Loading...
HomeMy WebLinkAbout48-21 Jackie Realty Holdings LLCPermit Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit Permit Number 48-21 RECEIVED APR 3 0 2021 for X Major Development in an Area of EnvironmerWAll" CITY pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Jackie Realty Holdings LLC., PO Box 850 Burlington, NC 27216 Authorizing development in Onslow County at ado. to the AIW W. at the terminus of Lot 23 Marina Way. in North Topsail Beach , as requested in the permittee's application dtd 10/1/20 (MP-1), "Rev 2127/21" (MP-2,4) and 2/27/21 (MP-3), incl art workplan drawings (3), Sheets 2,4 of 4 did 9/29/20 and Sheet 3 of 4 dtd "Rev 2126/21 ". This permit, issued on April 16, 2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation >t these terms may be subject to tines, impnsonntent or civil action; or may cause me permit to De nuu ana vota. Dockine Facility 1) This permit authorizes only the docks, piers, boathouses, finger piers, platforms and floating dock, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Char of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Jackie Realty Holdings LLC. ADDITIONAL CONDITIONS 3) This permit authorizes a maximum of two (2) formalized boat slips. Permit No. 48-21 Page 2 of 5 4) The boathouse shall not be completely enclosed or have side coverage more than one half the height of the side, from the roof waterward. The footprint of the boathouse shall not exceed the dimensions on the authorized workplans. 5) The authorized boathouse shall be single story, and shall not be designed to allow for second story use. 6) No attempt shall be made by the penmittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 7) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. 8) No portion of the permitted structure shall be located within 80 feet of the near bottom edge of the federally maintained AIW W channel. 9) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. Boat Ramp 10) Unless specifically altered herein, this permit authorizes one concrete boat ramp, as indicated on the attached workplan drawings. 11) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. 12) Placement of fill materials below normal water level shall be limited to the ramp structure. 13) Excavation and ground disturbing activities, associated with the placement of the boat ramp, above and below the normal water line shall be limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in size than specified in the attached permit application and workplan drawings. Shoreline Stabilization - Bulkheads 14) The bulkhead alignment shall approximate the normal high-water level at the time of construction. 15) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 16) No open water shall be excavated or filled, even temporarily, outside of the approved b ti &QVED alignment. DCM-MHD CITY Jackie Realty Holdings LLC. ADDITIONAL CONDITIONS Permit No. 48-21 Page 3 of 5 17) The alignment of the authorized bulkheads shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. 18) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. 19) The bulkhead shall be constructed prior to any backfilling activities. 20) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 21) This permit does not authorize any excavation waterward of the approved alignment. 22) The fill material shall be clean and free of any pollutants except in trace quantities. 23) Unless altered herein, all backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 24) No backfill material is to be placed within 30 feet of the normal high-water level, except that which will be used to backfill the area behind the permitted bulkhead. 25) All fill material to be placed below normal high-water level shall be confined behind the permitted bulkhead. Upland Development 26) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the grading and addition of gravel to the existing road, all as expressly and specifically set forth in the attached permit application and workplan drawings. Sedimentation and Erosion Control 27) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 28) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. 29) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly instal"VW61y landward of the bulkhead cap immediately following completion of backfilling activities. APR 3 0 2021 Jackie Realty Holdings LLC. ADDITIONAL CONDITIONS As -Built Survey Permit No. 48-21 Page 4 of 5 30) An as -built survey shall be performed docking facility and boat ramp facility, and copies of the survey provided to the U.S. Army Corps of Engineers and Division of Coastal Management, within 60 days of completion of construction of these portions of the project. USACE Conditions 31) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish 8a Wildlife Service's Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https://www.fws. og v/raleigh/pdfs/ManateeGuidelines20l7.pdf. 32) A U.S. Army Corps of Engineers Easement exists over the entire parcel and along the Marina Way from the AIWW to the oceanfront shoreline. During dredging activities conducted by the Corps, or its contractors, a pipeline may be placed from the AIW W along Marina Way to the oceanfront shoreline. The boat ramp would be blocked during the duration of the Corps dredging/disposal activities. General 33) Due to the ramp being located in the power line transmission easement area, there shall be a [National Electric Safety Code requirement] minimum of 45 feet of vertical clearance over the boat ramp, the ramp approach, and associated sailboat rigging areas. Please contact the Jones-Onslow E.M.C. for additional information at (910) 577-6318. 34) Signage shall be posted at the ramp, in the ramp approach, and ramp staging area warning the public of the presence of overhead power transmission lines and the risk of possible electrocution hazard. 35) The authorized project is located within a primary nursery area (PNA). Therefore, in accordance with NCAC ISA:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or excavation within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 36) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 37) All debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and removed to an appropriate upland location. 38) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. RECEIVED NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW- 2020-02214). APR 3 U 2021 DCM-MHD CITY Jackie Realty Holdings LLC. Permit No. 48-21 Page 5 of 5 ADDITIONAL CONDITIONS NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2020-1620. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is fiuther advised that many non -water dependent activities are not authorized within 30 feet of the normal high-water level. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. RECEIVE[) APR 3 0 2021 DCM-MHD CITY DIVISION OF COASTAL MANAGEMENT Application Processing Notes Applicant: Type: (Check all that apply) New I Major Mod Permit# Permit Coordinator: Field Representative: LmulI \Date/Time U�1a�i.� GQQ\ioa��^ � J qc.k ti - 4C Minor Mod _ _ _ _ Renewal Transfer Message 4 71711 �n�viJrci '� ` `t N CA OP05 I DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Jackie Realty -Holdings LLC LOCATION OF PROJECT SITE: The project is located adjacent to the Stump Sound ICW at the northern terminus of Marina Way (Lot 23) in North Topsail Beach, Onslow County. Latitude:34°31'1.34"N Longitude: 77022'18.73"W INVESTIGATION TYPE: CAMA/D&F INVESTIGATIVE PROCEDURE: Date(s) of Site Visit — 10/28/20 Was Applicant or Agent Present —No Photos Taken — Yes PROCESSING PROCEDURE: Application Received —cc: 11/3/20 Office — MHC SITE DESCRIPTION: (A) Local Land Use Plan — North Topsail Beach Land Classification from LUP —Rural (B) AEC(s) Involved: PTA, EW, ES (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing — none Planned -none (F) Type of Development: Existing —utility poles and gravel access Planned - docking facility and boat ramp (G) Estimated Annual Rate of Erosion: N/A Source — N/A HABITAT DESCRIPTION: DREDGED (A) Shallow Bottom 240 fF (B) Open Water 1,594 W shaded (C) High Ground 300 ftz (E) Total Area Disturbed: 2,134f ,2 (F) Primary Nursery Area: Yes (G) Water Classification: SA; HQW Open: Yes (H) Cultural Resources: None Proiect Summary: The applicant wishes to construct a docking facility and boat ramp adjacent to Stump Sound for private use in North Topsail Beach. Field Investigation Report: Jackie Realty Holdings LLC Paee 2 Narrative Description: The property is located adjacent to the Stump Sound IC W at the northern terminus of Marina Way in North Topsail Beach, Onslow County. This lot is currently undeveloped. The adjacent riparian properties are developed with single family residences. The elevation of the adjacent high ground of the parcel is approximately 2' above the normal high water level (NHL). Vegetation on the parcel mainly consists of Coastal Wetlands, predominantly Spartina alternii fora. The parcel has 2,483' of continuous shoreline along Stump Sound. Immediate offshore water depths adjacent to the parcel range from —1.5' to —3.5' normal low water. The subaqueous substrate is firm with shell. This proposal is located near a Federal Channel. There is not a cultural resource in the project area. This waterbody is approximately 480' across at this location. These estuarine waters are classified as a Primary Nursery Area. Submerged aquatic vegetation was not observed at this location. This area is open to shellfish harvest and is classified as SA; High Quality Waters. This parcel is within the White Oak River basin. Proposed Development: The applicant is proposing to construct a private docking facility and boat ramp within Stump Sound, - in North Topsail Beach. The proposed development would take place adjacent to Lot 23 Manna Way, Onslow County. This proposal is for private use in a residential neighborhood. The applicant is proposing to construct a fixed 2-slip docking facility 20' west of the existing gravel drive. The proposed pier access would be 6' by 55'. The proposed pier would connect to a 12' by 18' fixed platform (partially covered) out on the main waterbody, Stump Sound. Two boathouses, each containing a boat lift, would be on either side of the fixed platform. Both of the proposed boathouses would be 13' by 23', with 3' by 47' catwalks. The proposed boat ramp would be at the end of the existing gravel drive. The proposed boat ramp would be 12' by 35% with 20' extending below the NHW of Stump Sound. The proposed ramp would be supported on either side by 19' retaining walls. The applicant is also proposing a 3' by 20' floating staging pier on the west side of the proposed boat launch. Anticipated Impacts: There is a Federal Channel in the nearby vicinity of this proposed docking facility. This proposal would not be a hazard to navigation. The proposed docking facility and floating staging pier would usurp 1,594 square feet of Public Trust Area. The proposed boat ramp and supporting retaining walls would fill 300 square feet of high ground. The proposed boat ramp would fill 240 square feet of shallow bottom PNA habitat. Traditional marine construction methodology will be utilized during the construction of this project. Turbidity impacts are not anticipated during the Brad Connell December 15, 2020 Morehead City Field Investigation Report: Jackie Realty Holdings LLC Page 3 construction activities in Stump Sound. There is not a cultural resource in the vicinity of the project area. These waters of Stump Sound are classified as a Primary Nursery Area and the presence of submerged aquatic vegetation was not observed. This area is open to shellfish harvest and is classified as SA; High Quality Waters. Brad Connell December 15, 2020 Morehead City Narrative Revised 2/27/21 As acting agent for Teena Koury, who owns Lot 23 Marina Way, North Topsail Beach, in Onslow County, N.C, I am submitting the enclosed CAMA Major Permit Application for a proposed private docking facility adjacent to the AI W W. Ms. Koury would like to construct a pier (6' x 55') a partially covered platform (12' x 18') which will be located in between 2 boathouses (13' x 23' each). Each boathouse will contain a boatlift (13'x 13') and will have a 3' wide walkway around the outside of three sides of the boathouses. These structures are proposed to be located in existing water depths of approx. -3' to 3.5' @ NLW and would extend approx. 73' into the AIW W which measures approximately 408' wide at the location of the proposed project thus, conforming to the '/< width of the waterbody limitation and will not encroach into either of the adjacent 15' riparian corridor setbacks. Ms. Koury is also proposing to install a new boat ramp (12' x 48' overall, 12' x 34' will be below NHW) at the waterward end of the existing road. Existing water depths at the waterward end of the proposed boat ramp are -3' @ NLW. A bulkhead (15' long each with a 4' section parallel to the AIWW) will be installed adjacent to the boat ramp on each side on the high ground. Adjacent to the boat ramp on the west side will be a fixed dock (3' x 28') to assist in the launching and retrieving of boats. There will also be approx. 520 sq. ft. of gravel placed in an area of the existing road footprint measuring approx. 20'- 30' x 22' to fill in holes at the approach of the boat ramp. It should be noted that no wetlands will be filled with any gravel. The DWR pre -filing meeting request has been filled out on the website and a copy of the return email resulting from that submittal is included in this CAMA Major Permit application. • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. Please feel free to contact me if you need any additional information or have any questions MAR 2 2021 MP SECTION MHD F P, ikm r. g A;6mi North Topsail Beach VICINITY MAP Fulwrd Creek cnalw Ghadwi�4 Go�eC n Teena Koury Lot 23 Marina Way North Topsail Beach Onslow County Prepared By Debbie Wilson 9/29/20 NTS Sheet 1 of 4 U�ay. `NSITE RAJ Contact Name * Debbie Wilson Contact Emall Address * debblew75@charter.net Project Owner* Teena Koury Project Name * Lot 23 Marina Way Project County* Onslow Owner Address:* street Address P. O. Box 850 Address Line 2 ON Burlington Postal / Zip Code 27216 Is this a transportation project?* r Yes r No Types) of approval sought from the DWR: W 401 Water Quality Certification- r- 401 Water Quality Certification - Regular Express r" Individual Permit r Modification r Shoreline Stabilization Does this project have an existing project ID #? r• Yes r No Sale/ Bovince / Fixion NC o>wv USA Do you know the name of the staff member you would like to request a meeting with? Holley Snider Please give a brief project description below.* Install a new private boat ramp vdth launching floating dock, bulkhead, pier, 2 boathouses and covered platform. Please give a couple of dates you are available for a meeting. 10/29/2020 10/30/2020 11/2/2020 11/3/2020 11 /4/2020 Please attach the documentation you would like to have the meeting about. Agent Aulhorization.pdf 48.3KB dcmmpl.pdf 1.26MB dcm-mp2.pdf 677.52KB dcm-mp4.pdf 662.69KB Proposed Structure & Water depths.pdf 1.07MB Existing Conditions & Adjacent Property 2.42MB Ovmers.pdf Pdf mN By digitally signing below, I certify that 1 have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature" ,-r 111a,4r Submittal Date 10/27/2020 AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Teena Koury. Mailing Address: P. 0. Box 850 Burlington, NC 27216 Phone Number: (336) 260-084.1 Email Address: tkoury(Mcarolinahosiery.com I certify that 1 have authorized Debbie.Wilson ..- ".. ' Agent/ Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: 5' x 55' Pies,-12' x 18' Covered Platform, 2 10k Boat Lifts, 213' x 26' Boathouses and boat ramp: . at my property located at Lot 23 Marina Way, North Topsail Beach in, Onslow, County. I furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: N o :tq��� Print or Type Name Title i Date This certification is valid through Keith and Sabrina Patterson 3513 Wheat Swamp Road LaGrange, NC 28551-8743 2280'0001 7428. 3389 l O8 S Knightsbridge Road 4v;; Cary; NC 27513 4805 ,: 9590;9.402 3004,7;124 2081r95 ' ;°. '7019 2280 0001 7428 33 PS Form 3811, July 2015_PSN 753o-az-000-som ROY COOPER (.rerun' MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Direclnr Coastal Management ENVIRONMENTAL QUALITY December 14, 2020 The Daily News Legal Advertisement Section 724 Bell Fork Road Jacksonville, NC 28540 Re: Public Notice —Jackie Realty Holdings LLC Dear Sir: Please publish the attached Notice in the December 20, 2020 issue of The Daily News. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Jessica Gibson, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, Brad Connell Coastal Management Representative Enclosure cc: Gregg Bodnar Roy Brownlow Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 1 DCM Coordinator: tg 2� Permit #: 7 0 'L t 1� Agents: DCM Field Offices Elizabeth City Morehead City US ACOE Offices: MAILING DISTRIBUTION SHEET Washington Wilmington zzu� (with revised work plan drawings) (OBJECTIONS ) Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffan (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Greg Curry (Brunswick, New Hanover) "�air (CAM, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Kim Harding David Harris Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan Clif Whitfield (WARD) Jimmy Harrison Washington: Chris Pullinger-401 Tina Martin - 401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bettie, Camden, Carteret, Chowan, Craven, Cuff ituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Holley Snider-401 (Carteret, Onslow, Pender, Brunswick, New Hanover) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARD) Natural Heritage Prrogram� q Rodney Butler (NCDOT) Travis Wilson ROY COOPER MICHAEL S. REGAN e. p'Oltll1' BRAXTON C. DAVIS n„.LI,,, Coastal Management ENVIRONMENTAL QUALITY December 14, 2020 Jackie Realty Holdings LLC c/o Ms. Teena Koury PO Box 850 Burlington, NC 27216 Dear Ms. Koury: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located adjacent to Stump Sound at Lot 23 Marina Way in North Topsail Beach, Onslow County. It was received on November 3, 2020, and appears to be adequate for processing at this time. The projected deadline for making a decision is January 19, 2021. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from November 3, 2020, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right- of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 T Jackie Realty Holdings LLC Page 2 of 2 12/14/20 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Fud &fw& Brad Connell Coastal Management Representative m Enclosure CC: Gregg Bodnar, Asst. Major Permits Coordinator Roy Brownlow, District Manager Debbie Wilson, agent Nothing Compares State of North Carolina [ Environmental Quality I coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 908 2808 T 1014 �a��OpBry��np�a�I�;r��m1;p��yWBpaRq �yryl00py�� t{tORp��BaR �pya�0p1�� IOIOOE'OOUIMI110Etla��N�Ip0�TTy... 7300140yR0�I�NON FAP ie Amt:- 01Ts2e/oo,P pe I oral4 '66 PM Revenue Tex: $0.00 OnaloM CouniV NC Bxb4255 Pa904-917needa NORTH. CAROLINA SPECIAL. WARRANTY DEED Excise Tax: NTC ParcelldentifierNo. Verified by County on the_ day of _20— By Mall/Box to: This instrument was prepared by: WDUIRDG Burgin III (w/out title examination) - Brief description for the Index: THIS DEED made this .3 day of December, 2014, by and between TEENA M- KOURY, unmarried a/Wa Teens Marie Koury' P.O. Boa 850 Burlington, NC 27216 JACKIE REALTY HOLDINGS, LLC a NC limited liability company P.O. Boa.850 Burlington, NC 27216 Enter in appropriate block for each Grantor and Grantee: name, mailing address, and, if appropriate, character of entity, e.g corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties,, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by codext. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of Township, ONSLOW County, North Carolina and more particularly described as follows: See Exhibit "A" attached hereto and incorporated herein by this refereoce. The property hereinabove described was acquired by Granter by instrument recorded in Book page All or a portion of the property herein conveyed _ includes or _X_ does not include the primary residence of a Grantor. A map showing the above described property is recorded in Plat Book page NCByAsSWkff04Farm No.6® 111,2010 Printed by Aloeonad with the NC BuAssociation 7655120 Book: 4256 Page, 1977-Current: 904 Seq: I hags 2 0114 TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor has done nothing to impair such title as Grantor received, and Grantor will warrant and defend the title against the lawful claims of all persons claiming by, under or through Grantor, other than the following exceptions: Restrictions, easements, rights of way of record, encumbrances, if any, and ad valorem taxes for the current year. IN WITNESS WHEREOF, the Grantor has duly executed Teena M. Koury State of North Carolina- County of first above written. v 1, the undersigned Notary Public of the County of 0 h and State aforesaid, certify that Teena M. Koury personally appeared before me this day and acknowledged the uothe uo execution the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seat this 31 day of December, 2014. My Commission Expires: e? to Ito ✓ /� , - NotaryPublic (Affix Seal) Notary's Printed or Typed Name OFFICIAL SEAL m MARTHA B. BAILEY nda�F �a�Iamb C.raeam E>ai'e>� NC Bar Asm Wan Farm No.6 ® 1/12010 Frintcd by Agx=rat with the NC Bar Association 765512v1 Book: 4255 Page, 1977-Current: 904 Seq: 2 Pege 3 or 14 Exhibit "A" (Description of Real Property) Tract 1: Oulsow Caun_brParcel ID 012513 BEING all of Lot 18 as shown on a map entitled "Galleon Bay" prepared by Tidewater Associates, Inc., Engineer, and recorded in Map Book 11, Page 72, Onslow County Registry, North Carolina For back reference see Deed Book 3025, page 88, Onslow County Registry. Tract2: OnlsowCounty Parcel ID016972 - BEING all of Lot 19 as shown on a map entitled "Galleon Bay" prepared by Tidewater Associates, Inc., Engineers, and recorded in Map Book 11, Page 72, Onslow County Registry; North Carolina. " There is also conveyed herewith all;.of the property between the northern property lines of Lots 18 and 19 extended and the channel of Old Sound Way as shown -on map entitled "Lot Recombination for Nathan F. McDaniel and wife, Linda T. McDaniel",dated October 18,, 2006 prepared by Charles Riggs and Associates. For back reference see Deed Book 2803, page 154, Onslow'Couniy Registry. Tract 3: Onssow County Parcel D 019210 ' BEING all of Lot 23 as shown on a,map entitled "Galleon Bay" prepared by Tidewater Associates, Inc., Engineer, and recorded in Map Book 11, Page 72, Onslow County Registry, North Carolina For back reference see Deed Book 3819, page 161, Onslow County Registry. oatmw•7aaie 76551Yv1 Book: 4255 Page, 1977-Current: 904 Seq: 3 Page 4 of 14 Tract 4: Oalsow County Parcel ID 065999 10.510 Acres off N.C.SIL 1568 Stump Sound Township, Onslow County, North Carolina Town of North Topsail Beach Commencing at the centerline intersection of Bay Court and N.C.S.13.1568, thence leaving said centerline intersection and along the centerline of N.C.S.R 1568 in a southwestern direction 1,55327 feet to an existing Parker Kalon nail in the centerline of N.C.SIL 1568, thence leaving said centerline North 29 degrees 02 minutes 07 seconds West 30.08 feet to a existing iron rod in the northern right-of-way line of N.C.SIL 1568 , thence leaving said northern right-of-way line and along the eastern margin of a 3e ingress, egress, regress casement North 29 degrees 02 minutes 07 seconds West 300.04 feet to an existing iron rod in said easement margin thence continuing along said ewt'em easement margin North 29 degrees 02 minutes 07 seconds East 70.00 feet to an existing iron rod in add'eastern easement margin, thence leaving said eastern easement. margin, North, 60 degrees 57 minutes 25 seconds East 148:61 feet to a point in the former centerline of Old Sound Way and being THE TRUE POINT OF BEGINNING: thence from the above described true point of beginning and leaving the former centerline of Old Sound Way and along the southern property line of the Hunter Heath Tmst property the following courses and distances: North 72 degrees 02 minutes 29 seconds East 20453 feet, North 56 degrees 10 minutes 18 seconds East 116.67 feet, North 37 degrees 06 minutes 02 seconds East 116.46 Lfeet North 02 degrees:13 minutes 12 seconds East 14729 feet, North 22.degrew 29 minutes 12 seconds East 153.11 feet, North 70 degrees 25 minutes 10 seconds East 158.25 feet, North 56 degrees 19 minutes 51 seconds East 110.91 feet, North 18 degrees 50 minutes 08 seconds East 24935 feet and North 29 degrees 02 minutes 07 seconds West 115.56 feet to a point in Stump Sound, thence along and with Stump Sound North 59 degrees 27 minutes 43 seconds East 432.68 feet to a point in Stump Sound and in the centerline of the southern canal of Galleon Bay, thence leaving Stump Sound and along the centerline of the southern canal of omiow-jwwc 7655120 Book: 4266 Page, 1977-Current: 904 Seq: 4 hag. 5 ut 14 Tract 4: Onlsow t oanly Parcel D) 065999 YCO UMMDI Galleon Bay South 25 degrees 32 minutes 04 seconds Fast 506.60 feet to a Point in the intersection of the centerline of the southern canal of Galleon 1;ay and the former centerline of Old Sound Way, thence leaving said canal centerline and along the former centerline of Old Sound Way the following courses and distances: South 69 degrees 21 minutes 37 seconds West 55731 feet and South, 54 degrees 52 minutes 22 seconds West 306.58 feet to an existing iron rod in. said former Old Sound Way centerline„ thence leaving the centerline of the former Old Sound Way, South-56 degrees 26 minutes'44 seconds Past 294.46 feet to an existing iron iod, thence South 32 degrI16 minutes 24 seconds East 137.58 feet .to an erdsting iron rod,and being the northeastern comer of Tract. 2,I'Map Book 45, Page 225 of the Onslow County Registry, thence along the norther property line of Tract 2 South 57 degrees 43 minutes 36 seconds West 79.72 feet to an existing iron rod and being the northwestern comer of Tract 2, thence leaving Tract 2 North 31 degrees 33 minutes 24 seconds West- 32.95 -feet to an existing iron rod, thence North 84 degrees 42 minutes 55 seconds West.64.06 feet to an w sting iron rod in the, former, centerline of Old Sound Way; thence along the former centerline of Old Sound' Way the following courses and distances: South' OS degrees 17 minutes 06 seconds' West 58.65 feet to'an;axiating iron rod, South 60 degrees 04 minutes.00'seoonds West 139.7i feet to an existing iron rod, South 86 degrees. 44 minutes 21 seconds` West 85:65 feet to an existing iron rod, North 76 degrees 12 minutes 57 seconds West 204.27 feet to an existing iron rod,and North,85 degrees 33 minutes 48 seconds West 271 A3 feet to a. point and being the point and place of beginning. Being all of that land as'descn'lied in Deed Book 2724, Page 472, of�the Onslow County Registry`and presently zoned by;the Town of North Topsail Beach as Conservation and containing 426,169 square feet or 9.783 acres and also being all of Tract 1 as' shown in'Map Book 45, page 45 of.th6 Onslow County Registry and presently zoned by the Town of North Topsail Beach as R-10 and containing 31,650 square feet or 0.727 acres and having a combined area of 457,819 square feet or 10.510 acres as determined by a compilation of a partial field survey and a composite of deeds and maps. The courses contained within are"correctin 'angular relationship and are referenced to NAD83(CORS). There is also conveyed herewifh art c f the dg6t, title and'Interest of the Grantor In and to the beach access on the ocean side'as shown an map recorded in Map Book 46, Page 203, Onslow County Registry anddescribed In the. Restrictive Covenants recorded In Book 2393, Page 618-622; Onslow County Registry. aN1aW-jad e 765512YI Book: 4255 Page, 1977-Current: 904 Seq: 5 Page 8 of 14 Tract 4: Onhow County Parcel Dl 065999 (CONTINUED) Together, along and with the above described 10.510 acre tract are three easementsdescribed as follows: Easement 1: Ingress, egress and regress easement Commencing at the centerline intersection of Bay Court and N.C.S.R. r568, thence leaving, said centerline intersection and along the centerline of N.C.S.R. 1568 in a southwestern direction 1,553.27 feet to an existing Parker Kalon nail in the centerline of W.C.S.R. 1568, thence leaving .said centerline North 29 degrees 02 minutes 07 seconds West 30.08 feet to. a existing iron rod in the northern right-of-way line of N.C.S.R. 1568 and being TIM TRUE POINT OF BEGIN -UNCY: thence from the above described true point of beginning.and along, said northern right-of-way line South 65'degrees .05 minutes 56 seconds West 30.08 feet to a point in said northern right-of-way line, thence leaving said northers right-of-way line and along the western margin of said easement North 29 minutes 02 minutes 07 seconds West 299.34 feet to..a point in said western easement margin, thence continuing along said western easement margin North 29 degrees 02 minutes 07 seconds West 93.17 feet to a set iron rod in the northem margin of said easement, thence along the northern 'margin of said easement the following courses and distances: North49 degrees 45 minutes 27 seconds East 193.53 .feet to a set iron rod and South 78. degrees 52 minutes 43 seconds East 136.09 feet'io' a set iron rod in the terminus of said easement, thence along said temilnus'South 72 degrees 02 minutes 29 seconds West 61.73 feet to a set iron rod in the southern margin of said easement, thence leaving said terminus and along the southern margin of said easement the following courses and distances: South 78 degrees 52 minutes 43 seconds East 61.73 feet to a set iron rod -and South'49 degrees 45 minutes 27 seconds West 154.46,feet to an existing iron rod in said. southern easement. margin, thence along the eastern margin of said easement .South 29. degrees 02 minutes 07 seconds East 70.00 feet to an existing iron rod in said eastern easement . ami,,, • thence .continuing along said eastern easement margin South 29 degrees 02 minutes 07 seconds EaAt300.04 foot to an existing iron rod in the northern right-of-way line of N.C.S.R. ,1568 and being the point and place of beginning. The courses contained within ere correct in angular relationship and area referenced to NAD83. Easement 2: All of that 10' Permanent NCDOT Expansion Ease^ eaM: lying along.. adjacent, parallel .and north of the northern rigbt-of--way line of N.C.S.FL 1568 and crossing ';act 2, as shown in Map Book 45. Page 225 of the Onslow County Registry. . Easement 3: All of that 12' ingress, egress, regress easement lying along, adjacent. parallel and east of the western property, line of Tract 2 as shown In Map nook 45, Page 225 of the Onslow County Registry. Far back reference see Deed Book 3458, page 471, Onslow County Registry. OMIOW-Jadio t655MVI Book: 4255 Page,1977-Current: 904 Seq: 6 Page I &114 Tract 5: Onlsow County Parcel ID 033806 4.731 Acre, Tract off, Marina Way Stump Sound Township, Onslow County, North Carolina Commencing at an existing iron pipe in the intersection of the western right- of -way line of Marina Way and the terminus of Marina Way, and also being the northeastern comer of Lot 23, Galleon Bay as recorded in Map Book 11, Page. 72 of the Onslow, County Registry and being THE TRUE POINT OF BEGINNING:' thence from the above described true poim5of 6eginnirrg and leaving said .western right-of-way line and along the northern line of Lot 23 South 66 degrees 47 minutes,00 seconds West 50.00 feet to apoim in the northern line of Lot 23 and in the approximate mean ,high water line of Stump Sound, thence leaving the northern. line of Lot.23, and along. the approximate mean high water line of Stump Sound the following courses and distances: North 20 degrees 10 minutes 11 seconds West 81:55 feet, North 25 -degrees 49 minutes 58 seconds East 31.69 feet; North02 degrees 43 minutes 19,secands West 13.82 feet, South 56 degrees 55 minutes 19 seconds West 38,49 feet, South 39 degrees L0 minutes 29 seconds West 38.41 feet, South 75 degrees' 03 minutes 46 -seconds West 7232 Feet North 63 ddgrees,59 minutes'03. seconds West 221 89 feet,: South' 89' degrees 06 minutes,2& seconds .West 118.36 .feet, North'69 degrees 54'minutes' 37 seconds West 33.50 feet, North 51 degrees 15 minutes 46 seconds West 12.10 feet North 29 degrees 46 minutes 10 seconds West 12.13 feet ,North 05 degrees 37 miautes•26 seconds West 11.13 feet;, North'10 degrees 47 minutes 13 seconds East 19.36 fee% North'.33degrees .04 minutes 41 seconds East 13.53 feet, North 56' degrees 24 minutes 03'seconds East 12.14 feet, North 79 degrees 26 minutes 13.seconds,East 1034- feet,, North 88 degrees 40 minutes 06 seconds Easf28.89 fee; North 74 degrees I L minutes 41 seconds East 79.16 feet, North 64 degrees '21 minutes 35 seconds East 182.20 feet, North 77 degrees 46 minutes 38 seconds East 169.65 feet North 71 degrees 40 minutes 13 seconds East 154:14 feet; North 56degrees 09 minutes 14 seconds East•78.68 feet,,North 80 degrees 22 minutes'17 seconds East 85.15 feet North"66 degrees 21 minutes 04 seconds .East 168.66 feet, North 77'degrees 59 minutes 52 seconds East 10.59 feet,'South 84 degrees 53 minutes 29 seconds East 9.91 feet,'South 66 degrees 22 minutes 53 seconds East 39.58 feet South 57 degrees 10 .minutes 13 seconds Fag.8.29 feet; South 49 degrees 26 minutes 12, seconds East 8.68 feet Sontli"43 degrees 14miatrte.R 16, seconds East,9.80. feet,. South 29 degrees 02 minutes I seconds East 96.21 fleet, South 08 degrees 10 minutes 43 seconds East,12.13 feet South,09 degrees GO n-dr ites 43 seconds West 10.32'feet,. South 33 degrees 15 minutes 38 seconds West 12 67 feet, -South 56 degrees 21 minutes 21 seconds West 61.60 feet, South 66 degrees 42. minutes 18 seconds West 15.09 feet, .South 84 degrees 44 minutes 28• seconds West 14.08 feet, North 76 degtees.29 minutes 25 seconds -West oailaw-ledge 7655120 Book: 4256 Page, 1977-Current: 904 Seq: 7 Page 8 u114 Tract 5: Onlsow County Parcel ID 033806 (CONTERMDI. 14.85 feet, North 62 degrees 46 minutes 54 seconds West 14.31 feet, North 46 degrees 27 minutes 35 seconds West 30.35 feet, North'56 degrees 21 minutes 06 seconds West 14.87 feet, North 72 degrees 07 minutes 16 seconds West 17.3.1 feet, North.85 degrees 19 minutes 39 seconds West 19.04 feet, South 84 degrees 06 minutes 26 seconds' West 2032 feet, South 79 degrees 51 minutes, 3 sec"onds'Vest 94.49 feet,'South 73„degrees 37, minutes 40 seconds West 116.54 feet, South 55 degrees 25 minutes. 13 seconds West 1432 feet, South 41 degrees, 33 minutes ,34 seconds West 15.35 feet, South 31.degrees 18 minutes •16 seconds West 62.46 feet, South 53 degrees 33 minutes 3�'seconds West 12.67 feet,,South 38 degrees 29 minutes 48 seconds West` 20.51 feet, South 15 degrees 42 minutes 13 seconds West 17.14 feet; South 02 degrees 09 minutes 47 seconds.Wet 15.02 feet, South 17 degrees 45. minutes 26 seconds East 49.48 feet, South 37' degrees 14 minutes 19 seconds East 1632 feet, South 54 degrees 07,minutes 39 seconds East,17.66 feet, South 77 degrees 43 minutes 55 seconds East 16.98 feet,_North 87. degrees 39 minutes 39 seconds East 18.21 feet to a point - in said' approximate mean high Water line, thence leaving said approximate mean high`water line South 23 degrees 13 minutes 00 seconds East 70.00 feet to- ant existing ironpipe and being the; common comer of Lots 25 and 24, Galleon Baylas recorded in, Map Book I F, Page 72 of -the Onslow County, Registry, thence leaving'said common 60mer and along the northern property line of Lot 25,' South 66 degrees 47 `minirtes 00 seconds West 80.00 feet to. an existing, iron pipe and tieing the common comer of Lots 24 and 25, thence leaving said common comer and along the northern line of Lot 24 South 66'degrees 47,minntes 00 seconds West 80.00 feet to an existingi iron pipe in the eastern right-of-way.line of MarinWay, thence leaving said ewternn right-of-way line and along the terminus of Marina Way South 66 degrees 47.minutes 00 seconds West 50.00 feet to an existing iron pipe in the intersection of said- terminus and the western right -of way and being the point and'placd'of beginning. Containing 4.731 acres as calculated from a compilation of deeds and maps and not from an actual field survey. The courses contained within are correct in• angular relationship and are referenced to Map Book 11, Page 72 of the Onslow County Registry. For back reference see Deed Book 2486, page 431, Onslow County Registry. 0,W w.Jazide 76SS12,1 Book: 4255 Page,1977-Current: 904 Seq: 8 'Page 9 if 14 Tract 6: Onlsew County Parcel ID 051975: 010564'and 051396 Parcel 1: Beginning -at a stake on the edge of tlie:shme, South, 70,, East 71.1eci frtnn'a stake In the middle of•tie road -,on tie north side of Sold Ford Cruising, runs North 70, West 100 feet, then South 70, West ,7n "feet, then -Narih' 78•.,,Wcst 60; feel, then •North 42, k West 100 feet, then South 811• ' West 415 feet, then North 91 • UY' West fool foci, then South Sl• West 100 feet, then South '78• West 100 feet, then;Soulh 78. 30" West IM feey"Ihencg South.87�rIW West T011'feuL ThenSlauth 85,• 30" West 1f101sul, lhen'Sttulfi 78. 30".West 100,11oet, then South 62' West 99 feet; then South 25• East 180 feet across the,saund, then Norih 76' East 7SO feet, then North 86. Yr East 405•feet, then'Soulh 77• East 250 feel, then North 14• East across,;the sound near the Turd tlrthe beginning, the same cimu iping 4.93 acres. Parcel 2• Lying Lind being din West Oarinw Rench, Ti+iiridl ' lslnnd, OogloW County,, North Carolina, and Southwesterly tram Mckee's Pier nppmximntcly W mile and liagintang tit an iron stake on'the'Intnnd' ' Waterway'rjght-of-*uy, said sii+ke behia North 16- ltr''West .754.3 feet from-o concrete monument on the Northern'im: oaf Hfghwuy No. ZiQ chid monument being the comer hetweeh-Loot. #4A and Lin #3A, Flumpitreys"Divisiari; thence North 74. 22 Easf 530.1 feet to Iic sound; theactl,South 40• Uis6326.5; rect; Bence South 66z West 316 feet; thence'North 52- 21r West Xh.9 feet; thence North 77. 25" West 143 feet; thence South Nor 2lt° East 86.9 fact; t1wrice South 55, 40 Wert 58.6 feet; thence South 37• .55" West 103.8 feet; thence South 9. 20"West 98.5 feet-, thence South- 13. 23" East 97.8 feet, thence South 20, Yr West 91 feet; thence South 57. 2W West 95.9 feet; thence North 83. 45" West l00 fcet; thence'North 51. 5" Wesl'229 feet; he South 87' S0" West 836 feet to on !ran shake on the Inland Waterway right-of-inty; thence North 74. 22" East 13912 feel us. the paint or beginning, containing U net s "Carding to surM of Jack Provost made Septemher,.1969. „ Parcel 3• ' Beginning at`a shake, sold stake being. North .190•311" Wust 450.5 feet fomim it concrete monument tin'the northern side of Highway #2ilk @ntd'miwument'hehfg the comer between Lot #4A and Lot 413A of the Humphrey Digislim;'thence South 27- 21r' West 241 feet; thence,Soutfi:51- 3W West 1.13 feet;,thence North AD• Yr West 150 feet;. m theNorth 11• Bast a feet, am= North on-, t 71.9 feett thence North 73. 1W 9618L3 feeti.thence North 16. 3S" Enst 117.5 Leer thence North S• 1S- West 90.9 feet thence North 13• soe Fast 93.2 feet; thence North 23'. Or East 9M reef-, thence North 61. 2$"'East.713 feet;,theace South 4. 50'; Etist 147.1 leer thence'Soith 22•'Esat,114 feet to the point of beginning, and being tite same truct of hand as described In Quitclaim Deed from Rufus Yupp and wife, Roxie Yopp, et ulas• to P.O.Onint land wife, Marguerite Grunt, doted April 3, 1970. omlaw•la0de 763512rt Book: 4255 Page, 1977-Current: 904 Seq: 9 'Page tdot la Tract 6: Onlsow County Parcel ID 051975, 010564 and 051396 (CONTINUED) Parcet4: Lying and being on 'West Onslow'Beach, Topsail Island, Oustow County, North Carolina, and Southwesterly from McKee's tier opprmimtitely 112 mile and Beginning at an Iron stake on the -Inland Waterway right of way, said stake being North 16. 111" West 7543. feet •triim u concrete mtmumem on the Nanhern, sldC of•Highomy No. 210, said monument being the comer tietween Lot #4A and Litt"#3A Humphrey's Divisinn-,thence Sntilh 74. 2r,, Wesi`1393.2 feet, thence NaAW2. 16" West 260 feet ilience North 87• SW East M75 feet;. thence-North•74. 2O'Sist 474.3 fuel, thence'North 04 391 West 6411 feet,.lheme North 74. 220 Edst 491 feet-, ♦hence South 15•'3tC Last fin feel; thence South 74. 22a West 531 feet to -the point of beginning. Parcel 5• Being that Certain -portion of Stmdfdrd Island, originally a part of whut was known us Umg Hummock, lying on -the North side of, the Southern right•:nf'way line of the Imotcanstal•Woietwuy, t nd hcing boundea,on the North by said IntructinstulOilnul; on the South by the pnipprty; (if 1•Ipntei; lienth; un the- West by the Ctrurrwa �u `UNi Old Sound adjacent. to•ihe Quint property;'nhd on the East by the courier of ilic,nld Sound u(ljtiepnt to the Gallean-Bny-SubdiA%ion; cuninininb,25 acres; more or leas. TH13RB Is AL -go CoN rzm xBREwrfH,THE FO1d ovmci E&gmw TNTs: 4) A 30 foot p6'petoel,agaementfcr%w-s% earw%r=ges♦-and inaauaiian ofutltltres aS e dwa %cd m Judgment datedMarrh 13,1990;and recorded in Book 1282, Page 291, Onslow CouldFRegistry, '(b) Tha right ofEssement for i¢g ess, cgrms,.regreaa mflthc imtaUadm'ofutiitim desm,Ibod in casement dated May 21, 2010 sadrecorded in Book 3414, Page 680, Oeslow ConatyReg[slry. ® Thewis dso oonveyW herawith anyugld tide or interest ofthe Grantor is and to &e dyatei Baffom described as First Tract set ad herein and dmcdbedin deed recorded In ® Dead Book 555. Page 392, Onslow CetyReglehy u wall u tho shall Fish'Pranebise (d) T1ds cmwayanwlamade anbject to•thc r1abt of way of tbekdra Coastal Waterway as shown oa map recorded iaMep'BDok 1, Pogo 91, OnAow CamtyRegtsby. (e) This convaAnce isalsomade subject We Line Agremmeat with Rae Holding Compaaydated October l4, 199Tand recorded inBook 1408,Pajp1941 Onslow County Registry. • ' I - I ' For back reference see Deed Book 4157, page 388, Onslow County Registry. Owl=-Jeetie 7655120 Book: 4255 Page, 1977-Current: 904 Seq: 10 Page 111.114 Parcel1: ( - v1 BEING ALL THAT LOT OR TRACT NORTH OF AND ADJACENT TO LOTS 1 AND 2 AS SHOWN ON MAP OF OLD 6ETTr7t1t g'BEACH REVISION OF BLOCK 15, SCTION I RECORDED IN MAP. BOOK15, PAGE 57, ONSLOW COUNTY REGISTRY AND; DESCRIBED AS FOLLOWS:I BEGINNING AT THE NORTH WEST CORNER OF Lot one(1) in the lino of Lot-10, Map Book 7, Page 19, Oaslow Croaky Registry and running thence with the Northern most line of Lots I and 2, North 58 degreesl0l minme East 185.70 fed the Southwestern coma of Lot 10, Block 15, Map Book 25, Page.141, Onslow CountyRcgisty; thence with the Western line of . Lots 7, 8 and 9,as shown on Mep of Old Settlers Beach recorded in Book 15, Page 57, North 29 degrees 7 minutes West 50.6 feet and North 31;minates 59 seconds West:Ioo feet to a point in the Southern fine of Lot 10 as shown on Map Book 25, Page 141, Onslow. ComtyRegistry; thence witi the Southwestern line of Lot 10 South 58 degrees, I minute West 219.56 fed to a Point in the line of Lot 10, Map1Book 7, Page 19, Onslow County Regww, thence with the line of said lot 10 South 43 degrees 0 minutes East 153 fed to the point and place ofbegianing and being all of Onslow County Tax' Pared 763.1.2 (New Parcel M 035078), containing 0.69 acres. Parcel 2: BEING all of that parcel or trail of land located off Island Drive North Topsail Beach, Onslow County, North Carolina contai 'mug 161.27 acres more or less and being Onslow County Tax Parcel 769-4.6 (New Parcel ID 053154) together with marsh Islands 763.2 (New Parcel ID 046331) and 763-1.2 (New Parcel l ID 035078) containing 6 acres more or less. SUBJECT TO THE RIGHT OF IWAY OF THE INTRA COASTAL WATERWAY AND AN EASEMENT TO THE UNITED STATES OF AMERICA to maintain channel improvements recorded in Book 1184, Page 416, Onslow County Registry. Parcel 3: BEING all that small Was identified as Onslow Con Deed Book 897, Page 69, For back reference see Deed nmlow-fume 765512v1 lot on the South side of New River Inlet Road (SR1568) x parcel 7791(New Parcel ID 031130) and being a portion of w County Registry. page 385, Onslow County Registry. Book: 4255 Page, 1977-Current: 904 Seq: 11 4 Page 1t o114 9 Tract S: Oolsow County ParceIIID 065357 BEING ALL OF LOT 2 AS SHOWN ON A PLAT ENTITLED "RECOMBINATION AND BOUNDARY SURVEY MAP LbT 3 SEA.DRAGONS" AS IS SHOWN ON A SURVEY FOR PANNKUK CONSTRUCTION COMPANY AS PREPAREDByPARKER & ASSOCIATES, INC. AS RECORDED IN MAP kOK 47, PAGE 64,'SLIDE U143, ONSLOW COUNTY REGISTRY. THERE IS ALSO CONVEYED,HEREWITH A PERPETUAL EASEMENT FOR ACCESS TO THE BEACHOVER AND UPON THEYOLLOVMG TRACT: BEING ALL OF LOT 3, UNIT C, A3 SHOWN ON A MAP ENTITLED'MAL SURVEY FOR STACY A. PADGETT AND'CHARLES PADGETT", SAID MAP BEING RECORDED IN MAP BOOK 23, PAGE 89;?NSLOW COUNTY REGISTRY. II onsiow-Iacldc 765512YI Book: 4256 Page, 1977-Current: 904 Seq: 12 a Page 13 d114 DEPARTMENT OF TAX ADMIN FV This certifie taxes which collecting, t Marina Parcel Identi This is not a No certificat. taxes will be deed. Collections 234 NW Corridor Blvd 'Jacksonville, North Ca Tax Certification Form (Check One Box) that there are no delinquent ad valorem taxes, or other to Onslow County Tax Collector is charged with it are a lien on: ltion Number: See attached addendum tification that this Onslow County Parcel amber matches the deed description. required, as attomey statement that any delinquent d from closing proceeds is included on first page of 01 /28/2015 Date • 28540 • Phone: (910) 989-2200 • Fax: (910) 989.5818.0nsloWCOontyNCgov/tax Book: 4265 Page, 1977-Current: 904 Seq: 13 7age tbbf 14 S ADDENDUM -TAX CERTIFICATION PARCEL NUMBERS This certifies that there are no delinquens ad valorem taxes, or other taxes which the Onslow County Tax Collector is charged, with collecting, that are a lien on: Parcel Identification Numbers: 1012513 26 1 51 76 2016972 27 52' 77 3 019210 28 I 53 78 4065999 - 29 54 79 ' 5 033806 '30 I 55 80 6051975 31 I 56 81 7010564 32 57 82 8 051396 33 58 83 9 065357 34 I 59 84 10 031130 35 I 60 85 11 046331 36 I 61 86 12 035078 37 62 87 13 053154 38 -. 63 88 14 39 64 89 15 40 TI I 65 90 16 41 I 66 91' 17 42. 67 92. 18 43 1 68 93 19 44 1 69 94 20 45 I 70 95 21 46 71 96 22 47 72 97 23 48 I 73 98 ' 24 49 74 99 , 25 50 75 100 This is not a certification that these Ch sliw County Parcel Identification Numbers match the deed description. R• " - I 1282015 Tax Collections Staff Signature Date Book: 4255 Page, 1977-Current: 904 Seq: 14 NORTH CAROLINA bwironmemal oualni December 12, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg. bodnar(rDNCDENR.gov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Jackie Realty Holdings LLC Project Location: Marina Way in North Topsail Beach, Onslow County Proposed Project: Docking facility and boat ramp ROY COOPER cavernar MICHAEL S. REGAN Secmlary BRAXTON DAVIS Director, Division ofCnasml Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. ;J[71:Y1 AGENCY SIGNATURE DATE This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 DCM Coordinator: Gregg Bodnar Applicant: Distributed Yes® No ❑ Date: AGENCY WARO ^� pWIRO LPo Rachel Love Adrick MHC Rachel Love Adrick Washingon DCM Planner Mike Christenbury WNI"An Charlan Owens Eliz City US COE: IN Hair Raleigh Bland (Beaufort, Camden, (Carteret, Onslow, Pender) Chowan, Craven, Hertford, Hyde, Greg Curry Perquimans, Tyrrell) (Brunswick, New Hanover) Josh Pelletier — (Bertie, Currituck, Dare, Gates, US COE (NC DOT) DOT Brad Shaver Pamlico, Posquotank, Washington) (Brunswick, New Hanover, Onslow, DOT -Tom Steffans—(Beaufort, Carteret, Pender) Craven, Pamlico Mark Zeigler (Onslow, Pender, New Community Assistance Hanover, Brunswick) Lee Padrick (Beaufort, Carteret, Lee Padrick (Beaufort Carteret Craven Craven, Eliz Cit)6 Pamlico, Washington) Eliz City, Pamlico, Washington Cultural Resources Renee Gledhill -Earley Renee Gledhill -Earley Div. of Water Infrastructure Heidi Cox �, NAkw Clif Whitfield Marine Fisheries James Harrison David Harris NC DOT David Harris Shellfish Sanitation Shannon Jenkins & Sharon Gupton Shannon Jenkins & Sharon Gupton State Property Tim Walton & Mike Moser & Wanda Tim Walton & Mike Moser & Hillard Wanda Hillard DEMLR/DWR: Sheri A. Montalvo Sheri A. Montalvo (NC DOT) Kristy Lynn Carpenter NCKristy Lynn Carpenter DEMLR Sediment & Erosion Dan Satril " Samir Dumpor Storm water Christine Hall Roger Thorpe DWR401 Robb Mairs(CarteretNew Hanover Chris Pullinger Onslow, Pender, Brunswick —untilfurther notice) (NC DOT) Joanne Steenhuis Brunswick, New Garcy Ward Hanover, Onslow, Pender WRC Maria DunnRO) Maria Dunn (WARO) WRC (NC DOT) Travis Wilsodw Travis Wilson Natural Heritage Program Rodney Butler^ Rodney Butler T:\MAJOR PERMITS SECTION\Permits\Forms and Templates\Admin\Maj Comment Distribution Sheet 2020.docx Revised: 5/7/201e Bodnar, Gregg From: Bodnar, Gregg Sent: Wednesday, March 3, 2021 8:22 AM To: debbiew75 Subject: RE: [External] Lot 23 Marina Way Morning Debbie, Please accept this email as confirmation that Jackie Realty Holdings LLC has been taken off hold as of 3/2/21. The adjusted 75 day date is 3/21/21. In addition, the project may more than likely be extended on 3/21/21 since it is right around the corner. Thanks, Gregg From: debbiew75 <debbiew75@charter.net> Sent: Tuesday, March 2, 20214:49 PM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: RE: [External] Lot 23 Marina Way CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Hey Greg, I would like to formally request that the hold be removed for the Teena Koury project at Lot 23 Marina Way in North Topsail Beach. Thank you. Debbie Sent from my U.S.Cellular® Smartphone -------- Original message -------- From: "Bodnar, Gregg" <ereRR.bodnar@ncdenr.aov> Date: 3/2/218:17 AM (GMT-05:00) To: debbiew75@charter.net Cc: "Snider, Holley" <hollev.snider@ncdenr.aov>, "Harding, Kimberlee k" <Kimberlee.Harding@ncdenr.gov>, "'twyla.cheatwood@noaa.gov"' <twvla.cheatwood@noaa.ltov>, kathrvn matthews@fws.2ov. "Dunn, Maria T." <maria.dunnC@ncwildlife.or¢>, "Brownlow, Roy" <rov.brownlow@ncdenr.gov>, "'Arnette, Justin R CIV USARMY CESAW (USA)"' <Justin.R.Arnette@usace.armv.mil>, 'D Hill MPA AICP CFM CZO'<dhill@ntbnc.org , "Connell, Brad" <brad.connell@ncdenr.gov>, "'tpritchard@joemc.com"' <tpritchard@ioemc.com>, "'Hair, Sarah E CIV CESAW CESAD (US"' <Sarah.E.Hair@usace.armv.mil> Subject: RE: [External] Lot 23 Marina Way Morning Debbie, Bodnar, Gregg From: Bodnar, Gregg Sent: Wednesday, December 30, 2020 8:06 AM To: debbiew75@charter.net Cc: Connell, Brad Subject: RE: [External] RE: Jackie Realty Holdings LLC Morning Debbie, Understood. Please accept this email as confirmation that Jackie Realty Holdings LLC was placed on applicant hold as of 12/29/20. Please keep me in the loop as things unfold and I will do the same if I hear anything from the agencies. Thanks, Gregg From: debbiew75@charter.net <debbiew75@charter.net> Sent: Tuesday, December 29, 2020 3:46 PM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: RE: [External] RE: Jackie Realty Holdings LLC CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Gregg, Hope you had a nice Christmas! I would like to formally request that the Jackie Realty Holdings, LLC project for Lot 23 Marina Way in North Topsail Beach be placed on hold. I will contact Cameron Weaver to set up a conference call with the agencies that had concerns for this project. I'll keep you posted. Debbie From: "Bodnar, Gregg" To: "debbiew75Pcharter.net" Cc: Sent: Tuesday December 29 2020 2:28:13PM Subject: RE: [External] RE: Jackie Realty Holdings LLC Afternoon Debbie, I wanted to check in on any updates. Hope all is well, Gregg From: debbiew759charter.net <debbiew75@charter.net> Sent: Friday, December 18, 2020 10:50 AM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: RE: [External] RE: Jackie Realty Holdings LLC CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Gregg, I've sent an email to the CORPS to discuss, I not too concerned about the boat ramp water depth, can always extend just a bit to get to -3', my biggest concern is the CORPS and power lines. I'll let you know by Monday about the hold. May even suggest the ramp be removed from the project. Thanks and have a great weekend!! Debbie From: "Bodnar, Gregg" To: "debbiew75@charter. net" Cc: Sent: Friday December 18 2020 9:42:13AM Subject: RE: [External] RE: Jackie Realty Holdings LLC Hey Debbie, Not until 1/17/21. But if we continue to process and I get back the official comments of objection and/or denial of the DWR or USACE permit we would be working farther towards a denial. With the info I sent previously I think USACE and possibly DWR are moving in that direction now. Gregg From: debbiew75@charter.net <debbiew75@charter.net> Sent: Friday, December 18, 2020 10:30 AM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: [External] RE: Jackie Realty Holdings LLC CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Gregg, I figured this one might be challenging, what is the 75-day? Debbie From: "Bodnar, Gregg" To: "debbiew75@charter.net" Cc: Brad" Sent: Friday December 18 2020 7:38:56AM Subject: Jackie Realty Holdings LLC Morning Debbie, I just received this project and have not had much of a chance to review but I have received a number of comments (above) of concern that I wanted to get to you asap. In summary, DMF, DWR and WRC have concerns with the depth of the ramp in PNA being less than 3 feet. DWR also noted potential concerns with easements that were verified by USACE and the Town. The Town's easement concerns have to do with the power lines. I have also attached comments from the power company that note a possible path forward on their end. The most notable comments besides the resource agencies, come from USACE, where they note that the property may not be able to be developed as proposed. My suggestion would be to place the project on applicant hold and set up a scoping meeting through Cameron Weaver to review the project with the agencies so we can get a clear picture of the concerns and discuss any potential options. think this is preferrable over email since there are a number of concerns, it might get too cumbersome otherwise. Let me know your thoughts when yob've had time to review. Thanks, Gregg ROY COOPER DIONNE DELLI—GATTn Secretary BRAXTON DAVIS Director Debbie Wilson Debbiew75@charter.net Dear Ms. Wilson, NORTH CAROLINA Environmental Qualify March 22, 2021 This letter is in reference to the application submitted for Jackie Realty Holdings LLC., for a Coastal Area Management Act Major Permit to undertake development activities to construct a boat ramp and docking facility at the terminus of Marina Way, in Onslow County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c) which would make June 4, 2021 the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, should you have any question on the status of your application, do not hesitate to contact me by phone (252-808-2808 ext. 215) or a -mail (gregg.bodnar@ncdenr.gov). Sincerely, Gregory W. Bodnar Assistant Major Permits Coordinator Cc: DCM Morehead City D_E Q� North Carolina Department of Environmental Qualfty I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead Ch8557 y, North Carolina 2 .�wr� /�� 252.808.2808 Bodnar, Gregg From: Sent: To: Subject: Attachments: Afternoon Debbie, Bodnar, Gregg Monday, March 22, 2021 1:25 PM debbiew75 Jackie Realty Holdings Extension Jackie Realty Holdings LLC EXT.pdf See above for the extension with the 150 day adjusted for the past hold. Still waiting on USACE and DMF. I don't know of any issues from USACE or DMF, I am just waiting on final comments after the revisions. Once those are available I should be able to make a final determination shortly thereafter. Thanks, Gregg ygp•Cdr.-1� R E Qi Cg�tllm� W,+q Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 ON 2W8 ext 21S (Office) Gregq;,Bodnar,Qncdenrgov EmaAcoarespondeace to and from this address is subject to the. North Carolina Public Records Low and may be disclosed to third parties. MAJOR PERMIT FEE MATRIX Applicant: Selection Development Type Fee DCM % DWQ % (14300 16014351000931625 6253) (243001602 435100095 2341) I. Private, non-commercial development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial development that does not 100% ($400) 0%($0) involve the filling or excavation of any wetlands or o en water areas: d$400 Major Modification to a 100% ($250) 0% ($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non- commercial development, if $250 100% ($250) 0% ($ 0) General Water Quality Certification No. 4097 (See attached can be applied: III(B). Public or commercial Ej development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 4097 (See attached) can be applied: If General Water Quality Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality Certification No. $400 60% ($240) :40%/:($160;)4097 (see attached) cannotbe a lied: IV. For development that ❑ involves the filling and/or $475 60%($285) 40%($190 excavation of more than one acre of wetlands and/or Ill open water areas: Deg MP-1 APPLICATION for Major Development Permit (lost revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT Business Name Project Name (if applicable) - Jackie Realty Holdings, LLC Lot 23 Marina Way Applicant 1: First Name MI Last Name Teena Kou Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names listed. Mailing Address PO Box City State 850 Burlington NC ZIP Country Phone No. FAX No. 27216 USA 336 - 260 -0841 eat. Street Address (if different from above) City State ZIP Email tkou carolinahosie .com F •. 5 A L l � � L $ 25 ygefrUContractorTnformation> n � y Business Name Agent/ Contractor 1: First Name MI Last Name Debbie D Wilson Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 16275 Wilmington NC ZIP Phone No. 1 Phone No. 2 28408 910 - 612 ' 0402 ext.. ext. FAX No. Contractor# Street Address (if different from above) City State ZIP Email debbiew75 charter. net <Form continues on back> 252.806.2800 :: 1-888-41RCQAST :: www.nccoastrafmanageniont.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit County (can be multiple) Street Address State Rd. # Onslow Lot 23 Marina Way Subdivision Name city State Zp North To sail Be 1 28460 Phone No. Lot No.(s) (if many, attach additional page with list) 336 - 260 - 0841 ext. 23 ' 19 ' 18 ' ' a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak AIWW c. Is the water body Identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural []Manmade ❑Unknown AIWW e. Is proposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. North Topsail Beach a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.fL) 2 483' 206,038 s . ft. c. Size of Individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) lot sizes, attach additional with a list) ®NHW or ❑NWL (If many please page 2, e. vegetation on tract Wax Myrtle, Spartina patens, Juncus roernerianus,Sal icornia, and various "404" type wetland species. I. Man-made features and uses now on tract Deteriorted asphalt road and power poles. g. Identify and describe the existing land uses adjacent to the proposed project site. Single family residences. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) CON-D ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located In a National Registered Historic District or does it involve a ❑Yes ®No ❑NA NationalRegisterlisted or eligible property? <Form continues on next page> 252-348.2808 .. 1-088-4RCOAST .. cwwev.rracna etafm oila l,�em ent.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes []No (11) Are there coastal wetlands on the site? ®Yes ❑No @I) If yes to either () or (ii) above, has a delineation been conducted? ®Yes ❑No (Attach documentation, if available) See site plan n. Describe existing wastewater treatment facilities. None o. Describe existing drinking water supply source. None p. Describe existing storm water management or treatment systems. None i a. Will the project be for commercial, public, or private use? ❑commercial ❑PubliclGovemment NPrivatelCommunily, b.. Give a brief description of purpose, use, and daily operations of the project when complete. Private residential use. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Typical marine construction methods with excavator and bare mounted pile driver. d. List all development activities you propose. Private boat ramp, bulkhead, floating dock, pier and 2 boathouses. e. Are the proposed activities maintenance of an existing project, new work, or both? New I. What is the approximate total disturbed land area resulling.from the proposed project? NSq.Ft or ❑Acres 2,338 g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes NNo ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. None I. Will wastewater or stormwater be discharged into a wetland? []Yes NNo ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ❑No ❑NA J. Is there any mitigation proposed? ❑Yes NNo ❑NA If yes, attach a mitigation proposal. <Form continues on back> 252.808.2800 :: 1-888.41RCOAST :: www'.nccoastalmanagement.uet Form DCM MP-1 (Page 4,of 4) APPLICATION for Major Development Permit 6 AdtlrhAnal Information �` t ' ` ' � � " � In addltlpn to this completed appnci36on Cortry (MP t) the /dl/o�vYngrtems below 1f applicable 111Vst ba subm:dadp�. order(ortheappllcatlon u r packeg'"e 10 be cornplefe IlerrJs (aJ = (� aie ah ays appNcabf 5 dny mafordevelopment appphcehon Plaasa aonsulflhe apphcabpd xy rnstrrict%nbooklBtori'howtopmpelypreparelFierequnatlrtem`sbelow }x ? �r,;. _ .k ,� :q.+ ? a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly Indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that Is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims fille to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the.proposed project to the Division of Coastal Management. Keltt and S�brind Patterson � _ � � � E, r 'Agross 354'3 Wheat�5warnp�d LaGrange NCB 28551'8743: . '' "-' �� .�'� � ..K Name Remus Outlaw & Topsail Sunrise, LLC Phone No. Address 108 S Knlghtsbrldoe Rd Cary NC 27513-48 15 N f r 4 - �,Adilrass g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permiftee, and issuing dates. None h. Signed consultant or agent authorization form, If applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects In oceanfront and Inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), If necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 10/1/20 Print Name Debbie Wilson Agent for Teena Koury Signature 91AIe 2.i Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information 2R2-80S•2808 :: 1-888-4RCOAST :: www.nccoastatmeinagement.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline (NLW or NWL stabilization Length 48' Width 12' Avg. Existing NA NA Depth 2' Final Project NA NA Depth 3' 1. EXCAVATION ❑This section not applicable I a. Amount of material to be excavated from below NHW or NWL In b. Type of material to be excavated. cubic yards. _, c. (i) Does the area to be excavated Include coastal wetlands/marsh (CW) submerged aquatic vegetation (SAV), shell bottom (88). or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW _ []SAV ❑SB ❑WL _ ®None (11) Describe the purpose of the excavation In these areas: Boat ramp installation d. High -ground excavation in cubic yards. 10 cu. Yd. 2. DISPOSAL OF.EXCAVATED MATERIAL El This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Contractor's property (Ennett Marine) at 252 Ennett Lane Sneads Ferry. c. (1) Do you claim title to disposal area? ®Yes ❑No ❑NA Jerry Ennett, Contractor (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (11) Describe the purpose of disposal in these areas: d. (1) Will a disposal area be available for future maintenance? []Yes ®No ❑NA (II) If yes, where? I. (I) Does the disposal Include any area in the water? []Yes ®No ❑NA (11) if yes, how much water area Is affected? v MAR 2 2021 252-808.2808 :: '1.888.4RCOA5T :: vvuv_w_nccoasca9maU_gement.ne4 NIP v 26/06 Form 0CM WIP-2 (Excavation and Fill, Page 1, of 2) 3. SHORELINE STABILIZATION ❑This section not applicable (if development Is,a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: 38' total) ®Bulkhead ❑Rlprep ❑Breakwater/Sill ❑Other: _ Width: 1' c. Average distance waterward of NHW or NWL: d. Maximum distance watenvard of NHW or NWL: 0' 0' e. Type of stabilization material: Vinyl Sheathing g. Number of square feet of fill to be placed below water level. Bulkhead backfill 0 Riprap _ Breakwater/Sill_ Other_ I. Source of fill material. I. (t) Has there been shoreline erosion during preceding 12 months? []Yes ®No ❑NA (ii) If yes, state amount of erosion and source of erosion amount Information. h. Type of fill material. Clean sand 4. OTHER FILL ACTIVITIES []This section not applicable (Excluding Shoreline Stabilization) a. (I) Will fill material be brought to the site? ®Yes ❑No ❑NA b. (1) Will fill material be placed In coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or 408 sq. ft. other wetlands (WL)? If any boxes are checked, provide the (ii) Amount of material to be placed in the water number of square feet affected. (III) Dimensions of fill area 12' x 34' ❑CW ❑SAV _ ❑SB (iv) Purpose of fill ❑WL ®None Concrete slabs for boat ramp (11) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated controlled? site and erosion b. What type of backhoe, or Silt fence Backhoe and / or excavator. c. (1) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (11) If yes, explain what type and how they will be Implemented. 10/120 Revised 2/27121 Date will be used (e.g., dragline, d. (i) Will wetlands be crossed in transporting equipment to project site? []Yes ®No ❑NA (11) If yes, explain steps that will be taken to avoid or minimize environmental Impacts. None planned but if ft becomes necessary, mats will be used. Teena Applicant Name RECEIVED Lot 23 Marina Way 9.4.a. 2-i Agent Project Name Applicant Signature MAR 2 2021 252-808.2608 :: 1-868-4R�CUAS"P ;: W—vV ,necoas@glmarlawe TLens.,re,t MP SECT `'M C° 01m; F / 7 /Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MPA -supplemental information. sureto tto complete all other sections of the Joint Application that relate to this proposed project. Please include all GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. Road repair c. Density (give the number of residential units and the units per acre). N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (1) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? Dyes ®No DNA (11) If yes, list the dale submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. Less than 1 % 1. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. Less than 1 % j. Describe proposed method of sewage disposal. N/A I. Describe location and type of proposed discharges to waters of the state (e.g.. surface runoff, sanitary wastewater, industrial/ commercial effluent. 'wash down' and residential discharges). Surface runoff b. Number of lots or parcels. d. Size of area to be graded, filled, or disturbed Including roads, ditches, etc. Varies from 20' to 30' in width x 22' within existing road footprint. f. List the materials (such as mad, paver stone, asphalt, or concrete) to be used for impervious surfaces. Gravel approx. 520sq.ft. h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (1) Has a site development plan been submitted to the Division of Water Quality for review? Dyes ❑No ®NA (ii) If yes, list the date submitted: k. Have the facilities described in Item (I) received state or local approval? Dyes ®No DNA If yes, attach appropriate documentation. m. Does the proposed project Include an innovative stormwater design? Dyes ❑No ®NA If yes, attach appropriate documentation. RECEIVED MAR 2 2021 m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) N/A o. When was the lot(s) platted and recorded? 1969 2/27/21 Date Lot 23 Marina Way Project Name Debbie Wilson, Agent for Teena Koury Applicant Name Applicant Signature n. (I) Will water be impounded? []Yes ®No ❑NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be Installed for this upland development? ❑Yes ❑No ®NA MAR 2 2021 NIP EbOECTIUN NI D Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for LAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental Information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (1) Is the docking facility/marina: ❑Commercial ❑Public/Govemment ®Private/Community c. (I) Dock(s) and/or pler(s) (ti) Number 2 (111) Length 55_& 28' IN) Width 6' & 3' (v) Floating Yes ®No ❑This section not applicable b. p) Will the facility be open to the general public? []Yes ®No d. (1) Are Finger Piers Included? ®Yes ❑No If yes: (11) Number 2 (III) Length 47' (Iv) Width 3_ (v) Floating []Yes ®No e. (1) Are Platforms included? ®Yes []No f. (1) Are Boatlifts included? ®Yes []No If yes: If yes: (11) Number 2 (it) Number 2 (III) Length 12' & 12' (III) Length 13' IN) Width 12' & 6' (iv) Width 13' (v) Floating ❑Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (1) Number of slips proposed h. Check all the types of services to be provided. 2 ❑ Full service, Including travel lift and/or rail, repair or (tt) Number of slips existing maintenance service D ❑ Dockage, fuel, and marine supplies ❑ Dockage ('wet slips') only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: 1. Check the proposed type of siting: ❑ Land cut and access channel []Open water, dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: 22' in. (1) Will the facility have tie pilings? ❑Yes ®No (ti) If yes number of tie pilings? j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout I. (1) Will the facility be open to the general public? ❑Yes ®No RECEIVE® MAR 2 2021 252-808-2508 :: 1-888-4?COAST :: 71 66 r vr7n5 tD. Ci."9 Ki-?r l (Si ur:«:'u'ns, P'.ge '! C1 =t) Z DOCKING FACIUMMARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be Included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (1) Give the location and number of "No Sewage Discharge' signs proposed. (i j Give the location and number of'Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake' signs proposed. 1. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RE —COVED MAR 252-806-2B:ti+::'i.$9c-ro^6:Cf1G.£::.www"Iccoas'airr�anr go)e,*+,:r?;neC r viveas�: 92ii7•'tic m. Is the marinaldocking facility proposed within a primary or secondary nursery area? []Yes []No n. is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area? []Yes ❑No o. Is the marinaldocking facility proposed within or adjacent to coastal wetiands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)1 If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 13. BOATHOUSE (including covered lifts) ❑This section not applicable a. (i) Is the boathouse structure(s): []Commercial ❑Public/Govemment ®Private/Community, (ii) Number 2 (iii) Length 23' (iv) Width 13' Note: Roofed areas are calculated from ddpline dimensions. 14. GROIN (e.g., wood, sheetplle, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (1) Number (ii) Length (III) Width 15. BREAKWATER (e.g., wood, sheetplle, etc.) ®This section not applicable I a. Length c. Maximum distance beyond NHW, NWL or wetlands b. Average distance from NHW, NWL, orwetiands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the slructure(s): ❑Commercial ❑Public/Govemment ❑Private/Community C. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. a. Arc of the swing _ MAR 2 2021 b. Number d. Description of buoy (color, inscription, size, anchor, etc.) Mp c rC-71C)N @� HD pry 2-rynN-24nS :: t-118S-.9e'!CC).9:57 . a•n'•(._,nrrps:i_�,!r. rer'J:i'?re^"r,} »..y r:..gt.:.rr1: OIT'%'tl,tG (~®pnv 63Cib1 IMP-4 (structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines 1,028 to the west & 1 418' to the east Note: ForbucyormoodngPiling, use arc ofswing including length ofvessel. c. Width of water body 408' e. (1) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. Over 2 miles alonq the AIWW d. Water depth at waterward end of structure at NLW or NWL 3.5' 18. OTHER ❑This section not applicable a. Give complete description: The ' x'28' fixed dock located adjacent to the boat ramp is for launching and retrieving boats. 10/1120 Revised 2/27/21 Date Lot 23 Marina Way Project Name Teena Koury Applicant Name 9�. Zi Agent Applicant Signature MAR 2 2021 252-a06.2808 :: 1-888-4RCOAST :: revised: 12127106 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please Include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑This section not applicable a. (1) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ❑Commercial ❑Public/Govemment ®Private/Community ❑Yes ®No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ®Yes []No (ii) Number 2 If yes: (!if) Length 55' & 20' (ii) Number 2 (Iv) Width 6' & 3' (iii) Length 47 (v) Floating ®Yes ®No IN) Width 31 1 = Fixed & 1 = Floating (v) Floating []Yes ®No e. (1) Are Platforms included? ®Yes ❑No f. (i) Are Boatlifts included? ®Yes ❑No If yes: If yes: i�F'r (ii) Number 2 (ii) Number 2 (iii) Length 12' & 12' (I11) Length 13' (iv) Width 12' & 6' (iv) Width 13' (v) Floating []Yes ®No Note: Roofed areas are calculated from driplfne dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 2 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 0 ❑ Dockage, fuel, and marine supplies ❑ Dockage ('Wet slips') only, number of slips: _ ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: I. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: 22' m. (i) Will the facility have tie pilings? ❑Yes ®No (if) If yes number of be pilings? j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout I. (1) Will the facility be open to the general public? ❑Yes ®No 252-808.2808 :: 1-885-4RCOA5T :: www.nccoastaima-naciement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number. _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. r d. How will overboard discharge of sewage from boats be controlled?. e. (1) Give the location and number of'No Sewage Discharge' signs proposed. (if) Give the location and number of'Pumpout Available' signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and 'No Wake' signs proposed. 1. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin gushing? I. If this project Is an expansion of an existing marina, what types of services are currently provided? 252-80S-2808 :: 1.888-4RCOAST :: www.nceoastalmannaement.ne revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW _ ❑SAV ❑SB _ OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. V 3. BOATHOUSE (including covered lifts) ❑This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑PubliGGovemment ®Private/Community (it) Number 2 (III) Length 23, (iv) Width 13. Note.: Roofed areas are calculated from ddpline dimensions. 4. GROIN (e.g., wood; sheetpue, etc.It a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (III Length (iii) Width _ 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the stmcture(s): ❑Commercial ❑PubliGGovemment ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 252.808.2808 :: 1-888.4RCOAST :: www.necoastalmanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines 1,028 to the west & 1 418' to the east Note: For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body 408' e. (1) Will navigational aids be required as a result of the project? ❑Yes ENO ❑NA (tl) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. Over 2 miles along the AM d. Water depth at waterward end of structure at NLW or NWL 3.5' 8. OTHER 0This section not applicable a. Give complete description: The 3' x 20' floating dock located adjacent to the boat ramp is for launching and retrieving boats. 10/1120 Date Lot 23 Marina Way J Project Name Teena Koury Applicant Name 9� Z.i , Agent Applicant Signature _ 252-808.2806 a 1.888.41111COAST :: www.nccoastalmanaaement.net revised: 12127/06 Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet. Access Other hannel NLW or D Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL) stabilization Length 35' Width 12' Avg. Existing Depth 2' NA NA Final Project Depth 3, NA NA `1. EXCAVATION ❑ This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (I) Does the area to be excavated Include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (if) Describe the purpose of the excavation in these areas: Boat ramp installation d. High -ground excavation In cubic yams. 10 cu. yd. 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable' a. Location of disposal area. b. Dimensions of disposal area. Contractors property (Ennett Marine) at 252 Ennett Lane Sneads Ferry. c. (I) Do you claim title to disposal area? d. (I) Will a disposal area be available for future maintenance? ®Yes ❑No ❑NA Jerry Ennett, Contractor ❑Yes ®No ❑NA (ii) If no, attach a letter granting permission from the owner. (II) If yes, where? e. (1) Does the disposal area Include any coastal wetlandsfmarsh f. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (II) Describe the purpose of disposal in these areas: (1) Does the disposal include any area in the water? ❑Yes ®No ❑NA Qi) If yes, how much water area is affected? 252-808-2808 :: 1.8884RCOAST :: www.nccoastatmanaaement.net revised: 12126/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: 36' (total) ®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: _ c. Average distance waterward of NHW or NWL: e. Type of stabilization material: Vinyl Sheathing g. Number of square feet of fill to be placed below water level. Bulkhead backfill 0 Riprap Breakwater/Sill_ Other_ I. Source of fill material. Width: I d. Maximum distance waterward of NHW or NWL: f. (1) Has there been shoreline erosion during preceding 12 months? ❑Yes ®No ❑NA (11) If yes, state amount of erosion and source of erosion amount Information. h. Type of RII material. Clean sand 4. OTHER FILL ACTIVITIES ❑This section not applicable (Excluding Shoreline Stabilization) a. (i) WIII fill material be brought to the site? ®Yes [:]No ❑NA b. (i) Will fill material be placed In coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or QI) Amount of material to be placed in the water 240 sq. R. other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (111) Dimensions of fill area 121x 20' ❑CW ❑SAV _ ❑SB (iv) Purpose of fill ❑WL ®None Concrete slabs for boat ramp (1i) Describe the purpose of the fill in these areas: 15. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Silt fence c. (1) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (it) If yes, explain what type and how they will be Implemented. 1011/20 Date Lot 23 Marina Way Project Name Backhoe and / or excavator. d. (I) Will wetlands be crossed In transporting equipment to project site? ❑Yes ®No ❑NA (it) If yes, explain steps that will be taken to avoid or minimize environmental Impacts. None planned but if It becomes necessary, mats will be used. Teens Koury Applicant Name 9.c�ai Z.i Agent Applicant Signature 252-808.2808 :: 1.8884HCOAST :: www.nccoastaimanastement.net revised: 12/26/06 NOTICE OF FILING OF APPLICATION FOR LAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on November 3, 2020. According to said application, Jackie Realty Holdings LLC proposes to make construct a 2-slip docking facility and boat ramp adjacent to Stump Sound, at Lot 23 Marina Was in North Topsail Beach, Onslow County. A copy of the entire application may be examined or copied at the office of Brad Connell, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808-2808 during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to January 9, 2021, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISHED ON: December 20, 2020 -5>^Ncithinq Compares State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 2528082808 T N0T1(0'$1?gA CAMA PERMIT APPLIED FOR PROJECT: Construction of a 2-slip docking facility and boat ramp adjacent to Stump Sound at the northern terminus of Marina Way. COMMENTS ACCEPTED THROUGH ✓a17uary9, 202' APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Jackie Realty Holdings LLC Brad Connell - DCM c/o Teena Koury Z 400 Commerce Avenue PO Box 850 Morehead City, NC 28557 Burlington, NC 27216 (252)808-2808 ext. 214 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Jackie Realty Holdings LLC PROJECT NAME: COUNTY: Onslow LOCATION OF PROJECT: North Topsail Beach DATE APPLICATION RECEIVED COMPLETE BY FIELD:11-3-20 FIELD RECOMMENDATION: Attached: Yes FIELD REPRESENTATIVE: Connell DISTRICT MANAGER REVIEW: Roy Brownlow B) DATE RECEIVED BY MAJOR PERMITS UNIT: APPLICATION ASSIGNED TO: Bodnar PUBLIC NOTICE REC'D: 12-20-20 i ADJ. RIP. PROP NOTICES REC'D: C) 75 DAY DEADLINE: 1-17-21 ;IM 11.1 HOLDS: 1AIA W - 2 v EMAIL OUT DATE: 12-15-20 PERMIT FINAL ACTION: ISSUE DENY To Be Forwarded: Yes DISTRICT OFFICE: MHC FEE RECD: $400 60140splil # Click or tap here to enter text. END OF NOTICE DATE: 1-9-21 DEED REC'D: Yes / 150 DAY DEADLINE: STATE DUE DATE: Click or tap to enter a date. AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES DCM - Field Rep L 1�I20 /I ' (! N6414io DCM - LUP Consistency Determination tS�ll v-" Local Permit Officer ((�Z( &A Corps of Engineers - Regulatory Branch t (L �uitw.� i 1070-VTZ DWR-401 Section `qh ifs S ( IJ7���Roi(tKa �S DWR-Public Water Supply 1L[.0 10 1� DEMLR - Stormwater DEMLR - Sed and Erosion DOA - State Property Office Wildlife Resources Commission t t f (� 3 3, w'e„,cg DMF - Shellfish Section DMF - Habitat & Enhancement u r y DNCR - Archives & History �ti5 h DNCR - Natural Heritage Program NCDOT NC Dept of Commerce ayl/-o Bodnar, Gregg From: Sent: To: Subject: No additional comment. Thank you, Brad Connell Environmental Specialist II NC Division of Coastal Management 400 Commerce Avenue Connell, Brad Tuesday, March 2, 2021 12:45 PM Bodnar, Gregg RE: New CAMA Major Permit Application - Jacking Realty Holdings LLC Morehead City, NC 28557 htti3://Dortal.ncdenr.org/web/"cm/dcm-home (252)204-4427 Brad.Con n el I is ncde n r.aov We �' Nothing Compares ��.. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bodnar, Gregg Sent: Tuesday, March 2, 2021 10:33 AM To: Cannon, Amanda J <Amanda.Cannon@ncdenr.gov>; Kate Winsler <kate@ntbnc.org>; Austin Brinkley <Austin_Brinkley@onslowcountync.gov>; Sammie Rogers <Sammie_Rogers@onslowcountync.gov>; Christenbury, Mike <mike.christenbury@ncdenr.gov>; Liz Hair <Sarah.E.Hair@usace.army.mil>; Zeigler, Mark D <mzeigler@nccommerce.com>; DCR - Environmental_ Review <Environmental.Review@ncdcr.gov>; Cox, Heidi <heidi.cox@ncdenr.gov>; Harding, Kimberlee k <Kimberlee.Harding@ncdenr.gov>; Harris, David B <davidharris@ncdotrgov>; Jenkins, Shannon <shannon.jenkins@ncdenr.gov>; Gupton, Sharon <sharon.gupton@ncdenr.gov>; Walton, Tim <tim.walton@doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Hilliard, Wanda <wanda.hilliard@doa.nc.gov>; Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>; Sams, Dan <dan.sams@ncdenr.gov>; Hall, Christine <Christine.Hall@ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Butler, Rodney A <Rod ney. Butler@ncdcr.gov> Cc: Connell, Brad <brad.connell@ncdenr.gov>; Brownlow, Roy <roy.brownlow@ncdenr.gov> Subject: RE: New CAMA Major Permit Application - Jacking Realty Holdings LLC Morning all, After consultation with multiple resource agencies the applicant has revised the proposal to extend the ramp into the waterbody and revised the fixed pier adjacent to the ramp. In addition, gravel is now proposed landward of the boat ramp. Finally, the power lines have been added to the workplan Sheet 3 of 4. Please see the above attachments that Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM DATE: December 15, 2020 TO: Gregg Bodnar THRU: Roy Brownlow FROM: Brad Connell ROY COOPER I,,, 1,111a,' MICHAEL S. REGAN BRAXTON C. DAVIS I h,I ,,,, SUBJECT: Comments and Recommendations - CAMA Major Permit —Jackie Realty Holdings LLC, Onslow County The following is my assessment and consequent recommendations of the above referenced proposal: This proposal incorporates 1,894 square feet of Public Trust Area. The proposal is adjacent to a Federal Channel. These waters of Stump Sound are open to shellfish harvest. This waterbody is a Primary Nursery Area. The applicant is proposing 1,594 square feet of shading impacts (covered platform and two boathouses) with over 2,000 feet of shoreline on the property. The applicant is also proposing 240 square feet of shallow bottom fill and 300 square feet of high ground fill. Assuming other state and federal agencies concur, the Morehead City District staff recommends that the project be authorized with the following conditions: 1) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this marina/docking facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 2) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 3) This permit authorizes a maximum of two boat slips. At no time shall more than two vessels be moored or docked at the facility. The restriction of the number of vessels shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and personal watercraft. 4) It is possible that the authorized structure may be damaged by wave wash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity Nothing Compares , Slate of North Carolina I Environmental Quality I CoasW Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 T Jackie Realty Holdings LLC 12/14/2020 Page 2 of 2 of the permitted structure and the safety of moored boats. The permittee shall not hold the United States liable for any such damage. 5) Approval of the structure was based on a determination that there would be no obstruction to navigation. Under conditions existing within the AIW W, a possibility exists that the structure may be damaged by wave wash from passing vessels. Unreasonable slowing down of vessel traffic cannot be required because such an action would tend to nullify the navigational benefits on which the AIW W was justified. Issuance of this permit should not be construed as relieving the permittee of taking proper steps to ensure the structure and moored boats will not be damaged by wave wash normally to be expected in the AIW W. The permittee shall not hold the United States liable for any such damage. 6) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. CC: Roy Brownlow, DCM 400 Commerce Ave., Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-3330 Internet: www.nccoastaimanagement.net An Equal Opportunity 1 Afim b" Action Employer Bodnar, Gregg From: Gupton, Sharon Sent: Thursday, March 4, 2021 9:32 AM To: Bodnar, Gregg Subject: RE: New CAMA Major Permit Application - Jacking Realty Holdings LLC No Comment with revisions. Sharon Lupton .Administrative Speciaitst SheCCfish Sanitation & Recreation( Water Quality Division of .1Narine ,Fisheries N.C.Department of EnvironmentaC2,uaC%ty 252-8o8-8u8 office 252-726-6827 sharonyupton@)ncdenr.gov P.O. Box 769 Morehead City, NC 28557 DE rnvvmmnw Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Sent: Tuesday, March 2, 2021 10:33 AM To: Cannon, Amanda 1 <Amanda.Cannon@ncdenr.gov>; Kate Winsler <kate@ntbnc.org>; Austin Brinkley <Austin_Brinkley@onslowcountync.gov>; Sammie Rogers <Sammie_Rogers@onslowcountync.gov>; Christenbury, Mike <mike.christenbury@ncdenr.gov>; Liz Hair <Sarah.E.Hai r@usace.army.mil>; Zeigler, Mark D <mzeigler@nccommerce.com>; DCR - Environmental_ Review < Environmental. Review@ncdcr.gov>; Cox, Heidi <heidi.cox@ncdenr.gov>; Harding, Kimberlee k <Kimberlee.Harding@ncdenr.gov>; Harris, David B <davidharris@ncdot.gov>; Jenkins, Shannon <shannon.jenkins@ncdenr.gov>; Gupton, Sharon <sharon.gupton@ncdenr.gov>; Walton, Tim <tim.walton@doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Hilliard, Wanda <wanda.hilliard@doa.nc.gov>; Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>; Sams, Dan <dan.sams@ncdenr.gov>; Hall, Christine <Christine.Hall@ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Butler, Rodney A <Rod ney. Butler@ ncdcr.gov> Cc: Connell, Brad <brad.connell@ncdenr.gov>; Brownlow, Roy <roy.brownlow@ncdenr.gov> Subject: RE: New LAMA Major Permit Application - Jacking Realty Holdings LLC Morning all, NORTH CAROUNA i3mtrnxntnnd! Motif) December 12, 2020 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier11-12-09) gregg. bodnar(g)NCDENR.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Jackie Realty Holdings LLC Project Location: Marina Way in North Topsail Beach, Onslow County Proposed Project: Docking facility and boat ramp ROY COOPER Governor MICHAEL S. REGAN secretary BRAXTON DAVIS Dirty.,, Division ofC'oastal Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: PRINT AGENCY This agency has no objection to the project as proposed. "Additional comments may be attached" X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Shannon Jenkins NCDMF/Shellfish Sanitation SIGNATURE for Shannon Jenkins DATE 12/16/2020 State ofNorth Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919796 7215 DEC 1 6 2020 Vdp SECT10N 161HD MEMORANDUM To: Gregg Bodnar From: Michael Christenbury, Wilmington District Planner Subject: Consistency Determination, Major Permit Application, JackieRealty Holdings LLC, North Topsail Beach, Onslow County Date: March 15, 2021 This project appears to be consistent and not in conflict with the North Topsail Beach Land Use Plan update. . The applicant proposes to construct a docking facility and boat ramp adjacent to Stump Sound for private use. The property is located at adjacent to Stump Sound/ICW at the northern terminus of Marina Way in North Topsail Beach, Onslow County. Areas of Environmental Concern (AEC's) impacted by the proposal are EW, PTA and ES. Waters at the site are classified as SA-HQW and are open to the harvesting of shellfish. The area is a primary nursery area. I have reviewed this proposal for consistency with the North Topsail Beach Land Use Plan and offer the following comments. The general area of the project is classified Rural, while the AECs impacted by the work are classified as Conservation. In general, the North Topsail Beach Land Use Plan allows development in Rural/Conservation classified AECs which is consistent with the State's minimum use standards. The North Topsail Beach Land Use Plan contains some policies, which exceed the State's minimum use standards. However, none of these more restrictive policies appear to be applicable to this project. Provided all local, state and federal requirements can be met, this project appears to be consistent with the North Topsail Beach Land Use Plan Update. Cc: File DECEIVED MAR 1 5 2021 hqp SECTION WO L10 December 12, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) areas. bodnar(a)NCDENR.uov SUBJECT: CAMA /.Dredge and Fill Application Review Applicant: Jackie Realty Holdings LLC Project Location: Marina Way in North Topsail Beach, Onslow County Proposed Project: Docking facility and boat ramp ROY COOPER ( .n,vernm MICHAEL S. REGAN .rerrxnar BRAXTON DAVIS Dimaor. DAhiaaafC tel Mmmgemem Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greosr Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: X This agency has no objection to the project as proposed. "Additional comments may be attached" See attached GC letter This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Holley Snider AGENCY NC Div. of Water Resources-401 Buffer Permitting Branch SIGNATURE ffouec) Jy(dep_ DATE 3/12/2021 MAR 1 -7 2021 • S ~r8()N 'D State of North Carolina I Environmental Quality l Coastal Marugemlldl e � 127 Cardinal Drive Exl, Wilmington, NC 29405 919796 7215 DocuSign Envelope ID: 5693AEF2-D9D3-427B-95BC-9CD9C29A2F68 ROY COOPER Governor DIONNE DELLI-GATTI Secretary S. DANIEL SMITH Director Jacky Realty Holdings, LLC ATTN: Teena Koury P.O. Box 850 Burlington, NC 27216 NORTH CAROLINA Environmental Quality March 10, 2021 Subject: No Written Approval Required Lot 23 Marina Way— Galleon Bay Onslow County Dear Ms. Koury: DWR # 2020-1620 Onslow County 9' elk E I D MAR 1 -7 2021 MP "."L-C ION MH® The Division of Water Resources (DWR) has received a copy of your CAMA Major permit application request dated received by this office on December 15, 2020 and additional information received on March 2, 2021. The application proposes to construct a two -slip docking facility and boat ramp. The proposed project is located in the waters of Stump Sound which are classified as SA:HQW by DWR. Please understand that the waters around your project area have been identified by the Division of Marine Fisheries as Primary Nursery Area (PNA). Should the need for dredging within the proposed project area arise in the future, please be aware that new dredging within a PNA is not permitted under 15A NCAC 02B .0221 as it results in degradation of water quality standards and therefore is considered a water quality violation. [15A NCAC 02B .0221] DWR issues approval in the form of a Water Quality Certification (WQC) in conjunction with the Regional General Permit 291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the Regional General Permit 291 when issued by the US Army Corps of Engineers. In accordance with the attached General Certification #4175 (GC 4175), the impacts described in your application do not require written authorization to utilize GC 4175. However, you are required to follow the conditions listed in the attached certification. You should get or otherwise comply with any other federal, state and local requirements before you go ahead with your project including (but not limited to) erosion and sediment control regulations. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clews Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received D E Q North Carolina Department of Environmental Quality I Division of Water Resources Wilmington Regional Office 1127 Cardinal Drive Extension l Wilmington, North Carolina 28405 910.796.7215 DocuSign Envelope ID: 5693AEF2-D9D3427B-95BC-9CD9C29A2F6B D W R#20201620 Page 2 of 2 in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water. Please contact Holley Snider at 910-796-7304 or holley.snider@ncdenr.gov if you have any questions or concerns. Sincerely, OacuSignM by: K abt.0 6max Skt _um E3ABA14AC7DC4U_. Morelia Sanchez -King, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosures: GC 4175 cc: Sarah Hair, USACE Wilmington Regulatory Field Office, EC Gregg Bodnar, DCM Assistant Major Permit Coordinator, EC Debbie Wilson, Consultant, EC DWR 401 & Buffer Permitting Branch file-LF WiRO i MAR 1 -7 2021 Bodnar, Gre From: Snider, Holley Sent: Thursday, December 17, 2020 8:33 AM To: Bodnar, Gregg Cc: Mairs, Robb L, Dunn, Maria T.; Deaton, Anne; Harding, Kimberlee k; Jenkins, Shannon; debbiew75; Connell, Brad; D Hill MPA AICP CFM CZO; Hair, Sarah E CIV CESAW CESAD (US); rlanier@joemc.com Subject: RE: New CAMA Major Permit Application - Jacking Realty Holdings LLC Attachments: [External] RE: ROW/Easement Question Good Morning Gregg, The DWR concurs with the concerns raised by WRC regarding the boat ramp. Additionally, it appears that the USACE maintains an easement on this property that may preclude the placement of permanent structures within the easement area (see attached email). It is also likely that the Jones-Onslow Electric Membership Corporation maintains a perpetual easement below the power lines that may affect the project. It may be helpful to have an inter -agency meeting to discuss the concerns of the resource agencies and the easement holders. Please feel free to call or email me if you have any questions or I may be of assistance to you in any way. Sincerely, Holley Snider.•. '•,><(((('>''.,,..><((((4>.•' Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7304 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Mairs, Robb L <robb.mairs@ncdenr.gov> Sent: Wednesday, December 16, 2020 8:37 AM To: Snider, Holley <holley.snider@ncdenr.gov> Subject: FW: New LAMA Major Permit Application - Jacking Realty Holdings LLC fyi From: Dunn, Maria T. Sent: Wednesday, December 16, 2020 6:00 AM To: Liz Hair <Sarah.E.Hair@usace.armv.mil>; Harding, Kimberlee k <Kimberlee.Hard ina@ncdenr.gov>; Jenkins, Shannon <shannon. ienkins@ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.eov> Cc: Connell, Brad <brad.connelhancdenr.Ro >; Bodnar, Gregg <greae.bodnarC@ncdenr.eov>; Deaton, Anne <anne.deaton@ ncdenr.gov> Subject: RE: New CAMA Major Permit Application - Jacking Realty Holdings LLC I looked quickly through the project. It appears the ramp ends in water depths close to -2.5' NLW. NCWRC generally does not support ramps that terminate in water depths less than -3' NLW. I have objected to several in the past. I'm not as familiar with the area so I do not know if there are other similar ramps in the vicinity that*may have been permitted under a GP or have been there for some time. I also am not as familiar with the aquatic resources, but chronic bottom disturbance would occur regardless of SAV or shellfish presence. At this time I will likely proceed with an objection, unless there are other agency responses to steer differently. Any thoughts or input would be appreciated. Take care. Maria From: Cannon, Amanda J <Amanda.Cannon@ncdenr.Rov> Sent: Tuesday, December 15, 2020 11:03 AM To: Kate Winsler <kate@ntbnc.org>; Austin Brinkley <Austin Brinkley onslowcountvnc.gov>; Sammie Rogers <Sammie Rogers@onslowcountync.gov>; Christenbury, Mike <mike.christenburv@ncdenr.gov>; Liz Hair <Sarah.E.Hair@usace.armv.mil>; Zeigler, Mark D <mzeigler nccommerce.com>; DCR - Environmental —Review <Environmental.Review@ncdcr.gov>; Cox, Heidi <heidi.cox(@ncdenr.gov>; Harding, Kimberlee k <K!mberlee.Harding@ncdenr.gov>; Harris, David B <davidharris@ncdot.gov>; Jenkins, Shannon <shannon.ienkins@ncderingov>; Gupton, Sharon <sharon.gupton@ncdenr.gov>; Walton, Tim <tim.waIto n@doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Hilliard, Wanda <wanda.hilliard doa.nc.gov>; Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>; Sams, Dan <dan.sams@ncdenr.gov>; Hall, Christine <Christine.Hali@ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Butler, Rodney A <Rodney.Butler@ncdcr.gov> Cc: Connell, Brad <brad.connell@ncdenr.gov>; Bodnar, Gregg <greRR.bodnar@ncdenr.gov>; Brownlow, Roy <rov.brown low@ ncden r.gov> Subject: New CAMA Major Permit Application -Jacking Realty Holdings LLC Hello All! Please accept this correspondence as the official distribution of CAMA Major Permit Application for Jackie Realty Holdings LLC in North Topsail Beach, Onslow County. Attachments include: Field Investigative Report, work plans, comment sheet, and any other documents intended for you. NOTE.• Please complete the bottom portion of the comment sheet with your information and signature. *RETURN TO GREGG BODNAR at ereee.bodnar a ncdenr.eov* ***No oversized plans have been submitted by applicant*** For questions or concerns, please contact Gregg Bodnar at gregg.bodnar@ncdenr.gov or (252) 808-2808 ext. 215 Division of Coastal Management Department of Environmental Quality 252.808,2808 Ext. 206 252.247.3330 Fax Amanda.Cannon Ca)ncdenr.gov 400 Commerce Ave Morehead City, NC 28557 r �Nothlnq Compares..0 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. J Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. RECEIVED MAR 1 l ROY COOPER 2021 MICHAEL S. REGAN , � � to mp SECBRAXTON DAVIS December 12, 2020 MEMORANDUM. FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnar o()NCDENR.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Jackie Realty Holdings LLC Project Location: Marine Way in North Topsail Beach, Onslow County Proposed Project: Docking facility and boat ramp Please indicate below your agency's position or viewpoint on the proposed project and return this form to Grego Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attaehed. -6o IoW This agency objects to the project for reasons described in the attached comments. PRINT NAME M Aic7 ,_C�tne\ AGENCY N (A SLC SIGNATURE DATE -I j .+ NCi-IRC. ol. s r + b6ffc-f 4VIe Qr4ct AS fWy�a4 -Sn plans VCAnFdJ 'ZI7.+021 A VrCca'C_X -OA 3 �al21 . —(� 1 s rww're rQ -Vi--4 -4z:jX"mu.r b+ 11 e Wt&j) -fD -31 NLA Gci&CSbl �r p1; CS~,cmrt J (f .J- uc. VK. dl w o -{n k 1'c rkp �i�CtrQ SP1l znr CnCk 5Z VCA , l�ainr��,n{n'JCA Stac OMOMCarolina I EnvirminmterqualityICoa Maaageaj - 'e stir VJtA L f KN 127CwditWDriw Ez4Wilmingtm.NC2gd05 9191967215 P `ram:�.p.'n� • ea .. .. _.. Bodnar, Gregg From: Dunn, Maria T. Sent: Wednesday, December 16, 2020 6:00 AM To: Liz Hair, Harding, Kimberlee k; Jenkins, Shannon; Mairs, Robb L Cc: Connell, Brad; Bodnar, Gregg; Deaton, Anne Subject: RE: New CAMA Major Permit Application - Jacking Realty Holdings LLC I looked quickly through the project. It appears the ramp ends in water depths close to -2.5' NLW. NCWRC generally does not support ramps that terminate in water depths less than -3' NLW. I have objected to several in the past. I'm not as familiar with the area so I do not know if there are other similar ramps in the vicinity that may have been permitted under a GP or have been there for some time. I also am not as familiar with the aquatic resources, but chronic bottom disturbance would occur regardless of SAV or shellfish presence. At this time I will likely proceed with an objection, unless there are other agency responses to steer differently. Any thoughts or input would be appreciated. Take care. Maria From: Cannon, Amanda J <Amanda.Cannon@ncdenr.gov> Sent: Tuesday, December 15, 202011:03 AM To: Kate Winsler <kate@ntbnc.org>; Austin Brinkley <Austin_Brinkley@onslowcountync.gov>; Sammie Rogers <Sammie_Rogers@onslowcountync.gov>; Christenbury, Mike <mike.christenbury@ncdenr.gov>; Liz Hair <Sarah.E.Hair@usace.army.mil>; Zeigler, Mark D <mzeigler@nccommerce.com>; DCR - Environmental —Review <Environmental.Review@ncdcr.gov>; Cox, Heidi <heidi.cox@ncdenr.gov>; Harding, Kimberlee k <Kimberlee.Harding@ncdenr.gov>; Harris, David B <davidharris@ncdot.gov>; Jenkins, Shannon <shannon.jenkins@ncdenr.gov>; Gupton, Sharon <sharon.gupton@ncdenr.gov>; Walton, Tim <tim.walton@doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Hilliard, Wanda <wanda.hilliard@doa.nc.gov>; Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>; Sams, Dan <dan.sams@ncdenr.gov>; Hall, Christine <Christine.Hall@ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Butler, Rodney A <Rodney.Butler@ncdcr.gov> Cc: Connell, Brad <brad.connell@ncdenr.gov>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Brownlow, Roy <roy. brownlow@ncden r.gov> Subject: New CAMA Major Permit Application - Jacking Realty Holdings LLC Hello All! Please accept this correspondence as the official distribution of CAMA Major Permit Application for Jackie Realty Holdings LLC in North Topsail Beach, Onslow County. Attachments include: Field Investigative Report, work plans, comment sheet, and any other documents intended for you. NOTE: Please complete the bottom portion of the comment sheet with your information and signature. *RETURN TO GREGG BODNAR at ereae.bodnar( ncdenr.eov* 'No oversized plans have been submitted by applicant*** For questions or concerns, please contact Gregg Bodnar at grege.bodnar@ncdencgov or (252) 808-2808 ext. 215. Av 4*6d v Can wo w Division of Coastal Management Department of Environmental Qualms 252.808.2808 Ext. 206 252.247.3330 Fax Amanda.CannonCa).ncden r.gov 400 Commerce Ave Morehead City, NC 28557 k. Nothing Compares, -,-. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. w I NORTH CAROLINA Dwiranmenkd Onalitt December 12, 2020 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnar cD,NCDENR.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Jackie Realty Holdings LLC Project Location: Marina Way in North Topsail Beach, Onslow County Proposed Project: Docking facility and boat ramp ROY COOPER GaYernar MICHAEL S. REGAN Secretary BRAXTON DAVIS Direclor. Dwaiun ofC'a.I.1 Mauagemenl Please indicate below your agency's position or viewpoint on the proposed project and return this form to Grego Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: X This agency has no objection to the project as proposed. "Additional comments may be attached via email More Information is required to know if this meets NESC" are irlcorpo�aled.n9te at�tacoheoarlment on the proposed project. Tli1 a0enc� ogPec°tseto�ha pr8jeo�c orr reya ons desccrri a inefne aaagt�ied comments. PRINT NAME —Thomas AGENCY Jones- Onslow SIGNATURE DATE 1211 State of North Carolina I Environmental Quality I Con tal Management 127 Cardinal Drive Ext., W ilminyrton, NO 28405 919 796 7215 CON L.J3� dt�l OZOZ L � O3a Bodnar, Gre From: Tommy Pritchard <TPritchard@joemc.com> Sent: Thursday, December 17, 2020 1:29 PM To: 'dhill@ntbnc.org'; Bodnar, Gregg Cc: jcanady@ntbnc.org'; 'kate@ntbnc.org' Subject: [External] FW: New CAMA Major Permit Application - Jacking Realty Holdings LLC Attachments: Plans.pdf, Comment Sheet JOEMC.pdf 'CAUTh7N: External email. Do not click links or open attachments unless you verify. Send all suspicious email as anattachmeht to 'Report Spam. Dear Sirs: We appreciate you keeping us informed in this permitting process. We have carefully studied the plans from the view point of Public Safety, knowing that the boat ramp area is directly underneath a 12,500 Volt Overhead power facility owned by Jones-Onslow EMC. Section Table 232 of the National Electric Safety Code requires minimum of 45 feet of vertical clearance over boat ramps and associated rigging areas at boat ramps ,especially if they can be used for launching sailboats. This is to prevent contact with the electric power lines during launching and rigging. The NESC also requires signs to be posted in the area to warn public of the presents of overhead power facilities in associated rigging areas. The permitting drawings neither designate rigging areas or vertical clearances. It is our opinion that a vertical measurement survey of the actual final grade height of electrical facilities be conducted prior to issue of permit. This information can be provided by a professional survey crew calculations or Jones- Onslow EMC would be willing to assist with vertical measurements ,but JOEMC has no view of allowed rigging areas or measurement of final filled grade. The Town of North Topsail Beach should be especially interested in this location because this overhead power line crossing is the primary source of electric power for the North End of Topsail Island. If Jones- Onslow EMC needs to provide more information on this overhead crossing please contact the following address or numbers. Tommy Pritchard PE Chief Utility Engineering Officer Jones-Onslow E.M.C. 259 Western Blvd. Jacksonville, NC 28546 Direct 2: 1-910-577-6318 Fax 4: 1-910-353-1632 Cell 2: 1-910-389-2079 E- Mail JR: Ipritchard@]oemc.com From: D Hill MPA AICP CFM CZO Sent: Wednesday, December 16, 2020 3:00 PM To: 'rlanier@joemc.com' <rlanier@ioemc.com> Cc: Jimmy Canady <jcanady(@ntbnc.ors>; Kate Winzler (kate(antbnc.ore) <kate@ntbnc.ora> Subject: FW: New CAMA Major Permit Application -Jacking Realty Holdings LLC Hi, just wanted to give you a heads up about a CAMA Major Permit application for a boat house and ramp at the end of Marina Way in North Topsail Beach. The lot has a utility easement and power lines running across the intercoastal. If there are any concerns by JOEMC, please contact Gregg Bodnar, Assistant Major Permits Coordinatior for NCDEQ Division of Coastal Management at grego.bodnand)NCDENR.00v , Thanks, Deborah J. Hill MPA AICP CFM CZO Planning Director J "-1-lrwex ✓/ t wo/ 1000 NC HWY 210 • Sneads Ferry NC 28460 dhill@ntbnc.org 910.581-3008 www.ntbnc.org/planning From: Kate Winzler <kate@ntbnc.org> Sent: Tuesday, December 15, 2020 11:31 AM To: D Hill MPA AICP CFM CZO <dhill@ntbnc.org> Subject: FW: New CAMA Major Permit Application -Jacking Realty Holdings LLC Hi Deb! Do we need to weigh in on this Major CAMA permit application? Cheers, Kate Winzler Permit Specialist Town of North Topsail Beach Temporary Location: t000 NC HWY 210, Sneads Ferry, NC 2846o 910.328.1349 x3 www.n bnncorWiaspe_ctioas Inspections must be scheduled by permit number24 hours in advance by either email or phone. Pursuant to the Freedom of Information -Privacy Acts and NCGS Chapter 32, Public Records, this electronic mail message and any attachments hereto, as well as any e-mail message(s) that may be sent in response to it are considered public record and as such are subject to request and review by anyone at any time and maybe disclosed to third parties. NTB is an equal opportunity employer and provider. From: Cannon, Amanda J <Amanda.Cannon@ncdenr.gov> Sent: Tuesday, December 15, 202011:03 AM To: Kate Winzler <kate@ntbnc.org>; Austin Brinkley <Austin Brinkley@onslowcountvnc.gov>; Sammie Rogers <Sammie Rogers@onslowcountvnc.gov>; Christenbury, Mike <mike.christenburv@ncdenr.gov>; Liz Hair <Sarah.E.Hair@usace.armv.mil>; Zeigler, Mark D <mzeigler@nccommerce.com>; DCR - Environmental —Review < Environmental. Review@ncdcr.gov>; Cox, Heidi <heidi.cox@ncdenr.Rov>; Harding, Kimberlee k <Kimberlee.Harding@ncdenr.gov>; Harris, David B <davidharris@ncdot.gov>; Jenkins, Shannon <shannon.!enkins@ncdenr.gov>; Gupton, Sharon <sharon.Ruoton@ncdenr.gov>; Walton, Tim <tim.walton@dda.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Hilliard, Wanda <wanda.hilliard@doa.nc.gov>; Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>; Sams, Dan <dan.sams@ncdenr.gov>; Hall, Christine <Christine.Hall @ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Butler, Rodney A <Rodnev.Butler@ncdcr.gov> Cc: Connell, Brad <brad.connell@ncdenr.gov>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Brownlow, Roy <roy. brownlow@ ncde n r.gov> Subject: New CAMA Major Permit Application - Jacking Realty Holdings LLC Hello All! Please accept this correspondence as the official distribution of CAMA Major Permit Application for Jackie Realty Holdings LLC in North Topsail Beach, Onslow County. Attachments include: Field Investigative Report, work plans, comment sheet, and any other documents intended for you. NOTE: Please complete the bottom portion of the comment sheet with your information and signature. *RETURN. TO GREGG BODNAR at ereee.boduaramedenr.eov* ***No oversized plans have been submitted by applicant*** For questions or concerns, please contact Gregg Bodnar at izrea%z.bodnar@ncdenr.gov or (252) 808-2808 ext. 215. Division of Coastal Management Department of Environmental Quality 252.808.2808 Ext. 206 252.247.3330 Fax Amanda.Cannon(a)ncdenr.gov 400 Commerce Ave Morehead City, NC 28557 i . Nothing Compares, -..- Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Bodnar, Gregg From: D Hill MPA AICP CFM CZO <dhill@ntbnc.org> Sent: Tuesday, March 16, 2021 4:35 PM To: Bodnar, Gregg Subject: RE: [External] Lot 23 Marina Way CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. As long as it meets all state/federal requirements, I think we're good to go. From: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Sent: Monday, March 15, 2021 1:06 PM To: D Hill MPA AICP CFM CZO <dhill@ntbnc.org> Subject: RE: [External] Lot 23 Marina Way Afternoon Ms. Hill, I wanted to check in on any final comments from the town. Thanks, Gregg From: D Hill MPA AICP CFM CZO <dhill@ntbnc.ore> Sent: Wednesday, March 3, 20219:00 AM To: Bodnar, Gregg <grees.bodnar@ncdenr.gov> Subject: RE: [External] Lot 23 Marina Way CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Yes. Thank you. From: Bodnar, Gregg <grees.bodnar@ncdenr.eov> Sent: Wednesday, March 3, 20218:49 AM To: D Hill MPA AICP CFM CZO <dhill@ntbnc.org> Cc: debbiew75 <debbiew75@charter.net> Subject: RE: [External] Lot 23 Marina Way Morning Deborah, Sheet 4 of 4 has a side view available. CRC rule allows for the top half of the boathouse to be enclosed. From sheet 4 of 4 it looks to be a lattice type enclosure. ROY COOPER Governor MICHAEL S. REGAN Secremry BRAXTON DAVIS Ulreclor, Ulvlclun ofCoaata( Man,gems l December 12, 2020 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) orreaa. bodnar(cD NCDENR.aov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Jackie Realty Holdings LLC Project Location: Marina Way in North Topsail Beach, Onslow County Proposed Project: Docking facility and boat ramp Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greaa Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" _ 2 This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. &arl (mot(( ,, L?b�T PRINT NAME Austin Brinkley, CFM �� �5) qoaz;� AGENCY Onslow County Planning and Development SIGNATURE 7�tlst/K B/`/KKGP� DATE 12/15/20 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Dove Ext, Wilmington, NC 28405 919 796 7215 NO COMMENT, NORTH TOPSAIL BEACH JURISDICTION RECEIVED DEC 1 5 2020 r'1 NORTII CAROLINA £nvironmcnlai Ua,olim December 12, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) areoo.bodnarna NCDENR.aov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Jackie Realty Holdings LLC Project Location: Marina Way in North Topsail Beach, Onslow County Proposed Project: Docking facility and boat ramp ROY COOPER Govemar MICHAEL S. REGAN Secretary BRAXTON DAVIS Director, Division ofCoowal Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: x This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Mark Brown AGENCY SIGNATURE DATE Public Water Supply 12-15-20 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 RECEIVED DEC 2 1 2020 ROY COOPER Simen:nr MICHAEL S. REGAN .AYwarl' BRAXTON DAVIS Clree:w; lhVainn af('nnxtt+l h:ar:n,�aexrn December 12, 2020 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12.09) aregg bodnarCfDNCDENRgov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Jackie Realty Holdings LLC Project Location: Marina Way in North Topsail Beach, Onslow County Proposed Project: Docking t'acility and boat ramp Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by January12, 0t; If you have any questions, regarding the proposed project, contact Brad Connell 252-808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT: NAIVJE UJ a4L.dn a-t� SIGNATURE Wt Store ofNonh Carolina i Environmental Qwliry � Coutal Mmagemnt 127 Cardinal Dd1V Eat., Wfl. nag on, NC 28405 919 796 7215 RECEIVED JAN 7 2021 '14Y1� .4 North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Roy Cooper March 16, 2021 MEMORANDUM TO: Gregg Bodnar grege.bodnar&ncderingov Division of Coastal Management Department of Environmental Quality FROM: Ramona M. Bartos, Deputy P ` + R&,r4,V** 1 i xaA& State Historic Preservation Officer Secretary D. Reid Wilson SUBJECT: Construct docking facility & boat ramp, Lot 23, Marina Way, North Topsail Beach, Onslow County, ER 21-0098 Thank you for your email of March 2, 2021 concerning the above project. We have conducted a review of the project and are aware of no historic resources which would be affected by the project. Therefore, we have no comment on the project as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill -Earley, environmental review coordinator, at 919-814-6579 or environmental.reviewancdcr.¢ov. In all future communication concerning this project, please cite the above referenced tracking number. RECEIVED MAR 1 6 2021 L ZE&ICTION MMT) Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4017 Mail Service Center, Raleigh NC 27699-4617 Telephone/Pax: (919) 814-6570/814-6898 Received: 1 /14/2021 a Historic Preservation Office ER 21-0098 NORTH CAROLINA Enri,omncmal Oudhip December 12, 2020 MEMORANDUM. - Due: 1 /21 /2021 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnar cD..NCDENR.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Jackie Realty Holdings LLC Project Location: Marina Way in North Topsail Beach, Onslow County Proposed Project: Docking facility and boat ramp ROY COOPER Gnvenmr MICHAEL S. REGAN S'ecrerary BRAXTON DAVIS Dimclor, D,vuion afC o.W Management NC - SBA 1/21/2021 Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRMT NAME Renee Gledhill -Earley AGENCY SIGNATURE DATE Historic Preservation Office 1 /25/2021 RECOVE® JAN 2 5 2021 MP SECTION MHD State of Noah Carolina I Environmental Quality I Coastal Management 127 Cardiml Drive Em., Wilmington, NC 28405 919796 7215 Bodnar, Gre From: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Sent: Thursday, March 4, 2021 5:14 PM To: kathryn_matthews@fws.gov; leigh mann; pace wilber; Pete benjamin; HORTON, J TODD CIV USARMY CESAW (USA); Arnette, Justin R CIV USARMY CESAW (USA); DCR - Environmental_Review; Bowers, Todd; ethan coble; fritz.rohde; matt creelman; Twyla Cheatwood; Ellis, John; Howell, Jonathan; Wojoski, Paul A; Snider, Holley; Tranter, Kent W CIV USARMY CESAW (USA); Bertram, Paul J BOSN3; Bodnar, Gregg; Connell, Brad; Posey, Ward B CIV; Manning, John E CIV USARMY CESAS (USA) Cc: Jessop, Jordan E CIV USARMY CESAW (USA) Subject: [External] [WARNING: UNSCANNABLE EXTRACTION FAILED][WARNING: UNSCANNABLE EXTRACTION FAILED]CAMA MAJOR/PGP 291/SAW-2020-02214/ lot 23 Marina Way dock and boat ramp/Jackie Realty Holdings LLC/North Topsail Beach/Onslow County Attachments: [Non-DoD Source] RE: New CAMA Major Permit Application - Jacking Realty Holdings LLC; Goog]eEarth_Placemark.kmz; SAW-2020-02214_lot 23 Marina Way North Topsail Beach dock and boatramp ePN.pdf; Field Report & App.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. All, Pursuant to the CAMA-Corps Programmatic Permit process, the North Carolina Division of Coastal Management (NCDCM) has forwarded to our office a copy of a revised CAMA permit application (see email attachment) , Field Investigation Report and BioReport (dated December 2020) for the subject project. The attached notice requests federal agency comments on this project by April 3, 2021. The site is located within waters of Stump Sound, adjacent to the AIWW, lot 23 Marina Way, in North Topsail Beach, Onslow County, North Carolina. Coordinates are approximately 34.517148 N,-77.372010 W. The applicant is proposing to construct a two -slip docking facility and a boat ramp. Specifically, the applicant proposes to construct a fixed 2-slip docking facility 20' west of the existing gravel drive. The proposed pier access would be 6' W by 55' L. The proposed pier would connect to a 12' by 18' fixed platform (partially covered) out on the main waterbody, Stump Sound. Two boathouses, each containing a 13'X 13' boat lift, would be on either side of the fixed platform. Both of the proposed boathouses would be 13' W by 23' L, with 3' W catwalks located on three sides of the exterior of the boathouses. The proposed boat ramp would be located at the end of the existing gravel drive, and would measure 12' W by 48' L, with 34' extending below the NHW of Stump Sound. The ramp was extended in order to reach water depths on -3' NLW. Additionally proposed is a bulkhead (15' long each with a 4' section parallel to the AIWW) will be installed adjacent to the boat ramp on each side on the high ground. Adjacent to the boat ramp on the west side will be a fixed dock (3' x 28') to assist in the launching and retrieving of boats. Further, in order to provide a level access approach to the boat ramp, approximately 520 sq. ft. of gravel is proposed within the existing road footprint (to fill holes w/in the existing access). This area measures approximately 20'- 30' x 22'. No wetlands would be impacted by the gravel placement. The applicant has stated that the facility will be for private use and will not be open to the public. Dredging is not proposed as a part of this project. I Bodnar, Gregg From: Arnette, Justin R CIV USARMY CESAW (USA) <Justin.R.Arnette@usace.army.mil> Sent: Thursday, December 17, 2020 7:50 AM To: Snider, Holley Subject: [External] RE: ROW/Easement Question 6;� Attachments: Iot23.JPG C\) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Holly, See Attached. Basically it is our normal AIWW easement. it also looks to be under some powerlines so the power company may also have an easement there. this easement means any construction would need corps approval and restricts permanent construction completely. if you need anything else just let me know. Justin Justin Annette Team Lead Cartographer Landuse Coordinator Wilmington District U.S. Army Corps of Engineers 910-251-4196 justin.r.arnette@usace.army.mil -----Original Message ----- From: Snider, Holley <holley.snider@ncdenr.gov> Sent: Wednesday, December 16, 202012:12 PM To: Annette, Justin R CIV USARMY CESAW (USA) <Justin.R.Arnette@usace.army.mil> Subject: [WARNING: UNSCANNABLE EXTRACTION FAILED][Non-DoD Source] ROW/Easement Question Good afternoon Justin, I hope you are well and happy holidays. Could you please tell me what, if any, easements or right of ways the USACE maintains at this location along the waterway near North Topsail Beach and Sneads Ferry? Thanks in advance. Sincerely, Holley Snider. •''•.,><II((°j•"-.••..••><(1((2>.-'- Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7304 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Google Earth streams the world over wired and wireless networks enabling users to virtually go anywhere on the planet and see places in photographic detail. This is not like any map you have ever seen. This is a 3D model of the real world, based on real satellite images combined with maps, guides to restaurants, hotels, entertainment, businesses and more. You can zoom from space to street level instantly and then pan orjump from place to place, city to city, even country to country. Get Google Earth. Put the world in perspective. (BlockedhttP:Hearth.google.com) • DEPARTMENT OF THE ARMY I4 WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE I WILMINGTON, NORTH CAROLINA 28403-1343 March 3, 2021 Regulatory Division Action ID No. SAW-2020-02214 Jackie Holdings, LLC Attn: Teena Koury Post Office Box 850 Burlington, North Carolina 27216 tkoury&carolinahosierv.com Dear Ms. Koury, A review of your application received by this office on March 1, 2021, for Department of the Army (DA) authorization to construct a proposed docking facility, road repair, and boat ramp in North Topsail Beach, Onslow County, North Carolina indicates it to be a candidate for Federal authorization pursuant to the CAMA-Corps Programmatic Permit process for construction activities that receive authorization from the State of North Carolina. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this permit process for any reason, you will be informed regarding its further management. If there are no unresolved differences in State - Federal positions or policies, the final action taken on your application by the State will result in your receiving written notice from us that your application is consistent with the Federal permit and you may commence your activity. Only after receiving such confirmation should you begin work. Your application, pursuant to Section 404 of the Clean Water Act, and section 10 of the Rivers and Harbors Act has been assigned Action ID No. SAW-2020-02214. -2- We will be coordinating your permit application with other Federal agencies. Please feel free to contact me at sarah.e.hair@usace.army.mil. Sincerely, mor Liz Hair, Project Manager Wilmington Regulatory Field Office Electronic copies furnished: NCDEQ-DCM; Mr. Gregg Bodnar gree Q.bodnargricdenn gov NORTH C7AROLNr1 I""'nnrn.+m!0O ilr,) December 12, 2020 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) g re g g. b od n a r(a) N C D E N R. g ov SUBJECT: CAMA/Dredge and Fill Application Review Applicant: Jackie Realty Holdings LLC Project Location: Marina Way in North Topsail Beach, Onslow County Proposed Project: Docking facility and boat ramp ROY COOPER Gorenmr MICHAEL S. REGAN Secmlary BRAXTON DAVIS Dlrecie,, Dmisron ofCo=tal Management Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greaa Bodnar at the address above by January 12, 2021. If you have any questions regarding the proposed project, contact Brad Connell 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. X This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME Kimberlee Hardi AGENCY NCDMF SIGNATURE /i)4W,0"AZ 9Y DATE 03/22/2021 s MAR 2 2 2021 MP SECTION MHD State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 9197967215 ROY COOPER Governor MICHAEL S. REGAN Secretary JOHN G.BATHERSON Acting Director MEMORANDUM: TO: Gregg Bodnar, DCM Assistant Major Permit Coordinator FROM: Kimberlee Harding, NCDMF Fisheries Resource Specialist SUBJECT: Jackie Realty Holdings LLC - docking facility and boat ramp DATE: 03/22/2021 A North Carolina Division of Marine Fisheries (NCDMF) Fisheries Resource Specialist has reviewed the CAMA Major Permit application for proposed actions that impact fish and fish habitats. The applicant is proposing to construct a private docking facility and boat ramp within Stump Sound, in North Topsail Beach adjacent to Lot 23 Marina Way, within in White Oak River basin. The proposed docking facility is planned as a fixed 2-slip docking facility 20' west of the existing gravel drive. The proposed pier access would be 6' by 55'. The proposed pier would connect to a 12' by 18' fixed platform (partially covered) out on the main waterbody, Stump Sound. Two boathouses, each containing a boat lift, would be on either side of the fixed platform. These estuarine waters are classified as a Primary Nursery Area (PNA) by the NCDMF. This area is open to shellfish harvest and is classified as SA; High Quality Waters and no Submerged aquatic vegetation was observed at this location. PNAs are estuarine waters where initial post -larval development occurs. Species within this area are early post -larval to juvenile and include finfish, crabs, and shrimp. Species inhabit PNAs because they afford food, protection, and proper environmental conditions during vulnerable periods of their life history, thus protection of these areas are imperative. Increased sedimentation raises concern for shellfish and shellfish habitat by either the direct burial of oyster beds or reductions in filtration efficiency, respiration rates, and/or reproduction and settlement. Larval oysters require a clean hard bottom for attachment and sedimentation as little as 1 or 2 mm may inhibit settlement. Duration of sedimentation suspension and water quality degradation has been shown to result in juvenile oyster mortality. Coastal wetlands are considered among the most productive ecosystems in the world. Coastal wetlands are a productive detritus -based system that trap nutrients, toxins and sediment, aid in shoreline erosion control, dissipate wave and storm action, provides a barrier to flood damage, and provide nursery functions and support fish production. The NCDMF does not have concerns with the proposed design, however, for the above -mentioned reasons, the NCDMF would request that a moratorium on in -water work, from 1 April to 30 September is recommended to reduce the negative effects on critical fish life history activities, to include spawning migrations and nursery functions. RECEIVED State of North Carolina l Division of Marine FishMes AO , ? 2�2� 3441Arendell Street I PD.Box769I Morehead CityMAP ,North Carolina 28557 M 252-726-7021 Contact Kimberlee Harding at (910) 796-7475 or Kimberlee.Harding@ncdenr.gov with further questions or concerns. i y v MAR 2 2 2021 MP SECTION MHD State of North Carolina I Division of Marine Fisheries 3441ArendellStreet 1 P.O.Box769I Morehead City, North Carolina 28557 252-726-7021 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 April 12, 2021 Regulatory Division Action ID No. SAW-2020-02214 Mr. Jonathan Howell Division of Coastal Management North Carolina Department of Environmental Quality 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Howell: RECEIVED A P R 1 2 2021 LIP SECTION MHD Reference the application of Ms. Teena Koury to construct a private boat ramp and docking facility, in waters of Stump Sound, adjacent to the AIWW and lot 23 Marina Way, in North Topsail Beach, Onslow County, North Carolina. Specifically, the applicant proposes to construct a fixed 2-slip docking facility 20' west of the existing gravel drive. The proposed pier access would be 6' W by 55' L. The proposed pier would connect to a 12' by 18' fixed platform (partially covered) out on the main waterbody, Stump Sound. Two boathouses, each containing a 13'X 13' boat lift, would be on either side of the fixed platform. Both of the proposed boathouses would be 13' W by 23' L, with 3' W catwalks located on three sides of the exterior of the boathouses. The proposed boat ramp would be located at the end of the existing gravel drive, and would measure 12' W by 48' L, with 34' extending below the NH W of Stump Sound. The ramp was extended in order to reach water depths on -3' NLW. Additionally, proposed is a bulkhead (15' long each with a 4' section parallel to the AI W W) will be installed adjacent to the boat ramp on each side on the high ground. Adjacent to the boat ramp on the west side will be a fixed dock (3' x 28') to assist in the launching and retrieving of boats. Further, in order to provide a level access approach to the boat ramp, approximately 520 sq. ft. of gravel is proposed within the existing road footprint (to fill holes Win the existing access). This area measures approximately 20'- 30' x 22'. No wetlands would be impacted by the gravel placement. The project site is located directly adjacent to the Corps federal channel. A Corps Easement exists over the entire parcel and along Marina Way. The Wilmington District Navigation Branch requires a Consent to construct the boat ramp and must be obtained prior to construction. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the modification to the State authorization: -2- 1. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at httns•//www fws. ovg /raleigh/pdfs/ManateeGuidelines20l7.pdf 2. A U.S. Army Corps of Engineers Easement exists over the entire parcel and along Marina Way from the AI W W to the oceanfront shoreline. During dredging activities conducted by the Corps, or its contractors, a pipeline may be placed from the AIW W along Marina Way to the oceanfront shoreline. The boat ramp would be blocked during the duration of the Corps dredging/disposal activities. 3. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772-2191. 4. All work authorized by this permit must be performed in strict compliance with the submitted plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 5. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 6. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 7. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Resources at (919) 733- 5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 8. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 9. If the permittee discovers any previously unknown historic or archeological remains while accomplishing the authorized work, he will immediately notify the Wilmington District RECEIVE® APR 1 2 2021 rsP G1=rTlnM RIl14n -3- Engineer who will initiate the required coordination procedures. 10. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 11. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 1 I3A Article 4). 12. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 13. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre -project condition. 14. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Questions or comments may be addressed to Ms. Liz Hair Wilmington Field Office, Regulatory Division, telephone (910) 251-4049 or email at sarah.e.hair@usace.army.mil. Sincerely, ,L� ram, Liz Hair, Project Manager Wilmington Regulatory Field Office APR 1 2 2021 MP SECTION MHD -4- Electronic Copy Furnished: USEPA; Mr. Todd Allen Bowers NCDEQ/DCM; Mr. Gregg Bodnar NCDEQ/DWR; Ms. Holley Snider USFWS; Mr. Pete Benjamin/Mr. John Ellis NMFS; Dr. Pace Wilber/Ms. Twyla Cheatwood USACE/Navigation Branch; Mr. Justin Annette RECEIVE® APR 1 2 2021 P SECTION MHD ***This is a word processing form to be completed in Microsoft Word` NC Division of Coastal Management Major Permit Application Computer Sheet (11/1/2012) Applicant: Jackie Realty Holdings LLC Date: 12/1420 Project Site County: Onslow Staff: Brad Connell District: Elizabeth City ElWashington ®Morehead City ❑Wilmington Project Name: Koury ramp and dock Date of initial application submittal (EX: 1/82007): 11/3/20 Date application "received as complete' in the Field office (EX: 1/82007): 11/32020 Permit Authorization: CAMA Dredge 6 Fill SBoth SITE DESCRIPTION/PERMIT INFORMATION PNA: OYes No Photos Taken: YesS No❑ Setback Required (riparian): Yes No Critical Habitat: []Yes ❑No ®Not Sure 15 foot waiver obtained: Yes ONo Hazard Notification Returned: ❑Yes ®No SAV: Yes []No ONot Sure Shell Bottom: MYes No Not Sure Temporary Impacts: Yes ONo Sandbags: ❑Yes No El Not Sure Did the land use classification come from county LUP: []Yes ®No Mitigation Required (optional): []Yes []No Moratorium Conditions: []Yes ®No ❑NA Environmental Assessment Done: [_]Yes []No ®NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) WETLANDSIMPACTED El (404) Corp. of Engineers (Jurisdictional (LS) Sea lavender (Limonium sp.), (SS) Glasswort (Salicomia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina (SY) Salt reed grass (Spartina ahemiffora) cynosuroides) ❑ (DS) Salt or spike grass (Distichlis (SC) Bullrush or three square (Scirpus (TY) Cattail (rypha sp.) spirata) sp.) ❑ (JR) Black needlerush (Juncus (SP) Salt/meadow grass (Spartina roemedanus) patens) APPLICATION FEE ❑ No fee required - $0.00 0 III(A) Private w/ D&F up to 1 acre; 3490 El III(D) Priv. public or comm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 Minor Modification to a CAMA Major Major Modification to a CAMA Major El IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 Permit Transfer - $100 E3 Ill(B) Public or commercial w/ D&F to 1 Express Permit - $2000 acre; 3490 can be applied - $400 Major development extension request - II. Public or commercial/no dredge $100 and/or fill - $400 I. Private no dredge and/or fill - $250 ® III(C) Priv. public or comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 252-808-2808 :: 1-888-4RCOAST :: vvww.nccoastaimanaaement.net revised: 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant: Jackie Realty Holdings LLC Date: 12/15/20 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One Piers 2 New work Replace 6', 3' 55', 20' Maint ❑ ❑ Y ON Platform 1 New work Replace 12' 1 g' fixed Maint ❑ ❑ Y ® N Boat Houses 2 New work Replace 13' 23' Maint ❑ ❑ Y ON Finger Piers 2 New wont Replace 3' 47' Maint ❑ ❑ Y ® N Boat Ramp 1 New work Replace 12' 35' Maint ❑ ❑ Y ® N Retaining 2 New Work Replace 19, Walls Maint ❑ ❑ Y ON revised 02115110 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant: Jackie Realty Holdings LLC Date: 12/15/20 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. F TOTAL Sq. Ft FINAL Sq. Ft TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact temp impacts) impact amount) temp impacts) amount Open Water Dredge ❑ Fill ❑ Both ❑ Other ® 1594 ftz 1594 ftz Shallow Bottom Dredge ❑ Fill ® Both ❑ Other ❑ 240 ftz 240 ft2 High Ground 300 fp 300 ftz Dredge ❑ Fill ® Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanaoement.net revised: 02/15/10 All Water Depths Relative to NLW v = Area to be Graveled = 520 sq. ft. 0 0- < No Existing Piers for over 2 miles <--Property Line approx. 1,028' tL Coastal/404 Wetlands y y 0 00 Proposed Structures RECEIVED MAR 2 2021 MP SECTION MHD Approx. 1/4 Width of Waterbody -3.5' CORPS Federal -3' 12' 26' ,2' 26' No Existing Pi Pro p Pro osed Boathoudse Boathouse 9'—� Slip 1 Slip 2 —'1�--19'—iI -2.5' °' -3' -3' v, 01 -2' 64' to Power Lines 48' LProposed ro Boat ramp NLV)ll \ I I Uplands �p�ands '�� � \ , 1e, 15- i y \\ y ro se y Bul he Jackie Realty Holdings, LLC c/o Teena Koury \\ Exis in y Lot 23, North Topsail Beach \�� Roa y �\ 25 W Teena Koury Lot 23 Marina Way North Topsail Beach Onslow County Drawn By Debbie Wilson 9/29/20 Revised 2/26/21 Scale: 1" = 20' Sheet 3 of 4 I ISetback 2 miles —� Lines y Property Line approx. 1,418'--> y y Wetlands y v 01 y I 1..� �' • aH:ra an.n•s•••• • fra»r.{Z • _ '+t tt21 _. H.u. n • ssa»rr rr/ brrlfruH n.Nf.e iaaMa.ys • ' ttX }tjf S • � e _ 5}j, . t { � - a i � � • �� — �i � ffiY i �.•��' �� �a>�slssurrtsrsiali {ri A fgau/I{!r./trirrsHrrKflr +rafrrs•fusasrsafru rra»•%a nNtb•r fuian � � ••�+t• • rr»a•f►rruNfugrarirr. • • •• »rrrrK,�'j(a rrs.niittMllrr! alfrrt!!la �H trifK/aalf »ruK».re pfrr :fMH/r`Nsrnlrer � c�1 49 fft • _ Oaf t w. f ti L4L454 • _ 1 f • \ I j4Q) ft' • t ` � �� • • f OOjy�A ��(r • " s•; �.:SZKSIyiZh{Spfilf HrnafNu{tlf uraHra� u - • . IIJJJJ.JIllJlllJ �� '�_ [il_ • j f ! w .ran.aH sa• ..... t t « 3004 �•:.. �E k,`- , t 309�1 O \M p4V C47 C, C A. /e YoL wcr�z' �1 X-Sections Concrete Slab F IW Typical Boat Ramp X-Section NTS Proposed Boathouse 2 @ 19' x 26' Each Typical Pier & Boathouse X-Section NTS NW � T NLW ��- Tie -rod -rod Contour A Irheet Pile Typical Bulkhead X-Section NTS Ground Elevation man Proposed Bulkhead Teena Koury Lot 23 Marina Way North Topsail Beach Onslow County Drawn By Debbie Wilson 9/29/20 Sheet 4 of 4 Typical Floating Dock X-Section NTS NHW NLW r All Water Depths Relative to NLW <---No Existing Piers for over 2 miles NL Property Line approx. 1,028' Coastal/404 Wetlands y y 0 CD S Cr 0 CL u .r, 0 00 Fj Proposed Structures �--A1 WW--� -3.5' -3.5' Approx. 1/4 Width of Waterbody 6' x 12' --- 4 -3' 7 12' -3' 26' 112' 26' Proposed,ro osed Boathouse Boathouse Slip 1 Slip 2 -2.5' °) X -2.5' 2.5' cn ��-12'�I V' if Jackie Realty Holdings, LLC c/o Teena Koury Lot 23, North Topsail Beach 15 15' i Existing --)L Road 25' y Teena Koury Lot 23 Marina Way North Topsail Beach Onslow County Drawn By Debbie Wilson 9/29/20 Scale: 1" = 20' Sheet 3 of 4 1[�'fiitita& : M51 No Existing Piers for over 2 miles y y LW y Property Line approx. 1,418'--) W y Coastal/404 Wetlands � y y y 4