Loading...
HomeMy WebLinkAbout84928_North Creek Landing HOA ( Keith Quinton)_20211130 30?4`°A5'4`4, _!CAMA [7 DREDGE & FILL l� N° 84928 A B C D �q Previous GENERAL PERMIT ') O 'O Date previous permit issued I 'New Modification Complete Reissue Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: ISA NCAC Rules attached. [J General Permit Rules available at the following link:www.deq.nc.Eov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) • Email Subdivision City ZIP Affected I I CW EW I I PTA ES PTS Adj.Wtr.Body (nat/man/unk) AEC(s): I I OEA IHA I I UW I I SPIMA I PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: / . Shoreline Length I • Access Length C I I } y I Pier(dock)length ' rl it e Fixed Platform(s) 4i I I Floating Platform(s) Finger pier(s) r, 1— - 1 IV t i Total Platform area t J I 1 Groin length/It r i 1 Bulkhead/Riprap length -- f j --------- Avg distance offshore Breakwater/Sill Max distance/length i .7 -.�- Basin,channel ; '�... j Cubic yards �� i Boat ramp ± I --r'� Boathouse/Boatlift ( k — -=— ""—�^--� 1 i Beach Bulldozing I Other 1 ( I SAV observed: yes no "~ �� ��� i / j i Moratorium: n/a yes no ..._ / Site Photos: yes no —r ./ . ' Riparian Waiver Attached: yes no .r �'. _ I 1 I A building permit/zoning permit may be required by: f 6 TAR/PAM/NEUSE/BUFFER(circle one) Permit Conditions See note on back regarding River Basin rules - - See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie, Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 �o��'`°�'"`N❑CAMA ` DREDGE & FILL 1C_ No 84928 ABC D 0 3 r. ! � C_ � Previous permit y : GENERAL PERMIT 4f ( r (o.�(� Date previous permit issued New Modification H Complete Reissue Partial Reissue As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected I I CW EW I 'PTA [ ]ES I I PTS Adj.Wtr.Body (nat/man/unk) AEC(s): OEA n IHA UW I I SPIMA PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline length Access Length I ' j I l I l { Pier(dock)length I /i Fixed Platform(s) MIIIII ME111112, 1. --�— { • ���� RMMMMMEM����� Floating Platform(s) i II Finger pier(s) Total Platform area ff t } Groin length/# Bulkhead/Riprap length -- j- / e' nil —1—10 Avg distance offshore - i Breakwater/SillII } Max distance/length �. Basin,channel111111 Cubic yardsI i Boat ramp • Boathouse/Boatlift r Beach Bulldozing • Other i ii• SAV observed: yes no ' I ! Moratorium: n/a yes no d-_'., I I v Site Photos: yes no ifI Riparian Waiver Attached: yes no i Y I I I I A building permit/zoning permit may be required by: TAR/PAM/NEUSE/BUFFER(circle one) Permit Conditions See note on back regarding River Basin rules See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden,Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ROY COOPER Governor MICHAEL S. REGAN _ F:f NC Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 &.0259.The Division of Coastal Management(DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly(which is defined as between 75 and 105 degrees) unless.otherwise approved by DCM.The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width:The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way.This drawing will be used to aid in compliance and monitoring efforts.s Pre-project site conditions: Le,...-4. R.t f( S„�w( 1- s By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. Agent or A li t Prin ' e ermit Officer's ign re • ���teAgent or A Issu Date CAMA GENERAL PERMIT 4 : t y/p 2 State of North Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington Square Mall Washington,NC 278891252-946-6481 • Wilmington Office l 127 Cardinal Drive Ext.Wilmington,NC 28405-38451 910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead Cdy.NC 28557 1252-808-2808 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own Lot#313 adjacent to the North Creek Landing Homeowners Association Marina Common Area located on the North Creek waterway at North Creek Drive in Bath Township, Beaufort County, North Carolina. The applicant has described to me, as shown below,the development proposed at the above location. I understand that any construction, excluding bulkheads, must be set back a minimum distance of fifteen feet(15') from my area of riparian access unless waived by me. XI have no objection to the project as proposed but do not wish to waive the(15')setback requirement. I have no objection to the project as proposed and do wish to waive the (15')setback requirement. I object to the project as proposed. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT Remove and replace existing boat ramp in the same footprint as the current boat ramp. Below drawing not to scale. Lot 12 " / Brown Boat Ramp a .\ \\ ,-.- la, Go Lot13 ' tartan .2nit=570 Gon/aALe2--. Printed Name and Signature lel0 9'OS o,"6 (1/L(71/ZoZ4 Telephone Number and Date 41111111111111.111111111111.1111111111111. ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own tota12 adjacent to the North Creek landing Homeowners Association Marina Common Area located on the North Creek waterway at North Creek Drive In Bath Township,Beaufort County,North Carolina. The applicant has described to me,as shown below,the development proposed at the above location. I understand that any construction,excluding bulkheads,must be set back a minimum distance of fifteen. feet(151 from my area of riparian access unless waived by me. I have no objection to the project as ermined but do not wish to waive the(15')setback requirement. I have no objection to the project as proposed and do wish to waive the(15')setback requirement. I object to the project as proposed. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT Remove and replace existing boat ramp in the same footprint as the current boat ramp. Below drawing not to scale. • . aoatnanplit144Pfr/ tries' m BgD\ , l Vv` %',Qt,x„_ Printed Name and Signature SO -399-9ai9 1ov . a3 mat Telephone Number and Date