Loading...
HomeMy WebLinkAbout86435A_Mueller, Mark & Christine_20211206- (L N' ) 8643.5 B C D AAM�CAMA � DREDGE � FILL � 1lG Previous permit ` ji- GENERALPERMIT Date previous permit issued L4 t)WA- )CNew ❑ Modification ❑ Complete Reissue Ra+ +ak-Reissm As authorized by the th��e11State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I SA NCAC T l ± .� L._..._._...__._........._._.__._.._.____.— Rules attached. General Permit Rules available at the following fink: wvr,,.deo.ncsovlC gs Applicant Name UMr I Authorized Agent Plitt"fT VW— (�lLt,►riet.+L Wa t7ffj�j iUY �. Address :2L4 Czi—AgM0, %� E7KrWl ti ._...._.... ... Project Location (County): _D;�- City C z `J ��+ � State, ZIP 2-'5L �4' Street �A, dddress/St/ate Road/Lot fi(s) 9 1 rJ 5�_ 6A"Aeu ._.._ Phone # (&4 _5U(L—�t+L.L4 _ s[lY�._..4 i Email r^ZWY-, MLt.l..UA,,, nn"tJA,Q,{CbV- IAAA61ICo Subdivision C V W► City 5L"A i("A �21A L V"'*? L2 ZIP Affected cW s EW PTA j� ES I PTS Adj. Wtr. Body -SeCiw}e- r¢ an/unk) AEC(s): oEA ( IHA UW [� SPIMA PWS Closest Mai. Wtr. Body CIAW1 54`:.t.t/lLri ORW: ye no PNA>&o �n Type of Project/ Activity (F ) i%Atj't'Y i,i CA Gl i 5r X � 51 yVC:)i U fl-, _^_ (State: Shoreline Length i Access Length '~T Pier (dock) length Fixed Platform(s) Floating Platform(s) Finger piers) Total Platform area _ Groin length/# Bulkhead/ Riprap length Avg distance offshore Breakwater/Sill Max distance/ length Basin, channel Cubic yards Boat ramp Boathous oat t —_— Beach Bulldozing Other SAV observe& yes no Moratorium: n a yes no Site Photos a no Riparian Waiver Attached: A building permit/zoniing permit may be required by: Permit Conditions 19;A FV cPrr. 0-1� w t;tA �- Vic) 0 f ',. ',_ ! Agen r ApDlicant ?R Signature '*P#ease re t a em n on back of permit" Application Feels) Check #/Money Order AND TARtPAM/NEUSE,rBLIFFER (circle one) See note on back regarding River Basin rules 112 11W See additional notes/conditions on back ^2) --1$, & ,NCESTATEMENT, (Please initial)__ Permit Officer's PRINTED N e Signature Z-- 2C' i GvL2. Issuing Date Exa r� ation Date N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM Date 0-,I-) I Name of Pro Owner Applying for Permit: i)LOL 71.r�,elljz- Mailing Address: P I �I `i r Q_ 4Jl 1V to act on m I certifythat I have authorized (agent) 15 6 Y g behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) at (my property located at) I l t1 i (- This certification Property Owner Signa Date ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director Richard & Karen Galganski 95 Osprey Lane Southern Shores, NC 27949 NORTH CAROLINA Environmental Quality December 6, 2021 Re: Objection to the Issuance of CAMA General Permit No. 86435-A for a Docking Facility Development Project, located at 97 Osprey Lane, Southern Shores, Dare County. Dear Mr. & Mrs. Galganski: The Division of Coastal Management has reviewed your correspondence dated September 30, 2021 and received on October 5, 2021, in regards to your objection as an adjacent riparian property owner to a permit request from Millstone Marine Construction, an agent for Mark & Christine Mueller, The permit request was for the construction of a 13'x13' boat lift and to properly notify you of changes in the existing docking facility's initial orientation and location along the shoreline of 97 Osprey Lane in Southern Shores, Dare County. On September 16, 2021, DCM Field Representative Sarah Loeffler conducted a site visit to evaluate the permittee's need for additional permitting, and to address the concerns expressed by you in a phone call on September 8, 2021. Under the Coastal Area Management Act (CAMA), the Coastal Resources Commission (CRC) has established Rules for General Permits for this type of development that are found in 15A NCAC 07H.1200, The Division has reviewed your objections, along with all aspects of this development proposal for consistency with the aforementioned Rules, which describe the CRC's standards and guidelines for this type of development. Our review of the proposed modification has found it to be consistent with the Rules of the CRC and the State's Coastal Management Program, and that all pre -requisites have been satisfied. Therefore, the Division of Coastal Management issued the General Permit No. 86435-A on December 6, 2021 (copy attached) for the proposed development. If you wish to appeal this permit decision, you must file a Third Party Hearing Request Form with the Director of the Division of Coastal Management within 20 days of the permit issuance date. If you choose to pursue an appeal, please contact this office so that we can provide you with the appropriate forms and addresses. If you have any further questions regarding this matter, please do not hesitate to contact Sarah Loeffler or myself at this office. Sincerely, Ron Renaldi, District Manager Northeast District cc: Sarah Loeffler, DCM Field Representative Millstone Marine Construction, Authorized Agent Mark & Christine Mueller, Permittee Enclosed North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 +ain.c�.era..m 252.264.3901 September 30, 2021 Richard Galganski 95 Osprey Lane RECEIVED Southern Shores, NC 27949 OCT 0 5 2021 Division of Coastal Management 401 S. Griffin Street aCi�n-EC Suite 300 Elizabeth City, NC 27909 RE: Adjacent Riparian Property Owner Notification 97 Osprey Lane, Southern Shores, NC In response to the received Boatlift addition for owner Mark Mueller: OBJECT. Owner Mueller's original application for proposed pier depicted the structure in or about the middle of the 140' bulkhead, which in good faith, was not objected to. However, in a bad faith move and without further notice, owner shifted the structure to the far end of the bulkhead, settling within 1' of the permitted 15' off the adjacent property line. The proposed boat lift sits parallel and as close as permitted by rules to our existing boat launch. It is clear that the owner intended to leave his sightline undisturbed without any regard to his neighbor by producing an unnecessary hardship to the egress and ingress to our boat launch. Although we are of the understanding the application of this structure will most likely be permitted under the existing rules, the deception exhibited by the applicant is unacceptable. When an application is submitted for approval it should be held to the intent presented. The owner could have comfortably shifted the structure utilizing any other portion of the 140' bulkhead, especially in light of the fact the property to his right has no pier, bulkhead or boat launch and is not occupied by a full time resident. Further, the applicant is not a full-time resident and will not be utilizing the structure on any routine basis making his deception even more callous. RICHARD GAL I, owner 95 Osprey Lane REN GALGANSKI4owner 95 Osprey Lane September 23rd, 2021 Richard Galganski 95 Osprey Lane Kitty Hawk N.C. 27949 Reference: Boatlift addition for Mark Mueller Mr. Galganski: We have been hired to construct a new pier and bulkhead on your neighbor's property by Mark Mueller. I did not include a boatlift when we originally permitted the pier. This notice is for the boatlift addition. Enclosed is an adjacent property owner consent form and drawing of the proposed change required by Coastal Management to be sent to you. If you have no objections please sign and date the form and return it to us in the stamped envelope provided. Should you have objections please follow the instructions on the form. Have a great day Kevin Lineberger Estimator Millstone Marine Construction, Inc. 252-202-2678 cell 0 C T 13 2021 W o � Y O v 60b� 9TTE 2000 0922 620Z c•a n~• 16- E6EZ 9TTE 2000 0922 6M Postal Service' �TIF]Fn MAIL' RECEIF M Domestic Awl Vinly 27R4� 0954 7G $3.75 04 m S.,� eas kb=4ddf*OEyfPfR?" 13 to ru rij 0 Retum Recd-Pt py) 0 Pet = Receipt (C%C rt:,-) LI Ctflod M.1 Rest eM —1-Y $ []AdaugnatxeR-i-d $ tlf- — []AduttSlgr--wmRest;cted0o:M'Y_S $0.78 u C T 2 6 2021 September 23rd, 2021 Anne Thomas 99 Osprey Lane Kitty Hawk V.C. 27949 Reference: Boatlift addition for Mark Mueller Ms. Thomas: We have been hired to construct a new pier and bulkhead on your neighbor's property by Mark Mueller. I did not include a boatlift when we originally permitted the pier. This notice is for the boatlift addition. Enclosed is an adjacent property owner consent form and drawing of the proposed change required by Coastal Management to be sent to you. If you have no objections please sign and date the form and return it to us in the stamped envelope provided. Should you have objections please follow the instructions on the form. Have a great day Kevin Lineberger Estimator Millstone Marine Construction, Inc. 252-202-2678 cell Rt��et-. 0 C T 1 3 2021 DCM-EC Pier for 97 Osprey Lane Revised J This map is prepared from data used for the inventory of the real property for tax purposes. Primary "'. information sources such as recorded deeds. plats. >v wills, and other primary public records should be consulted for verification of the information 97 Osprey LN Southern Shores NC, 27949 Parcel: 022309000 Pin: 986709264113 Owners: Mueller, Mark -Primary Owner Mueller, Christine -Primary Owner Building Value: $184,000 Land Value: $351,700 Misc Value: $0 Total Value: $535,700 Tax District: Southern Shores Subdivision: So/sh 114-117 126,127 200- 202 Lot BLK-Sec: Lot: 10 Blk: 126 Sec: Property Use: Residential Building Type: Ranch Year Built: 1988 e: 84.67 M-1 &moo 11 e- 4 - m