HomeMy WebLinkAboutHilton (4) CERTIFICATION OF EXEMPTION
\/-
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
Applicant Name ` I, M lA \ \. r‘ Phone Number >5,3- 3' U
Address 3t C.1,.tt-, ^r \irtv',. 'ur,dc
City L 1•-%. o r+� State tv L) Zip �Pt4L,
Project Location(County, State Road, Water Body, etc.) 3 r kA,n c-,0 tr .- (Q c.n t t L.o-1-
F'u\4 1%.41‘`•\ Cr,urt �er‘ `-! L4U ¢ c-t-9tc" ) , `^4 . ...)61,4s \v,pPtl
P, ` C5t..,1tL..k Crec K
Type and Dimensions of Project Zu11<-''pc 6 / rc �-w;c (N„‘rA t,, fl 1` Pcrc.)u,r,6(1 p( t, ose d
\,1 v L
The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is
above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiration,
quirement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be necessary
CAMA permit requirements does not alleviate the necessity of to continue this certification.
your obtaining any other State, Federal,or Local authorization.
SKETCH (SCALE:
a0T I ,_ )
:7)(. -S4-1:', ` M rSk _ V
\' ( r
4 f ‘ir _ _ _ •
)00
`c cc`^ ed lc vc
,
,
1
Any person who proceeds with a development without the con- �r y/1 f�.�
4
sent of a CAMA official under the mistaken assumption that the Applicant's signature- xpg,
l T
development is exempted,will be in violation of the CAMA if there
\--<)r4j4"..C2:<7
is a subsequent determination that a permit was required for the /
development. / CAMA Official's signature
The applicant certifies by signing this exemption that (1)the ap- (\` , {� �`'`1 t� I 2 UCH G
plicant has read and will abide by the conditions of this exemp-
tion,and(2)a written statement has been obtained from adjacent a-.Lt I { -)c�h 0
Bert W. Miller
General Contractor
N. C. License #40230
4354 Polly Gully Ct. SE
Southport, N. C. 28461
Phone (910) 253-5272
May 18, 2000
St. James Plantation
P. 0. Box 10879
Southport, N. C. 28461
I will soon start building on Lot 23, Section C, Polly Gully
Cousrt S.E. , St. James Plantation, N. C.
According to CAMA rules I must notify the adjacent property
owners that I intend to erect a bulkhead (retaining wall) similar to
those on other properties that abut the marsh. The purpose of the
retaining wall is to control erosion of the soil surrounding the
structure.
If you will please sign and return the attached copy to me ASAP,
I can proceed with the CAMA application on behalf of my client.
Thank you,
Bert W. Miller,
Builder
Recipient's Signature:
r Bert W. Miller
General Contractor
N. C. License *40230
4354 Polly Gully Ct. SE
Southport, N. C. 28461
Phone (910) 253-5272
May 18, 2000
Walter & Joan Madsen
4402 Polly Gully Ct. SE
Southport, N. C. 28461
I will soon start building on Lot 23, Section C, Polly Gully
Cousrt S.E. , St. James Plantation, N. C.
According to CAMA rules I must notify the adjacent property
owners that I intend to erect a bulkhead (retaining wall) similar to
those on other properties that abut the marsh. The purpose of the
retaining wall is to control erosion of the soil surrounding the
structure.
If you will please sign and return the attached copy to me ASAP,
I can proceed with the CAMA application on behalf of my client.
Thank you,
Bert W. Miller,
Builder
Recipient's Signatures: �0` AL.;c_