HomeMy WebLinkAbout79814_Chris Barrett_20210623 ,-g.5
0❑CAMA / ❑DREDGE & FILL ZD 4(Qb "" No 79814 A 0 C D
GENERAL PERMIT Previous permit# •
>Z IIiNew —Modification Li Complete Reissue ❑Partial Reissue Date previous permit issued /Vf-J
As authorized by the State of North Carolina, Department of Environmental Quality 2
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC
7)/_ [� (Rules attached.
Applicant Name C r) r ' -> -/--/-T' Project Location: County -),. 1 _,•L_
Address I ,(-- C- X / `44 ) Street Address/State Road/Lot#(s) `- 'S 7,iC//
City Te w' State N/A- ZIP 2I 67 S
Phone# j" % //y,,, , ',/4;' ` Subdivision
( ) E-Mail /=ca
Authorized Agent I._ , t ^4- City ZIP 7)/
CD
Affected ❑CW 1IEW 1 r
PTA ❑ES ❑PTS Phone# ( ) River Basin A le-CA
❑OEA ❑HHF ❑IH ❑UBA ❑N/A i c,c I':v' -- fiatm/ an /unkn)
AEC(s): Adj.Wtr. Body J
❑ PWS: II rr
Closest Maj.Wtr. Body v '-' �E'
ORW: yes / no PNA yes / no
Type of Project/Activity I ' 0', - i I,.
(Scale: / ' sa )
Pier(dock)length
Fixed Platform(s) Ni.JAS.� //b t`
i I
K
Floating Platform(s) ( � I
i
: :
Finger pier(s) i 1
-
Groin length I t'"i QSCr' }
7
number _ .t... ..........1....._....._.._.._...._._.
Bulkhead/Riprap length y — ---- —__. _.____ —---.........._. l
avg distance offshore I t 4 � �
max distance offshore ' I j i � � � '
Basin,channel j i �`/' '��
8 : ic41 ilf,(//
cubic yards /
i
Boat ramp i IL
,
Boathouse/Boatlift / -- _-- _.— — _.._ --
I ; I
Beach Bulldozing - --4--k 4 + I t
Other I
I f , --1
Shoreline Length I �
1 't 4 1 U 1
SAV: not sure yes no I
�_.
f IMoratorium: n/a yes nooT ir /te I +
Photos: yes `6)_ s iWaiver Attached: yes no 1 ! I
— .
—
A building permit may be required by: /6-2-""'// %..O C . ®See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions //i "l-,4 .1 =/ , -4, e.cJev'- /$2� X,„eic/-j`il �:„ ''// "
i /'
A it\r t:i .ijtt' o \fm ..// i ,--,.,, e.,f-
n rApplicant Printed N e Permit Officer's.Prinjed N
Signature **Please read compliance statement on back of permit" Signature
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(9 I 0-796-72 1 5)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick,New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
4111❑CAMA/ ❑DREDGE & FILL "S.D.4�b No 79814 A B ) C D
GENERAL PERMIT Previous permit#
�� ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
❑Rules attached.
Applicant Name Project Location: County
Address Street Address/State Road/Lot#(s)
City State ZIP
Phone# ( ) E-Mail Subdivision
Authorized Agent City ZIP
Affected ❑CW ❑EW ❑PTA ❑ES ElPTS Phone# ( ) River Basin
AEC(s): ❑OEA ❑HHF ❑IH ❑UBA ❑N/A Adj.Wtr. Body (nat /man /unkn)
❑ PWS:
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body
Type of Project/Activity
(Scale: ),
Pier(dock)length
1 •I
Fixed Platform(s)
Floating Platform(s) :: : i I Ill I •! _ __
Finger pier(s) all plullii t.III
Groin length
number 1. Q i ...... - _�_._
Bulkhead/Riprap length ■■ I }
f
avg distance offshore IMIENIMMIlli MIME C-MIMI 111151111 __ 1I jinimmui
max distance offshore HIHI__ 1111111 HHIIIiiI
1 1 I. a IN 1 1 f i 1UN
J i / / i ,I
, ism
cubic yards f , ' '
Boat ramp
i 1 I •s
i
Boathouse/Boatlift
....... .__ ... __.- {. .�...... ......f__t-
1-1 III
Beach
Other Bulldozing I I II ! liii I
I11I1UU
a' I
„ , , , I
Shoreline Length
all t ?,
I : _ ;
SAV: not sure yes no r i = _1
Moratorium: n/a yes no - i f
Photos: yes not tI r t_. l }
Waiver Attached: yes no ' I I
A building permit may be required by: . "I See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions
1(Ii V.. ,I \' r s(*Nr‘ 7 I/
Agent rr4Applicant Printed Name Permit Officer's Printed Name
Signature **Please read compliance statement on back of permit** Signature
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648I) or the
Wilmington Regional Office(9 I 0-796-72 1 5)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
A ROY COOPER
^a. Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259.The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources(DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
• Pre-project site conditions: Z.,101 j 5 42,-U--- `4- . j
By your signature below you agree to be held responsible for meeting all of the conditions listed abov- :nd verify
tha I information provided is complete and accurate.
V 0 1,-e , r P,C,�2 - + w
t or Applilica. inted Name Pe .O ignature
r.��L/�'1 (O/2._'3/L-/
Agent or Applicant Signature Issu4 Date
CAMAGENERAL PERMIT#: � 9/ 4/
State of North Carolina i Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 27889 1252-946-6481
Wilmington Office i 127 Cardinal Drive Ext.Wilmington,NC 28405-3845 I 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808
Gent ? O?c / f O+�ra t(
From: Vic Edwards vlc®vicedwardscpa.com 6'
Sublact: RE:Barrett Project
pay: May 26,2021 at 2:46 PM
To: Brandi Robertson bcandiprobertsonagmail.00m
Hi Brandi,
It was great getting to talk with you today. I still can't believe your daughter is already 16.
This e-mail is to confirm the receipt of the proposed project and I have no issues with it.
Take care,
Vic
D.Victor Edwards,CPA PLLC
3948 Browning Place,Suite 110
Raleigh,NC 27609
vic_vicedwardsc
tel 919.782.9000
fax 919.789.3077
From: Brandi Robertson [mailto:brandiprobertson@gmail.com]
Sent: Wednesday, May 26, 2021 12:49 PM
To: Vic Edwards<vic@vicedwardscpa.com>
Subject: Barrett Project
Dear Mr.Edwards,
We have been contracted by Mr.Chris Barrett to install a piling alongside his existing dock
and boat lift on his property located on Hardison Lee Farm Rd.. As part of the permitting
process set by the Dept.of Environmental Quality we must NOTIFY ADJACENT
PROPERTY OWNERS of the proposed project. Please accept this email as that notification
and respond confirming receipt of message.
If you have any questions please do not hesitate to contact me at 252-249-0149. If you
have any objections please contact Mr.Kent Vaughan,the CAMA Field Rep.at 252-948-
3853.
I have included a rough sketch of the proposed project.
,.n
c
Sincerely,
Brandi Prescott Robertson
B Prescott Marine Construction,LLC
252.249.0149
brandiorobertson@ gmail.corn
From: Chris Barrett cbarrett@alleghanystone.com
Subject: Re:Indian Trail Project
Date: June 1,2021 at 3:33 PM
To: Brandi Robertson brandiprobertson@gmail.com
Brandi,
Please act as my authorized agent.
thanks,Chris
From: Brandi Robertson
Sent: Tuesday, June 1, 2021 3:07 PM
To: Chris Barrett
Subject: Indian Trail Project
Dear Mr.Barrett,
I have gathered the necessary paperwork from your adjacent property owners to move forward with the permit for the Pole near your existing boat
lift. I should be able to complete the site visit with Mr.Vaughan,the CAMA Field Rep.,this week. Please respond to this email confirming that I
have permission to act as your Authorized Agent. This classification will allow me to obtain the permit on your behalf and you will not need to be
present at the site visit.
Please feel free to contact me if you have any questions.
Sincerely,
Brandi Prescott Robertson
B Prescott Marine Construction, LLC
252.249.0149
brandiprobertson@gmail.com
From: Jeff Tryon tryon.jeff@gmail.com
Subject: Re:Barrett Project
Date: June 1,2021 at 1:29 PM
To: Brandi Robertson brandiprobertson@gmail.com
I have received the notification
Thanks,
Jeff Tryon
Sent from my iPhone
On Jun 1,2021,at 12:07 PM,Brandi Robertson<brandiprobertson@gmail.com>wrote:
Please respond to this email confirming that you have been notified about the proposed project so that we may move forward with
the permitting process. Please feel free to contact me if you have any questions.
Dear Mr.Tryon
We have been contracted by Mr.Chris Barrett to install a piling alongside his existing dock and boat lift on his property located on
Hardison Lee Farm Rd.. As part of the permitting process set by the Dept.of Environmental Quality we must NOTIFY
ADJACENT PROPERTY OWNERS of the proposed project. Please accept this email as that notification and respond confirming
receipt of message.
If you have any questions please do not hesitate to contact me at 252-249-0149. If you have any objections please contact Mr.
Kent Vaughan,the CAMA Field Rep.at 252-948-3853.
I have included a rough sketch of the proposed project.
<pagel image38080368.jpeg>
Sincerely,
Brandi Prescott Robertson
B Prescott Marine Construction, LLC
252.249.0149
brandiprobertson@gmail.com