HomeMy WebLinkAbout79740_Buddy Best_20210519 0 ❑CAMA/ li DREDGE & FILL 1D # (g 559 No 79740 /,�p, C D
GENERAL PERMIT Previous permit# %it
)z L New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit Issued /2)4
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC
l�t� II El Rules attached.
Applicant Name 6Li1+:91� } S't Project Location: County -.
�-3+ Street Address/State Road/Lot# s )I' j '. "
Address ( `� Lr� O
City /-', o State /V L ZIP .,:5i 0
Phone#(25-,) !-71`7V/ g_ 2 / E-mail Subdivision
Authorized Agent r k.----,,_ City 4 `"J I�erc ZIP 7. . PO
Affected ❑CW NOTA ❑ES ❑PTS Phone# ( 7S7) y7"/ '/c/`i River Basin 'Vt ic2+
AEC(s): OEA ❑HHF CIIH ❑UBA ❑WA Adj.Wtr. Body f ; 4.,K ,:'.
(nat /man /unkn)
E PWS.
ORW: yes / no PNA yesC n/ Closest Maj.Wtr. Body n y'�
Type of Project/Activity,
(Scale: /, )
Pier(dock)length
Fixed Platform(s) !-.f"_ N C KA 1r/, { j {
Floating Platform(s) {
I • , I —�
Finger pier(s) I I
Groin length '
number _.__.. ;. e._1.. -e_. ---------
�,i l !� *L� LPG`
Bulkhead/Riprap length I — i 1 i
avg distance offshore I t •
O �-�-
max distance offshore
Basin,channel r i - r
! 1 1 {�'lH
cubic yards
Boat ramp I
Boathouse/Boatlift I�y / - « .
`
..{..._.._..__._.—i— ............. —_a.... _._
Beach Bulldozing ! — —
Other i i
I - l i
Shoreline Length I o1 / �,I L 6 .. 8'�") I i }�,
illiJc
i I 1
SAY: not sure yes no - 1 --.-... `) i---+ --—
Moratorium: n/a yes o �-] 4.l ._
Photos: yes} o • I , ` L
Waiver Attached: Eyes ni i i i I
A building permit may be required by: }'0y1\‘ c ip 615 . Lai See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions
u.)
, hi- b e 7-- L.,„. ,./ v (
Agen or Applicant Priced Name Permit Officer's
i
Signature **Please read compliance statement on back of permit ee Signature
g P
— /9 o 1
Application Fee(s) Check# Issuing ate Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to thepermit officer when the project is inspected for compliance. The
P P
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-390 I Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/I7
, .t.,,, 0
WCAMA/ E DREDGE & FILL No 79740 A BCD
GENERAL PERMIT Previous permit# '
�� "New Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC .
❑Rules attached.
Applicant Name Project Location: County
Address Street Address/State Road/Lot#(s)
City State ZIP
Phone# ( ) E-Mail - — Subdivision
Authorized Agent- City ZIP
Affected ❑CW ClEW ❑PTA ❑ES ElPTS Phone# ( ) River Basin
AEC(s): ❑OEA Li HHF C IH ❑UBA ❑N/A Adj.Wtr. Body (nat /man /unkn)
❑ PWS:
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body
Type of Project/Activity
(Scale: / )
Pier(dock)length
j I.
Fixed Platform(s) I
Floating Platform(s) ' I
Finger pier(s) i-////// 1 1 I. 1 1 , ;
Groin length 1 t _
I
number i f ' —� --- i -
� f
' -- — --
Bulkhead/Riprap length i j "'�` —` —'_
avg distance offshore , „
i _
max distance offshore I 1 1 1 I
Basin,channel -
.. k i 1 . I
cubic yards - - //J It
i , f
Boat ramp
Boathouse/Boatlift ! --- — —._........ , ' , . .. ..._t a
_ _ : .. -4 - - .- _ j _ - - -- - - -
i '
Beach Bulldozing — -----1 1 ---- i .
Other __ " 1 jj
t r f
4,
Shoreline Length tr f� ', •
? i I. >
SAV: not sure yes no t 1 `
- i
�y_ I
Moratorium: n/a yes no;
Photos: yes not T____...
•
Waiver Attached: yes no
A building permit may be required by: ' . EISee note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions 9,
Agent or Applicant Printed Name PermitOfficer's Printed Name
Signature **Please read compliance statement on back of permit** Signature
ry /
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(9 I 0-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan, Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
ROY COOPER
_. Governor
MICHAEL S. REGAN
r Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY
Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
1.. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
Pre-project site conditions: 4)/, /7211i714,1L or 7��,v
teli &JAZ-A,
By your signature below you agree to be held responsible for meeting all of the conditions listed above nd verify
tha I information provided is complete and accurate.
y cc 2, /--c.1/J �r-c is ez,
rt or Applica, inted Name Pe it s Signature
j r4Jr L 1�` ma's' /91/6. ./Agent or Applicant Signature Issue
CAMA GENERAL PERMIT#: -7 9/90 i-3
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington,NC 27889 1252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-3845I 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808
ADJACENT RIPARIAN PRCearty Duza.v2kamin-
ilerek4 '.'`flak n=icitr=,'.7=13P -7 aCriaCela 3LkIdi4 O1± -•.,
i. rne Gi' aPzzcrf----------
)11)h-t- VO-14-
(Address.La' Block,Read, "- .
zit NAAAR ?,Lk2A
RiaterbedY) , iCatfaCwal andfor CouR4) -
1`PC aPPIZEirtiMS tiem,Ifthets tn gi--e-,2s Shcam telorc ti•!3-,_dc-u- Virrtlt psnpor "at tha above
toexd.,7z/-
i tva.ve 00-1**-.14-.^-41 1a Tus .opt :1,
DESCRIFTWX ANOKA DRUMM OF PROPOSED DEV8,0PINIENT
(kwavidlitiPiiii*jarga 7--iikiilantinitstiiii in desert-00n belawrOrligaiertipiaiiiiiiiitivi
6,4 ct_.661-7 ,
/
n1,,,,,_ RvIa-fe_
-, atioc_
,_
proeacc,1 ..
1;4_11_
-wimpHt-sEcTioN
I 2.Elder- 1d.=: a el doCk_rrmatk1p ptings - c. ramp_
mist e.. s..-- fr:kir-l-a---ici-ra.Nrcfmtninace 1E':ix.,:.
of-rat‘.1.ii Q vie-0,-----...-5... back_lvola mint;ii. d it4e=a3,t3 s- .1;4 biaTik- 4alt... a_i 1' I dia IhliSAI 11)we 15'Selbs6c.7 .1...11-:=..-Twrz.
_ I do not 90 ,1 ta waive 1-F....15-setteck r.2..%TJeri.
- ) I_Acijaceilt PraParty Owner infolaselioo)
.‹)
------
. -irl-p:ii 4.‘,./i 4‹
Ijisi 4721-1,370,1,-11__ AA- MO
?vs-
::,•'''--•.3..Wzil:-.,w _
7(1-
ilveciscophrewilwrismairatilm& 11._ie1.3,ria-",kmalterizale:3.,.. et . ---
.c-/J-14
_- _____.
:-.1.•• • - -
f!..:• elAia 3 ,r.-;
-t.zs-r-d ta- ra m*..__ thr ys... .-.-4.---•--anjna•a---Er _._
•
From: claudia beland claudieb216@gmail.com C$
Subject: Re:Best Lane Project
Date: May 10,2021 at 5:28 PM
To: Brandi Robertson brandiprobertson@gmail.com
Thank you Brandi.We have reviewed your email and have no issues with Mr. Best's Project.
Claudia and Rich Beland
104 Best Lane
On Mon, May 10,2021 at 4:10 PM Brandi Robertson<brandiorobertson@gmail.com>wrote:
Dear Ms. Beland,
We have been contracted by Mr. Buddy Best to install a boat lift on his property at 114 Best Ln. As part of the permitting process
we are required to notify the adjacent property owners about the proposed project. I have included a rough sketch.
Please respond to this email confirming that you have been notified about the proposed project. If you have any questions please
feel free to contact me if you have any questions. If you have any objections please contact Mr.Kent Vaughan with the Dept.of
Environmental Quality at 252-948-3853.
my r.cerviYa_sam.mows,•4o.ala► Ot3l t
iro..
MdM
`M Mb Ara nrmsl
egioMem
3ClCIl17bl AMNON 0RAMr10 ty/odoV V IL
8• are..errriM"
Talk .
Pry+ io.P"Alt
J Axk.
GM M rl ra•..rr d M SM.A ears d4•01.
4 Ors...do wall per swat r/r,/MOr NM IMP
I r rr rr•aMrM/N r1ll.0
I de ma.r.le woo. IwAI+a
Weer. Mm111.74
M mos;MO a/Mom
Thank you,
Brandi Prescott Robertson
B Prescott Marine Construction, LLC
252.249.0149
brandiprob, -;on@gmail.com