Loading...
HomeMy WebLinkAboutSCEX_18-07_ Kornegay ROY COOPER Governor Ih I:a MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director March 22,2018 Glen and Carol Kornegay , 290 Cedar Ridge Road Murphy,NC 28906 RE: EXEMPTED PROJECT(MINOR)EXEMPTION MAINTENANCE AND REPAIR-(15A NCAC 7K.0209)—Exemption#SCEX18-07 1806-A&B S. Shore Drive,Surf City,NC AREA OF ENVIRONMENTAL CONCERN—Ocean Hazard AEC Dear Mr. and Mrs.Kornegay: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. Based on the information provided,I have determined that the activity you propose is exempt from needing a minor development permit if it remains consistent with the information received from your agent(High Tides Construction and Design)on March 21,2018,and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions,please contact me before proceeding. Maintenance&Repair 1. The maintenance and repair work authorized under this exemption specifically includes the replacement of decking along the ocean of the existing dwelling.No additions,including roof overhangs,deck expansions,enclosures,etc.are authorized under this exemption.All decking located within the 60' setback,as measured from the First Line of Stable Natural Vegetation(FLSNV)shall not exceed a combined total of 500 sq.ft.(i.e.total deck sq.ft.for the combination of 1806-A S.Shore Drive and 1806-B S.Shore Drive) 2. The development must not involve removal,damage,or destruction of threatened or endangered animal or plant species. 3. The development must not alter naturally or artificially created surface drainage channels. 4. The development must be consistent with all applicable use standards and local land use plans in effect at the time the exemption is granted. 5. The proposed development shall remain consistent with the attached work plan drawings. 6. This permit does not authorize expansion of the existing structure. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization. This exemption expires 90 days from the date of the letter. Sincerely, 4-Dail, on il,LPO cc: DCM—WIRO Steve Padgett/Patti Arnold,Town of Surf City Lin and Shelia Kornegay, 1806-B S. Shore Drive, Surf City,NC 28445 State of North Carolina I Environmental Quality I Coastal Management 177(`.r,lin.l Tl.;..e VW 1l1:1...:......... mr`oannc (._:-,-.Ly 7_c 1......0 i .._., eil /r\ ...---- 0 G�'1 4/ /4/ ()lir hi , 41( 26"906 Atlantic Cicea4 ,. I- ,_ 4 . High Tides Construction&DesignT t � - PO Box 2924 , ll_ Surf City,NC 28445 „p - - - - - -"- - 1 - rt Contact: I t , I _ Elizabeth Hamme 910.515.5157 �: a• ' tmmi -• • i mmi Forrest Hamme 910.233.6154 u — - mm I mm _ — — Project Address: W '== ! 'I NJ(YYAY if Mrs MN Lin&Shelia Kornegay 1• < 1806 A S.Shore Drive nEGiG DEGiC Surf City,NC 28445 25'X 10' — 25 X T4 li -I 1 —it817-584-2815 ' �_� 1 1 J Glen&Carol Kornegay 1806 B S.Shore Drive Surf City,NC 28445 682.429.3624 Description of Project: Remove existing upper and lower decks on oceanfront and replace based on drawings EXISTING HOUSE EXISTING HOUSE 24'x37 24'x37 submitted. **Drawing Not to Scale** S.shore Drve