HomeMy WebLinkAbout79084_Frank Seymour_20210407 0 s CAMA/ DREDGE & FILL .3:2)44 d f No 79084 A C D
GENERAL PERMIT I Previous permit# P-14
Yam--= ZINew III Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued NJ/4
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC 0 I-I • ) 0 .
(' X Rules attached.
-F Applicant Name R 4 1-1 K SE y V"C O LA IZ, Project Location: County B E'cou-Cc:,r
Address 201 rJ BA Y J L E`-.3 C2,6 Street Address/State Road/Lot#(s)
City '30:1/2 State NC ZIP ,-+S C S V I`,> i.:jG y v' u...
Phone#(9 PI) rjSSG-1 SS r4S E-Mail -. E5 3b'K'4-v^�O?r gnu,i•-' Subdivision sJ/,A
Authorized Agent Robbie Hop V-•>>--5 City a+ ZIP ^ 9,(-=S
Affected ❑CW NfE `? a
X PTA ❑ES ❑PTS Phone# ( I9 ) 6-S0- 1 r n 5 River Basin-rA A/ PArYI i I I-O
AEC s : OEA ❑HHF ❑IH ❑UBA ❑N/A Adj.Wtr. BodyPc-�\+C.a i2 k4 e i
( ) ❑ PWS. �at`/man /unkn)
Closest Maj.Wtr. Body Pa
ORW: yes / no PNA yes / no
'n"k'c( 1 U��
Type of Project/Activity i r,_,, 4. \ ..i';') C7'-/1 1 ;" X )3" 1 oa-/-/,' () .
(Scale: I " 3 p' )
Pier(dock)length .X
1 1 1
Fixed Platform(s) 1 i i ril'AA (0 ;up i=-
Floating Platform(s) ,
Finger pier(s) •
_ , \ _.....
c sl pis .
Groin length { J �
i 17c1�
number �.._.. — —
1...
Bulkhead/Riprap length
avg distance offshore 1 1 • 4 }
max distance offshore I 1 I Ii 1
Basin,channel 11 l e i
cubic yards )Sr*;, i ley
�J� I _ . ii. L + . 1
17 1 k.' �'<j`'k I
Boat ramp , i'
??. is I i
Boathouse/ oatli /7 X _ . . . . i — L. ...._ r_ — f
Beach Bulldozing '. ��'i'X/sj. •
I.
Other �trst�S 1
i / -lq 1 f- I I, i i ,
rf
I ! f
Shoreline Length - (> to
SAY: not sure yes ( tS —._ 1 _ —
Moratorium: n/a yes ® ~ 7 $ �
Photos: yes ® .. 1 \ '(,.
Waiver Attached: no 1 I '
A building permit may be required by: Pf'a,.-^ e k C.C, • . 1X1 See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) ,
Notes/Special Conditions 15 P7)Ca ,1) I<A wn • / 7)7/1( i'11-11 /1// ,i)2 4JJns, (//) ;,„, s)y ! ( /) )7UG4-/,Tf/ k- .
' fishi(y (i# I
Agent or Applicant Printed Name Permitpffjicer s Printed e
Signature **Please read compliance statement on back of permit** Signature
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 9I0-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
0 II CAMA / DREDGE & FILL �D44 (CJ 1 '; No .8'79084 A '. C D
GENERAL PERMIT �`J Previous permit# -
>'( New ❑Modification _iComplete Reissue ❑Partial Reissue Date previous permit issued :./i-'I
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC .
Rules attached.
Applicant Name FF.A t.J \` 5 E'/ 61 C-LA rz, Project Location: County
Address -, -)I 1'D t`.`?t) y q L E W 1 -, 1 Street Address/State Road/Lot#(s)
City _ ,k \ State tiC ZIP +;1 C y v
Phone# ( ) '-,' : - I`.. ,/-,--:-.,E-Mail 3 ;ti.. .,;;: 1„ "" Subdivision
Authorized Agent •Z r..►,,';91 L. j-i -, 'r-, •S City ZIP ~ -1` `` --
Affected ❑CW ICE NPTA ❑ES ❑PTS Phone# ( ) ''4,0- 7 4 c 5 River Basin ' i i`f'0 7/;, C'
❑OEA ❑HHF ❑IH El UBA ❑N/A
AEC(s): Adj.Wtr. Body ri.,,\' > 7'"`e s (nat: /man /unkn)
❑ PWS:
ORW: yes / no PNA yes / no
Closest Maj.Wtr. Body ' ''-' ` ? ' `'
Type of Project/Activity t !
(Scale: f _ .;c' )
Pier(dock)length
I1111 1 1
Fixed Platform(s) {".� Y o {
i I 1 �+� t � +I`D -
i
Floating Platform(s) ; I •' I 14 !
Finger pier(s) L_ �._ A
1 .._ .r....._. .7.__ ! .. __.____._ .. ............. ... 1,y 'a'f 4 ram f... ._I
Groin length �" '�',f / -;,/�e5 ,r ' /t
number �_._.__—___
i } _ __
Bulkhead/Riprap length i {--"'— --- - --,� `'""' �`
1
avg distance offshore i1. 1 }
max distance offshore I
Basin,channel . I • ' I
�\,!L , c.,c"''' S 1•5
cubic yards ' ' Is 1`1` t
Boat ramp �� i — -- j
}
! i
Boathouse/;Boatli 22 —......._j L........................_.........__._...,.
f/
Beach Bulldozing ! ' 'S i _
i i... j- i
I I
}
Other 1 s� S t
1 }
I i f r<,, IA i 1
•
• 1 I' a ! I i
Shoreline Length - L- • —�F"' ' i - •��� r
SAY: not sure yes no ;.- c. ' --- i
Moratorium: n/a yes ^_ �:.� 7 ►�, —
,.., ,,t1/. 1 L 1
Photos: yes not L — f I 1 . .-..� _..-.; t�, ._ i 1._ _.,�.
Waiver Attached: yes no ! 1
j I
A building permit may be required by: /3 'et v•+ .;::r•t Cr • . **1 See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)Notes/Special Conditions i.0 '1,4"k ! 5 n rrrf}}
01 ,�•,!) ' lAI{1 . `'.1
II'?4 )to.: / /.;,n/'t/
i
Agent or Applicant Printed Name Permit Officer's Printed Name
1'.
t_ -,,-_.f,,....-�%�
Signature Please read compliance statement on back of permit`* Signature
' Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648I) or the
Wilmington Regional Office(9 I 0-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford,Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Diretlu,
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
>. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
e r ,. 1
• Pre-project site conditions: 10� IS /P r4,„,) q w�
By your signature below you agree to be held responsible for meeting all of the conditions listed a ove and verify
th t all inform do provided is complete and accurate.
gen A I nt rinted Name Permit O icer's ignature
Agent or plicant Signature Issue Date
CAMA GENERAL PERMIT#: 1 G D f5 1
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington,NC 27889 1252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-3845 1910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to Ytr� �41144
(Name of Property Owner)
property located at 20L5' r gat,
1 • (Address, Lot,ABlo0, Road,etc.) N.C.
on gArr he u �1 V+r , in 1?AY''�
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
local
I have no objection to this propo
sal.
.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
•
(9 �
s ' tr
lav , rD rt1G
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15'setback requirement.
I do not wish to waive the 15'setback requirement.
(Property Owner Information) (Adja t roperty Information)
Signature
t Si 'I g,* \ d w!v
Print or Type�am U Print or T}{pe
Mailing Address eM� M itin Ad re 1��
PkAt ith_ 2 v
City/State/Zi Cit /St te/Zip Q
Telephone_Numbe'r,/�m�i!address Telephgr�e NumbArf email�ddr.
r
CahA
Date Dale* `
(Revised Aug. 2014)
`Valid for one calendar year after signature*
Scanned with CamScanner
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to '�� 4"4♦.~ ��'^••"'. 's
I
O`� �� VI
c 3 , `w(Name of Property Owner)
property located at 2
• tIgo
Address, Lot, lock Road,etc.)
on fkr, `►c0 e. , in (54% , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Ind' dual proposing development must Till In description below or attach a site drawing)
•
*Pr 0,1
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15'setback requirement.
I do not wish to waive the 15'setback requirement.
(Property Owner Information) (Adj ent Prope O r I formation)
Sign tur ,�i1,410‘►r Signature*
A 4
Print or Tye Name Print or Type Name
Zt,/� w Utz �� 2.005- Bay vicw
Ma�ling Add 2 y Mailin�Addrss //` L
Y�� D �J�-� I"
CI,c��rryis��ta�re2ip _ 3 e ,-.�, ��City/State/Zip 027 do g
0- f u
Telephone Nuryber/er it address Telephone Number/email address
j(( *a- -1 a5Z- -y4{20 e1-rkod��s�lid{r►.4;
Date Date* �l
(Revised Aug. 2014)
'Valid for one calendar year after signature*
Scanned with CamScanner
Grandy, Ashley
From: hopkinsmarine82 <hopkinsmarine82@yahoo.com>
Sent: Tuesday, March 2, 2021 12:02 PM
To: Grandy, Ashley
Subject: [External] Fw: Boat lift permit
CAUTION:External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Sent from Yahoo Mail for iPhone
Begin forwarded message:
On Tuesday, February 9, 2021, 5:23 PM, gfs3@embargmail.com<gfs3@embargmail.com> wrote:
My name is Frank Seymour. I give Hopkins Marine permission to apply for a permit for a boat
lift at 2015 Bayview Road, Bath NC. I will be sending signed permissions from my 2 adjoining
neighbors tomorrow. Thanks
Sent from my iPhone
i