Loading...
HomeMy WebLinkAboutFlohr (4) J CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commissio in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0202. ft Applicant Name 1Y. ts.) 1—Lo 2. o 1- y MYU�Tt Phone Numbe sa 2&�o O6a Address b Ce4 ZSLrrun City 1 c State N C Zip Project Location(Co unt tate oad, Water Body, etc.) � .�. ► ie-v.) t4 ti (y1r-e r p p • 4 Type and Dimensions of Project —Ate' l 1°YZ� _, c(2t�L cLt, `c 1 t( -1-6S' The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiration, quirement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be necessary CAMA permit requirements does not alleviate the necessity of to continue this certification. your obtaining any other State, Federal,or Local authorization. SKETCH (SCALE: IS ) i k o A °a 4 • ,,,,,s, __) . a ? 11 ill 45 I , Any p erson who proceeds with a development without the con (/.46tM' sent of a CAMA official under the mistaken assumption that the Applicant's sig to ._..a,._,...1:.__ development is exempted,will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. CAMA Official's signature The applicant certifies by signing this exemption that (1)the ap- Issuing date plicant has read and will abide by the conditions of this exemp- tion,and(2)a written statement has been obtained from adjacent t c9. ' ' F J 5 Marine Contractors, Inc. Capt. Ed Flynn P. O. Box 868 Durwood Sykes Wrightsville Beach, N. C. 28480 Phone/Fax 910- 256-3062 e-mail efly@msn.com DAn) NoOt gl),41-:11)" i 6�'�'�- �,/1rr o 1)),),A4.04j5411) 0(-- zap 1 /40 4 [LYL L; „Ts__ EC3:731 by." SEP 2 0 2000 get)izv DIVISION OF a6��dC COASTAL MANAGEMEN Atkyq,5 n I J Piers Bulkheads Floating Docks Pilings Repairs Boat Lifts Complete Marine Construction Service For Over 25 Years