Loading...
HomeMy WebLinkAboutHendricks, Donald 84328C1* 1 LoAsr4t F-1 I CAMA F-1 DREDGE & FILL N(?84328 A B C D a Previous permit Date previous permit issued GENERAL PERMIT 1 D New, El Modification [] Complete Reissue F-1 Partial Reissue As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC F-] Rules attached. General Permit Rules available at the following link: www.deq.nc.goy/CAMAruIes Applicant Name Address City State -ZIP Phone # Email Authorized Agent Project Location (County): Street Address/State Road/Lot #(s) Subdivision City 71P Affected F-1 cW F1 EW El PTA F ES FIPTS Adj. Wtr. Body (nat/man/unk) AEC(s): F10EA ni HA D" W E] SPIMA F u PWS Closest Maj. Wtr. Body ORW: yes/no PINA: yes/00' Type of Project/ Activity Shoreline Length HIM Access Length Pier (dock) length . . Fixed Platform(s) ... .... .... Floating Platform(s) Finger pier(s) Total Platform area Groin length/# Bulkhead/ Riprap length Avg distance offshore Breakwater/Sill Max distance/ length Basin, channel Cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other SAV observed: yes no — — — — — — — — — — — — — Moratorium: n/a yes no Site Photos: yes no,/�---- Riparian Waiver Attached: yes, no A building permit/zoning permit may be required by: F] TAR/PAM/NEUSE/BUFFER (circle one) Permit Conditions See note on back regarding River Basin rules Rildd- F❑ See additional notes/conditions on back I AM AWARE OF STATUTES, CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's, PRINTED Name Signature "Please read compliance statement on back of permit" 7 Signature yf Application Fee(s) Check #/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: 1-1 Tar - Pamlico River Basin Buffer Rules 1-1 Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven — south of the Neuse River, Onslow Counties) Elizabeth City District 401 S. Griffin St. Ste. 300 Elizabeth City, NC 27909 252-264-3901 (Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Craven — north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover and Pender Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 �o1*°``°"Sr41 ❑ CAMA ❑ DREDGE & FILL N9 84328 A B C D y = GPrevious permit GENERAL PERMIT Date previous permit issued New. ❑ Modification ❑ Complete Reissue ❑ Partial Reissue As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC ❑ Rules attached. ❑ General Permit Rules available at the following link: www.deq.nc.gov/CAMArules Applicant Name _ Address City Phone # (_ ) Email Authorized Agent Project Location (County): State ZIP Street Address/State Road/Lot #(s) Subdivision City P Affected ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS Adj. Wtr. Body (nat/man/unk) AEC(s): ❑ OEA ❑ IHA ❑ UW ❑ SPIMA ❑ PWS Closest Maj. Wtr. Body ORW: yes/no PNA: yes/no Type of Project/ Activity Shoreline Length. Access Length Pier (dock) length Fixed Platform(s). Floating Platform(s) Finger pier(s) Total Platform area Groin length/# Bulkhead/ Riprap length Avg distance offshore Breakwater/Sill Max distance/ length Basin, channel Cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other SAV observed: yes no ' -77 — Moratorium: n/a yes no Site Photos: yes no.• - -- Riparian Waiver Attached: yes no A building permit/zoning permit may be required by: Permit Conditions (Scale: ❑ TAR/PAM/NEUSE/BUFFER (circle one) ❑ See note on back regarding River Basin rules ❑ See additional notes/conditions on back I AM AWARE OF STATUTES, CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature "Please read compliance statement on back of permit" Signatur �i1_5s Application Fee(s) Check #/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: 1-1 Tar - Pamlico River Basin Buffer Rules F-1 Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven — south of the Neuse River, Onslow Counties) Elizabeth City District 401 S. Griffin St. Ste. 300 Elizabeth City, NC 27909 252-264-3901 (Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Craven — north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover and Pender Counties) http://Portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 Styron, Heather M. From: David Braswell <Bdynamiceast@aol.com> Sent: Tuesday, October 26, 2021 6:30 PM To: Styron, Heather M. Subject: [External] Boat Lift Application - Hendricks Attachments: Waiver for Don Hendricks.pdf, arp danny.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailto:report. spamgnc.gov> heather, Here is the application for: Don Hendricks 114 Mary Lane Newport, NC 28570 requesting a boat lift install to his existing dock. Thanks, David Braswell Dynamic East Construction Sent from my Whone N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAIVER FORM CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: Address of Property: Mailing Address of Owner: Donald Hendricks 114 Mary Lane Newport, NC 28570 PO Box 5921 High Point, NC 27262 djhendricks67@gmail.com 336-880-7120 Owner's email: Owner's Phone#: Agent's Name: Agent's Email: Agent Phone#: ��wsr i rrrrrrirmrrrriniimn ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing with dimensions must be provided with this letter. t0' I DO NOT have objections to this proposal. I DO have objections to this proposal, if you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management (DCM) In writing within 10 days of receipt of this notice. Correspondence should be mailed to 400 Commerce Ave., Morehead City, NC 28557. DCM representatives can also be contacted at (252) 808-2808. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (if you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15' setbacks Signature 9f Adjacent Riparian Pro wner -OR- I'll" I do not wish to waive the 15' setback requirement (initial the blank) Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: Mailing Address of ARPO: a t-'•' I�j✓ c*^ `_'alp • �` (�-+''`�MU� f� ARPO's email: r', ARPO's Phone#: Date: C % 1 ' 2- i `wain r is valid for up to one year from ARPO's Signature' Revised July 2021 LAL TIPS FOR ADJACENT RIPARIAN OWNER NOTIFICATION & WAIVER FORMS CAMA Regulations require notice of proposed development to the Adjacent Riparian Property Owners (15A NCAC 7J.0204(b)(5)). Proof of actual notice (a sign -off by the owner on this form) or certified mail return receipts (showing delivery of notice) are needed. The purpose of this notice is to make adjacent riparian property owners aware of the proposed development so that they have an opportunity to provide comments (or potentially object to) the proposed development, and to give DCM an opportunity to consider these comments/objections before a permit decision is made. "Permission" of adiacent praRed owners ig not necessaril}Lrequired for DCM to issue a permit; however, permission must be obtained for certain types of proposed developments if they fall within a 15' setback area along the riparian access area of the adjacent property, as determined solely by DCM. It is in the applicant's best interest to provide comprehensive and accurate notice so that any concerns or objections can be resolved early in the permit review process. In addition, if the adjacent riparian property owner appeals the permit decision, insufficient notice could be a basis for granting such an appeal. Who is an Adjacent Riparian Property Owner? What is Adjacent? (Mote, DCM reads this broad) to ensure comment oUotentially impacted neighbors) • A property that shares a boundary line with the site of proposed development; AND • A property that fronts a natural or manmade waterbody that is connected to coastal waters and can support some form of navigation, even a kayak or canoe, including a common canal system or a manmade basin. • Easement holders? Yes, if the easement could be impacted by the proposed development. • Streets/Roads? Only if the streettroad could be impacted by the proposed development, This might include street -ends which might be used for parking and beach access. • Holders of recognized submerged lands claims/shellfish franchises. What is Riparian? Do the boundaries of the adjacent property legally intersect with the water at mean high tide? If there is a question about whether an adjacent property is considered "riparian," please reach out to DCM Staff - especially on the oceanfront beach where there may be undeveloped parcels on the beach or in the water. Who/What is a Property Owner? For private individuals (or families), send notice to the address listed on the tax card. If the property is owned by an Inc. or LLC, please send notice to the person listed as the registered agent on the NC Secretary of State's Corporations Look Up site: http�.f/wv v Sq� jnr.ctavl rr Mind � l�_c?rt?. For Condominiums or neighborhoods with an owners' association (HOA/POA), send notice to the association (which is usually a corporation, for which you send notice to its registered agent). What is Notice, and how do I ensure it is received? • You can meet with your adjacent property owner, provide a description or drawing of the proposed development, and ask them to sign this form and return it to DCM; OR • You can hand -deliver this form and a description or drawing, and ask your neighbor to return it to DCM (consider providing them with a stamped envelope); OR • You can mail this form by USPS Certified Mail, return receipt requested (the Green Card). If you choose this option, you must provide either the signed & returned green card OR track the certified mail package number on USPS.GOV's online tracking system, and provide the tracking print-out as proof of delivery to DCM If you have any questions about this process, please reach out to DCM Staff and DCM Legal Counsel and we will work to answer your questions. Revised July 2021 �� J N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONtWAIVER FORM CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: Address of Property: Donald Hendricks 114 Mary Lane Newport, NC 28570 Mailing Address of Owner: PO Box 5921 High Point, NC 27262 Owner's email: djhendricks67@gmail.com Owner's Phone#: Agent's Name: Agent's Email 336-880-7120 Agent Phone#: ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing, with dimensions must be provided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. if you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 400 Commerce Ave., Morehead City, NC 28557. DCM representatives can also be contacted at (252) 808-2808. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (if you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15' setback Signature of Ad' cent Riparian Property Owner -OR- I do not wish to waive the 15' setback requirement (initial the blank) Signature of Adjacent Riparian Property Owner: - Typed/Printed name of ARPO: ;yi 'Filu6' t W_, 1-. c ti..��,,w LT)t'Att t `tn+)`.�` Mailing Address of ARPO: ���:� 11 F�- 4 1�3 � ttt 51 ARPO's email: i �it)� Y (0)CtVI-kA(; Y)t ARPO's Phone#: 0110 V �. Date:?2A *waiver is valid for up to one year from ARPO's Signature* Revised July 2021 4 tl RIP 1 T�111j--. '�AAI A I rig 4A i r �nggi it: y',T1 to+} f y- �f 1J., r�.?4 .t�';� IT 'r 14.�s r t� r �r .. �I ' tk 7 •-'_, �7 � ti L � +r m> - y �1 ����Y f + 1 6. ��i W S�� ��'� ,yl ... /.r� � tiSi 51k .,,.•t T{j -Nn i � A F - " T 4�-"�R r ir" KITt t 1 W S � t •yW � J� s F ov���>� � � _� � �_ t :g���, :rn �{ '� � 9k � - �'--�'s'�71�a� - �-F "at.. K��� WfJ i�� 11 � �,d�t�L } � •� 1 gyp' .f' a = , zl t• 4 N11f I r. r� F u 1: - •'.l�+ ,.�arte .R w. i