HomeMy WebLinkAbout77229_Peggy Rose_20210617 0 -'LAMA/ ❑DREDGE & FILL :i # 0 r7 . R No 77229 A G C D
QENERAL PERMIT Previous permit# N(///
's —% LI New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued Milt
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC 7 II • /iD 0
['Rules attached.
Applicant Name Pe5.5Y Pose Project Location: County 'Sea u-C-0,-k
Address IUD 5 Li 4+)e Cr.e K iz. Q.x r. Street Address/State Road/Lot#(s) Lb4 /3
City 1�Ihuoevi State IN1C ZIP a I0 A ei0 rni i, rot t_.54-rck E.3
Phone#(Z52.) %'1— del 21C E-Mail Subdivision WI,��vrll I �o1,.�� C S- -es'
Authorized Agent Se.,(-0, SA i —c, City IJA howe>1 ZIP pZ1$ Iv
Affected ❑CW .0I EW ❑PTA S h rs Phone# ( ) River Basin T/i.re.. /PA-('Y]
AEC(s): ❑OEA ❑HHF ❑IH ❑UBA ❑N/A Adj.Wtr. Body ?U 6 b
1 u`~--• 6:::0/man /unkn)
❑ PWS:
Closest Maj.Wtr. Body?
ORW: yes /(no') PNA yes /e)
�N bo p_l Jc r
Type of Project/Activity , iv c-'-rei / , „ ,t.)
(Scale: I' ` (I 0C.eN)
Pier(dock)length _ 'T
i 1
Fixed Platform(s) - -- I I t j 1 j
Floating Platform(s) - t 1 I I
Finger pier(s) 1
Groin length I ; i ; — —
f
number _ —
t
._ I
Bulkheadhiti length _ C/ — —_• /`J Co
I
avg distance offshore fl
! D0
max distance offshore /Di .A?
Basin,channel t� I
M
N;
cubic yards
M
Boat ramp --- I I O Q.:,
Boathouse/Boatlift l ....... v ; .........r�Q.. ')?
p D V
CI �
Beach Bulldozing f - 0_ � ��,. a�/V ` : . -
II Other — _-- f I !
I � til�1� i �� ;I
F k b
Shoreline Length ./ , 1 + ry
SAV: yes no Al!. • { } -- — t
>�/ ; IRS
Moratorium: n/a yes ( '7 / I I V+i r�[l l --
Photos: yes no
Waiver Attached: yes
K— �+ ` i C��
Lt
A building permit may bfrreguired by: IJQ AU e-k C0uytk! • L4 See note on back regardingLLL River Basin rules.
(Note Local Planning Jurisdiction) �/
Notes/Special Conditions '4 C ,-,// /72 GG 4.. .1/( /6)-Yi.
1 -... •/
t -,1
Agent qr Applicant Printed N. •e Permit Officer's Printed Name
D ! ''/
SignIure **Please read:domance statement on back of permit** Signature
-/ (/(�� 1` r l/j/... / /0 i '/ t
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-390 I Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
kxj0 n
IJCAMA / ❑DREDGE & FILL I� # W 8 ` N9 77229 A A
ka) C D
GENERAL PERMIT Previous permit# Ni:
�� ❑New -Modification ❑Complete Reissue ['Partial Reissue Date previous permit issued ,
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
LRules attached.
l�
Applicant Name ' rlprj i? Project Location: County -,_. ,- - "
Address I IL,41. Li 4+)r' ✓`r<e!'c i (1 Street Address/State Road/Lot#(s) L0+ /3
City f f e 1 h 00.'11 State ti G ZIP 41S 1 V ./.J i :'t,tell i'. I D IA:\ c, .5-tack t
Phone# ( ) "1L; - (-12IL E-Mail Subdivision II)t :'vrit i _ •„"\ E 5 es
Authorized Agent _ L:W IDi)
'sf c: l `.>f'�) Y 7 1:{ , City I'";X` �'l U J'11 ZIP fit j 10
Affected ❑cw ❑E PTA EtS ars Phone# ( ) River Basin T,4 2. /PA
❑OEA ❑HHF ❑IH ❑UBA ❑N/A AEC(s): Adj.Wtr. Body k 7'.t 4 L:b ' ,v i (nat /man /unkn)
❑ PWS:
ORW: yes Una' PNA yes / Closest Maj.Wtr. Body ;� "" Z.4t<
Type of Project/Activity
(Scale: i ' 4' )
Pier(dock)length -•-• al".
'lr•s�
Fixed Platform(s) - _, ? f I —
Floating Platform(s) -- ! , 4 I.
Finger pier(s) } I 1
Groin length �1,, }
number ------ i G... !
H 1_01 N ,
Bulkhead/Riprap;length ; _. 1 1 —41,- — n— _ }(_ ...'1"- __......
g d ,fl �- ,, --_._ 1 (f
av distance offshore / i �ol i 1 ' .1../' I
max distance offshore l P i 1111 i ; 11 t lGf�
Basin,channel1111 \ : ' _ , 1 zVA g 1
cubic yards I
Boat ramp 1 1 L•• i•�.r f }
1'11
-+ r •, '
Boathouse/Boatlift 1 _-_._ U X ti ` • - 9
i
Beach Bulldozing ; - �,.f ., /$ i15 ; i - -- I
I I J
Other -- ;, i t, -_fl iii') ��i
i
a
r.
Shoreline Length -7 t + ry r�`\ I [j ,
SAV: of sure yes no - •
,z __ 1 ,
I i I
Moratorium: n/a yes t� i I xt _�..
---- ---- - ---
Photos: yes
L
Waiver Attached: y M► F — — .. - - - , A:/.,r
A building permit may be required by: 1t Art CV r A CQU '} 1 L See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions /..i 0( /. i. / /r j( //,'
Agent or Applicant Printed Name Permit Officer's Printed Name
Signature **Please read•tompliance statement on back of permit** Signature
Application Fee(s) Check# Issuing Date ' Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(9 I 0-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
ROY COOPER
Governor
MICHAEL S, REGAN
Secretary
Coastal Management BRAXTON DAVIS
VNVIRONMENTAI.QUALITY t
Director
• BUFFER AUTHORIZATION CERTIFICATE FOR SHOREUNE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR)regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR)has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL) or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward)is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused(non-channelized)flow of storm water runoff through the buffer.
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is
expected to be severe,the first ten (10)feet landward(unless specifically authorized otherwise by DCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation ata stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
• Pre-project site conditions: 4-4✓LA
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and anyassociated clearing,g, grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
Ag it or A.plican Primed me errmit Of icer's SiAnature
i ,5k t or p. (cant 1.1 a r Issu Date
CAMA GENERAL PERMIT a: 77.Z2 9 Q
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington,NC 27889 1252-946-6481
Wtlmingron Office I, 127 Cardinal Drr.Er.W8mirgrcn,NC 28405-3845 1910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808
•
Authorized Agent Consent Agreement
to act on
I � ��� ��— ,-hereby authorize 1 � y��('
(Property Owner) - (Authorized Agent)
my behalf in obtaining CAMA permits for the location listed below. This agency
authorization is limited to the specific activities described above.
Property Address:
Property Owner's Mailing Address:
PQam1 Pie
oe..EL a 6,1_,
Leh — AsI
Property Owner's Signature: ��
Authorized Agent Signature:
Date:
TrT'd SLL9t7966:01 8Lt08t,6ZS2 INWSW 1d1SIOJ (iia ON:woJd az:t,T LOOZ-LT-1J0
f
r. . '11'.e.1.1%1
•
I hereby cxutdythem I cmn property adjacent to
property located at
(Address,Lot„Block,Ra ;�stc.) N.C.
Abs? (Cityf own andlor County). ., •
'The . .4 i-nt has described to me, as shown below,the development p at the above
/ ct thus no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
pndheidual proposing dsvolopnont must fill in description below or attach a tits*sawing}
Bulk as 3Rif Retfi- 1.e A"`k
WAIVER SECTION,
I understand that a pier, dock, mooring pangs, boat ramp, breakwater, boathouse, lift,or groin
must be set back a minimum distance of 1 b' from my area of riparian access unless waived by
. me.(N. wish to waive the setback►you must initial the appropriate blank below.)
•
, , 1 I do wish to waive the 15'setback requirement.
do nat'y✓vish to waive the 15'setback requirement..
piPettY I on} (Aka M property Information)
(J /( j(,y j Signature* jjj� See
J'�i yf 11 , £It.t t Y «. -:7tc... frpaiir
j 9ce y��
or 0 None . , Print'kip { t
Mailing Andress
memo Address • �RcofA) JO C 2 JA P
My/State/4
JANA 96%P-1411
T t ka rthe,/etneil address Telephone Number/email 5dahses
Date _ Doe
(Revised Aug.2014)
'Mild for one calendar your after sib.
Christopher P.Adair
224 Waverly Drive
Clayton, NC 27527
252.481.8537
chris.p.adair@gmail.com
To whom it may concern:
I am the property owner of Lot 14, Windmill Point Estates, Belhaven NC. I have no objections to the
bulkhead project to be completed on Lot 13 Windmill Point owned by Peggy W. Rose.
Regards,
Christopher P. Adair
Date June 4, 2021