Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
79763_Marchell Alvarado_20210521
Rx5 ' erEli CAMA/ ❑DREDGE & FILL - D$ Cap, N . 79763 A B EC D GENERAL PERMIT 010�� Previous permit# `V�i >- E— ENew `.Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued /11/) As authorized by the State of North Carolina,Department of Environmental Quality P / and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC <- `yq / / A ERules attached. Applicant Name // /" I X f� /je, 4,z. Project Location: County !� 4n,fL,-- Address i J 05 00,-, F 421 ' Street Address/State Road/Lot#(s) / , r City / �,e, State r i ZIP —Z.-Sc,,Q ( LAr A 1`c_ r Phone# ( �)32..7 »�'c_ E-Mail Subdivision 1 i ; -L�i' f L'- Authorized Agent City ZIP 2S. (-D Affected ❑CW ❑EW 0 PTA ❑ES ;K (-/PTS Phone# )-32 7_'/C) River Basin ;V.a� C c -- ❑OEA ❑HHF ❑IH 0 UBA ❑N/A i AEC(s): Adj.Wtr. Body /'ii n--(� A-1"-k-i-cc '<- (nat Jriian)unknj ❑ PWS: ORW: yes /`no PNA yes /�� Closest Maj.Wtr. Body NL .-c. 4,!_.- Type of Project/Activity I�/ c),< / - v �� f L': 1' (Scale: / : /) ) Pier(dock)length • I I I Fixed Platform(s) �' I ; 1 A'ei Floating Platform(s) Finger pier(s) ! _ - - Groin length number -- —..__..__.� Bulkhead/Riprap length O —` ` I avg distance offshore 2 max distance offshore 2 ' Y--�' Basin,channel j A✓'' 'r. f o� ! cubic yards Boat ramp \ j 1 I ' ` i Boathouse/Boatlift _ ..............._.._..t._.- —_... .................... — — — ........-......._.._-�--}-1.._ �j s-C�._..... Add } I -- i f{C Beach Bulldozing f } i Other A . 2<raginamp.200,0/1 ,I . , r�j( 1 Shoreline Length 30 I IIIC�� m' C �- L/j I /��1 SAV: not sure yes no a 1- Q D ` 4C7\ Moratorium: n/a yes k Photos: yes Waiver Attached: yes 1 A building permit may be required by: //r/i J`,_ C-E) //�r �.r c_!;,47////j f` VSee note on back regarding River Basin rules. (Note Local Planning Jurisdiction) Notes/Special Conditions Agent or Applicant Printed Name Permit Officer's Prie6id Signature **Tease read compliance statement on back of permit** - Signature Application Fee(s) Check# Issuing bate f Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-648 I Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-390 I Fax: 9 I 0-395-3964 Fax: 252-264-3723 (Serves: Brunswick, New Hanover, (Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet- Dare, Gates, Pasquotank and Perquimans and Pender Counties) Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 WI..MOIMM.P..-- ---— ,q KIC En CAMA ❑DREDGE & FILL O - D ft to oZ� N . 79763 A B Sj D GENERAL PERMIT Previous permit# >' New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued i 1 As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC Rules attached. Applicant Name Project Location: County Address Street Address/State Road/Lot#(s) ` City State ZIP / it Phone# (r. ) E-Mail Subdivision Authorized Agent City ZIP "(--.) Affected ❑CW ❑EW ❑PTA ElES ©PTS Phone# ( ) River Basin L!. . i�''f AEC(s): ❑OEA ❑HHF ❑IH ❑UBA ❑N/A Adj.Wtr. Body (pat /man /unkn) ❑ PWS: ORW: yes / no PNA yes / no Closest Maj.Wtr. Body Type of Project/Activity • (Scale: / •0 ) Pier(dock)length 1 ; Fixed Platform(s) j I j i I y Ji I I i I �1/ Floating Platform(s) 1 j I Finger pier(s) --}._ �. - - i - ..-._. j } Groin length 1 i I i i } number = - - - -......_...... — - - -F -- i Bulkhead/Riprap length "' i -avg distance offshore ,? 1 I I I ( I 1 } max distance offshore I / Basin,channel I Y '/.' �t'. ; i . . LLL���-- i J' j/' cubic yards - _ Boat ramp i I 1 Boathouse/BoatliftI �- _ — —__._. ----_-...- _-- f J ---...._. 1 � b i 'r11 ,:�r., Beach Bulldozing I Other l I I I E Shoreline Length # �.Y f' C. SAY: not sure yes no - -.. J t - --1- { '' -- ! �F r-, Moratorium: n/a yes mo i f��� -- Photos: yes no . _ I__--.-. 7 Waiver Attached: yes no -A building permit may be required by: / / , /.,,_ L py See note on back regarding River Basin rules. (Note Local Planning Jurisdiction) Notes/Special Conditions ✓ "N Agent or Applicant Printed Name Permit Officer's Printed Name Signature **Please read compliance statement on back of permit** Si ature ' ,C'o`/'- C� - ," - ,' , 71,y ./, 2 o2/ — „).-/, , 2 t , Vic-= r ( Application Fee(s) Check# Issuing bate Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to thepermit officer when the project is inspected for compliance. The P P applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the Wilmington Regional Office(910-796-72 15)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-6481 Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 Fax: 252-264-3723 (Serves: Brunswick, New Hanover, (Serves:Camden, Chowan,Currituck, Onslow-South of New River Inlet- Dare,Gates, Pasquotank and Perquimans and Pender Counties) Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 ROY COOPER Gov ernor MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and • filling in the buffer is a violation of the riparian buffer rules. 2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes maintaining diffused (non-channelized)flow of storm water runoff through the buffer. 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation ata stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration rnust be completed by the first subsequent planting season(November 1 through March 30)after completion of the bulkhead. • Pre-project site conditions: i. / i ,S /c]-_'v'-- 'VD 7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing,grading,and construction corridors.Thls drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed c it' n and ify that all infor ation is co..plete d occur e. Agent or A pit Printed a P i Offic n ure Agent or Applicant Signature Issu Date CAMA GENERAL PERMIT#: 79 7(3 State of North Carolina I Environmental Quality!Coastal Management Washington Office 1943 Washington Square Mall Washington.NC 27889 1 252-946-6481 Wilmfnoton Office 1127 Cardinal nrtue Ext.Wilmington NC 28405-3845 I TO-796_7215 Morehead City Office 1 400 Commerce Avenue Morehead City.NC 28557 1 252-808-2808 James H. McCormick Martha J. McCormick 6119 Cutlass Court New Bern, NC 28560 May 14, 2021 RE: PROPOSED CANAL BULKHEAD REPLACEMENT AT 1305 CARCARA DRIVE, NEW BERN NC (FAIRFIELD HARBOUR) We,the undersigned, are co-owners and residents of 6119 Cutlass Court. Our canal bulkhead abuts that of our neighbor, Marchello Alvarado of 1305 Caracara Drive, on the left descending side. We are very much in favor of the work desired by Mr. Alvarado, as it is much needed. Our only request is that the proposed work be done professionally, in accordance with all pertinent state, federal and local requirements, and in no way jeopardize the structural integrity of our existing bulkhead. Sincerely, . Pi\Q Lry- JAMES H. MCCORMICK ceu.2 MARTHA J. MC ORMICK 5/14/2021 Dear Sir or Madam, Regarding the bulkhead repairs to 1305 Caracara Drive New Bern NC. My name is jeff Harrison and I live directly next door to the new residents of 1305 Caracara Drive New Bern NC. The bulkhead at 1305 caracara drive is in need of some repair. I have i this repair with the homeowner and have no to the repair methods or discussed objectionsp p procedures. If there is any additional information that is needed, I will be available at my residence throughout the day. Thank you, Jeff Harrison 1309 Caracara Drive New Bern NC 28560