Loading...
HomeMy WebLinkAboutSCEX_18-09_ DiRuzza 'rt ROY COOPER Governor t,a MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS Director ENVIRONMENTAL QUALITY April 6,2018 Barry and Dee DiRi17.7,a 6423 Lundin Link Lane Charlotte,NC 28277 RE: EXEMPTED PROJECT(MINOR)EXEMPTION MAINTENANCE AND REPAIR-(15A NCAC 7K.0209)—Exemption# SCEX18-09 1834-B Shore Drive, Surf City,NC AREA OF ENVIRONMENTAL CONCERN—Ocean Hazard AEC Dear Mr. and Mrs.DiRuz7,a: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. Based on the information provided,I have determined that the activity you propose is exempt from needing a minor development permit if it remains consistent with the information received from you on April 3, 2018,and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions,please contact me before proceeding. Maintenance&Repair 1. The maintenance and repair work authorized under this exemption specifically includes the repair/maintenance of decking along the ocean and street side of the existing dwelling.No additions, including roof overhangs,deck expansions,enclosures,etc.are authorized under this exemption. All decking located within the 60'setback,as measured from the First Line of Stable Natural Vegetation(FLSNV)shall not exceed a combined total of 500 sq.ft.This shall include existing and proposed decking. 2. The development must not involve removal,damage,or destruction of threatened or endangered animal or plant species. 3. The development must not alter naturally or artificially created surface drainage channels. 4. The development must be consistent with all applicable use standards and local land use plans in effect at the time the exemption is granted. 5. The proposed development shall remain consistent with the attached work plan drawings. 6. This permit does not authorize expansion of the existing structure. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization. This exemption expires 90 days from the date of the letter. ; erely on ail,LPO cc: DCM—WIRO Steve Padgett/Patti Arnold,Town of Surf City State of North Carolina I Environmental Oualitv I Coastal Mana¢ement Dail, Jason From: Jeff James <carolinacoastcontracting@gmail.com> Sent: Tuesday, April 03, 2018 9:44 AM To: Dail,Jason Subject: [External] Fwd: 1834E S Shore, Surf City - Exemption Hi Jason We are hoping to start this project next week. Do you need anything further from me? Cindy Forwarded message From:Jeff James<carolinacoastcontracting@gmail.com> Date: Mon, Mar 19, 2018 at 1:42 PM Subject: 1834E S Shore, Surf City- Exemption To: "Dail,Jason" <jason.dail@ncdenr.gov> Hi Jason We are doing a replacement of handrails and deck boards on top floor ocean side deck and stairs leading to lower deck. Also replacing rails and boards on streetside balcony. Owner information: Barry&Jo Dee DiRuzza 6423 Lundin Link Lane Charlotte, NC 28277 Please let me know if you need any further information Cindy Jeff James Owner/Operator Carolina Coast Contracting PO Box 2391 13775 Hwy 50, Suite 401 Surf City, NC 28445 910-328-6400 office 910-329-9793 fax