HomeMy WebLinkAbout79777_Josh May_20210602 R-1--5
,ECAMA/ LIDREDGE & FR.Lo 79777 g C D
GENERAL PERMIT AkAl°9 jvPrevious permit# //IIf
>Z ❑New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued 1v/l
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC / - ' .
rules attached.
Applicant Name /��'`I_f`'�"� a�L/ Project Location: County �c�
Address 1 L'//'�c» -2 I/L Street Address/State Road/Lot#(s) —
City +d al ic1C State ZIP )i ;---{ ''i)ol;c. /.4-- .
Phone#(26-2) 9/7 In'51 E-Mail Subdivision
Authorized Agent u-"C e Se__v City % ' 'J" '{ ZIP J/e:.-
❑CW qEW 16PTA ❑ES ❑PTS Phone# (?r'7 ' 7551 River Basin /vJ2"`3�
Affected
AEC(s): ❑OEA ❑HHF 0 IH 0 UBA ❑N/A Adj.Wtr. Body w'c` c<e r' !--"--- t'(nat /man /unkn)
❑ Pws: /L t..e. -.-,,t
ORW: yes / no PNA yes / no� Closest Maj.Wtr. Body
Type of Project/Activity ?cr) ' <-,‘ -I- . L.n e
. .`� L . (Scale: )
Pier(dock)length I
Fixed Platform(s) - X 2-C� 1
Floating Platform(s) I 1 1 I.■ ; '
Finger pier(s
Groin length j
number — r : — -! ._........_.._!
i MEM
Bulkhead/Riprap length 1 IIIIHI!IpIi
Aavg distance offshore ■■■■■■■ �mI !irra ■ ; . sus ■ Nu' max distance offshore IHHIHHHHUiI1iii12ZUl111111111
Basin,channel
> I H-
1111111111
cubic yards II!I!III1IiIU1IH1
1 Boat ramp
Boathouse/Boatlift i !!HI1IHLIAIIIHIIIIELIIIII!IllI_ O 1
■■O ■ ■ ■■■■ ■ ■■ ■■.
T ■■ 111111111111111111111111111 7/1,11■ ■■■■■ ■■■■■■■■
Beach Bulldozing p .� �
Other
pre' "ill III
' i i i .IT 6 1
IllIIi1lI 'T 'TJIifH1IAlIJ
Moratorium: n/a yes IPPON L ■■ ——IN '
Photos: yes no ... . .._.—_.... ■/f �...._ ...., 1 _.„ ,
; }_ ■ _ .. ■ i
Waiver Attached: yes n 4. ,
do
A building permit may be required by:�w-"I i GC . K-See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) r 2
Notes/Special Conditions / i i"'I ,�. o-'6 . /.CO
---gi ,
'kr- ii2f27
(14,4, hect, 7 -/,,./ bii,--s14,......_
_ . Applicant Printed am ,e PermitC d,N s Printeame✓
it t il,CZ i i /
Si_ 7. re Please read compliance statement on back of permit** Si ature
9r1 Pk 6b) --- ) 2 %' jw2. ,a°2 l - Doi , a/ �D-?Application Fee(s) heck# suing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules j—I Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves: Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan, Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
A
•LICAMA/ EIDREDGE & HLL --r'�;'� u I j
U�, No 79777 ABCD
GENERAL PERMIT —L`� Previous permit#
>Z ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC
❑Rules attached.
Applicant Name Project Location: County
Address Street Address/State Road/Lot#(s)
City State ZIP
Phone# ( ) E-Mail Subdivision
' Authorized Agent City ZIP
Affected ❑CW ❑EW E PTA E ES ❑PTS Phone# ( ) River Basin
AEC(s): ❑oEA ❑HHF ❑IH ❑UBA ❑N/A Adj.Wtr. Body (nat /man /unkn)
❑ PWS:
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body
Type of Project/Activity
(Scale: )
Pier(dock)length
Fixed Platform(s) - 3 -ttioniwt-
Floating Platform(s) / ~_ �Issi4k �` K V.
, T ' N� C
4.
Finer pier(s)
Groin length
number ` j... : t i— �...
Bulkhead/Riprap length \ i !._� ....__.___ —4L,y � 1 T_mil_
avg distance offshore N,t it i iI ! --"" -Flo{4� i `max distance offshore 2 . . s i, 1
I
Basin,channel
I
•
1
cubic yards y-.!" 1
Boat ramp - i I I 1 _
Boathouse/Boatlift / Iti...i. ... t h ........_..
t
Beach Bulldozing — I --
1111 M n r.' .I '7 (
Other �' - '
1 I
( �1 c" r -
-� }
Shoreline Length - G! '
SAV: not sure yes no j } P L ( ' ,---_---_-
' 1
Moratorium: n/a yes �nd 1
Photos: yes no # j, --k—t -. .- a .... I
Waiver Attached: yes no -- -- --- - t 'i ' i ' ' '
A building permit may be required by: . g]See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) ,/'
Notes/Special Conditions '4r� � `-)t- / ,t` C`-,.-Kl• / `,
&(bI4 f 1c, tie L, -,. .--,',-./ 1- 1` L
Applicant Printed ame Permit Officers Printed Name
'-KA, reit..a7 /le rid1-61-1
Signature **Please read compliance statement on back of permit** Signature
}
Application Fee(s) Check# Assuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action;and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(910-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort,Bertie,Hertford,Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves:Brunswick,New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates,Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncden r.org/web/cm/dcm-home
Revised 7/06/17
CCep4ed +Matt
�
From: Josh May josh.may@ongfinancial.com 6'
Subject: RE:Estimate from B Prescott Marine Construction,LLC
Date: May 10,2021 at 1:42 PM
To: brandiprobertson@gmail.com
I accept, please move forward
OApply Online
Josh May
Branch Manager
NMLS ID 501570/NC 1-168320
Your Home Purchase Expert
"There is no traffic on the extra mile"
NMLS#5645
OnQ Financit
Mortgages Simplified
1516 Greenville Blvd,Greenville NC 27858
Office: 252-917-8928 I Cell: 252-917-7557 I Fax:252-214-6528
Josh,may@onpfinanc
This e-mail is being sent as a professional courtesy from Josh May at On Q Financial, Inc. This is an unsecured e-mail service that is not
intended for sending confidential or sensitive information. This may be a promotional e-mail or an attempt to notify you of important mortgage
market news or industry trends. If you wish to not receive this type of e-mail,please reply to the sender and your e-mail address will be
removed. If you are not the named addressee,please reply and advise the sender and delete the message. Please note: Any views or
opinions presented in this e-mail are solely those of the author and do not necessarily represent those of On Q Financial, Inc. Equal Housing
Lender
O
LC Nf)CN
From: B Prescott Marine Construction,LLC <quickbooks@notification.intuit.com>
Sent: Friday, April 30, 2021 12:48 PM
To: Josh May<josh.may@ongfinancial.com>
Subject: Estimate from B Prescott Marine Construction,LLC
Dear Josh May,
Please review the estimate below. Feel free to contact us if you have any questions.
Please note that all final invoices will be based on"As Built"dimensions. Prices are subject to change based on possible increasing
material costs.
We look forward to working with you.
Thanks for your business!
B Prescott Marine Construction,LLC
Estimate Summary
Estimate#: 1839
Estimate Date:04/29/2021
Total: $7,393.00
The complete version has been provided as an attachment to this email.
I Ad Jac(a+ ?rç
100i 4i(00 ow\H \10"-k411(4‘1.
From: (null)(null)rrabbithunter@yahoo.com
Subject: Re:Magnolia Ln.Project
Date: May 11,2021 at 1:54 PM
To: Brandi Robertson brandiprobertson@gmail.com
Hi Brandi,
No concerns,proceed as planned.
Kind Regards
Mike Wetherington
Sent from my iPhone
On May 11,2021,at 10:40,Brandi Robertson<brandiprobertson@gmail.com>wrote:
Dear Mr.Weatherington,
We have been contracted by Josh May to install a dock platform and mooring piling at 355 Magnolia Ln.,Arapahoe,NC.
As part of the permitting process with the NC Department of Environmental Quality we are required to notify adjacent property owners about
any proposed projects. Attached is a rough drawing of the project.Please respond to this email confirming that you have received this
notification message so that we may continue with the permitting process.
Please feel free to contact me if you have any questions about the project. I can be reached at 252-249-0149 or brandiprobertson@matl.com. If
you have any objections to the project please contact Mr.Kent Vaughan with the Department of Environmental Quality at 252-948-3853.
<IMG_0024.jpeg>
Sincerely,
Brandi Prescott Robertson
B Prescott Marine Construction, LLC
252.249.0149
brandiprobertson@omail.com
0IS v
Jr) - -1Dii1N1.
9'h n o'c ' 0 A
- ..h ,r,,,w
_,
....-..t.„. ...,,_......4„,_
ii
._ btlaj @a•3*"ice
p,S -.—
., _ `, 4,
tu�.E UMO Pti
{+�s tfz;:_,
f —_
?L'.„Str rtvaIpeepast cc t3M 4tu1 OFT R
tZ t `1;, Ai::l.+r.sl. ..,�e,--. fit= =i
-=V:e:. q f�l+.o1 ;, tea n-;ry{3 ii:p„''till
ctt s-ag_ 1ii Y^
w+,4344.0101 ,OZx,to paSodokd ---> - r ,"
-1) 6-►)+-sixa =
_7(- 1-.: r --
•
_,Icw- -psyld N ktaio\ /
` "ems ;
atavid doaa30 etutieskm tiotativ isou.41soisin1
otItsi-Ott Wtekl 1
T gg- s&Caf5 tc'=-In 0=Patz. .O fit{Vo"YM';Qt'3L'1
DDI l'' . 19__J A4------m- .)i--- --F----eruc-r= •
rc
U y
S� ) E: � ,
�� _ NVRIVOSIEIOVIMV
V 9tv
ROY COOPER
,..
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
• Pre-project site conditions: ��f /S / ten ;-,--
By your signature below you agree to be held responsible for meeting all of the conditions listed above an erify
tha I information)provided is complete and accurate.
fI.77 -,
t or Applilica, rinted Name Permit Officer's S. ure
., (-44, 9�� �� , /z/2
Agent or Applicant Signature Issuf; Date
CAMA GENERAL PERMIT#: 79
State of North Carolina i Environmental Quality i Coastal Management
Washington Office!943 Washington Square Mall Washington,NC 27889 1252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-3845 i 910-796-7215
Morehead City Office!400 Commerce Avenue Morehead City.NC 28557; 252-808-2808
I