HomeMy WebLinkAbout79157_Jimmie Wayne Riggins_20210407 ❑CAMA/ DOREDGE & FILL � NO ,,-
0 (os 15� 79157 A g) C D
GENERAL PERMIT Previous permit# v; r
>' New 'Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued A,
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC O I- . I I (- ' . .
pRules attached.
Applicant Name 5'‘r-- \ L l/3--Y`c +c tCi t rS Project Location: County I�j -- ,k. ;,RI'
Address .:-LD 1-tv5V-. So C-..-ro t4 t/P of itoZ Street Address/State Road/Lot#(s)
City CA YE--1 C rr v 1 L L-E' State N C ZIP c•-• 5301 15 -T'ta c?...\= ]�
di►t)Phone#(AO i Ct•55- li 2.1P E-Mail _ Subdivision N )A
Authorized Agent -2A vi t> e u A-,.l.5, City 1A0&v- vc. AT,1J ZIP c'c "SS.i'
Affected ❑CW ❑EW DITTA ❑ES [OPTS Phone# (' ) C1 - I l-ItoRiver Basin 1 12 / 4
El AEC(s): oEA ❑HHF ❑IH ❑UBA ❑N/A Adj.Wtr. Body Sc,, k S L'cc a el< nat' man /unkn)
❑ PWS:
ORW: yes / PNA yes /� Closest Maj.Wtr. Body j m k I.
4- 2: �.e r
Type of Project/Activity -�NS'fa1I 1 2SS1.
c . •C1Cl.4.► bu\V‹v ' 'a a i 'N 11JC. .
(Scale: I q i i, )
Pier(dock)length r
Fixed Platform(s) T
Floating Platform(s) �1 , • •
Finger pier(s) �■■■■■■ ■■ ��� ,...
1
Groin length i jI!.... HulL
j -i 'Bulkhead/Riprap length - 25 ammo ■ 111111111111111111 ; ••mamma l�■
avg distance offshore IJ' NNE ammo•• I._'.__11111111111111111111111117
max distance offshore ,L' 11110 ' 1
Basin,channel '• 0
IV I
cubic yards , , rk I
Boat ramp • Jflf
._1._...._. ■ 11111.... TTlliiiigp
■ �.__ I; fi
a: ■
Beach Bulldozingii"u'J!!!IiI+
it.. . Siiiii i1
Shoreline Length + - 5 :���� —'l�III■R ; I l
SAV: of sure ; yes no 1
Moratorium: n/a yes o � �
■■■__■ +!I, �'- ;■ { ■ _RIME ■:
Photos: yes ■ ■ 1 t Na.
Waiver Attached: yes o ,.\ I I
A building permit may be required by: ^ •% oc vVQli yi9'}bil X See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) 11 rw Notes/Special Conditions Lt,1- r 5 (0010.:6I.,0{J, <.i 1.....? w✓1 ' G - ,1„, 77e/4..\ /Ve
)1: i d /o b ' b ) I4- T/OM S'O''r0 It I . intr)e,-,4 /G31/L)/.U-,a-A • Cr :1:
)a4I r M Zor1A5 (t)Iw9)la. hl( a4- to
J 1 C Lv A w 5 �,5\11ey 6 RA-s1,�/
Agent orAppf ant Printed N e P icefr's Printed Nam
Signature **Please re compliance statement on back of permit** Signature
'hK --Pe .d 94-b.-�- i13 -/ ' i 1 / 2OZ i - -7 ✓furr - Zoz
Application Fee(s) Check# Issuing Date Expiration Date
i•
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie,Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden, Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
,II1CAMA / LIDREDGE & FIIL :# Wg 15 g No 79157 A 0 C D
GENERAL PERMIT 0 Previous permit# Nil A
�� 'ENew IlModification ❑Complete Reissue ❑Partial Reissue Date previous permit issued 1,1/A
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC C_ - - I-( . j I GC.)
[Rules attached.
Applicant Name ._-eNt.-N, , ',-A3.-j . r ';Z;Ts.t y'$ Project Location: County ,, r)•.•t} `;R'1
Address 2 t) 1-;,,,yy., S- i•c.--t t +4 (r-c-S' it 7. Street Address/State Road/Lot#(s)
City ',- ;/---I";: v 1 L L-& State \1 C ZIP ,)..-'t53C.1 i < ,.2 ;= %.
Phone#(A 1'-,s• ii 2 L E-Mail -- Subdivision )1A
Authorized Agent - 'i u1. -> L—V A*IS City '..A 1?" ,.-c� -kZ ZIP .+ SS(.1'
Affected ❑CW ❑EW [ TA ❑ES L)TS Phone# ( .I)C c1) 4 - 1 I Z� River Basin a/?A Vi1
AEC(s): 0�' ❑HHF ❑IH ❑URA ❑N/A Adj.Wtr. Body , k, - . or. . . (flat /man /unkn)
❑ PWS: �'•v r
ORW: yes / no PNA yes / nos) Closest Maj.Wtr. Body
Type of Project/Activity -- ri•s L...1' 7 4 - . . •:.; 'A 1 L .
(Scale: )
Pier(dock)length
I i 1 '
Fixed Platform(s) d —C A l-%A �'t A K t i i7
Floating Platform(s) 1 tit
Finger pier(s) -----1---- 1 ; I
Groin length .._.......I y number _._ 11 — .. lY
c� _ _. — __.._ i _T _.__ 1_____-' .I
Bulkhead/Riprap length j Z ✓ I �--___.._ —�_ _---
avg distance offshore t'j` I 4
max distance offshore 2.' h!
Basin,channel ( v
. ►^
cubic yards 1 } I }
Boat ramp "i-0� I
Boathouse/Boatlift , , +-._._......_......_......_...._...._._._..._......__._._....._._._...._..-_---_ —.._............_..-..._...__..._.____._....__
i
ri
till
` � N
,
1i
_
L`Beach Bulldozing I � , 4t7 � v
. f .AtOther ,ii r
I 'r} 1 i l
Shoreline Length Z 5
SAY: not sure,i yes no ; . ---,
. ..y,;-.S I '17 1
Moratorium: n/a yes no a '.... 9
Photos: yes tio i
Waiver Attached: yes to_ si , !
A building permit may be required by: ;4-'j (4 �1.4-.,,-1517.1 k . W.See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) - / _Notes/Special Conditions f •5 r't l Imo i .,,.:) i ,W v _'' C" . -'F'Pl✓ -i/;•,S, Meg,
[ ..?,/r ?hartI .-• 4s t?)
+ 11 t V A t•.d S �1-, ► t 12 i.I TO f
Agent
/orAppljtant Printed Name Permit Officer's Printed Names/
,,
Signature **Please re d compliance statement on back of permit** Signature
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
Y
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
kTar-Pamlico River Basin Buffer Rules Other:
r
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penal
ty by DWR of up to$25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing& Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized)flow of storm water runoff throu
gh the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satis
factorily actorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is
expected to be severe, the first ten (10)feet landward (unless specifically authorized otherwise byDCM) from p Y the •
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woodyvegetation. Restoration must be completed
g mp eted by the first
subsequent plantin
g p g season
ason (November 1 through March 3 ) after c mpletion of the bulkh d.
• Pre-projecto w 4 1
site conditions: � � 1li� I q av
if ma f� 17C�� �G' � �C
7. Project Drawing:The drawing on the CAMA General Permit is considered the project d awing of your property
indicating the location of the shoreline stabilization structure and anyassociated clearing,
grading,and constr tion
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the abo listed c ditions an e that II
information is complete and accurate.
Age o Appli t inted a Per ' Of e s Si ure
A-- 71 61 (
Agent or ApprWant Signature Q r Is e D to
CAMA GENERAL PERMIT#: -/
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 27889 1252-946-6481
Wilmington Office 1177 Cardinal nrive E t'Irvington NC 28405-3845 i orn_796_72:5
Morehead City Office 1400 Commerce Avenue Morehead Ciry.NC 28557 1252-808-2808
sig. —LSj
`9n, - r "'7Sz 102--)Tz1 _1(1-779-V1 {,-de)- � �, Qom. cg-c-11.z? rmos..•
1
1
C ity ���f CITY OF WASHINGTON
Waáhinon
ORTH CAROLINA ZONING COMPLIANCE
CERTIFICATE
DATE: 4/6/2021 PERMIT NUMBER: 031234A2021
ISSUED TO: Wayne Riggins
ADDRESS: 815 Park Drive, Washington
ZONING DISTRICT: Residential
SCOPE OF WORK: Install Bulkhead
APPROVED BY: Glen MooreA------
ADJAC , PAR1k4 PROPERTY OWNER STATEME T
'''ititterAl certify that I own prnporiy agtiatent to ,V1(14 19.. 1 ----- ---.4
(P sme of r Owner)
r'ty located at { ) -.._.—.�- ---
dreas, Lot, E ock, ad etc.)
N C
. a.
(Wet body) (City n and/or Co++nllr)
71* applicant has de crIb 'd to me at- athown below, the r)eveloprnrrnt propoeod St the above
I have no obleclio++la,Sims propoael
I have objections an proposal
s_
DESCRIPTION AND'OR DRAWING OF PROPOSE[) DEVELOPMENT
Proposing dev.icprwnt must fill in description below or attach a site drawing)
, Afreo.›. .2:7 ..) ci or It-1-, fl-cif .tiZ'r\46-.?
F` r.
WAIVER SECTION
I understand tat a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or growl
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish b waive the setback, you must Initial the appropriate blank below )
:r� Nish to waive the 15' setback requirement
i do lot wish to waive the 15' setback requirement.
(Props Ow information) (Ad- cent Property Owner Information)
nature 6 S _ Signature• 7
�1 G ., , (D114 J N'S � `') ^ c �'J- .
Print orType Name, - +. (�2 Print or Type Name
_-~�� 1\ :"-n .� L e,4' vN
� Mailing Addre s
Mait�y�ddr y111
%`i r` 4 ' u Sffr1�v v 1"n�,f...-�c�
C ty/Slat 1 __.-_--- Cit /3t�1¢lltp p
P on Nu b Telephope,Number
C-t ��ma' s ! '',� ,'' ' o`
Darr �.__.. ... ._. ,_._--- hurt f
(Revrsed Aug. 2014)
L. 'Valid for one oattnylar fear after signature'
Pr
NO') b L fyi, c
coutievitstimputtry OWNER&TATUM/IT
herabv Certify that i own property aillyouent to . iditIAAlk.- J.!ij.'4 4 „l.0 's
,rOparty local _.,„_eid at ___ ,,. Z,S____-Liar.k—t_NL—).4-11.17 71 tc"elY°jiff" -
1A4Wees, Lot, Bloqk, Roodloto.)
311 ,k1r4., GI,(AL ._ In WCIS r..3........_ ,Coun N C.
(City n end/ott ty)
(Waterbody)
Me 4001C.1ilt hug described to rne 41110 ihown below, Ilia (Inveinfirnenl ProPoeed at the above
Vcstrot},
I have no obiaction to sere proposal
,_...k,<_...._
I Nom oblection• .- — , - ,i,,,-..II
DESCRIPTION ANDOR DRAWING OF PROPOSED DEVELOPMENT
0111001111AMI1 proposing risvolopmerit must fill in description below or attach a site drawing)
z)
/75 1AI/019
:,,,„, ..,. f„,, , • (..
..., ..
WAIVER SECTION
I understand thai a per. dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set bar* a anciimum distance of 15 from my area of riparian access unless waived t)
me. (If you wish to wave the setback, you must initial the appropriate blank below )
I do wit' !o waive the 15' setback requirement.
_
I do not sri-sh to waive the 15' setback requirement
(Prope?y Owner riforrnation) (Adjac Pr arty Owner 7,21tIon)
, .
(
_ --,..-------
NIVit/flirt' e. Sr- ., a
• II,
•....5.5 e / (
--)ent or/I y 0 Nea /C
l-ft.-5 L Ppyr /6r,:izNarruAesrl..
• d2 *.tioil
...lag Ad sS, MZI dress IQ
Y/S g te/Zip City/ Lite, ip 35,...9scx)
fie - 2i4.4/24 _ _
elep on Num er/email Telephone Iu bar I email address - -.
22. /
tt I A9§Qk _
(Revised Aug 21914)
'Valid for one Calendar yew eer signature'
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: TS ,. 1i r--5 Pi( it,-
Mailing Address: ZZ•G- }ktl :-{� vL ris,77N1 192
-Li 4i44,r ;Li. `i , KJ (--- rz-��f)t
Phone Number: Ci() - , - (i2
Email Address: 10,fit(o4oc \C-A- , t-CriA
I certify that I have authorized �W t C `t.()
Agent 1 Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: V c ; nC f k)7 t 01 L.
►''r , nvo ir�5 C Cr(7 a L_
�
at my property located at C,; c- '� f-t-qK \‘- 1 U'L r_uat-e_.1217_,(•) + N C,
2'4t
in ��}si t,,PBX'1` County.
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application
Property Owner Information:
r r.
Signatur1i `
-coAe I 1 ► 1. F'Lie-,_ t r
rrint or Type Name
Title
Date
This certification is valid through LJL( ` _