HomeMy WebLinkAbout85035_Steven L. Lee_20211216 sic°"'k%;®LAMA :.I (DREDGE & FILL �Kj Q N 85035 A C D
dA-
J. GENERAL PERMIT �D tot O O Previous permit ��
Date previous permit.issued X‘i ii •
`,l New : ❑'Modification ❑Complete Reissue ❑Partial Reissue
As authorized byp the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
15A NCAC �-/ --i- 4 r t i OD _ _ ❑Rules attached. 0 General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
• 1
Applicant Name Te%..'.� kN L<r Z.€.'E:-.. Authorized Agent F>4bhy rigo re ti r/ /3. • si'..Acf r 74r
Address 1 7 ✓ FR t oe.f A C'.( P S j,,. Project Location(County): RP f.t GS t
City C MITI 1)R P4A1 I4 State K.1 C ZIP T( 9 Street Address/State Road/Lot#(s)
Phone#(Z-51) ^- (/C 19i (.7 '5 Co,- q cze , Z.-k.)
Email 4;'i4,'_j)ef 1 e6'.' r>r,-‘1„.�1 e`k,C.G0- Subdivision i i'4 '
City f/fJfa 4,1,r•ti e• ILO✓'t ZIP 7 7-55 gCt
i
Affected n CW ®EW n PTA ElES ElPTS' Adj.Wtr.Body P4!3'3'!'!e t i* g 1‘..1 a 4.- ,na man/unk)
AEC(s): ❑OEA ❑JHA ❑UW ElSPIMA El PWS Closest Maj.Wtr.Body a/)1 O ( 6 l Lie,'"
ORW:yes/a, PNA:yes/i t ,'
t� } i
Type of Project/Activity �-Y1 S+4 V\ 11` t''1ea ‘.,a b°-.,-\l � aN6nek C."7 ri " "C 0t5,- 6
O�i- AA ir)i- (0 L ' R J (Scale: )
Shoreline Length it- I?s'`
II� ■� l
Access Length �■ ■. MI.S' 31�
,r u%
is i
Pier(dock)length 41111
�� min oi ms
Fixed Platform(s) f Will IMI
t EMINOMMEMMIIM WOMME II INIMMEMMOMMEM mango
Floating Platform(s) 1 1 iiiillialmak
Finger pier(s) - t
Total Platform area i
' Groin length/# P ' i� k
8..—d/Riprap'length 4I IC) fii ; �` f
(' `Ah11111iLIF
g
Basin,channel � . Ilia II II ■ #' ■■ IIu,
Cubic yards ' dill
Boat ramp
Boathouse/Boatlift k i i!!'JiiIiiiiiE!!!!!!Uiuu!II$I!a wawa'
Other Ii I
SAV observed: yes no ; +;"NH ;II I b
Moratorium: n/a yes' no' ! ) r 'P i ''II III _III 1111111111.
111 f-
Riparian Waiver Attached: t es no e 1 I
A building permit/zoning permit may be required by: , 7e,)/ '/ V'T . q; h�
Permit Conditions L-/) / .S f6 r t,i-c l h PU 14 14 di . No " 7'�"I l t-i'to,,,A TAR/PAM/NEUSE/BUFFER(circle one)
� 19 or - Ejr e vff ennelt t,,y 4l5)-1( )fr'• .et (� O
�}} �f,A���'//1 n See note on back regarding River Basin rules r
-1 Ckfi77ir7)'i(Y C NI..Olt)1..
I r - ,See additional notes/conditions on back
. ,..,r
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) . /'"
Agent or Applicant PRINTED.Name Permi Officer's PRINTED Name
Sig ature**Please read�comRliance statement on back of permit** Signature 0 U -
Application Fee(s) Check#/Money Order Issuing Date • ' Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance.The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves:Carteret,Craven—south of the Neuse River,Onslow Fax:252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S.Griffin St.Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties) '
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
•
ou'k'", CAMA ,0-DREDGE & FILL k�j 'N° 85035 A :8:. C D
s GENERAL PERMIT J`v to v Previous permit 19 r
Date previous permit issued P,'/A
• ''' New n Modification I I Complete Reissue I 1 Partial Reissue . .
•
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I 5A NCAC L' 1 iI ' I ( I ' Rules attached. I.y'I General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name �..,"M'.. )`' V^ L_, ,_r' Authorized Agent !Z•, L 7bV /1 '.P PI, ) et /`y 4 _
Address — - F '- r'N'.. �, i.r3 Project Location(County): 1"`-• t-'r.":(G-t CO r'}C .
} r C4
City ''7J.i•=i l A G;` ;�l State '',..1L.. ZIP Street Address/State Road/Lot#(s)
4.
Phone#(_) 1-1e/ f ei I `t 1 ,„ . +`..1.
Email - 1,-,.., ' 1,,• ,-• '. `r,. 1 • ".. :}-. Subdivision '
•
City J,c i,L" i ,•,,. -I- ,r} ZIP _.) 17 C 'SL:1
Affected CW piEW pi PTA ®ES •
. PTS Adj.Wtr.Body / n.: /. .- :, 1 .? ,r ram- (nat/man/unk)
AEC(s): n OEA n 1HA n UW n SPINA ❑PWS Closest Maj.Wtr.Body / "r,6'1,'I 1 . , . Jq t,. f
ORW:yes/not PNA:yes/nod
Type of Project/Activity -_ .1 l , -• •- i"t %t.., ,^ 1,.., i-`)4-• t;. - '• i> .. '''( `;ri, t a +.) (6•"+/ f ' ,,i ,. .
• . f.,:':i 1 Nqr.,, `,.)E•.. (Scale: )
/ ..l
Shoreline Length = I '•) 2'-› jj,,
H ��
IIIEMIMIIIMIMBIIIMII
Access Length
Pier(dock)length / C� .■ aa ■.............
Fixed Platforms) II E _L_
smil I
Floating Platform(s) 1
11.1111
1 II Ell
.
Finger pier(s) �+ j _ _ ____�_ a �� inwn rim
MUEMMIMMINIMUMMEIMEA
,
Total Platform area ) 1II 1 MI 11111111111111111111r...........................r.,..r.....,
i;
.........r.......1,...
Groin length/#
!Bulkhead/Riprap length '' (`,+ 1.r r ,
III---;-- mai si Ian
lwir
Avg distance offshore -.
■
Breakwater/Sill ,, IIIIIMIIIMIIMIIMIIIMIIIIIIIIEIIIIIIIIIIIIMILMHIMIIMMI ", aa
Max distance/length MIL l 111110111111 .
Basin,channel k �WIw
Cubic yards ) III P HT 1 NI
Boat ramp i 1 IMI �� aaa
Boathouse/Boatlift t 111111111111111111 , =--- ` ,_. 11111111111111111111111111111111111111
aa.a
Beach Bulldozing t j '�-�_°' r'`'��--I M
', 1,y
MIIIIII
Other1t-- - - ail
1 INEMENONIIIIOMIIIIIIIIIIIIIIIKINIMMIENEWM11111111111, Will Ear
'� aa ■ 11111111r,
SAV observed: yes nog
Sitperatorium:Photos: yn/a yyes nno L_ + ,,_ , 1 c.,iiiimista iIllIllI�� ,
Riparian Waiver Attached: lie?"-, no
11111,4
A building permit/zoning permit may be required by: '' .'i'' ` ..'1 i ,'• •
r 4a't1 }` ® TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions .:7-,' , L-.;:i . .-1) 1 I L-a,A , V, I v r •,. ,, •',r'
nSee note on back regarding River Basin rules I-
`. i;_. -'
a See additional notes/conditions on back
r ti..
• I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) k.
ff'
lir;.)%,i.rVV 1-�r , 1o,+
Agent or Applicant PRINT,ED_Name Permit Officer's PRINTED Name
r 1 '.r t
Signature**Please read compliance statement on back of permit**g- Signature ')
)'t'. . E,l k<, / '7 l i r,' i :is 1 - it: P- o r 2l 2,-
Application Fee(s) Check#/Money Order Issuing Date ' Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance.The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer-Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin.These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City,NC 28557 943 Washington Square Mall Washington,NC 27889
252-808-2808/1-888-4RCOAST Fax:252-247-3330 252-946-6481
(Serves:Carteret,Craven—south of the Neuse River,Onslow Fax:252-948-0478
Counties) (Serves:Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S.Griffin St.Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
ROY COOPER '.
i•;? Governor
MICHAEL iCHAE1 S. REGAN
W Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BLUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DOA)through a Memorandum of Understanding with the Division of Water Resources(DWR)has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization _
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer.Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized)flow of storm water runoff through the buffer.
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is
expected to be severe,the first ten (10)feet landward(unless specifically authorized otherwise by DCM)from the •
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation ata stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30)after corn letion of he bulkhead.
o
Pre-project site conditions: Le l...5 �4/A /)�rep a wn ,
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and anyassociated clearing,
grading,and construction
corridors.Thls drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting ail of the above listed conditions a verify that all .
information is co plete and accurate.
A Ap n Printed Name Pere➢la$Off ceps igraature
Zli
Agent or Applicant Signature issue Date
I ZD
CAMA GENERAL PERMIT#:
86635 S
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mail Washington.NC 27889I 252-946-6481
Wilmington Office 1127 Cardinal()rive Ext.Wiimington.NC 28405_38451 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808
N.C.DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
•
CERTIFIED MAIL•RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner: S`1.2 VE.Vt
Address of Property: i 23 ebver IfkC+''LS WdSr wL'tSk1NG Iv'-i !'JC- 2-7Els•J
Mailing Address of Owner. L2-3 12.Wwar )4C S (�KSf i J k r� Imo, a7 sfs�/
Owner's email: Owner's Phone#: �1
•
Agent's Name: 1 lOby l-k1-v1VICv Agent Phone#: O-€a- at 3- 4'3 5—
Agent's Email: bobby Q 6-ethilbleAr.wl .GOrr,
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
•
(Bottom portion to be completed by the Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me,as shown on the attached drawing,the development they are proposing.A
description or drawing,with dimensions,must be provided with this letter.
V I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed,you must notify the N.C.Division of Coastal
Management(DCM)in writing within 10 days of receipt of,this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington,NC 27889.DCM representatives can also be
contacted at(252)946-6481.No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier,dock,mooring pilings,boat ramp,breakwater,boathouse,lift,or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments).(If u wish to waive the setback,you must skin
the appropriate blank below.)
I DO wish to waive some/all of the 15'setback /�
Signa re fAdja nt Riparian Property Owner
-OR-
I do not wish to waive the 15'setback requirement(initial the blank)
Signature of Adjacent Riparian Property Owner:
Typed/Printed name of ARPO:
Mailing Address of ARPO:
ARPO's email: ARPO's Phone#:
Date: *waiver is valid for up to one year from ARPO's Signature`
Revised July 2021
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner: SITA/6 .+ L.. ��
Address of Property: 453. (516��„� i-M v 1at ro9 /.M L).xf / Z 7$s5
GC i ✓ L0 t j 4,i--s )$( 71 (I e Z• 9
Mailing Address of Owner: 1L 1ft� � /
Owner's email: S¢e-ue 44'ie-lie -Owner's Phone#: Q 4-2' 9 V---` SV9/$
Agent's Name: 13d::26 Agent Phone#: 2S 2
Agent's Email: 1!/0,6 .7 be5,45k '{rat •
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner) --
I hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit has described to me, as shown on the attached drawing, the development they are proposing. A
descripti• or drawing,with dimensions, must be provided with this letter.
I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
- contacted at(252) 946-6481. No response is considered the same as no objection if you have been
notified by Certified Mail.
WAIVER SECTION
I understand that any proposed pier,dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback,you must sign
the appropriate blank below.)
I DO wish to waive some/all of the 15'setba
Signature of Adjacent Ri' '"rope y Owner
-OR-
I do not wish to waive the 15'setback,requirement(initial the blank)
Signature of Adjacent Riparian Property Owner:
Typed/Printed name of ARPO:
Mailing Address of ARPO:
ARPO's email: ARPO's Phone#:
Date: *waiver is valid for up to one year from ARPO's Signature* "
Revised July 2021
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: 5+�d_. Lee
Mailing Address: - /'2 2 AJP/V �-oveJ
(mot , 4 ish-7A5, _ ) C ze7,77
• Phone Number: . ' 2,2 . �k.?- c'c ' 9'
Email Address: e /ee e✓Kv/ �—
I certify that I have authorized 'a��.? { OAL
Agent/Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: ►,t_l[✓.ec.i
at my property located at -1S3 d'a 4 tit( IVA514-ias 4.4 de., 27 24
in `A- r f- County.'
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
, on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
Signature
LL./—
Print or Type Name
•
Title ,
Date.
This certification is valid through / /
Grandy, Ashley
From: Spivey, Kelly
Sent: Tuesday, November 23, 2021 4:24 PM
To: Grandy,Ashley
Subject: FW: [External] Griffins Beach
Kelly Spivey
District Manager, Division of Coastal Management •
North Carolina Department of Environmental Quality
252 946-6481 office
252 948 3851 direct office
kelly.spivey@ncdenr.gov
943 Washington Square Mall
Washington, North Carolina 27889
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and maybe disclosed to third parties.
From: Pelletier,Josh R CIV USARMY CESAW(USA) [mailto:Josh.R.Pelletier@usace.army.mil]
Sent:Thursday, November 18,2021 9:01 AM
To:Spivey, Kelly<kelly.spivey@ncdenr.gov>
Cc: Bland, Raleigh W CIV USARMY CESAW(USA)<Raleigh.W.Bland@usace.army.mil>;Thompson, Emily B CIV USARMY
CESAW(USA)<Emily.B.Thompson@usace.army.mil>
Subject: [External] Griffins Beach
CAUTION External email:,Do"not click links,or open attachments unless you verify.Send allsuspicious email as'an attachment to
Report Spam.
Mr.Spivey,
The USACE conducted a site visit of the proposed bulkhead alignment at Griffins Beach, Beaufort County, NC on 18
November 2021. No jurisdictional 404 wetlands were observed within the proposed alignment. Should the alignment
or the proposal change, please let us know. Thank you.
Josh Pelletier
Project Manager
US Army Corps of Engineers
Washington Regulatory Field Office
2407 W.5th Street
Washington, North Carolina 27889
Phone: (910) 251-4605
Email: iosh.r.pelletier@usace.armv.mil
We would appreciate your feedback on how we are performing our duties.Our automated Customer Service Survey is
located at:
http://corpsmapu.usace.armv.mil/cm apex/f?p=136:4:0
1