Loading...
HomeMy WebLinkAboutrev Site Plan 011821Anne Street 30' R/ W I I I I I Note: Contractor shall insure that he and all his workers (contractors, subcontractors and other site personnel) do not damage construction stakes or other measures used in laying out the project whether by the Engineer or another entity including those under the employ of the contractor. Contractor shall cause his workers to observe and verify to the fullest extent practicable that stakes, other measures and grades are, or appear to be, accurate and correct, and immediately, but prior to any associated work, notify the staking entity of any potential conflict, error or question regarding the work. The Engineer shall not be responsible if all of the above measures are not strictly adhered to. The Engineer shall not be responsible where due to damage, his staking can not be verified. For critical or costly components of the work, where the contractor believes that staking may not be preserved, the contractor shall request the staking entity to place staking in an area where its preservation can be insured. SHEET INDEX Sheet Description 1 Site Plan - Parker & Assoicates, Inc. 2 Structural Plan - S1- Stillwater Engineering, Inc. 3 Structural Plan - S2 - Stillwater Engineering, Inc. 4 Electrical Lighting Plan - E1- John H.W. Tripp Electrical Lighting Plan - E2 - John H.W. Tripp L67 Electrical Lighting Plan - E3 - John H.W. Tripp Electrical Lighting Plan - E4 - John H.W. Tripp Legend: Conc. - Concrete c&g - Curb & 6utter D.B. - Deed Book ex. - Existing a ecb - Existing Catch Basin ❑ eeb - Existing Electric Box nefh - Existing Fire Hydrant ® egv - Existing 6ate Valve egl - Existing Ground Light l__ egw - Existing Guy Wire o ejb - Existing Junction Box elt - Existing Light elp - Existing Light Pole 0 emh - Existing Manhole 0 emw - Existing Monitoring Well epl - Existing Pedestal Light O epp - Existing Power Pole O esp - Existing Service Pole ® ewsv - Existing Water Shut-off Valve a eyi - Existing Yard Inlet hw - Hard Wood Treet im. - Invert O ISF - Iron Stake Found M.B. - Mop Book mbp - Metal Base Pole man. - Monument 0 NS - Nail Set Pg. - Page 0 PKF - PK Nail Found rcp - Reinforced Concrete Pipe R/W - Right-of-way .•- �- sfm - Sewage Force Main SPS - Sewage Pump Station sd - Storm Drain u.g. - Underground WFL - Wetlands Flag - Coastal Wetlands Line - - Existing Water Line ohpl -Overhead Power Line sf - Silt Fence Q - Existing Shrubs -Coastal Wetlands Hatch Survey Notes: 1.) Topographic information taken from an actual survey by Parker & Associates, Inc., in October 2020, and previous surveys of Tallman Street dated October 2011 and Onslow County Justice Complex dated 11-9-15. 2.) Boundary information taken from an overlay of record maps and partial survey information from Parker & Associates, Inc. dated October 2020. 3.) Flood Lines taken from an electronic overlay of the FEMA map CPN 370178 4376 J and CPN 370178 4366J (City of Jacksonville). Effective November 3, 2005. 4.) Storm Pipe sizes & location from field locations and design plans. 5.) The GP5 portion of the control work was performed to third order, Class I, FGCC specifications, the coordinates were obtained by Real Time Kinematic Differential &PS Observations using Trimble Survey Grade 5800 GPS Unit, NCGS RTK Network Adjustments to NC Grid NAD'83, 2007 Adjustments. Average Positional Accuracy is 0.07' 6.) All distances are horizontal ground, U.S. survey feet. New River ­01111- n P. . \ -' . Tex 1.2 A5• `. . . . . . . . .. Field Book: Lusk Name: Arad 2968 Filename: NRWFP-Site,dwg KHW Job No.: S200715-7434 Site Benchmark #1 Existing PK Nail N= 368,184.24 E=2,470,709.49 Elev. 6.31 (Datum NAVD'88) Site Benchmark #2 Existing PK Nail N=368,486.71 E=2,470,661.29 Elev. 2.48 (Datum NAVD'88) T - _ I I I I I Site l \ Ty/ New River Sfree} vl v c c e Old Bridge St / neef / e e / fk 5s IPA College Strut `T Vicinity Sketch Not to Scale General Notes: 1. The intent of this plan is to replace the existing bulkhead, pier, boardwalk, handrails, and lighting along New River. 2. The new bulkhead shall be vinyl Sheet Piles placed in exact location as the existing bulkhead. The existing bulkhead, boardwalk, handrails, shall be removed and properly disposed of and replaced. 3. The In -Water Installation of the sheet pile bulkheads cannot be installed from April 1 to September 30, Due to this area being classified a Primary Nursery Area. 4. See The Structural and Electrical Lighting Plans for more detail. 5. Contractor shall take precautions as needed when driving Sheet Piles, not to damage existing storm drain or other utilities. 6.Onslow County Officials shall remove all signs, trash cans, benches, picnic tables, etc. from the boardwalk area, prior to demolition, then replace them after construction is complete. 7. Contractor shall verify location of existing water and sewer mains and report any deviations to Engineer prior to construction. 8. As of October 1, 2014, anyone digging with mechanized equipment in highway right-of-way, private utility easements, or public spaces will be required by North Carolina law to give notice of the proposed excavation to all existing area utilities at least three to twelve business days before starting to dig. The utility owner is to locate its facilities in the area of the proposed excavation. Utility members of North Carolina 811 can be contacted at 1-800-632-4949 or Call 811. 9. Contractor is responsible for contacting any utility company that is not a member of ULOCO. 10. Contractor shall verify location of all underground utilities prior to commencement of work. 11. Contractor is responsible for any damages to any existing utilities. 12. Contractor shall install orange safety fence at construction limits to keep pedestrians out of the construction area. 13. Unusable equipment, Debris and Material shall be disposed of in an approved manner and location, in accordance to the requirements and to the satisfaction of the Governing Local, State, and Federal Agencies. 14. All fill material brought to and used on site shall be from an approved NCDEQ Site. 15. Contractor shall comply with all information and conditions used in the Bid Documents. See Bid Documents for additional information. 16. Contractor shall comply with all information and conditions in the CAMA Major permit. See permit for additional information. Endangered Species Notes: 1. The Contractor shall follow all applicable guidelines within the US Fish and Wildlife Guidelines for Avoiding Impacts to the West Indian Manatee. 2. The Contractor shall be responsible for observing any water -related activities for the presence of manatees. 3. If a manatee is spotted within a 50-foot radius (buffer zone) of the active work area, all work, equipment, and vessel operation (if applicable) must cease. Manatees must not be herded or harassed into leaving the active work area. Once the manatee has left the buffer zone on its own accord, and after 30 minutes have passed without additional sightings of monatee(s)in the buffer zone, any in -water work can resume under careful observation for manatee(s). 4. If used, siltation or turbidity barriers should 4f,properly secured and be monitored to avoid manatee entrapmentpP.�lp>fts?o(r o Weir oveSEAL 14575 SITE PLAN Owner: :orgy M 51��,` ONSLOW COUNTY NEW RIVER WATERFRONT PARK REPAIRS Jacksonville trvp., Onslow Co., North Carolina DATE: 12-16-2020 SCALE: 1"=30' Onslow County 234 NW Corridor Boulevard Jacksonville, North Carolina 28540 GRAPHIC SCALE: 1-=30' 0 10 20 30 60 90 FEEr PARKER & ASSOCIATES, INC. Engineers - Surveyors - Planners Jacksonville, North Carolina P.O. Box 976 - 306 New Bridge Street - 28540 Phone (910) 465-2414 - www.ParkerJacksonville.com N.C. Firm License Number: F-0108 is Rev. 01/18/21 KHW - Add cedar tree note Rev. 01/13/21 KHW - Revise note #2, Add willow tree note Sheet 1 of 1