HomeMy WebLinkAboutSCEX_18-04_ Time it: ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
r
ENVIRONMENTAL QUALITY
January 29,2018
Time in Topsail,LLC
Attn: Karen Sommerville
5005 Lenoraway Drive
Raleigh,NC 27613
RE: EXEMPTED PROJECT(MINOR)EXEMPTION
MAINTENANCE AND REPAIR-(15A NCAC 7K .0209)—Exemption#SCEX1&04
1132 S.Shore Drive, Surf City,NC
AREA OF ENVIRONMENTAL CONCERN—Ocean Hazard AEC
Dear Ms. Sommerville:
I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an
application for a minor development permit under the Coastal Area Management Act. Based on the information
provided,I have determined that the activity you propose is exempt from needing a minor development permit if
it remains consistent with the information received from you on January 26,2018,and meets the conditions
specified below. If your plans should change and your project will no longer meet these conditions,please
contact me before proceeding.
Maintenance&Repair
1. The maintenance and repair work authorized under this exemption specifically includes the
repair/maintenance of driveway along the street side of the existing dwelling.Maintenance shall be
limited to the resurfacing of the existing driveway.Additionally,a wooden walkway is authorized under
this exemption(located beneath the residence)to allow for pedestrian access from the ground level to the
first story elevation.THIS EXEMPTION DOES NOT ALLOW FOR THE CREATION OR
INSTALLATION OF ANY RETAINING WALLS WITHIN 60' OF THE FIRST LINE OF
STABLE NATURAL VEGETATION.
2. The development must not involve removal,damage, or destruction of threatened or endangered animal
or plant species,nor does it allow for any disturbance to the frontal dune,vegetation of sand.
3. The development must not alter naturally or artificially created surface drainage channels.
4. The development must be consistent with all applicable use standards and local land use plans in effect at
the time the exemption is granted.
5. The proposed development shall remain consistent with the attached work plan drawings.
6. This permit does not authorize expansion of the existing structure.
This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State,
Federal or Local authorization. This exemption expires 90 days from the date of the letter.
Si ely,
son D ,
cc: DCM—WIRO
Steve Padgett/Patti Arnold, Town of Surf City
State of North Carolina 1 Environmental Quality I Coastal Management
,
CE-1Dail, Jason
From: Jeff James <carolinacoastcontracting@gmail.com>
Sent: Wednesday, January 24, 2018 3:58 PM
To: Dail, Jason
Subject: [External] 1132 S Shore- Owner Information
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless verified.Send all suspicious email as an attachment to
report.spam@nc.gov.
Time in Topsail LLC
5005 Lenoraway Dr �l i
Raleigh, NC 27613 5)titwig
Cindy
Jeff James
Owner/Operator
Carolina Coast Contracting
PO Box 2391
13775 Hwy 50, Suite 401
Surf City, NC 28445
910-328-6400 office
910-329-9793 fax
Cc 71-7-4C1
yn -+Ad1
•
7i-�
•
NMI
' Y
I
I
1 L747iOS