Loading...
HomeMy WebLinkAbout79172_Kevin & May Casey_20210505 S 411'E CAMA/ ❑DREDGE & FILL r-" t „\(J. 3 (0C No 79195 ')A , C D GENERAL PERMIT Previous permit# r-'• 11 )Cew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued /1i�f 1 As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC 11//2° . d;,Ri)ies attached. /1( , ( Applicant Name ���� �lf'4—ky J l Project Location: County I—I,, ' i , Address ; «7c / Street Address/State Road/Lot#(s) /4/ !��' i City / `/1-''7 t- 77,. State AC- ZIP ` `7)/r'j Phone# (i ( / : 1 j`, E-Mail Subdivision ______ Authorized Agent iin e- -� /)City ,%.--r•l- 'Tha t ZIP 2bCs/ 0 Affected ❑CW ❑EW PTA El ES ❑PTS Phone# (7 ) (r-- / U/7 River Basin ,AL----, �',� AEC(s): ❑OEA ❑HHF ❑IH ❑UBA ❑N/A Adj.Wtr. Body /^1 *ter4"` •<. / "re. gnat an /unkn) El PWS: Closest Maj.Wtr. Body ./L c -- ORW: yes / no PNA yes / no_ ' i w/ / Type of Project/Activity x (Scale: / / 3 0 ) Pier(dock)length , i 1 Fixed Platform(s) z/ 5 ■ &t 11lNa I■.. , ■■ • I 111115, Floating Platform(s) / I ►1:- IIII_ • 11�� ,1H... __i!.f,,! liif..,I 1 ��� Finger pier(s) Groin length II number ........... H_1, 41"; t1I:, { Bulkhead/Riprap length - { . -._ avg distance offshore ■ ■■.■ ��E' 1,� I!'�! `M= max distance offshore / , Basin,channel / cubic yards / ' I Boat ramp 1 I ; 41 l j i . Boathouse/Boatlift IIi Beach Bulldozing / II li ■ 111111 , , ,: I Other 1 '1, E . , Shoreline Length �` r b c1 4-' ' 4 1 liiiE N. SAV: not sure yes no -- �, p i —tea ._.... — ' ' '�� 1_ .._ I- Moratorium: n/a yes no r 1 ,�; I Photos: yes nr. i Waiver Attached: yes n• ! ' / 11 ! 1 1 A building permit may be required by: {"Jr.�. 'i C_ rJ ( O . . KSee note on back regarding River Basin rules. (Note Local Planning Jurisdiction) 1 Notes/Special Conditions ( 'ram "/r*'" 2 -1-4 Tr A KA ( C,, 1S6T1 / .-/ vi",,,....7 te,,,,....._ Applicant Printed Name PermitOfficer's P' N — /6..,k -cG1 - / Signature Please read compliance statement on back of permit** Signature i4 r .0 Application Fee(s) Check# Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-648 I Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 Fax: 252-264-3723 (Serves: Brunswick,New Hanover, (Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet- Dare,Gates, Pasquotank and Perquimans and Pender Counties) Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 •. CAMA / El DREDGE & FILL �N, 1:t 1 )5 3 (0c 79195 A C D GENERAL PERMIT � �t '(1 Previous permit# ',j7-1 > ❑New III Modification IA Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC . ElRules attached. Applicant Name Project Location: County Address Street Address/State Road/Lot#(s) /4'1 City State ZIP Phone#( ) E-Mail Subdivision Authorized Agent City ZIP ('-1 Affected ElCW ❑EW ❑PTA ❑ES ❑PTS Phone# ( ) River Basin ' ; AEC(s): ❑OEA ElHHF ❑IH ❑UBA ❑N/A Adj.Wtr. Body (nat /man /unkn) ❑ PWS: ORW: yes / no PNA yes / no Closest Maj.Wtr. Body Type of Project/Activity _ (Scale: / . eI )v Pier(dock)length ') % • r - � Fixed Platform(s) ti'I,.., Y K--': i ; �.} a.1 v e.� r i Floating Platform(s) J 1 ._• , ; 1 .� — ..__ ...._— Finger l � 1 -- Finger pier(s) _ 1 ,. 1 Groin length I: II / w. number -- / r._...- .-1 Bulkhead/Riprap length , I 4 r avg distance offshore I ii L..r`a 'Y''Cj max distance offshore I , s '4 / Basin,channel j i i ‘1I i cubic yards .I !,--- 1 Boat ramp ��� i / Boathouse/Boatlift ---..__ _.__..._-.. - ,�,{......._ 1 f 11 i 1 Beach Bulldozing _.___ iWI 1 1 i $ n; Other Shoreline Length ! (" ! i t j J f • `'} SAV: not sure yes no — --- - --- I -..ra - 1 - Moratorium: n/a yes no,27 t I 1 I _ ; Photos: yes n I i I 1 L. —:...... . 1 I Waiver Attached: yes no - - I ( }}�� , A building permit may be required by: I" r; . L�II See note on back regarding River Basin rules. (Note Local Planning Jurisdiction) Notes/Special Conditions !,, - h)IA11Aj K( �' 13(- , r o.-, 1,/ ;t ram. Agent or Applicant Printed Name > f Permit Officer's Printed Name Signature **Please read compliance statement on back of permit** Signature / ° .t t, ` { Application Fee(s) Check# Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648I) or the Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-648 I Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 Fax: 252-264-3723 (Serves: Brunswick, New Hanover, (Serves:Camden, Chowan,Currituck, Onslow-South of New River Inlet- Dare,Gates, Pasquotank and Perquimans and Pender Counties) Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 ROY COOPER Governor MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance andmonitoring efforts. \ • Pre-project site conditions: i_c7 / 1 5 r�J LAD ‘`- \'( � bk 1 c\.� Q (r O l -e o By your signature below you agree to be held responsible for meeting all of the conditions listed abov nd verify that all information provided is complete and accurate. Agent or Applic Printed Name Pe it Offi is - nature : zQz Agent or Applicant Signature Issu ate CAMA GENERAL PERMIT#: 7 9/ / State of North Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington Square Mall Washington.NC 27889 1252-946-6481 Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-3845 1910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808 ADJACENT RIPARIAN PR OWNERSTATENEWE heretri ceflifv btr.I am T-71121: adiaCeE4'tO-TIT vr+(A' K.A-4ky...1111citoivt _:: �n� (" ( i 1 �� (Address,i_.gii Mack,R ) Waterbuck) . ;�_(�l Vl 1CityiTown dlor Co (ty�_ E aek ;2 has sec CD mr,as wt xb+x_ ti 3ev ►1 ,r 's ^at the above tom. t ^ve Obj1. 11 VIIS 1:_i.a.urYl_ nave aLte- ivnB to WdS_xis 1 .- ..... .... .".."".. ...""---DESCRIPTION ARMORDRAINING flF PROPOSED DEVELOPIIIIE I-1 dil a vo-i _irl ni(Aijsktk-o-y pi-dperly Gold be_ ro, r�y H e Us C PrdeaCeZ/ D p l v e VT buQl Licit S. A, P(41-- L nit'I k �� �� H -WAIV. -SECTION I �' :7,-;%a a'S'£:Y_etacC irr-o?gv p raq h(:) :temp. _ 4iw, toecrzuse.�i'sT;or.. , 31 t a ..{a tte E'i i of 1�7v'"7L T:4'dtb;�•iT LTz a LV��:L'Iry frk-:_Of yoe witil 1s'. -ve it's .you must initial the -u,,p, bia crv_ IdQwiSh10 waive ate;5' I do not vi`i t)!.turn iia 15-setback ieguirerrerri (PropettyOwnel ) Omar-[ii7Pi-r°741;0/t1�$ Pfizf=____P____a_d_- i'd o//a _ , Sigiusnres _Lae MQ dL71 .714Zb 7.- CPS/ 3 1-727 . - m hxniine1errea ='a=�for me r p •.- Z•e' rr r; ,?r ;� From: David M Goldberg auberg64@aol.com Subject: Re:Best Lane Project Date: April 6,2021 at 5:45 PM To: Brandi Robertson brandiprobertson@gmail.com Thank you for the heads up. Dave Sent from my iPad On Apr 6,2021,at 1:46 PM, Brandi Robertson<brandiprobertson@gmail.com>wrote: Dear Mr.Goldberg, I hope you are doing well and are getting down here to enjoy some of this good weather on the River. B. Prescott Marine Construction has been contracted by your neighbors Trent and Kathy Holland to install a dock on their property located at 14 Best Lane,Arapahoe, NC. As part of the permitting process with the state of NC we must Notify Adjacent Property Owners of any proposed development. Please accept this email as that notification. Attached is a form that includes a rough sketch of the proposed project. Please feel free to contact me if you have any questions. Please respond to this email confirming that you have been notified about the upcoming project. <I MG_4150.jpeg> Sincerely, Brandi Prescott Robertson B Prescott Marine Construction, LLC 252.249.0149 brandiprobertson@gmail.com From: Kathy Holland katarinaholland@att.net Subject: Re:Sign off on Permit for 14 Best Lane Minnesott Beach-Trent and Kathy Holland Date: April 29,2021 at 4:10 PM To: Brandi Robertson brandiprobertson@gmail.com Hi Brandi, Yes you have our permission to move forward with a dock and groin permit. Thank you, Trent and Kathy Holland On Thursday, April 29, 2021, 11:47:44 AM EDT, Brandi Robertson <brandiprobertson@gmail.com> wrote: Dear Mrs. Holland, Please respond to this email confirming that I have permission to act as you Authorized Agent. This will allow me to obtain the permit for your dock and groin project on your behalf. Please feel free to contact me if you have any questions. Thank you, Brandi Prescott Robertson B Prescott Marine Construction, LLC 252.249.0149 brandiprobertson@gmail.com On Apr 29, 2021, at 6:42 AM, Kathy Holland <katarinaholland@att.net> wrote: Hey Brandi, It was good to see you the other day. We haven't received by email the request for permit we were to sign off on. I didn't know if you'd sent and didn't go through? I'll be on the look out for it to come. Thank you, Kathy