Loading...
HomeMy WebLinkAbout85088_Robert Camerson_20220216 S '4 `Y.❑CAMA DREDGE & FILL 1 5 NO 85088 A B C D V095 Previous permit GENERAL PERMIT Date previous permit issued a I I New I I Modification n Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: ISA NCAC I I Rules attached. n General Permit Rules available at the following link:www.dea.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): ^` '.(-"4t—T, t -A.- ,( City State ZIP Street Address/State Road/Lot#(s) Phone#(_) Email _-- Subdivision City ZIP Affected n CW [EW n PTA n ES n PTS Adj.Wtr.Body (nat/man/unk) AEC(s): n OEA n IHA I I UW n SPIMA I-PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity r '. (Scale: Shoreline Length Access Length I r1. i il TC 1 i --' Pier(dock)length Fixed Platform(s) ) 7 I Floating Platforms) W I I 1 Finger pier(s) _ • - I Total Platform area 1 I 1 Groin length/# _ . j , Bulkhead/Riprap length — Avg distance offshore - ' i r l Breakwater/Sill ( i /iC r- Max distance/length I J 1 f I Basin,channel _ +_�__ 1 l �r t;. "- -f , �s-- 7 Cubic yards -- � W i r, , Boat rampL. I Boathouse/Boatlift Beach Bulldozing ' ;- `f�,.': 1 ("�^'^ ' 'r. , 1*So Other i Pi /C I SAV observed: yes no 'impie�., t. __ 1 I ��- =ti% Moratorium: n/a es no Site Photos: yes n —' _3 — r. _..._._ - r 1----_ — Riparian Waiver Attached: yes ef� I I I. 1 ! , I A building permit/zoning permit may be required by: Permit Conditions I I TAR/PAM/NEUSE/BUFFER(circle one) [I See note on back regarding River Basin rules I—I See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) )----;/ i Agent or Applicant PRINTED Name ! Permit Officer's PRINTED Name -- - Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 a,0t°"�'4' I CAMA [ ! DREDGE & FILL No 85088 ABC D 3 GENERAL PERMIT . SOU 9� Previous permit Date previous permit issued I (New p Modification ( I Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: ISA NCAC Rules attached. I General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address - Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#(_ ) Email Subdivision City ZIP Affected CIA/ I I EW I-I PTA [ I ES PTS Adj.Wtr.Body (nat/man/unk) AEC(s): FI OEA n IHA UW SPIMA PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length Access Length I Pier(dock)length , IK. _• - f r' Fixed Platforms) ...._. — — -- — — r Floating Platform(s) i i Finger pier(s) Total Platform area I i f Groin length/# L �— i f Bulkhead/Riprap length I Avg distance offshore - ! +-� I 1 Breakwater/Sill i - j I I y Max distance/length i I Basin,channel i Cubic yards 7 1 ( . i I ; {' i Boat ramp ( ; I - - y i I I I - Boathouse/Boatlift L . Beach Bulldozing j.i I �F,--:.l' .--,! -f ' ' <' f...N Other I j �, 1 SAV observed: yes no - I- —r— Moratorium: n/a yes no ;' ( " { I I I f . Site Photos: yes no 1 - i—-- l._-- —.-- I i Riparian Waiver Attached: yes no I I j A building permit/zoning permit may be required by: - Permit Conditions TAR/PAM/NEUSE/BUFFER(circle one) See note on back regarding River Basin rules See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) . - Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check If/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar -Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden, Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 - y `' , ROY COOPER Governor ' - MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE - FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259.The Division of Coastal Management(DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party.(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly(which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width:The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way.This drawing will be used to aid in compliance and monitoring efforts. 9 Pre-project site conditions: J,/ ; y i A—...t, /,1,--1 By your signature below you agree to be held responsible for meeting all of the conditions li d a and verify th II informa ' n rovided is complete and accurate. doh, _ dorfr, Agent or Applicant rinse Name P J i ic Signature 044/n/ i Agent or Applicant Signature kaleDae • CAMA GENERAL PERMIT#: ?TS vg? State of North Carolina I Environmental Quality I Coastal Management - Washington Office 1943 Washington Square Mall Washington.NC 278891 252-946-6481 Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-38451 910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner rgU►1e✓f ti� t'� 4- &If h xc _ O v Address of Property: 404- C h i jta V r6(.- ,} Mailing Address of Owner: 501 So.c-h c..)�h 01. 1 r ....ri vl J X CF,a'g 3 3Gj Owner's email: (Qt C r e.v o OrrtI (4wner's Phone#: 1141 — 6Wf Agent's Name: 6r�►. .1 1r! d t1 Agent Phone#: asa-aLiq Agent's Email: b V&V\plt Q robc (n(pJ MQ 1, C0 yvt ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A DYQIo description or drawing, with dimensions, must be provided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. (]\ bade! If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252) 946-6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp,breakwater, boathouse, lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setback Signature of Adjacent Riparian Property Owner -OR- I do not wish to waive the 15' setback requirement(initial the blank) %Signature of Adjacent Riparian Property Owner: 4 Uher� Typed/Printed name of ARPO: / 7/e., / �/ .c/t CU,><cc Mailing Address of ARPO: ARPO's email: ARPO's Phone#: Date: *waiver is valid for up to one year from ARPO's Signature* Revised May 2021 M r_ Culler Prc'.pevty 1. • CAME,P_ON \\ • • • • Sec-to,,, L«,e1 utiffi, / Pjklktn cod- GX20 (semi_Sec-ttbn � {4 �TC�? - quo PROP • ; Lam/ w — - — �� CAS f� rEk N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: egObe.v+ ha'c Cho Ir-) Address of Property: 70 C h j tta- er60-12 • Mailing Address of Owner: 50I SO4.*Vt S- t.� JuCa$339 Owners email: (QCo."CY'O GJ'hYA (4. wner's Phone#: I1I " l 0 4 O0T) /� Agent's Name: h(�l ?R Vu e,r Agent Phone#: O�e,Jp�"'1 "OH(); Agents Email: braykoki )rt be tr i0(n In(v1Q t i. (D ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A Draw WI description or drawing, with dimensions,must be provided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. on bacV If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252) 946-6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments).(If you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setback Signature of Adjacent Riparian Property Owner -OR- 11( I do not wish to waive the 15'setback requirement(initial the blank) ��'r I ,l_./ Signature of Adjacent Riparian Property Owner: � (7.44-\_} Typed/Printed name of ARPO: r(T0 L e�( Meryt�t-ji pl[%, 4 C� ('i�i I i� Mailing Address of ARPO: Pt 1 �`I S l p ;,2 �r r N 243,-5 .1 ARPO's email: KCa t y w` (el ,(fri. ARPO's Phone#: 7/-k, ) b Date: /- 7Y - *waiver is valid for up to one year from ARPO's Signature* Revised May 2021 • _ -- - -713 (1i -I 3S1/0 N • v,Qpas p;Aarno1 QV(l0 -Po)LTA Pn 9 Li-pre1 pnr1 'Q-Pas ,--v--Th ' 1 : N. heard=► 'ND ' From: Pat Cameron rpatcameron@gmail.com Subject: Re:China Grove-Dock Project Date: February 10. 2022 at 1:39 PM To: Brandi Robertson brandiprobertson@gmail.com Yes, please proceed. Thanks for your help. Pat. On Thu, Feb 10,2022 at 11:12 AM Brandi Robertson dxandiprobertson@gmail.com>wrote: Dear Mr.Cameron. I have gathered the necessary paperwork to move forward with the CAMA Permit for the Dock project on China Grove Rd. I will schedule a site visit with the CAMA Field Representative, Mr. Kent Vaughan. Please respond to this email confirming that I have permission to act as your Authorized Agent. This will allow me to obtain the permit on your behalf and you will not need to be present at the time of the site visit. Ty is planning on doing his own site visit today to look at your bulkhead and get some recommendations together for you. Please let me know if you have any questions. Sincerely, Brandi Prescott Robertson B Prescott Marine Construction. LLC 252.249.0149 brandiprobertson@gmail.com