Loading...
HomeMy WebLinkAbout85035_Steven L. Lee_20211216 sic°"'k%;®LAMA :.I (DREDGE & FILL �Kj Q N 85035 A C D dA- J. GENERAL PERMIT �D tot O O Previous permit �� Date previous permit.issued X‘i ii • `,l New : ❑'Modification ❑Complete Reissue ❑Partial Reissue As authorized byp the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC �-/ --i- 4 r t i OD _ _ ❑Rules attached. 0 General Permit Rules available at the following link:www.deq.nc.gov/CAMArules • 1 Applicant Name Te%..'.� kN L<r Z.€.'E:-.. Authorized Agent F>4bhy rigo re ti r/ /3. • si'..Acf r 74r Address 1 7 ✓ FR t oe.f A C'.( P S j,,. Project Location(County): RP f.t GS t City C MITI 1)R P4A1 I4 State K.1 C ZIP T( 9 Street Address/State Road/Lot#(s) Phone#(Z-51) ^- (/C 19i (.7 '5 Co,- q cze , Z.-k.) Email 4;'i4,'_j)ef 1 e6'.' r>r,-‘1„.�1 e`k,C.G0- Subdivision i i'4 ' City f/fJfa 4,1,r•ti e• ILO✓'t ZIP 7 7-55 gCt i Affected n CW ®EW n PTA ElES ElPTS' Adj.Wtr.Body P4!3'3'!'!e t i* g 1‘..1 a 4.- ,na man/unk) AEC(s): ❑OEA ❑JHA ❑UW ElSPIMA El PWS Closest Maj.Wtr.Body a/)1 O ( 6 l Lie,'" ORW:yes/a, PNA:yes/i t ,' t� } i Type of Project/Activity �-Y1 S+4 V\ 11` t''1ea ‘.,a b°-.,-\l � aN6nek C."7 ri " "C 0t5,- 6 O�i- AA ir)i- (0 L ' R J (Scale: ) Shoreline Length it- I?s'` II� ■� l Access Length �■ ■. MI.S' 31� ,r u% is i Pier(dock)length 41111 �� min oi ms Fixed Platform(s) f Will IMI t EMINOMMEMMIIM WOMME II INIMMEMMOMMEM mango Floating Platform(s) 1 1 iiiillialmak Finger pier(s) - t Total Platform area i ' Groin length/# P ' i� k 8..—d/Riprap'length 4I IC) fii ; �` f (' `Ah11111iLIF g Basin,channel � . Ilia II II ■ #' ■■ IIu, Cubic yards ' dill Boat ramp Boathouse/Boatlift k i i!!'JiiIiiiiiE!!!!!!Uiuu!II$I!a wawa' Other Ii I SAV observed: yes no ; +;"NH ;II I b Moratorium: n/a yes' no' ! ) r 'P i ''II III _III 1111111111. 111 f- Riparian Waiver Attached: t es no e 1 I A building permit/zoning permit may be required by: , 7e,)/ '/ V'T . q; h� Permit Conditions L-/) / .S f6 r t,i-c l h PU 14 14 di . No " 7'�"I l t-i'to,,,A TAR/PAM/NEUSE/BUFFER(circle one) � 19 or - Ejr e vff ennelt t,,y 4l5)-1( )fr'• .et (� O �}} �f,A���'//1 n See note on back regarding River Basin rules r -1 Ckfi77ir7)'i(Y C NI..Olt)1.. I r - ,See additional notes/conditions on back . ,..,r I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) . /'" Agent or Applicant PRINTED.Name Permi Officer's PRINTED Name Sig ature**Please read�comRliance statement on back of permit** Signature 0 U - Application Fee(s) Check#/Money Order Issuing Date • ' Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance.The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves:Carteret,Craven—south of the Neuse River,Onslow Fax:252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) ' http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 • ou'k'", CAMA ,0-DREDGE & FILL k�j 'N° 85035 A :8:. C D s GENERAL PERMIT J`v to v Previous permit 19 r Date previous permit issued P,'/A • ''' New n Modification I I Complete Reissue I 1 Partial Reissue . . • As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I 5A NCAC L' 1 iI ' I ( I ' Rules attached. I.y'I General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name �..,"M'.. )`' V^ L_, ,_r' Authorized Agent !Z•, L 7bV /1 '.P PI, ) et /`y 4 _ Address — - F '- r'N'.. �, i.r3 Project Location(County): 1"`-• t-'r.":(G-t CO r'}C . } r C4 City ''7J.i•=i l A G;` ;�l State '',..1L.. ZIP Street Address/State Road/Lot#(s) 4. Phone#(_) 1-1e/ f ei I `t 1 ,„ . +`..1. Email - 1,-,.., ' 1,,• ,-• '. `r,. 1 • ".. :}-. Subdivision ' • City J,c i,L" i ,•,,. -I- ,r} ZIP _.) 17 C 'SL:1 Affected CW piEW pi PTA ®ES • . PTS Adj.Wtr.Body / n.: /. .- :, 1 .? ,r ram- (nat/man/unk) AEC(s): n OEA n 1HA n UW n SPINA ❑PWS Closest Maj.Wtr.Body / "r,6'1,'I 1 . , . Jq t,. f ORW:yes/not PNA:yes/nod Type of Project/Activity -_ .1 l , -• •- i"t %t.., ,^ 1,.., i-`)4-• t;. - '• i> .. '''( `;ri, t a +.) (6•"+/ f ' ,,i ,. . • . f.,:':i 1 Nqr.,, `,.)E•.. (Scale: ) / ..l Shoreline Length = I '•) 2'-› jj,, H �� IIIEMIMIIIMIMBIIIMII Access Length Pier(dock)length / C� .■ aa ■............. Fixed Platforms) II E _L_ smil I Floating Platform(s) 1 11.1111 1 II Ell . Finger pier(s) �+ j _ _ ____�_ a �� inwn rim MUEMMIMMINIMUMMEIMEA , Total Platform area ) 1II 1 MI 11111111111111111111r...........................r.,..r....., i; .........r.......1,... Groin length/# !Bulkhead/Riprap length '' (`,+ 1.r r , III---;-- mai si Ian lwir Avg distance offshore -. ■ Breakwater/Sill ,, IIIIIMIIIMIIMIIMIIIMIIIIIIIIEIIIIIIIIIIIIMILMHIMIIMMI ", aa Max distance/length MIL l 111110111111 . Basin,channel k �WIw Cubic yards ) III P HT 1 NI Boat ramp i 1 IMI �� aaa Boathouse/Boatlift t 111111111111111111 , =--- ` ,_. 11111111111111111111111111111111111111 aa.a Beach Bulldozing t j '�-�_°' r'`'��--I M ', 1,y MIIIIII Other1t-- - - ail 1 INEMENONIIIIOMIIIIIIIIIIIIIIIKINIMMIENEWM11111111111, Will Ear '� aa ■ 11111111r, SAV observed: yes nog Sitperatorium:Photos: yn/a yyes nno L_ + ,,_ , 1 c.,iiiimista iIllIllI�� , Riparian Waiver Attached: lie?"-, no 11111,4 A building permit/zoning permit may be required by: '' .'i'' ` ..'1 i ,'• • r 4a't1 }` ® TAR/PAM/NEUSE/BUFFER(circle one) Permit Conditions .:7-,' , L-.;:i . .-1) 1 I L-a,A , V, I v r •,. ,, •',r' nSee note on back regarding River Basin rules I- `. i;_. -' a See additional notes/conditions on back r ti.. • I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) k. ff' lir;.)%,i.rVV 1-�r , 1o,+ Agent or Applicant PRINT,ED_Name Permit Officer's PRINTED Name r 1 '.r t Signature**Please read compliance statement on back of permit**g- Signature ') )'t'. . E,l k<, / '7 l i r,' i :is 1 - it: P- o r 2l 2,- Application Fee(s) Check#/Money Order Issuing Date ' Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance.The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer-Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin.These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City,NC 28557 943 Washington Square Mall Washington,NC 27889 252-808-2808/1-888-4RCOAST Fax:252-247-3330 252-946-6481 (Serves:Carteret,Craven—south of the Neuse River,Onslow Fax:252-948-0478 Counties) (Serves:Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ROY COOPER '. i•;? Governor MICHAEL iCHAE1 S. REGAN W Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BLUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal Management(DOA)through a Memorandum of Understanding with the Division of Water Resources(DWR)has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization _ provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to comply with this Buffer.Authorization may subject the property owner and the party(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes maintaining diffused (non-channelized)flow of storm water runoff through the buffer. 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is expected to be severe,the first ten (10)feet landward(unless specifically authorized otherwise by DCM)from the • structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation ata stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30)after corn letion of he bulkhead. o Pre-project site conditions: Le l...5 �4/A /)�rep a wn , 7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and anyassociated clearing, grading,and construction corridors.Thls drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting ail of the above listed conditions a verify that all . information is co plete and accurate. A Ap n Printed Name Pere➢la$Off ceps igraature Zli Agent or Applicant Signature issue Date I ZD CAMA GENERAL PERMIT#: 86635 S State of North Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington Square Mail Washington.NC 27889I 252-946-6481 Wilmington Office 1127 Cardinal()rive Ext.Wiimington.NC 28405_38451 910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808 N.C.DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM • CERTIFIED MAIL•RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: S`1.2 VE.Vt Address of Property: i 23 ebver IfkC+''LS WdSr wL'tSk1NG Iv'-i !'JC- 2-7Els•J Mailing Address of Owner. L2-3 12.Wwar )4C S (�KSf i J k r� Imo, a7 sfs�/ Owner's email: Owner's Phone#: �1 • Agent's Name: 1 lOby l-k1-v1VICv Agent Phone#: O-€a- at 3- 4'3 5— Agent's Email: bobby Q 6-ethilbleAr.wl .GOrr, ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION • (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me,as shown on the attached drawing,the development they are proposing.A description or drawing,with dimensions,must be provided with this letter. V I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed,you must notify the N.C.Division of Coastal Management(DCM)in writing within 10 days of receipt of,this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington,NC 27889.DCM representatives can also be contacted at(252)946-6481.No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier,dock,mooring pilings,boat ramp,breakwater,boathouse,lift,or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments).(If u wish to waive the setback,you must skin the appropriate blank below.) I DO wish to waive some/all of the 15'setback /� Signa re fAdja nt Riparian Property Owner -OR- I do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: Mailing Address of ARPO: ARPO's email: ARPO's Phone#: Date: *waiver is valid for up to one year from ARPO's Signature` Revised July 2021 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: SITA/6 .+ L.. �� Address of Property: 453. (516��„� i-M v 1at ro9 /.M L).xf / Z 7$s5 GC i ✓ L0 t j 4,i--s )$( 71 (I e Z• 9 Mailing Address of Owner: 1L 1ft� � / Owner's email: S¢e-ue 44'ie-lie -Owner's Phone#: Q 4-2' 9 V---` SV9/$ Agent's Name: 13d::26 Agent Phone#: 2S 2 Agent's Email: 1!/0,6 .7 be5,45k '{rat • ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) -- I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A descripti• or drawing,with dimensions, must be provided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be - contacted at(252) 946-6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier,dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback,you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setba Signature of Adjacent Ri' '"rope y Owner -OR- I do not wish to waive the 15'setback,requirement(initial the blank) Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: Mailing Address of ARPO: ARPO's email: ARPO's Phone#: Date: *waiver is valid for up to one year from ARPO's Signature* " Revised July 2021 AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: 5+�d_. Lee Mailing Address: - /'2 2 AJP/V �-oveJ (mot , 4 ish-7A5, _ ) C ze7,77 • Phone Number: . ' 2,2 . �k.?- c'c ' 9' Email Address: e /ee e✓Kv/ �— I certify that I have authorized 'a��.? { OAL Agent/Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: ►,t_l[✓.ec.i at my property located at -1S3 d'a 4 tit( IVA514-ias 4.4 de., 27 24 in `A- r f- County.' I furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter , on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signature LL./— Print or Type Name • Title , Date. This certification is valid through / / Grandy, Ashley From: Spivey, Kelly Sent: Tuesday, November 23, 2021 4:24 PM To: Grandy,Ashley Subject: FW: [External] Griffins Beach Kelly Spivey District Manager, Division of Coastal Management • North Carolina Department of Environmental Quality 252 946-6481 office 252 948 3851 direct office kelly.spivey@ncdenr.gov 943 Washington Square Mall Washington, North Carolina 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and maybe disclosed to third parties. From: Pelletier,Josh R CIV USARMY CESAW(USA) [mailto:Josh.R.Pelletier@usace.army.mil] Sent:Thursday, November 18,2021 9:01 AM To:Spivey, Kelly<kelly.spivey@ncdenr.gov> Cc: Bland, Raleigh W CIV USARMY CESAW(USA)<Raleigh.W.Bland@usace.army.mil>;Thompson, Emily B CIV USARMY CESAW(USA)<Emily.B.Thompson@usace.army.mil> Subject: [External] Griffins Beach CAUTION External email:,Do"not click links,or open attachments unless you verify.Send allsuspicious email as'an attachment to Report Spam. Mr.Spivey, The USACE conducted a site visit of the proposed bulkhead alignment at Griffins Beach, Beaufort County, NC on 18 November 2021. No jurisdictional 404 wetlands were observed within the proposed alignment. Should the alignment or the proposal change, please let us know. Thank you. Josh Pelletier Project Manager US Army Corps of Engineers Washington Regulatory Field Office 2407 W.5th Street Washington, North Carolina 27889 Phone: (910) 251-4605 Email: iosh.r.pelletier@usace.armv.mil We would appreciate your feedback on how we are performing our duties.Our automated Customer Service Survey is located at: http://corpsmapu.usace.armv.mil/cm apex/f?p=136:4:0 1