HomeMy WebLinkAbout85052_Jim Bunch_20211229 °�`""t* I 'ICAMA DREDGE & FILL � s N9 85052 A �C D
4 GENERAL PERMIT 704 (0c-co1 Previous permit N"
Date previous permit issued kli A
FINew n Modification n Complete Reissue I I Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
ISA NCAC j ' I I Rules attached. General Permit Rules available at the following link:www.dea.nc.gov/CAMArules
Applicant Name I i}' ._ Authorized Agent t ' E74"
II
Address r 62— 1 Project Location(County): '-• '
7
City ( State ZIP -1 Jt Street Address/State Road/Lot#(s) I r
Phone#(—)7.:: •:ems i / /
Email Subdivision
City ZIP 'S c.'
Affected n CW D EW ri PTA n ES n PTS Adj.Wtr.Body Gnat n/unk)
AEC(s): n OEA n'HA n UW n SPIMA PWS Closest Maj.Wtr.Body „.+` 4--.`
ORW:yes/no PNA:yes/no
Type of Project/Activity •
(Scale: 3 )
Shoreline Length
Access Length p-,,+-c-i- ---.c t e_o'3L' - \
Pier(dock)length N
Fixed Platform(s)
Floating Platform(s) / p. N — ? j
A r
Finger pier(s) r,. ---
Total Platform area _. _—
Groin length/# / l - .- -- _.
Bulkhead/Riprap length_ / l_ t
Avg distance offshore I
Breakwater/Sill
Max distance/length R
Basin,channel }._ ( ... .. iI_.- -..__.._.___..__ 1_. _._. __
Cubic yards __
Boat ramp L ) _
Boathouse/Bo lift -- ( • i
Beach Bulldozing 1 1
Other . I
Ar
��'`Th.-
f
SAV observed: yes no j (. i .
Moratorium: n/a yes no, - '`-+ -• - --- �`--"- i I r 1"'
Site Photos: yes no .. _ _ + ........ _ )s
Riparian Waiver Attached: yes' no �. - �.__.__I 1 _`
A building permit/zoning permit may be required by:
n
Permit Conditions TAR/PAM/NEUSE/BUFFER(circle one)
nSee note on back regarding River Basin rules
nSee additional notes/conditions on back
I AMAWARE OF STATUTES!CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
15lC4 h('(; "I - C.Ory i rii .
Agent or Applicant PRINTED a Permit Officer's PRINTED Name
t • / /A �..
Signature*,*Plea /1se read compliance statement on back of permit** Signature
�( ( k 70 (D ? ,
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves:Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
�- No 85052 ABC D
°�°` °�ts^ F CAMA DREDGE & FILL
GENERAL PERMIT . ---D"T� �O ! IC(0' Date previous s I
Previous permt
i permit issued ?'.) A
I )New Modification n Complete Reissue 7 Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
15A NCAC Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected CW n EW PTA ES PTS Adj.Wtr. Body (nat/man/unk)
AEC(s): I OEA IHA UW SPIMA PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: )
Shoreline Length
Access Length -1' )
ai
Pier(dock)length I + I
Fixed Platform(s) i
....,-._..-. .._..._._._-'_-
Floating Platform(s) p
{
Finger pier(s) f•' § 4 _.. - i - -_�-,_-
Total Platform area__ i # j . , i-
f f ,' I
Groin length/# I / i rt-- - .
Bulkhead/Riprap length — 7._.. . ?>>
•
Avg distance offshore 11 3 } i
Breakwater/Sill _. ' F. I i
-
Max distance/length
..liaBasin,channel i Ell1.- A .
III
Cubic yards __ n
Boat ramp
Boathouse/Boatlift i 11
Beach Bulldozing ' } i ___--___.__, .!
Other ti' i- �
SAV observed: yes no V ' I ___ '
Moratorium: n/a yes no ' . { i I
I
•
t
Site Photos: yes no __... -..___ I �.-----.� -- .r ,..,,1_—�. I I.. ' c. —,_—,-
Riparian Waiver Attached: yes no ! i s. _1 # i I . A; _
A building permit/zoning permit may be required by:
TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
II See note on back regarding River Basin rules
See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie, Camden,Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
LISPS Tracking Moe >
Track Mother Package +
Track Packages Get the free lnforovd Delivery®feature to receive Learn More
Anytime,Anywhere automated notifice ions on your packages oupianewensawv wrr
o rt.,Na.rac pfloi, .ruWunrenpasmarscswi,m+meuw,ru.Wawnrt nneoroada uuW
Tracking Number.70190160000078503401 Remove X
Your item was delivered to an individual at the address at 5:31 pm on October 12,2021 in DURHAM,NC 27713.
G Delivered, Left with Individual
October 12,2021 at 5:31 pm
DURHAM,NC 27713
Get Updates'/
Text&Email Updates
I v
Tracking History
m
Product Information
See Less t.
Can't find what you're looking for?
Go to our FAQs section to find answers to your tracking questions.
FAQs
CERTIFIED MAIL.RETURN RECEIPT REQUESTED
,DIVISION OF COASTAL MANAGEMENT -
ADJACENT RIPARIAN PROPERi1(OWNER NOTIIF�ICATIONIWAIVER:FORM
Nerve of Property Owner V i.rn t li(,�le`f"k 5 U r
Address of Property: 5LQ 8+moron Dr. ;art evt-1 , MC.
(Lotor�t& or Road,City County)
k App t Sol - 752—Snag hiding Address: 51#a7 S n a+ .
•
0rTet.44 A c 8 1/
„I Ty►hehereby* tlret_I cam_praperty-admit to ire,above_eferenoed.Dn
applying far thIs pent*ire der arbed to me as shown on the attached drawing the development
they me wptoposi g.A description or dra kwiah h dimensions,must_ engwvided_wtth this letter.
ep
✓ I have no objaxions to this proposal. I have objectkeis to this proposal.
flan hove o ns to whattsbelogrepiser4yournustneatheiadskutofCaeslaWRL.w.merrt
(DCAIt la s.U&g wilds 1A digs of nroagtt of We notice. Confect bdbrmedm►for Dab cokes is
avails* et nw demben or by adios 14884RCOAST. No .
response conskkad tbe ea es no S onVitahavebeennotifiedbyCartlirodMa
WAIVER SECTION '
I;understand that a pier,dock._mousing pi hugs.breakwater,boathcnse1 or lilt swat be set back a
mw�t twntlistance of 1S from my area of riparian access unless waived by me.(if you wish to
waive Uie attock,you must initial the appropriate blank below.)
. lao Wish tovravthe1tsetback Fecedmment
Ido not wish towaive the 151selbackre ukernard.
(Property Owner Information) (Riparian Properbi Owner T
•
� � •
,'
dim * 8 hBurch ayna-_) sn&
Pratt or Type Alma Print orlype Name
5(40P7 Sl yr'i f s'fl Vesw-Jk 4S
Mating thing Address •
ire 0.".A/ 02 S` i 774 thle¢/sES. �L 32143
ktn. .5 651�
TelelaxN e :Telep isle koflb
/0 /z/2A/2I .
`�AL1 DO GtJfd�9i �Mn
, . .
. ..
. •
' • •
- \14j1
e •• . '
. .;:t
•
• r
Wt.r:;,,.-C,3 lea,SOCAZT: •7.,it
. . .
Pt':
---ce • "as---Jj
• •k•r•kt••17. :•Ctki k'•
Y• AV •••••• •••••• •••••„•••••• •••A•••••••• „ •• ,•••••••,•••I
•
474 %.*A t'••‘k
" kkkkkkkkk k kk "
•
•
7
�1f B Prescott Marine Construction,LLC
PO Box 874
Oriental, NC 28571 US
A�rj\' (252)249-0149
'VA F07
brandiprobertson@gmail.com
Estimate
ADDRESS ESTIMATE# 1895
Jim & Beth Burch DATE 08/27/2021
5627 Styron Dr.
Oriental, NC 28571
DATE ACTIVITY AMOUNT
Tide Tamer 7,000 lb. Boatlift, Pilings and Installation Fees, 1 @ $10,139.27 10,139.27
Boat Lift Step (This is an optional step for easier access to the lift from the dock) 20" 200.64
x 45"= 6.27 sq ft, 6.27 @ $32.00
Wooden Dock Extension: 5' x 30'= 150 sq ft, 150 @ $35.00 5,250.00
CAMA Permitting Fee - Boat Lift, 1 @ $200.00 200.00
Pamlico County Building Inspection Fee- Boat Lift and Dock, 1 @ $111.90 111.90
Permit Processing Fee, 1 @ $75.00 75.00
ALL ESTIMATES ARE VALID FOR 90 DAYS TOTAL $15,976.81
AND MAY BE UPDATED BEFORE
CONSTRUCTION BEGINS.
Accepted By 1 Accepted Date 0e/20/202
C l
,0)024Auk...
nta,se. kiW) pvt,
(r\--
f1aW0141,&111 c S e ri -
mitt xo1- 76g-g70
In'-- 251- 2-461 - 02RL1
117
•
tte 1
4` ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management
ENVIRONMENTAL QUALITY BRAXTON DAVIS
Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
•
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259.The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed com
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer A horization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. ilure to
comply with this Buffer Authorization may subject the property owner and the party.(contractor) performing
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly(which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
•
3. Access Width:The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and/monitoring efforts.
a Pre-project site conditions: k r-♦'F - j S cZD t
By your signature below you agree to be held responsible for meeting all of the conditions listed above verify
that all information provided is complete and accurate.
Agent or Applicant Printed '.ame ce s Sign ure
S/O(.d' /0/0 J? / z9/1/
A ent or Applicant Signature !stile bate
CAMA GENERAL PERMIT#: D4Scc b 5c22
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 27889 1252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-38451 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808