HomeMy WebLinkAbout79858_Frank Doka_20210727 41.
0,,,.,'' = . ,0 1 ,. 1 1 Z i i 1 '.'.1., , ,1 i 'f '1 Tr.1 '.44 0 4 • 14-' .. g ''' ,"---/ 1.. ,,-- •z . ;P ;. i :.V 1 2 .
ig
';;;;;:.. ...1,,-; ; 1,‘"t lg., . ;-I t 1" . ); qii; ; i 1 la 1r'; ;r I it i 1 4 1.! .-Tri, 1 11 °..i- ''''- r 1 1, i 1; ,,...t\. if •-=a t
, ,,-: .:•:*:„, -4-• r, t ._ ,,.., , , . !.,--- -- • - .s•-t .1. ,- '. , .'.4:....,--.--.0-.i .1 1.....- • . .i--, A.-- -
r � ¢ ` t 1, ; __. 1 0ni, • • 1' —"
t T'y f• , a 3 �fa)
't ��-,�,�.z="r�ti. _�-- :iIT
�S 1� f}y�;1 � n +yam-�'w v /V�.
vz
it• { . ! �. , ,ram,.:. ;. ' f � i . fY z •
7`i i r -' .o ..3
is
F. g , 6 i • ' , . ma` , , j ('"ir V
-.4
-.--.• '• . r-r .;-- -,:.'-4,1-7----4' .1- :- . --, '',-..- --:--1--- , --- -''-: 1 v---4i 11-',. t . .
• r
ROY COOPER
Governor
•
MICHAEL S. REGAN
. Secretary
•
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director.
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
•
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 &.0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received BufferAuthorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75.and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
' materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
a. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
a Pre-project site conditions: 1' i,L A.21/1 - .ee._ 5j
By your signature below you agree to be held responsible for meeting all of the conditions listed abov and verify
tha .a.Jl information provided is complete and accurate. •
or Applica. rinted Name Permit Officer' Signature
Agent or Applicant Signature Is e Date
CAMA GENERAL PERMIT#: '7 13 s8
State of North Carof:na ' Environmental Quality Coastal Management
Washington Office.943 Washington Square Mall Washington.NC 27 889 t 252-94o-o-1.81
Wilmington Office 127 Cardinal Drive Ext.Wilmington,NC 28405-3815: 410-796-7215
Morehead City Office 400 Commerce Avenue Morehead City.NC 23557 252-808-2808
OF ' AMA/ ❑DREDGE & FILL 79858N9 A C D
GENERAL PERMIT Previouspermit# %Ji1
)C ew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued al--
As auth rized by the State of North Carolina,Department of Environmental Quality 1 n
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC -MI' 4a.0 0 •
,q�" ules attached.
Applicant Name r dr NG- 11 IIc� Project Location: County -Few.
Address Red J \4t___("--5 'Pp)Yv-i' Stre t Address/State Road/Lot#(s) /4 /City Cin ,` Statek- ZIP2F5-7/ / ''"" 5 6-L,-1-- Cr:/
Phone# E-hair ka. . mot` Subdivision 1;J5& C-ire¢_Iv
Authorized Agent iGSt19 City )('i ZIP Z SjhJ
Affected ❑CW KEW gPTA ❑ES ❑PTS Phone# (.-- ----)f River Basin_Aky�,L�j-Q_
❑OEA ❑HHF ❑IH ❑UBA ❑N/A
AEC(s): Adj.Wtr. Body e- -C.-44-- na man /unkn)
❑ PWS:
ORW: yes (eo PNA yes / no
Closest Maj.Wtr. Body N 6--e- kV'A,"
Type
co2 Project/Activity !/C' (�G o -__s 7� i.is -(' 5X /3 /I r) e—
39 x 30 'Rene /C2' Pak Y,s i C4- / CI \ 1 (o 1000 psi-It'a (Scale: /;4 30 )
Pier(dock)length 1.) i f`
Fixed Platform(s) � _�i�-- ( ■ I i , -■ IMI l�Ivy
Floating Platform(s? .■ i ■ 1- L ;_ ; 1_ ! -__-
3 # 1 _Finger pier(s) � -�---�---- -- �� -------=--.._.!._._ -Li- -'�"J`'-f( - 'I(�l� �--- � -i-E'�►'►'iDV�.04-�
Groin length
number _!.._._.l_--III - ----I . i -- -......__..-�._-_ - 1iH
Bulkhead/Riprap length -- ■■ = ' • f -I [--; - ENE
!
avg distance offshore _ f ; j i - E-
p
max distance offshore a : *-i 6 i 1 I 1_ !; ! I I !
1 I - -- 1- �� rd !a
Basin,channel 11111115/a !--. I - !z imional
_ I _
cubic yards ■��-■ • Il_t i - r- - • �` all '' I
Boat ramp -.� ..� - . ! ! •
I
Boathou "-•Boatlift /. LL /3 -'._. %' 1 I ..__., _ i"1(.k,. .. - �� L II
cki 7-e)\-/-73:--A*--}:: .
•
1
• •
. _
Beach Bulldozing - � _L_-- -�•-- -r__ ___- 1 •-_- •:-- ( I i :— ; i
Other �NMI , _..,,opPII � ./ I 11 ; 1 1
1 �•� rutrk. i +1 ! _ 11 ,I I
Shoreline Length ' 0 f�-1 P I 4 • 1 I ' i�Ui
• , 1NMotoium: -
n/a Yes o I � i � V : I ! ! ` � --�-- ,
Photos: yes -.—•. I - ! ; _ - ! �
t •Y
Waiver Attached: yes -" no 1 I I I I ----.__ 1-__;.__ ' - ! ( I I 111. I !
A building permit may be required by: ' "^•(1 Gel CD i . Idl See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) ( ��
Notes/Special Conditions 7 p6.4//11�-„.-, area 7� a-7- (/8b d �
q.77a
We- Vito e[e Z e, ` ru•• e-d (2 i00.-4- 1.143 w•• •,l 1 o•s..i. j
. -
Agent or Applicant Printed Name Pe • 1 is Pr' ed :m
-
Signature * Please read compliance statement on back of permit* gn re
re
...7 re,/ _ efki i 2 ;2624
Application Fee(s) Check# /'
Is SIP, ate ( Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions.-Any
violation of these terms may subject the permittee to a fine or criminal or civil action;and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s). -
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
n Tar-Pamlico River Basin Buffer Rules Other:
n Neuse River Basin Buffer Rules •
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division,of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(910-796-7215)for more information on howto comply with these buffer rules.
•
Division of Coastal Management Offices
Morehead City Headquarters Washington District -
400 Commerce Ave 943 Washington Squire Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves:Beaufort,Bertie,Hertford,Hyde,
- North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties) __ -- _—
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves:Brunswick,New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates,Pasquotank and Perquimans and Pender Counties)
Counties)
•
http://portal.ncdenr.org/web/cm/dcm-home --
Revised 7/06/17
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that 1 own property adjacent to Fri VI Do Va•- 's .
, w } Mlle of Property Owner)
property located at 110 l ro_pc 1 T I(( e yell to ,
(Address,Lot,Block,Boat!,etc.)
on r vYp ���G+L , in AftADA / Ta Pi4 Uio. Ca. . , N.C.
(Waterbody) (City/Town andlor County).
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
1 have objections to this proposal.
- - - -DESCRIPTION AND/ORDRAWING-OFPROPOSED-DEVELOPMENT - -
tiOM • � ��, -. ��. ;� ��.-ram�- V � -�-- ��.�-.x.�W
ilat
• V-) ' eon y PrcPev'+y
Jc -s1c---- .
�e •
D& oPrôçcv4y
—DC Nc-er Ase OYC ek54 i
5
h
Thr�� yo1,. Proecsecl .P L �C-tnSo , -
0-- Pr J _k .
�.rlt�.:KR 514vi r .. , .
- ... - ---Jc#Ski I.tt+
WAIVER SECTION- COJThe w et t Proev
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be setback-a minimum distance of 15'from my area of riparian access Unless waived by
me. (If you wish to-waive the setback,you must initial the appropriate blank below.)
- - - - I do-wish to waive the 15'setback requirement. - -__ _ _
9A-Pc/ ,I do not wish to waive the 15'setback req.i men
(Property Owner Information) (Adja ii . . ;o
A
Signature "flu/ c / ' e l/ -
Print or TName Print or T Na ��
WD 7ea'u rt. I ►^
Mailing Address Mailiy A dress efjoio.ti
, „ r fr ,/�/
Uat�i ,/ W c� d
City/State/Zip CCIY(o /- p .2 7�.® 55d /eo
g doll
Telephone Number/email address Telep ne plumber/emar7 address •
Date Date*
'-'"AO -2/
(Revised Aug.2014)
•
!-ti;'l.ft.i�s41S f Q:t ii�t F*,ST._(., \!N'•?It.: r 1 ' .:;t tp:..x��,•'1 4 +:• l,cl:? Jt X') v
C.c.f:.ifr?rsZ;;y 'it.}
V+gt,ie+-].i q-.k;.if>.aLu
•
•
of�ix�Sx.'wPj:'ri.�.7 x��•r 4> It�.'6Ya+t.��,,� 4
•
�i 3-,tiZ is zZ'Sr`.'}• t()As_LSS. 6�}}Y`x,li s'}3.Sis F+ <Vn..`x.+s.rrg
&�`,-:S.Xh•.v U...�`k
e.�Y,:..a,.�..nv.w•s..>.....w.wn.-...a.�+.m.:a::.w.my e....+n�... ...xssa,.M,. .Y....,.a...,,n•wmcu...,..,.....z..,wa..-...nx.> �.:.r•�.:�,+..,_;.+.<o-..-,.�....-�_._,-+..x«,..,.n..ax9•.a+•fnv+xsa•»s+-..sra.,
J14:;16; �v �;S«�rirk Pgiv,.
•
•
1,alE , ' c,,3 9r e'fy 1: 'Aar Rs{tts' 1.1• #EEi p • i}{•a
' = ='• z- E$ ; "ft,�'L.'-in J E''i : Y O, �p 3a. + . w ,;a €7 3 is F t `w�' t(1sr4�•;s
!:�e'ar � � � JJ 4 6.E `y c.i:i.ti'�: c v ,��' a..0 FS, p .�, i t.+ t`.::�$ E xs ;.�. �,A.s" s ;"J.
'oJcI>puq is's r C7 C r i} i r?4'jt ;titi # } b!!!u•Z `'` �{�rt±' {, 11.}i..�' si Y.,�.iex ' �`a+7 ' ' rr 'cr
� � } � i,, r, �. ••"te.F;,� ttr:.j, £ ;JL" r1C(i• { - }t7,(' 1}. CAL{.:•.d
•
•
.Ft1...
�gr; :.Sy°:�; - ..^t'_`'Y`� t'"3 �� •� <.r^r•r � •'i: :S.:Y.xb<^'�e-t•,u `<�r�: .... .rrty�eE �; .�,-�_�p r.E:'.•:sue(<.
.> '"'s, -.;i..::`ezf sr: ,0y`•'t'•. 5�,. ;{t:8t<'� ,fir: t}.ii i.b• ,, - � ?"S,t :`�.: .p
,X..:E»:T ;iY k_'»�P11. tii a7yg.,y3 VINO A",.fi ti". ^'7F `.?''1..%.ti.%- rs ;.•f 1"tT����Sm'—"•vl{°"'?k2'�,�.»�F7d:.._,._...� _
..,..<...,..,.,,.....,.....,..t..•,.�.�z.....}a,.....T.,tx.w,....:_>...�.........x..,..,..�.,,.,,e,1..-,.a..,,,>.,�...,,..•, ., ,w..�..,.«...,x�....,.,,..,w.m..+,.w".w,....r,.a..,.,.,.....a,.-<..>.n.<,:r....,..r,+ .du.f..m.......,.
PY.t2P2 'a5
.............W,..,....,_. I �i.?:`i. -d�.?4:`.I ii._.t[.XS..i E.S ,�3 n•'i i ::8„3r 1"
.Y,3-i }7?'.t, %: i:.s. i3 vi; (,r Ut.” •i1' *`i c: s na •• a rr -tc,g0 ' S t fr 'Si ,"r,)b'wf,1:,t„q bLii` S ar,-44.
�., }�> 7aa,, TA) E,�+,n.' ✓.,.`- .aW SKr• •fl !•� �% 1;+t', l.�:'• �..+
4Ffs'ri. ,3r".'"+�'-1 '4gr''4.:S..': �,.$ =s2.�1�1tP '�:,°r:,iPrS•€...r°.{,i�
�_. YP;7St;<.. t•e.` ref-' 4 r{1i cro•. ,.;: 1 -
, v!'7.J, •ri a'�rF+ rw ..! _ .,..,...-...«..._.........« ..- ».,.-�•.,..e...._..�..,. •
i + .. --;•_ • '- • - W, Syr :
!IG-LeP 2i Ce1.:111% 0j1:11.4 biatLe. l Sii'.11S•Ci3. i..1; 7, ..``�77 ,',A'.,« 4_.T,,At -_.... -......,.................,......r<..............- ro
f,, •
• �'+.,���-G.ii o:�"`:�7g"3x�e;: E.�e � ," #%w.
ADJACENT RIPARIAN PROPERTY OWNER iDoVaSTATEMENT
I hereby certify that I own.property adjacent to -Fro V tU-, qf
property located at I LO 1 - apt✓' a*eir,(Q(Name ntProperty Owner)
(Address,Lot Block,Road;e
on VtwJO CTCCi, ,in AIciop tuv j 4 ►A ko. Cd- , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
IocaL_tior�
I have no objection to this proposal.
I have objections to this proposal.
- - ——� DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
i fi i " w 1 `f .:( e i`t)ti s v.� t =it z aiir►ing
6eccg y Propev+y
e� ��Q Prcpcx$y
•
•
Vv-tvha e °Arc ek(s i
S
WSJ r, d ,. 'roecsect Peck- E)c-fnSP3in
WAIVER SECTION Ca,._rnp v/ett r roe
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15'from my area of riparian access unless waived by
me. (If you wish to waive the setback,you must initial the appropriate blank below.)
- - - I do-wish°to waive the 15'settlitck requirement.
I do not wish to waive the 15'setback requirement.
(Property Owner Information) (Adjacent P Owner Information)
-41111
Agill\Awlealtk
Signature Signature*411111" f
Print or Type Name - or Type Nam_e
Mailing Address Mailing A less
City/State/Bp City/State/Zip
Telephone Number/email address Te hone Nu /email adabe*
Date e*
_ (Revised Aug 2014)
9 r't ;_••.4•••=, = ;,::)
• --..,
i"; cur i.(r— • • 4
. •
• • • • nr%
•
e:Yf' Tzk, 11
rsoJo
"Io
• • :•
„_ •
. .
.•
• •
• •
•••!, V"i • .
•
4
. . _
; .
. . .
. • - _
. .
-r kf!t
I , (.1r:
ney:f;i
if,•,dgI )i
•
„.•
**•`-:;Ciq.,7
s`•
.......... _ . _ . . •- . _
•
DOVa- ?rojec_t{--
LoIaalai _... =
Ropoolb
7
_ p 1,
SIN on(3er
Swinger NEE
5'x l3' b<-1ehs•Tbn
From: Frank Doka frankdoka2@gmail.com
Subject: Re:Cape Hatteras Pt. Project
Date: July 15, 2021 at 12:15 PM
To: Brandi Robertson brandiprobertson@gmail.com
Hi Brandi, yes you are authorized
Sent from my iPhone
On Jul 15, 2021, at 11:58 AM, Brandi Robertson<brandiprobertson@gmail.com>wrote:
Dear Mr. Doka,
I have received all of the necessary paperwork back from your neighbors and am ready to proceed with
appointment with the CAMA Field Rep tomorrow and I hope to get the permit for your project then.
Please respond to this email confirming that I have permission to act as your Authorized Agent. This wil
permit on your behalf and you will not need to be present at the site visit.
Your boat lift and jet ski lifts have been ordered from Tide Tamer.
Please let me know if you have any questions.
Sincerely,
Brandi Prescott Robertson
B Prescott Marine Construction, LLC
252.249.0149
brandiprobertson@gmail.com