HomeMy WebLinkAbout79773_Joey Roes Little Creek Inc._20210623 0 CAMA/ DREDGE & FILL D' (AI79 N9 79773 A BCD
GENERAL PERMIT 1l Previous permit#
�� -'New _Modification ,Complete Reissue C ,Partial Reissue Date previous permit issued
As authorized by the State of North Carolina,Department of Environmental Quality /
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC /�, .z/7//G-'C1
�'I'fules dLtdcl ed.
Applicant Name j. ; , ,``� - Project Location: County < <. 7 - /-
Address -e"'Y /7,2/ L . '/i c - / t. i - / Street Address/State Road/Lot#(s) ,f -I 2__
City /t - .. State ZIP y.2 6'' {':�. . -i.. 'j //
Phone# ( `') `-- E-Mail Subdivision ill''
- J,,,. /'( ,
Authorized Agent ,.' `- , 'f,2 City /:,.. 7 ZIP
" fit/
Affected ElCW ❑EW RITA rTES EI PTS Phone # ( ) __ River Basin 7 /- / ..
❑OEA ❑HHF ❑tH ❑USA ❑N/A i
AEC(s): Adj.Wtr. Body c / , , , ;man /unkn)
❑PWS: "
..
ORW: yes I,no PNA yes ("Tr! Closest Maj.Wtr. Body ✓`"
Type of Project/Activity I: , - 1-�(.- / I „„7.
f
w % cr ,¢ r-'1 ,-c / t-.. //.--. (Scale: / )
Pier(dock)length -
1 ! 1 i 1 I I I
I
Fixed Platform(s) 1 I ! ( I iI
Floating Platform(s) ' ,, I t I y l
Finger pier(s) -_ ..L I I / — i ----
!
Groin length I %'
number -- /` I __________
y.", -r I I _ 4 I I i I
Bulkhead/Riprap length /.%£- - I I
avg distance offshore _ i
max distance offshore '' 1 1 i
I
!
I I j 1
_ 1
Basin,channel 1 `` �/ ! � `I 1 j t4
jj
cubic yards "` 1 � i` } � i i � �,i 1 e !.'B 1 !
k I
Boat ram --- ti-i t C`Q \ I
P __ v.
j k
1 -d
Boathouse/Boatlift I 1_ }r_ _________i __.___ Z__-.-- ;�
1 __ i _. Ik�./'.,A-. mod'!- ' "!A✓
f 1 I I
".' j f`•
I
1 1 C1. ..1
Beach Bulldozing ± — ---
Other i ;
1
I
Shoreline Length // 1 1 �� I I — Y
{ 1
SAV: not sure yes f n9 I I j - i--I I I ( i
Moratoriu
m: e n a s no` I
/ Y !
Photos: yes no :--4 _— l � �?! ! I
Waiver Attached: yes no
I I
A building permit may be required by: /.: e f< f l C 2 See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) /
Notes/Special Conditions '' // O J
7f i .1'�:.
Agent or Applicant Printed P Jj I Permit Officer's Printed Nam
S Please read compliance statement on back of permit Signature
Application Fee(s) Check# Date Expiration Date
Authorized Agent Consent Agreement
I a ;hereby authorize (-� r.�l Selby r to act onAuthorized Agent)
roperty Owner) ( g )
my behalf in obtaining CAMA permits for the location listed below. This agency
authorization is limited to the specific activities described above.
Property Address:
)
,n yam .
Property Owner's Mailing Address:
42-7+(e)
Property Owner's Signature:
Authorized Agent Signature:
Date:
L/L'd SLL9b966:01 8Lb081762S2 1NWSW 1d1SdOJ ()Ia JN:woad 22: 't L002-LL-lJ0
ADJACENT RIPARIAN PROPERTY (l OWNERr STATEMENT
f►/
I hereby certify that I own property adjacent to �' C ee L ved;siPet 's
` (N,Ane of Property Owner)
property located at L r o2,2Z 4t)11,ci ' (I t+r
(Address, Lot, Bloc Rg}d, etc.)
?t)� d
on 1t GCK , in fie=//1 U✓G4 , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
777aes.ty' /Pow o S aye e-
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15'setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information) (Adjacent Prope wner Information)
L—7dj W
Name Print or Type,Woe
e
P//2/TyJ•rilk G'k /L� c�I 020,ay� e 10e b•
Mailing Address
City/ t ip r City/State/Zip
Telephone Number/email address Telephone Number/email address
Date Date*
(Revised Aug. 2014)
*Valid for one calendar year after signature*
ADJACENT RIPABLAN PROPERTY OWNED STATEMENT
I hereby certify that I own property adjacent to 's
' (Name of Property Owner)
a Prty located at ()r/19,9jN i(( �"7• k7r5 i'7 D .
/� (Address,Lot, Bloc Road,etc.)
on . u l91 7 t"c i i , in t3 Pr3 w C'-0 ,N.C.
(Waterbody) (City/Town andlor County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPO
SED DEVELOPMENT
(individual proposing development must fill in description below or attach a site drawing)
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15'from my area of riparian access unless waived by
me. (If you wish to waive the setback,you must initial the appropriate blank below.)
I do wish to waive the 15'setback requirement.
I do not wish to waive the 15'setback requirement.
(Property Owner Information) (Adjacent Property Owner Information)
4.�i,4/ ,A.Ar G7ttl-CC
Signature ,-� ;1_ * J
Print or Type Name Print or Type Name
Address / Mailing res 7
_Palling\ c � 7ti. L a—) / v �!?�41 •�._ AJL A-)3
city/state/zipcdy/state5 S= 55'Cje
Telephone Number/email address Telephone Number/email address
9 0 1
Date Date*
(Revised Aug. 2014)
*Valid for one calendar year after signature*
{
ROY COOPER
>4' Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QVALIYY
Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHOREUNE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR)regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR)has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL) or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
• filling in the buffer is a violation of the riparian buffer rules.
2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused(non-channelized)flow of storm water runoff through the buffer.
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects,but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash:For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is
expected to be severe,the first ten (10)feet landward(unless specifically authorized otherwise by DCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30)after completion of the bulkhead.
• Pre-project site conditions: fryi
7. Project Drawing:The drawing on the CAMA General Permit Is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and anyassociated clearing,g,grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
Oral .e�6 •
Age di sr App cant/ri :d N. e Permit Officer's Signature
i
OF or Applicant Sig -t • Issue Date
9CAMA GENERAL PERMIT IS: 7 7 7J 8
State of North Carolina I Environmental Quality I CoastaiManagement
Washington Office 1943 Washington Square Mall Washington,NC 278891252-946-6481
Wilmington Office 1127 Cardinal Drive Esq.win,i„grcn,NC 28405-38451 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808