Loading...
HomeMy WebLinkAboutTBEX_21-06_ IngramTo . ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRAXTON DAVIS Director Lynne Ingram 9 6i 2013 Ocean Blvd. Topsail Beach, NC 28445 NORTH CAROLINA Environmental Quality April 19, 2021 RE: EXEMPTED PROJECT (MINOR) EXEMPTION Structural Accessway (15A NCAC 7K .0207) and Accessory Structure (15A NCAC 7K .0209) — Exemption# TBEX21-06 2013 Ocean Blvd, Topsail Beach, NC AREA OF ENVIRONMENTAL CONCERN — Ocean Hazard AEC Dear Ms. Ingram: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. Based on the information provided, I have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing dated received by DCM on April 13, 2021, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. ACCESSORY STRUCTURE/USE 1. The work authorized under this exemption specifically includes construction of a 10' x 10' seating area along the ocean side of the property. The final project dimension(s) shall not exceed a footprint greater than 100 square feet. 2. The development must not involve removal, damage, or destruction of threatened or endangered animal or plant species. 3. The development must not alter naturally or artificially created surface drainage channels. 4. The development must be consistent with all applicable use standards and local land use plans in effect at the time the exemption is granted. 5. The proposed development shall remain consistent with the attached work plan drawings. 6. This permit does not authorize the removal of vegetation or sand from the frontal dune. 7. WITH EXCEPTION OF THE BEACH ACCESS WALKWAY, ALL DEVELOPMENT AUTHORIZED UNDER THIS EXEMPTION SHALL BE LOCATED LANDWARD OF THE FIRST LINE OF STABLE NATURAL VEGETATION (FLSNV). This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization. This exemption expires 120 days from the date of the letter. u.,,th r--Ji,.,a n<nart—nt „f Fnvimnmrntal ()„auty I Division of Coastal Manaaement Page 2 L. Ingram TBEX21-06 STRUCTURAL ACCESSWAY EXEMPTED 1. The accessway must not exceed six feet in width and shall provide only pedestrian access to the ocean beach. 2. The accessway must be constructed so as to make negligible alterations to the frontal dunes. This means that the accessway must be constructed on raised posts or pilings of five feet or less in depth, so that wherever possible only the posts or pilings touch the frontal dunes without any alteration to the dunes. In no case shall the frontal dune be altered so as to significantly diminish its capacity as a protective barrier against flooding and erosion. 3. Construction of the accessway be shall consistent with all other applicable local ordinances and N. C. Building Code standards. 4. No portion of the proposed walkway may extend beyond the seaward toe of the Frontal Dune, nor shall it extend onto the wet sand beach. The walkway shall terminate as close as possible to the toe of the existing frontal dune. Sincerely, jnDail d Representative cc: DCM — WIRO Linda Vescovi — Topsail of Topsail Beach r.____._........t ru—nbv I rug i.inn of Cnnctal Mnnanement Dail, Jason From: lynne ingram <mlynneing97@icloud.com> Sent: Tuesday, April 13, 2021 10:29 AM To: Dail, Jason Subject: [External] Ingram. 2013 ocean blvd TB CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mai Ito: report. sparnod nc.agov> Hey Jason, Here is my simple sketch. Plz advise if you need more ? I appreciate your help on this .. if you are able to have it by Friday that would be very helpful to our working calendar. We Best regards, Lynne Lynne Ingram 908-601-5098