HomeMy WebLinkAbout79717_Stuart Peoples_20210628 05
0 r CAMA/ il DREDGE & FILL �`� .}.�- QQ� NO '7971'7 A (BD C D
GENERAL PERMIT v 1T W Previous permit#
w ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued /VA-
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 7,i /Z Oi--). .
j' f?�J Rules attached.
Applicant Name J � /e Project Location: County�,1' / (-.,c,
Address 06 �— Street Address State Road Lot# s /, CJ y
Cv�'� l � / l l ( ) Q
City 46 4-°'`•-- / State iUe--ZIP 2-8-ss7 /41.. e--: ;cs-, L l-i ire), /2o,
Phone# 'Y 1 J c Subdivision
( `�- E-Mail �"/-
.� _
f�'�/7 - C'otiti-
-
Authorized Agent L�', �'�c City A r o 1'^1.- ZIP Z S-5/0
❑CW lit EW IyPTA ❑ES ❑PTS Phone# ( '-' 7--- River Basin /vk _
Affected ❑OEA ❑HHF ❑IH ❑UBA ❑N/A v A t- $ /I V
AEC(s): Adj.Wtr. Body / at /' an /unkn)
❑ PWS:
ORW: yes / no PNA yes no f)
Closest Maj.Wtr. Body Ale-4-- ( T✓�
Type of Project/Activity
L -;w / .. (Scale: /'3C.) )
Pier(dock)length /G C
Fixed Platform(s) /3X ?0/rx'67 I 'tC"1 yU<2.t, . ✓G'
/ i
Floating Platform(s)
I I I
Finger pier(s)
Groin length i
number —_.__�. _ ....., ,.. a_' ' — —
Bulkhead/Riprap length _ __ r ..._... T
QY (!
avg distance offshore T ,�� -, V
max distance offshore i '
It fa
Basin,channel t I
1
cubic yards /
Boat ramp i } �(a e D c / . , C 1
Boathouse/Boatlift 7�k/ —.. p,! �/ —..._.. —...� 75,1.7;
_......_. _.
---ter -._t_-} l - _
Beach Bulldozing I I
Other /-. �� ,21
Shoreline Length ��O 4/ I C:,. D % (� r �,� CI t I' YZC D e� B�{/.
SAV: not sure yes no — --- -- 1 Moratorium: n/a yes ._...� I I 'O..._.. - ''P fi
Photos: yes _..._. ._
I
i i
Waiver Attached: yes no . . f o i 1
A building permit may be required by:Tern.r It.Jo CO , . KSee note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) n
Notes/Special Conditions -Pro(-Pro( ( .)4-14 1 61/'faf ii''',('.71? (/
,c'i 7 m ,1- rt' (7//ft-`''',-.
:„§
, ropy], • 11 019(,/ tici _ „ii / 1,,,,4:2- -"----
Agent&Applicant Printed Name Permit Offic is Pri
Signature **Please read compliance statement on back of permit" ' __.----S`—n re
C /1./ �= gg/ , _ /-, e 2g, 2-6 /- Oci. 23 , Z.0'z1
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
OF❑CAMA / ❑DREDGE & FILL �� 09 b No 79717 A B C D
r-. P".'..0111•EM
GENERAL PERMIT lU Previous permit#
>Z ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC .
❑Rules attached.
Applicant Name Project Location: County
Address �% -C /`)„ f, Street Address/State Road/Lot#(s) I'c _;
City /t, ''� , f State ' ZIP !, `:, f< e/'
J
Phone# ( ) E-Mail Subdivision
//''/) .
Authorized Agent I. . /,: , - .- .=�' City '"{— ZIP '--' .>
❑CW %t]EW MPTA ❑ES ❑PTS Phone# ( ) i River Basin •1/.'"-I''`. ._
Affected
AEC(s): EloEA IAHHF ❑IH ❑UBA ❑N/A Adj.Wtr. Body `' r' (nat /man /unkn)
❑ PWS:
Closest Maj.Wtr. Body .1.-''' ""-- '
ORW: yes / no PNA yes / no
Type of Project/Activity
/
(Scale: )
Pier(dock)length
Fixed Platform(s) ' --r-.� Ca_ter; J� . ._ '� I
Floating Platform(s)
Finger pier(s) + 1.
Groin length I T....
number L.. /11 % -.
Bulkhead/Riprap length —� Imo- —I 1 —•-e— ..._ � - —
t
II 1
avg distance offshore ' 1� '" ' _. ` ��
I './ 1 14 '
max distance offshore
Basin,channel I ' 1 6
I
cubic yards
l -�a " %, a / I . tBoat ramp ( 1
4
Boathouse/Boatlift tl -rt /._ r.Q` .,I r _✓._ _
17:Hr:' 1.- , _ '
Beach Bulldozing —__ �
Other 1...
! ,�'" `O.."
y
1 { � ; j .
1111 11 i QI�L✓
Shoreline Length r !. 1 ;tf'
/
--
SAV: not sure yes no i.. I ' _ �
1
Moratorium: n/a yes no I %
7,1.„ 'ir?-C-1-'.' '
Photos: yes no ... r`sa'.' t t L.. '/ .....-.—. —. 4..... 1 I.
Waiver Attached: yes no P 1 a - ,
A building permit may be required by: ' . ' See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions
Agent or Applicant Printed Name / Permit Officer's Printed Name
/I` v di :/ / `'G f 2-' - tom/
Signature **Please read compliance statement on back of permit** Signature .
r1
„2C�0 C---:-C---:---~ - ' ,. r 7 ; , i 6 L I— (-+r/. 2. ) 7t%2/
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
From: Stuart Peoples stuart_peoples@msn.com
Subject: Re:Dock Project
Date: June 22,2021 at 9:39 AM
To: Brandi Robertson brandiprobertson@gmail.com
Yes, I approve.
From: Brandi Robertson <brandiprobertson@gmail.com>
Sent: Monday, June 21 , 2021 4:00 PM
To: Stuart Peoples <stuart_peoples@msn.com>
Subject: Dock Project
Dear Mr. Peoples,
I have received all the necessary paperwork from your neighbors to obtain the permit for your dock. I have an appointment with the
CAMA Rep.,Mr.Vaughan tomorrow.
Please respond to this email granting me permission to act as your Authorized Agent. This designation allows me to obtain the permit
on your behalf and you will not need to be present a the site visit.
Please feel free to contact me if you have any questions.
Thank you,
Brandi Prescott Robertson
B Prescott Marine Construction, LLC
252.249.0149
brandiprobertson@gmail.com
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to T UAA ft RC) )( S 's
//��
(Name of Prr party Owner)
property located at 1 Noel �a y4.icon Lee, 1(N'►
� I (Address, Lot, Block, Road, etc.)
l
on y0. e_ FNek( , in Aii.,p4 h1e.e) yakt k(to Co. , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
KoP n
Pao (rS wc�lkw� -S
Prv�( pta�� r"- 13k20 L�
5%eteAuA;r1 - 5)cl U
`6.� oar-((� �
+- EU S
At*1� nn
U�Q�- L1`
Po w
PGVer4-ki
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information) (Adjacent Property Owner Information)
Signature Signature*
Print or Type Name Print or Type Name
Mailing Address Mailing Address
City/State/Zip City/State/Zip
Telephone Number/email address Telephone Number/email address
Date Date*
(Revised Aug. 2014)
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to tAA ffi ()cool-es 's
h (Name of Property Owner)
property located at Vt el Havi icon Lee- Fcmvi vs4 +
(Address, Lot, Block, Road, etc.)
on Hettge_ I�e1r , in nwv7 �'14 , -v t((C Cc . , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
to ation.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
Pictavi
Prr po
17tUeeYfiNalkwau.k - SX loo
�/ ptc�t �arrh- 13kzo `�..
S{eAcu:�� - 5ct p '' `` L
Poc� �a- T IU L(Z
PtOQe .
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information) (Adjacent Property Owner Information)
15g.Yir 1/C/,
Signature Si/ ani% KG
Print or Type Name Print or T Name G// _
l� � Q!d /Sdf\ -ge 1-a-rif)
Mailing Address Ma ling Addre
City/State/Zip aterhp�S ? n f- eA,i , a`/
711
Telephone Number/email address Telephone Number/email address/ ��dt"ei / e�
Dale o� ?11 f
(Revised Aug. 2014)
1 .- 1 t� • 1 b 2 ,y,j _
•
. . 6f` ` 'F f .j„�.. .�, _r'k.aw..:�.tx•`' e .-.* r"' .{ <'3fX * ''f °' '� _ • �d� c °4 -
n s -
F. ,*y'# _,�' •'�,9 Y ' ., 'n7't r5'5v ;... .:,.,:;.....:.:,,A. r - "a'' t:+ 'ham F _��• • i $k !v° -
F .d'.r � `-x-,�, .F , 4,; sY 7`". ,}
' 2 ,_ � - "".- + ,'�Y��"/-,.�[• �y¢��'] � a� -,r ,,x,e•�+r" � p_�� r---5►• �"f &
°' u: ." t ..; 4 , T F,...S ak `tA x :� _. { Ig.
_ ( *'!'! - �� .� �' Q+ £ � � 1, :spy' - _.'teif`
.r t "�, - �. a --•# r-- j,,„ ,'# .- h f
a { '� MY t(5` "'.�li tr '� r ?,' 7uEc u K �r L,' - • .rti - $ S .,t
. F a • x�"Z } N J "y � . ,�''V' F ;_.,.,��i w'�� F _*J'a '�+! ; iE i'^.
+ A - ..7 ad t v`�;. .:4 '• . t4.4 , "� icy 2 w r '�n :' •,�,qz
-gip y --' E''.� ,
. . ° s.y f F,j v �yz • ), o f eL' $ .. d -y''+ � e _'a^t c ,. � 4% � ''♦
- ?"+Ftil'ts`.1 ;4' i,.v ci41 .,! 't .rr- n„ '�.`k`: .' • �'A
9CC� •
_-.. t.. ram :
L.
� •
• yl Yi . - .� -4 r *r4 k t� to`Y . '
•
•
t i • x:-. ' • } A� f
,;..5t r • .f $ . y i
•
e i b
•
-
., kEl i xa :! f* xU a }•# aj has ° .f '. 4 f�,:"
r: - r b
r - • t I41'11T T'F TCA' {y1 - f,YC •TT 'iL '' -.. ..
/4
pp �s� L fie:;. ( ;
M c i- " "f : "vxpe t" r r ;'`f 1 �'_.#'".r ` ,Jr,' 1��`'7rerY• �:r ^. �N-- • -
$�}Y 1,° t -.._ 4 ,fi r v a..'- q.,• ,+. • - 1. y.
•
i ;k�i(°t 3 �._ � ewriks�1 } t •
,.d..''x :►s, ys k ,--.!1' 1^ l:.4p'n-, .,..,,,'�•_w.t..+ w* •w'4 + v w ' ar r A
� � i- ( ( - � x+ w � l. s' e ��.'�N J DTI � ,`Y.t a •k' �k � , ." +{'.�
t• h 7e
• '- + - r` `. ,. � .' { ▪ tf7. ems'.° }" n ' �k `:
- • r f` ....... p't"+.▪..---r7 sw -+' ;lei s*►',.nrw a - - «.-w,ri:.: •' ..i§ iW •r'2 '. - ,-'-- -
•
- - , >,zt-+; iy T't' v t- - •
.y a" e ate ' h .• q.1 ;
.- , .4-;I:.-1,- -• .-'`'''' .,.,':-', ,.--tii;:-; ,, ,:-,.,„.:--..,.,..--.,„....:,,,,,:,.,._. ,kf,;•-•;4441i,,,t,,'' •;:r•-•!'",--.*"•••4•••• . %,,7:.-..;•,•-2.'•'-',:',='-'kl•'! "...,'=1-••;14-::•-r''''•Cr-•..i
•
v^. • • - 7. t x. ; k
4e..e.1 rh'y" s9�Ve ^'•'y}},y�,, > r._ t;77, ''', 9t }
'G� & � ' v - 'Y , •a A- 1 fiQ'i'i▪ 4V ',riySz'. • kt" ,t� �� rfi ° .e
w{—� 5' - k .'47, Lf t•4"_ a. -,, A 1-„a i
• qy �y �`
th ' ut�,;c S° ._'_ }.. „`4i1. '; �,�$ i39 y.('*4 , �`` , �' -' "� 4 e'C�,` " - F4 �� ;t zi.
C'
▪ r. ..- faV -T •a� 13' k,r., a 4 ,.I- '' �' ♦ fi 4 Pv` a4
Vaughan, Kent D
From: Brandi Robertson <brandiprobertson@gmail.com>
Sent: Thursday,June 24, 2021 2:56 PM
To: Vaughan, Kent D
Subject: [External] Fwd: Dock Project
CAUTION:External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Kent,
Here is the Notification for the Project on Hardison Lee Farm Rd for Peoples.
Please let me know if you need any other information.
Sent from my iPhone
Begin forwarded message:
From: Brandi Robertson<brandiprobertson@gmail.com>
Date: June 24, 2021 at 2:54:33 PM EDT
To: Macy Wood <macyawood@gmail.com>
Subject: Re: Dock Project
Thank you!
Sent from my iPhone
On Jun 24, 2021, at 2:21 PM, Macy Wood <macyawood@gmail.com> wrote:
Very nice! Received.
Macy Poole, BSW
On Jun 24, 2021, at 1:57 PM, Brandi Robertson
<brandiprobertson@gmail.com> wrote:
Dear Ms. Poole,
We have been contracted by Stuart Peoples to install a dock and
boatlift at his property at 1069 Hardison Lee Farm Rd,
Arapahoe,NC.
i
As part of the permitting process with the Department of
Environmental Quality we are required to notify adjacent property
owners of any proposed projects. Please accept this message as
that notification.
Attached is a rough drawing of the proposed project. Please
respond to this email confirming that you have been notified so
that we may move forward with the permitting process.
<image0 jpeg>
If you have any questions please do not hesitate to contact me at
252-249-0149.
Sent from my iPhone
2
R.OY COOPER
^a. Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
•
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3 Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
a. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
s Pre-project site conditions: li-U /5f Ala �
By your signature below you agree to be held responsible for meeting all of the conditions listed ab e and verify
tha_L,a.Jl information provided is complete and accurate.
17 i'Q
t or Applica Tinted Name P it Officer's Signature
Agent or Applicant Signature I ue Date
CAMA GENERAL PERMIT t: 79 / /7 tt
State of North Carolina Environmental Quality'Coastal Management
Washington Office!943 Washington Square Mall Washington,NC 27889,252-946-6481
Wilmington Office 127 Cardinal Drive Ext.Wilmington,NC 28405-3845 010-796-77_15
Morehead City Office 400 Commerce;venue Morehead City.NC 28557 252-808-2808
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
z Pre-project site conditions: r S
By your signature below you agree to be held responsible for meeting all of the conditions listed above an " erify
than a l information provided is complete and accurate.
�' r C1 i-e CX rc-c.rAgt7 E�c
t or Appllica. _ rinted Name Per Office S' nature
r,r.L9�� � W-2- /a
Agent or Applicant Signature Issue Date
CAMA GENERAL PERMIT#:
79-7/
State of North Carolina Environmental Quality'Coastal Management
Washington Office 443 Washington Square Mail Washington.NC 2783Q!252-Q46-0481
Wilmington Office 127 Cardinal Drive Ext.Wilmington,NC 28405-3845 a10-796-�215
Morehead City Office 400 Commerce\venue Morehead City.NC 28557 252-808-2308