HomeMy WebLinkAboutOak (38) . /, � CERTIFICATION OF EXEMPTION 6C2.-
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmentall! concern pursuant to 15 NCAC Subchapter 7K .0203.
Applicant Name ( �10IIA vT VQri�5-44v Phone Number q1D) 2 7$-5c�1/
Address r l 6 0 I E. k. _l- s�G.1 t D r
City ' ' tate Aj(e_ zip ,Zq L S
Project Location (County, St e Fjo�d, Water Body, etc.) 0 r J P4
d u L "\ ft 4.t �L( A/1 on 0 /. 44 ) r-_.)4 ,/mil,
v0`J A + /
Type and Dimensions f Project ti ,r- 0 4 f'\. S /u,l c? ki r 4 . C.( l c P► pu r' Lilal l l
n I-
Ci5 PQr U4- ! 4rla V, , y --r- w ri aCr+ P S f riDi2r1
The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is
above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiration,
quirement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be necessary
CAMA permit requirements does not alleviate the necessity of to continue this certification.
your obtaining any other State, Federal, or Local authorization.
SKETCH (SCALE: )
9 e ( /"'") k Ct l, le
Any person who proceeds with a development without the con- /144 ,
LAea
sent of a CAMA official under the mistaken assumption that the Applicant's signature
development is exempted,will be in violation of the CAMA if there /j ("�/
is a subsequent determination that a permit was required for the ` ( (A
development. CANMC cial'stsignature
The applicant certifies by signing this exemption that (1)the ap- 3 f /�... V 0
Issuing date
plicant has read and will abide by the conditions of this exemp- t �_ D
tion,and(2)a written statement has been obtained from adjacent � ' /
TOWN OF OAK ISLAiVD
DATE: —
THE FOLLOWING ARE DETAILS TO SUPPORT A REQUEST FOR A CAMA PERMIT TO
RESTORE THE BEACH ACCESS AT
LOCATION: b\)
go�
NT
5Gi3
ss
Total Volume of Stone Required �� Cu Yds
WORK TO BE DONE:
1. First remove any debris,existing parking blocks,all old signs,etc. and clean up the area.
2. Trim back shrubbery,if necessary,to maximize parking in the area as outlined above.
3. Grade the area outlined above(area will be marked with stakes at the site)to an
approximate level condition with a slight down slope from the street edge,if possible. If fill
is required,it shall be compatible fill provided from an upland source.
4. Place a 4"base of to 1 '/4"stone. Add a top coat of half rock and finish grade smooth.
5. Place new parking blocks for angled parking. Parking should be set for both sides of the
area if at all possible.
6. Place sand fence on the landward side of the dune,oriented to guide people to the beach
access point and prevent walking over the dunes.
7. Place the"Beach Access and Stay Off Dunes"sign next to the access point on the landward
toe of the dune. If the access is also a vehicle drive on point,then also place the"Emergency
Vehicle Access Only"sign. (NOTE: INITIALLY,THESE WILL BE THE ONLY SIGNS
PLACED AT ANY BEACH ACCESSES.)
8. Lastly,remove the concrete barriers from the site and return them to storage by the Airport
Maintenance Building.
.<)?1.-QA1sj