Loading...
HomeMy WebLinkAbout85032_Bill Watson_20211209 S`mN I ICAMA DREDGE & FILL ?-Y"� No 85032 A (6) C D GENERAL PERMIT Previous permit Date previous permit issued n New Modification ( I Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I5A NCAC n Rules attached. n General Permit Rules available at the following link:www.deo.nc.gov/CAMArules Applicant Name Authorized Agent Address r Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email - Subdivision City ZIP Affected n CW n EW PTA n ES ' PTS Adj.Wtr.Body (naf/man/unk) AEC(s): n OEA n IHA n UW n SPIMA ❑PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale:/' D) Shoreline Length _. Access Length i —�- i Pier(dock)length I. —�. `�_" — �—` 1 j j+ Fixed Platforms) ..__ Floating Platform(s) ) I ! I 4 j! � {i ) Finger pier(s) _.. }_—_ I I Total Platform area. Groin length/# _i__. Bulkhead/Riprap length i 1.- .._.-._..._ — _...... ._ ._.. --j .__ {i f (,:,�i-. Avg distance offshore , — - - >'r 7 � ICJ JA�/� 0 ; / `h Breakwater/Sill I , 1 .t i/ Max distance/length 4 / �. ^•__. Basin,channel „`�;.. �H. �._. ` �� , ���}t3j 9 Cubic yards ' / lam' •'`.. i .� Boat ramp r r / -- -...r ✓ i Boathouse/Boatlift 1 . Beach Bulldozing LL I IA!.` d"��ry _.. Other 0 E �7 .r 0y7 i .J{ SAV observed: yes no _ 4 Moratorium: n/a yes no • 1 t "" — I . : Site Photos: yes no L - 1 i_.-,I,.._. _ .....} _—___ _ ._._._._ Riparian Waiver Attached: yes no , , I A building permit/zoning permit may be required by: n TAR/PAM/NEUSE/BUFFER(circle one) Permit Conditions nSee note on back regarding River Basin rules [n See additional notes/conditions on back I AM AWARE OF;STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) ' k/ ( — Age.it or Applicanttt PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden, Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ,*'COu'k�cy�c( ICAMA DREDGE & FILL AB CD 0 GENERAL PERMIT Previous permit Date previous permit issued New Modification Complete Reissue I Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I SA NCAC Rules attached. I General Permit Rules available at the following link:www.deq_nc.gov/CAMArules Applicant Name _ --_ Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected I CW EW PTA I ES PTS Adj.Wtr.Body (nat/man/unk) AEC(s): I I OEA IHA I UW SPIMA I I PWS Closest Maj.Wtr. Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length Access Length < +14 Pier(dock)length I ! ' Fixed Platform(s) [1:,---- + • Floating Platform(s) I I i I Finger pier(s) i _ I ___ Total Platform area 4 Groin length/# { Bulkhead/Riprap length +— i i_-- --- I — j Avg distance offshore i I f / Breakwater/Sill �� / f' .1 Max distance/length ..!., Basin,channel —f — 1 7 " ' t [�'I r .. Cubic yards � i -• 4,) l 1//' Boat ramp �"..^�'.,"" -.... I ._� ' . Boathouse/Boatlift j' "rA - It; r , fflf ! > f Beach Bulldozing - Other - I" SAV observed: yes no I r Moratorium: n/a yes no ' 11 Site Photos: yes no Riparian Waiver Attached: yes no i �J I - A building permit/zoning permit may be required by: Permit Conditions I I TAR/PAM/NEUSE/BUFFER(circle one) II See note on back regarding River Basin rules ISee additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature"Please read compliance statement on back of permit" Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 5. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 • AGENT AUTORIZ T ION FOR CAR A PERP.H;FAPPLiCAi IC•rd Name of Property Owner Requesting Permit: E L'L Mailing Address: I lac {j I ytJCL e �-'c✓L.4 IAoe S . -k 1 �, �y c127 g 0 • Phone Number: sue c( `t [� `- 02 l t. � Z Z Email Address: 6 c A-4xwo 9i'L Co l )vl 'C'r>wt I certifythat I have authorized V\\ S-�-i ry t,A,k4i � lM II s l r&i ,�,r� J Agent/Cdnrredo� V`�'� to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: CP v_1) ( A ` 4:-.0 at my property located at - 519 f4trl\�0r.50.0 Lc s2 c6Ac4' , /-t-20,61 I��et rv•C .agsza in k\'"-Iirn County. l furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application, Property Owner formation: ignature Print or ype Name D1.iruPf2 Title �lDate Thic rnrtif aatlOn is valid through / _/ ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify Thal I own properly adjacent to Bull/ theca fan es g'� (Nam of Property Owner) property located at )4ardlyt„ �c t(�=r.. (Address,Lot,Block/Road,etc.) on Alese /:ioi ,In az.r.,J-�/ ,cin/.era- ,N.C. (Waterbody) (City/To and/or County) . The applicant has described to me, as shown below, the development proposed at the above location. X I have no objection to this proposal. I have objections to this proposal. DESCRIPTION ANDIOR DRAWING OF PROPOSED DEVELOPMENT (individual proposing development must fill in description below or attach a site drawing) Jln1' SCav+c(t O0 � \ jPSkl1 WAIVER SECTION - I understand that a pier, dock, mooring.pilings, boat ramp, breakwater,boathouse• lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me.(If you wish to waive the setback,you must Initial the appropriate blank below.) X I do wish to waive the 15'setback requirement. I do riot wish to waive the 15'setback requirement. (Props w inform.t n) • (A ant Prope Ow—information) Sig' }m. Sfg Star • s i L (. W at-j �� , Stacy A Pisani pre f 9rT _ N m /ZN.I Print or Type Name 1!�7?,f7J q.s>3� Air 5272 S Holland St MA,Ad /_ MallLit Addross M/--11 :altarAi C. Llttlptnn CD�0123 City/Sfate "g. / co City/State/zip 72n-RAn-qt An i ( Taip h no Number,/o f Qr1reL _ Telephone Number/email address cl c _ 3(_ti `-/ 11/17/21 Oat• rzak Dares ItPJACENT RIPARIAN PROPERTY/n A �OYytigR STATEMENT '1 hereby certify that I own.property adjacent to /J/l� We.i " es 7 (1 (Na of Property Owner) propefty located at 41 .f I welly„ I y a Y. 'm . (Address,Lot,Block,Road,etc.) , f t __Aee .In Un'r^i/ en�ca. on (yyatorbody) (Cityrrov andlor County) • • The applicant has described-to me,as shown below.the development proposed,of the'active I" I•havo no objection to this proposal. t have objections to this proposal. - DESCRIPTION ANDIOR DRAWING OF PROPOSED DEVELOPMENT • . (Indiv/dual proposing development must fill in description below or attach a site drawrnt Ok �ln j.I SCrb+°(t ey fn*:((t7 WAIVE_R SECTION . - I understand that a pier,dock.mooring pilings,boot ramp.breakwater,boathouse,flit,or groin i .must be setback a minimum distance of 15'from my area of riparian n access unless waned by me:(If you wish to waive the setback,you must Initial the aPProP ), ;' trio wish to waive the 15 setback requirement. rt a Get • .�-� .�iu� •/ . ,( to comic J iL.r Ido�not wish to waive the 15'setback requirement. St !4 SeQwa�, morn , ) • (Ad cent P o Owner Information) . • (Propo ,t Js • d, ukaa AN,u Si ore�,ri�/ : kRN[iF Tclnbc lle Ja�o� Pn o: e N mo aAlfsr �;_za,-a.1 z Fv(/ 1 /. �}N fP.., a,, n Cec Fc.�-red Mo ng '6f N A5 t7'L �1tr.Addro_a -e _1 .0 0235,0 pryfsrerd ' . • ciSi0 Crty/56o1 'p.ZSo2—GG5--3yd7 aedcewarb9evt'e �q Tore Number/email eddmss /+q; TotcpphPG Nu 2 L l r- I a— 6.A.( 9 ,40A, awe la.rr I (C !Z al I . ROY COOPER Governor MICHAEL Si REGAN Secretory Coastal Management BRAXTON DAVIS ENVIRONMENTAL OUALIty ofrector • BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR)regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal Management(OCM)through a Memorandum of Understanding with the Division of Water Resources((MR)has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to what must be impacted for the sound installation of the shorellne stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. • 2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward)is allowed provided that it is re-vegetated immediately and Zone 1 Is not compromised,which includes maintaining diffused(non-channelized)flow of storm water runoff through the buffer. 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects,but they must be satisfactorily restored as described in condition 5 below. - 4. Potential Overwash:For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the structure may be maintained as a stable lawn in order to provide for structural stability. • 5. Temporary Stabilization:Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation eta stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season(Novemye r 1 hrough March/ ' 30)after completion of the bulkhead, • Pre-project site conditions: ( vS �r✓ti ar'/ 7. Project Drawing:The drawing on the CAMA General Permit Is considered.the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing,grading,and construction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed condition d verify that all information is oft plete and accurate. Age t or A Ilpnt Printed Name Emit Off' er' Signature 2 A nt or Applicant Signature Issue Da CAMA GENERAL PERMIT#: '5o32-- State of North Carolina I Enviromnental Quaihy I Coastal Management Washington Office 1943 Washington Square Mall Washington.NC2788 9 1 252-94 6-6 481 wlimhgton Office 1127 Cardinal Olive Ext.wdmingtcn,NC 28405-38451 910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808