Loading...
HomeMy WebLinkAbout6-21 NC Division of Marine FisheriesPermit Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 6-21 Issued to NC Division of Marine Fisheries, 3441 Arendell St., Morehead City, NC 28557 Authorizing development in Carteret County at adi. to South River, at 229 Tosto Road, near Beaufort as requested in the permittee's application dated 9/17/20; includine attached workplan drawing=-s (22). Sheets 1-21 of 21 all dated 7/I/20 and Sheet 1 of I dated 9/3/20. This permit, issued on January 19, 2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation it tnese terms may be subject to tines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization — Bulkhead and Return Wall Extension 1) The northern bulkhead located adjacent to the boat ramp shall not extend waterward more than 2 feet from the existing bulkhead at any point along its alignment at the time of construction. 2) The return wall extension located at the southern bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 3) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the approved bulkhead alignment. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 Signed by the authority of the Secretary of DEQ and the Chair of the Coastal.Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee NC Division of Marine Fisheries Permit No. 6-21 Page 2 of 4 ADDITIONAL CONDITIONS 4) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. 5) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. 6) The bulkhead shall be constructed prior to any backfilling activities. 7) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 8) The fill material shall be clean and free of any pollutants except in trace quantities. 9) Unless altered herein, all backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 10) No backfill material is to be placed within 30 feet of the normal water level, except that which will be used to backfill the area behind the permitted bulkhead. 11) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead. 12) In accordance with commitments made by the permittee, no live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State during construction of the bulkhead or return wall extension. Docking Facility Expansion 13) This permit authorizes only the demolition of the existing pier and construction of the pier, dolphin removal and/or repair, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent.part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 14) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 15) This permit does not authorize any new formalized boat slips. The docking facility is authorized for no more than three (3) formalized boat slips. 16) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. NC Division of Marine Fisheries Permit No. 6-21 Page 3 of 4 ADDITIONAL CONDITIONS 17) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. Boat Rama Expansion 18) Unless specifically altered herein, this permit authorizes one concrete boat ramp, as indicated on the attached workplan drawings. 19) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. 20) Excavation and ground disturbing activities, associated with the placement of the boat ramp, above and below the normal water line shall be limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in size than specified in the attached permit application and workplan drawings. Sedimentation and Erosion Control 21) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 22) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. 23) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. USACE Conditions 24) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish & Wildlife Service's Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at littys:Hwww.fws.gov/raleigh/pdfs/ManateeGuidelines20l7.pdf. General 25) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 26) All debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and removed to an appropriate upland location. 27) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NC Division of Marine Fisheries Permit No. 6-21 Page 4 of 4 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2020-01855). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2020-1355. NOTE: Future -development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Neuse River buffer regulations in place at the time of such development. NOTE: An application processing fee of $400 was received by DCM for this project. I DIVISION OF COASTAL MANAGEMENT Application Processing Notes Applicant: Type: (Check all that apply) New V -ChMajor Mod ___ _ Permit# Minor Mod Renewal Transfer Permit Coordinator:_ Field Representative: "_iU-11 Date Time �iI (6 Jooio aMzµk tt 70 pK -� I, VA ki`�v Message DCM Coordinator: Permit #: � --Z MAILING DISTRIBUTION SHEET Permittee: AC baP If,11, h..n1n, Zh 2,/ '7/ Q IJ. _.,1....j DCM Field Offices Elizabeth City 1 Morehead Cil US ACOE Offices: Washington: Washington Wilmington At 2MI (with revised work plan drawings) (OBJECTIONS ) Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New knover, Onslow, Pender) Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Renee Gledhill -Earley at Environmental.Review@ncder.gov I Heidi Cox (WIRO) Kim Harding David Harris OW Shannon Jenkins / Sharon Gupton fFTim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan Clif Whitfield (WARD) Washington: Chris Pullinger-401 Tina Martin - 401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Cunituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs-401 (Brunswick, New Hanover) Holley Snider-401 (Carteret, Onslow, Pender) hristine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARD) Natural Heritage Program f Rodney Butler LPO: 14Y (NCDOT) Travis Wilson NICE MF4 APPLICATION for =- Major Development Permit (last revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. PrimaryApplicant/ Landowner Information Business Name Project Name (if applicable) N.C.D.E.O. Division Of Marine Fisheries Dock Structural Repairs - South River Applicant 1: First Name MI Last Name Andy Gupton Applicant 2: First Name MI Last Name Haddldonal applicants, please attach an additional pages) with names listed. Mailing Address PO Box City te TNC 3441 Arendell Street Morehead City ZIP Country one No. FAX No. 28557 Cartereet 252-726-7021 ext Street Address (d dNerent from above) City state ZIP WA WA WA WA - Email ANDY.GU PTON@NC D EN R. GOV 2. Agent/ContrectorWbrmatlon Business Name Moffatt And Nichol Agent/ Contractor 1: First Name MI Last Name Doug Huggett Agent/ Contractor 2: First Name MI Last Name Rebeckah Sims Mailing Address PO Box City State 310B Greenfield Drive Newport NC ZIP Phone No. 1 Phone No. 2 28570---T-- 919-645-0649 ext. 919-534-6834 ext. FAX No. Contractor # N/A N/A Street Address (if different from above) City State ZIP NIA N/A WA WA - Email DHUGGETT@MOFFATTNICHOL.COM <Form continues on back> 252-808-2808 :: 1.888.4RCOAST www.nccoastaimanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 229 Tosto Road NA Subdivision Name City State Zip N/A Beaufort NC 26516- Lot No.(s) (flmany, attach additional page with list) Phone No. N/A - ext. N/A, I I , In NC river basin is the project located? b. Name of body of water nearest to proposed project a. which Neuse South River Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. c. ®Natural ❑Manmade ❑Unknown South River e. Is proposed work within city limits or planning jurisdiction? f. If applicable,�inthe planning jurisdiction or city limit the proposed work []Yes ®No N/A 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.fL) +/-490' 211,701 sf (4.86 acres) d. Approximate elevation of tract above NHW (normal high water) or c. Size of individual lot(s) NWL (normal water level) N/A, (If many lot sizes, please attach additional page with a list) +/-5' ®NHWor❑NWL e. Vegetation on trail I grasses, pine trees, coastal wetland vegetation f. Man-made features and uses now on tract parking lot/staging area, bulkhead, docks, boat ramp g. Identity and describe the existing landuses adjacent to the proposed project site. Large tracks of land with minimal development - mainly residential usage with docks or piers. There are also some commercial developments nearby that appear to be dependent on water access. h. How does local government zone the tract? 1. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) N/A ❑Yes []No ®NA - J. Is the, proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ONo k. Hasa professional archaeological assessment been done for the tract? if yes, attach a copy. [-]yes ®No ❑NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252-808-2808 :: t-088-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the side? ®Yes ❑No (ii) Are there coastal wetlands on the site? ®Yes ❑No (111) If yes to either (i) or (ll) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. N/A o. Describe existing drinking water supply source. N/A p. Describe existing storm water management ortreatment systems. N/A 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Govemment ❑Private/Community b. Give a brief description of purpose, use, and dairy operations of the project when complete. The facility is utilized by the NC Division of Marine Fisheries mainly as a staging and loading area for the Division's oyster reef and artifical reef programs. Materials are stored on site and loaded onto vessels at the dock(s) and/or ramp so that they may be transited to and placed on reefs sites. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Standard marine construction equipment will be utilized, included but not limited to barge mounted pile installation equipment and land -based equipment such as small wheeled and/or tracked construction equipment. d. List all development activities you propose. 1. Repair and extend existing dock 2. Repair and enlarge existing boat ramp 3. Repair/reface existing sheetpile bulkhead 4. Install short concrete retaining wall for slope stabilization 5. Replace missing support banding on existing pile cluster a. Are the proposed activities maintenance of an existing project, new work, or both? Maintenance f. What is the approximate total disturbed land area resulting from the proposed project? 4.01 acres ❑Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes - ❑No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Existing discharges limited to stormwater runoff. No new discharges proposed. I. Will wastewater or stormwater be discharged Into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA J. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application Porn, (MP-1) the following items below, N applicable, must be. submitted In order for the application package; to be complete. Items (a) - (0 are always applicable to any major development application. Please consult the application Instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other Instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money -order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified. mail. Such landowners must be advised that they have.30 days In which to submit comments on the proposed project to the Division of Coastal Management Name Bert Hardy Phone No.. WA Address 120.Old Vanceboro Road, New Sam NO 28560 _ Name Juanita Gaskill Phone No. WA Address 201 Big Creek Road, Beaufort, NO 28516 ' Name ..Phone No. Address g. A list of previous state or federal permits Issued for work on the project tract. Include permit numbers, pernittee, and Issuing dates. NIA h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. J. A signed AEC hazard notice for projects In oceanfront and inlet areas. (Must be signed by property owner) k. A stateent of compliance with the N.C. Environmental Policy Act (N.C.G.S.113A 1-10), if necessary. If the project Involves expenditure m of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. on Land I understand that any permit issued in response to this appueaaon wm auow omy um uwvwruPurw- aca•a,— ,,, ••• r r•• ••-• •• The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and fellow -up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 09/17/2020 Print Name Doug Huggett (Agent) Signature /' ,,eo Please indicate application attachments pertaining to your proposed project. NDCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts EJDCM MP-3 Upland Development NDCM MP-4 Structures Information 252.808.2808 :: 1.886.4RCOAST :: www.nccoastalmanagement. net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline (NLW or NWL stabilization) Length N/A N/A N/A 20 N/A WA WA Width N/A N/A N/A 25' N/A N/A WA Avg. Existing N/A N/A N/A 0' to -8' NA NA N/A Depth Final Project N/A N/A N/A 01to-8' NA NA N/A Depth 1 EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal weliands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (il) Describe the purpose of the excavation in these areas: d. High -ground excavation in cubic yards. 2 DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? ❑Yes ❑No ❑NA (11) If no, attach a letter granting permission from the owner. e. (1) Does the disposal area include any coastal wetlands/marsh (CW) submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW _ ❑SAV ❑SB ❑WL _ ❑None (ii) Describe the purpose of disposal in these areas: d. (1) Will a disposal area be available for future maintenance? , ❑Yes ❑No ❑NA (ii) If yes, where? f. (1) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (11) If yes, how much water area is affected? 252-808.2808 :! 1.888.4RCOAST :: wvm_nccoastalmanegement_net revised: 12126106 Form DCM MP-2 (Excavation and Fill, Page 2 of 3) 3. SHORELINE.STABILIZATION ❑ This section not applicable (if development is a wood groin, use MP4 — Structures) a. Tvoe of shoreline stabilization: b. Length: +1=9T ®Bulkhead ❑Ricrac ❑Breakwater/Sill ❑Other. c. Average distance waterward of NHW or NWL: 2' e. Type of stabilization material: Concrete facing appled to existing deteriorating sheetpile New T tall CIP concrete retaining wall to extend bulkhead landward for slope stabilization g. Number of square feet of fill to beplaced ;below water level. Bulkhead backfill _ Riprap _ Breakwater/SIII _ Other 194 sf (max) I. Source of fill material. concrete facing material Width: 2' max. d. Maximum distance waterward ofNHW or NWL: 2' f. (1) Has there been shoreline erosion during preceding 12 months? []Yes ®No ❑NA (II) if yes, state amount of erosion and source of erosion amount Information. NIA h. Type of fill material. concrete facing material 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (I) Will fill material be brought to the site? LIYes UNo If yes, (p Amount of material to be placed in the water (III) Dimensions of fill area (iv) Purpose of fill How will excavated or fill material be kept on site and erosion controlled? No excavation except removal of portions of existing boat ramp. Boat ramp debris will be disposed of at upland location. a (1) Will navigational • aids be required as a'result of the project? ®Yes ❑No ❑NA (ii) If yes, explain what type and how they will be Implemented. Replacement of wire banding on one pile cluster. No other navigational aids are proposed. b. (q Will fill material be, placed in coastal wegandstmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide th number of square feet affected. ❑CW ❑SAV _ ❑SB ❑WL ❑None (li) Describe the purpose of the fill in these areas: b. What type of construction equipment will be used (e.g., backhoe, or hydraulic dredge)'! Land -based construction equipment such as front end loader, small dozer, small crane, eta d. (1) Will wetlands be crossed In transporting equipment to project site? ❑Yes ®No ❑NA (11) If yes, explain steps that will be taken to avoid or minimize environmental impacts. See Avoidance and Minimization Section of attached Project Narrative 9/17/2020 Date N.C. Division of Marine Fisheries NCDMF South River Facility Improvements Applicant Name Cu �f Project Name ApplirantSignature 252-608-2808 :: 1-888.4RCOAST :: www,nceoastalmana�yc oment_net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 3 of 3) 252.808-2808 :: i-888.4RCOASY :: www.necoastalmanagement.net revised: 12126/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (I) Is the docking facility/marina: []Commercial ®PublidGovemment ❑Private/Community c. (1) Dock(s)and/or pler(s) (11) Number 1 (III) Length 65.6' (iv) Width 5' (v) Floating []Yes ®No e. (1) Are Platforms Included? []Yes ®No If yes: (11) Number (ill) Length _ (iv) Width _ (v) Floating []Yes []No Note: Roofed areas are calculated from ddpline dimensions. g. (1) Number of slips proposed a (ii) Number of slips existing 3 1. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water, dredging for basin and/or channel ®Open water, no dredging required ❑Other, please describe: k. Typical boat length: 35_ -60' m. (i) Will the facility have tie pilings? ®Yes ❑No (ip If yes number of tie pilings? 7(new) ❑This section not applicable b. (1) Will the facility be open to the general public? []Yes ®No d. (i) Are Finger Piers Included? []Yes ®No If yes: (Ip Number (lip Length (iv) Width _ (v) Floating []Yes ❑No f. (1) Are Boallifts Included? []Yes ®No If yes: (11) Number (ill) Length _ (iv) Width h. Check all the types of services to be provided. ❑ Full service, Including, travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage (lwet slips") only, number of slips: 3 existing ❑ Dry storage; number of boats: ® Boat ramp(s); number of boat ramps: 1 ❑ Other, please describe: J. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). NCDMF work boats and barges I. (1) Will the facility be open to the general public? []Yes ®No 252-808-2808 :: 1-888.4RCOAST n wvvw.nccoastaimana_qement.net revised: 12127/06 Forth DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS OThis section not applicable a. Check each of the following sanitary facilities that will be Included in the proposed project ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater, None c. Describe the disposal of solid waste, fish offal and trash. All solid waste is transported offsite for proper disposal d. How will.overboard discharge of sewage from boats be controlled? No overboard discharge allowed. If needed, sewage pumped out at offsite pumpout facility 6. (1) Give the location and number of "No Sewage Discharge" signs proposed. N/A (iq Give the location and number of "Pumpout Available" signs proposed. N/A f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. N/A g. Where will residue from vessel maintenance be disposed of?' N/A h. Give the number of channel markers and "No Wake" signs proposed. 0 1. Give the loeation.of fuel -handling facilities, and describe the safety measures planned to protect area water quality. None on site J. What will be the marina policy on overnight and live-aboard.dockage? N/A k. Describe design measures that promote boat basin flushing? N/A I. If this project Is an expansion of an existing marina, what types of services are currently provided? NIA m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ®No 252-808-2808 :: 1-888-4RCOAST :: www.nccoastatmanagement.net revised: 12/27106 Form QDCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ®No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAW shell bottom (SB), or other wedands.(WL)? If any boxes are checked, provide the number of square feet affected. ®CW unknown ❑SAV ❑SB OWL, unknown ❑None p. Is the proposed madna/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. N/A 3. BOATHOUSE (including covered lilts) ®This section not applicable a. (I) Is the boathouse structure(s): , ❑Commercial ❑PublidGovemment ❑Private/Community, (li) Number (Ili) Length (iv) Width Note: Roofed areas are calculated from ddpline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use,MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (11) Length (iii) Width 5: BREAKWATER (e.g., wood, sheetpfle, eta) ®This section not applicable a. Length _ b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicab/e a. Is the stmcture(s): ❑Commercial ❑PublidGovemment ❑Private/Community c. Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge; if present. e. Arc of the swing _ 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 252-808.2808 :: 1-88114RCOAST :: www.nccoastelmananement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. +/- 29-P to north, +/-190' to south +/- 380' to north, +/- 410' to south Note: For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body +/- 4.250' e. (1) Will navigational aids be required as a result of the project? []Yes ®No ❑NA (li) If yes, explain what type and how they will be Implemented. Replacing missing wire banding on one existing pile cluster d. Water depth at wateneard end of structure at NLW or NWL -5. 8. OTHER ®This section not applicable a. Give complete description: 9/17/2020 Date NCDMF South River Facility Improvements Project Name N.C. Division of Maribe,Fisherles APIA cant Name /- Applicant Signalure 252-808-2806 :: 11.888.4RCOAST :: vmw.necoastalmanayement.net revised: 12127106 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Moffatt and Nichol Doug Huggett dhuggett@moffattnichol.com Dear Mr. Huggett, NORTH CAROLINA Environmental Quality December 14, 2020 Pi`Ai /� This letter is in reference to the application submitted for the NC Division of Marine Fisheries., for a Coastal Area Management Act Major Permit to undertake development activities to perform dock structural repairs at the South River facility, in Carteret County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. I I3A-122(c) which would make February 28, 2021 the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, should you have any question on the status of your application, do not hesitate to contact me by phone (252-808-2808 ext. 215) or e-mail (gregg.bodnar@ncdenr.gov). Sincerely, Gregory W. Bodnar Assistant Major Permits Coordinator Cc: DCM Morehead City North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252.8082808 Bodnar, Gregg From: Bodnar, Gregg Sent: Monday, December 14, 2020 9.43 AM To: 'Huggett, Douglas' Subject: DMF South River Extension Attachments: DMF SR EXT.pdf Morning Doug, Please see above for the extension for South River. Currently I am waiting on comments for DWR. Once those are available I should be able to make a final decision shortly thereafter. Thanks, Gregg v Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 292808 2808 eM 215 (Office) GtemBodnar0ncdemraov Emaflcomespondence to and fmin this address Is subject to the North Caroline PublkReeordsLawand owbedbdased to third parties. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: NCDivision ojMarine Fisheries COUNTY: Carteret PROJECT NAME: LOCATION OF PROJECT: South River DATE APPLICATION RECEIVED COMPLETE BY FIELD:10-1-20 FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: Yes FIELD REPRESENTATIVE: Connell DISTRICT MANAGER REVIEW: Roy Brownlow B) DATE RECEIVED BY MAJOR PERMITS UNIT: APPLICATION ASSIGNED TO: Bodnar PUBLIC NOTICE REC'D: 10-25-20 ADJ. RIP. PROP NOTICES RECD: 10/1/2020 C) 75 DAY DEADLINE: 12-15-20 EMAIL OUT DATE: 10-15-20 PERMIT FINAL ACTION: ISSUE DENY DISTRICT OFFICE: MHC FEE REC'D: $400 # Transfer END OF NOTICE DATE: 11-30-20 DEED REC'D: N/A 150 DAY DEADLINE: STATE DUE DATE: Click or tap to enter a date. AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES DCM — Field Rep n l �► O C DCM — LUP Consistency Determination Illt to n5 Local Permit Officer Corps of Engineers — Regulatory Branch I?' Z02 j „ fiA(40 14 DWR-401 Section DWR— PublicWaterSupply ZSIIb y DEMLR — Stormwater DEMLR— Sed and Erosion DOA — State Property Office Wildlife Resources Commission 1 [ I040 DMF— Shellfish Section DMF — Habitat & Enhancement 1A DNCR—Archives & History (l '(I� K DNCR — Natural Heritage Program NCDOT NC Dept of Commerce 111 1p NORTH CAROLINA EW.Mrmonia: Q=1irr October20, 2020 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregn_bodnar0NCDENR.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: NCDAIF—South River Project Location: 229 Tosto Road, Beaufort Carterel County Proposed Project: Improvements to existing facility ROY COOPER Gx.= MICHAEL S. REGAN sa my BRAXTON DAVIS Mrv=r. Dhtkn rfC=1 Please indicate below your agencys position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by November 17, 2020 [f you have any questions regarding the proposed project, contact Brad Connell 252-808-2808_ when appropriate, in-depth comments with supporting data is requested - REPLY: This agency has no objection to the project as proposed - "Additional comments may be attached" X This agency has no comment on the proposed project - This agency approves of the project only if the recommended changes are incorporated- See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Lee Padrick AGENCY 'SIGNATURE DATE NC Commerce RECEIVE® F4� OCT 2 3 2020 8-7-20 MP SECTION MHD Sto of Noah Ca olm 1 Emsaot WQualityI ComsW Mrzgm 127CardmdDme Est,Wgn#EU=NC28A05 9197917215 NORTII CAROLINA Envrromnenla! Ouahn October 20, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead ,City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) grego. bodnarna.NCDENR.gov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: NCDMF— South River Project Location: 229 Tosto Road, Beaufort Carteret County Proposed Project: Improvements to existing facility ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Dim,clor, Division ofCoasml Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by November 17, 2020: If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** K This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached: This agency objects to the project for reasons described in the attached comments. PRINT_NAIIAE bpr4 AGENCY 7a" L.Q SIGNATURE .4, 14A DATE RECEIVED OCT 2 2 2020 MP SECTION MHD State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext, Wilmington, NC 28405 919 796 7215 NORTH CAROLINA Emironmental Quality October 20, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) aregg.bodnar(d)NCDENR.gov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: NCDMF— South River Project Location: 229 Tosto Road, Beaufort Carteret County Proposed Project: Improvements to existing facility ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director, Division ofCoastol Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Grego Bodnar at the address above by NOvCR bkb 17, 20203 If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: X This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. RINTNAMg Mark Brown GENCY SIGNATUR V AT Public Water Supply 10-21-20 State of Noah Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext,, Wilmington, NC 28405 919 796 7215 OCT 2 3 2020 ROY COOPER N.' r.-V_ Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM DATE: October 23, 2020 TO: Gregg Bodnar THRU: Roy Brownlow FROM: Brad Connell MICHAEL S. REGAN BRAXTON C. DAVIS SUBJECT: Comments and Recommendations - CAMA Major Permit —NCDMF South River, Carteret County The following is my assessment and consequent recommendations of the above referenced proposal: This proposal incorporates 325 square feet of Public Trust waters, fills 694 square feet of shallow bottom area, and fills 2,890 square feet of high ground. These waters of the South River are closed to shellfish harvest. This waterbody is not a Primary Nursery Area. This area is subject to the Neuse River Basin Riparian Buffer Rules. The proposal is not within a Federal Channel. Assuming other state and federal agencies concur, the Morehead City District staff recommends that the project be authorized as it is proposed. CC: Roy Brownlow, DCM Nothhig Compares Slate of North Carolina 1 Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 T NORTH CAROLINA Environmental Quality October 20, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) g reoo. bodnar(a2NCD EN R.00v SUBJECT: CAMA/Dredge and Fill Application Review Applicant: NCDMF— South River Project Location: 229 Tosto Road, Beaufort Carteret County Proposed Project: Improvements to existing facility ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director, Division of Coastal Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by YoVembe� 17� 2020.1 If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached"' X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. RINT NAMEJames Harrison GENCY NCDMF SIGNATUR 91'�B� ME 29 October 2020 OCT 2 9 2020 MP SECTION MHD State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 Bodnar, Gre From: Huggett, Douglas <dhuggett@moffattnichol.com> Sent: Sunday, November 1, 2020 10:05 AM To: Bodnar, Gregg Subject: [External] FW: Pre -Filing Meeting is not needed for NCDMF South River Facility (Carteret County) Structural Repairs - 20201355 Ver 1 FYI Environmental Permit Specialist/Project Manager Moffatt & Nichol 310-B Greenfield Drive Newport, NC 28570 Main 919.781.4626 ext.12149 Direct 919.645.0649 Cell 919.534.6834 Creative People, Practical Solutions. From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov> Sent: Sunday, November 01, 202012:01 AM To: Huggett, Douglas <dhuggett@moffattnichol.com> Cc: holley.snider@ncdenr.gov Subject: Pre -Filing Meeting is not needed for NCDMF South River Facility (Carteret County) Structural Repairs - 20201355 Ver 1 CAUTION: This email originated from outside of the organization. The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for NCDMF South River Facility (Carteret County) Structural Repairs that you submitted on 10/1/2020 8:46 AM. The ID number for that project is 20201355, Version 1. It has been decided that no meeting is needed for this project. Project file link: https://edocs.deg.nc.gov/WaterResources/Browse.aspx?dbid=0&startid=l315312 r When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Received: 10/29/2020 Historic Preservation Office NORTH CAROLINA Erma onmewal Ouahly October 20, 2020 Due: 11 /6/2020 ER 20-2300 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) arega.bodnar(a)NCDENR.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: NCDMF— South River Project Location: 229 Tosto Road, Beaufort Carteret County Proposed Project: Improvements to existing facility ROY COOPER Governor MICHAEL S. REGAN secrelory BRAXTON DAVIS Direcror, Dm ion ojCoaxtal Management NC - SBA 11/3/2020 Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by November 14 20201 If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Renee Gledhill -Earley AGENCY SIGNATURE DATE Historic Preservation Office 1 11 /4/2020 NOV 4 2020 MP SECTION MHD State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive ExL, Wilmington, NO 28405 919 796 7215 �a gta..Al" NORTH CAROLINA Environmental Oaaklp October 20, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax:252-247-3330 (Courier11-12-09) gregq.bodnar aC ..NCDENR.gov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: NCDMF— South River Project Location: 229 Tosto Road, Beaufort Carteret County Proposed Project: Improvements to existing facility ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Direclor, Division ofCoasml Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greco Bodnar at the address above by November 17, 2020. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: X This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT N/1ME Rachel Love-Adrick AGENCY Division of Coastal Management SIGDIATURE DATE 11/3/2020 State orNotth Carolina I Environmental Quality I Coastal Management 127Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 Y"aRECEIVED NOV 2 2020 MP SECTION MHD r ROY COOPER Governor MICHAEL S. REGAN secretary BRAXTON C. DAVIS Director MEMORANDUM NORTH CAROLINA Environmental Quality TO: Gregg Bodnar, Assistant Major Permits Coordinator RECEIVED Division of Coastal Management FROM: Rachel Love-Adrick, District Planner �Y.YII NOV 2 2020 Division of Coastal Management L V� SUBJECT: Major Permit request by NCDMF at South River MP SECTION MHD DATE: November 3, 2020 Consistency Determination: The request is consistent with/not in conflict with the Carteret County Land Use Plan certified by the CRC on December 20, 2010. Overview: The proposed project is located adjacent to the South River at 229 Tosto Road near Beaufort, Carteret County. Current on -site development includes a boat ramp, bulkheads, piers, dolphin clusters, and upland gravel driveway and parking area (CAMA. Major Permit 55-08). This site is used for government use at an existing loading facility that supports habitat enhancement projects. The adjacent riparian properties are currently undeveloped. The elevation of the adjacent high ground of the parcel is approximately 5' above the normal water level (NWL). Immediate offshore water depths adjacent to the parcel range from -3' to -9' normal water level (NWL). The subaqueous substrate is firm with shell. Vegetation on the adjacent parcel mainly consists of pine trees and black needlerush. The parcel has 490' of continuous shoreline along the South River, and is approximately 4,130' across at this location. Areas of Environmental Concern (AECs) include Estuarine Waters (EW), Coastal Shorelines (CS) and Public Turst Areas (PTA). South River is classified as SA; HQW; Nutrient Sensitive Waters, is not classified as PNA, and is closed to shellfish harvest. There are no Coastal Wetlands, coastal resources, of SAV within the project area. This proposal is not located near a Federal Channel and is subject to the Neuse River Riparian Buffer Rules. The applicant is proposing to replace the existing bulkhead along the center portion of the shoreline on the parcel; the bulkhead would be 97' long and 2' waterward of the existing bulkhead alignment. This D Q� North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead Cft% North Carolina 28557 252.808.2808, proposed bulkhead would be made of concrete. The alignment would be encased temporarily while the poured concrete cures. The bulkhead tie -back rods would protrude 12' into the high ground. The existing northern most pier along this tract's shoreline would be replaced and expanded. The proposed pier would be 5' wide and 65' long. The proposed concrete hog slat pier would not extend beyond the existing dolphin pile cluster at the facility. The existing concrete boat ramp would be replaced and expanded as a part of this project. The proposed boat ramp would be 25' wide and 60' long. It would not extend any further waterward than the existing boat ramp. The proposed concrete boat ramp would be fabricated on the high ground and then pushed into placed with heavy equipment upon curing. A retaining wing wall extension is also being proposed as a part of this project. It would be 20' long in the nearby vicinity of the southeastern property boundary. This wall extension would tie back into the high ground elevation. Anticipated impacts: This proposal would be within the existing footprint of the facility. The proposed pier would shade 325 square feet of Public Trust Area. The proposed boat ramp and bulkhead would fill 694 square feet of Estuarine Waters. The proposed wing wall extension, bulkhead tie back system, and boat ramp approach would fill 2,890 square feet of high ground. Traditional marine construction methodology will be utilized during the construction of this project. Turbidity impacts are not anticipated during the construction activities in the South River. Basis for Determination: The project site is located in Carteret County and is subject to the 2005 Carteret County Land Use Plan Update. The Future Land Use Map (FLUM) designates the site as Rural (land) and Conservation due to the sites location in Estuarine Shoreline, Public Trust Area, and Estuarine Waters, and Coastal Shoreline AECs (Areas of Environmental Concern). The "Rural" land use category is defined as: "Areas included within the rural classification include lands that are appropriate for or presently used for agriculture, forestry, mineral extraction, and other uses that should be located in a relatively isolated and undeveloped area. The predominant land uses are agricultural and residential. However, public facilities, health care facilities, and scattered industrial and commercial uses are allowed. Areas classified as rural are usually served by individual wells and septic systems. No central water service is anticipated during the planning period". Residential densities average two dwelling units per acre, with a minimum lotsize of 20,000 square feet (2.2 units per acre). Extensive portions of the Down East area are classified as rural, as are areas in northwest Carteret County. Within areas depicted as Conservation on the Future Land Use Map, there may be high -ground areas that are suitable for development. These high -ground areas shall be considered as Rural and development shall be consistent with densities and requirements contained in the Rural classification description, policies contained in the Land Use Plan, and applicable local, state, and federal regulations. Land uses allowed in Areas of Environmental Concern are those consistent with the State's minimum use standards and state and federal regulations. RECEIV ED DW NOV 2 2020 North Carolina Department of Errimunmental Quality I Division of CoastalManagement Morehead CltyOfflce 1400 Commerce Avenue I Morehead city, North Carolina 28557MP �" CT!®AI G1 pI �l1® 252.808.2808 v Y G9i�ii M 9 The following LUP policies may be applicable to this request: Policy 2.4 Carteret County's policies for development in estuarine and public trust waters are as follow: 1. Carteret County will only allow development activities in estuarine and public trust waters that are associated with water -dependent uses, consistent with state and federal standards, and meet all local policies contained in this plan. RECEIVED \ NOV P 2020 MP SECTION MHD North Cardin Department of Environmental Quality I Dh4slon of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City. North Carolina 28557 252.8082808 Bodnar, Gre From: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Sent: Tuesday, November 3, 2020 2:59 PM To: kathryn_matthews@fws.gov, Leigh_Mann@fws.gov, pace.wilber@noaa.gov; Pete_Benjamin@fws.gov, Owens, Jennifer L CIV USARMY CESAW (USA); HORTON, J TODD CIV USARMY CESAW (US); Arnette, Justin R CIV USARMY CESAW (USA); DCR - Environmental_Review; Bowers, Todd; ethan coble; Ryan.L.Taylor@uscg.mil; fritz.rohde; matt creelman; Twyla Cheatwood; Ellis, John; MacPherson, Tara; Howell, Jonathan; Wojoski, Paul A; Bodnar, Gregg; Snider, Holley; Tranter, Kent W CIV USARMY CESAW (USA); Connell, Brad Cc: Charles, Thomas P CIV USARMY CESAW (USA) Subject: [External] [WARNING: UNSCANNABLE EXTRACTION FAILED]CAMA MAJOR-PGP 291/SAW-2020-01855/NC DMF South River/Carteret Attachments: SAW-2020-01855_NC DMF SOUTH RIVER_Carteret.pdf, NC DMF South River - Application.pdf; NC DMF South River - Field Report & DWR Form.pdf; NCDMF South River construction drawings.pdf; NCDMF South River construction additional drawing.pdf; GoogleEarth_Placemark.kmz All, Pursuant to the CAMA-Corps Programmatic Permit process, the North Carolina Division of Coastal Management (NCDCM) has forwarded to our office a copy of the CAMA permit application, Field Investigation Report and BioReport for the subject project. The attached notice requests federal agency comments on this project by December 3, 2020. The site is located within waters of South River, at 229 Tosto Road, north of Beaufort, Carteret County, North Carolina. Coordinates are 34.955987 N,-76.583487 W. The North Carolina Division of Marine Fisheries (DMF) proposes to construct a new retaining wall, expand the existing boat ramp, replace the existing bulkhead, and replace and expand the existing pier. The applicant proposes to replace the existing bulkhead along the center portion of the shoreline on the parcel. The proposed concrete bulkhead would be 97' long and 2' waterward of the existing bulkhead alignment. The alignment would be encased temporarily while the poured concrete cures. Bulkhead tie -back rods would protrude 12' into the high ground. The existing northern most pier along this tract's shoreline would be replaced and expanded. The proposed pier would be 5' wide and 65' long. The proposed concrete hog slat pier would not extend beyond the existing dolphin pile cluster at the facility. The existing concrete boat ramp would be replaced and expanded as a part of this project. The proposed boat ramp would be 25' wide and 60' long. It would not extend any further waterward than the existing boat ramp. The proposed boat ramp would be fabricated on the high ground and then pushed into placed with heavy equipment upon curing. A retaining wing wall extension is also being proposed as a part of this project. It would be 201ong in the nearby vicinity of the southeastern property boundary. This wall extension would tie back into the high ground elevation. Approximately 694 ft2 of open waters would be filled as a result of the project. Dredging is not proposed as a part of this project. The project site is not located near a Corps federal channel. Please see the attached field investigation report, application, kmz file and plans for detailed information concerning the proposed project. EFH: This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson -Stevens Fishery Conservation and Management Act. The Corps' initial determination is that the proposed project may affect, but not likely adversely affect EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine Fisheries Service. The waters within the project area are not designated as PNA by the Division of Marine Fisheries, are classified as SA; HQW; Nutrient Sensitive Waters by the Division of Water Resources, and are closed to shell fishing. Average water depths within the project area range from -3' NLW to -9' NLW. The application also states that submerged aquatic vegetation (SAV) was not observed in the project area. Substrate is firm, with shell. ESA: The Corps has reviewed the project area, examined all information provided by the applicant and consulted the latest North Carolina Natural Heritage Database. Based on available information, the Corps has determined that the project may affect, but is not likely to adversely affect the West Indian Manatee. The use of Manatee Guidelines may be required as a permit condition. The project would have No Effect on any other federally listed species. NHPA 106: Pursuant to Section 106 of the National Historic Preservation Act (NHPA) of 1966, Appendix C of 33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C, the District Engineer consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that no historic properties, nor properties eligible for inclusion in the National Register, are present within the Corps' permit area: therefore, there will be no historic properties affected. Please contact me if you have any questions and provide comments as soon as you can, or by December 3, 2020. Thank you, Liz Hair Regulatory Project Manager Wilmington District US Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 Sarah.e.hair@usace.army.mil Work Cell: 910-512-4456 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 88 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403.1343 November 9, 2020 Regulatory Division Action ID No. SAW-2020-01855 North Carolina Division of Marine Fisheries Attn: Mr. Andy Gupton 3441 Arendell Street Morehead City, North Carolina 28557 ANDY.GIPTON( NCDENR.GOV Dear Mr. Gupton, A review of your application received by this office on October 21, 2020, for Department of the Army (DA) authorization to construct a new retaining wall, expand an existing boat ramp, pier, and bulkhead replacement at an existing boat landing located at 229 Tosto Road, in waters adjacent to South River, near Beaufort, in Carteret County, North Carolina indicates it to be a candidate for Federal authorization pursuant to the CAMA-Corps Programmatic Permit process for construction activities that receive authorization from the State of North Carolina. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this permit process for any reason, you will be informed regarding its further management. If there are no unresolved differences in State - Federal positions or policies, the final action taken on your application by the State will result in your receiving written notice from us that your application is consistent with the Federal permit and you may commence your activity. Only after receiving such confirmation should you begin work. Your application, pursuant to Section 404 of the Clean Water Act, has been assigned Action ID No. SAW-2020-01855. RECEIVED NOV 1 0 2020 IMIP SECTION MHD -2- We will be coordinating your permit application with other Federal agencies. Please feel free to contact me at sarah.e.hair@usace.army.mil. Electronic copies furnished: Moffatt and Nichol Attn: Mr. Doug Huggitt 310 B Greenfield Drive Newport, NC 28570 DHUGGET@MOFFATTNICHOL.COM Mr. Gregg Bodnar NCDEQ-DCM gregg.bodnar@ncdenr.eov Sincerely, itally signed by HAIR.SARAH. / HAIPSARAH.EAJ 054693512 A.1054693512-05'00' 020.11.09 1357:34 Liz Hair, Project Manager Wilmington Regulatory Field Office NOV 1 0 2020 iwP SECTION 1WH® a ROY COOPER Govemor MICHAEL S. REGAN Secretary BRAXTON DAVIS NORTH CAROLINA Director, Division o,/Coasial Environmental Oiu?Hlp Management October 20, 2020 MEMORANDUM: FROM: - Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg. bodnar(a)NCDENR.gov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: NCDMF— South River Project Location: 229 Tosto Road, Beaufort Carteret County Proposed Project: Improvements to existing facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by November 17, 2020. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. X "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Shannon Myers gGENCY NCDMF- Shellfish Sanitation and Recreational Water Quality SIGNATURE for Shannon Jenkins RECEIVED DATE November 4, 2020 NOV 5 2020 State of North Carolina I Environmental Quality I Coastal Management MP SECTION MHD 127 Cardinal Drive Ezt., Wilmington, NO 28405 9197967215 ROY COOPER ..wo MICHAEL S. REGAN BRAXTON DAVIS October 20, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) Ar_eQQ.bodnaf 3NCDENR.cov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: NCDMF— South River Project Location: 229 Tosto Road, Beaufort Carteret County Proposed Project: Improvements to existing facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by NO_vember 17, 2020.1 If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT -NAME (A)G-nda 0111I0rd AGENCY &atC - 1�2 Q rO P �I*f i G✓ SIGNATURE tAu�n DATE A0,2b RECEWE® NOV 1 7 2020 MP SECTION MHD SulcefNonh C=1i. Euiwn .td Qudiryl Coazla1.%4magcwm 127 Cardinal Dmc Fat„ WilningwN NC 28405 9197967215 October 20, 2020 MEMORANDUM.• FROM: G, �0'.10.21 10i Gregg 'Bodlar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) ROY COOPER Gma'iio MICHAEL S. REGAN seaelaT BRAXTON DAVIS mmaor. DMsim ofco al Llunagmnrni SUBJECT: CAMA/Dretlgsend Fill Application Review Applicant: NCDMF— South River Project'Location: 229 Tosto Road, Beaufort Carteret County' Piopo`sed P�ojei t: Impiovemerits to existing facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by NOve►pber 17; 2PPIf you have any.questions regarding the proposed,project, contact Brad Connell 252-808-2808. when: appropriate, in-depth comments vaith supporting data is requested. REPLY: This agency)I has no objection to the project as proposed, "Additional comments maybe attached" I Ithis agency has no comment on the proposed project. This agency, approves of the project only if the recommended changes are incorporated. See attached. This agency, objects to the project for reasons described in the attached comments. A ENGY TilnJiZC+ RECEI'VED Stog-4Tl o A�In�� " t ! NOV 1 3 2020 patE i► 13-�020� MP SECTION MHD G Sl orNoNi CmNm I Emivo=emdQ=fitylCmsWMme=ern 127 Ce'dmalDtive bra, Witmiegm NC 2UW 9197967215 DEPARTMENT OF THE ARMY WILMINGTODISTRICT, CORPS ENGINEERS 89 DARLINGTON AVENUE E 0 WILMINGTON, NORTH CAROLINA 28403-1343 December 7, 2020 Regulatory Division Action ID No. SAW-2020-01855 RECEIVED DEC 1 0 2020 Mr. Jonathan Howell Division of Coastal Management North Carolina Department of Environmental Quality MP SECTION MHD 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Howell: Reference the application of the North Carolina Division of Marine Fisheries (NC DMF) to construct a new retaining wall, expand an existing boat ramp, pier, and bulkhead replacement at an existing boat landing located in waters of the South River, at 229 Tosto Road, near Beaufort, in Carteret County, North Carolina. Specifically, the applicant proposes to replace the existing bulkhead along the center portion of the shoreline on the parcel. The proposed concrete bulkhead would be 97' long and 2' waterward of the existing bulkhead alignment. The alignment would be encased temporarily while the poured concrete cures. Bulkhead tie -back rods would protrude 12' into the high ground. The existing northern most pier along this tract's shoreline would be replaced and expanded. The proposed pier would be 5' wide and 65' long. The proposed concrete hog slat pier would not extend beyond the existing dolphin pile cluster at the facility. The existing concrete boat ramp would be replaced and expanded as a part of this project. The proposed boat ramp would be 25' wide and 60' long. It would not extend any further waterward than the existing boat ramp. The proposed boat ramp would be fabricated on the high ground and then pushed into placed with heavy equipment upon curing. A retaining wing wall extension is also being proposed as a part of this project. It would be 20'long in the nearby vicinity of the southeastern property boundary. This wall extension would tie back into the high ground elevation. Approximately 694 ft2 of open waters would be filled as a result of the project. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the modification to the State authorization: 1. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and -2- strictly adhere to all requirements therein. The guidelines can be found at 2. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further information, the permittee should contact the U.S. Coast Guard Marine'' Safety Office at (910)-772-219I ,_ 3. All work authorized by this permit must be performed in strict compliance with the submitted plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USAGE) prior to implementation. 4. Except as specifed in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 5. Except as authorized by this. permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 6. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Resources at (919) 733- 5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 7. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 8. If the permittee discovers any previously unknown historic or archeological remains while accomplishing the authorized work, he will immediately notify the Wilmington District Engineer who will initiate the required coordination procedures. 9.The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, includin o s, shall be available at the project site during construction and maintee DEC 1 0 2020 ���'6 6�N MH� MP -3- 10. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter I I3A Article 4). 11. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 12. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre -project condition. 13. Violations of these conditions or violations of Section 404 of the Clean Water Actor Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Questions or comments may be addressed to Ms. Liz Hair Wilmington Field Office, Regulatory Division, telephone (910) 251-4049 or email at sarah.e.hair@usace.army.mil. Sincerely, Digitally signed by HAIR.SARAH.E HAIRSARAH.EA.1054693 512 A.1054693512 Date: 2020.12.07 15:28:52 -05'09 Liz Hair, Project Manager Wilmington Regulatory Field Office Electronic Copy Furnished: USEPA; Mr. Todd Allen Bowers NCDEQ/DCM; Mr. Gregg Bodnar/Ms. Tara MacPherson NCDEQ/DWR; Ms. Holley Snider . USFWS; Mr. Pete Benjamin/Mr. John Ellis NMFS; Mr. Pace Wilber/Ms. Twyla Cheatwood RECEIVED DEC 1 0 2020 MP SECTION MHD .DocuSig'h Envelope ID: BC84398C58A4-4582-AIA3-EOC9431AAE23 ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director North Carolina Division Marine Fisheries ATTN: Andy Gupton 3441 Arendell Street Morehead City, North Carolina 28557 NORTH CAROLINA Environmental Quality January 7, 2021 RECEIVED JAN 1 3 2021 MP SECTION MHD DWR # 2020-1355 Carteret County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Approval of Neuse River Riparian Buffer Impacts with Additional Conditions South River Facility Structural Repairs - repairs to water dependent structures Dear Mr. Gupton: You have our approval for the impacts listed below for the purpose described in your application received by the Division of Water Resources (Division) on December 14, 2020, with additional information received on December 21, 2020. These impacts are covered by the attached Water Quality General Certification Numbers 4175 and the conditions listed below. This certification is associated with the use of Regional General Permits 291, once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. The Division has determined that the proposed project will comply with water quality requirements provided that you adhere to the conditions listed in the enclosed certification and to the additional conditions itemized below. The following impacts are hereby approved, provided that all the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)]] Type of Impact Amount Approved Amount Approved Plan location/ (units) (units) Reference Permanent Temporary Attached Open Water repair boat ramp & 694 (square feet) Sheet 19 of 21 bulkhead 325 (square feet) Sheet 10 of 21 replace pier Buffers Zone 1(replace boat ramp/loading ramp) 250 (square feet) Sheet 19 of 21 Zone 1(repair bulkhead tie backs construct wing 2640 (square feet) Sheet 10 of 21 wall) D_E Q�� North Carolina Department of Environmental Quality I Division of Water Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 d...++�:'w..nna+w� /'� 252.946.6481 DocuSign Envelope ID: BC8439BC-58A4-4582-A1A3-EOC9431AAE23 NCDMF South River Facilities _ DWR#20201355 Page 2 of 3 This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of this Authorization and General Certification, If you change your project, you must notify the Division and you may be required to submit a new application package. If the property is sold, the new owner must be given a copy of this Authorization and General Certification and is responsible for complying with all conditions. [15A NCAC 02B .0611(b)(2) - Neuse]. If you are unable to comply with any of the conditions below, you must notify the Wilmington Regional Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. The permittee shall report to the Wilmington Regional Office any noncompliance with the conditions of this Authorization and General Certification and/or any violation of state regulated riparian buffer rules [15A NCAC 02B .0714 - Neuse]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. Additional Conditions: 1. The proposed project must comply with all the conditions of the General Water Quality Certification(s) 4175. [15A NCAC 02B .0507(c)] 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and Authorization and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)] 3. During construction of the proposed project, fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(0] 4. When concrete is used during construction, then all necessary measures shall be taken to prevent direct contact between the uncured concrete and waters of the state. Water that inadvertently contact uncured concrete shall not be discharged to waters of the state. [15A NCAC 02B .0200] S. The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 02B .0200. Appropriate sediment and erosion control practices must be used to meet this standard. These practices may include but are not limited to the utilization of turbidity curtains, cofferdams and/or similar measures for in water excavation and construction. [15A NCAC 02B .0211 (21)] 6. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, or any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 & Buffer Permitting Unit, NC Division of Water Resources, 1617 Mail Service Center, Raleigh NC 27699-1617. This approval and their conditions are final and binding unless contested. [G.S.143-215.5] This Certification can be contested as provided in Chapter 150E of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information RECEIVED JAN 1 3 2021 MP SECTION MHD DocuSign Envelope ID: BC8439BC-58A4-4582-A1A3-EOC9431AAE23 NCDMF South River Facilities DWR#20201355 Page 3 of 3 regarding requirements for filing a Petition and Petition forms may be accessed at httn://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000. One (1) copy of the Petition must also be served to the North Carolina Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Act and 15A NCAC 02H .0500. Please contact Holley Snider at 910-796-7304 orholley.sniderPricdenng_ov if you have any questions or concerns. Sincerely, 000usienea by. ueAUA rocax... Morel a Sanc ez-King Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, Wilmington Regional Office Enclosures: GC 417S cc: Doug Huggett, Moffatt and Nichol (via email) Sarah Hair, Regulatory Specialist, USACE (via email) Maria Dunn, NCWRC (via email) DWR 401 & Buffer Permitting Unit file LF iIEC E ICE® JAN 1 3 2021 MP SECTION MHD iL DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403.1343 February 9, 2021 Regulatory Division Action ID No. SAW-2020-01855 and State Permit No. 6-21 North Carolina Division of Marine Fisheries Mr. Andy Gupton 3441 Arendell Street Morehead City, North Carolina 28557 Andy.gupton@ncdenr.gov Dear Mr. Gupton: Reference your application of the North Carolina Division of Marine Fisheries (NC DMF) to construct a new retaining wall, expand an existing boat ramp, pier, and bulkhead replacement at an existing boat landing located in waters of the South River, at 229 Tosto Road, near Beaufort, in Carteret County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of the CAMA-Corps Programmatic Permit process (copy attached) for construction activities that receive authorization from the State of North Carolina. Therefore, you may commence construction activity in strict accordance with applicable State authorization, enclosed Federal special conditions, the approved plan, and the following special condition: 1. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https://www.fws.gov/raleigh/pdfs/ManateeGuidelines20l7.pd Failure to comply with the State authorization or conditions of the Federal permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Your Department of the Army permit will expire on December 31, 2021. F E B 1 0 2021 I MP SECTION MHD -2- Questions or comments may be addressed to Ms. Liz Hair, Wilmington Field Office, Regulatory Branch, telephone 910-251-4049 or email sarah.e.hair@usace.army.mil. Sincerely, Liz Hair, Project Manager Wilmington Regulatory Field Office Enclosures: Plans CAMA permit GP 291 conditions Manatee Guidelines Electronic Copy Furnished (with enclosures): Moffatt & Nichol; Mr. Doug Huggett- Dhuggett@MoffattNichol.com Electronic Copy Furnished (without enclosures): USEPA; Mr. Todd Allen Bowers NCDEQ/DCM; Mr. Gregg Bodnar/Ms. Amanda Cannon/Mr. Roy Brownlow NCDEQ/DWR; Ms. Holley Snider USFWS; Mr. Pete Benjamin/Mr. John Ellis NMFS; Mr. Pace Wilber/Ms. Twyla Cheatwood F E B 1 0 2021 MP SECTION Ei HD DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: NC Division of Marine Fisheries LOCATION OF PROJECT SITE: The project is located adjacent to the South River at 229 Tosto Road near Beaufort, Carteret County. Latitude:34°57'20.01"N Longitude: 76°34'58.57"W INVESTIGATION TYPE: CAMA/D&F INVESTIGATIVE PROCEDURE: Date(s) of Site Visit — 9/21/20 Was Applicant or Agent Present No Photos Taken — No PROCESSING PROCEDURE: Application Received — cc: 10/1/20 Office — MHC SITE DESCRIPTION: (A) Local Land Use Plan — Carteret County Land Classification from LUP —Rural with services (B) AEC(s) Involved: CS, PTA, EW (C) Water Dependent: Yes (D) Intended Use: Government (E) Wastewater Treatment: Existing — none Planned -none (F) Type of Development: Existing — boat ramp, piers, bulkhead, dolphin pilings, gravel parking and driveway Planned - new retaining wall, expansion ofiexisting boat ramp, pier, and bulkhead replacement (G) Estimated Annual Rate of Ekosion: N/A Source — N/A HABITAT DESCRIPTION: DREDGED FILLED INCORP/SHADED (A) Open Water 694 ft2 325 ft2 incorp (B) High Ground 2,890 ftZ (E) Total Area Disturbed: 3,909,fft (F) Primary Nursery Area: No (G) Water Classification: SA; HQW; NSW Open: No (H) Cultural Resources: None Project Summary: The applicant wishes to make improvements at within the footprint of an existing facility adjacent to South River for government use in Carteret County. Field Investigation Report: NCDMF Pace 2 Narrative Description: The property is located adjacent to the South River at 229 Tosto Road near Beaufort, Carteret County. This property is currently developed with a boat ramp, bulkheads, piers, dolphin clusters, and upland gravel driveway and parking area (ref. CAMA Major Permit 55-08). This property is located within the Neuse River basin. The adjacent riparian properties are currently undeveloped. The elevation of the adjacent high ground of the parcel is approximately 5' above the normal water level (NWL). Vegetation on the adjacent parcel mainly consists of pine trees and black needlerush. There are no Coastal Wetlands within the project area. The parcel has 490' of continuous shoreline along the South River. Immediate offshore water depths adjacent to the parcel range from —3' to —9' normal water level (NWL). The subaqueous substrate is firm with shell. This proposal is not located near a Federal Channel. There is not a cultural resource in the project area. This waterbody is approximately 4,130' across at this location. These estuarine waters are not classified as a Primary Nursery Area. Submerged aquatic vegetation was not observed at this location. This area is closed to shellfish harvest and is classified as SA; HQW; Nutrient Sensitive Waters. This parcel is subject to the Neuse River Riparian Buffer Rules. Proposed Development: The applicant proposes to make improvements to an existing boat landing adjacent to the South River, north of Beaufort. The proposed development would take place adjacent to 229 Tosto Road, Carteret County. This proposal is for government use at an existing loading facility that supports habitat enhancement projects. The applicant is proposing to replace the existing bulkhead along the center portion of the shoreline on the parcel. This bulkhead would be 97' long and 2' waterward of the existing bulkhead alignment. This proposed bulkhead would be made of concrete. The alignment would be encased temporarily while the poured concrete cures. The bulkhead tie -back rods would protrude 12' into the high ground. The existing northern most pier along this tract's shoreline would be replaced and expanded. The proposed pier would be 5' wide and 65' long. The proposed concrete hog slat pier would not extend beyond the existing dolphin pile cluster at the facility. The existing concrete boat ramp would be replaced and expanded as a part of this project. The proposed boat ramp would be 25' wide and 60' long. It would not extend any further waterward than the existing boat ramp. The proposed concrete boat ramp would be fabricated on the high ground and then pushed into placed with heavy equipment upon curing. A retaining wing wall extension is also being proposed as a part of this project. It would be 20'long in the nearby vicinity of the southeastern property boundary. This wall extension would tie back into the high ground elevation. Brad Connell October 20, 2020 Morehead City Field Investigation Report: NCDMF Paee 3 Anticipated Impacts: This proposal is not in the vicinity of a Federal Channel setback. This proposal would be within the existing footprint of the facility. The proposed pier would shade 325 square feet of of Public Trust Area. The proposed boat ramp and bulkhead would fill 694 square feet of Estuarine Waters. The proposed wing wall extension, bulkhead tie back system, and boat ramp approach would fill 2,890 square feet of high ground. Traditional marine construction methodology will be utilized during the construction of this project. Turbidity impacts are not anticipated during the construction activities in the South River. There is not a cultural resource in the vicinity of the project area. This project area is subject to the Neuse River Riparian Buffer Rules. These waters of the Neuse River are not classified as a Primary Nursery Area and the presence of submerged aquatic vegetation was not observed. This area is closed to shellfish harvest and is classified as SA; HQW; Nutrient Sensitive Waters. Brad Connell October 20, 2020 Morehead City Dock Structural Repairs (South River) North Carolina Department of Environmental Quality (NCDEQ) Division of Marine Fisheries (DMF) South River, North Carolina The following is a description of the elements for the proposed Dock Structural Repairs (South River) for the North Carolina Department of Environmental Quality (NCDEQ) Division of Marine Fisheries (NCDMF) site. The elements proposed by the DMF are herein collectively referred to as the "Project" or "Proposed Project", which is subject to this application. The NCDMF proposes the removal and replacement of the northern timber pier, the extension of the pier, the removal of the pier wave screen, the removal and replacement of the failed timber fender piles, the removal of the failed 6-pile cluster remnants, and the repair of the 6-pile cluster wire wrap. Other work will include a 3' tall x 20' long concrete retaining wall bulkhead extension for slope stabilization, encapsulating the northern bulkhead steel sheet piles with concrete, removal of the articulated mat boat ramp and replacing it with solid precast concrete panels and widening of the boat ramp. Project Location The South River facility is located on Tosto Road in South River, NC approximately 'h mile east of South River Road on the western bank of the South River near its confluence with the Neuse River (Figure 1). The property lies along the western shore of the South River with a waterfront frontage of approximately 490 feet. fi L.\t I uRT IIIICOT N-FY �.+. } } psmurco love, i BEAUFORT CRAVEN COUNTY CRAVEN COUNTY TONES COUNTY - CRAVEN COU! t_ . L, � ONSIAW COUNTY Sls Legend PAMLICO COUNTY Cape Lookout HYDECOUNTY PamReo Sound -I-Jm •� l.fa Orn oke Isiaad West OtA. say �vly Banks River N Project vicinity Map 0 81.000 162,000 Fmt Figure 1: Project Location Purpose and Need There are a variety of reasons necessitating the repairs at the South River Site. The bulk of the damage to the northern timber pier was caused by Hurricane Florence in September 2018. The work on the boat ramp is viewed as a safety and efficiency improvement. The bulkhead repairs are a result of typical corrosion of the existing steel sheet piles. Existing Conditions The NCDMF is responsible for the stewardship of the state's marine and estuarine resources. DMF owns two properties in South River. The facility on the water, which is the subject of this permit application, is a staging site for their artificial reef program. The South River NCDMF facility consists of two areas of steel sheet pile bulkhead with concrete cap, two timber piers, a boat ramp, and offshore timber pile clusters. Original construction of the bulkhead and northern timber pier was completed in 1998. The boat ramp and southernmost timber pier were constructed in 2009. The northern pier was part of the original facility construction in 1998 and was recently significantly damaged during Hurricane Florence in 2018. The timber decking and stringers are completely missing, and the timber handrail is significantly damaged. The southern face of the pier is lined with a solid vinyl sheet pile wave screen. Portions of the wave screen and supporting timber whalers have also been significantly damaged. Two timber fender piles on the southern face of the pier have also failed. The northern bulkhead is approximately 100 linear feet in total. It was originally constructed in 1998 and composed of PZ 22 steel sheet piles. There is also a 2'-3" X 2'-9" concrete cap atop the sheet piles, which is anchored back by threaded rods to concrete deadman anchors below grade. The steel sheet piles are exhibiting signs of coating system failure and corrosion is beginning in the tidal splash zone. Three (3) 6-pile clusters were installed during the original construction in 1998 on the southern end of the facility. Three (3) additional 6-pile clusters were later installed in 2009. A 3-pile cluster aligned with the northern timber pier was also part of the original 1998 construction. The southeastern -most 6-pile cluster is missing. The existing boat ramp begins on the landside as a 15-foot-wide by 10-foot-long cast -in -place concrete slab. Beginning at the landside corner of the bulkhead wall, the boat ramp and surrounding scour apron is composed of articulated concrete block mats totaling 1,290 square feet. The boat ramp itself is 15 feet wide and 36 feet long, with the scour apron extending an addition 10 feet on the southern and eastern perimeter of the ramp. NCDMF staff expressed concerns over the inability of the mats to retain fill as intended within the void space within and between individual blocks. The lack of consistent fill within the block mat voids creates a tripping hazard for personnel as well as creating an uneven surface for vehicles to maneuver when launching and retrieving vessels. A scour hole at the north corner of the boat ramp near the interface with the bulkhead was recently detected by NCDW personnel. North Timber Pier: A full replacement of existing structure is required, with the exception that certain piles may still be still intact and in a condition that they can be utilized in the pier replacement. Replacement will include extension of the pier waterward by approximately 15' to reach an existing 3-pile dolphin cluster. The width of the new pier will not exceed the width of the existing pier (5'). The new structure will not require a vinyl wave barrier. Therefore, the existing wave barrier will be removed and not replaced. Hog slat style decking will be utilized to minimize damage potential during future storms. The structure will be constructed without handrails, as it is not required for fall protection due to elevation, and further presents a hinderance to operations. No water or electrical services are required on this pier. Piling Repair and Removal: One existing 6-pile dolphin cluster will require replacement of a missing wire wrap. One 6-pile dolphin cluster was broken off during past storms and the resulting debris must be removed. No replacement of this broken cluster is proposed as it is not required under future growth plans. One 6-pile cluster must be removed, as it hiders bulkhead expansion plans. If in good condition, piles may be saved for future placement. Bulkhead Repairs and Concrete Encasement: In order to prevent further deterioration of the bulkhead structural members due to severe corrosion, the proposed design is to completely encase the bulkhead with concrete tying into the header. The construction methods for the concrete encasement effort is discussed in detail below. The southern bulkhead will have a 3' tall x 20' long cast -in -place concrete retaining wall extension added landward to provide additional slope stabilization near the existing electrical panel access platform. Boat Ramp Replacement and Widening_ The boat ramp is presently —15' wide and constructed of articulated blocks. In its current state, it is heavily damaged by recent vessel activity, heavy use, and poor original design. The south side of the ramp (or right as you face the water), on land, there exists a small concrete structure with little apparent purpose. To improve functional use and structural longevity, it is proposed that the articulated blocks and land -side concrete structure be removed in favor of widening the ramp and replacing the surface with new concrete slab. These new concrete slabs will be formed in an upland location and put into place once cured. No "wet" or "uncured" concrete will touch waters of the State. Waterside Construction Construction will utilize a combination of barge -mounted and land -based construction equipment. For the construction of the bulkhead repair, the implementation of a full coffer dam may be cost prohibitive for this work. Instead, since much of this work will be above normal water level, it is anticipated that the contractor will form up the new area with pour chutes in the top of the form to allow the concrete in. The contractor would dewater the forms as much as possible prior to placement of the concrete in the formed void. Allowing the water to be displaced as the concrete is poured will be avoided so as to decrease the likelihood of wet concrete contamination to the waters of the South River. Avoidance and Minimization Measures The following includes the avoidance and minimizations measures that have been considered and employed: - Direct impacts to water quality by construction of the concrete encasement around the northern bulkhead will be avoided by dewatering the forms as much as possible to place the concrete in the formed void. o Allowing the water to be displaced as the concrete is poured will be avoided in order to decrease the likelihood of wet concrete contamination to the waters of the South River. - There will be no shading of coastal wetlands. - Submerged Aquatic Vegetation was not observed in the project area. - No portion of the proposed work will take place within or close to the 15' riparian corridor setbacks (+/- 297' to north, +/- 190' to south). - The alignment of the refaced bulkhead will be no further waterward from the existing sheetpile bulkhead than is necessary to carry out the refacing activities. - Existing pilings will be utilized wherever possible on the reconstructed dock. - The replacement of the existing wave screen is not proposed. - There are currently sufficient water depths at both the boat ramp and docking facilities to accommodate the anticipated vessel usage. Compliance with N.C. Environmental Policy Act In accordance with NCGS 113A-12(6), a review under the North Carolina Environmental Policy Act is not required for projects requiring a CAMA Major Permit. During a site visit on August 20, 2020, no submerged aquatic vegetation was found by visual inspection on site. Coastal wetlands do not exist within the footprint of the proposed maintenance activities, but do exist on the property to the north of the proposed activities. Below are pictures of each element featured in this project narrative, taken by Doug Huggett on a site inspection conducted August 20, 2020. NORTH TIMBER PIER v r 416 75 I O tt PE BOAT RAMP I MISSING STEEL BAND Constructability Discussion The following describes each of the waterside elements, progressing north to south (See Figure 2 and Permit Drawing Figures 1-21). Figure 2: Proposed Features Location ID#* 20201355 Version* 1 Regional Office* Wilmington Regional Office - (910) 796-7215 Reviewer List* Holley Snider Pre -Filing Meeting Request submitted 10/1/2020 Contact Name * Doug Huggett Contact Email Address* dhuggett@moffattnichol.com Project Name * NCDMF South River Facility (Carteret County) Structural Repairs Project Owner* NC Division of Marine Fisheries Project County* Carteret Owner Address: Street Address 3441 Arendel Street Address Lne 2 aY Stale / Rake / Rxiion Morehead City NC FbstA / Zip mde C_" 28557 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: R 401 Water Quality Certification- r 401 Water Quality Certification - Regular Express r" Individual Permit r Modification r Shoreline Stabilization Does this project have an existing project ID#? r Yes t: No Do you know the name of the staff member you would like to request a meeting with? Holley Snider Please give a brief project description below.* The following is a description of the elements for the proposed Dock Structural Repairs (South River) for the North Carolina Department of Environmental Quality (NCDEQ) Division of Marine Fisheries (NCDMF) site. The elements proposed by the DMF are herein collectively referred to as the "Project" or "Proposed Project", which is subject to this application. The NCDMF proposes the removal and replacement of the northern timber pier, the extension of the pier, the removal of the pier wave screen, the removal and replacement of the failed timber fender piles, the removal of the failed 6-pile duster remnants, and the repair of the 6-pile cluster wire wrap. Other work will include encapsulating the northern bulkhead steel sheet piles with concrete, removal of the articulated mat boat ramp and replacing it with solid precast concrete panels and widening of the boat ramp. Project Location The South River facility is located on Tosto Road in South River, NC approximately'/i mile east of South River Road on the western bank of the South River near Its confluence with the Nauss River. The property lies along the western shore of the South River with a waterfront frontage of approximately 490 feet. Please note that a CAMA Major Permit was applied for on September 17th, at which time we were unaware of this requirement. 1 may be contacted at 919 646-0649. Doug Huggett (consultant) Please give a couple of dates you are available for a meeting. 10/6/2020 10/9/2020 10/12/2020 10/15/2020 Please attach the documentation you would like to have the meeting about. NC DMF South River Site Project Narrative 3.2M6 final.pdf pdm arty By digitally signing below,) certify that 1 have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request • I also understand that DWR is rat required to respond or grant the meeting request. Your project's thirty dayclock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature .AOG642-T N1198eT Submittal Date 10/1/2020 Contact Name* Contact Email Address* Project Owner* Project Name * Project County* Owner Address:* Is this a transportation project?* Doug Haggett dhuggeft@mffaftnichol.com NC Division of Marine Fisheries NCDMF South River Facility (Carteret County) Structural Repairs Carteret Street Address 3441 Arendel Street Address Lie 2 Oty Morehead City Rstal / Z9 Cade 28557 r Yes r No Type(s) of approval sought from the DWR: A 401 Water Quality Certification- r- 401 Water Quality Certfication- Regular Express r Individual Permit r Modification r Shoreline Stabilization Does this project have an existing project ID#? r Yes r No Sate / Province / Flagon NC C-*Y USA Do you know the name of the staff member you would like to request a meeting with? Fblley Snider Please give a brief project description below. * The following is a description of the elements for the proposed Dods Structural Repairs (South River) for the North Carolina Department of Environmental Quality (NCDEQ) Division of Marine Fisheries (NCDMF) site. The elements proposed by the DMF are herein collectively referred to as the "Project" or "Proposed Project', which Is subject to this application. The NCDMF proposes the removal and replacement of the northern timber pier, the extension of the pier, the removal of the pier verve screen, the removal and replacement of the failed timber fender piles, the removal of the failed 6-pile cluster remnants, and the repair of the 6-pile cluster wire wrap. Other work will include encapsulating the northern bulkhead steel sheet piles with concrete, removal of the articulated mat boat ramp and replacing it with solid precast concrete panels and widening of the boat ramp. Project Location The South River facility is located on Tosto Road in South River, NC approximately % mile east of South River Road on the western bank of the South River near its confluence with the Neuse River. The property lies along the western shore of the South River with a waterfront frontage of approximately 490 feet. Please note that a CAMA Major Permit was applied for on September 17th, at wfiich time we were unaware of this requirement. I may be contacted at 919 646-0649. Doug Huggett (consultant) Please give a couple of dates you are available for a meeting. 10/812020 10/912020 10/12/2020 10/15/2020 Please attach the documentation you would like to have the meeting about. NC DMF South River Site Project Narrative 3.2MB final.pdf Pdf any By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. I also understand that DWR is not required to respond or grant the meeting request. Your projects thirty -day clock started upon receipt of this application. You will receive ratification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * too Submittal Date 10/l/2020 Contact Name * Contact Enroll Address` Project Owner* Project Name" Project County" Owner Address:' Is this a transportation project?" Doug Hbggett d1huggett@molfattnichol.com NC Division of Marine Fisheries NCDMF South River Facility (Carteret County) Structural Repairs Carteret Street ArJdess 3441 Arendel Street Address Lie 2 Oty Morehead City Rstal / Zip (bde 28557 r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification- r 401 Water Quality Certification - Regular Etglress r Individual Permit r Modification r Shoreline Stabilization Does this project have an existing project ID#?' r Yes r: No StMe / Rovi / Rxjm NC oxxty USA Do you know the name of the staff member you would like to request a meeting with? Holley Snider Please give a brief project description below." The following is a description of the elements for the proposed Dock Structural Repairs (South River) for the North Carolina Department of Environmental Quality (NCDEO) Division of Marine Fisheries (NCDMF) site. The elements proposed by the DMF are herein collectively referred to as the "Project" or "Proposed Project", which is subject to this application. The NCDMF proposes the removal and replacement of the northern timber pier, the extension of the pier, the removal of the pier wave screen, the removal and replacement of the failed timber fender piles, the removal of the failed 6-pile cluster remnants, and the repair of the 6-pile cluster wire wrap. Other work will include encapsulating the northern bulkhead steel sheet piles with concrete, removal of the articulated mat boat ramp and replacing it with solid precast concrete panels and widening of the boat ramp. Project Location The South River facility is located on Tosto Road in South River, NC approximately''/] mile east of South River Road on the western bank of the South River near its confluence with the Neuse River. The property lies along the western shore of the South River with a waterfront frontage of approximately 490 feet. Please note that a CAMA Major Permit was applied for on September 17th, at which time we were unaware of this requirement. 1 may be contacted at 919 646-0649. Doug Huggett (consultant) Please give a couple of dates you are available for a meeting. 10/6/2020 10/912020 10/12/2020 10/15/2020 Please attach the documentation you would like to have the meeting about. NC DMF South River Site Project Narrative 3.2MB final.pdf pdf oriy By digitally signing below,) certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This forth completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your projects thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day, clock has expired, and you can submit an application. Signature * twee s Nu98e1T Subn tal Date 101112020 ANC State Property Office owleumy Atsset maintenance (Public Access) 1-00, I RequodDeecnanae Rstum t0 LlY 1 ommwta 11 w Repmt 11 Swd Link SitM Map OnEY RewvsBna OAa Bwws Bulging Aawt ID'. i8I3 I. Page I of I 000E Complex: 1 (INSTATE) v 18 (GYewQ v 5] Asset No:O C MARINE FISHERIES ANNEX Building Asset Status JOINNED(0) V Land Asset'.—S;WLand Meet Building Meet Name LOUTH RIVER MAINTENANCE SXOP Acdw: Department ♦000 ENVIRONMENTAL QUALITY) V Oviedo 19008(MARINE FISHERIES) v Asset Use 25 fSHOP (WASH 8 GREASE. CARPENTRY. RLA v Fixed Assel'. 0 Midmost 1124 SAVAU LANE City' BFAUFORT Latilode: .g5]812 Allen, ID'. CodaeYfben Type'. STEEL OR METAL BUILDING (S) V Original Net SFI F713 O'nosl Grow SgFI'. Fwoa 0 Aoquiti8en Date'. 11l]I2001 VYuatlon Method'. —Staid Valuetion Mathod — v Ineunna Year Ibcumem 01 plan.. Docummd 02 Filename: Document /3 Plenum Fie No AM...2. Sale. NC v Mp Code: 28518 LongduM'. ]8.588e0s URL'. Construction Cost 3188,002.00 Conatinchon Year: 2001 Cumin Net SyFC 4713 Cumin Grow SgFC 5000 Elewwn:OO Vaunt: Acquisition Cast: Bg.Bo Argnsi ion Method: —Sewct Acqu Gonwnl Vawe: 95 000.00 human. Value: 31005000. Fuel Type: IWS(2) VI AC Type. Bmwse.. Bmwse._ Pmwae._ RECEIVED Nov : 2020 MP %ECTION MHD https://www.ncspo.com/FIS/dbBldgAsset_public.aspx?BldgAssetiD=823 10/30/2020 AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: NC Division of Marine Fisheri s Mailing Address: 3441 Arendell Street Morehead City NC 28557 Phone Number: (252) 808-8042 Email Address: andy.gupton(@ncdenr.gov I certify that I have authorized Moffatt and Nichol Agent /Contractor to act on "my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: -Structural repairs to NCDMF South River Facility at my property located at 229 Tosto Road; Beaufort, NC. in Carteret County. l furthermore certify that l am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signature l��gS( (.vtJA�dr✓ Print or Type Name nL"J�eNlN G'C /CON 2UGT/Q:� SN/oe2urSG%L Title of r 1 , 2dzd Date This certification is valid through ■ Complete Items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the hack of the mailpiece, or on the front R space permits. 1. Article Addressed to: ! ZO okl Vonce6or,, kd A. Signature ❑ Agent B. D. Is delivery address different from Dern 17 ❑ Y% If YES, enter delivery address below: jd No N V aern AIC 2?1 6Q 1 II I IIIIII IIII IIII III III IIII I I III III III II III III 3 Service Type ❑ Priority Mail Express® ❑ Adult Signature ❑Registered MaiP"' ❑ Adult Signature Restricted Delivery ❑ Registered Mail Restricted' 9590 9402 5585 9274 4685 46 ❑ certified Mail Restricted Delivery ❑ Reform Receipt for ❑ Collect on Delivery Merchandise Ar' ' ••---.-•.__ ___a__ ,.w_n ❑ Collect on Delivery Restricted Delivery ❑ Signature Confirmation^' 7019 0160 0000 1777 6323 ❑ Signature Confirmation Mad Delivery Restricted Delivery PS Form - - - - , July 2015 PSN 7530-02-D00.9053 ■ Complete items 172, and 3. ■ Print your name and address so that we can return the card Lathe feveme ■ Attach this c,m t„ w._ .. you. nmll IIII IIII III II IIIII I ���� ��� 9590 9402 .rrog 7019 0160 0000 1777 6316 Domestic Return Receipt on Delivery Restricted Dpiivery ❑ it Restricted DHivery ❑ Domestic Return 01pt m ru m r f� ra 0 O 0 0 O a 0 u, a 0 r, 0557 09 ❑RahnRe p1(MUpp/) t ❑ RMun Rmelpt lelectnwoo t Poslmaek ❑CMMW Mal RnWae 0.My t HBIB ❑e s� RavA t._�Q0 09/17/2020 .00 $2.85 i19 Vu ee c.P� baw, addM�Yp1�re) ReNnResattd-vh t—fV eVTV ❑RMun Reoelq pbeuaYq i •00- RwIaWOMi Pos"wk ❑fiVeetM t� p.a.e.....w,.., t cn_nn Here p,wttYa+.. xmmraore.r t �oetage t1 $� 09/17/2020 ROY COOPER ame„a. MICHAEL S. REGAN Seem,ary BRAXTON C. DAVIS Diremm Coastal Management ENVIRONMENTAL QUALITY October 5, 2020 The NC Division of Marine Fisheries c/o Andy Gupton 3441 Arendell Street Morehead City, NC 28557 Dear Mr. Gupton: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of the NC Division of Marine Fisheries property located adjacent to the South River at 229 Tosto Road near Beaufort, Carteret County. It was received on October 1, 2020, and appears to be adequate for processing at this time. The projected deadline for making a decision is January 15, 2021. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from October 1, 2020, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right- of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. --�` othtng Compares-':-., State ofNorth Carolina I Environmemal Quality I Coastal Management 400 Commwue Ave I Momhead City, NC 28557 252 808 2909 T NCDMF Page 2 of 2 10/5/20 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Brad Connell Coastal Management Representative BC Enclosure CC: Gregg Bodnar, Asst. Major Permits Coordinator Roy Brownlow, District Manager Doug Huggett, Moffatt and Nichol Nothing Compares Stem ofNonh Cv hm I Emironmemal Quality I Coa ml Management 400 Cononnce Ave I Morehead City. NC 28557 252 908 2808 T —This is a word processing form to be completed in Microsoft Word"' NC Division of Coastal Management Major Permit Application Computer Sheet (11/1/2012) Applicant: The NC Division of Marine Fisheries Date: 10/5/20 Project Site County: Carteret Staff: Brad Connell District: Elizabeth City Washington ®Morehead City ❑Wilmington Project Name: NCDMF South River Date of initial application submittal (EX: 1/8/2007): 9117/20 Date application "received as complete" in the Field office (EX: 1/8/2007): 110/11/2020 Permit Authorization: MCAMA Dredge & Fill OBoth SITE DESCRIPTION/PERMIT INFORMATION PNA: Yes ONo Photos Taken: Yes No® Setback Required (riparian): Yes No Critical Habitat: ❑Yes NNo Not Sure 15 foot waiver obtained: Yes NNo Hazard Notification Returned: ❑Yes ®No SAV: Yes NNo ❑Not Sure Shell Bottom: Yes nNo Not Temporary Impacts: Yes NNo Sure Sandbags: ❑Yes nNo Not Sure Did the land use classification come from Mitigation Required (optional): county LUP: NYes ❑No []Yes ❑No Moratorium Conditions: Yes ZNc, Environmental Assessment Done: ❑NA []Yes []No N NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) Future Water Supply (FWS) 0 Nutrient Sensitive Waters (NSW) Swamp Waters (SW) High Quality Waters (HQW) Outstanding Resource Waters (ORW) WETLANDSIMPACTED (404) Corp. of Engineers (Jurisdictional (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort (Salicornia sp.) wetlands) (CJ) Saw grass (Cladium jamaicense) (SA) Salt marsh cordgrass (Spartina (SY) Salt reed grass (Spartina altemiflora) cynosuroides) (DS) Sall or spike grass (Distichlis (SC) Bullrush or three square (Scirpus El (TY) Cattail (Typha sp.) spicata) sp.) (JR) Black needlerush (Juncus 0 (SP) Salttmeadow grass (Spartina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 III(A) Private w/ D&F up to 1 acre; El III(D) Priv. public or comm w/ D&F to 1 3490 can be applied - $250 acre; 3490 can't be applied - $400 Minor Modification to a CAMA Major LJ Major Modification to a CAMA Major IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 Permit Transfer - $100 0 III(B) Public or commercial w/ D&F to 1 Express Permit - $2000 acre; 3490 can be applied - $400 El Major development extension request - U II. Public or commercial/no dredge $100 and/or fill - $400 252-808.2808 :: 1-888-4RCOAST :: www.nccoastaimanaaement.net revised: 02115110 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 4) ❑ I. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 revised 02115/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of al Applicant: NCDMF Date: 10/23/20 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. Activity Name Number TYPE Choose One REPLACE Choose One Dimension 1 Dimension 2 Dimension 3 Dimension 4 Plea l New Work Maint ® Replace ®Y ❑ N 5' 65' Bulkhead 2 New Work Maint R Replace MY ON 97', 20' 11,11 Boat Ramp 1 New Work Maint ® Replace MY ❑ N 259 60' revised 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 4) Applicant: NCDMF Date: 10/23/20 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact temp impacts) impact amount) temp impacts) amount Open Water Dredge ❑ Fill ❑ Both ❑ Other ® 325 ft2 325 ft2 High Ground Dredge ❑ Fill ® Both ❑ Other ❑ 2,890 ft2 2,890 ft2 Shallow Bottom Dredge ❑ Fill ® Both ❑ Other ❑ 694 fit' 694 ft2 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: w .nccoastalmanaaement.net revised: 02/15/10 ROY COOPER Governor ml_ MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Coastal Management ENVIRONMENTAL QUALITY October 21, 2020 The Carteret News Times Legal Advertisement Section 5039 Executive Drive, Ste 300 Morehead City, NC 28557 Re: Public Notice — NC Division of Marine Fisheries Dear Sir: Please publish the attached Notice in the October 25, 2020 issue of the News Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Jessica Gibson, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, owd &W Brad Connell Coastal Management Representative Enclosure cc: Gregg Bodnar Roy Brownlow Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 T NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on October 5, 2020. According to said application, the NC Division of Marine Fisheries proposes to make improvements adjacent to the South River, at 229 Tosto Road near Beaufort, Carteret County. A copy of the entire application may be examined or copied at the office of Brad Connell, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808-2808 during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to November 20, 2020, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISHED ON: October 25, 2020 nothing Compares? 5 State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 809 2808 T NOTI(04'$170A LAMA PERMIT APPLIE FOR PROJECT: Make repairs and improvements adjacent to the South River near Beaufort at 229 Tosto Road. COMMENTS ACCEPTED THROUGH November30, 2020 APPLICANT. FOR MORE DETAILS CONTACT NC Division of Marine Fisheries THE LOCAL PERMIT OFFICER BELOW. Brad Connell - DCM c/o Andy Gupton 400 Commerce Avenue 3441 Arendell Street Morehead City, NC 28557 Morehead City, NC 28557 (252)808-2808 ROY COOPER Oovemor MICHAEL S. REGAN Secretary BRAXTON DAVIS /wrrroq Uiviz;nn afr'aavlal Management October 20, 2020 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg. bodnar aa)NCDENR.gov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: NCDMF—South River Project Location: 229 Tosto Road, Beaufort Carteret County Proposed Project: Improvements to existing facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Great Bodnar at the address above by November 17, 2020. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. `*Additional comments may be attached" This agency has no comment on the proposed project. PRINT AGENCY SIGNATURE DATE This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Sisk ofNwb Carolim I Envuoomental Quality I Coastal Management 127 Cardin.] Drive Em_ Wilmington, NC 28405 919 796 7215 DCM Coordinator: Gregg Bodnar Applicant: h 1. n n e r Distributed YesM No ❑ Distribution Date: Ito AGENCY WIRO WARO 6�lt LPO Uri Rachel Love Adrick MHC Rachel Love Adrick Washingon DCM Planner Mike Christenbury Wilmington Charlan Owens Eliz City US COE: Liz Hair - Raleigh Bland (Beaufort, Camden, Chowan, (Carteret, Onslow, Pender) Craven, Hertford, Hyde, Perquimans, Tyrrell) Jordan Jessup (TBD) Josh Peletier — (Bertie, Currituck, Dare, Gates, Greg Curry (TDB) Pamlico, Posquotank, Washington) USCOE (NC DOT) (Brunswick, New Hanover) DOT - Tom Steffans—(Beaufort,Carteret, DOT Brad Shaver Craven, Pamlico (Brunswick, New Hanover, Onslow, Pender) Mark Zeigler (Onslow, Pender, New Community Assistance Hanover, Brunswick) Lee Padrick (Beaufort Carteret Craven, Eliz Lee Padrick (Beaufort, Carteret Craven City, Pamlico, Washington) Eliz City, Pamlico, Washington Cultural Resources Renee Gledhill -Earley Renee Gledhill -Earley Div. of Water Infrastructure Heidi Cox Clif Whitfield Marine Fisheries Anne Deaton Jimmy Harrison NC DOT 110yid Harris David Harris Shellfish Sanitation Shannon Jenkins & Sharon Gupton Shannon Jenkins & Sharon Gupton State Property Tim Walton & Mike Moser & Wanda Tim Walton & Mike Moser & Wanda Hillard Hillard DEMLR/DWR: Sheri A. Montalvo/Shelton Sullivan - Sheri A. Montalvo/ Shelton Sullivan (NC DOT) Kristy Lynn Carpenter Kristy Lynn Carpenter DEMLR Sediment & Erosion Dan Sams +� �!l,j Sami Dumpor Storm water Christine Hall Roger Thorpe DWR401 Robb Mairs (Carteret New Hanover Anthony Scarbraugh Onslow, Pender,) Chad Coburn (Brunswick) (NC DOT) Joanne Steenhuis Brunswick, New Garcy Ward Hanover, Onslow, Pender WRC Maria Dunn (WARW Maria Dunn (WARO) WRC (NC DOT) Travis Wilson Travis Wilson Natural Heritage Program ' ,Rodney Bulter Rodney Buller D:\Amanda\Amanda\Major Permit Processing\2020 Admin forms\Major Comment Distribution Sheet 2020.doac Revised: 5/7/2019 w Ll i September 17, 2020 N.C. Division of Coastal Management Brad Connell 400 Commerce Avenue Morehead City, NC 28557 US mottott & nichol Mr. Connell; The North Carolina Division of Marine Fisheries (NCDMF) intends to carry out improvements and maintenance and repairs to the Division's South River facility, which is located at 229 Tosto Road in eastern Carteret County. The proposed project, as detailed in the attached permit application package, is summarized as follows: 1. Repair and extend an existing dock, 2. Repair and enlarge an existing boat tamp, 3. Repair/reface an existing sheetpile bulkhead 4. Install a short concrete retaining wall for minor slope stabilization, and 5. Replace missing support banding on an existing pile cluster. With this information in mind, Moffatt and Nichol, on behalf of the NCDMF, respectfully submits this request for permit approval from the N.C. Division of Coastal Management (NCDCM). A CAMA Permit fee of $400 will be electronically transferred from NCDMF to NCDCM shortly. Should you have any questions about this submission, or if we can provide any additional information to facilitate your review of our findings, please feel free to contact me at (919) 645- 0649. Si , Doug Huggett Attachments: MP-1 Form MP-2 Form MP-4 Form Project Narrative Authorized Agent Form Certified Mail Receipts Drawings September 17, 2020 N.C. Division of Coastal Management Brad Connell 400 Commerce Avenue Morehead City, NC 28557 Mr. Connell; 1/11 mot tat: 6 I`C'lol The North Carolina Division of Marine Fisheries (NCDMF) intends to carry out improvements and maintenance and repairs to the Division's South River facility, which is located at 229 Tosto Road in eastern Carteret County. The proposed project, as detailed in the attached permit application package, is summarized as follows: 1. Repair and extend an existing dock, 2. Repair and enlarge an existing boat ramp. 3. Repair/reface an existing sheetpile bulkhead 4. Install a short concrete retaining wall for minor slope stabilization. and 5. Replace missing support banding on an existing pile cluster. With this information in mind, Moffatt and Nichol, on behalf of the NCDMF. respectfully submits this request for permit approval from the N.C. Division of Coastal Management (NCDCM). A CAMA Permit fee of S400 will be electronically transferred from NCDMF to NCDCM shortly. Should you have any questions about this submission. or if we can provide any additional information to facilitate your review of our findings. please feel free to contact me at (919) 645- 0649. Si rely, Doug Huggettt Attachments: MP-1 Form MP-2 Form MP-4 Form Project Narrative Authorized Agent Form Certified Mail Receipts Drawings SCO ID NO. 18-18815-02B DOCK STRUCTURAL REPAIRS (SOUTH RIVER) NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) DIVISION OF MARINE FISHERIES SOUTH RIVER, NORTH CAROLINA DRAWING INDEX INDEX NO. SHEET NO I SHEET TITLE GENERAL 1 G-001 COVER SHEET 2 G-002 APPENDIXB- BUILDING CODE SUMMARY 3 G-003 GENERAL NOTES&ABBREVIATIONS 4 G-lW OVERALL SITE PLAN DEMOLITION 5 D-101 DEMOLITION PLAN 6 D-301 DEMOLITION TV PI CAL SECTIONS D-901 1 DEMOLITION PHOTOS STRUCTURAL 8 S-0Ot STRUCTURAL NOTES 9 S-W2 STATEMENT OF SPECIAL INSPECTIONS 10 S-1m OVERALL STRUCTURAL SITE PLAN 11 S-101 PIER FRAMING & DECK PLANS 12 S-301 PIER ELEVATION & SECTION 13 S-W2 TYPICAL SECTIONS 14 S-6➢1 STRUCTURAL DETAILS SHEET t OF 2 15 S-502 STRUCTURAL DETAILS SHEET 2 OF 16 S503 STRUCTURAL DETAILS ADDITIVE BID ITEM NO.1 17 Sb04 I STRUCTURAL DETAILS SHEET 1 OF 2 ADDITIVE BID ITEM N0. 2 18 SSOS STRUCTURAL DETAILS SHEET OF 2 ADDITIVE BID ITEM NO. 2 19 5-506 STRUCTURAL DETAIL& SHEET 1 OF 3 ADDITIVE BID ITEM NO. 3 20 S-W7 I STRUCTURAL DETAILS SHEET 2 OF 3 ADDITIVE BID ITEM NO 21 S-W8 I STRUCTURAL DETAILS SHEET 3 OF 3 ADDITIVE BID ITEM NO NOTE: DEVELOPMENT WHICH WILL TAKE PLACE WITHIN THE LIMITS OF THE 100-YEAR FLOOOPLAIN AT ELEVATION +9.10 NAVD88 (+10.14 NGVD29) IS DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF EXECUTIVE ORDER NO. 123-UNIFORM FLOODPLAIN MANAGEMENT POLICY. C MV SITE• 0 r 0 0 u Q^ VICINITY MAP NTS mv� SITE g, LOCATION MAP VICINITY MAP NTS mv� SITE g, LOCATION MAP E NTS 2N��Q9fv i SEAL i g03]<]B NAi O _ _ PRELIMINARY =IN.�21 NOTTO BE USED FOR CONSTRUCTION .Y C 5 ORANING SCPLES SMONM 9RSFn nN JJ1Y' fIRGYNNf: SMB AREW.B BUILDING CODE SUMMARY I�rtl Axor Y.wav = w"wwmvoml I.r.OR1991— ❑rnr.b ❑rr .r ,r"rmrrr.rOrw ❑new_—®r L` N wee Dun— m1uuD �r .1.xc...n,ce mor rJ rm..o..• R..r. CMn�. r�ln. o.c.w.orcvrnxrYD,InIx�Ye vA.0 ri r..(t.1'swn'tv.Ax.YA KtD—bi— Y. L...rA ❑: .F D. D0. �...ww .M .D0 .rMO DM.0m ❑N.A D. .uoe x. ❑.. o. l Du On ❑r.Ds ..., ,....®w O...1.Mrr1 nr r..mD`IS. ........ Dr 0. � B.iE— an_ ".RO, S1 8. DI 0. D, w..Tx a. on ..ri._. ...r u.......A.....q®u. " ■ BY ❑.. .max+..-. 0 r.r....rrT.r.T..rrr.m .�r.Trr.r..w H•.in D.Tw�rr o r�rrra.n D �Mo,'an..uM 001+ails+r 0 Krrr.TrwnErrr�®u. rs_.�.an:ionii o A..Turrrr D rrwrr.rT.�rrrmiuxn Co. D O nr..rwr+.rTrm.rn..r.MNn.x ❑ r�rT..rrrarrrrT.rrr. n W—N .wu..:ra...�.uw4�Irrwlw.>as..r..n `M1 ��Yr�Y err.rrr�T.r.�Y.rrY..a�.. a-.— 0.. Ow 0. r++..mrrM n.�rwbw�M.F:.rw.y. T.rrr., w_br' .,. rTrrry rT� r..r rrp .UDLpCC000 SIIMMA`PY MM'Msxr[RRNMKM..aLF � WeY y_ 11 w .r.r �.. .ruw 4_ �..1= JL Mtucn DA 0..E 00 r"`rTrT.xrw. D� ap. o. D. w� ■n�.OxM.uxm rrrD .... i`::....+:.w... V . +qb eDeire'reSED BUILDING CODE SUMMARY MR ALL COMMERCIAL ApIECIS �wr �bMM r�br� aia rr. .1. Ane mD BUILDING CODE SUMMARY MR ALL C9OMMIERCIAAL BEOIECIS YrwarT.su O.m:r. Jr.e� o.r,r�rr...... o...,.rwD.MNr.r or....rrT.�I..nrlr NN WQ ED a w,. ywaf¢- m O ILg 2w m O i W n U m R,M— zit Ujp ao �.0 O N HNO 67 WN O DO Y UD Do =O skn 1N GARpI' sEu� olme SEAL SDBM Refemno No. PRELIMINARY G-002 NOT TO BE USED FOR CONSTRUCTION irvGER: 2 OF 21 GENERAL NOTES: 1. GENERAL NOTES ARE NOT INTENDED TO REPLACE THE CONTRACT DOCUMENTS. SEE CONTRACT DOCUMENTS FOR REQUIREMENTS IN ADDITION TO THESE GENERAL NOTES. THE CONTRACT DOCUMENTS SHALL CONSIST OF THE COMPLETE PROJECT WNUAL (SPECIFICATIONS) AND WORKING DRAWINGS INCLUDING BUT NOT LIMITED TO: ADVERTISEMENT FOR BIDS; NOTICE TO BIDDERS; INSTRUCTIONS TO BIDDERS AND GENERAL CONDITIONS OF THE CONTRACT, SUPPLEMENTARY GENERAL CONDITIONS; DIVISION 1 REQUIREMENTS, TECHNICAL SPECIFICATIONS; AND ANY RELEVANT ADDENDA ITEMS. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THESE DRAWINGS AND SPECIFICATIONS. 2, THE WORKING DRAWINGS ARE NOT NECESSARILY COMPLETE IN EVERY DETAIL. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, SERVICES, LABOR, ETC, FOR A COMPLETE INSTALLATION; INCLUDING WORK REASONABLY INFERRED FROM THE CONTRACT DOCUMENTS AS BEING NECESSARY TO PRODUCE THE INTENDED RESULTS, WHETHER SHOWN OR NOT ON THE DRAWINGS. 3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE STARTING WORK DO NOT SCALE PROJECT DRAWINGS. REPORT ANY DISCREPANCIES IN THE DRAWINGS AND/OR SPECIFICATIONS TO THE OWNERS REPRESENTATIVE FOR CLARIFICATIONS OR ADJUSTMENTS PRIOR TO COMMENCING WORK THE CONTRACTOR SHALL NOT BEGIN DEMOLITIOWCONSTRUCTION IN ANY SUCH AFFECTED AREA UNTIL THE DISCREPANCY HAS BEEN RESOLVED. 4. SHOULD THERE BE A CONFLICT BETWEEN THESE GENERAL NOTES, WORKING DRAWINGS, ANDOR SPECIFICATIONS, THE MOST RESTRICTIVE INTERPRETATION SHALL PREVAIL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING FROM THE OWNERS REPRESENTATIVE ANY CLARIFICATION OR INTERPRETATION OF THE GENERAL NOTES, WORKING DRAWINGS, AND/OR SPECIFICATIONS IN WRITING AND IN ADVANCE OF THE BEGINNING OF DEMOUTIO WCONSTRUCTION. 5. ALL FEDERAL, STATE, AND LOCAL SAFETY REGULATIONS ARE TO BE STRICTLY FOLLOWED. METHODS OF DEMOUTIONOONSTRUCTION AND INSTALLATION OF MATERIAL IS THE CONTRACTOR'S RESPONSIBILITY. 6. THE CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE, AND LOCAL ENVIRONMENTAL PROTECTION STANDARDS, LAWS, AND REGULATIONS. 7. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER THIS CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF WRITTEN ACCEPTANCE BY THE OWNER IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 9. THE CONTRACTOR SHALL KEEP ACCURATE RECORDS OF ANY CHANGES MADE TO THE DRAWINGS ON A SEPARATE WHITE SET OF PLANS PROVIDED BY THE DESIGNER. THESE ANNOTATED DRAWINGS SHALL BE RETURNED TO THE DESIGNER PRIOR TO APPROVAL OF THE FINAL PAYMENT APPLICATION. 9, THE NCDMF SOUTH RIVER FACILITY IS AN OPERATIONAL FACILITY. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER'S REPRESENTATIVE IN REGARDS TO OPERATIONS AND ACCESS TO THE PROJECT SITE. 10. THE CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITY, CONSTRUCTION, MATERIAL STORAGE. AND EQUIPMENT MOVEMENT WITH NCDMF OPERATIONS SO AS TO AVOID INTERFERENCE WITH AND IMPEDANCE OF FACILITY ACTIVITIES. 11. UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL, ON A DAILY BASIS, REMOVE FROM THE SITE ANY DEBRIS RESULTING FROM DEMOUTION/CONSTRUCTION. DISPOSAL OF MATERIALS IS THE RESPONSIBILITY OF THE CONTRACTOR. ALL MATERIALS TO BE REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR, UNLESS OTHERWISE NOTED, AND SHALL BE DISPOSED OF AS SPECIFIED. ALL DEBRIS SHALL BE PROPERLY DISPOSED OF IN A PERMITTED LANDFILL. 12. EXISTING CONSTRUCTION, INCLUDING UTILITIES AND OTHER MISCELLANEOUS ITEMS WHICH ARE TO REMAIN, SHALL REMAIN UNDISTURBED AND SE PROTECTED, UNLESS OTHERWISE NOTED. 13. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING, AT HIS OWN EXPENSE, ANY AND ALL DAMAGES THAT MAY OCCUR OUTSIDE THE LIMITS OF THIS PROJECT AS A RESULT OF DEMOLITIO WCONSTRUCTION. 14. ALL AREAS DISTURBED DURING DEMOUTIONICONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION, AT NO EXPENSE TO THE OWNER, UNLESS OTHERWISE NOTED. 15. THE CONTRACTOR SHALL PROTECT ADJACENT STRUCTURES, UTILITIES, PEDESTRIANS, AND VEHICULAR TRAFFIC FROM POTENTIAL DAMAGE DUE TO CONTRACTOR'S OPERATIONS. 16. THE CONTRACTOR SHALL PLACE CONSTRUCTION DEBRIS CONTROL DEVICES, TURBIDITY CURTAINS, BOOMS, TARPAULINS, FLOATS, STAGING, AND OTHER DEVICES AS NECESSARY TO PREVENT CONSTRUCTION DEBRIS FROM ENTERING THE WATER AND AIRBORNE MATERIALS FROM LEAVING THE IMMEDIATE VICINITY OF THE SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF ANY MATERIALS DEPOSITED OUTSIDE THE WORK AREA. 17, ALL CONSTRUCTION, EXCEPT THAT WHICH CAN BE PERFORMED FROM SHORE, SHALL BE CONDUCTED FROM BARGES, WORK BOATS, OR OTHER TEMPORARY PLATFORMS PROVIDED BY THE CONTRACTOR, AS APPLICABLE. IS. ALL BUILDINGS,SURFACE, AND SUBSURFACE IMPROVEMENTS ON AND ADJACENT TO THE PROJECT SITE ARE NOT NECESSARILY SHOWN HEREON. 19. LOCATIONS OF EXISTING UTILITIES AND STRUCTURES SHOWN ON THE DRAWINGS ARE APPROXIMATE. UTILITIES SHOWN ARE LIMITED TO FIELD LOCATION OF VISIBLE APPURTENANCES AND DO NOT NECESSARILY DEPICT ALL UTILITY LOCATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTLRIES PRIOR TO BEGINNING WORK VERIFY DISCREPANCIES WITH THE OWNER'S REPRESENTATIVE. 20. THE OWNER SHALL HAVE THE AUTHORITY TO DESIGNATE ANDOR LIMIT AREAS OF CONSTRUCTION. 21. LIMITED STAGING AREAS WILL BE PROVIDED ON SITE FOR THE CONTRACTOR'S USE. THE CONTRACTOR SHALL CONFIRM THE EXTENTS OF STAGING AREAS WITH THE OWNER'S REPRESENTATIVE. 22. WHEN SPECIFIED GRADING REQUIREMENTS ARE NOT SHOWN ON THE DRAWINGS. THE CONTRACTOR $HALL GRADE TO DRAIN ALL AREAS WITHIN THE LIMITS OF CONSTRUCTION, OR OTHERWISE DISTURBED BY CONSTRUCTION, AND ALSO TO MATCH THE ADJACENT GROUND. 23. THE CONTRACTOR SHALL NOT OVERLOAD EXISTING STRUCTURES DURING DEMOLITIOW CONSTRUCTION. OPERATION OF ANY EQUIPMENT OR STORAGE OF MATERIALS WHICH WOULD RESULT IN OVERLOAD WILL NOT BE PERMITTED. CRANE OUTRIGGERS AND OTHER SUCH CONCENTRATED LOADS SHALL BE PROVIDED WITH CRIBBING TO PROPERLY DISTRIBUTE THE LOAD. SAFETY OF PERSONNEL, REQUIRED EQUIPMENT, AND CONDITION AND SUITABILITY OF THE EXISTING STRUCTURES TO SUPPORT MATERIAL AND EQUIPMENT LOADS IS THE CONTRACTOR'S RESPONSIBILITY. 24, THE CONTRACTOR SHALL PROVIDE TEMPORARY SHORING AS REQUIRED FOR DEMOLITION AND CONSTRUCTION ACTMTIES. 25. THE OWNER MAKES NO REPRESENTATION$ ABOUT SUBSURFACE CONDITIONS THAT MAY BE ENCOUNTERED WITHIN THE LIMITS OF THE PROJECT. 26. ALL ELEVATIONS PROVIDED ON THE DRAWINGS ARE REFERENCED TO MEAN SEA LEVEL(MSL), 27. ELEVATIONS SHOWN ON THESE PLANS AND THE FOLLOWING REFERENCE DATA ARE BASED UPON INFORMATION PROVIDED IN THE ISSUED FOR CONSTRUCTION DRAWINGS DATED 7R420DS AND ARE REFERENCED TO NAVD88, UNLESS OTHERWISE NOTED. ALL CONTOUR ELEVATIONS SHOWN ARE REFERENCED TO NORMAL WATER LEVEL. CONTRACTOR $HALL BE RESPONSIBLE FOR VERIFYING ELEVATIONS PRIOR TO CONSTRUCTION. NAVDBB = OM FT NWL =-0.37 FT(NAVDSS) NGVD29 =-0.96 FT(NAVD8S) 28, THE DIMENSIONS, QUANTITIES, AND OTHER MISCELLANEOUS INFORMATION INDICATED IN THE DEMOLITION PLANS AND DETAILS CAN BE CONSIDERED TYPICAL AND WERE DERIVED FROM THE ORIGINAL CONSTRUCTION DRAWINGS AS PROVIDED TO THE DESIGNER BY THE OWNER. HOWEVER, THE INFORMATION SHOWN DOES NOT NECESSARILY REPRESENT ALL THAT MAY BE ENCOUNTERED DURING THE COMPLETION OF THIS PROJECT THE CONTRACTOR SHOULD ANTICIPATE VARIABILITY IN THE EXISTING CONSTRUCTION AND ALLOW FOR VARIATION IN THE PREPARATION OF HIS BID. THE FOLLOWING RECORD DRAWINGS WERE USED TO CREATE THESE PLANS AND WILL BE MADE AVAILABLE TO THE CONTRACTOR FOR INFORMATION ONLY. A. SOUTH RIVER BULKHEADNAMP FACILITY SHEETS 1 THROUGH S4 ANDREW & KRUSKE CONSULTING ENGINEERS, INC RECORD DRAWINGS DATED JUNE 22, 1988 BCD ID NO. 4392164688D B. ROADWAY IMPROVEMENT AND MAINTENANCE DREDGING SOUTH RIVER BOAT BASIN SHEETS CO THROUGH S2 CRISER TROUTMAN TANNER CONSULTING ENGINEERS ISSUED FOR CONSTRUCTION DRAWINGS DATED JULY 24. ZOOS SCO ID NO, 050656301 PROJECT SCOPE: 1, BASE BID: A. REMOVE AND REPLACE EXISTING NORTHERN TIMBER PIER SUPERSTRUCTURE B. EXTEND NORTHERN TIMBER PIER 15 FEET C. REMOVE NORTHERN PIER WAVE SCREEN D. REMOVE AND REPLACE FAILED TIMBER FENDER PILES E. REMOVE FAILED B-PILE CLUSTER REMNANTS F. REPAIR"ILE CLUSTER WIRE WRAP G. PROVIDE MODULAR BLOCK RETAINING WALL AT SOUTHERN BULKHEAD 2. ADDITIVE BID NO, 1: A. ENCAPSULATE NORTHERN BULKHEAD STEEL SHEET PILES WITH CONCRETE 3. AODRIVE BID 40. 2: A. REMOVE ARTICULATED MAT BOAT RAMP AND REPLACE WITH SOLID PRECAST CONCRETE PANELS 4. ADDITIVE BID 40.3 A. WIDEN BOAT RAMP 10-0. INDICATES ADDITIONAL INDICATES GRID LOCATION ON SHEET NUMBER WHERE 93 SHEET FOR PLAN, DETAIL, REFERENCE IS MADE -\. g4pi ELEVATION, OR SECTION BRQ INDICATES SHEET NUMBER WHERE DRANK OR TAKEN FROM REFERENCE BUBBLE DESIGNATION 9 I a ABBREVIATIONS: ACI= AMERICAN CONCRETE INSTITUTE NAVD= NORTH AMERICAN VERTICAL DATUM 1'' - AISC= AMERICAN INSTITUTE OF STEEL NC=NORTH CAROLINA CONSTRUCTION NCSBC = NORTH CAROLINA STATE BUILDING ALT = ALTERNATE CODE ANSI= AMERICAN NATIONAL STANDARDS NCDEO= NORTH CAROLINA DIVISION OF INSTITUTE ENVIRONMENTAL QUALITY APPROX = APPROXIMATE NCDMF = NORTH CAROLINA DIVISION OF ASCE= AMERICAN SOCIETY OF CIVIL MARINE FISHERIES a ENGINEERS NGVD = NATIONAL GEODETIC VERTICAL ASTM= AMERICAN SOCIETY FOR TESTING AND DATUM MATERIALS NIC = NOT IN CONTRACT AVM= AMERICAN WIRE GAUGE NO.=NUMBER AWS= AMERICAN WELDING SOCIETY NOAA= NATIONAL OCEANIC AND BOTT = BOTTOM ATMOSPHERIC ADMINISTRATION STW = BETWEEN NTS = NOT TO SCALE CIF = CUBIC FEET NW- NORMAL WATER LEVEL CIP = CAST -IN -PLACE O.C. = ON CENTER CJ = CONSTRUCTION JOINT O.D. = OUTSIDE DIAMETER C.L. = CENTERLINE P/C = PRECAST CLR = CLEAR PCF = POUNDS PER CUBIC FOOT IS CONC = CONCRETE PE = PROFESSIONAL ENGINEER CONN = CONNECTION PEN = PENETRATION 4 CONSTR=CONSTRUCTION PSF= POUNDS PER SQUARE FOOT CONT= CONTINUOUS PSI = POUNDS PER SQUARE INCH CONTD=CONTINUED OTY=QUANTITY CY = CUBIC YARD R = RADIUS DEL = DOUBLE REINF = REINFORCED DEMO = DEMOLITION REO'D = REQUIRED DIA = DIAMETER SCH = SCHEDULE MJ DIM=DIMENSION SCO= STATE CONSTRUCTION OFFICE OWN =DRAM SER= STRUCTURAL ENGINEER OF RECORD �Q m E=EAST SF=SQUARE FOOT Ww 4 EA=EACH BHT =SHEET EJ=EXPANSION JOINT SI= SPECIAL INSPECTOR NJWm �� EL = ELEVATION SP = SOUTHERN PINE W %m ELEC = ELECTRICAL SPA =SPACES CZ mC W Z ¢ ELEV=ELEVATION SO=SQUARE NHS > EMBED=EMBEDMENT 55=STAINLESS STEEL �0= w m EO = EQUAL SSP = STEEL SHEET PILE ETC =ETCETERA STA=STATION 'rN0 w¢ EXIST. = EXISTING STO = STANDARD W rn O O FT=FEET STL=STEEL OY U GALV = GALVANIZED SY=SQUARE YARD VO N GR=GRADE S4S=SURFACED 4 SIDES Z❑ H = HIGH T= TON HORIZ = HORIZONTAL THK = THICK ICC= INTERNATIONAL CODE COUNCIL TYP=TYPICAL 10 = IDENTIFICATION UDLL = UNIFORMLY DISTRIBUTED LIVE LOAD IN=INCHES JOIN = UNLESS OTHERWISE NOTED INC =INCORPORATED USACE = U S. ARMY CORPS OF ENGINEERS INFO=INFORMATION VERT = VERTICAL INT = INTERMEDIATE VLF= VERTICAL LINEAR FEET JT=JOINT W/= WITH FFF# ( K= KIPS OR 1" POUNDS ' = SECONDS OR INCHES KSI = KIPS PER SQUARE INCH ' = MINUTES OR FEET L = ANGLE OR LENGTH • = ASTERISK LB = POUND It = NUMBER OR POUND LF=LINEAR FEET B=AND a LG = LONG ®= AT MAX = MAXIMUM I = PLATE C MHHW= MEAN HIGHER HIGH WATER 0=DIAMETER MHW=MEAN HIGH WATER •=DEGREES g df ! 7E MIN = MINIMUM z= PLUS OR MINUS MISC = MISCELLANEOUS %= PERCENT MLLW= MEAN LOWER LOW WATER 9 g MLW = MEAN LOW WATER 3 LL MPH = MILES PER HOUR MSL = MEAN SEA LEVEL i MT- =MEAN TIDE LEVEL N=NORTH 0 5 t9 d V WA=NOT APPLICABLE NAD = NORTH AMERICAN DATUM u' o� PERMITS: AM c 1, IT IS THE INTENT OF THESE PLANS TO BE IN ACCORDANCE WITH APPLICABLE CODES AND AUTHORITIES HAVING JURISDICTION. ANY DISCREPANCIES BETWEEN THESE PLANS AND APPLICABLE CODES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE. I c E T 2. IS THE INTENTTHESE PLANS AND THE RESPONSIBILITY OFTHE CONTRACTOR COMPLY WITH THE ENVIRONMENTAL PERMITS ISSUED FOR THIS PROJECT. ITSHALL BE THE CONTRACTORS RESPONSIBILITY TO FAMILIARIZE AND GOVERN HIMSELF BY ALL PROVISIONS OF THESE PERMITS. �tN LtaoR' �q,4 i BEAL onne �RKE�P SKaet RNerenm No. PRELIMINARY I G-003 NOT TO BE USED FOR CONSTRUCTION IINDEX: 3 of 21 1 2 3 4 5 ' .• EXISTING CONC SLAB •• `GONG BLOCK TYP EXISTING d. 4' • d EXISTING ELEC / CONC BARRIER EXISTING PANELACCESS • •'• APPROACHH SLAB PLATFORM ru(( O EXISTING ELEC DUCT BANK n 4..' 6 B g PROX LOCATION OF EXISTING STEEL ISTING MECHANICAL SHEETPILE BULKHEAD --IL ANCHOR BELOW, TYP W/GONG CAP, TYP EXISTTNG STONE FILL I. ZZn si W- yp JAE m Q ry a =W n Q yccK- // / \ 1 1 I I = aFF � \ \ I I I 1 n ® Ny EXISTING VIWL -- CEO= \\ \1 SHEETPILE1 NC] > EXISTING B-PIL� I I TIMBER PILE EXISITNG BELOW\ WAVE SCREN dN,_— I \ \ I I CLUSTER,TYP°1 I GRADE COFFER DAM„ pL__ UUEXISTING I'� T_ Z 9 /I\ `\ FENDER I SCOUR APRON, TYP BOAT RAMP \\ ARTIICULATED CONC MAT PILE, TYP O L _ 0 I 1 I -_-_ EXISTING TIMBER PIER 0.-L:-x O fill 1 I l I I I O m--x O EXISTING I I I I TIMBER PIER i i -- EXISTING I I�` \ s B I � 1 3-PILE TIMBER 1 PILE CLUSTER - gE EXISITNG UNDERWATER j 714 1 ` `_ H�+gyg rI CONTOUR, TYP, SEE NOTE I I o= O __ O wP / __ o O I / / - o E ca tH Aa�� ��ssl sEAL 'f NOTES: mine 1. FOR DEMOLITION PLAN ,SEE SHEET D-101. t `ApIEe" FOR OVERALL STRUCTURAL SITE PLAN, SEE SHEETON y P yet 1 SURVEY SHOWN IS FROM 3. RY FROM THE RECORDFEREFERENCED •�.. RACTH I DATIEDUCTION ER BOAT BA T NWL.GS RIVER BE ARE REFERENCED TONWL.CONTRACTOR CONTRACTOR IOK 05ERIFYIN0CURRENT lDGB ANDRIVERBED lad ad tad tad RESPONSIBLE SHALL BE RESPONSIBLE FOR VERIFYING CURRENT RIVERBED DEPTHS PRIOR TO CONSTRUCTION. SCALE: 1"=10' Shcet RSNlmlra Nojo PRELIMINARY (,.�pp NOT TO BE USED FOR CONSTRUCTION INDEX: L OF 4 5 pUWRG ELEC PANEL ACCESS REMOVE & STORE TIMBER STAIRS FOR REINSTALLATION ,REMOVE CONC BLOCKS REMOVE S STORE LIGHTPOLE FOR REINSTALLATION EXISTING ELEC DUCT BANK TO REMAIN I jI BELOW GRADE COFFER DAM I &PILE TIMBER TO REMAIN REMOVECONC BARRIER & BOLLARD (ADDITIVE BID REM NO. 3) CONIC MATS, TOTAL (ADDITIVE BID REM I PILE CLUSTER I I TO REMAIN, TYP a � 1 ARTICULATED y / I CONIC MAT SCOUR R1 / I APRON TO REMAIN I 1 � I 1 I � / I IN EXISTING UNDERWATER 1 I CONTOUR, TYP, SEE NOTE 1 I 1 I � I 1 I I P5 I I I I I 1 I INSTALL WIRE WRAP /\Ji) // / ��-� / I I TIMBER PILE CLUSTER I p� I � I i i I / I i i 1 / / / ` LEGEND: APPROXIMATE DEMOLITION PHOTO LOCATION 6 DIRECTION, FOR PHOTOS, SEE SHEET D-901 / REMOVE FAILED TIMBER PILE / / CLUSTER REMNANTS, CONTRACTOR r / TO REMOVE IN ITS ENTIRETY O1 i APRON 9 CONIC SLAB TO REMAIN APPROACH/� SLAB TO REMAIN REMOVE ARTICULATED y199SOU •99 1904..Y9Yn9 i9Y999Y9Y9. /9Y0Y9s9Y9. V, APPROX LOCATION OF V MECHANICAL SOIL ANCHOR ,9�Y Y:Y=YaY:YEL • • 9 TO REMAIN, ,CJ9Y9Y91�� � C9�9�9Y9� i i9�9rY9Y9�I. �t - ,6*0- •n�9�����•��99�L�C1 DO094-0 9�imse 91 9Y9���9�9�9� - .0.0 MCI-DC,D9��99999�i ��9.9.9����9�9�9�i - PILE TO TYP TIMBER PIER TO REMAIN I I 1 1 1 I 1 I 1 1 1 I 1 I I 1 1 I I 1 1 1 I I I 1 1 1 i 1 i 1 1 1 I 1 1 I 1 1 1 1 1 1 1 1 1 / a0 REMOVE FAILED TIMBER FENDER PILE, CONTRACTOR TO REMOVE IN ITS ENTIRETY, TYP (2 TOTAL I I I � I I I � I I I I I I I I I I I I I TIMBER PILE C PILE CLUSTER I TO REMAIN, TYP I � I I I I j I I I lily I I I I I iI - I I � I I � I I I � gll� I I I I 1 I I STEEL SHEETPILE BULKHEAD WJ CONIC CAP TO REMAIN, TYP REMOVE TIMBER STRINGERS, BENTS. CROSS BRACING & HANDRAIL AT EXISTING PIER, PILES TO REMAIN I 1 � I \` I I I I I I / 1 / 1 NOTES: 1. HYDROGRAPHIC SURVEY SHOWN IS A REPRODUCTION FROM THE RECORD DRAWINGS TITLED 'SOUTH RIVER BOAT BASIN,- BCD IDIJ ONB80901 DATED 7242008 AND ARE REFERENCED TO NWL. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING CURRENT RIVERBED DEPTHS PRIOR TO CONSTRUCTION. 2. DIMENSIONS AND INFORMATION SHOWN ARE BASED ON THE TWO REFERENCE DRAWINGS PROVIDED BY THE ONMER AND DETAILED IN THE GENERAL NOTES ON SHEET G-M CONDITIONS ARE BASED ON VISUAL INSPECTION BY MOFFATT & NICHOL DURING A SITE VISIT ON 5112019. 19-0' VJ 19a W-0 SCALE: I"-I(F PRELIMINARY NOT TO BE USED FOR CONSTRUCTION r ptN C4N0� 9 J wk§ d B 05 Sh.t Reference NO. D-101 INDF 5 OF 21 1 2 3 4 5 s�z REMOVE 12'0 TIMBER 10'4'* SB'4'4 FENDER PILE IN ITS APPROACH BOAT RAMP ENTIRETY SLAB tt S1 REMOVE TIMBER HANDRAIL D REMOVE 2x12 TIMBER EXISTING SHEETPILE � CAP & CONNECTION BULKHEAD W/CONC TOP OF RAMP CAP TO REMAIN REMOVE DEL 2x10 EL t1.0 (NAVDBB) TOP OF BULKHEAD CAP SHARDWARE TIMBER BENT CAPS & EXISTING CONC EL H.5 (NAVDW) 10.. REMOVE DSHAPED CONNECTION HARDWARE APPROACH SLAB aCD RUBBER FENDER • TO REMAIN '�ROry • REMOVE EXISTING ARTICULATED CONC • • MATS TO LIMITS SHOWN N RMAL WATER i REMOVE 2x8 TIMBER CROSS • • BRACING, BLOCKING, 8 ABANDON EXISTING REMOVE 64 TIMBER CONNECTION HARDWARE,MECH S WATER 8 CONNECTION SEE NOTE 2 TYP IS TOTAL�CHOR, APPROX EXISTING MUDLINE, HARDWARE, TYP TOP OF COFFER DAM EL VARIES RESTORE EXISTING GRADE SLOPE AFTER EL-7.5 (NAVDBB) / W� 12'0 *TIMBER PILE MAT REMOVAL WHERE NECESSARY PRIOR W ID TO REMAIN, TYP REMOVE 14'-0'* HIGH TO INSTALLING SOLID PRECAST PANELS as tV IM 6 9 VINYL SHEETPILE WAVE = r- . L1 SCREEN 8 TIMBER EXISTING BELOW GRADE vl W m a WALERS IN ITS ENTIRETY COFFER DAM TO REMAIN LL Q °` z ZO C C3 DEMOLITION SECTION ADDITIVE BID ITEM NO. 2 =R''a' 8l-=0 o F o o-m1 scAtr:: wtira->>_ �w APPROX EXISTING F y p o MUDLINE, EL VARIES QVl W ;t My ZG VI a M NOTES: eq 1. FILL ABANDONED SCREW AND BOLT HOLES IN TIMBER PILES WITH TREATED WOOD FILLER MATERIAL. 3y 2, CONTRACTOR TO REMOVE EXISTING CROSS BRACING AFTER INSTALLATION OF NEW TIMBER BENT CAPS TO MINIMIZE & • - y MOVEMENT OF EXISTING PILES DURING DEMOLITION.- fE ; C1 DEMOLITION SECTION 6tet SLAIE:ITTO 3 1� a h m 3 B w " D�t9dV � o I: E _ CA A ea as ea ea• wTme SCALE: IM'=1'-V ��a "a`k�'g sw t9) SCALE: 1/2'=1'-(r Sneer Reference No. PRELIMINARY D-301 NOT TO BE USED FOR CONSTRUCTION INDEx: a of i1 .! 1 2 3 4 5 C SHDWN BASED T2YS1' DRAWING 1 2 3 4 5 REMOVE TIMBER REMOVE ITB TIMBER *07 STRINGERS, FENDER PILES IN THEIR BENTS, CROSS ENTIRETY, TYP (3 TOTAL) — BRACING & - E'2"0 TIMBER REMOVE TIMBER HANDRAIL. PILES 1 v: ,<, IN THJR STRINGERS, BENTS, CROSS -C REMAIN `ll - "-` `� BRACINGBHANDRAIL M $ ;.. -., �' - "="��"' REMOVE VINYL REMOVE VINYL REMOVE FAILED TIMBER SHEETPILEWAVE c+_ SHEETPILE FENDER PILE CONTRACTOR / SCREEN REMOVE TIMBER STRINGERS AALE SCREENB TO REMOVE IN ITS ENTIRETY, TIMBER WAITERS BENTS, CROSS BRACING B B c. -- TYP (2 TOTAL) HANDRAIL, PILES TO REMAIN WK DEMOLITION PHOTO t 2 DEMOLITION PHOTO 2 3 DEMOLITION PHOTO 3 0.101 NOLTO SCALE 0.101 NOTTO50ALE 0.101 NOTTOSLLLE W W Q p www— O W C C z N,=— HS 0 QU~O t REMOVE FAILED TIMBER REMOVE & STORE V PILE CLUSTER REMNANTS, LIGHTPOLE FOR 1 a 80 0 O CONTRACTOR TO REMOVE MISSING REINSTALLATION— GY U aa IN ITS ENTIRETY CABLE WRAP 0O W p 20 — B _ d pp 4 f_ L.RR-EMOVE& �' W --s - '— - REMCVE STORE TIMBER OONCBLOI'S STAIRS FOR a S t G c �� REINSTALLATION•": y(� y d 5 a DEMOLITION PHOTO 4 5 DEMOLITION PHOTO 5 6 DEMOLITION PHOTO 6 m P 101 NOT TO SCALE D101 NOT TO SCALE 0101 NOT TO SLALE $ 4 p g u 05 w � Mao � � s o _ I� !. = IE._ _IMF -6 REMOVE CONC BARRIER $ BOLLARD (ADDITIVE BID ITEM NO 3) ,,ggtH cm." Y'�FSS1�%YT REMOVE ARTICULATED A CONC MATS (ADDITIVE Aa n411f a y BID ITEM NO. 2) r �G1NEEe ayo e 2TL'R.1�F' g sva tyT A.n_. $heel Rebrenm No. 7 DEMOLITION PHOTO 8 DEMOLITION PHOTOS PRELIMINARY D-901 D101 NOi TOSCALE 0.101 NOT TO SCALE NOT TO BE USED FOR CONSTRUCTION INOE%: T OF 21 .! 1 2 1 3 4 5 C IX NG STALES SHdMi BASEll ON 1 U'M WM DESIGN CRITERIA: 1. TIMBER FIXED DOCK. A. UNIFORM LIVE LOAD ............................ 70 PSF B. CONCENTRATED LIVE LOAD ............ . ........ 400 LB POINT LOAD CONCRETE AND REINFORCING STEEL: 1. ALL CONCRETE WORK SHALL BE PERFORMED IN ACCORDANCE WITH ACI 301"SPECIFICATIONS FOR STRUCTURAL CONCRETE", UNLESS OTHERWISE NOTED ON THE DRAWINGS. ALL REINFORCED CONCRETE MATERIALS SHALL BE PROPORTIONED, FABRICATED, DELIVERED, AND PLACED IN ACCORDANCE WITH ACI 318 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETP. 2. ALL DETAILING, FABRICATION, AND ERECTION OF REINFORCING STEEL SHALL CONFORM TO THE LATEST EDITION OF THE "ACI MANUAL OF CONCRETE PRACTICE' INCLUDING BUT NOT LIMITED TO: ACI 301 SPECIFICATIONS FOR STRUCTURAL CONCRETE' AND ACI SPE6 "ACI DETAILING MANUAL". 3. ALL REINFORCING BAR SPLICES SHALL BE CUSS "W TENSION LAP SPLICES IN ACCORDANCE WITH ACI 318, CHAPTER 25, UNLESS OTHERWISE NOTED. 4, ALL CAST4N-PLACE CONCRETE SHALL BE NORMAL WEIGHT CONCRETE (145t PCF). 5, MINIMUM CONCRETE COVER FOR STEEL REINFORCEMENT SHALL BE 3', UNLESS OTHERWISE NOTED ON THE DRAWINGS. 6, PROVIDE &P, W CHAMFER ON ALL EXPOSED EXTERNAL CORNERS OF CONCRETE, UNLESS OTHERWISE NOTED ON THE DRAWINGS. Z ALL JOINTS BETWEEN CAST -IN -PUCE CONCRETE AND HARDENED CONCRETE SHALL BE CLEANED WITH A ROUGHENED SURFACE OF 1/4' AMPLTTUDE AND COATED WITH A BONDING COMPOUND IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS, UNLESS OTHERWISE NOTED. 8, CONCRETE MATERIALS SHALL CONFORM TO THE FOLLOWING, UNLESS OTHERWISE NOTED: A. CAST -IN -PLACE CONCRETE ...................... 50D0 PSI Q 28 DAYS B. PRECAST CONCRETE DECK PANELS .............. 6000 PSI 0 28 DAYS Q PRECAST CONCRETE BOAT RAMP ................ S XI PSI Q 28 DAYS D. CEMENTITIOUS GROUT .......................... 8000 PSI Q 28 DAYS 9. REINFORCING STEEL SHALL BE IN ACCORDANCE WITHASTM A915. CONCRETE REINFORCING MATERIALS SHALL CONFORM TO THE FOLLOWING, UNLESS OTHERWISE NOTED: A. REINFORCEMENT FOR CONCRETE. ASTM A 615. OR 60 STRUCTURAL AND MISCELLANEOUS STEEL: 1. ALL STEELWORK SHALL BE PERFORMED IN ACCORDANCE WITH THE AISC SPECIFICATIONS FOR THE DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS. ALL WELDING SHALL CONFORM TO AWS D1.1. 2. STEEL MATERIALS SHALL CONFORM TO THE FOLLOWING, UNLESS OTHERWISE NOTED: A. MISC PLATES, BARS, S SHAPES .................... ASTM A 38. GALV, LION B. BOLTS, LAG SCREWS, 8 NUTS .................... ASTM A W7, GALV, LION C. THREADED ROD...... ............ ............ ASTM F 1554. GR 55 D. CAST IRON OGEE WASHERS ...................... ASTM A 4B E. SS PLATES 8 SHAPES ............................ ASTM A 276, TYPE 316 E SS BOLTS/ANCHORS.... ....................... .. ASTM A 10 OR ASTM F 593, TYPE 310 G. SS NUTS. . ....... .... ......... —_ .......... ASTM A 194 OR ASTM F594, TYPE 316, 8 ANSI B1822 H. SS WASHERS ................................... ANSI B18.22.1 (TYPE A -PLAIN), ANSI 818 71.1 (LOCKING), TYPE 316 3. ALL STEEL SHAPES,PLATES, OTHER FABRICATIONS, AND ALL HARDWARE INDICATED SHALL BE ZINCCOATED OR GALVANIZED BY THE HOT -DIPPED PROCESS IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A 123 AND/OR A IM, AS APPLICABLE, AFTER FABRICATION, UNLESS OTHERWISE NOTED. 4. FIELD TREAT DAMAGED GALVANIZED STEEL FINISH WITH TWO COATS OF HIGH ZINC DUST OXIDE PAINT, COLD GALVANIZED COMPOUNDS, OR APPROVED EQUAL, CONFORMING TO THE REQUIREMENTS OF ASTM A 780. IN ADDITION, ALL EXPOSED THREADED SURFACES SHALL BE PAINTED WITH TWO COATS OF HIGH ZINC DUST OXIDE PAINT AFTER INSTALLATION OF THE NUT. I. ALL TIMBER CONSTRUCTION SHALL CONFORM TO THE RECOMMENDATIONS OF THE AMERICAN INSTITUTE OF TIMBER CONSTRUCTION. 2. TIMBER PILES SHALL BE DRIVEN TO THE TIP ELEVATION INDICATED ON THE DRAWINGS. USING A HAMMER OF AN APPROVED TYPE, WITH A CAPACITY AT LEAST EQUAL TO THE HAMMER MANUFACTURERS RECOMMENDATION FOR THE TOTAL WEIGHT OF PILE AND CHARACTER OF THE SUBSURFACE MATERIAL TO BE ENCOUNTERED. 3, SPUDDING AND/OR JETTING OF TIMBER PILES SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS. 4. TIMBER PILES SHALL BE TREATED IN ACCORDANCE WITH AWPA U1 AND Ti FOR TIMBER IN SALTWATER IMMERSION. 5. ALL SOLID SAWN LUMBER AND TIMBERS SHALL BE TREATED WITH ACZA OR CCA IN ACCORDANCE WITH AWPA (USE CATEGORY SYSTEM STANDARD Ui-14, USE CATEGORY STANDARD 5B) FOR TIMBER SUBJECT TO SALTWATER IMMERSION. MINIMUM PRESERVATIVE RETENTION SHALL BE 2.50 POUNDS PER CUBIC FOOT. 6, FIELD TREAT ALL CUTS AND ABRASIONS IN TREATED TIMBERS AND PILES IN ACCORDANCE WITH THE AMERICAN WOOD PRESERVERS ASSOCIATION STANDARD M4. TRIM ALL CUTS AND ABRASIONS BEFORE FIELD TREATMENT. COATALL DEPRESSIONS OR OPENINGS AROUND BOLT HOLES, JOINTS, OR GAPS INCLUDING RECESSES FORMED BY COUNTERBORING, WITH PRESERVATIVE TREATMENT USED FOR TIMBER AND PILES. 7. TIMBER RELATED MATERIALS SHALL CONFORM TO THE FOLLOWING, UNLESS OTHERWISE NOTED: A. TIMBER PILES..... ....... ........... ............ ASTM D 25 B. TIMBER BENT CAPS .............................. SP NO. 1 DENSE (S4S) C. TIMBER STRINGERSIHEADERS......... .......... .. SP NO. I DENSE(S4S) D. MISC TIMBER.. .. . . — . . . .................. ... SP NO. I DENSE(S4S) E. TIMBER DECKING .................. ............. SP SELECT GRADE DECKING F. CONNECTING BOLTS 8 NUTS.... ..... ............ . ASTM A 3D7, GALV, LON 8. V%HEN CONNECTING HARDWARE IS SHOWN ON THE DRAWINGS, THE TYPE, SIZE, SPACING, AND ALIGNMENT ARE CRITICAL AND MUST BE MAINTAINED. DO NOT UNDERCUT WOOD. CONNECTIONS SHALL PULL AND HOLD MEMBERS BEING JOINED INTO CLOSE CONTACT. 9. WASHERS SHALL BE CIRCULAR FLAT SMOOTH AND SHALL CONFORM TO ANSI B18.22.1. USE DOCK WASHERS OR OGEE WASHERS WHERE INDICATED OR REQUIRED. 10. CHECK ALL BOLTS BY BURRING THE THREADS AFTER THE NUTS HAVE BEEN FINALLY TIGHTENED. RECOAT EXPOSED PORTION OF BOLT WITH TWO COATS OF HIGH ZINC DUST OXIDE PAINT. 11. COUNTERSINK ALL TIMBER HARDWARE TO PROVIDE 1Q' MINIMUM CLEARANCE BETWEEN BOLT AND/OR NUT AND THE OUTSIDE SURFACE OF TIMBER MEMBER BEING JOINED. 12. BORE HOLES FOR THRU BOLTS WITH A BIT 1116 INCH LARGER IN DIAMETER THAN THE SHANK OF THE BOLT. 13. TIMBER PILE WORKING (UNFACTORED) LOADS: A. 12-O TIMBER PILES ............................... 12.5 KIPS Le m wa 4 y LLwjm 2 ate= 0j0 r UNN0 O N WY zU U0 N 20 o E A � a Nr m �a � a # a E K$ gs g B 3 g � D m� LL 0 -• -t -Y E E cnt 5Gt 5fteel Reference No 5-001 INCE% 8 OF 21 Ioi Shan ad of Special Inspections Present: North Cardin. Upson of Marine FSM1Ies-Sau1M1 Riser- Dock Sbuchrtal Repade locution'. Saulb allver. NC Owner's Rel>esentatrva: Andy Canyon Canners Address: 3e41 Arendell Strand, Nom ease Or , NC 281 This Stetereent of Special Inspactions Is submitted as a condraton for PermitIssunee in aanMance wire i Special Inspection resettlements dine 2010 Norm Carolina State Builder, Code, It indsdea a Sdredule of Spacial Inspection Semces applicable to this Protect, the ire of the Special Inspector, the idmt0y of other appeared agendas retained for wndueeng Social hommetbnq and the as,wrad irepedor pudifintians. This SatmrOMd Spectel lnapxYbnswaspnpamdbymefollowing Dwory dR : Ja seem .... zP as .PE seW3hd The Specal Intel shall keep records doll special inWsvtiom and teals and snail lumahe reDorls fo the Slade Londncnon Olfice anti the Desgren d RecoN- Repada mall mdlcu[a g co woos ion t ter or teded wan Mesas rgi cpsh in conformat to weh ma dide attention construction tlocummts. Diswvered determinationspareshall be brought t0 the Imi rid attention del Conbaclor far correction. If Meham,Constra are netweeded, Dealer. of shall be bry Ins to thes enthrone d con Sam,Constrainthe Cn Olfice and the Designers d Record The Special Inspections pognm does rot Mteare the Cpneactor of his or Mr reaponsibirNes. Interim reports sled be su0rtrined fo this, Sam ConlAudion Office. Came, and ma Desynars of RecoN. heerlm Repast Fn01ax MonMty A Final Report ofSpedat Inspections dooJrnerrerg correlation of all models Special Inspector, tasting, and correction d any aisrxpandes should the subnined Peter to iaseares of a CoNiWts of Use and Occeparney. Job Site safety and mean anal methods of nortbudlore an sdely the responsibility of the Contndo,. Career's Authwvamh Accepted for ma SCO by: Spnaba. Date Sgn.. Date 2 d 5 Schedule of Special Inspection Services. The following sbsste wmprge the repaired s3ledulrs of shallot napec0ons for the. project. The conswdten a faces ancient mature special Inspection for this Preject are as fdbas. ❑ $M1uelva Sam a high Seraen IsA4ne ❑ taera"a Inear[n[ ❑ webme of srulwL SwN ❑ Ramme] aaereaat. Pia. a Sam Cdumm ❑ hcsd-Forma steel oM ❑ wri I —Pr mlard Maarel onsan❑ wam l classes rinmwtmn f. Stall FramiJ�Gf�s fuN ❑ Faenmaa Fnrsh bmn ® fNwx. GawNon ] "s-hesewm Pa..—&,. ❑ namaaycaama�aae ❑ fai cxra ® yeas, ❑ fabini.q fell at 5yslern.>sF. ❑ Jdb ❑ sptlal Insrai her Wmd Reslssara Driven Deap Fo ae a ❑ Swabllnzl>ASlorrslaSeivriclaama— ❑® Dwl-,- a cep PoUMau.n. ,..� ir.wonr.t.—'r — 4 p.ada. a Im,mnm.rmna.. P.a.�rsma=—"-�,..n-haafXa,IM1rra Avmrraaw sowmalt..arait. Aavm. a. Inspection Agenda Firm Name B Point ofAmmel Con an pllpsal Erlil 1. 8pertlsape[W8st) 2 Tea VAPc/RA-1) x TaskeA fral a oetrrMYtl Fprw faa-11 s oew(a.p { I Note: The Inspection am thanrg age alf WA M engaged by e. Amer M the Retaliated D"in Prolemb l d RewN acing as et owners agent, and rmt by the Canbam m Subwneader wM1ne aark Is to the impeded or tested My rorMict of interest must be disclosed to the State Conavudon Mine pra to camrrincirg work. Seismic Castle Category: IE A 0 a 0 e 0 D I5W[vnred Speed vady. ❑ toluenes ❑ 'where, 0 ai2lench Vand EJ,Pyyre Category'. ❑ e 0 c 0 0 )d5 Scttdule of Soedal Inspection Sanlees Concrete ConsbuceP kne"Peon Tat Tat Nee rs.efsCaada aleabr6 IIICNC fetal Alert 1. kT)ave-r-n.rrqudag peura ❑ P AO tlsA. IaM.,again essae.A 261Mx germ m e.] a aakyrdr96aaamaarav—artiar: d an vMfa'valEedlin eraarradge.ndr ❑ v zsa /CIM6a 1Tn.3 M ASTM AIpa uq mYtlra 4Y ❑ P MMA G. InspM snple paafilM wepsi 6ryn lnsrea;u.ema ores cure agwrr ❑ < AaxseC121i 4z a wrraae Azmla' InswRanenwa uuin conoew ❑ P AN a. Inamn. adnarcno3laaaann ❑ e AO A❑ Mrderwe mrvewws MreoneNa 1743A iq'aNIY it Warm PeellW pare wrrwma anirsn� ❑ v MJ l)d] a ashy nrdes'.eonesrve ancnm pnrlWb nareerma mower¢w+m wlanlaoanarPa ❑ F MA 1)A: a. lnspen memaerraiannwv nubbin narn.m rm ❑ P Micrs. im.i. 4 Cdixr mi. eeagn�aM veray Ue mlHmb leas aunn9 ineralwlon 21 1ebt3, el YIS, �a ❑ C teexl0 6 RYrm renew yamnenl.ladaugaM1rla In anangm lmb.pMmm strAap era aavatM cla ctJ2 f.e'sards—i-asarnpaww.1. Mho, rat. .a. AamA. safe ❑ C ACI 1e3 tMs. d Impact--te aM a,—, res, plc .la, poperapprvatnn.amnyuae 19ox7. BNa ❑ C t)qs. ). DelenrepansapxansVrca-n l,a—1 aze raAA..e e toads byaliwmnwemmlrtcYv.'.aara q Nclacsarron,gpaa ❑ P /O" 190e1 6 Vslry wnec wrnrg mream lxsnquas neasnrernarhii 'A86 x Iru�rnon lwPremessel-mrcreta ❑ Mho v. OMene apmlm;mMwaatraaslre twm , . 1mpKm,9rma�oIWMMIXeaVestinpte. ass ne Per 1. ran. ale alma. alfxemson, TIPC-1—:;- PT a mls Irvmaand a sal aseal 11,t 1arame, a>e®N nwneaalz Inexact Itir. M.ao, tralgn atdamnaiom of tn. mrmaerrranoer bun1J. ❑ talifigir'nes CtlIM.mJl wstremmla PSTM b1atY enancmMferem W .alb w wupRrq Memo .d5 Senedbte of Specal Inspection Sergioes Wood Construction trrtpassail0t Test FJp naeelerle Nr CaalY API IIpY alPeld IICNC 1. Fetinmmr®eAMtlm Jgeramasrd.A.M meet wttI Mahnaa w lelements anal ❑ C 1701 In VtyfeenretwAuelTabir6M Jess ❑ e Intel e. a. ..atfiretasMmmpiurm I— cal nacorn imm of l_adiratwn Im's 1Jo5.5 2 Iky.b] dupnraama AWS snearnirp saam the .aarnig ❑ P 1J115.51 arctlparel eu. mr.af emM one ❑ P AtrIG tfie.6t rr" a myth mirom artlatr}lrg al plv nNg panel �gawe a a1PN I2J.,2 ❑ P JTn.x1 e waaM-w atamenian,Tn.arr.rYny am apamg mmpnxefeM lm n.oa.m ao.r.wrd. x Far�fer.le-aonnad.a Darer ❑ v 1Jrms3 awm.n W fed m moo. rNvlalcon r.eMu Sofa Schedule of Special IMpediort Sonseas Orton Deep Foundations... Mspesnan Task Tilsit Tfee Na(♦laaP WO APrO a 11AlmNd NM 1. YeMyNNapbMYbn mOawb. ❑ C 1M) aIu area laa/e mn1/ cN the mYralloramnlwb a. obrwpiabtlreed Orlre O C t)Ex) Ay.Ma. ras eah" rrpk.eANre.rWA. J. IredNOMpsptaa Mmaea ❑ c 1)ai.) b mr[leaa ed call romY tlr lma .. VSMr ❑ c trek) riamatesslatwts lrarnr®.a Cap., rwean p. lm a pwr.Ovl. r.p.r p.rwkr. m.aeae ae+or nwar. p.ed eu w..rd�tmyaa.e enomtr a1MaMiNnu.a�eeamieMYY,TY]alYrbbfeeeebGY�p madana—anaem.sya�s`a.aevd mass. •w�as.ob•n®a....aaea.rwuersur sa=o.w'e.r...a.*"•.no-a:A r.m,.�a�r.aarsrrrre�v+we+l.r.ao+la+wrr PRELIMINARY NOT TO BE USED FOR CONSTRUCTION N� as 9 o_ dues 4 W�wm 0 n ME a 1--,0 z0,- w aU�p wya Q 6F'NO N Z WY O pV U VO H zo 3 <H CM0, ± q.A 7 SFAL i i oJJme � ii Q'tGINEEp,y�J ¢1F'R. Pfff` sFAt Sheet Reference No. S-M Hai 9 OF 21 LEVEL GRADE RETAINING WALL da BEHIND WALL CONC SLAB REINSTALL * § (ADDITIVE BID ITEM NO. 3)---- EXISTING TIMBER STAIRS 65- d EXISTING77 PANELACCESSACCESS PLATFORM, SEE NOTE x CONIC APPRO q SLAB(ADDIT b BID ITEM NO. EXISTING ELEC DUCT BANK w_ REINSTALL Y 0 d < EXISTING LIGHTPOLE m a i N V W= Y <10 EXISTING STONE FILL F p C= w ➢,2 xa iIr \ \ \ \ EXISTINGBELOW 1 GRADE CDFFER DAM ® \ \ 1 \s960 E PIC CONC BOAT RAMP \ 1 I 1 1 ER 1 I (11PDITNEBID fTEMNO. 3)- 1 ; \\ I PILE CLUSTER, BYP PILEEXISTINGCLUSTER, I _ \ T 1 I I 1 1 l l 1 1 11 \6\ 1 Kl—EISTING UNDERWATER II Il II 1 I I CONTOUR. TYP, SEE NOTE 1 I / WI/ I INSTALL RE WRAP I \Bl� / TO EXISTING& PIUE TIMBER PILE CLUSTER, SEE NOTE 3 / � r � I I I EXISTING TIMBER PIER I I I I I I I i i i i i i / , / / / / / 9 CONC SLAB EXISTING CONC APPROACH SLAB CIP CONC CLOSURE POUR SHEETPILE BULKHEAD W/ CONC CAP, TYP Zrz w BS M aQ�F N jZ; JmWF 0 S— w w m BZ w \� O \ \ m I\ TYP(4 TOTAXI �— I I \\ I \\ w 1 \ 1 � I 1 I 1 I 1\ NOTES: 1. HYDROGRAPHIC SURVEY SHOWN IS A REPRODUCTION FROM THE RECORD DRAWINGS TITLED 'SOUTH RIVER BOAT BASIN; BCD IDN 050656301 DATED 724riON. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING CURRENT RIVERBED DEPTH$ PRIOR TO CONSTRUCTION. 2, DIMENSIONS AND INFORMATION SHOWN ARE BASED ON THE TWO REFERENCE DRAWINGS PROVIDED BY THE OWNER AND DETAILED IN THE GENERAL NOTES ON SHEET G-M. CONDITIONS ARE BASED ON VISUAL INSPECTION BY MOFFATT 6 NICHOL OUR ING A SITE VISIT ON 5H2O1B. 3- INSTALL NEW WIRE WRAP AT EXISTING& PIUE TIMBER PILE CLUSTER SHOWN. WIRE WRAP SHALL CONSIST OF 6 TURNS OF 1.0 GALVANIZED CABLE WITH 3 CLAMPS AT EACH END. STAPLE EACH TURN TO EACH PILE. CENTER WRAP 5'-0 BELOW EXISTING WRAP. 4, TEMPORARILY BRACE EXISTING ELECTRICAL PANEL ACCESS PLATFORM DURING CONSTRUCTION OF NEW RETAINING WALL. \ BULKHEAD CONC ENCASEMENT (ADDITIVE BID ITEM NO. 1) AB1 ism SF P/C CONC BOAT RAMP 1 6501 (ADDITIVE BID ITEM N0. 2) I D1 j $309 1 R � EXISTING SCOUR I APRON, TYP I �19/ FOR PIER PILE AND FRA\ SEE SHEETS-1 1 16-WBOAT RAMP SEE SHEET $-101. 1 ADDITIVE BID fiEM NO.2) FOR PIER DECK P ( SEE SHEET S-101.1 , I I 1 � I I r I I � I I I I I I I 1 NEW TIMBER 14 FENDER PILE, 1 I ( TYP(7TOTOL) I I I I I I I 1 EXISTING 3 PILE 1 TIMBER PILE CLU 1 I I II 1 � I 1 1 I I 1 I l 1 1 I n I I m I I 1VL' 0'-0' 101Y illii SCALE: I"0' PRELIMINARY NOT TO BE USED FOR CONSTRUCTION L �14 �e 8 8 N� Qua N = 0: a: Ww w We w Z,gym aVjO 2QQ J moz jDa O] f N � wy`O m clU y UO Z� 3 - A a ' 3 B w Him, i12 ��od� I: o E CA 1N F0, h� SEAL a SEAL t mTae INEEp swL SNeat Retelenca No. S-100 INDE%: 10 OF P / / 8641't / / / pgf C.L. BENT C47Y C.L. BEM EXISTING TIMBER PILE BENT SPACING 4SPACES Q104Ts•404Ts C.L. / BENT / .pI C.L. BENT T$' 8' O 1 T. . TYP 9® BENT SPACING i I 51-T TIP a 4BENT SPACING Q 3 I 5�1 1 5 NEWIEXIST PILE BEM DESIGNATION, TYP / / 6 / 1b' / / GALV THRU BOLT WI OGEE WASHERS, TP/ / / 7 31'p7�ON8 f NEW 12'0 TUBER PILE, TYP (4 TOTAL) I I / EXISTING 12"B TIMBER PILE, TYP I 2104 TIMBER BEM CAP, TYP, SEE BDJ BxB TIMBER STRINGER,TYP 4xe TIMBE CORBEL, D3 US TI BER BLO ING, TYP — C.L. PIER ----- _ --- y — — w 8301 TYP, SEE IHXM o. J PILEROW _----------- 6x12 TIMBER ___ T / _�__—___ II— ------- TUBER BLOCKING ___—_ wl — —_ ain DESIGNATION, TYP J EXISTING SSP BULKHEADW/ EDGE BEAM, TYP 12"0 TIMBER FENDER PILE W/ 8"xS5W- "DSHAPED RUBBER FENDER, TYP C� am1' 'k I T FENDER PILE, TYP, EE A3 PIER EXTENSION CONIC CAP / NOTE: — — — — — — — — — — — — — — — — — — _ — — _ — — — — — FOR TIMBER PILE SCHEDULE, SEE SHEET SaDP. C1 PILE AND FRAMING PLAN slap scAle. vc-ro CONIC PANEL C PANEL, CONIC PANEL, TYP, UON NC PANEL CONIC PANEL 6x12 TIMBER EDGE BEAM, TYP 5 anz TIMBER STRINGER BELOW, TYP / / YB GALV CARRIA / / BOLT, TYP, SEE / sam 8xo2 / b 7 =Al 118" GAP. TVP 178" GAP,717 SLOTTED P/C CONIC TIMBER DECKING. SEE Q'I 8302 O O TIMBER FENDER PILE W/ RUBBER FENDER, TYP / 0 / O PANEL, TYP EXMING&PJLE — — — EXISTING SSP C1 L I TIMBER CLUSTER BULKHEAD W/ S3o1 CONIC CAP / �_ _ _ — _ — _ _ _ — — — — — — — — — — — — — — rAIN DECK PLAN slop xxe:llnra 1•a as za 4•a SCALE: 31B"�1'-0" PRELIMINARY NOT TO BE USED FOR CONSTRUCTION 1 2 3 4 5 8t NEW 12"OTIMBER FENDND ER PILE, TYP E1+90(NAVD88) TYP TOP OF FENDER TOP OF BULKHEAD EL+4.5 (NAVD88) CAP EDGE EL+5.0 (NAVD88), TYP � fi D BIM�BLIER TOP OF DECK BOTTOM OF EXISTING SSP NEW 8"A" D-SHAPED SLOTED PtC PANEL CONCBEYOND, m BULKHEAD WI RUBBER FENDER, TYP, SEE NOTE TYP CONC CAP i NYV EXISTING -1 MUDLINE, EL VARIES K WQ t N O NEWWEXIST PILE BEM W W 4 DESIGNATION, TYP y gJ$Wm N 1 2 3 4 8 7 8 ZjKm' 2' gKQVF' F NOTE: 0= w' THROUGH BOLT MOUNT RUBBER FENDERS TO TIMBER pXjy—p w PILE PER MANUFACTURER'S RECOMMENDATIONS. W .1 O L) w 00 w =� a a C1 PIER ELEVATION 6101 SGIE'1C•1'd' �1 R b i g B TOP OF BULKHEAD CAP TIMBER DECKING SLOTTED PIC PROVIDE 1/B• GAP 3 ppp 6 EeE 6 8 EL+4.5 (NAVDW) CONC PANEL, TYP BTW PANELS, TYP TOP OF DECK a M "ti.'. _i'•;; +4.5 (NAVD88) a a is .. .. .. .. B .:::(' .� L s S a o i i p9i - TIMBER TIMBER EXISTING SSP EXISTING BOTTOM OF STRINGER, TYP CORBEL TIMBER NEW N BULKHEAD W/ TIMBER TIMBER EDGE BEYOND, TYP BLOCKING TIMBER S g o CONC CAP PILE, TYP BEAM BEYOND TIMBER BENT BEYOND, TYP PILE, TYP & $0 LL CAP, TYP V� gN 'EL-037(NAVDSB) QS R i 0ajj n S EXISTING Li Li Li MUDLINE, 61 ELVARIES o -E NEWEXIST PILE BENT o E j DESIGNATION, TYP SI 1 2 3 4 5 8 7 8 p ZV'�ESSto2 y ac A Al PIER SECTION EIEf �],INE6�pyS 1 Stet -0• WI PE q 4'V 17 ' 2'-0' a'p' Sheet SCALE: 3IB"=1'-W Reference No. PRELIMINARY S-301 NOT TO BE USED FOR CONSTRUCTION INDEX: 12 OF 21 1 2 G 1 31 5 IXUWNG SLOTTED P/C CONIC PANEL B' GAP, TYP- TOP OF DECK EL+4.5 (NAVDSS), SEE NOTE 1 TIMBER STRINGER BEYOND-/ TIMBER BENT CAP J TIMBER CROSS B3 BRACE, TYP, SEE EL+9D(NAVDW) EL+9.0(NAVD88) -- NEW 12"0 TIMBER SLOTTED P/C New 1r IIm FENDER PILE CONC PANEL I FENDER PILE TIMBER EDGE EL *5.0 NAVO88 PROVIDE 1/e"GAP, TYP BEAM, TYP EL+5.0(NAVDS8' TOP OF PECK TIMBER BLOCKING EL+4.5 (NAVDSB) -: w TIMB CKING SEE NOTE 1 TIMBER IR STRINGER BEYOND TIMBER I ®I TIMBER CORBEL, TYP TIMBER BENT CAP I® CORBEL, TYP ®\ ro TIMBER CROSS B3 BRACE, TYP, SEE awe GALV THRU BOLT GALV THRU BOLT W/OGEE WEE WASHERS, TYP ® I 1 WASHERS, TYP NWL 9 AlmO I EL-0037(NAVD88) BLOCKING, EL -0,37 (NAVD88) BLOCKING, SEE A3 SEE A3 e RUBBER I S3o2 FENDER, EXISTING FENDER, PIES rP TIMBER TIMBER PILE, TYP SEE NOTE 2 SEE NOTE 2 EXISTING MUDLINE, EL VARIEI PILE TIP UNKNOWN 1 74Yt I I.-_ I PILETIP C.L. PILE OL PILE EL D(NAVD88) NOTES: 1. CONTRACTOR TO FIELD VERIFY AND MATCH TOP OF DECK TO TOP OF EXISTING BULKHEAD CAP. 2. THROUGH BOLT MOUNT RUBBER FENDERS TO TIMBER PILES PER MANUFACTURER'S RECOMMENDATIONS. 61 SECTION 81°t SCFLE Y4' 1'd PILE SCHEDULE PILE LOCATION PILE TYPE PILE CUT-OFF ELEVATION (NAvo98) ESTIMATED FILE TIP ELEVATION (NAvoee) BID LENGTH (VLF) DRIVEN PILE TIP ELEVATION (NAW88) PROVIDED PILE LENGTH (VLF) A7 12"OTIMBER 3.38 41.0 45.00 AS 12"0 TIMBER 3.38 41.63 45.00 87 12"0 TIMBER 3,38 41.63 4TW BS 1210 TIMBER 3.38 41.0 45.00 C2 12V TIMBER 900 38.00 45.00 C3 12"O TIMBER 900 36.00 45.00 C4 12"0 TIMBER 9.00 38.00 45.00 C5 12"O TIMBER 9.00 36.00 45.00 CB 12"O TIMBER RIX I -WD0 45.00 C7 12"OTIMBER 9.00 1 3 Do 45D0 CS 12'0 TIMBER I 9D0 1 36.00 45.00 C.L. PILE C.L. PILE NOTES: 1. CONTRACTOR TO FIELD VERIFY AND MATCH TOP OF DECK TO TOP OF EXISTING BULKHEAD CAP. 2. THROUGH BOLT MOUNT RUBBER FENDERS TO TIMBER PILES PER MANUFACTURER'S RECOMMENDATIONS. 63 SECTION 5191 SCAtE: Y4+1'JI' tN cww C� lq �f 111Ai°a� TO WALL WALL 4 TO WALL WALL 4 T CHAMFER, TYP LEVEL GRADE EL SEE NOTE SEE N CIP CONC /- RETAINING WALL e•.� 3" CLR I•�"' TYP APPROX AB BARS EQUALLY SPACED, TYP EACH FACE BARS Q I'-0" O.C.. TYP EACH FACE p6 BAR 3 3g uwee) z•s NOTE: TOP OF RETAINING WALL TO MATCH TOP OF ADJACENT BULKHEAD CAP. � � � � � � a A B5 SECTION = YY h q p � o C i g}'?"' �5' € �m2 V o u AM E E CM° 2-0' 0'-0' 1A' 2'4' i a SEAL 3 ro7ne }} 9J R. yfl S l 55eet Rekrenoe No. PRELIMINARY S-302 a NOT TO BE USED FOR CONSTRUCTION INI]EX: t3 or n 5 i 2 C.L. STRINGER C.L. BENT I 6912 TIMBER EDGEBEAM, W Ti 3M"0 GALV STL 1 THRU BOLT WI OGEE WASHER, TYP II II II I I I I �31 II I I 1 I I I I I/ I 11 11 I\ I I I I I I 3x3x,/2 GALV STL 4x5xB"LG \ ' ANGLE, TYP ` A\ TIMBER IA 4x3xiR GALV STL BLOCKING ,/rBxr LG GAJLV LAG BOLT ANGLE, TYP W/ OGEE WASHER, TYP SA TIMBER TIMBER PILE BELOW STRINGER 2x14 TIMBER BENT B C CAP BELOW, TYP PLAN TIMBER 4,2" EDGE BE F 2111 w O 1/B" GAP TYP b z TIMBER STRINGER, w SEE NOTE 2 TIMBER BLOCKING, 1 P/C CONC PANEL, TYP w F `4 EL MS SEE NOTE 2 I m Z Q' - _OL.BOLT F -a --- ------w -- - - - -4 o d. 1 v Typ. m GALV 1- m O O O g THRU BOI 0 ______ BOTTOMEDGE ______ GALV LAG BEAM BEYOND. TYP BOLT, TYP 314-0 GALV STL THRU BOLT, TYP GALV STL ______ ANGLE, TYP TIMBER BENT CAP, TYP SECTION A -A 1/B" GAP TIMBER EDGE BEAM PIC CONC PANEL C.L. BOLT „R" EL MS TIMBER EDGE BEAM 1 P/C CONC 4 PANEL Y EL -4.5 0 4 F --_— - - GALV THRU �.� m C GALVSTLANGLE BOLT, TYP I I GALV STL ANGLE � b I I I I BOTTOM OF STRINGER I I I I SECTION B•B I I TIMBER BEM CAP NOTES: „M" 1. PRECAST CONRETE PANEL NOT TIMBER PILE TYP GALV THRU SHOWN IN PLAN FOR CLARITY. BOLT, TYP 2. SET TOP OF TIMBER BLOCKING AND STRINGER TO BOTTOM OF PRECAST C.L. BOLT CONCRETE PANEL. SECTION C-C At CONNECTION aw, acALE z-,'n L EDGE BEAM � 05 TIMBER CORBEL 314"0 GALV STL THRU BOLT W/ OGEE WASHER, TYP C.L. BOLT C.L. BOLT D3 TIMBER CORBEL atot SCALE t+1'L' V P/C CONC PANEL PB GALV STL CARRIAGE BOLT W/ OGEE HER WC CONC • PANEL a x J c 0 I I d 1 AA II TIMBER CORBEL I NOTE: SET TOP OF TIMBER CORBEL TO BOTTOM TIMBER OF PRECAST CONCRETE PANEL. STRINGER C3 SECTION C4_ CONCRETE PANEL ATTACHMENT 3-0m SGIE:3y1'-0' 6101 SGlf:2"1'tl TIMBER BENT m CAP, TYP OB�'LO�MNG w ---TIMBERPILE BELOW�100 GALV BOLTW/—� -- OGEE WASHER, TYP J TIMBER STL ANGLE, TYP FENDER TIMBER EDGE PILE BEAM, TYP PLAN TIMBER EDGE BEAM SxSxVLG P/C CONC PANEL TIMBER BLOCKING GALV BOLT—+ _ 127 TIMBER FENDER TIMBER 0 PILE BLOCKING L+ TIMBER BENT CAP BEYOND � � SECTION r A3 1 TIMBER BLOCKING AT FENDER PILE 6101 SCALE.,,?.,.d. 9 1 2x14TIMBER BENT CAP, T 314"0 GALV STL THRU BOLT W/ OGEE WASHER, TYP PLAN TIMBER EDGE BEAM GALV STL ANG TIMB BEN EL -4.5 E GALV THRUER T CAP BOLT, TYP I of W� m ww 4 I SEE NOTE I yKW� ra i I OI ¢ wKaW w w 00 EXTEND NOTCH IN PILE REO'D �w = AS om ONwo Jm NEWOR pY U N c EXISTING PILE U L) z o 3 PILE pb ELEVATION �1 NOTES: o w C 1. TIMBER EDGE BEAM AND STEEL ANGLE NOT 3 SHOWN IN PLAN VIEW FOR CLARITY. 3 sp 2. CONTRACTOR MAY UTILIZE OLD MOUNTING R y S LOCATIONS IN EXISTING TIMBER PILES FOR HARDWARE REQUIRED TO ATTACH BENT CAP TO : a e j PILE. OLD LOCATIONS MUST NOT CONFLICT 8 WITH THE ATTACHMENT OF STEEL ANGLE, IF EXISTING HOLES ARE ABANDONED FILL WITH TREATED WOOD FILLER MATERIAL. 3 r ! ¥ w 65 TIMBER BENT CAP stot s6YE: t 1 r 1 Z y $ 3 9 3 B w § b � s - 0 E I jis SCALE: 1' 1'4T' ,q-1Y cAgo�i d` ra av r t'a sEAL mina SCALE:I I1r C Cd C 1'd R. p mu t91 SCALE: 2 m1'4Y PRELIMINARY =R;S= NOT TO BE USED FOR COUCT) C 5 fW4YMNC. SfSI FS SNdM.19LSFIl ON 41L' R111MNG BULKHEAD CONIC 1 I 2 1 3 1 4 1 5. 1'e's C.L. STRINGER C.L. STRINGER TIMBER m 3 EQUAL SPACES 1 DECKING O �.L ANCHOR C.2 U I T3M' ROD GALVTHREADEDABED 1IB'MIN _® SdR TIMBER EDGE a TYP ROD W/ OGEE WASHER,GAPTYP LAG BOLT, TYP BEAM, TYP 'e 'e I FIELD DRILL 8 EPDXV TIMBER I TIMBER EDGE MB' MIN EMBED, TYP DECKING BEAM, TYP �I lip I mN li 4 .. TIMBER BENT 12'O GALV D CAP BELOW, TYP �l LAG BOLT, TYP I S 2 I J STRINGER, TYP 2A8 TIMBER HEADER 340E RING mod. .. SHANKNAILSAT 62 SECTION ; C EACH END, TYP SaE2 BCAIE' 11Rti1'm B A —AE ® PIC CONIC C TIMBER I I PANEL C.L STRINGER 3 EQUAL SPACES C.L. STRINGER STRINGER, TYP I i I US" IN � GAP, TYP TIMBER DECKING A + I BOTTOM OF PIC CONC I TIMBER EDGE U IIII� I PANEL BEVONO BEAM, TYP W m a N ww 4 J ;Ap L TIMBER PILE Z W EV F N d• ____—_ BELOW, TYP ----- — _ LL J W m w w asoz 2X8 TIMBER 2>aee G N NOTE: STRINGER, TYP R V w TIMBER DECKING NOT SHOWN FOR CLARITY. 21B TIMBER HEADER, ] Z t NOTCH AS REQ'D 4W TIMBER KO O N BLOCKING, TYP Cn W CI C Cl TIMBER DECKING cY s,ln BCNE: ,-.ra C2 SECTION Up N C.L BOLT C.L BOLT 6a02 SGIf t t!3'Yt'd- 2 0 2x6TIMBER DECKING, T BULKHEAD CONC CAP — GALV EPDXY ANCHOR yj NOTCH O O STRINGER BOLT, TYP TIMBER HEADER � PIC CONIC as I AS REp 0 BOTTOM OF EDGE TIMBER BLOCKING NOTES: BEAM BEYOND 1. TIMBER PILE AND BENT CAP NOT SHOWN FOR CLARITY. 2. PROVIDE MINIMUM IIB'GAP BETWEEN DECK BOARDS AND BETWEEN DECK BOARDS AND ADJACENT CONCRETE PANELS. 3. ADJUST WIDTHS OF TIMBER DECK BOARDS AS REQUIRED TO COMPLETE SPAN. B1 SECTION ssoz NOTTo BCALE 2a8 TIMBER 2-16d RING SHANK NAILS 1 DECKING, TYP� �® EACH STRINGER, TYP BULKHEAD CONC CAP TIMBER HEADER TIMBER HEADER GALV EPDXY ANC�Rr A PIC TIMBER STRINGER CONIC e PANEL u `BOTTOM OF EDGE —TIMBER NOTES: BEAM BEYOND, TYP BLOCKING BEYOND 1. TIMBER PILE AND BENT CAP NOT SHOWN FOR CLARITY. 2. PROVIDE MINIMUM lfr GAP BETWEEN DECK BOARDS AND BETWEEN DECK BOARDS AND ADJACENT CONCRETE PANELS. 3, ADJUST WIDTHS OF TIMBER DECK BOARDS AS REQUIRED TO COMPLETE SPAN. Al SECTION 5! NOT T030ALE 12*0 BOLT, ,CE NOTE: CONTRACTOR MAY UTILIZE OLD MOUNTING LOCATIONS IN EXISTING TIMBER PILES WHERE FEASIBLE. NEW CROSS BRACING SHALL BE INSTALLED AFTER DECK INSTALLATION IS COMPLETED. B3 CROSS BRACE CONNECTION S ` BtlLLE: V.l•a 3M'0 GALV THRU BOLT, TYP 2a TIMBER CROSS �BRACE,TTP TIMBER GUSSET %Ai�\ CROSS BRACE BLOCKING sass eruE:,,.r.,'k� a a E a 3 � H2 V �C_IdV S � o c -e o E SN CARO�� 1'J C4Y 1'J YO REAL AonToe SCALE: 1'•1'-0' Y�T,�OINE RiLL SCALE: 1 1l2'�1'-0' Sheol ReRearxs NO. PRELIMINARY S502 NOT TO BE USED FOR CONSTRUCTION INDFJC IS of 21 1 2 3 4 5 i 25'-1•x 2T-1(•x REMOVE EXISTING NG STEEL PLATE 8 n STEEL CHANNEL FROM BULKHEAD EXISTING BULKHEAD CONIC CAP EXISTING BULKHEAD S65'o3 CONC CAP, TYP r AS I CONIC ENCASEMENT I 5 wa TOP OF BULKHEAD TOP OF BULKHEAD D EL 4.5(NAVI)W) EL4.5(NAVD88) e I §u § I I j 1 I I NWLEL-0.37 a �'(NAVD88) .• oNWL EL-0.3] a � 1 1 r(NAVD88) £ I CONC ENCASEMENT ` e Q L CONIC BOAT RAMP IF EXISTING SSP BULKHEAD C.L. TIMBER PIER B, - } ssha NOTE: TIMBER PIER NOT SHOWN FOR CLARITY. Dt EAST BULKHEAD ELEVATION D4 SOUTH BULKHEAD ELEVATION S1W EST fr1W SGllE: 1Nti1'-0' N� W � BI Wa W JO 2 EL4.5(NAVD88) EL 4.5(NAVD88) EL 4.5(NAVDW) 20-0't LLEWm w W . - 1B'S•t W��� OF C C ' c < (FIELD VERIFY) _��� J Qa EXISTING IS BULKHEAD EXISTING BULKHEAD r EXISTING BULKHEAD q EXISTING EXISTING Bi i = w d d CONC CAP [N G CONIC CAP d ' M 4 GRAVEL CONIC CAP d' h frw3 EXISTING p' O U O GRAVEL FILL d GRAVEL FILL d FILL G BULKHEAD O' W a TOP OF BULKHEAD CONIC CAP O Y V G Q Q Q a EL 4.5(NAVD88) Z� W 7 1 7 II L3X.i , TYP u 1 L3x3)w, TYP II �� LWX.V8, TYP II a o ROUGHEN . II ROUGHEN . II ROUGHEN . II BOTTOM OF EXISTING CONC II BOTTOM OF EXISTING CONC II BOTTOM OF EXISTING CONIC II § I a NWL EL-0.37 o w CAP TO 1W . ''a_ CONC r CAP TO 1/4• ice. ICONIC f ?' CAP TO 114' ry CONIC f q V (NAVD88) rL y N 2 o x AMPLITUDE d O AMPLITUDE d O AMPLITUDE d 0 II - ENCASEMENT °' 11 - ENCASEMENT z II ENCASEMENT `* 2: • w e w Al I rd w w w Al II' y w w w CONC ENCASEMENT LIMITS OF CONIC R b SS03 1� N SSW �I I� rc w > SSW ,.I' NWL EL -0.37 ¢ N > ENCASEMENT ` APPROX EXISTING e d ..1 a II Y NWL EL-0.37 - d Q 11 Y NWL EL -0.37 11. d a 11 (NAVD88) I GRADE, EL VARIES 11. (NAVD88) (NAVD88) jl Ir II CONIC BOAT - Ir RAMP, EL VARIES / �1 /\` " § m B5 NORTH BULKHEAD ELEVATION E = '' S1W SCAlE: 1N'h'-0' B j W14'CHAMFER { IXISNN G GRADE, El I I I EL VARIES 1 7t MIN 1 e't MIN I We MIN b I B EXISTING BULKHEAD w LL I EXISTING SSP BULKHEAD I EXISTING SSP BULKHEAD EXISTING SSP BULKHEAD CONIC CAP BEVOND wgni NOTE: NOTE: NOTE: EXISTING POUR TO TOP OF �' �` o `� CLEAN SURFACE OF EXISTING STEEL SHEET CLEAN SURFACE OF EXISTING STEEL SHEET CLEAN SURFACE OF EXISTING STEEL SHEET GRAVEL FILL EXISTING SHEET PILE BULKHEAD PILE WALL TO SSPCSPS STANDARDS PRIOR PILE WALL TO SSPCSP6 STANDARDS PRIOR PILE WALL TO SSPCSPB STANDARDS PRIOR TO PLACING CONCRETE. TO PLACING CONCRETE. TO PLACING CONCRETE. dd - Bt SECTION 62 SECTION B4 SECTION10 j SSa3 SCECTION SSW SCALE: PION S5W SCALE YI-•1'-0- - L3 TYP - II 11 d CONC c -tl iI ENCASEMENT L L 3"3 TYP EXISTING SSP a E Z BULKHEAD A5 SECTI.ON /•a as /•d- za 1>'<�10y 4i g BEnL as E:1/4'=1r' FRONT FACE OF L3 ENCASEMENT r0 ENCASEMENT SUPPORT ANGLE, TYP R R. PL g SCALE: 1/2'=1'-0" At SECTION za as 1•P rn SSW SCALE I?•1'41' SCALE: 3/4"=1'41" Sheet Reference No. PRELIMINARY S-503 NOT TO BE USED FOR CONSTRUCTION INl S tS OF 21 1 2 3 4 5 22YM•IX W!43 1 I 2 EXISTING u GONG BARRIER r EXISTINGCONC D3 d. I APPROACH SLAB GOING 5501 OSURE P 11 WR PANEL CONNECTION, A PANEL TYPE B, TYP B OPTIONAL CURB All ssa B EXISTING STET B SHEETPILE BULKHEAD W/ CONC CAP B PANEL DESIGNATION, TYP EXISTING -\ `EXISTINGDONC TIMBER PIER \\ SCOUR APAQN, TYP NOTE: PRECAST CONCRETE PANELS SHALL BE LOWERED INTO PUCE USING LIFTING INSERTS. PUSHING OR SLIDING PANELS INTO PUCE IS PROHIBITED. rB1 PRECAST CONCRETE BOAT RAMP PLAN 9-tee IXAIE:]n IW EXISTING BULKHEAD GONG CAP EXISTING GRAVEL FILL 4 44 • IN ENCASEMENT (ADDITIVE BID NO,1), SEE NOTE PRECAST GONG PANEL I CURB, CURB SEE NOTE ELVARIES , EXISTING CONC BENT PLATE, TYP UL BULKHEAD - --- NOTE: GEOTEXTILE CURB ON BULKHEAD SIDE OF PRECAST CONCRETE PANEL NOT REQUIRED IF ADDITIVE BID NOA IS SELECTED OR IS IN PLACE. CURB ON BULKHEAD SIDE OF PRECAST CONCRETE PANEL REQUIRED IF ONLY ADDITIVE BID NO, 2 IS SELECTED. Al SECTION EXISTING GONG APPROACH SLAT EL 6" GRAVEL GONG CLOSURE / POUR, TYP - CLOSURE POUR EXISTING SHEETPILE BULKHEAD W/GONG CAP PANEL TYPE B, TYP ABANDONED EXISTING MECHSOILANCHOR, ' TYP IS TOTAL) REMOVEASRED'D GEOTEXTILE D3 SECTION M B :1/1'•1'V EXISTING GONG APPROACH SLAB �PRECAST GONG PANELTYPEA L 63 CONCRETE CLOSURE POUR 6401 8CAlE:1?•1'-0' THREADED GONG ROD, TYP PANEL, TYP R CURB, TYP u u 5'k4Dcl& 4• LONG _1f SS TYPE 316 BENT PLATE, TYP 3/4.0 SS TYPE 316 THREADED ROD W/ NUTS 6 WASHERS PLAN CC PA BENT PLATE, ELEVATION A3 PANEL CONNECTION B&M 8GLE'. t'=1'd ROD { CONIC ENCASEMENT (ADDITIVE BID NO.t) I yNWLEL-0.37 t (NAvoee> EXISTING GONG APPROACH SLA E.41:L1N ELd.4t(NAVDBB), CONTRACTOR TO FIELD VERIFY � EXISTING CON( SCOUR APRON GRADE COFFER DAM 64 SECTION 8301 SCAlE. 1'•1'd' N 0 W- m d W W yl f W K oe J ti �UF wM ��Z �> I cc a ¢ F PRECAST GONG ON ` p PANEL TYPE A WO Y L0,1 Q VO n 2 zo 8 • N ) YB BAR g o W ONC CLOSURE POUR • R @}$ AB _Bi 1 Si s a a k j a B S o y�J 1111/ = d e - e 1 9•-P e'a' a'a Ba I, I )L SCALE: 3116•=1'-V SCALE: 1/I'=1'11' ont immillia SCALE: 1/C=t'-0" sx � SCALE: 1 =1'4r 9 sneer 2 Rekrenre No. S-5 4 t PRELIMINARY NOT TO BE USED FOR CONSTRUCTION INDEX: tT Or zt 5 J PANEL TYPE J PANEL TYPE NOTE: CURB ON BULKHEAD S10E OF PRECAST CONCRETE PANEL NOT REQUIRED IF ADDITIVE BID NO.1 IS SELECTED OR IS IN PLACE. CURB ON BULKHEAD SIDE OF PRECAST CONCRETE PANEL REQUIRED IF ONLY ADDITIVE BID NO, 21S SELECTED. B1 PRECAST CONCRETE PANEL TYPES A AND B sto4 s�ele:+¢.rn V-GROOVE FINISH I TO H ft BHOOK &M alas , 95 BAR J 8# BARS \—ROUGHEN :o SURFACE TO V4AMPLITUDE D3 SECTION sam scele.,1ra C3 SECTION ;WI BAR, TYP 3M' CHAMFER, TYP 04 BAR VW STD BO' HOOK Q 12-0. C., TYP r-a5 BAR @ 18' O.C. BAR 63 SECTION sws ecALE 1+ra BAR g 1W O.C. ONAL CURB 3V'B SS TYPE 316 THREADED ROD. TYP rC.L ROD NOTE: FINISH VGROOVE PATTERN ON PANELS WTH'V' GROOVE FLOAT AT SO- ANGLE TO CENTERLINE OF BOAT RAMP LANE IN DIRECTION SHOVAY ON PLANS. 65 V-GROOVE FINISH �ssos/ NOTTo scue t-a a4h zd 4'4h SCALE: ra- va +•a z4e SCALE: 1 =1'-0" PRELIMINARY NOT TO BE USED FOR CONSTRUCTION N 0 � m N aMW 4 wo rc z ILw�W yw m §(G w m >Z Ow COO J> C;'wo aF 1 W ¢ o VV N U¢ =O J N 1H CAROB 1oi s7AL C �wOrae�� 'Mpf1" o a R. Sheet Retelence No S-505 INp X 18 OF 21 7 2 3 4 5 BOAT RAMP 3&SHEXISTING �y SHEETPILE �, BULKHEAD WI CONC CAP D3 EXPANSION CONIC SLAB -0NGRAOE 1 8u'� JOINT, TYP NEW OR CONIC CLOSURE POUR fl CONIC ENCASEMENT APPREXISTOACH APPROACH SLAB PRECAST CONIC SLAB PANEL TYPE (ADDITIVE BID N0.1), D � A OR C re . a d d, PRECAST CONIC PANEL - -. `'`A 0.. ... TYPEBOR D, TYP I I YNWLEL -0.37 EL 1.0k(MAVOBB) i, J (NAVDBB) EL<.@(NAVD68), CONTRACTOR TO i CONTROL JOINT 5A.5'oe - &'GRAVEL BASE _ FIELD VERIFY wH - C ABANDONED EXISTING R ?Esi69; EXISTING CONC a b CJ 1 - MECH SOIL ANCHOR, ` - SCOUR APRON d EXISTING TYP (6 TOTAL) I n 'VF d Q - CONIC SLAB REMOVE AS REQ'D GEOTEXTILE TOP OF COFFER DAM Q..a EL-7b(NAVDBS) 4 C1 'w '- - EXISTING BELOW m G GRADE COFFER DAM d : D3 SECTION d &508 sLA1E:tn1t'a- EJ Z Q EXISTING CONC p N� IM— I I d APPROACH SLAB d. m a 50! D3 I D3 B3 B' MIN EMBED -0 mil 4 w O �¢ shoe I S58e CONIC DRILL&EPDXY ANCHOR U I I CLOSURE POUR PRECASTCONC LLQ]m N r C— --- ------- pB BAR PANEL TYPE A, B2 PRECASTCONC ] PANEL TYPE A _ BAR W/ STDnNEW t u C" a��o >>Z wm w A CONC SLABOGOKT OP PRECAST CONC B� APPROACH EXISTING CONIC EXISTING CONC - Wy O O PANELTYPEC ] 7D. APPROACHSLAB APPROACH SLAB - MR �V B2 PRECASTCONC �°] — — -- _— --__ _ CONIC CLOSURE POUR ZO IZ — PANEL TYPE B, TYP I I AT EXISTING CONC APPROACH SLAB '� R e 0 PRECAST CONIC B� Y8' PANEL TYPE D, TYP CONC SSW OPTIONAL CURB �.i� CLOSURE PRECASTCONC a D 'w B POUR Wr BAR PANEL TYPE C 4 _ ` PRECAST CONC ` PRECAST CONC EXISTING STEEL PANELTYPEC PANEL TYPE SHEETPILE BULKHEAD �' /B CONCRETE CLOSURE POUR D w B Wi CONC CAP NEWCONC Sloe sGIE: t/h1'L' APPROACH SLAB � BAR PANEL > CONIC CLOSURE POUR a n DESIGNATION, TYP O o AT NEW CONC APPROACH SLAB B i z m 4 f 0 3 ----- D w B4 SECTION 3 L t , seo6 :xu�,�,•� e 0 o e pp p 'w B B PANEL EXISTING 16 -0'8« n \ CONNECTION, TYP BULKHEAD z � Pe o i p CONC CAP 05=V_'dV f \ EXISTING GRAVEL ® FILL •'d CONIC ENCASEMENT r \ (ADDITIVE BID N0.1), \ SEE NOTE -! \ CONIC PANEL, --__ T O \ EXPANSION JOINT Bye CURB EL VARIES - T EXISTING TIMBER PIER \ EXISTIN�ONC \\ SCOUR AP N, TYP RB, NOTE//E ISTING GRADE E \ \ • BENT 4��SEE SCALE 3/16 -1'-0'caaNOTES: 1. PRECAST CONCRETE PANELS SHALL BE LOWERED INTO PLACE USING PLATE, TYP ° SFALLIFTING A INSERTS. PUSHING OR SLIDING PANELS INTO PLACE IS PROHIBITED. G SSP SE, TYP SCALE. 1M'=1'-0" W7478 _ 2. NEW CONCRETE SLAB-0GRADE AND NEW CONCRETE APPROACH SLAB SHALL MATCH GRADE AND SLOPE OF EXISTING ADJACENT CONCRETE. BULKHEAD NOTE: GEOTEXTILE, TYP CURB ON BULKHEAD SIDE OF PRECAST CONCRETE PANELmomma za' a-P 1'-P f-0' 1 NOT REQUIRED IF ADDITIVE BID NO.1 IS SELECTED OR IS IN SCALE: 12'=1'-0" R PLACE. CURB ON BULKHEAD SIDE OF PRECAST CONCRETE 4AL PANEL REQUIRED IF ONLY ADDITIVE BID NO. 3IS SELECTED. ,a V-0 1a - Al PRECAST CONCRETE BOAT RAMP PLAN A3 SECTION SCALE: 1'=1'4r SI1B8� Refer No. �:� PRELIMINARY SS06 NOTTO BE USED FOR CONSTRUCTION IM*X 19 OF 21 !1 1 2 3 4 5 C o NNG O w L. INSERT LVI 15BARW .. = o_ TYP /—HO01C®17O.C., TYP LIFTING INSERT, TYP SSTHREADED ` VGROOVE ROD m FINISH, TYP PANEL TYPE C PANEL TYPE D 61 PRECAST CONCRETE PANEL TYPES C AND D sane aCALE 1r 1 a4^ CHAMFER, TYP 04 BAR W STO W HOOK 017 O.C. � #5 BAR @ 1S O.C. C. L. ROD 3M^0 SS TYPE 316 THREADED ROD — Al SECTION sag] euLe:,•.,a e p. t g IT D.C. PANEL TYPE A PANEL TYPES NOTE: CURB ON BULKHEAD SIDE OF PRECAST CONCRETE PANEL NOT REQUIRED IF ADDITIVE BID NO.1 IS SELECTED OR IS IN PLACE. CURB ON BULKHEAD SIDE OF PRECAST CONCRETE PANEL REQUIRED IF ONLY ADDITIVE BID NO. 31S SELECTED. B2 PRECAST CONCRETE PANEL TYPES A AND B sane scALE:,¢-ro BAR 0IT O.C. #4 BAR W SM 90• HOOK Q 12^ O.C. —\ ftBAR BAR a IT O.C. A3 SECTION Sae] 4�A1,:,•-,•�• VGROOVE FINISH— #5 BAR — #5 BAR W/ STD 90•HOOK - WCHAMFER #5 BAR S BARS `ROUGHEN SURFACE TO D4 SECTION 1/4^AMPLITUDE VGROOVE FINISH /—#5 BAR /__SAISBARS z 8#5 BARS `N5 BAR rc �U C4 SECTION S30] eG1lE t+1'-P 26 Sao FINISH 3^CHAMFER I� p58AR W/ STD 9P HOOK r MR BARS �� ROUGHEN SURFACE TO 1/4^ AMPLITUDE �B#S BARS #5 BAR rc M SECTION U sso] scALe:nra• �3/4"CHAMFER, TYP NOTE: OF� OPTIONAL CURB FINISH VGROOVE PATTERN ON PANELS yt WIH'Y GROOVE FLOAT AT BB• ANGLE TO CENTERLINE OF BOAT RAMP LANE IN DIRECTION SHOWN ON PLANS. OD C.L. R ,__ y, B4 V-GROOVE FINISH ea0) N TTOSCAlE C ZD YQ 314-0 SS TYPE 316 THREADED ROD SCALE: 1(7=1'4Y• rc ac ra za SCALE:1=1-0 PRELIMINARY NOT TO BE USED FOR CONSTRUCTION 701 N 0 aQ H WW 4 WO Mac, JWeO mm W 292o J~ aV F 0 m w = D> Ic'm aF QNp VV N UQ ,0 � O N b Y I; Ny a 9 S �- aN a a �� do 8 w u ��y_ C ��uau • o I G - e ,AT i E JA I t� CARpi 1. ��6R9/p Y ° sFaL� o,]ae R. PE q rGuu tyl Street ReN,erKe No � S-507 lfl a 20 OF 21 1 2 3 4 5 ta4rt MATCH EXISTING iT CONC 06 ®1r O.C.. SLABGNCaRADE EA WAY 1' CONC SLAB W/ ROUGH TEXTURE FINISH MIN 61' N4.O.C. VGROOVES SLANTED ® 46' TOWARDS EXISTING GRAVEL 5�� 4- PAVEMENT, SEE EXISTING CONIC $ APPROACH SLAB o D EXPANSION JOINT N4 @12. 0. C., �AROKOD CLOSUREPOUR CONIC SLAB -ON- U EA WAY 17 O.C., TYP PRECAST PANEL \\ \' \\, V GRAVEL BASE Q : == COMPACTED GEOTEXTILE SUSGRADE IL•sD3 rCaTO C SLAB -ON -GRADE p 2a4 CONE • zY4 CONT 1V • . GEOTEXTPACTEDILE J •d I e } GRAVEL BASE COMPACTED SUBGRADE JJJ 3'CHAMFER, TYP _ 2-04 CONT THREADED CONIC M STIRRUPa ROD, TVP PANEL,TVP 12, O.C., TYP 1'-0• R CURB, TYP N Vl WO TYP I I w a< m �� C1 SECTION jj jj a =� 9 w °z N SYM SGIE 1'•1'4T J W m N w sY4x1m4•LONG W C' SSTYPE316SENT =p •r aF 3 G O M 1a 0" PLATE. TYP 304*0 SS TYPE 316 j�Z Wo W THREADED ROD W/ � K ti O a F CONC SLAB WI ROUGH TEXTURE FINISH S 1'k1-x4• NUTS S WASHERS p y'-- W Y O ¢ P Si O O.C. VGROOVES SLANTED ® u' • TOWARDS PLAN O U U U ¢ EXISTING GRAVEL PAVEMENT, SEE EXISTING O O v) Z CONC APPROACH SLAB GAP EXISTING ffi[EA.A 012. O.C., EXPANSION JOINT � GANGV MAX PANEL, TYP I I H GRAVEL FILL c> APPROACH AppROACH SLAB SLAB •.I G RZ N4STIRRUP® • R I± I 1Y O.C., TYP ..ed�2�.1. IY_ BENT R ;S +� p 244 CONT, TYP"I\\- -tr \%\PLATE,TVPTHED ROD GEO6•GRAVEL BASED/ ELEVATION s COMP ACTED SUBGRADE W CHAMFER, TYP 1.�- T7•P B3 PANEL CONNECTION ssae ecME: r-rm s `g e a a k a s B - Bt SECTION ssm scALe r-ra is 9 3 B a n al 316• y = p 4 2: U I I 12• d w3� a SEALERIN I I JOT ; ^ CONIC CmmY 6 JOINT SEALER PAVEMENT, TYP Am 4 u ' .. • G .� 6SACBKER ROD ••'•: 4 E Q. 1Q•PREFORMED JOINT FILLER CM 11B' ��iS41pti 9 •y A A BEA v CONTROLJOINT 5§AANNSSION JOINT -A-Al s�sm 2dR't� SCALE: 1•=1'-0• SMe _ Nannoe No PRELIMINARY 508NOT ER TO BEUSED FOR CONSTRUCTION : 21 OF 21 2 1 3 4 SHONN BPSEDON ZIkN' gUWNG 1 2 3 4 5 LABOAT � RAMPMP WIDENING ® WIDENING ®� LEVEL GRADE BEHIND WALL TEMPORA NEW CONCRETE 4,-• REMOVE EARN1D RLY ETAINING WALL REINSTALL w NEW CONIC EXISTING CONIC SLAB EXISTING 4 SLAB v • § TIMBER STAIRS 1' °f • . ° ° EXISTING ELEC a PANEL ACCESS a ! ° EXISTING CONC PLATFORM, 1O APPROACH SLAB _ TO REMAIN NEW CONIC - APPROACH a•a CIP CONIC b SLAB CLOSURE POUR EXISTING ELEC DUCT BANK _ W.0-* EXISTING STEEL \ BULKHEAD CONIC ENCASEMENT Sm.I PILE BULKHEAD •'a TEMPORARILY REMOVE WI CONIC CAP, TYP AND REINSTALL _ EXISTING LIGHTPOLE y c� - w REMOVE AND PROVIDE O EXISTING STONE FILL i .. f510 SF P/C CONC ZO $' O • BOAT RAMP x O 2 a �. 92 N N ------------ wa 4 W —0 5 / =_ C / zmwm N \ \ IXISTINGIBELOW 1 q == 1 1 COFFER DAM ® Z k GRADE I w b 11 11 ? p V) O f 1 NEW sa00 SF P/C CONC EXISTING SCOUR 1 EXISTINGSF14TIMBER 1 I a BOAT RAMP WIDENING F ON`— \ \ I PILE CLUSTER, O APRON, TYP I w i CY L) a IfYP I \I \ REMOVE EXISTING I 1 4 TIMBER PIER DOWN w z 1 I \ ra \ TO EXISTING PILES u^�� AND RECONSTRUl11 1B-040AT RAMP g m O -- O 1 NEWPIERATOP REPYACEMENf EXISTING PILES i i i =_ 1 / o \ \ \ 1 1 / 1 REMOVE EXISTING o -- o I 1 VINYL WAVEFill 1 SCREEN AND TIMBER FENDER I PILES IS TOTAL) 1 l l I 1 0 == O I I l I \\ TIMBER PIER I NEW TIMBER 1 -- FENDER PILE, I i \\ \\ TYP QTOTIL) \\ wIS jj O __ O I i 1 \ l l I I I I \\ T 1 1 1 3 i�/7/� 7 ' L l l I 1 I EXISTING UNDERWATER o == O / 1 EXISTING 3PILE I 1 \ a 9 q I / 1 TIMBER PILE CLU�TBR 1 I CONTOUR, TYP, SEE NOTE 2 / NEWER PILE, N/` I I 1 TYP (4 TOTALj �_ �8 n�yg� o == o \ INSTALL WIRE WRAP / 11 I I 1 \\ TO EXISTING e ILE I O -- o 1 I I \ Smo ¢ 1 TIMBER PILE CLUSTER, ® / 1 o ✓n / SEE NOTE 4 - o i E A NOTES: 1. A SURVEY OF THE SITE WAS NOT CONDUCTED FOR THIS PROJECT. THE 4. INSTALL NEW WIRE WRAP AT EXISTING a ILE TIMBER PILE CLUSTER BULKHEAD TOP OF CAP AND TIMBER PIER TOP OF DECK ELEVATIONS SHOWN. HARE WRAP SHALL CONSIST OF 8 TURNS OF 1-0 GALVANIZED ARE AT ELEVATION M.5 NAVDSS BASED ON RECORD DRAWINGS CABLE WITH 3 CLAMPS AT EACH END. STAPLE EACH TURN TO EACH A PROVIDED. THE ENTIRE SITE IS WITHIN THE ll l YEAR FLOODPLAIN PILE. CENTER WRAP FBELOW EXISTING WRAP. ELEVATION. THE ELECTRICAL PANEL IS AT OR ABOVE THE 100-YR g FLOOD ELEVATION BASED MEASUREMENTS OF THE ACCESS PLATFORM ABOVE GRADE. t0d NOTE: 2. HYDROGRAPHIC SURVEY SHOWN IS A REPRODUCTION FROM THE 170 Vd and DEVELOPMENT WHICH WILL TAKE PLACE WITHIN THE LIMITS OF THE 100-YEAR RECORD DRAWINGS TITLED'SOUTIi RIVER BOAT BASIN,' SCO IDS w � FLOODPLAIN AT ELEVATION i8.0 NAVM (a9.111 NGVD29) IS DESIGNED IN 050858501 DATED 7242008. CONTRACTOR SHALL BE RESPONSIBLE FOR SCALE: IMV SMM ACCORDANCE WITH THE REQUIREMENTS OF EXECUTIVE ORDER NO. VERIFYING CURRENT RIVERBED DEPTHS PRIOR TO CONSTRUCTION. 123-UNIFORM FLOODPLAIN MANAGEMENT POLICY. S. DIMENSIONS AND INFORMATION SHOWN ARE BASED ON THE TWO Re/emw�No. REFERENCE DRAWINGS PROVIDED BY THE OWNER. CONDITIONS ARE 2 BASED ON VISUAL INSPECTION BY MOFFATT 8 NICHOL DURING A STTE P R E L I M I N A R Y VISIT ON 5112019. NOT TO BE USED FOR CONSTRUCTION IMIpC 1 of 1 1 2 3 4 5