Loading...
HomeMy WebLinkAbout84950_Ed Croom_20210928 #F''N. rD D 7zj 79 N9 84950 A rs3 C D IGENERAL I—ICAMA DREDGE FILL t ryC j ,/ v� Previous permit .�/(4 ,✓ PERMIT • 3 Date preouspermitfissued: .r.'r:'/ nlew n Modification n Complete Reissue n Partial Reissue As authorized by the State of North Carolina;Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I 5A NCAC " (7))/1+e' //°° n Rules attached. n<G ne eras Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Nana-1 1:-,J c:•> '1//'/r r (1,2.-,, ,✓, Authorized Agent , 1/7 r u+/' .. G' /d. _- Address ...." 7 ( L f�.+,- Zil. Project Location(County): 1 r,,,,,.r "i.+.. / State i ZIP -�'" '. . /..2 Street Address/StateeRoad,Lot#(s) .r', A a-- •,r.., A-S" L-4-„, r^t' r Phone#(` /q).. 1. - 7/4 I Ernail l% ekC.r-OUers (`)4-,•,,,;t. r,,n Subdivision City f ice^ =` ZIP :.� ' 1 Affected n CW n.EW n A "ES FTS Adj.Wtr.Body r�'-r'r r r .`.: r -(n Oman/unk) AEC(s): n OEA n IHA n UW n SPIMA El PWS Closest Maj.Wtr.Body / M✓<'- ORW:yes*) PNA:yes nor Type of Project/Activity ...1j. 4,-, r, 7 y�/ / r, , -c- w e/axe-..,,..i r•J 7" ",. r ; ci dnu,/I r�, ._ .t 1 , J `, (Scale: ,1'' 0,) 7 Shoreline Length (3 ' I Access Length MIIIIMIII ■�I�a 1111 Pier(dock)length x �� �IIIII��� Fixed Platform(s) — INNIMPAIN inemARII MIIIIKM1111 MI II Floating Platform(s) — ' : arAnemmumimmemmommisa 11111111011111111111111111MIIIMMIIIIIIIIIIIIIIIIIIIIIIIIIIM101111111111111111111111 Finger pier(s) _10111111=111.1 II IMIIMI Total Platform area - Groin length/# a Bulkhead/prap length 9.t.)` IMMEMEINUIMMIIIMMEMIEMMEN -P Avg distance offshore J t Breakwater/Sill ■ �■ Max distance/length - f. I G1 1 1 101.11 II a Basin,channel �` zr r'Cr e. - Cubic yardsffEr ._ _ Elhih,...4411ill � Ia t 'w, Boat ramp ,—9 �.ulwri ..�s �"� mi 3 ' •Boathouse/Boatlift . =--=-- 1 ■�� Beach Bulldozing ..- ; < w�f ;� c .o-c x_ Other ,4 C.‹..-e.,,t� MIME* ! — ! SAV observed: yes no ■ Moratorium: n/a yes, , nog, Site Photos: ye /no Riparian Waiver Attached: yes ( = II II II `A building permit/zoning permit may required by: / t P,c,, s'"f-,-/ (7_.,r' r,�--'---^,, Permit Conditions ( 'er. t)%;/ J/G),0 2`J�?/PAM NEUSE/BUFFER(circle one) S ote on back regarding River Basin rules ElSee additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name ''' �,, Signature**Please read compliance statement on back of permit** ,. Signature 11 /-4(7/7e2 Application Fee(s) • Check#/Money Order Issuing Date'' ' Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance.The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax:252-247-3330 252-946-6481 (Serves:Carteret,Craven—south of the Neuse River,Onslow Fax:252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden,Chowan,Currituck,Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 _, "IN cfl' AMA rDREDGE & FILL ��5' C?�;?VN9 84950 ,. ALB' C D i 3 GENERAL PERMIT DatePrevioreus vousltermiti sued P P ' 0 New [Modification [Complete Reissue I I Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I 5A NCAC ' • r I " ``'-' [Rules attached. ['General Permit Rules available at the following link:www.deq.nc.gov/CAMArules , , Applicant Name - ' Authorized Agent i , / o t Address . . - Project Location(County): ' CityState - ( / ZIP • - Street Address/State I oad/Lot#(s) - - r j i Phone#(`_) 'i, Email - / - Subdivision City / ZIP - Affected [cw [EW [PTA I I ES [PTS Adj.Wtr.Body � (nat/man/unk) AEC(s): [OEA [IHA ri UW [SPIMA [PWS Closest Maj.Wtr.Body - ORW:yes/no PNA:yes/no , Type of Project/Activity . . / , / (Scale: jJ r'" Shoreline Length .F•i.' Access Length U, 1' 1 111111111111111111 1111111�11111111111111111111111111111111011111,11111111011111 Pier(dock)length "`Y- 1111111111111111111111111111111111111111111imu ■U 11 Fixed Platforms) ����. 11� ::::: orm1 .1 l rs) { Total Platform area ------ t. Groin length/# Bulkhead/Riprap length - ill 1111111111M-11 Avg distance offshore I , - Breakwater/Sill -- Max distance/length Basin,channel - . Cubic yards •--•-— Boat ramp -_ Boathouse/Boatlift - - i I Beach Bulldozing '. _ pai. Other '-- ' SAV observed: yes (no -' IIIIIIIIIIIII NMI IIIMIIIIIIIIIIIIIIIIIIIMIHIIIMMNIIUIIIIIINIII MIMI Moratorium: n/a yes , no 1 . ■■ ; ■ ■�■ 11111.1111111111111 ■ u■ Site Photos: yes no 1 - Riparian Waiver Attached: yes no I i 1 3 1 I 1 A building permit/zoning permit may be required by: _ • Permit Conditions [;TAR/PAM/NEUSE/BUFFER(circle one) t ri,see note on back regarding River Basin rules nSee additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) - - _ .c . / , , , Agent or Applicaant PRINTED Name Permit Officer's PRINTED Name , Signature**Please read compliance statement on back of permit** Signature r ti t ti Application Fee(s) Check#/Money Order, Issuing Date' ' Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions.Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance.The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin.These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax:252-247-3330 252-946-6481 (Serves:Carteret,Craven—south of the Neuse River,Onslow Fax:252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste.300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City,NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie,Camden,Chowan,Currituck, Dare,Gates,Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ROY COOPER r - • Governor MICHAEL S. REGAN - - w Secretary • Coastal Management BRAXTON DAVIS t� ENVIRONMENTAL QUALITY Director• SUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Meuse and Tar-Pamlico River basins per Division of Water Resources(DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR)has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned • regulations. I . Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. i. impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either. normal water line(NWL) or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. • 2. Clearing&Grading:Clearing and grading of Zone 2(begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwas.h is expected to be severe,the first ten (10)feet landward(unless specifically authorized otherwise by DCM)from the • structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. - This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 siems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. a Pre-project site conditions: G 4e✓Yt 7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting ail of the above listed conditions and verify that all information is complete and accurate. Eve>w Agent or Applicant Printed Name I ermit fficer's Signatur Agent or Applicant Signature issue Date CAMA GENERAL PERMIT#: O T 7 B State of North Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington Square Mall Washington.NC 278891252-946-6481 Wiiminaton Office 1127 Cardinal Drive Ext.Wilmington.NC 23405-3845 19i0-796-7215 • Morehead City Office 1400 Commerce Avenue Morehead'City.NC 28557 1 252 808 2808 • 9/24/21,2:37 PM Yahoo Mail-No Subject (No Subject) From: Mitch Harris(mitch.harrisjr@gmail.com) To: jerolselby@yahoo.com Date: Thursday, September 23, 2021,04:23 PM EDT o Whom It may Concern: We, Mitch and Thersa Harris at 790 Southwinds Lane Bath, NC 27808, have no concerns with any repairs, additions and/or maintenance to the bulkhead at 782 Southwinds Lane Bath NC 27808 for Mr. Ed Croom. If you have any questions please contact me at 252 944 6092. Thank you. Mitch Harris, Jr- Safety/Risk Manager City of Washington 102 East 2nd Street Washington, N.C. 27889 252-944-6092 mharris@washingtonnc gov • 1/1 9/24/21,2:38 PM Yahoo Mail-Bulkhead&Rip Rap Bulkhead & Rip Rap From: FRANK D MC DERMOTT(frank_mc_dermott@sbcglobal.net) To: jerolselby@yahoo.com Date: Thursday, September 23,2021,08:28 AM EDT You have our permission to repair the bulk head and rip rap on the property next door. Frank& Darlene McDermott 774 Southwinds Lane Bath Sent from my iPhone • 1/1 9/24/21,2:38 PM Yahoo Mail-cama permission cama permission From: Phyllis Croom (edcroom@gmail.com) To: jerolselby@yahoo.com Date: Wednesday, September 22, 2021,09:08 AM EDT To Whom It May Concern, I, Herman Edward Croom, owner of 782 Southwinds Lane, Bath NC, do hereby grant Jerol Selby permission to act and sign on my behalf any document required by CAMA in order to place rock along the bulkhead at the above property in Beaufort County, NC. Ed Croom 919-291-8969 1/1