HomeMy WebLinkAboutSCEX_18-09_ DiRuzza 'rt ROY COOPER
Governor
t,a
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
Director
ENVIRONMENTAL QUALITY
April 6,2018
Barry and Dee DiRi17.7,a
6423 Lundin Link Lane
Charlotte,NC 28277
RE: EXEMPTED PROJECT(MINOR)EXEMPTION
MAINTENANCE AND REPAIR-(15A NCAC 7K.0209)—Exemption# SCEX18-09
1834-B Shore Drive, Surf City,NC
AREA OF ENVIRONMENTAL CONCERN—Ocean Hazard AEC
Dear Mr. and Mrs.DiRuz7,a:
I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an
application for a minor development permit under the Coastal Area Management Act. Based on the information
provided,I have determined that the activity you propose is exempt from needing a minor development permit if
it remains consistent with the information received from you on April 3, 2018,and meets the conditions specified
below. If your plans should change and your project will no longer meet these conditions,please contact me
before proceeding.
Maintenance&Repair
1. The maintenance and repair work authorized under this exemption specifically includes the
repair/maintenance of decking along the ocean and street side of the existing dwelling.No additions,
including roof overhangs,deck expansions,enclosures,etc.are authorized under this exemption.
All decking located within the 60'setback,as measured from the First Line of Stable Natural
Vegetation(FLSNV)shall not exceed a combined total of 500 sq.ft.This shall include existing and
proposed decking.
2. The development must not involve removal,damage,or destruction of threatened or endangered animal
or plant species.
3. The development must not alter naturally or artificially created surface drainage channels.
4. The development must be consistent with all applicable use standards and local land use plans in effect at
the time the exemption is granted.
5. The proposed development shall remain consistent with the attached work plan drawings.
6. This permit does not authorize expansion of the existing structure.
This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State,
Federal or Local authorization. This exemption expires 90 days from the date of the letter.
; erely
on ail,LPO
cc: DCM—WIRO
Steve Padgett/Patti Arnold,Town of Surf City
State of North Carolina I Environmental Oualitv I Coastal Mana¢ement
Dail, Jason
From: Jeff James <carolinacoastcontracting@gmail.com>
Sent: Tuesday, April 03, 2018 9:44 AM
To: Dail,Jason
Subject: [External] Fwd: 1834E S Shore, Surf City - Exemption
Hi Jason
We are hoping to start this project next week. Do you need anything further from me?
Cindy
Forwarded message
From:Jeff James<carolinacoastcontracting@gmail.com>
Date: Mon, Mar 19, 2018 at 1:42 PM
Subject: 1834E S Shore, Surf City- Exemption
To: "Dail,Jason" <jason.dail@ncdenr.gov>
Hi Jason
We are doing a replacement of handrails and deck boards on top floor ocean side deck and stairs leading to lower deck.
Also replacing rails and boards on streetside balcony.
Owner information:
Barry&Jo Dee DiRuzza
6423 Lundin Link Lane
Charlotte, NC 28277
Please let me know if you need any further information
Cindy
Jeff James
Owner/Operator
Carolina Coast Contracting
PO Box 2391
13775 Hwy 50, Suite 401
Surf City, NC 28445
910-328-6400 office
910-329-9793 fax