HomeMy WebLinkAbout85078B - Bunch, Roy �`°"'k ID CAMA DREDGE FILL ��r5 N� 85078 A B"' C D
GENERAL PERMIT Previous permit 1
Date previous permit issued
❑New n Modification Complete Reissue n Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I5A NCAC ) - n Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name r c•• f C Authorized Agent
Address 1'S 27_ 7) 1c '--III ;1 T--.E'S l=!] Project Location(County): A
L cf
City 4. l"2 `Vt),i'9 "Z State l\J CZIP -,, ' Street Address/State Road/Lot#(s)
Phone#( t 1) 'I o"G 1 ! '27., t---'-. v-e 1'. . ki.:.i€S L
Email .//l Subdivision(( �- ;
City 4<A`4'I / ... ZIP • R$c.
!r
Affected n CW ❑EW RPTA ES PTS Adj.Wtr.Body c>ra ,(nit/man/unk)
AEC(s): OEA ❑IHA ❑UW ❑SPIMA n PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no L
Type of Project/Activity '1 15j' a I/ tie- ( i I/? " I S ' A-5),- -, ` "i
(Scale:/J f n )
Shoreline Length
Access Length - i I -- I ,- 1 4_ a
Pier(dock)length ' ) i I l
I
-i
Fixed Platform(s) 1.....,
i
}
Floating Platform(s) (c 1 ' 1 c i.s ,.., = - f
' 1 cl/' "fir- 2oZt
,\ 1
Finger piers) }' 1 ;..� 1
Total Platform area ' I C-- X i7 '' 111 / / � �G� r-
i ,J
Groin length/# }- i —Y fi._ _ t /) ' __-%
Bulkhead/Riprap length i.-- I I j ,+t E.._... be 1} .' ,— }`rt - -
Avg distance offshore l_.�_ ,C c5, --i-- - ----- f
Breakwater/Sill I Cv 14-
1.
Max distance/length ) '
Basin,channel r
Cubic yards --s• I .. i i (r J�; ► ., ./1 ('f
Boat ramp rt Y_,c 1 .f _
Boathouse/Boatlift I '':. N t~', ! i '
Beach Bulldozing ;•/ I I
Other I
T—
! i - ' I r-- 7 I LIP T) : 41.---,6 ..c., r nel S .
SAV observed: yes 0 E
Moratorium: n/a yes � 1 1 i
Site Photos: yes no -__..._ �' `- Ei { . . `‹ 1 4-_e ^_.__..._ ._
Riparian Waiver Attached: yes no v I
A building permit/zoning permit may be required by: _ - f
.-. / Fi TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions 1_,c? • i • `i I -"✓ ? Ze U✓ G 4°
1 f {t' `. })7I/ 4.,- -jr t,4,, ,// .1),.,, ' 1`See note on back regarding River Basin rules
piSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) .
//,'
Agent or Applicant PRINTED Name Permit Officers PRINTEp4Jame,
Signaturg**PleaA read compliance statement on back of permit** Signature ,`
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
,o '."4gycI CAMA ] DREDGE & FILL No 85078 ABC D
GENERAL PERMIT .��" ') Date pre vous permit issued
New Modification Complete Reissue Li Partial Reissue Previous
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I 5A NCAC Rules attached. u General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected CW EW PTA ES n PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): I 1 OEA IHA UW SPIMA PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: A. )
Shoreline Length
Access Length 1
i 4
Pier(dock)length S ) i
i
1
Fixed Platform(s) i-I-.._._._' .---._..------ -I - h
I _T....._....._.._.- --.._, _..._.__...
Floating Platform(s) I i s) C'-k-c r 5s l,t (� C. r ^
Finger pier(s) i 4_' 1 4 I (L1 0 5St...r 4- C:1.,7 - i I f"�.. � t'
-
4 t r7
Total Platform area )( i,r - �I , r Uf�i _
Groin length/# ,
Bulkhead/Riprap length .._._.__..._. ; _ -
Avg distance offshore i I - L r^>, E ) I
;
Breakwater Sill
Max distance/length } .f' '`)7 I
i
Basin,channel T j
Cubic yards I - - j 7 s !
Boat ramp I
Boathouse/Boatlift I I E I
Beach Bulldozing I
_._.._....----�..
I t — . T - - I _
Other i 1
SAV observed: yes no 1 i
r
Site Photos: yes no �. f-- t ` T.4.4 r "�"". t_ ".... I'.55 t"` 4
Moratorium: n/a es no i I ) i
Riparian Waiver Attached: yes no
A building permit/zoning permit may be required by:
Permit Conditions i.' TAR/PAM/NEUSE/BUFFER(circle one)
nSee note on back regarding River Basin rules
See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature"Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie, Camden,Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management •ENVIRONMENTAL QUALITY BRAXTON DAVIS
Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
Pre-prof ct site conditioAs: Cf+ / S Maiti ell^s-,ej ‘i'lr�-,
ktif
By your signature below you agree to be held responsible for meeting all of the conditions listed above and v ri
that all information provided is complete and accurate.
Agent or Amlicant Printed Name Permit Offic s 1 ture
Z2-1/2.
Agen ollaw leant Signature Issu Date
CAMA GENERAL PERMIT#: C)
State of North Carolina I Environmental Quality Coastal Management
Washington Office!943 Washington Square Mall Washington.NC 27889 1252-946-6481
Wilmington Office 127 Cardinal Drive Ext.Wilmington,NC 28405-3845! 910-796-7215
Morehead City Office 400 Commerce Avenue Morehead City.NC 28557 1252-808-2808
CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY
S
(Top portion to be completed by owner or their agent)
Name of Property Owner: 11,\ 1 ICJ
Address of Property: 1'6 J L 2 - -a))
Mailing Address of Owner:
(gyp(,
Owner's email: ALP ep (AfA-1zY'rb Owner's Phone#: a 'I�'b 2- (e QS 1
Agent's Name: Agent Phone#:
Agent's Email:
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
description or drawing, with dimensions, must be provided with this letter.
>/ I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal .
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
contacted at(252) 946-6481. No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign
the appropriate blank below.)
I DO wish to waive some/all of the 15' setback �aAsZ y-�L 9 �����
Signature of Adjacent
lRip_arian Property Owner
-OR-
I do not wish to waive the 15'setback requirement(initial the blank)
Signature of Adjacent Riparian Property Owner: '00L.4„tak ,z j
Typed/Printed name of ARPO: i_,.. (e4
Mailing Address of ARPO: C. ii-c 1 rde� • ID1bUlei /5 CA-11-P2- r •�( 0 `(
ARPO's email: h j ARPO's Phone#: Z n q S 32
Date: Mf(2.Z *waiver is valid for up to one year from ARPO's Signature*
Revised July 2021
-
TIPS FOR ADJACENT RIPARIAN OWNER NOTIFICATION&WAIVER FORMS
CAMA Regulations require notice of proposed development to the Adjacent Riparian Property Owners(15A
NCAC 7d0204(b)j5)k Prnnf of actual nnfrra(a sign-off by the coons'D57 the Eons*or term mail return
receipts (showing delivery of notice)are needed.
The purpose of this notice is to make adjacent riparian property owners aware of the proposed development
so that they have an opportunity to provide comments (or potentially object to)the proposed development,
and to give DCM an opportunity to consider these comments/objections before a permit decision is made.
"Permission"of adjacent property owners is not necessarily required for DCM to issue a permit;however,
permission mustbe obtained for certain types of proposed developments if they fall within a 15'setback area
along the riparian access area of the adjacent property,as determined solely by DCM.It is in the applicant's
best interest to provide comprehensive and accurate notice so that any concerns or objections can be
resolved early in the permit review process.In addition,if the adjacent riparian property owner appeals the
permit decision,insufficient notice could be a basis for granting such an appeal.
Who is an Adjacent Riparian Property Owner?
What is Adjacent?(Note:DCM reads this broadly to ensure comment by potentially impacted neighbors)
• A property that shares a boundary line with the site of proposed development;AND
• A property that fronts a natural or manmade waterbody that is connected to coastal waters and
can support some form of navigation,even a kayak or canoe,including a common canal system
or a manmade basin.
• Easement holders?Yes,if the easement could be impacted by the proposed development.
• Streets/Roads?Only if the street/road could be impacted by the proposed development This
might include street-ends which might be used for parking,and beach access.
• Holders of recognized submerged lands claims/shellfish franchises.
What is Riparian?
Do the boundaries of the adjacent property legally intersect with the water at mean high tide? If there is a
question about whether an adjacent property is considered "riparian," please reach out to DCM Staff-
especially on the oceanfront beach where there may be undeveloped parcels on the beach or in the water.
Who/What is a Property Owner?
For private individuals(or families),send notice to the address listed on the tax card.ate property is owned
by an Inc.or LLC, please send notice to the person listed as the registered agent on the NC Secretary of
State's Corporations Look Up site: https:l/www snsnc.gavfsearchfindextcoro. For Condominiums or
neighborhoods with an owners'association(HOA/POA),send notice to the association(which is usually a
corporation,for which you send notice to its registered agent).
What is Notice,andhow do[ensure d is received?
• You can meet with your adjacent property owner,provide a description or drawing of the
proposed development, and ask them to sign this form and return it to DCM;OR
• You can hand-deliver this form and a description of drawing,and ask your neighbor to return it to
DCM(consider providing them with a stamped envelope);OR
• You can mail this form by USPS Certified Mail,return receipt requested(the Green Card). If you
choose this option,you must provide either the signed&returned green card OR track the
certified mail package number on USPS.GOV's online tracking system,and provide the tracking
print-out as proof of delivery to DCM
If you have any questions ahrr+t this prnr> c,pteacp reach out to DCM Staff and OCM Legal Counsel
and we will work to answer your questions.
Revised July 2021
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner: ---. .,Da Pt :2)-4-x^f0C-4,
Address of Property: (b7uc-ii_.; f2c)- GS-A x�,`' (61, 0')- Vil
Mailing Address of Owner: -6t--E
Owner's email: Q{et l -e-t''r"(IV Owner's Phone#: 5 �- 96 2 e.Q LQ..S
Agent's Name: Agent Phone#:
Agent's Email:
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
description or drawing,with dimensions, must be provided with this letter.
I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
contacted at(252) 946-6481. No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign
the appropriate blank below.)
I DO wish to waive some/all of the 15' setback '/ _
Signature of Adjacent Riparian Property Owner
-OR-
I do not wish to waive the 15'setback requirement(initial the blank)
Signature of Adjacent Riparian Property Owner:_i
Typed/Printed name of ARPO: i:—i.��1�l Q +�-41....---",.1 i-t
Mailing Address of ARPO: 10 5 D u k C'u- - 'wr "V"U e.sc
ARPO's email: hS Pi, ARPO's Phone#: c.L 2_ UZC..)
Date: - \ -2 1. I Z7— *waiver is valid for up to one year from ARPO's Signature*
Revised July 2021
'l
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner:
Address of Property:
Mailing Address of Owner:
Owner's email: Owner's Phone#:
Agents Name: Agent Phone#:
Agents Email:
on iArgNT RIPARDAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adiacent Property Owner)
I hereby certify that I own properly adjacent to the above referenced property.The individual applying for this
permit has described to me, as shown on the attached drawing,the development they are proposing. A
description or drawing,with dimensions,must be provided with this letter.
I DO NOT have objections to this propr .4.- *DO have objections to this pzoposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM)in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
contacted at(252)946-6481.No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier,dock,mooring pilings,boat ramp,breakwater,boathouse,lift,or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments).(If you wish to waive the setback,you must sign
the appropriate blank below.)
I DO wish to waive some/ail of the 15'setback
Signature of Adjacent Riparian Property Owner
-OR-
I do not wish to waive the 15'setback requirement(mitialihe blank)
Signature of Adjacent Riparian Property Owner.
TypedlPrinted name of ARPO:
Mailing Address of ARPO:
ARPO's email: ARPO's Phone#:
Date: 'waiver is valid for up to one year from ARPO's Signature*
Revised July 2021