HomeMy WebLinkAbout79885_Eddie Thornton_20210819 '?K___5
ripINICAMA/"gDREDGE & FILL 113 6 N9 79885 A a) C D
GENERAL PERMIT �L34 Previous permit# MJ
-%$New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued 7J/ 4
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I5A NCAC C) 14/. /18t .
Rules attached.
Applicant Name Et)
)
E ThOryi+oy _ Project Location: County 8Aar i.ort
Address LiyO (ar.y 'R d Street Address/State Road/Lot#(s)
City/tot)IQrf nl1 lkZ State MC- ZIP AS590 LIS SiciG(z�1 r Larl€e
Phone# (25Z) 327-- I3511,,. E-Mail • Subdivision
Authorized Agent 4— lAi i a'r1--t do.11— City C h OLui I y ZIP 24$l*I-
Affected ❑Cw E EW PTA XS IKPTS Phone# ( ) 2,2-7--/35 ' River Basin VIA /('4'Yi
❑OEA ❑HHF ❑IH ❑UBA ❑N/A a unkn)
AEC(s): Adj.Wtr. Body B/1'14rc - 0Yl'4-pE 141-- (nat , /
❑ PWS: r�
ORW: yes /� PNA yes /V� Closest Maj.Wtr. Body Pala�/c® FIVE r
Type of Project/Activity f,44/[ /g' ® A2w '•r/k li ,fla�Zt»rL/1'J� b-t- 2
1o4 GJQ) D 7 -61I54'101/ bcr/k/yei dl {1: (Scale: /11— (.Ni )
Pier(dock)length
I ' I I
Fixed Platform(s) �^ I
I
Floating Platform(s) l I ; \
Finger pier(s) j I ;
Groin length I- M ` - _ --I l N1- ! i
TiT1C,�`�j I
number — i--..- ----I 1 - - -_
Riprap length -r-CjG i - - - - - -1---- -
-
id
avg distance offshore Z/ —n I ;1 ri I I
max distance offshore Z� • i
Basin,channel
I I
I � ,
I
i
cubic yards ----I — I 1 p _��, (
• r �, I
Boat rampI 1 I
i I I I � 4-1 � a
Boathouse/Boatlift i I 10-!-1, ieP !.
Beach Bulldozing 1 __ __ - .. -IF��
I1
Other F 1
w4 I { v�`"` I
( i I
i 1,,hii_{-/ / W 1•- n---_____--
i /
Shoreline Length O�' - - - , � ; „ i I n!
SAV: not sure yes ( !L - _—i I PIL 1�
i V _ IF Q O
Moratorium: n/a yes 1 I I T 1— —_�i- I - I
Photos: yes 1 — —. • h �(_`�_ ' ___�- _ _ ___- I _Ir i
no
Waiver Attached: yes no • I •I I I
A building permit may be required by: te,,,,.4yf Co . Ig See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) �}-
Notes/special Conditions �/ 1$ L ) -, ,,Cj) ^2' )O(A 11 (�1 . a 406.p a'c(-fyn` ,#'
1'lA�&rrii )0 be. - t ) l6 H ad1,k ?e'v+I f 4-R / 15, a, "l(
►1 C1,1- 4,diD, oc Z?D 1 - efr l ki en %cw ut7 Alca bakhahl ii ts# irtl
'eXcet'r) DV,' w /veil
Agent or Appli,:t Prin d Name 2ffiPrinteNarne
Signature Please read compliance statement on back of permit** Signature
Chk ?i JINDD.= I� ,M- q - ZOU - /9- 7)ec — ac
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action;and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project: -
tgj Tar-Pamlico River Basin Buffer Rules Other:
n Neuse River Basin Buffer Rules -
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 - Fax: 252-948-0.478
(Serves:Carteret,Craven,Onslow- (Serves:Beaufort,Bertie,Hertford,Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties) -
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-390I Fax: 910-395-3964
Fax: 252-264-3723 (Serves:Brunswick,New Hanover, •
_
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
• Dare,Gates,.Pasquotank and Perquimans • and Pender Counties) _
Counties) -
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
ROY COOPER
a Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATiON
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
z. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized)flow of storm water runoff through the buffer.
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash:For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is
expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhea . n
O Pre-project site conditions: /h/' I S l��)I- 1�r� lawti (,4 'f C cV
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and anyassociated clearing, grading,
and cons ruction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be.held responsible for meeting all of the abo liste onditions d erify at all
info - ':tin is c9Aplete and,accurate.
Agent 1Api. ,can, Prin ed Name err;,it Offi er's Si °tuts
r /� �Z./
Agen or Applica ignature ssue:rtf to
CAMA GENERAL PERMIT#:
sc 3 l
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 278891 252-946-6481
Wilmington Office 1 127 C'artiinai Drive Fvt,Wilmington.NC 28405-3645 9l0-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City•NC 28557 1252-808-2808
•
• To Whom it Concerns;
I give Bob-Carlyle and A Wall.Construction.My full permission to act on
my behalf in acquiring and executing the Permit for a new Bulkhead,
Pier, and Boathouse at 48 Blackbird Lane in Chocowinity, NC.
Thank you;
•
Eddie:Thornton
•
4
u;r�mz1 <o^oneaq- 'Yahoo Meo
Pier, Bulkhead Boathouse
From: pamsnith
To: ebhornton@suddeninkoet
Date Monday,August 16,DD1' O6:ZTPM EDT
Hi Eddie,
You have our approval ho build your Pier, Bulkhead&Boathouse.
I f you need anything further please let uoknow.
Pamela ASmith
08 Blackbird Lane
Ch000winity, NC27817
Sent from Yahoo Mail onAndroid
_
'
Grandy, Ashley
From: William Doar.<billdoarl @yahoo.com>
Sent: Thursday,August 12,2021 12:42 PM
To: Grandy,Ashley
Subject: Re: [External] Re:Thornton project change
CAUTION:External email.Do not click links or open attachments unless,you verify:Send all suspicious email as an attachment to
Report Spam.
I have no objections to the bulkhead replacement project.
William R Doar Jr
30 Blackbird Lane,Chocowinity
252-721- 1026
On Thursday, August 12, 2021.,.12:15:20 PM EDT, Grandy, Ashley<ashley.grandy@ncdenr.gov>wrote:
Mr Doar,
I received your message and thank you. The 15' setback is only in reference to the docking facilities not the
placement of a bulkhead. I just want to be sure you have no objections to the bulkhead replacement
project. Your 15'will be observed in any building of structures (i.e. platforms/boathouse) in the water as
referenced in the current active permit Mr. Thornton has. If you don't mind please reply that you have no
objections to the bulkhead replacement project and include your contact information under your name. This
will be very helpful for our records.
Thanks
Ashley Grandy
Field Representative, Division of Coastal Management
North Carolina DepartmentOf Environmental Quality
252 946-6481 office
252 948 3854 direct office
ashley.grandyCa.ncdenr.gov
1
9
943 Washington Square Mall
Washington, North Carolina 27889
%Nothing Compares_.`
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: William Doar[mailto:billdoarl@yahoo.com]
Sent: Thursday, August 12, 2021 12:06 PM
To: Grandy, Ashley <ashley.grandy@ncdenr.gov>
Subject: [External] Re: Thornton project change
CAUTION:External,email. Do not click links or open attachments unless you,verify. Send all suspicious email as an
attachment to Report Spam.
Thank you for this notification.I have no objection,as long as the 15'setback is observed.
Bill Doar
William R Doar Jr
On Thursday, August 12, 2021, 09:49:25 AM EDT, Grandy, Ashley<ashley.grandyC ncdenr.gov>wrote:
Mr. Doar,
I spoke with Mr. Bob Carlyle and he mentioned you would be sending me the adjacent property notification for
Mr. Eddie Thornton's change of project. This project will now include a bulkhead replacement and a 8'x20'
platform. You can reach me at the number below if you have any questions/concerns.
2
- I
Thank you,
Ashley Grandy
Field Representative, Division of Coastal Management
North Carolina Department of Environmental Quality
252 946-6481 office
252 948 3854 direct office
ashley.grandyna.ncdenr.gov
943 Washington Square Mall
Washington, North Carolina 27889
t• Nothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
•
From: William Doar[mailto:billdoarl( vahoo.com]
Sent: Monday, July 26, 2021 3:30 PM
To: Grandy, Ashley <ashley:grandy@ncdenr.gov>
Subject [External] Re: removal of objections
CAUTION: External email. Do not click links or open attachments unless you verify. Send,all suspicious email as an
attachment to Report Spam. - ' • , • •
3
,
Originally my objection to Eddie Thornton building a boathouse on property adjacent to mine must have been a mistake.I have no
objection to him building a boathouse.I do want the 15 foot setback from the property line to be observed.
William Richardson Doar Jr
30 Blackbird Lane
Chocowinity,NC
252-721-1026
On Monday, July 26, 2021, 11:07:59 AM EDT, Grandy, Ashley<ashley.grandyna,ncdenr.gov>wrote:
Ashley Grandy
Field Representative,.Division of Coastal Management
North Carolina Department of Environmental Quality
252 946-6481 office
252 948 3854 direct office
ashley.grandy@ncdenr.gov
943 Washington Square Mall
Washington, North Carolina 27889
N� /Nothing Compares.
Email correspondence to and from this address is subject to the
4