e-mail)
Randall Jones, DEMLR WaRO (via e-mail)
Laserfiche
"ECEIVED
JUN 2 2 2020
MP SECTION MHD
J % NORTH JLANDING IVER 1
NEW VINYL BEHIND
WOOD BULKHEAD
WATER DEPTH
2'+/-
CY4xl
LF VINYL BKHD
EXIST WOOD
5' WA TE DEPTH
AT END OF PIER
384 SF PIER
LF VINYL BKHD -
STEPS TO 4' WiDE
Ot LF VINYL BKHD
ER L 6NDING
TO
71, Tr
n II I
ITES WATER DEPTH
gg 3
BUFFER AFTER COMPLF'TIONL /rlt/
/ AREA OF BACKFILLL
PEti COMP BELOW NW. 230 S.F.
L�------------- — —
EXIST' RIPRml
— MAX )
\ TOP OF ESCARPMENT MAX LENGTH_
PROPERTY OF:
ROMM POINT NO LLC PROPERTY OF:
PO BOX 456 GARY KAYYE
MOYOCK_, NO 3310 ENVIRON WAY
27958 -(;INFO CHAPEL HILL, NO
a
LOCAL ADDRESS: 27517
VACANT LOT ROMM POINT RD
LOCAL ADDRESS:
JUN 2 2 2020 122 ROMM POINT RD
6YEL- SEC Y IONI
\ CONNECT NEW VINYL BEHIND
EXISTING WOOD BULKHEAD
.J
\
\ PROPERTY OF::
ANN�,WORGAI�
4013 W'FR UN ST
RICHMOND.
23221
LOCAL ADDRESS:
128 ROMM POINT RD
M96an3pN18DofWater L enF M.
to 06/18
MR# 20-051
PIERS
PROPERTY I;
VINCENT CC
132 ROMM I
CURRITUCK,
27929
LOCAL AC
132 ROI
SECTION A JUN 2 2 2020
N TS
DUSTING BOATLIFT TO REMAIN
141P SECTION MHD lr/
Bodnar, Gregg
From: Scarbraugh, Anthony
Sent: Thursday, June 18, 2020 9:29 AM
To: lyn@lsimarineobx.com
Cc: Corbett, Robert W; Bodnar, Gregg; Pelletier, Josh R SAW
(Josh.R.Pelletier@usace.army.mil); Dunn, Maria T.; Harrison, James A
Subject: 122 and 128 Romm Point, Currituck (DWR Project No. 20-0514)
Mr. Small,
After receiving the information regarding the results of the US Army Corps of Engineers site visit and conducting a
thorough review of available historic aerials, this Office will consider the information adequate to address the concerns
outlined in the additional information request issued by this Office on April 17, 2020. DWR will be moving forward with
the issuance of the 401 Water Quality Certification approval.
Regards,
Anthony Scarbraugh
EQR
Anthony Scarbraugh
EnvironmentalSpecialisill, Water Resources
North Carolina Department of Environmental Quality
252.948.3924 (Office)
Anthony_ Scarbraugh@ncdenr.gov
E'rw' Cf Ywj.txo' k"'h;C to s1Z Ilex;w CRfrHl"'.s J#'.1"V.'TIL:°!
rrt'q U's dSre "NN:Ii F) 177-(! ;M1•7 -
Bodnar, Gregg
From: Scarbraugh, Anthony
Sent: Wednesday, June 10, 2020 6:23 AM
To: Bodnar, Gregg
Cc: Pelletier, Josh R CIV CESAW CESAD (USA)
Subject: RE: [External] FW: Romm Point Bulkhead CAMA Major Permit
Gregg, Ali k ' _ A
The applicant and/or consultant will still need to address avoidance and minimization of impacts as requested in my
hold letter.
Thanks,
Anthony
Anthony Scarbraugh
Envirof North C��snaDi alisill Water ep artment of En vino Resources
Quality
252.948.3924 (Office)
Anthony_Scarbraugh@ncdenr_gav
From: Pelletier, Josh R CIV CESAW CESAD (USA) [mailto:Josh.R.Pelletier@usace.army.mil]
Sent: Wednesday, June 10, 2020 6:19 AM
To: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov>
Subject: RE: [External] FW: Romm Point Bulkhead CAMA Major Permit
Yes, according to Billy that's the only area in question on the entire site. I will confirm with him this morning just to be
sure.....
From: Scarbraugh, Anthony <anthonv.scarbrauah@ncdenr.gov>
Sent: Wednesday, June 10, 2020 6:16 AM
To: Pelletier, Josh R CIV CESAW CESAD (USA) <Josh.R.Pelletier@usace.army.mil>; Bodnar, Gregg
<gre¢¢.bodna r@ ncden r.¢ov>
Subject: [Non-DoD Source] RE: [External] FW: Romm Point Bulkhead CAMA Major Permit
Josh,
Is the wetland area (phragmites) limited to just the shoreline fringe? Just want to make sure that we're not cutting off
anything landward of the bulkhead alignment.
Thanks,
Anthony
..._..r cf�D Qom;
E a'- rr r J,,,
rlb,:.rr .... ,, r'! .. .
Anthony Scarbraugh
Environmental Specialist ll, Water Resources
North Carolina Department of Envamnm mIal Quality
252.948.3924(O (Office)
Anthony.Scarbraugh@ncdenr-gov
From: Pelletier, Josh R CIV CESAW CESAD (USA) fmailto:Josh.R.Pelletier@usace.armv.mill
Sent: Wednesday, June 10, 2020 6:10 AM
To: Scarbraugh, Anthony <anthonv.scarbrau¢h@ncdenr.aov>; Bodnar, Gregg <Rreee.bodnar@ncdenr.Rov>
Subject: RE: [External] FW: Romm Point Bulkhead CAMA Major Permit
Guys,
I apologize. We did get eyes on site to confirm the plans we had in the DCM application. There is an area of phrag
behind the bulkhead alignment that will be filled due to the new bulkhead construction. We are good to go on our end
and will be moving forward in the 291 process. Let me know if you need any other information. Thanks!
Josh
From: Scarbraugh, Anthony<anthonv.scarbraur;h@ncdenr.Rov>
Sent: Tuesday, June 9, 2020 2:05 PM
To: Bodnar, Gregg <AreRR.bodnar@ncdenr.gov>; Pelletier, Josh R CIV CESAW CESAD (USA)
<Josh.R. Pelletier@ usace.a rmv.mil>
Subject: [Non-DoD Source] RE: [External] FW: Romm Point Bulkhead CAMA Major Permit
Gregg,
I have not seen any additional information to address the items on our hold letter.
Anthony
Anthony Scarbraugh
DRM
EnvironmentalSpecialisillWater Resources
North Carolina Department of Environmental Quality
252.948-3924 (Office)
Anthony. Scarbraugh@ncdem.gcv
3
From: Bodnar, Gregg
Sent: Tuesday, June 9, 2020 1:54 PM
To: Pelletier, Josh R CIV CESAW CESAD (USA) <Josh.R.Pei letier@usace.armv.mil>; Scarbraugh, Anthony
<a nth o nv.sca rb ra ug h @ n cd e n r. gov>
Subject: FW: [External] FW: Romm Point Bulkhead CAMA Major Permit
Hey guys,
The applicant has checked in that they have provided some additional information. So I wanted to check in to see if this
is the case and if the project is off hold as a result.
Thanks,
Gregg
From: Renaldi, Ronald <ronald.renaldi@ncdenr.gov> .
Sent: Tuesday, June 9, 2020 1:48 PM
To: Lyndon Small <Ivn@lsimarineobx.com>; Bodnar, Gregg <gregg.bodnarta@ncdenr.gov>
Cc: John Driver <Idriver@Isimarineobx.com>; Debbie Carver <dcarver@Isimarineobx.com>
Subject: RE: [External] FW: Romm Point Bulkhead CAMA Major Permit
Lyn,
I'm forwarding this on to the Assistant Major Permits Coordinator in Morehead City (copied)
who is processing the application. Gregg, see below.
Ron Renaldi
District Manager, Northeastern District
NC Division of Coastal Management
NC Department of Environmental Quality
Ronald. Renaldi(a)ncdenr.gov
(252)264-3901
401 S. Griffin St., Ste 300
Elizabeth City, NC 27909
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Lyndon Small <Ivn@lsimarineobx.com>
Sent: Tuesday, June 9, 2020 12:44 PM
To: Renaldi, Ronald <ronald.renaldi@ncdenr.gov>
Cc: John Driver <idriver@lsimarineobx.com>; Debbie Carver <dcarver@Isimarineobx.com>
Subject: [External] FW: Romm Point Bulkhead CAMA Major Permit
Ron,
I received the following email from Josh Pelletier about two weeks ago. It looks like he is forwarding the application
with no objections, and I thought this would satisfy Anthony at DWQ. Are there any other holds I don't know about?
Thanks,
Lyn Small
From: Pelletier, Josh R CIV CESAW CESAD (USA) <Josh.R.Pelletier@usace.armv.mil>
Sent: Wednesday, May 27, 2020 6:07 AM
To: Lyndon Small <Ivn@Isimarineobx.com>
Subject: RE: Romm Point Bulkhead CAMA Major Permit
Mr. Small,
I got eyes on the Romm Point project last week. I am good to go on my end and will begin moving forward with the
permit. Thanks again and let me know if you have any questions.
Josh
From: Lyndon Small <Ivn@Isimarineobx.com>
Sent: Tuesday, May 26, 2020 4:23 PM
To: Pelletier, Josh R CIV CESAW CESAD (USA) <Josh.R.Pelletier@usace.armv.mil>
Subject: [Non-DoD Source] RE: Romm Point Bulkhead CAMA Major Permit
Josh,
Prez says we are suppose to be open! When can we meet? ... I promise that I will still wear a mask even if he won't.
Thanks,
Lyn Small
From: Pelletier, Josh R CIV CESAW CESAD (USA) <Josh.R.Pelletier@usace.armv.mil>
Sent: Thursday, May 7, 2020 7:56 AM
To: Lyndon Small <Ivn@Isimarineobx.com>
Subject: RE: Romm Point Bulkhead CAMA Major Permit
Hey Lyn,
Sorry for not getting back to you sooner. I am really hoping they let us get back to conducting site visits within the
next week or so and you are first on the list to knock out. I am going to dive into this tomorrow and see if there isn't a
way to move forward or get some other eyes on it sooner than that. Thanks for your patience and I will let you know
something as soon as I can. Thanks!
Josh
From: Lyndon Small <Ivn@lsimarineobx.com>
Sent: Tuesday, May 5, 2020 3:59 PM
To: Pelletier, Josh R CIV CESAW CESAD (USA)<Josh.R.Pelletier@usace.armv.mil>
Subject: [Non-DoD Source] RE: Romm Point Bulkhead CAMA Major Permit
Josh,
I have sent two emails recently about the Romm Point Bulkhead project; the first with photographs and measurements
and the second asking if you received the first. So now here is a third try. I know that the COVID-19 has you grounded
for the moment and so are many others but I need to try and keep the permit process moving. The area in question is
what you once described to me as "a parking lot variety of Phragmites". This is just a small isolated area that only exists
because enough of the remnant bulkhead exists to protect the substrate where they grow. It is the only area with any
wetland vegetation. Is it not possible to make a call from my pictures? Would more pictures and/or aerials help? Or
even better yet, when will you be able to get out again? Please let me know when or how we can get this moving again.
Thanks,
Lyn
t74l 504U, PU4.
Lyn Small, Inc
113 Ballast Rock Rd
Powells Point NC 27966
COMBTOOOTION LOM YLTINO Ol GION' VAOMT MANAO LMI IT
i1114A11 A\\L«..4 r11 tli tia •.1'. 11 IIIli1 Kblilllf\4�N l.iG )I'll.t
•,rn il.Tldal�Al li. (,112]�\"!.0 �vv�av�..l...n I..nu IT/A�1
Bodnar, Gregg
From: Scarbraugh, Anthony
Sent: Wednesday, June 10, 2020 6:32 AM
To: Ralph Conforti
Cc: Bodnar, Gregg; Pelletier, Josh R SAW (Josh.R.Pelletier@usace.army.mil); Tankard, Robert;
Pullinger, Robert C; Renaldi, Ronald
Subject: RE: [External] Heritage Point CAMA Permit 178-08
Mr. Conforti,
After review on the information provided and understanding the onsite conditions, this Office continues to request
additional information to address turbidity concerns associated with the discharge; As previously discussed in the
Division of Water Resources additional information request, possible information that will need to be provided include:
sediment analysis, calculations of effective area of the sediment detention basin, use of turbidity curtains, or
operation and maintenance plan to address this Office's concern of potential turbidity violations associated with
this request were provided within the Minor Modification Request. Please note, a discussed in your response,
excavation to approximately 2 below ground surface has a high potential of intersecting groundwater and
adding additional undesired consequence to your project.
Regards,
Anthony Scarbraugh
s
;.�. D E
Anthony Scarbraugh
Environmental Specialist II, Water Resources
North Carolina Department of Environmental Quality
2S2.948-3924 (Office)
Anthony-Scarbraugh@ncdenr-gov
E;11J': �[Yll�t:4F"fV: •tiL'ra :.� �i. ...F.'1�9...'8 i �':�,::!n [:, :��!�r. ::. 1,. U'I�:: L, b', .i')
From: Ralph Conforti [mailto:rkconfortiobx@gmail.com]
Sent: Tuesday, June 9, 2020 3:37 PM
To: Scarbraugh, Anthony<anthony.scarbraugh@ncdenr.gov>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Holly Sleph
<healthywithholly@icloud.com>; Bill Kraus <wgkraus1972@gmail.com>; Paul Greenhalgh <paul46obx@charter.net>;
Ted Hoefler<hoefler@yahoo.com>
Subject: [External] Heritage Point CAMA Permit 178-08
Dear Mr. Scarbraugh,
Approximately one week has passed since our last submission to the DWR. We anticipated that
our submittal completed the information required to allow the Agency to complete their review of our
modification request regarding the above referenced permit.
Recognizing that the agency likely has a busy calendar we are nonetheless anxious to schedule the dredging of
our Marina Channel, as maintenance of this waterway is long overdue. Therefore, is it possible for you to relay
where our modification request falls within your review calendar, in order that we may anticipate concluding
this subject.
Regards,
Ralph Conforti
Heritage Point HOA
ROY COOPER
Govern r
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
April 14, 2020
NORTH CAROLINA
EhvironmenralQuallty
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
oreoc. bodnar(fDncdenr.00v
SUBJECT: CA MA /Dredge & Fill Application Review
Applicant: Gary Kayye & Anne Morgan
Project Location: 122,128, Parcel 900500000900000 Romm Point in Currituck County
Proposed Project: Construct a bulkhead across 3 lots, a L-shaped pier and a dropdown
platform
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Grego Bo at the address above by May 5, 2020. If you have any questions
regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 2353 when appropriate, in-
depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.,
PRINT NAME Anthony Scarbrauqh
AGENCY DWR
SIGNATURE
DATE 04/17/2020
MCCEIVED
APR 1 7 2020
MP SECTION MHn
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth CltyOffice 1401 South Griffin Street, Suite 3001 Elizabeth City, North Carolina 27909
2522643901
ROY COOPER
Gow or
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
April 17, 2020
D W R # 20-0514
CURRITUCK County
CERTIFIED MAIL: 7019 0160 0000 3479 8711 n�r
RETURN RECEIPT REQUESTED REC�j
Gary Kayye and Anne Morgan
3310 Enviro Way APR 1 7 2020
Chapel Hill, NC 27517
Subject: REQUEST FOR ADDITIONAL INFORMATION MP SECTION nptl r,T
Bulkhead Installation across 3 lots at 122, 128, and Parcel #00500000900000
Romm Point, Currituck County
Dear Mr. Kayye and Ms. Morgan:
On April 14, 2020, the Division of Water Resources (Division) received your application April 14, 2020,
requesting a 401 Water Quality Certification from the Division for the subject project. The Division has
determined that your application is incomplete and cannot be processed. The application is on -hold until
all of the following information is received:
1. Coordination- USACE
A complete review of the project cannot be conducted until the U.S. Army Corps of Engineers has
verified all wetland locations for Parcel #00500000900000. [15A NCAC 02H .0502 (a)(7)]
2. Impact Justification (Avoidance and Minimization)
Please provide more details regarding the avoidance and minimization of 0.14 acres of open water
impacts associated with the construction of a bulkhead across the subject lots. Specifically, the
open water impacts associated with the construction of the bulkhead on Parcel
#00500000900000.
This Office believes that the open water impacts as proposed can be moved or reconfigured to
reduce the impacts to open waters. Please revise the plans to demonstrate further avoidance or
provide a detailed explanation of why this plan for the activity cannot be practically accomplished,
reduced, or reconfigured to avoid impacts. [15A NCAC 02H .0506 (6)(f) and (g)]
Pursuant to 1SA NCAC 02H .0506(a)(7), 15A NCAC 02H .0506 (6)(f) and 15A NCAC 02H .0506 (6)(g), the
applicant shall furnish all of the above requested information for the proper consideration of the
application. Please respond in writing within 30 calendar days of receipt of this letter by sending one (1)
D_E Q� North Carolina Department of Environmental Quality I Division of Water Resources
Washington Regional Office 1943 Washington square Mall I Washington, North Carolina 27889
�'\,0000' 252.946.6481
copy of all of the above requested information to the 401 & Buffer Permitting Branch, 1617 Mail Service
Center, Raleigh, NC 27699-1617 OR by submitting all of the above requested information through this
link: https://edocs.deci.nC.goy/Forms/Supplemental-information-Form (note the DWR# requested on the
link is referenced above).
If all of the requested information is not received within 30 calendar days of receipt of this letter, the
Division will be unable to approve the application and it will be returned. The return of this project will
necessitate reapplication to the Division for approval, including a complete application package and the
appropriate fee.
Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this
activity and any work done within waters of the state may be a violation of North Carolina General
Statutes and Administrative Code.
Please contact Anthony Scarbraugh at 252-945-3924 or a nthonv.scarbraugh@ncdenr.gov if you have any
questions or concerns.
Sincerely,
Anthony Scarbraugh, Environmental Specialist II
Water Quality Regional Operation Section
Division of Water Resources, NCDEQ
cc: Lyn Small, Lyn Small, Inc. (via email: Ivn@lsimarineobx.com)
Josh Pelletier, USACE Washington Regulatory Field Office (via email)
Gregg Bodnar, DCM Morehead City (via email)
Robert Corbett, DCM Elizabeth City (via email)
James Harrison, DMF WaRO (via email)
Maria Dunn, WRC WaRO (via email)
Laserfiche
RECEIVED
APR 1 7 2020
MP SECTION MHD
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BPAXTON C. DAVIS
Director
April 14, 2020
MEMORANDUM:
NORTH CAROLINA
Environmental Quality
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
gregg.bodnar ncdenr.00v
SUBJECT: CAMA /Dredge & Fill Application Review
J U N 2 2 2020
MP SECTION MHD
APR 2020
Applicant: Gary Kayye & Anne Morgan
Project Location: 122,128, Parcel 0005000oo900000 Romm Point in Currituck County
Proposed Project: Construct a bulkhead across 3 lots, a L-shaped pier and a dropdown
platform
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Gregp'Bodnar at the address above by May 5, 2.020, If you have any questions
regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 2353 when appropriate, in-
depth comments with supporting data is requested.
_ This agency has no objection to the project as proposed.
"Additional comments may be attached"
VThis agency has no comment on the proposed project.
_ This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME
AGENCY Nclia-C
SIGNATURE �I1
DATE
F.
5 t-
j11" Nrr 0
`'r `ij�sruss� t� l�1CtJtJ2
i n+tl'-1� K vtfif�l t-s (h`YR 1'� S9
North Carolina Department of Environmental Quality I Divisionof Coastalklanagement
Elizabeth City Office 1401 South Griffin Street. Suite 3001 Elizabeth City, North Carolina 27909
252.264,3901
Bodnar, Gregg
From: Dunn, Maria T.
Sent: Thursday, April 30, 2020 12:34 PM
To: Bodnar, Gregg
Subject: Gary Kaye and Anne Morgan, Currituck Co.
Gregg,
I've noticed NCWWR has requested a hold be placed on the project until they received information to address their
concerns. NCWRC will with hold comment during this time until additional information is received.
Please do not hesitate to contact me if we need to discuss.
Thank you.
Maria
Maria T. Dunn
Coastal Coordinator
NC Wildlife Resources Commission
943 Washington Sq. Mall
Washington, NC 27889
office: 252-948-3916
fax: 252-975-3716
www.ncwildlife.org
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
,ROY COOPER
'Govemar.- �^
MICHAEL S, REGAN
Seaetary
BRAXTON C; DAVIS
r � Directo_. -
April 14; 2020
-MEMORANDUM:
NORTH CAROLINA
Etivironatental Quality
FROMi Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave.,'Moreheatl City, NC 28557
Fax: 252-247-3330' fCour/er 04-1643)
gregg. bodnarancderinnov
SUBJECT: CAMA /Dredge & Ft71 Applical7on Review
Applicant: Gary.-Kayye & Anne Morgan
Project• o.catlon: 1221128; Parcel #00500000900000 Romm Point 16 Currituck County
proposed'Preject: Construct a bulkhead across 3 lots, a L-shaped'pierand a dropdown
platform
Please'indicate below your agency's position or viewpoint on the proposed project and
natiim:th►s form to GreoA Bodnar at the address above by.May 5, 2020. If you have any questions,
regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 2353 when appropriate, in-
depth -comments with supporting data is requested,
_ This agency, has no objection to the project as proposed.
"AdditionalComments may be.attached"
X This agency has no comment on the proposed project,
This agency approves of the project only if the recommended changes
,are incorporated. See attached.
'This agency objects to the project for reasons described in the attached
comments.
PRINT NAME James Harrison
AGENCY
SIGNATURE
DATE
NCDMF
04/24/2020
D_EQ�
RECEIVED
APR 2 7 2020
MP SECTION 9l HD
North Camllna Department ofEmirotimental Quality I Division of Coastal Management
EllzabethClty Office 1401 South GrifnnStreet, Suite 3001 Elizabeth Clty,North Carolina27909
252.2643901
Bodnar, Gregg
From:
Pelletier, Josh R CIV CESAW CESAD (USA) <Josh.R.Pelletier@usace.army.mil>
Sent:
Wednesday, April 15, 2020 11:34 AM
To:
Corbett, Robert W
Cc:
Bodnar, Gregg
Subject:
[External] Kaye, Morgan--Romm Point
email as tachment
Robert,
I hope this finds you well. I received the CAMA Major application for Kaye, Morgan today. It appears the lot is wooded
that they are going to be bulkheading. I know its mentioned in the application but we will need a wetland delineation
completed along the shoreline before we can process on our end. I know with the site visit restrictions this could take
some time. Perhaps the applicant could utilize a consultant to complete a delineation report. That along with some
pictures could possibly give me enough information to complete this without a site visit. Let me know your thoughts
and how you and the applicant would like to proceed. Thanks and let me know if you have any questions!
Josh
Josh Pelletier
Project Manager
US Army Corps of Engineers
Washington Regulatory Field Office
2407 W. 5th Street
Washington, North Carolina 27889
Phone: (910) 251-4605
Email: josh.r.pelletier@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at:
htto://corpsmapu.usace.army.mil/cm apex/PD=136:4:0
Thank you for taking the time to visit this site and complete the survey.
Bodnar, Gregg
From:
Bodnar, Gregg
Sent:
Wednesday, August 26, 2020 8:12 AM
To:
Pelletier, Josh R CIV CESAW CESAD (USA)
Subject:
RE: [External]
Attachments:
RE: [External] FW: Romm Point Bulkhead CAMA Major Permit; 20-0514_401 Approval
Letter.pdf; Gary Kayye & Anne Morgan - Romm Point - comment page - signed.pdf
No the original plans (Sheet 1 of 2 dated "Revised 3/24/20" and Sheet 2 of 2 dated 1/20/20) are still valid. I attached the
last correspondence I have from you above. No comments to date resulted in any requests for A&M. I have also
attached DWR cert and DMF comments. I can't seem to find WRC comments electronically but she no commented on
6/19/20.
Hope this helps,
Gregg
From: Pelletier, Josh R CIV CESAW CESAD (USA) <Josh.R.Pelletier@usace.army.mil>
Sent: Tuesday, August 25, 2020 1:17 PM
To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
Subject: [External]
Hey Gregg,
Are there any new updated plans with Kaye and Morgan showing the new alignment and impacts?
Josh Pelletier
Project Manager
US Army Corps of Engineers
Washington Regulatory Field Office
2407 W. 5th Street
Washington, North Carolina 27889
Phone: (910) 251-4605
Email: fosh.r.pelletier@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at:
http://corpsmapu.usace.army.mil/cm apex/f?P=136:4:0
Thank you for taking the time to visit this site and complete the survey.
Regulatory Division
SAW-2020-00688
Mr. Jonathan Howell
Division of Coastal Management
North Carolina Department of Environment
and Natural Resources
400 Commerce Avenue.
Morehead City, North Carolina 28557-3421
Dear Mr. Howell:
RECEIVED
AUG 2 7 2020
MP SECTION �D�� "
Reference the application of Mr. Gary Kayye and Mrs. Anne Morgan for Department of the
Army authorization to construct a bulkhead across 3 separate lots with a maximum distance
waterward of 36' measured from normal water level, a 29' x 6' L shaped pier with a 16'xl8'
platform, as well as a 16' x 4' dropdown platform at lots 122 and 128 on Romm Point,
adjacent to North River, in Currituck, Currituck County, North Carolina.
The Federal agencies have completed review of the proposal as presented by the
application and your field investigation report.
We recommend that the following conditions be included in the State authorization:
1. All work authorized by this permit must be performed in strict compliance with the
attached plans, which are a part of this permit. Any modification to these plans must be approved
by the US Army Corps of Engineers (USACE) prior to implementation.
2. The permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structure or work herein authorized, or
if, in the opinion of the Secretary of the Army or his authorized representative, said structure or
work shall cause unreasonable obstruction to the free navigation of the navigable waters, the
permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove,
relocate, or alter the structural work or obstructions caused thereby, without expense to the
United States. No claim shall be made against the United States on account of any such removal,
relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE
Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910-
3282 at least two weeks prior to beginning work and upon completion of work.
3. Except as specified in the plans attached to this permit, no excavation, fill or
mechanized land -clearing activities shall take place at any time in the construction or
RECEIVED
N
AUG 2 7 2020
MP SECTiOanee`otn�s project, in such a manner as to impair normal flows and circulation patterns
within waters or wetlands or to reduce the reach of waters or wetlands.
4. Except as authorized by this permit or any USACE approved modification to this
permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in
the construction or maintenance of this project, within waters or wetlands. This permit does not
authorize temporary placement or double handling of excavated or fill material within waters or
wetlands outside the permitted area. This prohibition applies to all borrow and fill activities
connected with this project.
5. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands
shall be generated from an upland source and will be clean and free of any pollutants except in
trace quantities. Metal products, organic materials (including debris from land clearing
activities), or unsightly debris will not be used.
6. The authorized structure and associated activity must not interfere with the public's
right to free navigation on all navigable waters of the United States. No attempt will be made by
the permittee to prevent the full and free use by the public of all navigable waters at or adjacent
to the authorized work for reason other than safety.
7. The permittee shall advise the Corps in writing at least two weeks prior to beginning the
work authorized by this permit and again upon completion of the work authorized by this
permit.
8. The permittee shall require its contractors and/or agents to comply with the terms and
conditions of this permit in the construction and maintenance of this project, and shall provide
each of its contractors and/or agents associated with the construction or maintenance of this
project with a copy of this permit. A copy of this permit, including all conditions, shall be
available at the project site during construction and maintenance of this project.
9. The permittee shall employ all sedimentation and erosion control measures necessary to
prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit
area. This shall include, but is not limited to, the immediate installation of silt fencing or similar
appropriate devices around all areas subject to soil disturbance or the movement of earthen fill,
and the immediate stabilization of all disturbed areas. Additionally, the project must remain in
full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statutes Chapter 113A Article 4).
10. The activity will be conducted in such a manner as to prevent a significant increase in
turbidity outside the area of construction or construction -related discharge. Increases such that
the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by
the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all
saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not
considered significant.
11. Violations of these conditions or violations of Section 404 of the Clean Water Act or
Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District
U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation.
12. In order to protect the endangered West Indian manatee (Trichechus manatus) the
Pemrittee shall implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly
adhere to all requirements therein. The guidelines can be found at http://www.fws.gov/nc-
es/mammal/manatee-guidelines.pdf.
Questions or comments may be addressed to Mr. Josh Pelletier, Washington Field Office,
Regulatory Division, telephone (910) 251-4605.
Sincerely,
/sh Pelletier
Copies Furnished:
Mr. Ian McMillan
North Carolina Division of Water Quality
1650 Mail Service Center
Raleigh, North Carolina 27699-1650
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636-3726
Mrs. Twyla Cheatwood
National Marine Fisheries Service
Habitat Conservation Service
101 Pivers Island Road
Beaufort, North Carolina 28516
Mr. Jeffrey Garnett
Wetlands and Marine Regulatory Section
Water Protection Division -Region IV
Regulatory Project Manager
RECEIVED
AUG 2 7 2020
UP SECTION M aD
C -1
U.S. Environmental Protection Agency
61 Forsyth Street, SW
Atlanta, Georgia 30303
Ron Renaldi, District
Manager Elizabeth City
Field Office
North Carolina Division of Coastal Management
RECEIVED
AUG 2 7 2020
MP SECTION MHD
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Gary Kayye & Anne Morgan
2. LOCATION OF PROJECT SITE: 122, 128 and Parcel # 005000000900000 Romm
Point, Currituck County, adjacent to North Landing River of the Currituck Sound
Latitude: 36026'44.69"N
Longitude:-7500'39.37"W
3. INVESTIGATION TYPE: CAMA / Dredge & Fill
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 9/11/2019, 3/17/2020
Was Applicant Present — Yes, No
5. PROCESSING PROCEDURE: Application Received Complete — 4/3/2020
Office — Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Currituck County
Land Classification from LUP - Full Service Area
(B) AEC(s) Involved: Estuarine Waters (EW), Public Trust Area (PTA), and
Estuarine Shoreline (ES)
(C) Water Dependent: Yes
(D) Intended Use: Private Residential
(E) Wastewater Treatment: Existing — Septic
Planned — None
(F) Type of Structures: Existing — Bulkhead across 2 of the lots, 2
separate piers with platforms, and 1
boatlift.
Planned - Replacement bulkhead, new pier and
platform with drop down platform to
replace an existing pier and platform.
(G) Estimated Annual Rate of Erosion: 17 feet / year
Source — Applicant (Staff estimates 2.4 feet / year based on aerial photography)
7. HABITAT DESCRIPTION: (Area ft2)
SHADED EXCAVATED 0THFR
(A) High Ground within ES
6,500 ft2 Disturbed
AEC
(Bulkhead)
(B) Shallow Bottom EW and
6,163 ft2 (Bulkhead)
PTA AEC
(C) Open Water EW and PTA
526 ft2 (Docking
AEC
Facility)
(D) Total Area Disturbed: 15,189 ft2
(E) Primary Nursery Area: No
(F) Water Classification: SC
Open to Shellfishing: No
RECEIVED
APR 14 2020
DCM-MHD CITY
Gary Kayye & Anne Morgan
Field Investigation Report
Page 2
8. PROJECT SUMMARY: The applicants propose to construct a bulkhead across 3
separate lots with a maximum distance waterward of 36' measured from normal water
level. The applicants also propose to construct a 29' x 6' L shaped pier with a 16'x18'
platform, as well as a 16' x 4' dropdown platform.
Project Setting
The site of the proposed development is located at 122, 128, and parcel ID #
005000000900000 Romm Point, off of SR 168, Currituck County, adjacent to North Landing
River of the Currituck Sound.
128 Romm Point contains a bulkheaded shoreline with a 27' x 6' L shaped pier with a 16' x
16' platform. On the north side of the property the bulkhead has a "v-notch" that brings the
bulkhead alignment 10' landwad.122 Romm Point contains an ageing bulkhead and a 16'
6' T head pier with an 8' x 16' platform. On the north side of the platform is a 12' x 12'
boatlift. Both of these properties are developed with single family dwellings. The bulkhead
from 122 Romm Point continues north over the property line onto a vacant third property,
parcel # 005000000900000, for 10' where it then returns 900 towards the west for 25'. This
25' section of bulkhead is lined with riprap. A remnant bulkhead extends 240' to the
northwest from the corner of the functioning 10' section of bulkhead to the adjacent
properties bulkheaded shoreline. A review of Google Earth imagery showed this bulkhead
was still functional in 2014 and was breached in 2015. Normal water level (NWL) is now
located an average of 20' landward of the remnant bulkhead alignment with a maximum
distance of 34'. The shoreline now has an escarpment that ranges from 1' to 14'. On the
north end of the shoreline is ±140 ft' section of what appears to be USACE wetlands. At
this time a USACE delineation has not been performed
Combined the properties are approximately 132,858 sf in size and have approximately 560'
of shoreline. The parcels average an elevation of approximately 5' above normal water
level. According to the USDA's Natural Resources Conservation Services' Web Soil
Survey, the soil on the property is made up of Bojac loamy sand and is vegetated with
grasses, shrubs and trees. Based on available information, there appears to be no
archaeological sites on these properties or nearby. The adjacent riparian properties to the
north and the south contain single family dwellings with bulkhead shorelines and docking
facilities.
North Landing River is classified as Joint waters by agreement with the Marine Fisheries
Commission and Wildlife Resources Commission. The Division of Environmental
Management's water quality classification for this area is SC and it is closed to shellfish
taking. Water depths within the project site range from -1' to -5' and average -3'. The
bottom substrate within the project area is made up of muddy sand. No submerged aquatic
vegetation was observed at the project site.
Development Proposal
RECEIVED
The applicants propose to stabilize the shoreline by constructing 425' vinyl bulkhead. To
start, the proposed bulkhead will tie into the existing bulkhead W-notch" located4R 2A-1 2020
0CM-MFi13 CITY
Garry Kayye & Anne Morgan
Field Investigation Report
Page 3
Romm Point. The proposed bulkhead alignment will continue in a northwesterly direction
40' across the property line with a maximum distance waterward of 10'. From this point the
bulkhead will continue 385' in a northwesterly alignment that will average 2' waterward of
the existing bulkhead located at 122 Romm Point and the remnant bulkhead located on the
vacant lot. The proposed bulkhead will tie into the existing adjacent properties bulkhead on
the northwest side. The alignment of the proposed bulkhead will average 14.5' waterward of
normal water level with a maximum distance of 36' waterward. The 36' maximum distance
is needed to obtain a straight alignment across all 3 properties.
The applicants also propose to remove the T head pier located at 122 Romm Point and in
its location construct a 29' x 6' L shaped pier with a 16' x 18' platform. Connected to the
northeastern side of the platform will be an additional 16' x 4' drop down platform. The
current boatlift will not be removed or relocated.
Anticipated Impacts
• The construction of the bulkhead along the proposed alignment will result in the
filling of t6,163 ft2 of the PTA and EW AEC with clean fill from an upland source
along 425' of the ES AEC.
The construction of the bulkhead will disturb t8,500 ftz of high ground within the
ES AEC.
• The construction of the docking facility will shade 526 ftz of open water of the
PTA and EW AEC.
Submitted by: Robert Corbett
Date: 04/13/2020
RECEIVED
APR 14 2020
DCM-MHD CITY
LiC Daweii i1C.
CONSTRUCTION CONSULTING • DESIGN • PROJECT MANAGEMENT
113 BALLAST ROCK OR . POWELLS POINT, NORTH CAROLINA 27966
Phaw (252)491.8562 Fax (252)491.8564 W"lImmall com LKWIse 929760
Received
0CM-EC
Kayye Major Permit Narrative for proposed bulkhead and pier at 122 Romm Point Currituck, NC 27929.
The proposed project will consist of 2 phases. The phases are as follows:
1- Constructing a bulkhead beginning at 128 Romm Point then crossing 122 Romm Point and a
vacant lot then ending at the southeast return at 119 N Romm Point.
2- Pier replacement at 122 Romm Point.
The bulkhead will be constructed with interlocking vinyl sheathing on a pile and wale frame. The height
of the bulkhead will vary from 3' to 6' along the shoreline. The bulkhead will begin at the corner of an
existing return located at 128 Romm Point where the adjoining bulkhead from 122 Romm Point forms
an inside corner. The bulkhead will continue in a northwest direction In front of existing bulkhead at 122
Romm Point and then continue parallel to the remnants of existing timber bulkhead on the vacant lot
then end by connecting to the existing bulkhead return located at 119 N Romm Point.
Equipment to be used for the construction of bulkhead will be a land -based excavator. Backfill will be
installed by dump truck and skid steer loader after bulkhead completion using clean fill from an upland
source. Once all backfill has been placed and graded, a seasonally appropriate grass will be spread.
The pier phase of the project will follow by removing the existing pier and replaced with a new pier that
will be marginally larger per drawing but at same location. The existing boatlift will remain unchanged.
*On site meeting has been held with CAMA representative Robert Corbett on 9/11/19.
RECEIVED
APR 14 2020
DCM-MHD CITY
Received
DCM-EC
Gary Kayye- Wetland delineation documentation.
Area of Phragmites at North end of bulkhead project has not been delineated. It is
a discrete, isolated area behind remnant bulkhead approximately 10' x 40'.
applicant is scheduling a site visit by USACOE Agent Krysta Stygar.
RECEIVED
All 14 IM
OCIVI-f1 HD CITY
Lyn Small Inc, Marine Construction
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit —Anne Morgan_
ReceiV@d
Mailing Address: 4013 W Franklin St, VA 23221
Phone Number: _804-517-9778s
2010
Email Address: _randym3@verizon.net
J)CrY► E
I certify that I have authorized _Lyn Small Inc_
Agent / Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: _Bulkhead repairs_
at my property located at 128 Romm Point
in _Currituck County.
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
Sign Lure
_ANNE N-0-G--ArV
Print or Type Name
Title
—1 Z. 17 I l
This certification is valid through _4_/_01 I 2020
Date — —
RECEIVED
APR 14 2020
DCM-MHD CITY
Lyn Small Inc Marine Construction
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION , �.'� -Nive
Name of Property Owner Requesting Permit _Gary Kayye_
Mailing Address_3310 Environ Way, Chapel Hill, NC 27517 i1,.,1Y1"L
Phone Number: 919.969-7501
Email Address: —_ ger AL4yepubs corn
I certify that I have authorized _Lyn Small Inc,
Agent Coninxtor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: _Bulkheads and
at my property located at _122 Romm Point, Currituck, NC_,
in _Currituck_County.
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owrk#r Information:
signature
Galy Kayye
Print or Type Name
Gary Kayyo
it , 21 , 2019
This certification is valid through _12_I 31 I 2020
Date — --
RECEIVED
APR 14 2020
DCM-MHD CITY
This certification is valid through _4_/_1_/_2021_
Revised Mar, 2016
Received
Zppyy,,,,
-1 262t1
tc,j�,
®CM -EC
RECEIVED
APR 14 2020
DCM-MHD CITY
'a
L WIN GINUL as 11 i1C.
CONSTRUCTION • CONSULTING • DESIGN • PROISCT MANAORNSNT
115 BALLAST ROCK DR.. POWELLS POINT. NORTN CAROLINA 27966
Ph" (252)491-9562 raa.(252)4914564 • www.lyrwnNloom • Lk:anra6'29760
DATE: February 25th 2020
NAME: Vincent & Genevieve Colon
ADDRESS: 132 Romm Point Road
CITY: Currituck ST NC 2gO 27929
RE: Kayye Bulkhead & dock
To Whom It May Co"Ci m:
This correspondence is m notify you as a riparian property Owner that Gary Kayye
is applying for
a CAMA Major permilto Install new bulkhead and remove existing dock and install new clock
on property located at, 122 Romm Point Rd, Currituck, NC 27929
Which is adjacent to your property. A copy of the applicalkm and project drawing(s) is e9CiOSed for your review. Byou have no
objections to the proposed eclNity, please mark the appropriate statement below and return to:
Lyn Small, Inc.
as soon es possible.
II no comments are received within day r r ,Ohio", d will be considered that you have no oommenls regarding this
Diulslof Coeatal emenl at 401
pro]acl. If you Nava obJectlons roommate t", please mark the eppropdete statement below and send your correspondence to the NC
on ManepS. Griffin St, Ste 300., Elizabeth City, NC 27909. II You have questions about the project,
please do not heshateroconlact me at 252-491-8582 or the Division of Coastal Management at 252-264-3901.
9rlcerel ,
41 .�4
INSERT NAW —
xI have no oblCcfion to the project as described.I have objections) 10 01e project as described.
WAIVER SECTION
I understand that a pier, dock, mooring flings, boat ramp, breakwater, boathouse, lift or groin must be set back a minimum distance of
15' from my area of riparian access unless waived by me.'(If you wish to waive the seibsck, you must 111101 the ePProodate blank
below.)
I do wish to waive the 15'setback requirement.
I do not wish to waive the 15
Received
ko^Iv
DCM-EC
RECEIVED
APR 14 2020
DCM-il4HD CITY
L,
I, do wish to wehre the 15' eetbirA rs4ulre nt
Print Name `-'--�
SOW ofAdJwent Pro Ovmer
WOlrg Address andbr EmsY AddrBss
I do riot wish to the 15' sAWA requirement
Vale
;—'1i_Z 233
Phone Number
Received
Pon 1 �''1010
DCM-EC
RECEIVF_.D
APR 14 2020
DCOA-MHD CITY
LY Soil11C.
r+ +err coo-r..uc ne.
CONSTRUCTION - CONSULTING - DESIGN PROJSCT MANA6114NNT
I15 BALLAST ROLK OR PUWELLS POINT. NORTH CAROLINA 27966
Pl"v (25e)491-6562 Fdx.(252)491-6564 www.lynsmaitcom • LKiMea29760
DATE: February 25th 2020
NAME: Ruth S, Cathay Cuttino
ADDRESS: 1527 Oxborough Circle
CITY: Mount Pleasant ST SC 71p 29466
RE: Kam Bulkhead S, dock
TO Whom It May Concern:
This correspondence is to notify you a a riparian property owner that _ GaryKayye A OPF4" for
a CAMA Major permit to Install new bulkhead and remove existing dock and install new dock
on property boated at__ 122 Romm POInI Rd, Currituck, NC 27929
which IS 4acent to your property, A copy of the application and project drawingje) Is e.ckSW for your review. If you have no
tions to 018 proposed wirrity, please mark the appropriate statement below and return to:
Lyn Small, Inc.
as soon as possible.
Imo comma__ nts are regelw.I a� .-rs of receiot of thi
project. If yuu have objections or comments,S4Uce, h will be considered that you have no mmmenle regarding this
Division of Coastal Ma PIew mark the appropriate statement below end send your conespondence k the NC
nagement at 401 S. Griffin St, Ste 300., Elizabeth City, NC 27909. if you have questions about the project,
please do not hesitate k corllact me at 252-491-8562 or the Division of Coastal Management at 252-28439111.
sincerely
r ,� rNil
INSERT NsAM/E
!_ I have no ebjectkn b the project as described, _ _. _ I haw) objection(s) k the project es described,
understand that a pier, dock, moon WAIVER SECTION
mooring pilings, boat ramp, breakwater, boathousa, lit or groin must be set heck a minimum dlelance of
15' from my area of riparian access unless waived by ME (d you wish to waive bre setback, YOU
S1YlL.Jpdtild the appropriate blank
I do wish 10 waive the 15' setback requirement.
I do not wish to waive the 15
Received
MAP 12 7020
D M-EC
RECEIVED
APR 14 2020
JCIViI-MHD CITY-
A
_ I do wish to waive the 15'sebrk requirement. _ _ I do n vdsh to waive the 15' seibadc ^ requlremant.
L,r1� y �lilTfit Print Name Slgneture olAdjeeent Property rn�er / 1 ate- "!
15J;7 OX:&R)j A4
Malllnp Address and/or Email Address
AV PLC--k3A01jS,e
I1v*e,Ift,jj,;tc)PIW Qevm—
Phone Number
Received
Mre 12 2020
DCM-EC
RECEIVED
APR 14 2020
CCM-MHO CITY
ServiceU.S. Postal CERTIFIED MAILP RECEIPT
Domestic may only
Ln
0 Cenillgd Me`'1> —
Ca9 Vw^ti'd'vpY) i(c/e[F Lac a It�ee�eae.���acWa.y
O Ivn HecelP.�(a�_
CZ1aslwn Pacnpl leleclrenml t PIp1aNd1
Q QCMXIBO f.4P PM4klatl Glrvp'/ t
CO
OFan slpawm PewMae i� oF®2
bla 64'aly. P.s4kla0 DeYrwy a
O Poll
Total oe49eaml aea
a Li
Fxl Saal To1-1
O Siieeie- - .. .. ...7�/,_.. :............. .. w
w
fn
Celt?w�Moga/
SJC89
a%
`•. \.
• IC9
(CIreCX4x, e00jl!lIw�e�e�ePen1e11
I'n PawWl Q�Pleaa•1/ i AIL
❑Palwn PBcelq I.9Paaeakl i
Po9M19rk
❑GnIAeOIAen Pnlrkitl OMwy t
Mere
CO❑MWlai.aea
.P Q ed i_
SPEW Slpnalwe PbtMleEpNWary f
FEB 2 7 2020 „
p
Fa1
.LnTala
r9
-...
•
+7
rq
T
5/'
..............
U
Received
DCM-EC
RECEIVED
APR 14 2020
-DCM-MHD CITY
0"c:
LA.I. MAl11N1 CON.TPYCTIOM
February 10, 2020
Vincent & Genevieve Colon
132 Romm Point Rd
Currituck, NC 27929
CONSTRUCTION • CONSULTING - DESIGN • PROJECT MANAGEMENT
113 BALLAST ROCK DR., POWELLS POINT. NORTH CAROLINA 27966
Phone: (252) 491-8562 - Fax: (252) 491-8564 • www.lynsmaII wm • License X 29760
RE: Adjacent Riparian Property Owner Notification
Dear Mr. & Mrs. Colon
,Received
1%, ..;I : .
UCM-EC
My name is John Driver, and I am the General Manager for Lyn Small, Inc. We are required by
the Division of Coastal Management to notify you that your neighbor @ 122 Romm Point,
Currituck, NC have contracted Lyn Small, Inc to install a bulkhead and dock.
Enclosed you will find an Adjacent Riparian Property Owner Notification Form as well as a
drawing of the proposed project. The purpose of the notification is to make you aware that a marine
structure is proposed on your adjacent neighbor's lot, and the setback will be a minimum distance
of 15' from your common boundary.
Please review the form and initial the appropriate box for your decision, and kindly return it back
to us at your earliest convenience via postal service, fax, or email. If you have any questions or
concerns, please don't hesitate to contact me. My email address is jdriyeralsimarineobx com , or
I can be reached at 252-491-8562.
Regards,
John Driver
General Manager
Lyn Small, Inc
113 Ballast Rock Drive
Powells Point, NC 27966
Phone: 252-491-8562
Fax: 252-491-8564
Email: jdrive Isimarineobx corn
enclosures
RECUMD
APR 14 2020
TCPiFH[7 CITY
ii ft MaLL i1C.
I x l -...Na Ce wa rw u c l S ON
February 10, 2020
Ruth & Cathey Cuttino
1527 Oxborough Cir
Mount Pleasant, SC 29466
CONSTRUCTION - CONSULTING OESION • PROJECT MANAGEMENT
113 BALLAST ROCK DR., POWELLS POINT. NORTH CAROLINA 27966
Phone (252) 491-8562 Fax (252) 491-8564 - www Ipumall cam I License #29760
RE: Adjacent Riparian Property Owner Notification
Dear Ms. Cuttino,
o cl I��>♦ i
My name is John Driver, and I am the General Manager for Lyn Small, Inc. We are required by
the Division of Coastal Management to notify you that your neighbor @ 122 Romm Point,
Currituck, NC have contracted Lyn Small, Inc to install a bulkhead and dock.
Enclosed you will find an Adjacent Riparian Property Owner Notification Form as well as a
drawing of the proposed project. The purpose of the notification is to make you aware that a marine
structure is proposed on your adjacent neighbor's lot, and the setback will be a minimum distance
of 15' from your common boundary.
Please review the form and initial the appropriate box for your decision, and kindly return it back
to us at your earliest convenience via postal service, fax, or email. If you have any questions or
concerns, please don't hesitate to contact me. My email address is 'dri cr@lsimarineobx com , or
1 can be reached at 252-491-8562.
Kega
John Driver
General Manager
Lyn Small, Inc
113 Ballast Rock Drive
Powells Point, NC 27966
Phone: 252-491-8562
Fax: 252-491-8564
Email: idriver biniarineobx com
enclosures
RECEIVED
APR 14 Z020
DCM-MHD CITY
r 1%
0
OVIA
VAN
Y'
ADOX 450 PAGE 085 3
. /
� 'DB DEC 16 P17 3 32
O MALM T. uNIA''
0 A[tISYM OF OFM
OVWITYFA iium AA.
•b
MpL�bA
w.YF
ARrYb�brl --
M
+ 11�
oA m, oaslfnet. !c fAAp
—
MMM1bM+4bM.
NORTH OLINA DEED OF TRUST
nn amatper.y.yr
s,� pw
u9q .r Wes.
•
°4"i0"
�nmrn
ewrnwr
A.YB OIfAOY! rtFWl
/�
I(Q.LLW M,J2pIr
JA.
lG]
Ar�iG Mµ �OR�i W vl[p,
W13 N. IMkllll ft.+lR�
PSdb+n] VA =1
011�1A.1ry Me.
\�h
)i1b
PKMl96 MMy
J
b
pM eCCECM] A%MIAIT `p`
r
0
�G
ru wrrrr.wr fib. wr A.. nb IwrbMae.br.c w.w Fwr.rl.Ygwr4Y..n, wA/, WpAH
Received
DMEC
RECEIVED
APR 14 2020
DCM-MHO CITY
C.
11:5 6eox 450 P66E 086
O
,eo
,e,
fie, t8AG1'[
e\ u a mvele mn^umat kuud in W mbroarR
a > OwaE Uan1
q Pa.e a
M. Wm, avd aW•
baplmMgLo " W
IAore K k 9ovod any m W wO,b." wmer orW
proputy heria8ar
Poet m an wmu< mowmen rvrWg tbrce me61] bi 51' Wep WON
dPe eo,..nv. ruseha.te
nook u e1y 11' wu ioo:a m m boe NPo, wb.� rvONg Wnea arlh 42 dq fl' 8an 117.11 raf m eo I'm dua k."
P. lhOro NOk Bourd, Oorovinp; tmok�p tbob
mah 36 dy. 1p' p� 19t.51
feet to ma yha or bgb.O L a ahawe on Wt yyy3, m11Nd b
o North CU-1b* a.d T.&hp
`Y,
3eMared by Ch,01 F.
9,0 WTi'a on Sg9embu L, 1911.
TRA rii
IfeploONp In the nonheelem eanv ofthe pmpanyar, ohfap q Qantan krnt9 rrd pow bebpwtb aMe9l Mt9ch 6004 tfom 1111 Pab6 or
NplA ffi rvneky Wru
M®we fp' Wu f3 M b • poiiq marl
ae(ycu !1' Wap Yl0 (wa, et kµ m a POW k "Oe Lb. W tbooe 8owh IS
Nvt propery rowowrod by aherW4 oa�wing, n Nl t4WA Swh{ ea
a1'LW IS.pO (lp man 4O�mOp:�
npYleru. Nrvth of de
SIT Iee4 mat w ka to Ib Isw 11' Pax
k bmbY vudo m Uut Plat Ie ➢ook 171, Pape eW. P k X4of
heron pdrveTep la humdef to be W aouden
Panel B UC,.,, plaP"j, pmJa N
Y
Yl/1
V
•
°G
�l0
Received ---- ---
aMEC
RECEIVED
APR 14 2020
bCM-MHD CITY
M
�
b.bn1
iVAy�.
rYyl
• b43l�1'
nobx�
r..w
n+rbNcbrbrr
�T(1�—o•u
8 �
1Y.•I. Nbw W M W M41w1w1/7•Yr�NrMl r.r
N bumnam.q�m.\.,,.. awe
wrr.rrnw.rr. nb.ib+-+Nr.rm
ry w+.Nr.rrrrr .W..rwwwr.y.r.nwrb
Received
RECEIVED
DMEC; APR 14 2020
DCM-MHD CITY
I
II IIIIIIIIYIIIINIII IN
G Sao Nary
a.�^yam armermeva 1e0: nx
SW Ip Py<l ark
nd�
NvVeNl
w
Y�
p` c eIV4d
471N
ex .C1S6n171
Y'
NORTH CAROUMA DEED OF TRUST
Q1 This is a Purchase Mores Deee of Tms1
SATISFACTf 00 SINEW by 04 wDeed Or DeOf TN
�^(,11Y —Elr
bpaYM UUU
UNei lln bweaeW dIn bill
NmY(!I
RaOofdlnp: Time, Book ertl Plga
Tells t01Ift DVA40"OSSIO0o). CM4004DW40M
Parcel ldengTror No. aM 006000Dm/114000
Ya M0
5Y Canboe Na___—deYd—_
'D
`
lamellar Rlmeftla lyf LlDwJtlR! PO Boa fUS QrYA0_ Mp
TN1 kaMnMM praparW of W_AiYn es 'Il�un.. _.. Fleaeo. 19851223_
n -- ._
Bdof DaWpldon for the Rules
THIS DEED of TRUST meld 1bb31'. day of _ _ paD' 2019. by and bal.
GRANTOR TRUSTEE �`, BENEFICIARY
Ran. Ppmt NC, ILLC A NO WILLIAM RRUMSEY, tlI '' Romm Peel, LUC, A Vkglnw Lmited
Csruana ll.Iled Uabally Coneyeny Q ` wbMlry CMWY
YM
J'
PO Boa 4%
Moyopk, NC 270M
Ent. n applopn.w blo-A b
Wdnelshp,
nettle. addles. awed,
Harbour Poml Apt. 202
InW Beam, VA 23451
1
ter o1anlAy, a p. corpashoo a
°G
G�
RECEIVED
APR 14 2020
0CM—MHD CITY
}
�
.2
\ w
�
�
\
/
�
~
2
o���
&�
�o
/
� \
w
. \
.
W 2
� J
�
c
§
C)
fr
�
utwno ul mt n.,e tro uy,a1owl,,,,w,la. uu.o uw bY
.r.m an. syreab
vd tt.ey a M MrWnbeu.e .ugaty d X. No.mdflitda., IN NY,ne Wr
U.. 91uk In! (MIV
nt NC,
L P. ou rp MAIL
Romm Revm�ha Tvy tnalnevdd/
.O�N T1f URpLINA ___• -._„_ .�....,..C.�w. tw ttotvle.111
F Ri' M. ellir N. MtnMgb, t Mnitry PubNc W IM CnuMY tM tblt Nortwla, wnitt Ntl
.._. RW.IIU P. IloM Yd"W RM1mr d�1.
e. pf/Bl\G fMl WerN bl9l. ms nYatY uq tauleWYpptj M.wNmAMforeYokq+ltbr+lrll.
q �Nuat Mdtrp oYklY tWrytl WLYIY (�a
44o y` iA �.t �bYd T_ qnp lQ .
'`•:":; `Mrun lymetpX«-f\w.W.dYii—..Yl •Ti_?J11,. i� —�
Pweodw—1""""f CANMY Alt NNp nafeae, nmry Iktl
SUR MNMh[wl'w Cavyuion l4ptH `„ I_ _ ^ NdrY
CaWY oICutNck
1, MLrydI6 N. AWutkld, . No Poblk�4iptrby .rnlfy tNt Nonnk R. I iu Yat, . PManbr. tty W MRo
WNeM uvoar ofthtMry Nava Rt.vttbk TWR �Aoam Point NC, LIE, A N' CuNoss, nlin. LLC. Fn ly.p,t hro tm d'u NIykErtA Wv. i�mlq. i hya.Ip d Mof ftmnt pfam eWkmaraitN w bneYYN��lf ofN uIf uPo44
u t1 LLC Wa awrbby tyhoray duly
purportlhryt
'e �O�ARiWISyj RryhW rd oMdtl.Wp a.ul�yy dllv1..3019.
__(SEAL)
SYIL off _ _�
L , t NOWy Ptllk ao Catby hairy u6Ar"1
Ntvoubb TN* of Rave Po4t NC, LLC A NOM L'vd W ILC, Ic.ontlly
Myl4w d fat'MN kniWrrcd on Et of Molar Po4X NC, U.C. trd
tMY dtlld dN 6.eednt Inmwtm N in ntmt to It. belulfu 4 Wtad aerd F.
Wib9tf my hod WORrtItI llNprlalthkr _d"Of_� 1
Sul
__(eP
My Cnmmiuian evplN.:/__. -Mdtry KYe
KAYYt, --a u IMt% d ft Cwy gyre
1 btb. me Mk Ly rvd .AluwledyN the the
WIN11rydYN tiY[n Yd tt tl.[I d IN tNlly.
O
0
�G
00
Deceived
DCM-EC I'3ECEI11ED
APR 14 2020
�OCO-MHD CITY
IN WTNESS HEREOF. yw GrenOl tit neraunb.N Ma nand aM wa, a X ^O'Par.la, by tgu. W y.e anlOmnnl b M.peu b 4 oaparpb ngma DY ae defy aAIv1[M 011xan.M X. aaal b N ns'wnm aRn.d W amagy q 4 Bwd a Wacdon. M NY gr4 YNI
^ILPp.b9n vnNkn
IO W. WN4 M ONy
YIN (GP'pwaro Namo) R. PairII NC, LW
NMMh01g, g1all�aW _ (SEAL)
TT
._ _11�_ Praidanl —
AIyMR •``JJn^••1' IINa-�DN,111N�Y rtl 19FAL)
Y� NNIV N aMdbry RNa - (NPAd)
8M-FrAMP
!Nb N. YN.NJQ • Nq. PVDKo a W. — w� fr C+wnr Ana wig �fwa..b, y.nry mn
E Raa,ON
AYppnntl bebana tli dN/alsdaall9YAadgNd M Maulbn a Mbrpoap anDl.Iiyl
�rMM.a aNwlganpo.W,�ly __ggygl .
lain _
Na>;ubaowI
vy PNbgg w m. cwnlr.�w wr wnaw, amM MI
_ fireNDr.
nYd M/Yb Cgy 11da1aIDMIfIpgEMgaa'Him alMgaepDyp bYIl11NY
n�rn •a�rlgyN�, Ma /umya-idy �?k�.. N19
/ _ _hinjul9 (
- ate"- �GIQ.,i _ 'ml,�y
PWY
C.wyOfc.H A
N
I.
MII,, ,h
.Nr u Xauy o(Ibe Mry Ron
Nis d.Y rd rxnowkdg.J IN due
giren.Pd u on an olthe eodlY, tlx
p uN.
Witnu my MM
Nosy Se.)
My CDmmk.ionaxpim.
b .nf_lNMhGr1GXy.
Cawryof
L iSKY►G,_pA yLY
N<Focabk f,N of Nomm 4,vini h
• Igbn O(Int f 8 I�
,NY uaPb Ine fwelrymen)
Awysa 1 0~
0
eoai(Y MI KNnk L. Rou, I. iu P. Rou, M—N,, .n6 MbY Romm,
n Mn, NC. I.IG A Noon CImni. LLC, pmorully.ppeuN beloae nx
rnannnl an b if of Ranm Po NC, LL(' NId Nn by PNonty de 1)
InNI b Xa. m il. NDelf a Rs w1 detd I«Ine purryul Xureln
i _d"Df __ 109.
I
a Now,, rnbox dD "on" unify6d Cwy Kk) , mewber IS DUIM of IN GDO Kayye
C A Nonn C.h. LW. bofa. nu Inn d.y.nd ubmablyed du I.
b NIr of Rwnm Ppdnl NC, LL . sM a by aalho, duty liven and a an wi of IN, miry,
'4.,rvM, Ns hAall.�X. ryi,..id daal foijjk poe. IMseI. eapesW.
T Iswnpauel d�ip�` dayaf."VNI 9.
'tl[jlpery q�nik ��
1
O
0
P�
N�
Received
rI
DCM-EC RECEIVED
APR 14 2020
DCM-MHD CITY
G^
'JO I MUM A
ICT()a
Mgq��gg,,i1nning&I k point in the edge ofCurriWd SnundaM lk in the NW properly liM ofWilliun IL Romm;
rwwing South, 42' 34' Was 400 fen to s point; lhmce muting North 44° 41Y West )00 fen w s
poi6keChems mining Nash 42'24'E.9 400feel to. point in the edge of Curriloek Sound; theme running
Soulls,1146 4a Eay eking Um edge ol'Cunituk SouW to the point of beginning, sustaining I.72 mes,mus
Or less. l
[king a ps'�yf the sure properly dncriped In deed recorded in Dead hook 94. Page 40 in the oPka of the
Regiser of s ofCunitwk County.
LESS AND F. PTING Chore cwnveYsass w William C. Winn recorded in hook 134 at False S)) W
Flo# 117 N Peg of the Currilwk Reglamy, Rald anvey.rwc. oilsvoting •parcel Hut b 3W fat
ewng Cuydtmk W Is 200 feel deep.
MaU1yM
Staling.l. Point Io We edge of Curtituck S.W W in the NW property lineof Ih. Willi.. N. Romm,
W mining SeuN 43' ]4' West 100 fat Iv •poise RaN point being Nc point of beeiming; thence running
South l2°N'Wew 50 fed'„d,,, nr. dsensc running Nosh 44°4a Wry J00 fedwspohn; Hwrxx running
NoM 42" 34' Fue150 feel to "l, thews running South 44' 40'Res1700 fen to the pMel of baginNng.
being. Pan ofth suns popei ysbcrids in dtrol raordW in IkN Book N, page 40 in the offttt of the
Regi4er of feeds of iloriack 1741*
IMILLIBME: I(
Beginningatsn ism pipe loesnd in IhN4 nbern corner of the pmpeny heRhl.Ra dewribre, sekl point of
beginning being in the Saushsanern mro pQf time property tww or formerly owned by Dr. L. E. Sawyer
when mid canes inkmWe wlb Hm edge lsrUorrilwk Sound; floor mid point of beginning running therm
Smith I7° 2V 50' Fast 267,14 fad an a point, 9(nfwereg; m umg tlwnce South 56' N' Wen 250.0 feel w.
poim,wrrering; mnninglha .Noel 25°5I54tbrf 118.73fed we point looted on the Southern boodsry
ofthd property no. or fdmerf, owned by Dr. De. SavSes, cantering; running Ihena NUM 70' Ta Fay
200.0 ren to the point W plase, of beginning G being Tres d u Wwn .rat delineated at that plot
sodded "F.shbil I", oepy of wbk:h is ebehe6 eoytAe bed resorted in 1kW Nook M. P., 660.nd h
inco,eorved bemht by Rfuvnm.M merle. pnn hdrQ(\lr
Those is maned a 10 foot e.evneel pudkl to sell e. ing 10 fin floor the Soulhan boundary of Hw
escrl .forodbod'rmn 0, u shown W delineated in Hw s1 rnt.IIM `FSrhibit 1", .copy of whirl copy is
.tuchnl to that bed mcurded In feed Boole 2", Page W .tat is swapo ved hcrtin by mferenoe W
made a pan hereof,
IBACTFOUR:
Beginning at . point kx.td on ill, Fukm right of wRy of NC N. 1242, Raid prim of baginning
wing'he Nevis... poll ofn,e psotvsr aein anrgW;f point ofbeginnine running thence
South 1° 59 40' Fin 367.5 fa4 w •poise currtning: running HR aM 70' )a Farr 221.6 fen to e
point kaaledon Hn Western side Oren exiningcssernem; nwningthe oM 70' Ia Fie w the Wedwn
boundv of Clue property heretofore described a Teen Toee, mid nduy des being the W".
boundn"Y of that onct boon u "Trace 1" a shown w that plot eorit E hiNt 1", copy of which is
dmchM w thin deed recorded in Dead Book 299, Pan. 660 W is i tM hertio by mfemwe and
made. pan hereof, runniog thsnce South 25° 51- Cast 31 a75 fen to a no "n& ..ing otre.
O
O
Received
OCIM-EC RECEIVED
APR 14 2020
OCNI-MHD CITY
G
'} South 46.42'Fmn)Ig,25fanwapob{cumctift&mating thenw Nonh 42' 56 45' F" 15.69 feel too
Yg Point, c'menng; tomiing lh. SMI, 44° 25' Fin 100 fen to an ex6ting toncme mvkn, tumcnng;
mg them South 42' S0' Wcu 250.o fen to an bra pipe; mnningtMica RaM 42• SO' Wa a aweight
,t w the Faawm tight of xry of Illghway No. 34. "ing running Ihrnw in 4 ymnal Northerly
y+t������ttt�!!!tttlion along tk lanem right of wry of fllghwq No. 34 W N(' Rn c No. 1242 to the point and pbce
o oning,
"rb, wned.20rwrightofway(oD,.W.I1. Rommand rife, Noma Romm,tkukin and waign>,
for e I and epev to'that pmpay of Dr. W. H. gomm and wilt• Norma R. , nld tight of way
monc ryayy�1luly Yawn analdelineaed on that plat entitled ^Fahibil I ". copy of obloh it anahcd to din
dad rec'h161 in Dccd Rook 299, Page 669 and ie imoTmaled hem, by refemme and Mao, a pan hereof
CMG
0�
0�
0
0
Y'
n�.
N�
O
O
o�
N�
Received
Der# -EC
RECEIVED
APR 14 2020
OCM-MHD CITY
UIx P1VJ I V IYG - I,, t'e) VV ff 00J' J 1
This Document eRecorded: 12/05/2018 01:42:06 PM
Tax: $650.00 F
G Currituck County, North Carolina ee. pzo.00
�0 Denise A. Hall, Register of Deeds
Currituck (*ty Land Transfer Tax: 3250.e0 County Excise Tax: 1985 Sessions Law Chapter 670 (HO 215)
This certifies 11114 W'S are no delinquent taxes wnlcn the GufDNOk County Tax Collector Is charged with
that are lien on the Ap�,p pedy described In this dead. as of the date of this certification.
Date: 12/06/201x Collector/Deputy/Clerk Deanna Soruit[
NORTH CAROLINA GENERAL WARRANTY DEED
Excise Tax:
By:
this insW monl was plapartd Jar.
Briefdescription for the IMex: _
THIS DEED mede 1hia2ga day orN-1�111`. 2(1 by RW between: —
_ ORANIUR:
10(vil EW C. EDWARDS, Tnulee,
Of The Aadej\/ 4. Edwardswt TrDated October 22, 19"
1025 E. Ball Road
0-heim. CA 92805
(rRttr9 /p'�rimry residence)
GRANTEE: V
GAAAARAYYE
33101'A1 y�' on Way
Chapel Hill.& 27517
This instrumera prepared by William R. Titchcna, a limaxcd Noah Carolina attorney. Ikiinquent Wu, ilanYJo be paid by the
closing attorney to to the county tax collector upon disbursement of closing proerods.
WITNESSETH, that"w Grantor, for a valuable wroideration paid by the iFticulady
m, flier ipt of which is hereby ackrpwledgW,
has and by these pn,,,is does grant, bargain, sell and convey unto the Gr fee simPle, ell that cenaln lot or pareN of laird
situated in Crawford Township, Currituck County, North (aamDtu and described as follows:
SEE EXHIErr "A"V-'�%
EelpeltY known u: 122 Ruston point. Qmttuck. NC 27929 0J
11a: PMPWY herelrwbove described was eogwmd by 0r r by imuument recorded ih Ry 1334, page 585.
ItRprNN.OeCINCBv Aww ixuu 1Wselle. a 0 1916, R[rkaa O tar1.20(o Y
NeleAb7 Apaama MW 0. NC me, A..waa iw. 1Ht
submitted electronicall by •ittchaner Law ofrtce"
rt
andche terms o7 theosutuaritterfaereeneutewithutheerrt currituckacountirc glscer of Deeds.
1.
�E'f:CIVt3�'
DECEIVED
APR 14 Z020
DCM-MHD CITY
Ur\ IYVJ I V IY6- IY'M tI wJOvl JI
0
HAVE AND TO HOLD the aforesaid Int or parcel of land and ell privilcgu and appur¢rur dualo belonging to the
`\r,^saenee in fee simple.
A�,1jte Grantor mverunn with the Grantee, that GMNOr is seined of the prcmius in fee simple, has the right In convey, M ame
in Ibp it plc, that Wle Is marketable and free and clear of all eaumbrmces, end that Granvx will wanent and defend the Title
again il lawful claims of all persons WhOne,never, other than the following eaceptlons-
C Ualantions, mstrictmu, fASCmenks and encumbtattces of record.
IN WI 1NF_"HF.RE0F. the Grantor has duly cam used the foregoing m of the day and year firm above written,
7M And Daled Otloher 22, 19"
By
Su¢ of California AIlllnty of _rJfdroln -6
1, the Un&t gold NIs'ear ie of the County and State aforesaid ANDREW C. FDW ARM Trustee of The Andrew C.
Edwards Trust therPAposes,I 22, peraotnlly appeared before me this day and acknowledged the due esesvfion ofthe foregoing
instrument for the purposes therein msard. Wimem my hand and Notarial atam o seal this Z P � day of November, 2111 S.
susaNuomavll Public
BHarrq,bk-ralspmtD
LIN
coww w, u70Wa Y' My Commission Eapirts:1��19�'
W Camm.laa•n rin ). NVI
Y
16
0
rm
V
1�50
"y
C"
lr-
C
l000x+H.axINC BV A+eoc'imiin MmNn 10 IY/a, RcvlsudOlV!), NMR �Y-1
Pnnlel by M�aI HIa Nc NC Bar Avo[I W m rYr I d
O
01.
!Received
D M-EC RECEIVED
APR 14 2020
DCM-MHD CITY
Ur\ IYVJ F V iYL - IYJ Y
t J VVlifr JJJ/JI
70
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
CML CODE] 11BB
-.yr auror.reo,u
N notary publle or other Ol cpnpleflrg this oeNfk:ala verlaes only the idmdly of the YwMtlur who ttlgllad�
t to wNch aris certificate h atlachsd, and rot the tndhfulness, sc Aosey N valkDy of the dowmem.
On" V afore me,
Dat
Personally e. "CLGr�eV red
IMMt nd oft ----_— "
.�x
Nemefs) of Sl ---_
who Proved to me on the basis of satisfactory evidence 10 b8 the -� — --
subscribed to the vMhkr Instrument and acknowl Pereorl(el whose narne(s) Ware
hlaAlerAheU authorized ca xts), and that byhiaaher�rtheirsignstutre(s)on M IeJMtlshilithey trumen�heaseme in
or the entity upon babeh the persnnisi'
Parsons)
acted executed the Instrument.
O
1 certify under PENALTY OF PERJURY under the laws
of the State of Caiifomis that the foregoing paragraph
Is true and correct.
susxx Moxr�d n
xwrryA,Wi< 4e
L
WITNESS m y bend and f( lal seal.
(YeMtYo.rtY
comma •mra� -
MYCumm &p,eeNv, 1.}
Signatare
Sl�sa ure of Al blk—
d
Place Notary Seal Above
Though this sect/on /a Optional, compienrg
in Ofrnation can decal aaemhon of the document
fmudufenf reattachment of
or
form to W1 unintended document
Description of Attached Document
N
Title or Type of DcOUMSM:
Document Date:
Signar(s) Other Than Named Above:
_ tirnbw a Ppe�
Capacity(ies) Claimed by Signer(y
Signets Name.
D Corporate Oflker — TRItl ❑ Para — ' ]Limited D &Itr _
G Individual fl Attorney In Fad
D Trustee fl Guardian at Coneeml
❑ Other:
Signer Is Representing: _
So Name:
D Co ate Officer — Mul
LT Perin®— (l Umaed Cl General
❑lndMdrprk' ❑Attorney In Fad
❑ Trustee V"(' 7 Guardian or Conservator
I I Other. _� .
er SignIs RePreVnhng: _
1l National Notary Association • www.NemmalNalary erg
Item #MT
Receivers RECEIVED
APR 14 2020
DCM-EC DCM_MHD CITY
UI\ IYUJ 1 V IYa - IYJ LYE UVVIe JJOIO I
G
�o
v
1'
�• EXHIBIT 'A'
BF ING at an iron pipe located in the Northwestern corner of the property now owned by Lloyd M.
GilbMt and wife, Ann M. Gilbert, said Iron pipe being In the Southwestern cornerof the property
herein described, from said point of Beginning running thence North 46 degrees 45' West 218.86
feet to anon pipe, cornering; running thence North 56 degrees 04' East 251.76 feet to an iron pipe
located at `hy edge of Currituck Sound, cornering; running thence South 36 degrees SW East iS4.43 feet
to an iron pi{{p cornering, running thence South 42 degrees 58" West 217.41 feet to the point and place
of Beginning. _ng 0.96 acres according to that survey entitled "Dr. W. H. Romm, Currituck County, NC,
Crawford Town ,,QQ prepared by Charles E. Brown, III, registered surveyor on September 24, 1981, less
and excepting that' strip of land conveyed to Lloyd M. Gilbert and wife, Ann M. Gilbert, in Deed Book
185 at Page i of a Currituck County public Registry and being the same property conveyed in Book
461, Page 576, Currituck County Registry.
Together with a 20' ease�r pp t for Ingress and egress as more particularly shown and delineated in the
aforementioned survey, r�
0
10
0
Received
DCM-EC
G
0
VIO
�Y1
d
0
0�.
RECEIVED
APR 14 2020
DCM-MHD CITY
MAJOR PERMIT FEE MATRIX
Applicant: Gary Kayve & Anne Morean
Selection
Development Type
Fee
DCM %
DWQ %
(14300 1601 435100093 1625 6253)
(24300 1602 435100095 2341)
I. Private, non-commercial
development that does not
$250
100% ($250)
0% ($0)
involve the filling or
excavation of any wetlands
or open water areas:
II. Public or commercial
development that does not
$400
100% ($400)
0% ($0)
involve the filling or
excavation of any wetlands
or open water areas.
Major Modification to a
$250
100% ($250)
0% ($0)
CAMA Major permit
III. For development that
involves the filling and/or
excavation of up to 1 acre
of wetlands and/or open
water areas, determine if A,
B. C, or D below a lies:
III(A). Private, non-
commercial development, if
$250
100%($250)
0%($0)
General Water Quality
Certification No. 4097 (See
attached can be applied:
III(B). Public or commercial
development, if General
$400
100% ($400)
0% ($0)
Water Quality Certification
No. 4097 (See attached)
can be applied
III(C). If General Water
Quality Certification No.
$400
60% ($240)
40% ($160)
4097 (see attached) could
be applied, but DCM staff
determined that additional
review and written DWQ
concurrence is needed
because of concerns
related to water quality or
aquatic life.
D). If General Water
:44097
ality Certification No.
$400
60%($240)
40%($160)
(see attached) cannot
a lied:
For development thatolves
the filling and/or
$475
60%($285)
40% ($190)cavation
of more than
one acre of wetlands and/or
RECEIVE
E
open water areas
APR 14 2020
)aCM-MHD CIT-y
NC Division of Coastal Management
91 Cashier's Official Receipt
Received From: n`�'n"�' I A('
Permit No.: ,��y.l i y//1„•.1
Applicant's Name:P tr�f ,a AA.e
Project Address: I :Z _—�- .4 11 1 c M
9942,,A B C D
Date: qp=v
g1 _ �- \ 1 ,
Check No.:-) 1 tr 7 -S �
County:
Plew retain receipt for your records as proof of payment for permit issued.
Signature of Agent or Applicant ''-�' t xi'j'��-�iN Date:
/--
Signature of Field Representable: '� n� % /y._ Date:
I
0
n
r
n
-
m
o
m
1V
O
v
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
EMAIL MEMORANDUM
TO: Susan Simpson
The Coastland Times
Manteo, NC 27954
leg alsCoMhecoastlandtimes.net
FROM: Ella Godfrey
DATE: April 13, 2020
SUBJECT: Public Notice: Gary Kayye and Anne Morgan
Please publish the attached Notice in the Sunday, April 19, 2020 issue of The Coastland
Times.
The State Office of Budget and Management requires an original Affidavit of Publication
prior to payment for newspaper advertising. Please send the affidavit, an original copy
of the published notice, and an original invoice to Ellie Davis, NC Division of
Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557,
(Telephone 252-808-2808).
Thank you for your assistance in this matter. If you should have any questions, please
contact me at our Elizabeth City office (252) 264-3901.
Attachment
cc: Jonathan Howell, Major Permits Coordinator, DCM, Morehead City
Christy Simmons, PIC, DCM, Morehead City
Ellie Davis, Accounts Payable, DCM, Morehead City
File
RECEIVED
APR 14 2020
North Carolina Department of Environmental Quality I Division of Coastal Management �/
Elizabeth city Office 1401 South Griffin Street, Suite 3001 Elizabeth City, North Carolina 27909 DCM—MHD CITY
252.264 3901
NOTICE OF FILING OF
APPLICATION FOR CAMA MAJOR
DEVELOPMENT PERMIT
The NC Department of Environmental Quality hereby gives public notice as
required by NCGS 113A-119(b) that application for a development permit in an AEC as
designated under the CAMA was received on 04/03/20. Gary Kayye and Anne Morgan
proposes to construct a bulkhead across 3 separate lots, construct a 29' x 6' L shaped
pier with a 16' x 18' platform as well as a 16' x 4' dropdown platform at 122, 128, and
Parcel #00500000900000 Romm Point in Currituck County.
A copy of the entire application may be reviewed at the office of the Division of
Coastal Management, located at 401 S Griffin St, Ste 300, Elizabeth City, NC, 252-264-
3901 during normal business hours. Comments mailed to Braxton Davis, Director, DCM,
400 Commerce Avenue, Morehead City, NC 28557, prior to 05/09/20, will be considered
in making the permit decision. Later comments will be considered up to the time of permit
decision. Project modification may occur based on review & comment by the public, state
& federal agencies. Notice of the permit decision in this matter will be provided upon
written request.
PLEASE PUBLISH ON: Sunday, April 19, 2020
]lw.Ymm+M PUM�
Nor lhCarolina Department of Environmental Quality I Division of Coastal Management
Elirabeth City Office 1401 South Griffin Street. Suite 300 1 EIWWh City. North Carolina 279og
252.264.3401
RECEIVED
APR 14 2020
DCM-MHD CITY
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
April 13, 2020
Gary Kayye
Anne Morgan
3310 Environ Way
Chapel Hill, NC 278517
Dear Mr. Kayye & Ms. Morgan:
The NC Division of Coastal Management hereby acknowledges receipt of your application
for State approval to construct a bulkhead across 3 lots, a 29' x 6' L shaped pier with a 16' x 18'
platform as well as a 16' x 4' dropdown platform at 122, 128 and parcel ID # 00500000900000
Romm Point in Currituck County.
It was received complete on April 3, 2020 and appears to be adequate for processing at this time.
The projected deadline for making a decision is June 17, 2020. An additional 75-day review period
is provided by law when such time is necessary to complete the review. If you have not been
notified of final action by the initial deadline stated above, you should consider the review period
extended. Under those circumstances, this letter will serve as your notice of an extended review.
However, an additional letter will be provided on or about the 75th day.
If this agency does not render a permit decision within 70 days from April 3, 2020, you may request
a meeting with the Director of the Division of Coastal Management and permit staff to discuss the
status of your project. Such a meeting will be held within five working days from the receipt of
your written request and shall include the property owner, developer, and project
designer/consultant.
NCGS I I3A-I 19(b) requires that Notice of an application be posted at the location of the proposed
development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted
at the property of your proposed development. You should post this notice at a conspicuous point
along your property where it can be observed from a public road. Some examples would be:
Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your
D Q'J RECEIVED
North Carolina Department of Environmental Quality I Division of Coastal Management APR 14 2020
Elizabeth City Office 1401 South Griffin Street. Suite 3001 Elizabeth City, North Carolina 27909
252.264.3901 0CM-'MHD CITY T
Cary Kayye
Anne Morgan
April 13, 2020
Page 2 of 2
property, or at a point along the road right-of-way where a private road would lead one into your
property. Failure to post this notice could result in an incomplete application.
An onsite inspection will be made, and if additional information is required, you will be contacted
by the appropriate State or Federal agency. Please contact Robert Corbett, Field Representative,
if you have any questions and or if you wish to receive a copy of his Feld report.
Sincerely,
:;(
n Renaldi
District Manager, Northeastern District
NC Division of Coastal Management
RR/eg
Enclosure
cc: Jonathan Howell, Major Permits Coordinator, DCM, Morehead City, NC
Robert Corbett, DCM, Elizabeth City
Lyn Small, Lyn Small, Inc., Powells Point, NC
RECEIVED
APR 14 2020
DCM-MHD CITY
I
P
*:
B
N0T1(0*'$13
CAMA PERMIT
APPLIED FOR
PROJECT: construct a bulkhead across 3 lots,
a 29' x 6' L shaped pier with a 16' x 18' platform
as well as a 16' x 4' dropdown platform
COMMENTS ACCEPTED THROUGH
m
m APPLICANT:
m Gary Kayye
v Anne Morgan
3310 Environ Way
Chapel Hill, NC 27517
919-868-3358
May 9, 2020
FOR MORE DETAILS CONTACT
THE LOCAL PERMIT OFFICER BELOW:
'1 Robert Corbett
401 S. Griffin Street, Suite 300
Elizabeth City, NC 27909
252-264-3901, ext. 233
ROY COOPER
Gcn,rmar
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
April 14, 2020
NORTH CAROLINA
Environmental Quality
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
grega.bodnarAncdenr.aov
SUBJECT. CAMA/Dredge & Fill Application Review
Applicant: Gary Kayye & Anne Morgan
Project Location: 122,128, Parcel #00500000900000 Romm Point in Currituck County
Proposed Project: Construct a bulkhead across 3 lots, a L-shaped pier and a dropdown
platform
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Gregg Bodnar at the address above by May 5, 2020. If you have any questions
regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 2353 when appropriate, in-
depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached`"
PRINT NAME
AGENCY
SIGNATURE
DATE
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1 401 South Griffin Street, Suite 3001 Elizabeth City, North Carolina 27909
252.264.3901
DECEIVED
APR 14 2020
DCM-MHD CITY
DCM Coordinator: Greg Bodnar Distributed Yes® No ❑
Applicant: Gary Kavve & Anne Morgan Distribution Date: 4/14/2020
AGENCY
ECRO
Community Develo ment/LPO
Debbie Lashomb
DCM Planner
Charlan Owens Elircity
US COE:
Josh Pelletier
Community Assistance
lee Padrkk (Beaufort Carteret Craven, Eli: City,
Pamlico, Washington)
Cultural Resources
Renee Gledhill -Earley
Div. of Water Infrastructure
(No longer public WaterSupply)
Clif Whitfield
Marine Fisheries
Anne Deaton WARO/ECRO
James Harrison
NC DOT
David Harris
Shannon Jenkins
Shellfish Sanitation
Sharon Gupton
Tim Walton
State Property
Mike Moser
Wanda Hillard
DEMLR/DWR:
Sherl Montalvo
DEMLR
Sediment & Erosion-
Samir Dumpor
Storm Water-
Roger Thorpe
DWR 401-
Anthony Scarbraugh
WRC
Maria Dunn (WARD)
National Heritage Program
Rodney Butler
D:\work\Maj Comment Distribution Sheet - Kayye & Morgan.docx
RECEIVED
APR 14 1020
geft#j!M"D CITY
—This is a word processing form to be completed in Microsoft Word"'
NC Division of Coastal Management
Major permit Application Computer Sheet
(41812020)
District:
City
Date of Initial application submittal (EX.11WO07): 3WO20
Date application 'received as complete' in the Field ofte (EX.1/81007): 4WO20
Permit Authorization: []CAMA ElDredge & Fill NBoth
SITE DESCRIPTIOWPERMIT INFORMATION
PNA: []Yes RNo
Photos Taken: Yes R No[]
Setback Required (riparian): ClYes 011ie
Critical Habitat: Yes Stile EINotsure
15 foot waiver obtained: 0 Yes No
Hazard Notification Returned:
❑Yes RNo
SAV.❑Yes RNo [--]NotSure
Shell Bottom: Yes RNo Not
Temporary Impacts: ZYes ❑No
Sure
Sandbags: UYes NAto UNotSuve
Did the land use classification come from
Mitigation Required (optional):
countyLUP:RYes []No
❑Yes RNo
Moratorium Conditions: UYes UNd
Environmental Assessment lone:
RNA
❑Yes ❑No RNA
SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4)
Ll Future Water Supply (FWS) 0 Nutrient Sensitive Waters (NSW) Swamp Waters (SW)
High Quality Waters (HQW) U Outstanding Resource Waters (ORW)
WETLANDS IMPACTED
El (404) Corp. of Engineers (Jurisdictional
(LS) Sea lavender (Limonium sp.)
(SS) Glasswort ( Salicomis sp.)
wetlands)
❑ (CJ) Saw grass (Cladtum jamaioense)
(SA) Salt marsh cordgrass (Spertina
U (SY) Salt reed grass (Spartina
afteminors)
cynosumides)
(DS) Sett or spike grass (Disfichlis
11 (SC) Bu11ruSh or three square (Scirpus
(TV) Cattail (Typhe sp.)
spicata)
SO
(JR) Black needlerush (Juncus
El (SP) Sallimeadow grass (Spartina
roemenanus)
patens)
APPLICATION FEE
El No fee required - $0.00
❑ III(A) Private w/D&F up to i acre;
9 111(D) Prfv. public or comm w(D&F to 1
3490 can be applied - $250
sae; 3490 can't be applied - $400
❑ Minor Modification to a CAMA Major
El Major Modification to a CAMA Major
U IV Any development involving D&F of
permit - $100
permit - $250
more then i acre - $475
❑ Permit Transfer- $100
❑ III(B) Public or commercial wl D&F to 1
Express Pemit - $2000
acre; 3490 can be applied - $400
❑ Major development extension request -
U IL Public or commerdal/no dredge
RhUhIVED
$100
and/or fill - $400
I. Private no dredge and/or rill - $250
0 lll(C) Pdv. public or comet w1V&F to 1
APR 14 202
acre; 3490 can be applied; DCM needs
DWQ agreement - $400
252-808-2808 :: 1-888-4RCOAST :: www_nccoas alman@gemant.net revised: Nov. 2012
NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3)
Applicant: Gary Kayye B Anne Morgan
Date:41&2020
Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of
measurement found In your Activities code sheet.
TYPE REPLACE
Acalvlly- Name Number Choose One Choose One Distension I Dimension 1 Dimension 3 Dimenslon 4
Bulkhead (Not
New Work ®
Replace
425'
1'
6'
MHW Vinyl)
Main, ❑
❑ Y ® N
Fill Shoreline
New Work ®
Replace
685 yd'
Stabilization
Maint ❑
❑ Y ® N
below H2O
Level)
Pier
I
New Work 2F
Replace
29,
6'
Maint ❑
® Y ❑ N
Platfottn
1
New Work
Replace
16', 16'
18', 4'
Maint ❑
❑ Y ® N
New Work U
Replace
Maint ❑
❑ Y [IN
New Work
Replace
Maint ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y ❑ N
New Work 0
Replace
Maint ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y ❑ N
New Work
Replete
Maint ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y ❑ N
New i4brlt
Replace
War ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y ❑ N
New Work
Replete
Maint ❑
❑ Y ❑ N
New Work
Replace
Metal ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y [IN
New Work Lj
Replace
Maint ❑
❑ Y ❑ N
ISCI,CI V CU
APR 14 2020
DCM-MHD CITY
revised Nov. 2012
NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3)
Applicant: Gary Kayye B Anne Morgan
Date: 41WO20
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
TOTAL Sq. Ft.
FINAL Sq. Ft.
TOTAL Feet
FINAL Feet
(Applied for.
(Anticipated final
(Applied for.
(Anticipated final
DISTURB TYPE
Disturbance total
disturbance.
Disturbance
disturbance.
Habitat Name
Choose One
includes any
Excludes any
total includes
Excludes any
anticipated
restoration
any anticipated
restoration and/or
restoration or
and/or temp
restoration or
temp impact
temp impacts)
impad amoun)
tamp impacts)
amount
High Ground
Dredge ❑ Fill ❑ Both ❑ Other ®
8,500
8,500
Shallow Bottom
Dredge ❑ Fill ® Both ❑ Other ❑
6,163
6,163
Shoreline
Dredge ❑ Fill ® Both ❑ Other ❑
425
425
Open Water
Dredge ❑ Fill ❑ Both ❑ Other ®
526
526
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fig Both ❑ Other ❑
Dredge ❑ Fdl ❑ Both ❑ Oder ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
RECEIVED
APR 14 2020
DCM-MHD CITY
252-808-2808 :: 1-888-4RCOAST :: www.nccoastahnanagoment. not revised: Nov. 20'12
17
2020-03-17
ff t
2020-03-17
24020-03-17
L6-£Q:--OZ Z -
4 a _
_ z
L6-CO-OZOZ
�•Y' :I __
oil
MI'11 IN
*4
-03-17
2020-03-17
2020-03-17 a 2020-03-17
21-CO-OZOZ
J
L 6-CO-WOZ
IVA,
I
RECEIVED
APR 14 2020
DCM-MHD CITY
1�
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
NORTH CAROLINA
EnWranntental Quoliry
RECEIVED
MAR 2 3 2020
Lyn Small Inc.
113 Ballast Rock Drive DCM-MHD CITY
Powells Point, N.C. 27966
Re: CAMA Major Permit Review for Gary Kay and Anne Morgan
Dear Mr. Small:
March 20, 2020
On March 3, 2020 the NC Division of Coastal Management acknowledged receipt of your application located at Romm
Point, Cunituck County. An initial screening of the submittal package was conducted, which revealed certain
deficiencies that required your attention.
On March 12, 2020, our office received documents for your re -submittal of the application. On March 17, 20201 made
a site visit to the proposed project location. During the course of my site visit a few differences arose that need to be
corrected on the CAMA Major Permit Application. My office must receive the following data before the Major Permit
Application can be accepted as complete:
1. On the Site Plan.
• The maximum distance waterward the proposed bulkhead will be located from Normal Water
Level is 36'.
i. On the site plan this distance is listed as 50'. The 50' measurement is the escarpment.
ii. Changing this distance to 36' will adjust the average distance waterward as well as the
amount of projected fill which will be beneficial to the project.
2. DCM MP-1
• 3.b: The name of the waterbody nearest to the proposed project is North Landing River
• 3.d: The name of the closest major waterbody to the proposed site is the Cumituck Sound.
3. DCM MP-2
• 3.b. The bulkhead length is listed as 525'. The site plan only shows the bulkhead being 425'
i. 525' is the total length of shoreline for the 3 lots.
• 3.c: Due to the maximum distance waererward being adjusted to 36' this number will need to be
recalculated.
• 3.d: The maximum distance waterward is 36'
• 3.g: This number will be the average distance waterward (3.b) x the length of the bulkhead (425')
North Carolina Department of Environmental Quality I Division or Coastal Management
Ellzabeth City Office i 401 South Griffin Street, Sutte 301 I Elizabeth City. North Carolina 27909
252.264.3901
Lyn Small
March 20, 2020
Page 2 of 2
4. DCM MP-4
• 7.a The proximity of structures to the adjacent property lines is 196' and 288'.
• 7.b The proximity of structures to adjacent docking facilities is 171' and 354'.
5. Other notes
• You will not need to re -notify the adjacent riparian property owners
• If you provide an agent authorization form for Anne Morgan, you can sign applications for them.
i. An agent authorization form has already been received for Gary Kayye.
ii. Also you can have both applicants sign the same application if you would like.
If you have any questions regarding this correspondence or the permit process, please don't hesitate to contact me.
Sincerely,
Robert Corbett
Coastal Management Representative
cc: Ron Renaldi, District Manager, DCM, Elizabeth City
Gregg Bodnar, Assistant Major Permits Coordinator, DCM, Morehead City
Gary Kayye, Applicant
Anne Morgan, Applicant
ROY COOPER NORTH CAROLINA
Govemw Environmental Quality
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
March 6, 2020
Lyn Small Inc.
113 Ballast Rock Drive
Powells Point, N.C. 27966
Re: CAMA Major Permit Review for Gary Kay and Anne Morgan
Dear Mr. Small:
The NC Division of Coastal Management hereby acknowledges receipt of your application on
3/2/2020 for State approval for the development of the referenced project. An initial
screening of the submittal package has been conducted as per 15A NCAC 07.0204. This
revealed certain deficiencies, which must be corrected before the application package can be
accepted as complete. To assist you in expediting the permitting process as much as possible,
I am notifying you of these deficiencies immediately so that they can be quickly corrected to
facilitate my detailed review.
Because the deficiencies are easily correctable, I am not returning the original application
package. Please make the needed changes, and submit the appropriate documentation. With
the retained copy of the application, I can commence the detailed review. Please understand
that the subsequent detailed review may reveal additional areas where further information
or documentation is required to demonstrate compliance with the rules directly applicable
to the proposed development. If this occurs, you will be notified of such issues separately.
Our initial screening has identified the following deficiencies:
Please address the following items:
To consider the application as complete you will need to submit the green
card receipts indicating the date the adjacent riparian property owners were
notified.
• The permit fee for this application is $400.00.
To expedite our response to your permitting request, we will commence the detailed review
of your application for a permit pending the receipt of the additional information requested
above. However, the statutorily provided 75/150 days allowed for review cannot commence
RECEIVED
�Q�
MAR 17 2020
North Carolina Department of Environmental Quality', Divisionof Coastal Management DCM-MHD CITY
Elizabeth City Office 1 401 South Griffin Street, Suite 301 1 Eltzabeth City. North Carolina 27904
252.264.3901
Lyn Small Inc.
March 6, 2020
Page 2 of 2
until such time as we have received a complete application package. Once your application
has been accepted as complete, you will receive a separate notification letter.
If it is not possible to render a permit decision within 70 days of the date when your
application is received complete, you may request a meeting with the Director of the Division
of Coastal Management and permit staff to discuss the status of your project. Such a meeting
will be held within five working days from the receipt of your written request and shall
include the property owner, developer, and project designer/consultant
Please do not hesitate to contact me at our Elizabeth City office (252 264 3901) if you have
any questions regarding this letter or the permitting process.
Sincerely,
Robert Corbett
Field Representative
Division of Coastal Management
cc: Gregg Bodnar, Assistant Major Permits Coordinator, DCM, Morehead City
Ron Renaldi, District Manager, DCM, Elizabeth City
Gary Kayye, Applicant
Anne Morgan, Applicant
PROPERTY OF:
RUTH CUTTINO
1527 OXBOROUGH CIR
MOUNT PLEASANT, SC
29466
LOCAL ADDRESS:
119 N. ROMM POINT RD
NCRTH LANDING RIVER
i f
1 EXISTING
......... . ..... " r j r (-�� r I '."') -'j I l", f"" f""� . > r
NORTH LANDING RIMER
ECT NEW VINYL BEHIND
NG WOOD BULKHEAD
�t LF VINYL BKHD
354'
WATER DEPTH
2'+/
EMNANT WOOD BULKHEAD-\ EXIST WOOD
PHRAGMITES i
30CAMA BUFFER AFTER CQMp�n� _ �'
� • �_ FTCEfPdij �..--_---__-
— TOP OF ESCARPI
PROPERTY OF
ROMM POINT NC LLC
PO BOX 456
MOYOCK, NO
27958
EXIST. RIPR7P—
MAX LENGTH
n
A WATER DEP1N ROPOSED 384 SF PIER
AT ENO OF PIER / I
LF VINYL BKHD
STEPS TO 4' WIDE
n
/ AREA OF BACKI
BELOW NWL 230 S.F
LF VINYL BKHD
TO I , we-_,
\ CONNECT NEW VINYL BEHIND
EASTING WOOD BULKHEAD
PROPERTY OF:.
PROPERTY OF:
ANW MORGANt
GARY KAYYE
4013 W'FR UN ST
3310 ENVIRON WAY
i
RICHMOND.
CHAPEL HILL, NO
23221
LOCAL ADDRESS: I
VACANT LOT ROMM POINT RD
GRAPHIC SCALE �'•�,•
1••
( }H 50 F£) �•.
1 iaot� � 60 tt.
27517
LOCAL ADDRESS:
122 ROMM POINT RD
LOCAL ADDRESS:
128 ROMM POINT RD
� 6 z �� PROPOSED BULKHEAD & DOCK
1 BOHM PODIT RD. CQBRIIVCIL NC
KAYYE & MORGAN CO -APPLICANTS
Received
s j
fltlo
DCM-EC
i PROPERTY OF:
VINCENT COLON
I 132 ROMM POINT RD
CURRITUCK, NO
I 27929
LOCAL ADDRESI`
132 ROMM POINT RD
RECEIVED
i
APR 14 2020
I u3 BN/ae/.vue.
vcn//s 191 567
ISI-<9r 4"9,
N(u(eny elc :9N:
6X6
REMNANT TIMBER _
BULKHEAD
_EXIS7ING GRADE
PROPDSM VV M. BULKIEAD
SECTION A
NTS
SECTION B
SCALE 1 "= 4'
BAgffILL
6x6
2.12 CAP
8*0 ROUND PILE
PROPOSED NNYL BULKHEAD
SECTION C
NTS
BAg61LL
EEXXISTING BOATLIFT TO REMAIN Received
1 n v
°mhl PROPOSED BULKHEAD & DOCK
/ / OF L ROMM PODrf RD, CURIMOC. NC
CO -APPLICANTS ON MULTIPLE PARCELS
iT7
;EIVED
14 2020
MHD CITY