HomeMy WebLinkAbout79147_Jason Caplen_20210330 "R-5
❑CAMA/ ❑DREDGE & FILL —'�'-1*�9" No 79147 A S C D
GENERAL PERMIT I-�"[ Previous permit# t'
>� ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued .4//.
As authorized by the State of North Carolina, Department of Environmental Quality // Zr.,
� r J,G
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ./vUj G' , / d
/; ,.p Ii Rules attached.
Applicant Name Je ,, C /'/ , Project Location: County :• •r• ... /c ./ Co
Address / / C (e4 ). l -c / r, ( f," V: / Street Address/State Road/Lot#(s) /2 / C)/J ,e;,?,, L,
City �. 7l- t., State V( ZIP -2?1/ /„.•: . ( / <-i i,/ ;
Phone#( ) y ' ' `/C E-Mail 1 6-' '.I .1036/_, fc.• Subdivision 4,
� /
Authorized Agent /' €i//•r !l k-,- City % - / , ,, ZIP i /i/('❑CW ❑EW [ 'PTAL3'ES LETS Phone# ( ) jRiver Basin /,-, /77
Affected ❑OEA E HHF CI IH ❑URA ❑N/A
AEC(s): Adj.Wtr. Body , „ 0- ,i , /, r Oat /man /unkn)
❑ PWS:
O -' Closest Maj.Wtr. Body i v� ',
RW: yes / no PNA yes / no
Type of Project/Activity ,
. . ,ii, (Scale: ) (, )
Pier(dock)length .3{
Fixed Platform(s)
I --
Floating Platform(s) ■
Finger pier(s) 1---,- pi , �,
•
Groin length 1
number Ill
;ill , 1 TaliN —.
Bulkhead/Riprap length - i 110
1
avg distance offshore •■,1�� . a 1 ����� ��
max distance offshore eiiliiiilil
y
1
Basin,channel r/� ,YL r: �' , HIE
cubic yards 7 0 11111111111111111 1 1 111111....111 _ 111111111111111111111M1
Boat ramp i IuuI11
� ! 111111
l
Boathouse/Boatlift L/",� 5 �1: 1 i 1 1 _
Beach Bulldozing ivi �..
Other : `i : 1 iiffiwif 4. ,iii- yr.,c r/
/', Ay 1111 I jiiiFiAW
i ! !
Shoreline LengthI x 6/ r
/ !
SAV: not sure yes no 1;/f 1 —
Moratorium: n a yes o } -
1 ►: � _
Photos: yes (no
1_ 7
. � d'
Waiver Attached: yes no �� �~ i � `
A building permit may be required by: /1 �'. . ! = i ' ° . [See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) ,Notes/Special Conditions ( 'I/ /70J f G 7f/.f:al, l • ( - ;i f
/616 1 i , . . . ,,
joh, e fr‘C ,I'Z ,: :, /
••-�or •••licant rint Name PermitO7fficer's Printed Name
Signature **P ase read compliance statement on back of permit** Signature
l
-,f7/if-2l %/.)G/.2 ,.
Application Fee(s) Check# Issuing bate Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. I 27 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden, Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
<< c: i .
, 0 eCAMA/
❑DREDGE & FILL --�—jr�-} ' �g�-' ' g' No 79147 A BCD
GENERAL PERMIT Jl�►i--N"f Previous permit#
��—= ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC
❑Rules attached.
Applicant Name Project Location: County
Address Street Address/State Road/Lot#(s)
City State ZIP
Phone#( ) E-Mail Subdivision
Authorized Agent City ZIP
Affected IIICW ❑EW ❑PTA ❑ES IDPTS Phone# ( ) River Basin
AEC(s): ❑oEA CI HHF ❑IH II UBA El N/A Adj.Wtr. Body (nat /man /unkn)
❑ PWS:
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body
Type of Project/Activity
(Scale: I )
Pier(dock)length ,
Fixed Platform(s) f ■u■■■■ u■■■■■■■� ■ ■■■a.■■
Floating Platform(s) ( ■ ■■ ■ 4_4, ■ ■III r- ......._ ■ '
Finger pier(s) ..._....._ f }..........._
•
Groin length `� I v
II
number
Bulkhead/Riprap length i - I ISM lin
avg distance offshore ; r i
max distance offshore Ma 11111111flariiii I 1 ! ! El
Basin,channel I
, , , , Ir
cubic yards . .
Ell ■ _.■■■ _._ ; ■■■ ��
Boat ramp 11111
11 , , ,
Boathouse/Boatliftf„ ,,, ..,
{
Beach Bulldozing MIMI I g liii;
■■■1 / , �1 _.. ` ��, ,. �`
■■ ■■i1 ■■nri ■■■■
Shoreline Length
SAV: not sure yes no 1ir i i i i
---- r. __
I
Moratorium: n/a yes no 1 ....... _.. it jy/
Photos: yes no ! ,_
Waiver Attached: yes no : , i ,�
A building permit may be required by: . I- I See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions
/
(A)bb; f I '14 l rA.(1.
Agent or Applicant Printed Name Permit Officer's Printed Name
t � 1
Signature **Please read compliance statement on back of permit** Signature
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
ROY COOPER
NCGovernor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Direclur
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
• Pre-project site conditions: A,,„ /,,,_,/ A•w,
By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify ghtall information provided is complete and accurate.
d[91')`1 e i-10) • S (7
A: •nt • Ap I' an Printed Name Permit Officer's Signat e
1
gent or pp cant Signature ssue ate
CAMA GENERAL PERMIT#: 7 // 7 5'
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 27889 1252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-3845 1910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808
Staples, Shane
From: hopkinsmarine82 <hopkinsmarine82@yahoo.com>
Sent: Monday, March 29, 2021 9:53 AM
To: Staples, Shane
Subject: [External] Fw: Consent to build boathouse and finger pier at Caplan Property
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Sent from Yahoo Mail for iPhone
Begin forwarded message:
On Thursday, March 4, 2021, 8:45 AM, Jason Raleigh <jasonraleigh2003@yahoo.com> wrote:
Hi Robbie,
In our phone conversation yesterday, you mentioned that you'll need my consent to do
the contracted work referenced in my Feb 11, 2021 email below in order to apply for the
CAMA permit. With this email, you now have my consent to proceed with the work per
the terms that we previously negotiated. Thank you.
Best regards,
Jason Caplan
131 Old Pamlico Beach Rd., W.
Belhaven, NC 27810
C: 919-819-0946
On Thursday, February 11, 2021, 04:35:38 PM EST, Jason Raleigh <jasonraleigh2003@yahoo.com>
wrote:
Hi Robbie,
Shown below is an email from my neighbor just West of our property giving permission
for the boathouse and pier work.
Jason Caplan
Forwarded Message
From: Abbott Dees <abbott.dees@cfafranchisee.com>
To:Winterville FSU <winterville.fsu@chick-fil-a.com>; Jason Raleigh <jasonraleigh2003@yahoo.com>
Sent: Thursday, February 11, 2021, 04:00:03 PM EST
Subject: Re: Caplan Boathouse and finger pier for canal
This sounds great. Its good with me.
1
Abbott Dees
Get Outlook for Android
From: Jason Raleigh <jasonraleigh2003@yahoo.com>
Sent: Thursday, February 11, 2021 10:32:09 AM
To: Winterville FSU <Winterville.FSU@chick-fil-a.com>
Subject: Caplan Boathouse and finger pier for canal
Hi Abbott,
I hope you and your family are doing well. I plan on contracting Hopkins Marine to
construct a 14'x28' boathouse and 4' wide finger pier in the cut-out area of our side of
the canal. If you have no objections to this work, please respond to this email stating
such. Thanks!
Jason Caplan
2
Staples, Shane
From: hopkinsmarine82 <hopkinsmarine82@yahoo.com>
Sent: Monday, March 29, 2021 9:52 AM
To: Staples, Shane
Subject: [External] Fw: Boathouse and finger pier
CAUTION:External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Sent from Yahoo Mail for iPhone
Begin forwarded message:
On Thursday, February 11, 2021, 2:19 PM, Jason Raleigh <jasonraleigh2003@yahoo.com> wrote:
Hi Robbie,
Below is an email from Bob and Kim Watson giving their okay to build the boathouse, boat lift,
and finger pier in the cut-out area of our canal. Thanks!
Jason Caplan
131 Old Pamlico Beach Rd, W.
Belhaven, NC. 27810
C: 919-819-0946
Sent from Yahoo Mail on Android
Forwarded Message
From: "Bob Watson" <watson@compinnv.corn>
To: "Jason Raleigh" <jasonraleigh2003@yahoo.com>
Sent: Thu, Feb 11, 2021 at 12:24 PM
Subject: Re: Boathouse and finger pier
All ok with us at 134 Watson Road i
Sent from Bob Watson - Mobile
On Feb 11, 2021, at 10:28 AM, Jason Raleigh<jasonraleigh2003@yahoo.com>
wrote:
Hi Bob,
1
As we discussed today, I plan on contracting Hopkins Marine to construct
a 14'x28' boathouse and 4' wide finger pier in the cut-out area of our side
of the canal. If you have no objections to this work, please respond to this
email stating such. Thanks!
Jason Caplan
2
Staples, Shane
From: hopkinsmarine82 <hopkinsmarine82@yahoo.com>
Sent: Monday, March 29, 2021 9:52 AM
To: Staples, Shane
Subject: [External] Fw: Caplan Boathouse and finger pier for canal
CAUTION:External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Sent from Yahoo Mail for iPhone
Begin forwarded message:
On Thursday, February 11, 2021, 4:35 PM, Jason Raleigh <jasonraleigh2003@yahoo.com> wrote:
Hi Robbie,
Shown below is an email from my neighbor just West of our property giving permission
for the boathouse and pier work.
Jason Caplan
Forwarded Message
From: Abbott Dees <abbott.dees@cfafranchisee.com>
To:Winterville FSU <winterville.fsu@chick-fil-a.com>; Jason Raleigh <jasonraleigh2003@yahoo.com>
Sent: Thursday, February 11, 2021, 04:00:03 PM EST
Subject: Re: Caplan Boathouse and finger pier for canal
This sounds great. Its good with me.
Abbott Dees
Get Outlook for Android
From: Jason Raleigh <jasonraleigh2003@yahoo.com>
Sent: Thursday, February 11, 2021 10:32:09 AM
To:Winterville FSU <Winterville.FSU@chick-fil-a.com>
Subject: Caplan Boathouse and finger pier for canal
Hi Abbott,
I hope you and your family are doing well. I plan on contracting Hopkins Marine to
construct a 14'x28' boathouse and 4' wide finger pier in the cut-out area of our side of
the canal. If you have no objections to this work, please respond to this email stating
such. Thanks!
Jason Caplan
i