Loading...
HomeMy WebLinkAboutSCEX_14-06_ Ozimek Ara NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory John E. Skvarla, III Governor Secretary April 25, 2014 Exemption Number—SCEX14-06 Thad and Karen Ozimek PO Box 2176 Surf City, NC 28445 RE: EXEMPTED PROJECT(MINOR) EXEMPTION ACCESSORY USE/STRUCTURE-(15A NCAC 7K.0209)—Exemption#SCEX14-06 2210-A S. Shore Drive, Surf City, NC AREA OF ENVIRONMENTAL CONCERN—Ocean Hazard AEC Dear Mr. and Mrs. Ozimek: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. Based on the information provided, I have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing dated received by DCM on 4/18/2014, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. Accessory Uses 1. The development specifically authorizes the work detailed in the site plan dated received by the Division of Coastal Management on 4/18/14, and includes the construction of a 7' 13'elevated deck along the ocean side of the existing dwelling. No other development activities are authorized under this exemption.Additional development will require re-evaluation by the Division of Coastal Management. 2. The development must not involve removal, damage,or destruction of threatened or endangered animal or plant species. 3. The development must not alter naturally or artificially created surface drainage channels. 4. The development must not alter the land form or vegetation of a frontal dune. 5. The development must be consistent with all applicable use standards and local land use plans in effect at the time the exemption is granted. 6. The proposed development shall remain consistent with the attached work plan drawings. 7. This permit does not authorize expansion of the existing structure. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization. This exemption expires 90 days from the date of the letter. .ncerely, on Dail, LPO Cc: DCM—WIRO Steve Padgett, Surf City Inspections T had i Ko.g-en, C'z ; r►aGK I 7 - X 1 4 ' v nicer{I'cd UecC" 1.3 Iv A S. S1-ort br. et ( sq �t C'e - c&rra:9c kctr surf c; , Ah e. ,1 BYyr r ii -Snit ki.ot,s c, I go c3or 2/�‘ , , ; V;itI, ,. 1 TN 1.....1 Li LI "S is SH 3k 1ff S1ct a. ti` - j Jv• — 'T1f -xi) NI o0 v4 Posts ace i r ' (Arm; tr, Ei'61';110 `31►ist I61/c "'xIsi-' Cciet,d La( wl owe 6614. APR 1 8 2014 UCM WiLMi GioN, NC 1t ,- , Dail, Jason From: Garry Baylies [cornerstoneservices2014@yahoo.com] Sent: Friday, April 18, 2014 9:33 PM To: Dail, Jason Subject: Cornerstone Services Deck Ozimec 2210A S. Shore drive Surf City Attachments: Ozimek.pdf Jason, Attached is the deck that we'd like to add onto the existing deck at 2210a S.Shore Dr. Surf City. 91 total sq. feet, as per conversation with you just wanted to verify that the total square feet is less 100 and that it wouldn't need a permit or any other paperwork to move forward with this project. Thank You Garry Baylies 910-226-7025