Loading...
HomeMy WebLinkAboutDavenport CERTIFICATION OF EXEMPTION • FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. Applicant Name 4G c-t card ve Da , poCT Phone Numb ►b Lig/ i 1 �--V Address p �o X 1% 0 S City S.R tvA r- r i`' State Zip `7 Project Location(County, State Road, Water Body, etc.) S 30 0 • b o Type and Dimensions of Project Ljjj( ' 1 t ' r The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiration, quirement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be necessary CAMA permit requirements does not alleviate the necessity of to continue this certification. your obtaining any other State, Federal, or Local authorization. SKETCH (SCALE: • - 41 p ) iVtS Cr • h pk2 x t b r Laa# e-2 t_o r • o.�x 4 Etc TS P rl u -'- 1n -k-„x1srt3 Dock. �60 X 4• Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the Applicant nature development is exempted,will be in violation of the CAMA if there is a subsequent determination that a permit was required for the 0-19- development. CAMA Official's signal re The applicant certifies by signing this exemption that (1)the ap- I S Issuing date plicant has read and will abide by the conditions of this exemp- tion,and(2)a written statement has been obtained from adjacent I 0 — IS l r vz , 7V.- --/- / tee 16,( "i S. \.) Iii/ lel) �,;it-.>-- a K2o 44 V-„ 1 f Por-X- 2 L 5/ 3 / : (60 P ,Dos el) D cx /qdd 4(v/3 4' f.�s w�/�� �Z is�, / p. ,6 ! S �Z)/L /���/ // / J ec 5 �,e z, 3 D (� �l n c� �A cue n)�O 1 o,,cs sc-4cr c.o..e, • • Coleman Dockworks Inc. P.O. Box 222 Long Beach, N.C. 28465 Rodney Nantzd,�, 1 402 West 34th St. .S Lumberton, N.C. 28358 Re: Dock addition and floating dock movement for Richard Davenport owner of Lt.15 & pt. of 14 Blk. 117 Sec. 4 Long Beach, N.C. Dear Sir: To satisfy N.C. General Statute requirements for CAMA Permits adjoining property owners must be notified of proposed waterfront construction and give written certification of such notification. I would like to inform you of the proposed Dock addition and floating dock movement for the above referred lot . If you have no objection to this project please indicate by signing the space provided below. If you have any questions please call my office. phone: 910-457-1724 If you have any objections please send them to the following address : DEHNR 127 Cardinal Dr. Wilmington, N.C. 28405-3845 If you have no objections please sign this form and return it in the self addressed stamped envelope provided within ten day. I do wish to waive the 15 ft. setback requirement. I do not wish to waive the 15 ft. setback requirement. Sincerely, Cheryll G. Coleman ignature f n Coleman Dockworks Inc. P.O. Box 222 Long Beach, N.C. 28465 Town of Long Beach Long Beach, N.C. 28465 Re: Dock addition and floating dock movement for Richard Davenport owner of Lt.15 & pt. of 14 Blk. 117 Sec. 4 Long Beach, N.C. Dear Sir: To satisfy N.C. General Statute requirements for CAMA Permits adjoining property owners must be notified of proposed waterfront construction and give written certification of such notification. I would like to inform you of the proposed Dock addition and floating dock movement for the above referred lot . If you have no objection to this project please indicate by signing the space provided below. If you have any questions please call my office. phone: 910-457-1724 If you have any objections please send them to the following address : DEHNR 127 Cardinal Dr. Wilmington, N.C. 28405-3845 If you have no objections please sign this form and return it in the self addressed stamped envelope provided within ten day. I do wish to waive the 15 ft. setback requirement. I do not wish to waive the 15 ft. setback requirement. Si rely, ery G. Coleman DA,„� ( 4 6 -) i e