Loading...
HomeMy WebLinkAbout84996_Roscoe Joyner_20211123 1a`Awk4I LCAMA U DREDGE & FILL K-5 N° 84996 A (B,,/c D GENERAL PERMIT # (o (d 33 Previous permit Date previous permit issued Ti New Ti Modification I -I Complete Reissue Ti Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I 5A NCAC n Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#(_) Email Subdivision City ZIP Affected n CW n EW n PTA n ES PTS Adj.Wtr.Body (hat/man/unk) AEC(s): ❑OEA ❑IHA n UW n SPIMA n PWS Closest Maj.Wtr.Body , ORW:yes/no PNA:yes/no Type of Project/Activity . (Scale: / j Shoreline Length ` I Access Length 7 i f f 18 1 /4' Y } ®--m - I i� i. . Pier(dock)length 1 y '' ' .. \'l` r` r� J � , Fixed Platform(s) ! { '` 4 { t r Floating Platform(s) , ?`5 { .. 1 Finger pier(s) i ! 1 Total Platform area .. I ,. + 1 -. Groin length/# ._ ' __. _ - Bulkhead/Riprap length .._-.._...___..___ t t <!i/ a ' 1 it Avg distance offshore 4 y J r I J3 V. Breakwater/Sill ' I Max distance/length C , 4 • Basin,channel — Basin, Cubic yards Boat ramp i Boathouse/Boatlift 1 Beach Bulldozing 1 { . _. —_. _....-_-___1 .1.'�. w Other ;'' 1 i SAV observed: yes no_ _ 1 11. 1 Moratorium: n/a yes no { Site Photos: yes no —._.1 .. .........._. . 1 Riparian Waiver Attached: yes no I `' AIR.% f �. • `. A building permit/zoning permit may be required by: Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one) nSee note on back regarding River Basin rules nSee additional notes/conditions on back I AM AWARE OF,STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature i Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie,Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 4.0t°"744.I ICAMA DREDGE & FILL ` No 84996 ABCD 1 GENERAL PERMITS &9(0? Previous permit t - Date previous permit issued 7 New Modification Complete Reissue Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I5A NCAC Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City _ State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected I I CW _EW PTA ES PTS Adj.Wtr.Body _ _(nat/man/unk) AEC(s): OEA IHA UW n SPIMA I I PWS Closest Maj-Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale:i ) • Shoreline Length Access Length _ . .4 Pier(dock)length 'I I k Fixed Platform(s) i, T 1 ]�/ - +— -I i y' r Floating Platform(s) ; }t I / f jI t Finger pier(s) I 4 # 1 . I ' , Total Platform area ( •I ! r j I • Groin length/# Bulkhead/Riprap length —1-. ._......_ ,....._.--+ ( ---.---' .-----..__.�....._._ _� i Avg distance offshore f i j A 4 j Breakwater/Sill I { 'f - ' f Max distance/length i I ( ' I d Basin,channel - { _ 4 Cubic yards —„ . Boat ramp } Boathouse/Boatlift I I E Beach Bulldozing l Other -, ,�, -- ---- SAV observed: yes no I ' I Moratorium: n/a yes no Site Photos: yes no i r 1 - - Riparian Waiver Attached: yes no I 1 jr I , _ A building permit/zoning permit may be required by: TAR/PAM/NEUSE./BUFFER(circle one) Permit Conditions See note on back regarding River Basin rules See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: f _ Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construct-ion of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden,Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ROY COOPER N Governor MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has reviewed your proiect proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the . construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either normal water line(NWL) or normal high water line(NHWL) and extends 30feet landward)shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing& Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. • • 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be • satisfactorily restored as described in condition 5 below. a. Potential Overwash: For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is expected to be severe, the first ten (10)feet landward (unless specifically authorized otherwise by DCM) from the • structure may be maintained as a stable lawn in order to provide for structural stability. 5. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. • s. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was wooded prior to • • this shoreline stabilization project must be restored with woody vegetation ata stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30)after completion of the bulkhead. • 3 Pre-project site conditions: 1-14,..1<.,21 /<k,,n • Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all ma ;on is co plete a d accurate. s Iv 'NA�:, 1 iican id Y E LL�j /D Pi V-e f P t Print: Name Per ' Officer's Signature ♦/ I A •LL..A. I Age l.rApplicant Signature Issue to CAMA GENERAL PERMIT#: f'/9 ‘ 0 • State of North Carolina I Environmental Q.ualtty I Coastal Management Washington Office i 943 Washington Square Mall Washington.NC 27884 i 2.52-94o-5481 • Wilmington Office 1177 Cardinal Drive Evt LVilminnro..NC 23405-3A45 i vn-79c_7215 Morehead City Office'400 Commerce Avenue Morehead City.NC 28557 252-308-2808 Authorized Agent C®idasentt greement Ras C o 2 L� J oyj4 IZ herby authorize Tobin Jay Tetterton of (Property s)) Ti's Marine Construction,LLC to act on my behalf in obt aining LAMA permits for the location listed below. PROPERTY ADDRESS: 6 to �4a et e-C P, ie IBC 7010 PROPERTY OWNER'S MAILING ADDRESS: �, pL,o I� �a �� III V Rhone-Mg1 �L2� cu - fl . ("\ CI( I 9- E3- 331 PROPERTY OWNER'S SIGNAT \ e 4 2qt(a i AdT HORN D AGENT SIGNATURE: T BIN 1DATE:X. 2Q / ADJACENT RIPARIAN PROPERTY OWNER STATEMENT. I hereby certify that I own property adjacent to Rostoe- L ,Tov t e✓— 's j O (Name of Property Owner) property located at C�a5i 5-1-res-t-'I Belt),°co an PC a7eib (Address, Lot, Bloc, Road,e • on I ,\qo r (oo'EL/ C'resiIL in -del (Sall e+n N)�' - , N.C. (Waterbody (City/Town andlor County) --------- - The applicant has described to me, as shown below, the development proposed at the above location Adjacent I have no objection to this proposal. Property - Gwne•k one I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT ibuf/ W/140446$40ffctent•MUStfikirt deSedilirdit6eaniittacfaasiIVdrawng) 1& ik&i . -roLs+edg U:nyi Ou /Ore . fpcoL /45e` • • Adjacent WAIVER SECTION Property I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin Chimer must be set back a minimum distance of 15' from my are"of riparian access unless waived by DUS: me. (If you wish to waive the setback, you must initial the appropriate blank below.) ORE ��' �(z/� I do wish to waive the 15'setback requirement I do not wish to waive the 15'setback requirement. .eope ®\ r Information) (AdJ�- Property Owner Information) y�� �Sz tureC.-- ,� raze �2 coe.. _ .io•'ner St � Print or TypeNerne `' peg m• orP ��f�. OrY� eio 5a�res-T nY(ekr- '4;-4)(v ga.isste-ior.b✓2. Printer Name RMeng Address �B���ivl< �(g • al -A-A - \L ;etc I Z M TingAddm ,r, g 76/� City/State Zip Citya , cl(GI-ca3-4-33I ( -79— W7aaS Telephone Number/email address Telephone Number/email address -I-2q - I 563--.1 Date .Date* "Valid for one calendar year after signature* (Revised Aug.2014) ADJACENT RIPARIAN PROPERTY OWNER STATEMENT. I hereby certify that I own property adjacent to f�osc oa L P (' y property located at 610 g.as+ S+rea t(Nl3eC-Q��e Owner) / (Address,lot, Ellol , Road,e ) on f Lc\go K\Jer %hoof ey Lieu,iL in 1� t)e� Q 2 (�— , N.C. (Waterboddy) (City/'Town and/or County) -- — - the applicant has described to me, as shown below, the development proposed at the above loopAdjacent J`�'"" I have no objection to this proposal. Property owner I have objections to.this proposal. Cheri:one p p DESCRIPTION AND/OR DRAWING OF PROPOSED EVELOPMENT (forlividLs'rl�liFo�tiE#SIt7�d�eJD%348e��f4Sttrli/F! _ +' `".:.descrrp.ttsnb v�or�aftac!•ia sFfe cfrdv>sml} ALS l'� � ) & /k/iai (i,proy Ad As.4i'-eert I understand that a pier; dock, mooringWAVER SECTION Property pilings, boat ramp, breakwater, boathouse, lift, or groin Owner must be set back a minimum distance of 15'from my area of riparian access unless waived by 'ate me. (If you wish to waive the setback, you must initial the appropriate blank below.) a .1 p W V I do wish to waive the 15'setback requirement. I do not wish to waive the 15'setback requirement ,.(P[ope ner Information) (Adj n roperty 0 nfonnation) SignfitureCy — ,Si ahae* ` fctm CDC •L •aoynevi nosyW/ .d Print or Type inc Name Print or Type Name NOD 6(G0 r O&- .Srt er- 1+4) za-Lble-tm,tit. Sri eo/ey Si- AKling Address Address o t Macy, � �C� a7� i Z ffenta✓ee) lye- 278/6 Cily/Stateinp City/State/Zip g-sa3-�(33 I go jr / -g2y6 Telephone Number/email address 2 � _� I Telephone Number/email address Date $'�Z/2 b Z 1 rate' 'Valid for one calendar year after signature* (Revised Aug.2014)