Shoreline Erosion Control Plan
W RIGHT’S CREEK PARK
B EAUFORT COUNTY, NC
Prepared by:
February, 2020
This report was prepared by Beaufort County under grant award #NA17NOS4190066 to
the Department of Environmental Quality, Division of Coastal Management from the
Office for Coastal Management, National Oceanic and Atmospheric Administration.
The statements, findings, conclusions, and recommendations are those of the authors
and do not necessarily reflect the views of DEQ, OCM or NOAA.
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
TABLE OF CONTENTS
PAGE
INTRODUCTION 1
PROJECT OVERVIEW 2
HISTORICAL EROSION 3
SUBMERGED AQUATIC VEGETATION SURVEY 5
ENVIRONMENTAL SCOPING 5
PROPOSED SHORELINE ENHANCEMENT OPTIONS 6
RIP-RAP REVETMENT OPTION
LIVING SHORELINE OPTION
PERMITTING REQUIREMENTS 7
PRELIMINARY COST OPINION 9
POTENTIAL FUNDING OPPORTUNITIES 9
CAMA WATER ACCESS GRANTS
CLEAN WATER MANAGEMENT TRUST FUND GRANTS
RECOMMENDATION 10
APPENDICES 11
A. SUBMERGED AQUATIC VEGETATION REPORT
B. INTERAGENCY SCOPING MEETING ATTENDEES
C. RIP-RAP ARMORING CALCULATIONS
D. CAMA G RANT INFORMATION
LIST OF FIGURES
1. PARK DEVELOPMENT CONCEPT
2. PROJECT VICINITY
3. SHORELINE EROSION HISTORY
4. RIP-RAP REVETMENT OPTION
5. RIP-RAP REVETMENT TYPICAL CROSS-SECTION
LIST OF TABLES
1. CONSTRUCT RIP-RAP REVETMENT, PRELIMINARY OPINION OF
PROBABLE COST
1
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
INTRODUCTION
Wright’s Creek Park is a 5.9 acre parcel of land owned
by Beaufort County. The property adjoins Wilkins
Road in the southeastern portion of Beaufort County
near the Pamlico Beach community.
The County has developed preliminary plans to improve
the property as a waterfront park with a picnic shelter,
restroom facility, fishing pier, walking trails and board-
walks along with various other passive recreational
amenities (Figure 1). Funding for initial park develop-
ment has been received from the North Carolina Parks
and Recreation Trust Fund.
The site has three distinct shorelines, several of which
have been subjected to erosion from wave action. Prior
attempts to assist in erosion prevention have met with
varying degrees of success. The County desires to miti-
gate additional shoreline erosion potential as part of park
development.
Beaufort County was awarded a grant from the NC Divi-
sion of Coastal Management to develop a shoreline ero-
sion control plan. Subsequently, the County issued a
Request for Qualifications for an engineering firm to
evaluate the current shoreline concerns and develop a
plan to mitigate future erosion potential. Rivers & Asso-
ciates, Inc. of Greenville, NC was selected and a profes-
sional services agreement was executed in October 2019.
Image furnished by Beaufort County
FIGURE 1
PARK DEVELOPMENT CONCEPT
2
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
PROJECT OVERVIEW
The study area consists of 5.9 acres of land currently
owned by Beaufort County, NC. The property is locat-
ed at the end of Wilkins Road (NCSR 1726) along the
shoreline of Wright’s Creek, a tributary of the Pungo
River. Future plans for the property include improve-
ments made to Wright’s Creek Park.
The shoreline has experienced a history of erosion.
Current measures have proved inadequate in preventing
erosion. The purpose of this report is to identify the
causes of the existing erosion and to develop a plan to
mitigate future erosion in line with the planned develop-
ments to the park site.
The proposed park is located off of Wright’s Creek and
has three distinct shorelines. The northern shoreline is
sparsely vegetated and is located south of the NCWRC
Wilkin’s Road Boat Access Area. The north shoreline
has a distinct beach to the east of an existing tree line
and west of the vegetated point.
The eastern shoreline along Wrights Creek is located
approximately 1500 feet from the confluence with the
Pungo River. The northern and eastern shores are ex-
posed to an open fetch of water approximately 2.5 miles
in length. Initial observations show the primary cause
of the existing erosion is due to wind-driven waves
propagating across the Pungo River.
The shoreline to the northeast and east is vegetated with
a variety of wetland and marsh grass, and the shoreline
to the south is vegetated with mature pine trees and a
variety of hardwoods and underbrush ranging approxi-
mately 20 to 40 feet from the shoreline.
Wright’s Creek Park Property, North Facing Shoreline (looking south)
FIGURE 2
PROJECT VICINITY
3
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
The location of Wright’s Creek Park in relation to the
Pungo River is illustrated in Figure 2.
HISTORICAL EROSION
There is evidence of continuing erosion on all three
shorelines and evidence of erosion near the top of the
bank resulting from major storm or wind events. The
western portion of the north shore is provided some pro-
tection from northeastern wind events by the NC Wild-
life Commission boat access area located to the north;
however the eastern portion of the north shoreline,
along with all of the eastern shoreline, is exposed to an
approximate 2.5-mile fetch across the Pungo River.
Aerial imagery taken on April 11, 2010 shows a well-
vegetated northern shoreline. Imagery taken on February
12, 2012 shows a loss of vegetation (presumably during
Hurricane Irene).
Further evidence of erosion was observed using NC
OneMap imagery taken on February 12, 2012 and Febru-
ary 1, 2016. A comparison between the two imagery
dates illustrates erosion along the northern and eastern
Aerial Imagery from April 11, 2010
Aerial Imagery from February 12, 2012
Vegetation Loss
4
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
FIGURE 2
SHORELINE EROSION HISTORY
5
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
shorelines, with a maximum erosion of approximately
15 feet. A comparison between the 2012 and the 2016
shorelines imagery can be seen in Figure 2.
A field reconnaissance of the site was performed on
August 8, 2019. Visual inspection of the shorelines
confirmed the existence of erosion along both the north-
ern and southern shorelines, although more pronounced
on the northern shore.
SUBMERGED AQUATIC
VEGETATION (SAV) SURVEY
Once authorized to initiate contracted services, Rivers
immediately sub-contracted with Land Management
Group, Inc. for performance of a submerged aquatic veg-
etation (SAV) survey to identify any specific vegetative
constraints to development of particular options, such as
harden shoreline options.
The SAV survey was completed on October
22, 2019. The results of the survey demonstrated that
no submerged aquatic vegetation was present along the
northern or eastern shorelines. The southern shoreline
did show a sparse amount of vegetation (~20% cover-
age), comprised of approximately 2-4 square foot patch-
es.
The SAV report concluded that the lack of vegetation
along the north shore was due to the existing substrate
conditions. The lack of vegetation along the eastern
shoreline was determined to be due to the same higher
velocities that are the cause of the existing erosion is-
sues.
The complete SAV report can be found in Appendix A.
ENVIRONMENTAL SCOPING
An interagency “scoping” meeting was scheduled in
the Washington Regional Field Office of NCDEQ.
The meeting was held on December 3, 2019 with rep-
resentatives of NC Coastal Management, USA Corps
of Engineers, NC Wildlife Resources Commission,
NC Division of Water Resources, and NC Division of
Energy, Mineral and Land Resources in attendance
along with representatives of Beaufort County and
Rivers’ project team. A list of attendees is provided in
Appendix B.
Topics discussed in the meeting included proposed uses
of the park property (including the influence of the exist-
ing uses from the adjacent NC Wildlife Commission
public boat ramp); location of existing erosion concerns
and their possible causes; a discussion on possible ero-
sion control measures, and; a conversation dealing with
the regulatory process.
Regarding the existing and proposed uses of the proper-
ty, the current use of the adjoining NC Wildlife Commis-
sion boat ramp was discussed. The existing boat ramp is
commonly used by both recreational boaters and com-
mercial fishermen. The conversation focused on the use
by commercial fishermen; specifically on the use of the
Wright’s Park property as their staging ground.
Northern Shoreline Erosion (looking west)
August 8, 2019
Southern Shoreline Erosion (looking west)
August 8, 2019
6
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
Feedback from attendees lead to the conclusion that
some aspects of the County’s proposed site plan would
need to be altered. Possible revisions include moving
the proposed kayak launch, as well as other land-borne
structures outside of any riparian buffer areas. Other
potential site-plan revisions include defining access
points to water-borne structures (i.e. boardwalk).
Site plan revisions, including any accommodations for
commercial fisherman, are beyond the scope of this ero-
sion control report, but are noted here as significant
items requiring attention by the County as it moves for-
ward with its site development goals.
The Submerged Aquatic Vegetation survey report was
reviewed. The results of the survey indicated the possi-
bility of incorporating a “living shoreline” along the
south shore. It was determined that this would be con-
sidered in the project design, but that any erosion con-
trol measure should prioritize long-term strength and
stability over any environmental improvements.
The scoping meeting concluded with the agreement that
any future project should proceed under a major permit.
PROPOSED SHORELINE
ENHANCEMENT OPTIONS
The length of the open-water fetch across the Pungo
River along with the history of shoreline erosion, sug-
gests the most appropriate way to mitigate future ero-
sion on the north and east facing shorelines would be
either a rip-rap revetment or a bulkhead.
Preliminary research was conducted to compare differ-
ences in material costs associated with a rip-rap revet-
ment versus a bulkhead. The average cost per linear
foot of a rip-rap revetment is estimated to be between
$90 - $150 per ton. For the given dimensions of this
project, the estimated cost would be between $140 -
$160 per linear foot.
Prices per linear foot for a bulkhead vary based upon
the material chosen. A timber bulkhead could possibly
be built for a price comparable to rip-rap, but would be
anticipated to have a significantly shorter lifespan than
other materials. Prices for concrete or vinyl bulkheads
could potentially range between $500 - $1000 per linear
foot solely for materials. Additional analysis would be
needed to determine if toe protection would be required,
potentially further increasing material costs.
Both design approaches (rip-rap, bulkhead) would be
sufficient in mitigating future erosion, but with potential-
ly vastly different construction costs. Considering the
site conditions and price differences, the rip-rap revet-
ment was explored in further detail.
Rip-Rap Revetment Option
The relationship between the 2016 and 2012 shorelines
(Figure 3) was used to determine and define the limits of
the revetment option. The proposed revetment begins
approximately one-half way along the northern shoreline
and ends at the southeast corner of the property.
Existing elevations in the project area are generally high-
er than the surrounding properties. The surface has a
relatively flat top, with side slopes ranging from 3:1 to
5:1 forming a well-defined perimeter.
The width of the proposed revetment was determined by
using available LIDAR data. The proposed revetment
would begin at the existing top of bank, and roughly fol-
low the existing grade to the bottom of the side slopes.
The proposed revetment would extend from the existing
top of bank to an elevation of approximately 1 foot be-
low mean sea level. The top of bank elevations range
between 5.0 - 6.0 FT NAVD, resulting in the total height
of the revetment between 6 - 8 feet. Revetment slopes
will range between 3:1 to 5:1, based upon the local ge-
ometry. The toe of the revetment would be at least 3 feet
in width. The base of the revetment would be lined with
geotextile fabric, and any disturbed ground not covered
by the rip-rap would need to be re-seeded for stability.
Relative to the existing side terrain the estimated limits
of the revetment are shown in Figure 4. The 2012 shore-
line is illustrated for reference. The anticipated revet-
ment length is estimated as approximately 520 linear
feet. Given the slopes and distances in the typical cross-
section, the total estimated amount of rip-rap would be
approximately 450 cubic yards.
Preliminary design calculations show the need for either
a Class 1 or Class 2 rip rap. The required volume of ma-
terial would require an estimated 800 - 1,000 tons of ei-
ther Class 1 or Class 2 rip-rap, with between 600 - 700
square yards of geotextile fabric liner.
7
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
A typical revetment cross-section is illustrated in Figure
5. Preliminary rip-rap sizing calculations are contained
in Appendix C.
Living Shoreline Option
During the regulatory scoping meeting, the potential for
the development of a “living shoreline” along the south-
eastern shore was discussed. Implementation of such a
feature could be included in the park as an environmen-
tal educational feature.
The SAV report determined that although an area of
potentially suitable SAV habitat exists, there exists only
several sparse isolated beds of submerged aquatic vege-
tation along this shoreline. This is likely due to higher
water flow velocities and/or frequent wave energy suffi-
cient to inhibit submerged aquatic vegetation growth.
Higher velocities and wave energy also potentially im-
pact water clarity and light attenuation needed to sup-
port submerged aquatic vegetation growth.
Observation of aerial photographs suggests this portion
of the shoreline has experienced minimal erosion over
the past twenty years. Site observations also noted an
abundance of shoreline vegetation at this location.
Considering the sparse coverage of submerged aquatic
vegetation, a determination was rendered that attempt-
ing to construct a “living shoreline” at this location
would not likely be sustainable.
Given the lack of erosion at this location, the abundance
of existing shoreline vegetation as well as the sparse cov-
erage of submerged aquatic vegetation, creation of a
“living shoreline” at this location was not included in the
final recommendations for this report. The concept can
be revisited later per the conditions of the major CAMA
permit, discussed below.
PERMITTING REQUIREMENTS
The location of the project area requires permitting from
the North Carolina Division of Coastal Management
(DCM) pursuant to the Coastal Area Management Act
(CAMA). Under CAMA requirements, two types of de-
velopment permits are available; major and minor. The
threshold for the major versus minor permit is at 500
linear feet of proposed shoreline improvements. As
shown in Figure 4, the length of proposed rip-rap revet-
ment is slightly more than 500 linear feet, thus requiring
a CAMA Major Development permit.
The length of the revetment could conceivably be trun-
cated to qualify the proposed improvements for the Mi-
nor Development permit. The major drawback to that
approach would be that any proposed design would be
constrained by the limitation of a “Minor Development”
permit. Any needed revisions to project scope which
would extend the length of improvements would require
a new permitting process. By approaching the improve-
ments through the “Major Development” permit process,
Beaufort County will be free to revise the scope of the
project within a three-year window.
The use of the “Major Development” permit will allow
for changes in scope to not only the rip-rap revetment,
but also the inclusion of any other land or water-borne
structures/measures deemed desirable or necessary for
development of the park (i.e. piers, boardwalks, etc.).
Should the County decide to incorporate a living shore-
line (or any other measure) to the project scope, the Ma-
jor Development permit can be modified for their inclu-
sion.
Permitting would be processed via the prescribed Major
Development permit application protocol. Application
for one Major Development permit will ensure all re-
quired state and federal stakeholder agencies are a part of
the review process for proposed construction activity
approval.
Existing Southern Shoreline, Credit SAV Report (looking west)
8
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
FIGURE 4
RIP-RAP REVETMENT OPTION
FIGURE 5
RIP-RAP REVETMENT TYPICAL CROSS-SECTION
9
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
Development of the application documents includes
preparation of “permit drawings”. Permit drawings typ-
ically require design development of construction plans
to a point such that specifics of the proposed construc-
tion are identified for permitting purposes. That level
of detail is utilized to prepare the “permit drawings”.
The application fee for a Major Development permit
will vary between $250-$475. The window of time for
issuance of the permit after application submittal may
vary from 2 - 6 months dependent upon complexity of
the project and stakeholder input.
PRELIMINARY COST OPINION
At this stage of project proposal, the proposed plan con-
sists of only a conceptual level of design. Based upon
this level of effort and other similar projects, a prelimi-
nary opinion of probable project cost is estimated. It
should be noted that details of construction to be de-
fined during the course of design development and the
permitting process will have an impact upon the final
cost for plan implementation.
Additionally, market conditions at the time of project
bidding/construction can have a profound impact upon
the actual prices bid, as will any elections by the County
that modifies the methods or extent of construction pro-
posed by the conceptual plan.
The preliminary opinion of probable project cost for con-
structing a rip-rap revetment along the northern and east-
ern shores of the Wright’s Creek Park property is ap-
proximately $287,000. The detailed cost opinion is pro-
vided in Table 1.
POTENTIAL FUNDING
OPPORTUNITIES
Funding opportunities specifically for erosion control
projects are limited. As such, these activities generally
occur as part of a larger overall project.
CAMA Water Access Grants
On January 14, 2020, the North Carolina Division of
Coastal Management (DCM) announced grant funding
available for Public Beach and Coastal Waterfront Ac-
cess projects for the upcoming 2020-21 fiscal year. Lo-
10
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
cal governments were invited to apply for funding for
projects that are anticipated to begin after November
2020 and are to be completed within 18 months.
Grant funds are available to provide pedestrian access to
public beaches and waterfronts within the 20 coastal
counties. Grant funds may be used for either land ac-
quisition or site improvements. Details on funding re-
quirements, timelines, and application information can
be found in Appendix D.
Clean Water Management Trust Fund
Grants
The North Carolina Clean Water Management Trust
Fund (CWMTF) is administered by the North Carolina
Department of Natural and Cultural Resources
(NCDCR). Stream Restoration is one of several catego-
ries also including land acquisition and innovative
stormwater measures for the highly competitive grant
funds.
Stream restoration projects include those projects de-
signed to enhance or restore degraded waters and to
protect downstream natural resources such as drinking
water supplies, fisheries and recreation opportunities.
The intent of the grant program is to restore previously
degraded lands to re-establish their ability to protect
water quality. Although the majority of eligible pro-
jects have been stream restoration projects, other ap-
proaches to restoring impaired waters may in-
clude riparian wetland enhancement, floodplain and
streambank enhancements, and estuarine shoreline
erosion control.
Reviewing the project eligibility with the CWMTF East-
ern Region Field Representative is advisable prior to pro-
ceeding with an application.
RECOMMENDATIONS
It is recommended that shoreline erosion control mitiga-
tion be pursued utilizing a revetment of rip-rap armoring.
The revetment is proposed to extend from the north fac-
ing shoreline, around the east-facing shoreline to the
southeastern point of the peninsula of land forming the
Wright’s Creek Park property.
Prior to initiating survey, design and permitting tasks,
Beaufort County may wish to pursue grants to assist with
funding of the shoreline erosion mitigation improve-
ments.
A topographic survey of the shoreline and adjoining
water’s edge will need to be completed such that detailed
design tasks may be undertaken. Based upon the topo-
graphic survey, engineering design of the revetment ar-
moring as well as specific siting of the revetment armor-
ing will need to be initiated so as to develop construction
drawings to the extent that permit drawings for a CAMA
permit can be prepared to accompany the permit applica-
tion documents for approval by the regulatory agency.
It is also recommended that a CAMA Major Develop-
ment permit be pursued such that additional shoreline
and water-borne related park uses may be implemented
under the same permit, or future amendments thereto.
Rip - Rap Revetment Example
11
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
APPENDICES
12
WRIGHT’S CREEK PARK - SHORELINE EROSION CONTROL PLAN
Beaufort County, North Carolina
This page left intentionally blank.
APPENDIX A
Submerged Aquatic Vegetation Survey
For:
Wrights Creek Park
Beaufort County, North Carolina
Prepared By:
Land Management Group
3805 Wrightsville Avenue
Wilmington, North Carolina
November 2019
Submerged Aquatic Vegetation Survey – November 2019
Wrights Creek
Beaufort County, North Carolina i
Contents
1. Purpose ................................................................................................................................................. 1
2. Site Description ..................................................................................................................................... 1
3. Methodology ......................................................................................................................................... 2
4. Results ................................................................................................................................................... 3
5. Conclusions ........................................................................................................................................... 5
Submerged Aquatic Vegetation Survey – November 2019
Wrights Creek
Beaufort County, North Carolina 1
1. Purpose
Land Management Group (LMG) was contracted by Rivers & Associates, Inc. to conduct a submerged aquatic
vegetation (SAV) survey in proximity to Wright’s Creek Park, off Wilkins Road, in Beaufort County, NC. Proposed actions
include shoreline stabilization along the property’s eroding shoreline reaches. This report provides a summary of the
methods and findings of the SAV resource survey.
2. Site Description
The property consists of approximately 5.88 acres along the south side of Wilkins Road and across from the Wildlife
Resource Commission (WRC) public boat ramp in Beaufort County (Figure 1). The northern boundary of the property
is adjacent to an excavated canal that serves for boat dockage and the public boat ramp. The eastern and southern
shorelines abut Wrights Creek, approximately 0.25 miles upstream of the Pungo River. The eastern shoreline and
northeast corner of the property show signs of ongoing severe erosion with portions devoid of any wetland fringe
(Figure 2). Concrete rubble and debris have been placed in these areas, presumably to help abate erosion. The
southern shoreline, not exposed to the northeast fetch, had a narrow but stable coastal wetland fringe (
Figure 4).
The water quality classification along the shoreline is SA, HQW, NSW and Inland Waters under the jurisdiction of WRC
in the Tar-Pamlico river basin. The waters are closed to the harvest of shellfish for human consumption and the location
is not mapped as Primary Nursery Area.
Figure 1. Site Location Map
Submerged Aquatic Vegetation Survey – November 2019
Wrights Creek
Beaufort County, North Carolina 2
Figure 2. View of the northern shoreline, looking south. Figure 3. View of the eastern shoreline, looking north.
Figure 4. View of the southern shoreline, looking west.
3. Methodology
The SAV survey was conducted on October 22, 2019 from approximately 11 am to 4 pm. Air temperature was 74°F
with partly sunny skies. Winds were southeasterly at 15 mph. Water clarity was measured with a secchi disk and found
to average 3 feet.
LMG’s standard SAV survey protocol includes a systematic sampling of transects spaced evenly across the footprint of
proposed dredging and adjacent waters. Transects are aligned approximately every 75’ perpendicular to the shoreline,
with sampling points located every 20 feet to 30 feet parallel to the shoreline along the transects until a limiting depth
is reached.
Sampling was conducted on foot and the presence of SAV was first noted by sight where water clarity allowed.
Sampling points were then raked to a depth of approximately -6” below bottom using a clam rake. Any individuals or
beds of SAV or SAV rhizomes were noted, GPS-located, and identified to species. Sample plots on transects in the
existing canal adjacent to the boat ramp where depths were greater than -3 to -4 feet NWL could not be sampled due
to the soft bottom and this area is presumed void of SAV as noted below.
Submerged Aquatic Vegetation Survey – November 2019
Wrights Creek
Beaufort County, North Carolina 3
4. Results
Bottom type within the survey area was characterized as a firm loamy sand bottom on the eastern and southern
shorelines, and soft silty mud and soft silty sand within the canal adjacent to the northern shoreline.
No SAV was visually observed adjacent to the northern shoreline or in the shallow waters (less than -3’ NWL) within
the canal. Sample plots were raked for the presence of SAV or SAV rhizomes and none were located.
Likewise, on the eastern shoreline, no SAV was observed in the shallow waters adjacent to the shoreline or found in
samples plots out to an approximate -4’ to -5’ MLW depth.
SAV identified as Widgeon grass (Ruppia maritima) was visually observed and found in sample plots in the shallow
waters adjacent to the southern shoreline (Figure 5). The presence of Widgeon grass was limited to a 15 to 20-foot
zone along the shoreline, where water depths ranged between -1’ MLW and -3’ MLW and the substrate was a firm
loamy fine grain sand. Density of the vegetation was sparse and estimated to be an approximately 20% coverage
comprised of approximately 2 to 4 square foot patches. Two isolated beds were found just south of the point that
separates the eastern and southern shorelines. No other SAV or SAV rhizomes where identified within the survey area
(Figure 6).
Figure 5. Ruppia maritima collected samples
Submerged Aquatic Vegetation Survey – November 2019
Wrights Creek
Beaufort County, North Carolina 4
Figure 6. SAV survey results.
Figure 7. SAV survey results detail view.
Submerged Aquatic Vegetation Survey – November 2019
Wrights Creek
Beaufort County, North Carolina 5
5. Conclusions
Although Ruppia maritima can be found in waters as deep as 6 feet, the average water column depth is described in
the NC Coastal Habitat Protection Plan (NC CHPP) to be 2.3 feet. Widgeon grass is also known to prefer low velocity,
low wave energy and more firm loamy sand habitats. The results of this report support these habitat characteristics
with most SAV occurring at -2.5 MLW depths and located on the southern shoreline sheltered from the higher energy
northeast fetch. Within the canal along the northern shoreline the soft silty mud substrate is likely the limiting factor
prohibiting SAV occurrence along this portion of the property. While the eastern shoreline has a suitable substrate
and water depths to support Widgeon grass, evidence of ongoing severe erosion indicates that this portion of the
shoreline experiences higher velocity flow and/or wave energy on a frequency sufficient to prohibit SAV occurrence.
As evidenced by the shoreline condition and also the aerial in Figure 6, higher velocity flow and wave energy can
potentially affect water clarity and light attenuation contributing to prohibit SAV occurrence along this portion of the
property.
APPENDIX B
APPENDIX C
Determining initial D50 of rip-rap for revetment
Hudson's Equation
K values set for tolerable damage
W 50 Median stone weight
ϒr Stone Density
H10 Characteristic wave height
Gs ϒr/62.4
cot α slope (H:V)
VMPH= 75 mi/hr
F= 2.8 miles
Hs= 4.63 ft
H10=5.88 ft
ϒr 162.5 lb/ft3
Gs 2.60
cot α 3 :1
W50 610 lb
D50= 1.70 ft
20 in
Varying Wind Speeds
Fetch Length 2.8 mi
ϒr 162.5 lb/ft3
Gs 2.60
cot α 3 :1
Wind Speed Fetch Hs H10 W50 D50 D50 Rip-Rap
(mi/hr) (mi) (ft) (ft) (lb) (ft) (in) Class
30 2.8 1.54 1.96 22 0.57 7 1
35 2.8 1.84 2.34 38 0.68 8 1
40 2.8 2.15 2.73 61 0.80 10 1
45 2.8 2.48 3.15 93 0.92 11 1
50 2.8 2.81 3.57 137 1.04 12 2
55 2.8 3.16 4.01 193 1.16 14 2
60 2.8 3.51 4.46 266 1.29 16 2
65 2.8 3.87 4.92 358 1.43 17 2
70 2.8 4.25 5.40 472 1.56 19 2
75 2.8 4.63 5.88 611 1.70 20 3
80 2.8 5.03 6.38 781 1.85 22 3
85 2.8 5.43 6.89 983 1.99 24 3
90 2.8 5.84 7.41 1224 2.14 26 3
95 2.8 6.26 7.95 1507 2.29 28 4
100 2.8 6.69 8.49 1839 2.45 29 4
APPENDIX D
1
Invitation to Submit Pre-application Access Grant Proposals
Public Beach and Coastal Waterfront Access Funds 2020-21 Cycle
TO: Local Officials in the Coastal Area
FROM: Mike Lopazanski, Policy & Planning Section Chief
Division of Coastal Management
DATE: January 14, 2020
We are pleased to notify local governments in the 20-county coastal area that the Division of
Coastal Management (DCM) has grant funding available for Public Beach and Coastal Waterfront
Access projects for the upcoming 2020-21 fiscal year. Local governments are invited to apply for
funding for projects that are anticipated to begin after November 2020 and to be completed in
eighteen (18) months.
Local governments interested in applying for financial assistance must complete and submit two
(2) printed copies of the enclosed Pre-application form with attachments. Your local DCM District
Planner must receive pre-applications on or before 5:00 pm on Friday, April 17, 2020.
Process: The application process has three (3) steps: the Pre-application, invitation to submit a
Final Application, and grant contract approval.
DCM will review the pre-applications and select a number of proposals for further consideration
based on available funding. Local governments that submitted applications in previous years but
were not selected for funding must re-apply for consideration during this grant cycle. Only pre-
applications titled 2020-21 will be accepted as the application packet and application forms are
adjusted annually.
Local governments whose proposals are selected will be notified by Friday, May 15, 2020 to
submit a Final Application with more detailed project information. A final application form will be
provided with the notification. Prior to submitting a Final Application, the local government shall
hold a public meeting or hearing to discuss its proposal and consider comments prior to its
decision to submit a Final Application for state funds. Final Applications are anticipated to be due
on or before 5:00 pm on Monday, August 17, 2020.
2
Local governments are encouraged to include their local contribution in their FY 2020-21
budget. All final applicants will be notified in September whether their project has been selected
for funding.
Match: Local government matching contributions for acquisition must be at least 15% of the
total project cost. For Tier 1 counties and their municipalities, the match for acquisition is at
least 10%. Grants for improvements to existing sites must be at least 25% however, for Tier 1
counties and their municipalities; the match is 10%. 1 At least half of the local contribution must
be cash match; the remainder may be in-kind match. Guidelines for determining allowable cash
and non-cash in-kind match contributions are enclosed.
Overview: The primary objective of the public access grant program is to provide pedestrian
access to public beaches and public trust waters in the 20 coastal counties. Grant funds may be
used for land acquisition (including “unbuildable” lots) and site improvement projects that are
consistent with the state guidelines for public access in the coastal area (15A NCAC 7M .0300)2.
Any facility constructed with these grant funds must meet state and federal guidelines for
handicap accessibility.
Examples of eligible projects include the following:
• Land acquisition - purchase of land for future public access facilities.
• Land easement acquisition - purchase of easements for public access.
• Parking areas, restrooms and other facilities.
• Urban waterfront access sites - improved public access to deteriorating or under-utilized
urban waterfronts through reconstruction or rehabilitation.
• Reconstruction or relocation of existing damaged public access facilities. Primarily for sites
not originally funded by this program or for improvements to any sites at least fifteen (15)
years old.
• Handicap facilities - Local governments are encouraged to submit proposals designed to
enhance handicap accessibility at existing facilities.
• Boat Launch facilities- boat launch and ramp facilities, whether motorized or not, may be
part of a project provided pedestrian access is still a major component of the project.
Proposals that include both land acquisition and site improvements are to be submitted
under separate applications.
A Pre-application Packet is enclosed. The packet includes:
a. Notice of the Availability of Funds
b. Guidance for Grant Proposals
c. Pre-Application Form
DCM hopes you will consider utilizing funding through this grant program to help make a
positive and lasting contribution to your community’s public access efforts. Your local DCM
District Planner looks forward to receiving your pre-application and assisting you in this
process. If you have any questions, please contact your local DCM District Planner listed in the
enclosed “Local Contacts and Resources”.
1 The NC Department of Commerce 2020 Article 3J County Tier Designations.
2 See https://deq.nc.gov/about/divisions/coastal-management/coastal-management-rules/coastal-development-rules
3
North Carolina
Public Beach and Coastal Waterfront
Access Fund
2020-21 Cycle
Pre-application
Division of Coastal Management
Department of Environmental
Quality
4
Table of Contents
Page
Table of Contents ......................................................................................................................... 4
Notice of Available Funds and Requirements .............................................................................. 5
Tier 1 Coastal Communities .......................................................................................................... 7
Local Contacts and Resources ...................................................................................................... 8
Guidance for Grant Proposals ...................................................................................................... 9
Pre-application Form 2020-21 Funding Cycle ............................................................................ 16
This application is also available online at:
https://deq.nc.gov/about/divisions/coastal-management/coastal-management-beach-
waterfront-awareness-program/public-access-grant-application-package
The application is available in a fillable .pdf and Word version.
Notice of Available Funds and Requirements 2020-21 Cycle
5
Funds Available: The N.C. Division of Coastal Management (DCM) estimates that approximately
$1 million dollars will be available for public beach and coastal waterfront access projects in FY
2020-21.
Eligible Applicants: The 20 coastal counties and municipalities therein that have public trust
waters (ocean, estuarine or riverine waters) within their jurisdictions.
Anticipated Contract Period: Eighteen (18) months beginning between November 2020 and
January 2021.
Maximum Request: There is no limit on maximum request. However due to the limited funds
available, applicants need to be mindful that larger requests may be difficult to accommodate.
Match Requirements: Local government matching contributions for acquisition must be at
least 15 percent of the total project cost. The match is reduced to 10 percent for counties
designated by the NC Department of Commerce as Tier 1.1
Matching contributions for improvements to existing sites must be at least 25 percent of the
total project cost. The match is reduced to 10 percent for counties designated by the NC
Department of Commerce as Tier 1.1 The match requirement for municipalities within counties
qualifying as Tier 1 is also 10 percent.
At least half of the local match must be cash match; the remainder may be in-kind non-cash
match. Pre-award costs associated with surveying, title work, appraisals, permitting fees, and
design and engineering costs associated with permits that are incurred within the last three (3)
years may also be eligible for credit towards non-cash match, provided they are documented in
the grant application and contract budget. See “Guidelines for Local Match” enclosed.
Use of Other State or Federal Funds for Local Cash Match: Other state and federal monies are
eligible for use to meet local match provided such funds are not already being used to match
other grants by other state or federal agencies. Local cash and non-cash in-kind match that is
already being used or intended to be used to also match other state or federal grants must be
disclosed and recognized within the application process and award contract.
Public Use: Property acquired with a grant through the Public Beach and Coastal Waterfront
Access Program must be retained and used for public access. Facilities built or renovated with
grant funds must be maintained for public access.
1 The NC Department of Commerce 2020 Article 3J County Tier Designations.
Notice of Available Funds and Requirements 2020-21 Cycle
6
Site Control: The applicant must own or have at least a 25-year lease on property where grant
funds are used to build or renovate facilities, except where improvements are proposed on
“Other Agency Lands” (see below).
Required Development Permits: Receipt of a grant award does not guarantee approval of a
CAMA development permit or any other State permit. The local government is required to
obtain all applicable permits.
Improvements on Other Agency Lands: A local government may apply for a grant to fund
improvements on property owned by a public school administrative unit or a state or federal
agency. The county or municipality, however, must serve as the applicant for the project.
Improvements must enhance public access to public trust waters and not just serve other
recreational purposes.
Notice of Limitations and Use Restrictions: Acquired properties funded through the grant
program will require recorded deed restrictions to be in place prior to a reimbursement of
grant funds. Land acquired with access grant funds shall be dedicated in perpetuity for public
access and the benefit of the general public. The dedication shall be recorded in the property
records by the grantee. Any lease or easement agreement shall extend at least 25 years. If land
acquired or improved with grant funds is sold or otherwise disposed of, the local government
shall reimburse the State with an equal percentage of access grant funds at current market
rate.
Criteria used to prioritize and select projects to receive grant assistance:
• Lack of access opportunities in the area;
• Demonstrated need for the project due to high demand and limited opportunities;
• Project is identified in a local beach or waterfront access plan or certified CAMA Land
Use Plan;
• Community has not received previous assistance from this grant program;
• The commitment of matching funds exceeds the minimum required local match;
• Project proposal includes multiple funding sources (in addition to DCM);
• Location includes donated land deemed “unbuildable” due to regulations or physical
limitations and;
• The community has demonstrated its ability to complete previous projects and/or
has demonstrated its ability to operate and maintain facilities previously funded.
Tier 1 Coastal Communities
2020-21 Cycle
7
County Municipality
Beaufort County
Town of Aurora
Town of Bath
Town of Belhaven
Town of Chocowinity
Town of Pantego
City of Washington
Town of Washington Park
Bertie County
Town of Askewville
Town of Aulander
Town of Colerain
Town of Kelford
Town of Lewiston-Woodville
Town of Powellsville
Town of Roxobel
Town of Windsor
Chowan County
Town of Edenton
Hertford County
Town of Ahoskie
Town of Cofield
Town of Como
Town of Harrellsville
Town of Murfreesboro
Town of Winton
Hyde County
Onslow County
Town of Holly Ridge
City of Jacksonville
Town of N. Topsail Beach
Town of Richlands
Town of Swansboro
Pasquotank County
City of Elizabeth City
Perquimans County
Town of Hertford
Town of Winfall
Tyrrell County
Town of Columbia
Washington County
Town of Creswell
Town of Plymouth
Town of Roper
Local Contacts and Resources
2020-21 Cycle
8
Local Contacts for Application Packet
Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, Pasquotank, Perquimans, Tyrrell and
Washington counties:
Charlan Owens, AICP, District Planner
Division of Coastal Management
401 South Griffin Street, Suite 300, Elizabeth City, N.C. 27909
(252) 264-3901 charlan.owens@ncdenr.gov
Beaufort, Carteret, Craven, Hyde and Pamlico counties:
Rachel Love-Adrick, District Planner
Division of Coastal Management
400 Commerce Ave. Morehead City, NC 28557
(252) 808-2808 rachel.love-adrick@ncdenr.gov
Brunswick, New Hanover, Onslow and Pender counties:
Mike Christenbury, District Planner
Division of Coastal Management
127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845
(910) 796-7475 mike.christenbury@ncdenr.gov
An electronic copy of the application is available on the N. C. Division of Coastal Management website
at:
https://deq.nc.gov/about/divisions/coastal-management/coastal-management- beach-waterfront-
awareness-program/public-access-grant-application-package.
A Word file of the complete packet will be available as well as a fillable PDF version of the application.
District Planners can also send you a hard copy of the application.
Public Access Rules: A copy of the rules that apply to the Public Beach and Coastal Waterfront Access
Program, 15A NCAC 7M Section .0300 Shorefront Access Policies, are available on the N. C. Division of
Coastal Management web site at:
https://deq.nc.gov/about/divisions/coastal-management/coastal-managementrules/ coastal-
development-rules.
Guidance for Grant Proposals
2020-21 Cycle
9
Introduction
The N.C. Public Beach and Coastal Waterfront Access Program is a matching grant program administered by
the Department of Environmental Quality, Division of Coastal Management. Rules and policies for
administration of the access program are provided in 15A 7M .0300 of the North Carolina Administrative
Code and N.C.G.S. 113A-134.1 through 113A-134.3. Land acquisition, site improvements, and amenities for
public access to coastal waters are funded through this grant program.
Local Match Requirements
Total projects costs for the calculation of match includes grant funding and local cash and non-cash in kind
match.
● Land Acquisition: For land acquisition, local government match must be at least 15% of the total project
cost. At least one-half (1/2) of the local contribution (7.5% of the total project cost) must be cash; the
remainder may be non-cash in-kind. For Tier 1 counties* and their respective municipalities, the local
government contribution for land acquisition is 10% of the total project costs. At least one- half (1/2) of
the local contribution (5% of the total project cost) must be cash; the remainder may be in-kind.
● Site Improvements and Amenities: For site improvements and amenities, local government match must
be at least 25% of the total project cost. At least one-half (1/2) of the local contribution (12.5% of the total
project cost) must be cash; the remainder may be non-cash in-kind. For Tier 1 counties* and their
respective municipalities, the local government contribution for site improvement and amenities is 10% of
the total project costs. At least one-half (1/2) of the local contribution (5% of the total project cost) must be
cash; the remainder may be in-kind.
Cash and Non-Cash In-kind Contributions (General)
● Criteria for Claiming Contributions: Cash and in-kind contributions may be claimed as part of the local
government’s match when such contributions meet all of the following criteria:
1. Are provided for in the project budget approved by the Division of Coastal Management;
2. Are verifiable from the local government’s records;
3. Are necessary and reasonable for proper and efficient completion of the project;
4. Are not included as contributions for matching any other state or federally assisted projects or
programs, except where authorized by state or federal statute;
5. Use of other state or federal funds for local cash match must be identified to ensure that double
matching does not occur;
6. Do not include N.C. state sales tax; and,
7. Conform to other provisions of these guidelines, as applicable.
In general, in-kind contributions are derived from resources already on hand or from donations, whereas
cash contributions will be utilized to purchase new services or equipment necessary for proper completion
of the access project.
*The NC Department of Commerce 2020 Article 3J County Tier Designations.
Guidance for Grant Proposals
2020-21 Cycle
10
Cash Contributions
Local cash contributions may be claimed for the following accountable items: planning and project design
fees, permit fees, land acquisition (including survey and appraisal), labor (other than local government
salaried employees), materials, construction equipment rental, amenities, and infrastructure. These costs
must be incurred during the contract period.
• Site Amenities: The cost of amenities purchased by the local government during the contract period
may be included as part of the cash contribution if it is an integral part of the access facility or its
construction as presented in the Final Application submitted to the Division of Coastal Management
and specified in the contract. Examples include park benches, bike racks, water fountains, trashcans,
and lights (See also “Donations of Property and Services”).
• Rental of Construction Equipment: If the local government must rent construction equipment to
complete the proposed project, (such as front loaders, graders, or dump trucks) rental costs may be
included as cash contribution (See also “Donations of Property and Services”).
• State and Federal Funds: State and Federal funds may be counted as cash match provided the funds are
not being used as a match for other programs. Local government employee salaries do not qualify as cash
match but may be included toward non-cash in-kind match.
Non-Cash In-kind Contributions
Local in-kind non-cash contributions may be claimed for the following accountable items: project design fees,
permit fees, land acquisition (including survey and appraisal), labor (including local government salaried
employees), materials, construction equipment rental, amenities, and infrastructure. Reasonable local
government employee time can also be credited. These costs must be incurred during the contract period,
except as specifically indicated below.
• Site Assessments: Title opinions, property appraisals, boundary surveys, and wetland delineations
associated with land acquisitions and site improvements may be counted toward in-kind match, provided
the costs are incurred within three (3) years of the grant award date.
• Permits: Project permit fees and design and engineering fees associated with permits that are expended
prior to a grant contract may be counted toward non-cash in-kind match, provide the costs are incurred
within three (3) years of the grant award date. Fees for preparing a grant or permit proposal are not
eligible.
• FEMA Buyout Properties: Property that was part of a FEMA buyout or other similar mitigation program is
eligible for this grant program, provided the original conditions for the buyout are not in conflict with the
proposed improvements. Use of the recent buyout property’s value as non-cash in-kind match may be
considered similarly as previously purchased or donated property. (See also “Donations of Property and
Services”.)
Guidance for Grant Proposals
2020-21 Cycle
11
• Volunteer Services: Volunteer services eligible as in-kind contribution are limited to professional
engineering and architectural services when those services are not found in the local government. Paid
fringe benefits that are reasonable, allowable and allocable may be included in the valuation, if approved
by DCM. When an employer other than the local government furnishes the services of an employee, or
when an individual contractor volunteers, these services shall be valued at the employee’s regular rate of
pay (plus an amount of fringe benefits, as described above), provided these services employ the same
technical skill for which the employee is normally paid. All volunteer services must be documented by
signed invoice showing the billing rate for the service, number of hours, and a statement that the charges
are forgiven. Excluded from volunteer services are prison labor, court-required community service and
other work programs, and volunteer civic groups. In those instances, in which the required skills are not
found in the local government, or for other activities specifically approved by the Division of Coastal
Management, rates shall be consistent with those paid for similar work in the labor market in which the
local government competes for the kind of services involved. In either case, paid fringe benefits that are
reasonable, allowable, and allocable may be included in the valuation.
Donations of Property and Services
• Land/Structures: If the local government has land that has recently been donated or that will be
donated, or structures for an access facility, and the donation is allowed by the Division of Coastal
Management to be counted as local contribution, the value of the donation for purposes of in-kind
contributions shall be established by an independent licensed appraiser. The donor of the land must be a
private organization or individual. The community must provide a five-year history of conveyance for the
property. Land that is transferred to the community due to a statute or rule is not considered a donation.
If a landowner is proposing to sell land to the community for less than the appraised value, the amount of
the donation is the difference between the appraised value and the amount paid by the applicant.
Donation to, or acquisition of, the property/structure by the local government must have occurred within
five (5) years of the grant award. A long-term easement (more than 25 years from the date of the grant
award) of land may also be considered.
• Property Lease: Lease arrangements must be for the life of the project (at least 25 years). When property
is leased to the local government for an annual fee, the first year’s lease payment may be considered as
in-kind contribution.
• Professional Fees: If the usual fees of a licensed professional, such as an architect or engineer, are
waived or donated to the local government for work associated with the access project, the fees may be
claimed as in- kind contributions. Rates shall be consistent with local pay scales. Partial contribution of a
fee (for example, the balance of a discount rate) will not be considered as in-kind match. All volunteer
professional services must be documented by invoice showing the billing rate for the service, the number
of hours and that the charges are forgiven.
• Construction Equipment: The use of privately-owned construction equipment (graders, loaders, dump
trucks, etc.) donated for construction of the access facility may be claimed as in-kind contribution. The use
value of rented equipment shall not exceed its fair rental value. Use of public agency equipment is not
eligible for matching.
Guidance for Grant Proposals
2020-21 Cycle
12
• Building Materials, Site Amenities and Landscaping Materials: Building materials (lumber, hardware,
marl, etc.), site amenities (benches, bike racks, water fountains, etc.) and landscaping materials (plants,
soil, timbers) donated to the project may be claimed as in-kind contribution. The value of any of these
goods shall not exceed fair market value at the time of donation. To be eligible as an in-kind contribution,
the building material, amenities or landscape materials must be an integral part of the original access
project as presented in the Final Application submitted to the Division of Coastal Management and
specified in the contract.
• Attorney Fees: Fees associated with the title opinion and other property transaction costs may be
included as non-cash match prior to the effective date of the contract. Reasonable costs following the
effective date of the contract may qualify as cash match. Such costs should be included in the budget.
Additional Guidance
The following is further guidance to assist communities with making a grant request. For additional information,
contact your local DCM District Planner listed in this packet (See Local Contacts and Resources).
Budget
• Include All Costs: List all items proposed for funding and the estimated cost of each item. All items
included in cost estimates must be shown on the site plan, except for items such as grading, utilities, and
planning. Round all cost estimates to the nearest dollar. Where practical, identify costs separately for
independent elements of the same type of facilities or improvements on the same site.
Land Acquisition
• Property Appraisal: A preliminary property appraisal will be required as part of a Final Application. The
preliminary appraisal is an educated estimate of the property’s value. An estimate does not require a
licensed appraiser. A certified property appraisal will be required prior to grant reimbursement. The
appraiser is required to certify that the appraisal was completed using the Universal Standard of
Professional Appraisal Practices. The appraisal must be for the value of the land and any existing
structures that will be used for public access and recreational purposes. Two (2) certified appraisals are
required for property with a value greater than $600,000 prior to grant reimbursement.
• When may a formal appraisal not be necessary: With DCM’s approval, the use of property value based
on property tax assessment may be used instead only when all the following is evident:
1. That the property owner will accept the tax appraisal assessment;
2. The proposal is not locally controversial;
3. The property is an unbuildable lot/ remnant or of a small size or awkward shape;
4. The property is contiguous to existing publicly owned or controlled property, or FEMA buyout
property and;
Guidance for Grant Proposals
2020-21 Cycle
13
5. The property has an estimated value of less than $15,000.
• When to Take Title to Land/Leases/ Easements: All communities must sign a contract with the state
before accepting a title/lease/easement to land that will be acquired using grant funds. This also applies
to property that is donated to the local government. A Contract for Purchase or a Loan Agreement may
be accomplished prior to the effective date of a grant contract. Cash payments that occur prior to the
effective date of the grant contract are not eligible for credit towards a cash match and are not
reimbursable. The exception is when the intent is to use it toward non-cash match.
• Acquisition Documentation: A report form along with two (2) copies of the deed with recorded
restrictions, property title, property appraisal, and proof of payment will be required prior to grant
reimbursement. DCM will supply the report form.
Site Control for Properties to be Improved or Renovated
• Site Control: The applicant must own or have at least a 25-year lease or easement on the property where
improvements or renovated facilities will be located. The community must submit copies of the deed or
of the signed lease or easement, as well as the opinion by the community’s attorney, regarding site
control as part of the Final Application submittal. Proposals that include the leasing or acquisition of
easements as part of the total project cost must identify the estimated costs and assumptions used in
the request proposal. Where property is owned or controlled by another governmental entity or
agency, a Joint Use Agreement may suffice, subject to approval of DCM.
• Joint Use Agreement: A local government and a school system or state or federal agency must include a
draft Joint Use Agreement with a Final Application. The agreement describes the hours of use of the
facilities by the public and how the site will be maintained. DCM staff must approve the formal
agreement prior to a reimbursement of grant funds. It is the community’s responsibility to ensure that
the agreement is acceptable to DCM/DEQ prior to expenditure of local funds to be reimbursed.
Recording of the Joint Use Agreement may be required.
Costs to Build or Renovate Facilities
• The Importance of Good Estimates: If you receive a grant, you are expected to complete your project
according to the cost estimates in your application. Obtain estimates from contractors, engineers or
architects, who have experience in developing or designing access sites. Consider the impact of inflation
by assuming that the project may be completed over an eighteen (18)-month period after the grantee
signs a contract with the State.
• Be Specific: Include specific units (sizes, numbers, lengths, etc.) for each item in the cost estimates.
Include dimensions or square footage of all indoor or sheltered facilities. The intended use of enclosed
structures, especially partitioned interior areas, must be identified.
• Equipment/Tools are Not Eligible: Tools, maintenance equipment, office equipment and indoor
furniture are not eligible for reimbursement with grant funds.
Guidance for Grant Proposals
2020-21 Cycle
14
Planning and Incidental Costs
• Planning and Design Costs: For projects to build or renovate facilities, the following items can be
included in cost estimates: architectural and engineering fees, site plans, design drawings, construction
drawings, construction management, and preparing cost estimates.
• Incidental Land Acquisition Costs: Appraisals, title searches, surveys, and attorney fees can be included
in cost estimates.
• Limit on Planning and Incidental Land Acquisition Costs: The sum of planning costs, incidental land
acquisition costs and the cost of preparing permit applications cannot exceed 20% of the total cost of
the project. Exceptions may be made for Tier 1 jurisdictions* with written approval from DCM.
• Timing of Expenses: Design, engineering and planning costs to develop projects and other incidental
costs to acquire land are only eligible for consideration as cash match or for reimbursement after the
local government signs a contract with the state. These expenses may be considered for non-cash
match.
Additional Improvement Requirements
• Placing Utility Lines Underground: All utility lines funded with a grant award must be placed
underground unless agreed to otherwise within the contract.
• Making Facilities Accessible: All facilities funded with a grant award must comply with the Americans
with Disabilities Act Accessibility Guidelines (ADAAG). Applicants are strongly encouraged to include the
costs of building accessible facilities and access routes to those facilities in the grant application. Prior to
closing out a project and receiving final payment of grant funds, the local building official will be required
to provide a letter certifying compliance.
Costs Not to be Included in a Grant Award or Local Match
• Environmental Assessments: other than preliminary work associated with site planning and wetland
delineation.
• Remediation Plans: associated with contaminated sites. However, some costs of actual remediation or
clean up may be eligible for non-cash in-kind match.
• Restoration Plans: however, wetland restoration may be eligible for cash or non- cash in-kind match
credit.
• Attorney Fees: no fees for permitting, condemnation or other litigation will be considered.
Guidance for Grant Proposals
2020-21 Cycle
15
Timing Issues
• Starting the Project: A grantee must sign a grant contract before beginning any components of a
project in order to be eligible for match or reimbursement. Certain costs can be incurred before the
contract start date.
• Completing the Project: Though grant contracts may be amended and extended at the discretion of
DCM, a contract typically is limited to eighteen (18) months. Despite amendments, state rules limit
the total life of a contract to three (3) years.
• Receiving Grant Funds and Reimbursements: Access grants are paid as reimbursements of actual
expenses. The program will reimburse grantees only after the community’s required local cash match
has been met. No grant funds may be dispensed/dispersed prior to a community meeting its local
cash match. The community’s cost estimates identify the total amount of grant funds to be
reimbursed. The grantee is responsible for any additional costs needed to complete the project. The
program will retain the final ten percent (10%) of the grant amount until the completion of the project.
Contact your local District Planner for the details of the process.
16
NORTH CAROLINA PUBLIC BEACH AND COASTAL WATERFRONT ACCESS PROGRAM
PRE-APPLICATION 2020-21 CYCLE
Please complete a separate application for each proposed project and submit two (2) printed copies
to your DCM District Planner. This application is also available online.
APPLICATION DEADLINE: FRIDAY APRIL 17, 2020
Project Name:
Provide a brief description of the proposed project:
Is this an ongoing project (Phase II of a previously funded project, or improvements to an existing project)?
Please Describe:
Government Name: Type of project: ☐Land Acquisition ☐ Site Improvement
Project Administrator Demand for Access: ☐ High ☐ Medium ☐ Low
Name: Site Control:
Title: ☐ Ownership
Address: ☐ Lease (25 years or more)
City/State/Zip: ☐ Easement (25 years or more)
Telephone: ☐ Joint Use Agreement
E-mail:
Previous DCM Access Grant Recipient: ☐ Yes ☐ No If yes, When?
Budget Totals and Financial Assistance Requested:
1. DCM Grant Assistance Requested: $
2. Total Local Contribution: $ 0.00
a. Local Cash: $
b. Other Grant Cash: $
Source:
c. Other Grant Cash: $
Source:
d. Local In-Kind: $
TOTAL PROJECT COST: $ 0.00
Additional Project Costs/Funding Sources NOT included in the
proposal (if applicable):
Source: Cost: $
Source: Cost: $
Source: Cost: $
Signature:
Name (print):
Date:
PRE-APPLICATION
2020-21 Cycle
PUBLIC BEACH AND COASTAL WATERFRONT ACCESS PROGRAM
N. C. Division of Coastal Management
17
Provide the following ATTACHMENTS and NARRATIVE:
A. Project location maps: Provide a regional location map and a detailed vicinity map (street map) showing the
project location.
B. Site description: Provide a description of the site, including natural features and existing improvements. Also
include NC Division of Water Resources Surface Water Classification(s).
C. For Land Acquisition: Provide an exhibit or boundary survey indicating land area, an estimated cost of the
property, and basis for the estimate. An overlay on aerial photos may be submitted. Indicate whether or not the
property would be acquired in phases.
D. Project description: Provide a description of the project, including information on features, materials, and
proximity to closest/other access sites.
E. Project site plan: Provide a to-scale site plan showing property lines, proposed construction, significant natural
features, and existing uses on adjacent lots. Include a north arrow and graphic scale. Improvements shown as
an overlay on aerial photos also may be submitted. Provide to-scale building elevations and floor plans as
applicable.
F. Pre-project tasks: Identify tasks that must be completed prior to starting the project.
G. Is all or a portion of this project under consideration by other programs for funding?
YES ☐ NO ☐ If so, indicate which program(s) and which fiscal year(s). Does the funding requested from
another program duplicate or complement the funding requested from the Access Program? How viable is the
project if complementary funding from another program is not secured?
H. Is this project identified as high local priority in your certified Future Land Use Plan or local Access Plan?
YES☐ NO ☐ If so, attach a brief description of the plan and a statement of the extent to which the
project implements the policies of the plan.
I. Is this project reflected in other policy documents or ordinances? YES ☐ NO ☐ If so, attach a brief
description of the document or ordinance and a statement of the extent to which the project implements goals
of the document or ordinance.
J. Proposed Local Match and Cost Assumptions: Provide narrative indicating the source of cash match and
availability of funds. Provide narrative explaining the relevance of proposed in-kind match to the project. If
other state and/or federal funds are to be used as local match, indicate the amount, the funding source, when
the funding will be awarded/available, and the specific project elements that will qualify for joint funding.
K. List the types and sources of utilities proposed; and identify associated costs.
L. List all necessary permits and/or certifications.
PRE-APPLICATION
2020-21 Cycle
PUBLIC BEACH AND COASTAL WATERFRONT ACCESS PROGRAM
N. C. Division of Coastal Management
18
M. Proposed Summary Budget: The form below must be completed and included with your application.
Grant Assistance
Requested
Local Cash
Contribution
Local In-Kind
Contribution TOTAL
Land Acquisition Costs:
$ 0.00 $ 0.00 $ 0.00 $ 0.00
$ 0.00 $ 0.00 $ 0.00 $ 0.00
Subtotal $ 0.00 $ 0.00 $ 0.00 $ 0.00
Permit and Design Fees:
$ 0.00 $ 0.00 $ 0.00 $ 0.00
$ 0.00 $ 0.00 $ 0.00 $ 0.00
Subtotal $ 0.00 $ 0.00 $ 0.00 $ 0.00
Site Improvement Costs:
Materials
$ 0.00 $ 0.00 $ 0.00 $ 0.00
$ 0.00 $ 0.00 $ 0.00 $ 0.00
Subtotal $ 0.00 $ 0.00 $ 0.00 $ 0.00
Site Improvement Costs: Labor
$ 0.00 $ 0.00 $ 0.00 $ 0.00
$ 0.00 $ 0.00 $ 0.00 $ 0.00
Subtotal $ 0.00 $ 0.00 $ 0.00 $ 0.00
Local Administrative Costs:
In-kind
$ 0.00 $ 0.00 $ 0.00 $ 0.00
$ 0.00 $ 0.00 $ 0.00 $ 0.00
Subtotal $ 0.00 $ 0.00 $ 0.00 $ 0.00
TOTAL BUDGET $ 0.00 $ 0.00 $ 0.00 $ 0.00
Additional Project Tasks NOT
Included in this Proposal
Additional Project
Cost
$ 0
$ 0
TOTAL ADDITIONAL COST $ 0
N. Proposed Budget: If available, attach a detailed breakdown of the cost assumptions upon which the Summary
Budget is based. Proposals that include this information increase their likelihood of funding.