HomeMy WebLinkAbout79746_Brian Huber_20210616 Rom;
toD CAMA/ ❑DREDGE & FILL J J 14 `Q p--/3 I No 79746 A BCD
GENERAL PERMIT Previous permit#
��—= Ill New -Modification ❑'Complete Reissue El Partial Reissue Date previous permit issued
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
E Rules attached.
Applicant Name -5r, i^ ' -1,{i • Project Location: County
Address ��^^i Ot L/ �1t c h:a d t r1'' Street Address/State Road/Lot#(s)
City —/l G )V't i 4 / State NC. ZIP q SOS I ' I L.4_8,- , ; \.'NU(- L, ,..
Phone# (2.`-Z) //cl- 5&:,C`I E-Mail Subdivision C 2fres,--..- 1.-t,,-k .-"c (
Authorized Agent gC>a<lbr e -`• r-K;-'s City (_. %',�C,c.-:wr f 1 / ZIP `5z si
❑CW ❑EW 51 PTA ❑ES I>3 PTS Phone# -77. 1 1) 1-ss(p `1 River Basin %rl R t���2
Affected /
AEC(s): El ❑HHF ❑IH El ❑N/A Adj.Wtr. Body 1)16(1 t7 C'E r tic; I (nat /mart /unkn)
❑ PWS:
ORW: yes / no PNA yes / Closest Maj.Wtr. Body 2 i"/, -,-) ' ` ,.. ,
/
Type of Project/Activity 2t J -/ ll 4 1- ,
S .f S[?Rrc
Cc.; r1v 1 L(1, _I (Scale: I r - ?, ;' )
Pier(dock)length
Fixed Platform(s) 7 ! I
i }
Floating Platform(s) P\.i
'Finger pier(s) S _
Groin length r` .T_
.
i '
number _- —=- j _.._._.__..._. _._..._...................._...._....._.__..._..... i
40
Bulkhead/Riprap length �� -`
avg distance offshore \ ('� r{I7-
max distance offshore IN;�� ►A i 4/ I T�yD - .. __._¢
Basin,channel 5 ,X t>X } ..� 1 7 j
cubic yards G /' I ` �(
Y a rck
i , xk�'Iv ,r Cu
Boat ramp / /'6
Boathouse/Boatlift — f �...�......_ �j 7> Y ._.. . . ? .....fb ��
' II i ‘
Beach Bulldozing ` I _ _ _ - V p
Other r,c.{k#,` t.KePC
�'
t/41 I 1\A r L.
+ � \ °` ' r
Shoreline Length _� j j ' l ,9�-
SAV: not sure yes nct .- ' ! I
Moratorium: n/a yes n _
4,w.t,.. r....
Photos: yes 9- _
Waiver Attached: yes no 1
.`
A building permit may be required by:_503 <k L D . 1251 See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) ` y� -
Notes/Special Conditions Lb+ /+ / S (YV )+1 tak P D I(AW f • Si ( � 4 r c` S/p o , I
"Pi P af ei Y ,- --,1 o-f y q A((r.vol-1 U rn G tom-/i c ( /'1, YJ e. Y-31 0,,e c1
Si4e c=< S & - -" S 1 s 'C1 d✓lc$, !Iv C <ctv)I1J7 )' h-e' '-rc)((c,.\., ' _,
-� c.e pil.. Sre•c.i f- r f ,,, (t-
it/4
1 �' �-� r5 -t G ley G r4i0/
I•Agent-or Pri ted Name Permit Officer's Printed N e
!� 1 ' .
, ,1,4
Signature "'*Please r_tead compliance statement on back of permit** Signature
7 % ' ` . --: f/2(/ 7 /6— 5 - - Zb21 - /6- pc fi21
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
40I S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan, Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
0 L_IJ CAMA/ DREDGE & FILL --IS)14 W p !'3 I N° 79746 A BCD
GENERAL PERMIT Previous permit#
>�-% ❑New -Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC .
Rules attached.
Applicant Name Project Location: County
Address Street Address/State Road/Lot#(s)
City State ZIP LL.
Phone#( ) E-Mail Subdivision
Authorized Agent City ZIP
Affected ❑CW ElEW ElPTA ❑ES ❑PTS Phone# ( ) River Basin
AEC(s): ❑OEA ElHHF ❑IH IIIUBA ❑N/A Adj.Wtr. Body (nat /man /unkn)
❑ PWS:
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body - -----
Type of Project/Activity i -s
C. (Scale: i - ),A
Pier(dock)length I 1
Fixed Platform(s)
!
{ !
Floating Platform(s) , y�! _ _ ;
Finger pier(s) ---_-'`L� - — _.._ —� —
Groin length I i
.
number — — _ — — - - —._...
Bulkhead/Riprap length I t I
avg distance offshore t
max distance offshore '}, "' I i /{ i }
Basin,channel i \i , 1 -
_ �y I `f 1 ..� y�
cubic yards ii . j f ` 0:C4 0. s A. t
• 6
Boat ramp '" ---..7` _ t 1 - ''i ..'- at" " 1 ``
Boathouse/Boatlift --_ — b e P
_.— =r r i 1
lV
Beach Bulldozing t:?
Other ( — .. -. � .�.___�j 1 '
L iI Shoreline Length
i , 1
I t
SAV: not sure yes no -..— _- — 1 i s . r 1
1 +
' - —
Moratorium: n/a yes no '
! ..; �—._ —1 t — .. .
Photos: yes no —. 1')I —— —
—
Waiver Attached: yes no ! • ,
A building permit may be required by: . 1,X See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) + ,.,;1 i
Notes/Special Conditions 1 r 1 )'''e .: Go n •
. cd . -r1 ✓-1f1G f4' ,
•
f ,, 1 �,J, ,e,$ ,,
} c. 0.•v 1 1(„ .. , Y
.�� '\,., ) .S Ai y G 1,� v)y
Agent or Applicant Printed Name Permit Officer's Printed N e
41-1,<?:' :14cr;I/,A, 1 -‘14
Signature **Please read compliance statement on back of permit** Signature '
/6,_ 5'rc — ?�21 — /(9— Oc k - 'rz 1
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
..a
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY
Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
J. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
o Pre-project site conditions: Lb71' /s j jP" /.7 Lu.,.
By your signature below you agree to be held responsible for meeting all of the conditions listed above an er.
that all information provided is complete and accurate.
A t or Applicant Pri a Name P mit O cer's S. natur
A ent or Applicant Si ature /" , `— '2
I e Date
CAMA GENERAL PERMIT#: cryqt, 3
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington,NC 27889 1252-946-6481
Wilmington Office 1 127 Cardinal Drive Ext.Wilmington,NC 28405-3845I 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to ` 's
(Name of Property Owner)
property located at ✓� N 'h I h�� L4he-
I (Address, Lot,�Ipck, Road, etc.)
on ROM M " fr6k CAA a , in o�wivd �'y , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
410) )1le,,nn QC
�� e E/C (-'4 U— \�
'
r Ain
— )'Vac' /le i
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information) (Adjac Prop 7ne Info t'
L�
Sign re Si nature
Print or Type Name Print or Type Na e
Mailing Address Ma A__ddres
/Uc -7 �
City/State/Zip City/State/Zip,
,Z�z553 EIZ)9
Telephone Number/email address Telephone Number/email address
/ /
Date Date*
(Revised Aug. 2014)
*Valid for one calendar year after signature*
! •
Grandy, Ashley
From: Jared Gray <Jared.Gray@jamesriverequipment.com>
Sent: Wednesday,June 16, 2021 10:17 AM
To: 'Huber, Charlene'; Grandy,Ashley
Subject: [External] RE: Huber--excavation per Ashley Grandy and Robbie
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
I have no objections to the maintenance dredging in the canal for the lift and pier. Thanks.
I own Lot 111.
m nu
JOfNN Daum
CS `...7 E8111FlREAi
Jared Gray I Territory Manager
James River Equipment
3064 US-264
Greenville, NC 27834
C:(252)558-5333
E:jared.grav@iamesriverequipment.com
www.JamesRiverEquipment.com
f W GO in
From: Huber, Charlene<huberc@pitt.k12.nc.us>
Sent:Tuesday,June 15, 2021 3:56 PM
To:Jared Gray<Jared.Gray@jamesriverequipment.com>; Grandy,Ashley<ashley.grandy@ncdenr.gov>
Subject: Huber--excavation per Ashley Grandy and Robbie
Caution:This email originated from outside of The Rivers Companies.
Good afternoon,
Jared, we hope you are well. Ashley Grandy, Robbie, and Mr. K. Whichard met today at our house. Ashley
would like for us to request permission for an excavation around our boatlift and pier in the repairin area. It has
been approved for you to send an email to Ashley Grandy concerning our request. I believe Brian is reaching
out to you through a text message. Ashley and Robbie are planning on reaching out to you on our behalf as
well.
Thanks so much for everything,
i
Mrs. C. Huber
Elem. Ed., Child Dev., Reading K-12
First Grade--Wintergreen Primary
Arlo Virus-free. www.avast.com
Message Sent from PCS GMai1
2
r
Grandy, Ashley
From: Huber, Brian K. <brian.huber@thermofisher.com>
Sent: Tuesday,June 15, 2021 4:48 PM
To: Grandy,Ashley
Subject: [External] RE:Agent Authorization
CAUTION:External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Yes I give Robbie Hopkins permission to sign the permit for my Pier and maintenance excavation.
Brian Huber
From: Grandy, Ashley [mailto:ashley.grandy@ncdenr.gov]
Sent:Tuesday,June 15, 2021 3:36 PM
To: Huber, Brian K.<brian.huber@thermofisher.com>
Subject:Agent Authorization
CAUTION:This email originated from outside of Thermo Fisher Scientific. If you believe it to be suspicious,report using the Report
Phish button in Outlook or send to SOC@thermofisher.com.
Mr Huber,
Would you please send me an email giving Robbie permission to sign for your Pier and maintenance excavation permit. I
will be looking for the email from Mr. Gray and will get Robbie the permits ASAP so he can begin work. Thank you and
have a great evening.
Ashley Grandy
Field Representative, Division of Coastal Management
North Carolina Department of Environmental Quality
252 946-6481 office
252 948 3854 direct office
ashley.grandyc ncdenr.gov
943 Washington Square Mall
Washington, North Carolina 27889
--- Nothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
1